LAGUNA LAKE DEVELOPMENT AUTHORITY

Consultation Meeting 12 November 2009 Legend Hotel Villas, Mandaluyong City

LAGUNA LAKE DEVELOPMENT AUTHORITY

Laguna de Bay Institutional Strengthening and Community Participation Project

LISCOP – 5-yr development initiative of LLDA

With co-financing support from the Netherlands Government Grant and World Bank Loan Envisioned to support the sustainable management of the Laguna de Bay Basin

COMPONENT 1: Co-Managed Investments for Watershed Development Improve the environmental quality in the region by engaging LGUs/stakeholders in implementing environmental sub-projects.

COMPONENT 2: Strengthening Institutions and Instruments Ensure that Laguna de Bay and its watershed are managed effectively and in a sustainable manner by strengthening the capacity of institutions in environmental governance.

Mission No. 1

Harness and deepen stakeholders ’ participation in microwatershed environment

Mission No. 2 Implement direct and strategic microwatershed level interventions that would contribute towards improvement of the quality of the Laguna de Bay and its watershed

Mission No. 3 Strengthen LGU’s self-governance and reinforce inter-LGU cooperation in the environmental

The 34 Pipeline Sub-Projects in 22 municipalities generated from 15 out of 24 micro-watersheds which have undergone LEAP

= Covered subprojects

SUB-PROJECTS IN RIZAL PROVINCE

= Covered subprojects

Tanay Micro-Watershed Enhancement Sub-Project (P 30.6 M) Key Components: Streambank stabilization Flood Control Ecological enhancement Reforestation Livelihood Coop Formation Pollution management MRF Rehab of dumpsites

Katutubo Village

Pavilion

Status: Operation

Teresa MRF w/ Composting Sub-Project (P 8.1 M) Production Area

Windrows/toxic & hazardous area

Bricks from wastes

White charcoal

Status: Operation

Eco garden

Morong MRF with Composting Sub-Project ( Php 9.9 M)

Admin Bldg

Production Area

Training on the use of the shredder

Status: Operation

Baras Flood Control Sub Project (P 10.0 M)

Status: Construction Stage

Taytay Flood Control Sub-Project ( Php 10.0 M)

Status: Construction stage

(1)Angono Material Recovery Facility (Php 11 M) and (2) River and Lakeshore Protection SubProjects

Status: (1)Pre-operation (2) MDFO approval

SUB-PROJECTS IN LAGUNA PROVINCE

= Covered subprojects

Kalayaan Integrated Solid Waste Management Sub-Project (P 11.2 M)

Sanitary Landfill Category 1

Status: Operation Stage

Sta. Cruz Integrated Waste Management Sub-Project (P 10.4 M)

Material Recovery Facility

Waste Water Treatment Facility

Status: Operation Stage

Status: 100% completed Testing Stage

Majayjay Falls Eco-Tourism Sub-Project (P 34.8 M)

Administration Building

Hanging bridge

Picnic huts; overnight accommodations, function rooms

Status: Pre-Operation Stage

Cavinti Eco-Tourism Sub-Project (P 13.8 M)

Status: Operation Stage

Liliw Community-Based Solid Waste Management Sub-Project (P 4.3 M)

Status: Operation

Siniloan Environmental Enhancement Sub-Project (Php 4.0 M)

Status: MRF:Pre-Operation Stage

Nagcarlan Integrated Waste Management Sub-Project ( Php 5.0 M)

ACCESS ROAD

MRF

MRF WWTF

Status: Pre-Operation Stage

Pila MRF with Composting (P6.0 M)

Victoria MRF with Composting (P5.3 M)

Status: Pre-Operation Stage

Pangil Environmental Enhancement Sub-Project (P23 M)

MRF Site

Status: Construction

Pakil Environmental Enhancement Sub Project (P 10M)

Eco-tourism Site

MRF Site

Status: Procurement of Civil

Mabitac MRF with Composting SubProject (P 5 M)

Status: Construction

SUB-PROJECTS IN CAVITE PROVINCE

= Covered subprojects

GMA Cluster Material Recovery & Composting Facilities Sub-Project (P 16.6 M)

Status:Construction Stage

TYPES OF SUBPROJECTS

Flood Control = 3 Eco-tourism = 6

Waste Management = 25

STATUS OF BATCH 1 SUB-PROJECTS

100 90 80 70 60 % Accom 50 40 30 20 10 0 1

2

3

4

5

6

7

8

9

10

11

No. of LGUs

Tanay; 2. Teresa 3. Morong 4. Liliw 5. Cavinti 6. Majayjay 7. Nagcarlan 8. Siniloa 2. 9. Sta Cruz 10. Kalayaan 11. GMA 17 Sub-projects in 10 municipalities = COMPLETED 1subproject in 1 municipality = UNDER CONSTRUCTION

STATUS OF BATCH 2 SUB-PROJECTS

100 90 80 70 60 % Accom 50 40 30 20 10 0 1

2

3

4

5

6

7

8

No. of LGUs

Angono; 2: Taytay 3: Pila; 4 Pangil; 5: Victoria 6. Baras; 7: Mabitac 8: Pa

4 Sub-projects = COMPLETED 3 Subprojects = SUBSTANTIALLY COMPLETED 2 Sub-projects = PRE CONSTRUCTION

Upcoming Projects MRF with Composting: 3 Paete

:P

5M

Antipolo Lucban

: P 24 M : P 17 M (with WWTF)

Flood Control: 1

Angono River and Lakeshore Stabilization : P 17 M

STATUS: Approved by the MDFO Paete: SPAR for

LISCOP Incentive Package

Micro-Watershed Management Plan

Funding Assistance in project implementation with Loan-Grant-Equity Scheme Project Development Fund of LLDA as a Source of Equity Assistance in securing Environmental Compliance Certificate (ECC) Capacity Building Local and International Recognition

LISCOP Will end January 2010 Working on its Additional Financing There is strong demand from LGUs to finance MRF, Flood Control,Ecotourism Water Supply and Sanitation

FOR LISCOP PHASE 2 Indicative List Rizal Province: Teresa Baras Cardona Pililla Antipolo

Laguna Province:

Batangas Malvar

Cavite: Silang Carmona

San Pedro Alaminos Lumban Rizal Bay Paete Mabitac Calauan Magdalena Pangil Pila Majayjay

Requirements from LGUs to be Eligible for LISCOP Funding 1.Letter of Intent (LOI), 2.Passage of a Sangguniang Bayan Resolution expressing its commitment and support to implement the sub-project, 3.Social acceptance of the sub-project/proof of consultation, 4.Borrowing Capacity, and 5.Proof of land ownership thru valid land documents

Financing Scheme

Green and Blue Sub-Projects Reforestation, watershed protection, river and shore protection

Municipalities Loan

Grant

Equity

Cities

80

0

20

1st & 2nd

50

30

20

3rd & 4th

45

40

15

40

50

10

Financing Scheme

Brown Environment Solid waste management, drainage, sewerage and sanitation support projects

Cities/Municipalities Loan

Grant

Equity

Cities

80

0

20

1st & 2nd

60

20

20

45

40

15

40

50

10

3rd & 4th

Sub-Project Appraisal and Approval DOF PGB MDFO

LLDA LISCOP - PCO

LGUs DOF – Department of Finance PGB – Policy Governing Board MDFO – Municipal Development Fund Office PCO – Project Coordinating Office CTRG – Consolidated Technical Review Group

CTRG Communities

Welcome to the LISCOP family!

For more information, contact: LLDA LISCOP Component 1 Km. 70 Brgy. Bangyas, Calauan, Laguna Telefax No. (049) 568-0099 Email ads: [email protected] [email protected]