Your intro slides with your history and past performance WHY KIC DEV?

Build Envelope (BE) and Roofing Asset Management

Cast-In-Place Concrete

What makes us unique! •

Our heritage is using only what we need and giving back t what we don’t !



We Truly Understand Sustainability !



We look at the Building as an Asset



Our Building Envelope and Design Build approach is: – First – Know what have ( we provide analysis) – Second- Keeping what you have…GOOD ( we will pro triage or plan to keep it functional for years t

What makes us unique! •

We understand that the building is composed of a series of c the strength of entire structure is only as good as its weakes component.



Sustainability : – Restoration – extending life of the asset – LEED- Understanding how to get you there – Green – Using environmental friendly materials – Vegetative- Roof systems

• Let’s review and example of our sustainability

Typical BE Roofing Methodology and Opportun Reality View

Traditional View of Facility Management

Opportunit Lost

 Roof condition versus roof performance



Invest in Green to Green

 Apply resources when pain gets too great



Restoration of Am money

Current Roofing Methodology & Opportunity Lost Average Roof Conditions

After 10-Years, Projected Conditions 25%

30%

30% 45%

30% 40%  Premature deterioration of

infrastructure  Budget uncertainty

 Deteriorate faster than resources can be applied  Budget uncertainty remains

 No change to current approach  Inefficient roof asset management * No programmatic approach * Backlog of maintenance and repair * Poorer performing asset / * No or limited preventive maintenance inventory * Traditional procurement methods

Proposed Performance Driven Roofing / B.E. Methodology Impact:

Recommended Minimum Objective (RMO)

- Establishes Programmatic - Common Levels of Su - New Roofing B.E. Me - Significant increase in per - Reduced life-cycle cost - Budget predictability

15%

Condition Change: 30%

55%

- 83% increase in Green - 25% reduction in Amb - 50% reduction in Red Current Customer / Inventory

Related Documents

Kic Dev Ppt Presentation
November 2019 15
Kic News
October 2019 14
Kic-panels
November 2019 27
Dev
May 2020 34
Dev
April 2020 61
Dev
June 2020 26