Maintenence Plan Komatsu Galeo Pc14r2 Version 2.docx

  • Uploaded by: Rizki Ilyas
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Maintenence Plan Komatsu Galeo Pc14r2 Version 2.docx as PDF for free.

More details

  • Words: 321
  • Pages: 6
KOMATSU GALEO PC14R2

WHEN REQUIRED No

Part

. 1

AIR FILTER

2 3

CARTRIDGE BATTERY WATER

Adjust

Change



Action Check

Clean





√ √



Lubricate

Ket

SEPARATOR FILTER 4 5

FUEL TANK STEEL TRACK

6

TENSION RUBBER

√ √

Draining √ √

TRACKS 7

RUBBER









TRACK 8

TENSION HYDRAULIC

Bleeding

SYSTEM CHECKS TO BE CARRIED OUT BEFORE STARTING THE ENGINE No

Part

.

Adjust

Change

Action Check

1

COOLANT



2

LEVEL OIL LEVEL IN



3 4

THE OIL PAN FUEL LEVEL OIL LEVEL IN

√ √

THE

Clean

Lubricate

Ket

HYDRAULIC 5

TANK AIR FILTER



CLOGGING 6

INDICATOR WATER



7

SEPARATOR WIRING



8

SYSTEMS FUNCTIONALITY



OF THE HORN MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION No . 1

Part

Adjust

HYDRAULIC

Change

Action Check





Clean

Lubricate

Ket

OIL FILTER MAINTENANCE AFTER THE FIRST 500 HOURS OF OPERATION No .

Part

1

HYDRAULIC

2

TANK FILTER TANK

Adjust

Change

Action Check



√ √

Clean

Lubricate

Ket

Lubricate

Ket



MAINTENANCE EVERY 500 HOURS OF OPERATION No .

Part

Adjust

Change

1

LUBRICATION

2 3

ENGINE OIL OIL FILTER

√ √

4

CARTRIDGE FUEL FILTER



5

CARTRIDGE OIL LEVEL IN

Action Check √







Clean



THE

FINAL

REDUCTION 6

GEARS FINS OF THE





7 8

RADIATOR EXCHANGER FAN BELT





√ √

9

TENSION HYDRAULIC





Only

OIL TANK

for

machines

in

which synthetic biodegradable oil type HEES MAINTENANCE EVERY 1000 HOURS OF OPERATION No .

Part

Adjust

Change

1

HYDRAULIC



2

OIL FILTER OIL IN THE



Action Check

Clean

Lubricate

Ket

Lubricate

Ket



FINAL REDUCTION 3

GEARS ENGINE





VALVE CLEARANCE MAINTENANCE EVERY 2000 HOURS OF OPERATION No . 1 2

Part COOLANT OIL IN THE

Adjust

Change

Action Check

√ √



Clean

FINAL REDUCTION 3 4

GEARS ALTERNATOR STARTER

√ √

Related Documents

Komatsu Hd785
April 2020 8
Komatsu Wb97s
April 2020 11
Komatsu 930e
May 2020 9
Komatsu Pc3000
December 2019 9
Prefacio Komatsu
November 2019 13

More Documents from ""