Ma Tugasan 5

  • Uploaded by: nur shahibah nusaibah
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Ma Tugasan 5 as PDF for free.

More details

  • Words: 128
  • Pages: 2
i)Alphas iii)Zebas

ii)Betas

1000x43 machine hours machine hours

3400x30 machine hours

=43000 =15000

600x25

=102000

Kadar overhead:€ LOH € anggaran machine hours 960000 15000 = 64 machine hour

Direct Material Direct Labour Manufacturing overhead

Alpha 680 900 2752

Betas 300 560 1920

Zebas 730 850 1600

4332

2780

3180

A Overhead dollars 170000 320000

B Activity level 34 400 Eng. change

C Activity Cost 5000 800

470000

5000 units

94

Betas

Zebas

2) Activity Machine Setups Engineering change Impaction & pocking 3) Alpha

Direct material Direct labour Manufacturing overhead Machine setups Engineering changes Inspection & packing Total ABC kos seunits 7000 Traditional 3180

(1000) 680000 900000

(34000) 1020000 1904000

(600) 438000 510000

5000 140000

30600 27200

12000 240000

1000000

11560000

3000000

2725000

14541800

4200000

2725000 4332

4277 2780

Related Documents

Ma Tugasan 5
May 2020 9
Tugasan Ma 5 2003
May 2020 6
Tugasan Ma
May 2020 17
Tugasan Ma
May 2020 11
Tugasan Ma
May 2020 9
Ma Tugasan 7
May 2020 7

More Documents from "nur shahibah nusaibah"

Ma Tugasan 8
June 2020 9
Tugasan 3
May 2020 9
Tugasan 5
May 2020 8
Saibah
June 2020 6
Tugasan 1
May 2020 16
Assgmnt 7
June 2020 6