Isea Eco-box - Tertiary Treatment For Treated Water Re-utilization

  • Uploaded by: AG-Metal /Tretman Otpadnih Voda/Wastewater Treatment
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Isea Eco-box - Tertiary Treatment For Treated Water Re-utilization as PDF for free.

More details

  • Words: 886
  • Pages: 3
ECO BOX

PRODUCT CATEGORY

TERTIARY PLANT PRODUCT NAME

ECO BOX APPLICATION

TERTIARY TREATMENT FOR TREATED WATER RE-UTILIZATION CAPACITY

FROM 1 TO 200 INHABITANTS EQUIVALENT

Certified Quality Sistem

PLANT DESCRIPTION ECO BOX is the tertiary treatment system for the final disinfection and filtration of treated water. The system consists of a water storage compartment, a sodium hypochlorite injection devise for disinfection and a final filtration with sand and activated carbons filters. The water storage tank is made in polyethylene and designed for underground installation, while filters and electromechanical equipment are housed in a steel cabinet which can be positioned above ground for easy maintenance and operation. Following the disinfection and filtration stage, water can be re-utilized for a variety of different uses e.g. irrigation, safe disposal to the environment (sea, rivers or lakes), or any other industrial and commercial utilization in line with the provision of international standards.

INSTALLAZIONE

STORAGE TANK

The storage chamber, made of a single piece of seamless polyethylene, is the tank where treated water is mixed with the disinfectant solution (sodium hypochlorite) to remove any pathogens still present in the outflow of an activated sludge plant.

DISINFECTION

Sodium hypochlorite is pumped into the storage tank by means of a membrane-dosing pump. The storage tank is designed with an appropriate volume to optimize the contact between treated water and disinfectant reagent for a time period necessary to complete the disinfection of the water.

FILTRATION

The storage chamber is also utilized to feed water to the pressurized filtration stage. A self-priming pump connected to a piping system, is utilized to feed water to the filters at a pre-determined pressure. The pump is lodge inside the steel cabinet and anchor to the floor cabinet to avoid vibrations. The pump’s discharge line is connected to the feed line of the pressure filters. The feed line of the filters is a manifold with manually operated isolation valves to allow forward feed to the filters or, when necessary, backwashing of the filters. Programmed periodical backwashing of the filters is necessary to maintain their efficiency. The on/off operation of the pump is controlled by level sensors placed in the collection chamber. The pump is activated when the water level rises to a point where there is sufficient water to make operation of the pump worthwhile and it de-activates as soon as the water level falls below the level of sustainable operation. Filtered water is generally conveyed into a final storage tank or directly connected to the irrigation system. |Back-flushing water is instead returned to the inlet of the primary treatment system. All these electro-mechanical parts are operated by an electrical panel in the ECO BOX.

22

INSTALLATION EXCAVATION

Dig a hole of appropriate dimensions. The bottom of the excavation must be leveled and compacted with a 10 cm layer of fine sand (grain size 0-5 mm).

PIPING AND FITTINGS

Connect the inlet pipe of the contact chamber to the outlet of the secondary treatment system. Install the piping for the dosing pump to the feed line from disinfectant storage tank. Position the self-priming pump on a horizontal surface, Connect outlet from the self-priming pump to the inlet manifold of the filter. Connect the outlet of the filter to the final receiving vessel.

BACKFILLING

Fill the tanks with clean water before backfilling to avoid collapse of the polyethylene structure. Once the tank is full, dump sand around it and level. For a walk-on solution build a 5 cm thick light concrete layer on top of the tank and finish with a 40 cm thick soil. For a drive-on solution a reinforced concrete slab is required to protect the tank. Accessible manholes are required for inspection and maintenance.

ELECTRICAL CONNECTIONS

Connect the dosing pump and the self- priming pump to the power supply (as appropriate for your model of pump) and ensure that the connections are water tight.

COMMISSIONING

After completion of installation, check that the dosing pump and the self- priming pump are both working correctly.

CHECKS AND MAINTENANCE

Periodically check that no large bodies obstruct the inlet of the disinfection chamber by opening the inspection ports. Similarly check that the out flow of filtered water is free from suspended particles.

MAINTENANCE

Regular filters backwashing with clean water is required to keep the efficiency of the filtration process. The operator must check that there is enough disinfectant solution in the storage tank. Maintenance of the dosing pump and the self-priming pump is required on yearly basis.

23

H

DIMENSIONS & DESIGN

disinfection and filtration

H

contact tank

L contact tank

l

l L

DIMENSIONS & DESIGN ECO BOX - Tertiary plant Code

Item

Equivalent

Contact tank

Disinfection and filtration

lxL

H

(cm)

(cm)

(cm)

(cm)

up to 50

100x144

108

120x200

230

Inhabitant

lxL

H

Filter Filtering media

Tension Q (m3/h)

(Volt)

KW

sand and act. carbon

2

220

1 1

10101

RAD1 220V

10102

RAD2 380V

51-100

137x220

145

120x200

230

sand and act. carbon

2

380

10103

RAD3 380V

101-150

137x220

145

120x200

230

sand and act. carbon

2

380

1

10104

RAD4 380V

151-200

174x215

180

120x200

230

sand and act. carbon

2

380

1

INFO With the installation of an ECOBOX tertiary treatment system downstream of an activated sludge treatment plant, ISEA guarantees the following performance: • BOD5 removal > 95% • Suspended Solids Removal >90% 24

Related Documents


More Documents from "AG-Metal /Tretman Otpadnih Voda/Wastewater Treatment"