Insumos Espigones.pdf

  • Uploaded by: Jorge Armando Arevalo Bartra
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Insumos Espigones.pdf as PDF for free.

More details

  • Words: 293
  • Pages: 1
S10

Página :

1

Precios y cantidades de recursos requeridos por tipo Obra

0301061

Subpresupuesto Fecha Lugar

001 26/01/2019 220909

CONSTRUCCION DE LA PROTECCION RIBEREÑA CON EL SISTEMA DE ESPIGONES, EN LA MARGEN DERECHA DE LA QDA. AHUASHIYACU, AGUAS ARRIBA DEL PUENTE UBICADO EN EL JR. AHUASHIYACU, DISTRITO DE LA BANDA DE SHILCAYO, SAN MARTIN - SAN MARTIN CONSTRUCCION DE LA PROTECCION RIBEREÑA CON EL SISTEMA DE ESPIGONES, EN LA MARGEN DERECHA DE LA QDA SAN MARTIN - SAN MARTIN - LA BANDA DE SHILCAYO

Código

Recurso

0147010001 0147010002 0147010004 0147010005

CAPATAZ OPERARIO PEON OPERARIO EQUIPO PESADO

Unidad

MANO DE OBRA hh hh hh hh

Cantidad

Precio S/.

Parcial S/.

37.9770 99.7240 1,250.6908 198.1136

26.20 21.83 15.96 21.83

995.00 2,176.97 19,961.03 4,324.82 27,457.82

0202010005 0205000034 0205000036 0205000037 0205360018 0229030003 0229220001 0244000021 0254110106

CLAVOS PARA MADERA C/C 3" PIEDRA ZARANDEADA DE 1/2" A 2'' PIEDRA GRANDE T. MAX.=8" PIEDRA PARA ESPIGONES D= 1.00 m AFIRMADO YESO EN BOLSAS DE 20 KG. CORDEL MADERA PARA ENCOFRADOS PINTURA ESMALTE AZUL NOCTURNO

MATERIALES kg m3 m3 m3 m3 BOL m p2 gln

18.1209 822.2130 720.8630 3,504.3800 904.8600 90.6045 181.2090 362.4180 7.2484

4.00 10.00 10.00 40.00 90.00 8.00 0.50 3.50 45.00

72.48 8,222.13 7,208.63 140,175.20 81,437.40 724.84 90.60 1,268.46 326.18 239,525.92

EQUIPOS 0337010001 0348040039 0349040008 0349040095 0349040098 0349040099 0349040100 0349040102

HERRAMIENTAS MANUALES CAMION CISTERNA 4x2(AGUA) 145-165 HP 2000 GAL CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3 MOTONIVELADORA 125 HP EXCAVADOR DE ORUGAS 120 HP 1.00 M3 MOTOBOMBA DE 6" CAMION VOLQUETE DE 15 M3 RODILLO LISO VIBRATORIO 0.5 TN DE 20-40HP

%MO hm hm hm hm hm hm hm

30.3752 63.9029 30.3752 358.3546 49.1175 198.1136 42.7880

80.00 300.00 260.00 380.00 20.00 150.00 240.00

810.61 2,430.02 19,170.87 7,897.55 136,174.75 982.35 29,717.04 10,269.12 207,452.31

Total

Fecha :

S/.

474,436.05

04/03/2019 15:52:34

Related Documents

Insumos Malla
May 2020 9
Insumos Diagnostico
May 2020 7
Insumos Ok.pdf
June 2020 12
Insumos Perfil
May 2020 8
Insumos Espigones.pdf
June 2020 9
Insumos Canal.xlsx
December 2019 16

More Documents from "Rusbel Rios"