KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara www.konawe.kemenag.go.id

DOKUMEN KONTRAK SURAT PERINTAH KERJA (SPK) Nomor : 643/Kk.24.04/Ks.01/5/ 2018 Tanggal : 25 Mei 2018

PEKERJAAN KONSTRUKSI

Instansi Nama Paket

: Kantor Kementerian Agama Kabupaten Konawe Utara : Pemeliharaan Gedung dan Halaman Kantor Kemenag Kab. Konawe Utara

Nilai Kontrak Terbilang

: Rp 184.850.000,00 : Sembilan Puluh Tiga Juta Rupiah

Waktu Pelaksanaan Tanggal Mulai Tanggal Selesai Tanggal SPMK Sumber Dana

: : : : :

Tahun Anggaran

: 2019

60 ( Empat Puluh ) Hari Kerja 4 Februari 2019 4 April 2019 4 Februari 2019 DIPA Kantor Kementerian Agama Kabupaten Konawe Utara

PENYEDIA : CV. Indotal Jaya Jl. Mekar No.07 Sodohoa Kendari Barat NPWP : 01.412.302.0-811.000

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara

www.konut.kemenag.go.id SURAT PERINTAH MULAI KERJA (SPMK) Nomor Tanggal

: :

214/KK.24.11/1/KS.01/02/2019 4 Februari 2019

PAKET PEKERJAAN : Pemeliharaan Gedung dan Halaman Kantor Kemenag Kab. Konawe Utara Yang bertanda tangan di bawah ini: Nama Jabatan

: RIDHA, SE : Pejabat Pembuat Komitmen (PPK)

Selanjutnya disebut Pejabat Pembuat Komitmen (PPK); berdasarkan Surat Perintah Kerja (SPK) Nomor : 213/KK.24.11/1/KS.01/02/2019 Tanggal : 4 Februari 2019 Bersama ini memerintahkan : Nama Penyedia : CV. Indotal Jaya Alamat : Agus yang dalam hal ini diwakili oleh : Direktur Selanjutnya disebut sebagai Penyedia; untuk segera memulai pelaksanaan pekerjaan dengan memperhatikan ketentuan-ketentuan sebagai berikut: 1.

Macam Pekerjaan

:

2. 3. 4.

Tangal Mulai Kerja Syarat-Syarat Pekerjaan Waktu Penyelesaian

: : :

5.

Sanksi

:

Pemeliharaan Gedung dan Halaman Kantor Kemenag Kab. Konawe Utara 4 Februari 2019 sesuai dengan persyaratan dan ketentuan Kontrak 60 ( Empat Puluh ) Hari Kerja dan Pekerjaan sudah harus selesai pada: 4 April 2019 Terhadap setiap hari keterlambatan pelaksanaan/penyelesaian pekerjaan Penyedia akan dikenakan Denda Keterlambatan sebesar 1/1000 (satu per seribu) dari Nilai SPK atau bagian tertentu dari Nilai SPK sebelum PPN sesuai dengan persyaratan dan ketentuan SPK.

Untuk dan Atas Nama Kantor Kementerian Agama Kabupaten Konawe Utara Pejabat Pembuat Komitmen

RIDHA, SE NIP. 198405302011011004 Menerima dan Menyetujui untuk dan Atas Nama CV. Indotal Jaya

Agus Direktur

Surat Perintah Mulai Kerja (SPMK)

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara SATUAN KERJA :

SURAT PERINTAH KERJA (SPK) Halaman 1 dari 2 halaman Paket Pekerjaan : Pemeliharaan Gedung dan Halaman Kantor Kemenag Kab. Konawe Utara

Kantor Kementerian Agama Kabupaten Konawe Utara Nomor dan Tanggal SPK : Nomor 213/KK.24.11/1/KS.01/02/2019 Tanggal 04 Februari 2019 Nomor dan Tanggal Undangan Pengadaan Langsung : Nomor 213/KK.24.11/1/KS.01/02/2019 Tanggal 30 Januari 2019 Nomor dan Tanggal BAHPL : Nomor 188/KK.24.11/1/KS.01/02/2019

Tanggal 01 Februari 2019 SUMBER DANA : DIPA Kantor Kementerian Agama Kabupaten Konawe Utara TAHUN ANGGARAN : 2019 WAKTU PELAKSANAAN PEKERJAAN : 60 ( Empat Puluh ) Hari Kerja NILAI PEKERJAAN : Rp184.710.000,00 Harga Satuan Uraian Pekerjaan Sat Vol Jumlah Harga (Rp) (Rp)

No

PEKERJAAN PENAMBAHAN RUANGAN KANTOR I

PEKERJAAN PERSIAPAN a Pek. Pembongkaran Lantai

M3

0,15

643.320

96.498

b Pek. Pemobongkaran Dinding

M3

1,8

558.000

1.004.400

Jumlah II

1.100.898 PEKERJAAN BETON

a Pek. Sloef Beton 12/15 1

Pek. Beton f"c 24 Mpa

M3

0,09

1.261.770

113.559

2

Besi Polos Ø 10 mm

Kg

12,3

15.000

184.500

3

Besi Polos Ø 8 mm

Kg

5,04

15.000

75.600

4

Bekisting

M2

1,5

170.585

255.878

Jumlah

629.537

b PEK. KOLOM 15/15 1

Pek. Beton f"c 24 Mpa

M3

0,07

1.261.770

88.324

2

Besi Polos Ø 10 mm

Kg

71,9

15.000

1.078.500

3

Besi Polos Ø 8 mm

Kg

4,52

15.000

67.800

5

Bekisting

M2

1,8

257.180

462.924

Jumlah II

1.697.548 PEKERJAAN PAS. BATA

a Pas. Batu Bata

M2

28,4

231.600

Jumlah III

6.577.440 6.577.440

PEKERJAAN PEMASANGAN KUSEN DAN DAUN PINTU a

Pek, Pemasangan Kusen dan Daun Pintu

Ls

1

396.400

Jumlah IV

396.400 396.400

PEKERJAAN TEGEL a

Pek. Pemasangan Tegel

M2

2,4

160.425

Jumlah V

385.020 385.020

PEKERJAAN PLASTERAN a Pek.Plasteran

M2

18

83.540

Jumlah VI

1.503.720 1.503.720

PEKERJAAN ACIAN a Pek.Acian

M2

18

37.475

Jumlah

674.550

Jumlah PEKERJAAN KANOPI MUSHOLA I

674.550 12.965.113

PEKERJAAN KUDA-KUDA a Perakitan Kuda - Kuda Besi Hollow

Ls

1

1.917.440

Jumlah II

1.917.440 1.917.440

PEMASANGAN ATAP a Pekerjaan Atap

Ls

1

1.790.240

1.790.240

Jumlah

1.790.240

Jumlah PEKERJAAN REHAB WC KANTOR

3.707.680

I

PEKERJAAN PERSIAPAN a Pek. Pembongkaran

M3

7

643.320

Jumlah II

4.503.240 4.503.240

PEKERJAAN LANTAI a Pek. Lantai Keramik 30 x 30

M2

4,0

160.425

Jumlah III

641.700 641.700

PEKERJAAN DINDING a Pek. Dinding Keramik 30 x 30

11,1

193.025

Jumlah IV

2.142.578 2.142.578

PEKERJAAN KUSEN PINTU DAN FENTILASI a

Pintu 1 Pek. Kusen Pintu

b

M3

0,03

8.583.500

M3

0,01

8.583.500

257.505

Fentilasi 1 Pek. Kusen Fentilasi

Jumlah V

85.835 343.340

PEKERJAAN KUSEN PINTU DAN FENTILASI a

Pek. Kusen Pintu

b

Pek. Pemasangan Daun Pintu

Jumlah

Surat Perintah Kerja (SPK)

0,03

8.583.500

257.505

1,2

531.800

638.160 895.665

Page 1 of 3

No No

Uraian Pekerjaan Uraian Pekerjaan

VI

Sat Sat

Harga Satuan (Rp) Harga Satuan (Rp)

Vol Vol

Jumlah Harga (Rp) Jumlah Harga (Rp)

PEKERJAAN PEMASANGAN CLOSET a Pek. Pemasangan Closet Duduk

La

1

501.050

Jumlah VII a

501.050 501.050

PEKERJAAN PIPA

b

Pek. Pipa

M1

4

65.105

Keran Air 1/2

Bh

1

15.000

Jumlah VIII

260.420 15.000 275.420

PEKERJAAN PENGECATAN

a

Pek. Pengecatan

M2

20

29.660

Jumlah

593.208

Jumlah PEKERJAAN PARKIRAN MOBIL I

593.208 9.896.201

PEKERJAAN PERSIAPAN a Pek. Pembersihan Lahan

M2

106

15.500

Jumlah II

1.643.000 1.643.000

PEKERJAAN TANAH a Galian Tanah

M3

22,67

70.000

1.586.900

b Urugan Tanah

M3

5,19

51.500

267.285

c Urugan Pasir

M3

2,79

120.000

Jumlah II

334.800 2.188.985

PEKERJAAN PONDASI a

PEK. PONDASI GARIS 1 Pek. Batu Kosong

M3

5,58

2 Pek. Pasangan Batu

M3

11,46

431.940 489.000

Jumlah b

2.410.225 5.603.940 8.014.165

PEK. PONDASI KOLOM 1 Pek. Beton f"c 24 Mpa

M3

0,58

1.261.770

2 Angkur Ø 8 mm

Kg

4

15.000

Jumlah

60.000 791.827

Jumlah III

731.827

8.805.992 PEKERJAAN BETON

a

Sloof 1 Pek. Sloef Beton 12/15 2 Pek. Beton f"c 24 Mpa

M3

0,45

1.261.770

567.797

3 Besi Polos Ø 10 mm

Kg

61,69

15.000

925.350

4 Besi Polos Ø 8 mm

Kg

26,33

15.000

394.950

5 Bekisting

M2

8,66

170.585

1.477.266

Jumlah b

3.365.363 Kolom

1 Pek. Beton f"c 24 Mpa

M3

0,48

1.245.847

598.007

2 Besi Polos Ø 10 mm

Kg

58,38

15.000

875.700

3 Besi Polos Ø 8 mm

M3

24,20

15.000

363.000

4 Bekesting

M2

13,50

257.180

3.471.930

Jumlah

5.308.637

Jumlah IV

8.673.999 PEKERJAAN PAS. DINDING

a Pas. Batu Bata

M2

58,08

231.600

Jumlah V

13.451.328 PEKERJAAN PLASTERAN

a.

Pek. Plasteran

M2

58,08

83.540

Jumlah VI

4.852.003 4.852.003

PEKERJAAN ACIAN a Pek.Acian

M2

58,08

37.475

Jumlah VII

2.176.548 2.176.548

PEKERJAAN KUDA - KUDA a Perakitan Kuda - Kuda Besi Hollow 6 x 8

M1

200

130.773

Jumlah VIII

26.154.667 26.154.667

PEK. LANTAI KERJA a Pek. Lantai Kerja

M3

5,32

841.510

Jumlah 1X

4.476.833 4.476.833

PEK. ATAP a Pek. Atap

M2

68,9

60.000

4.134.000

b Pek. Pemasangan Talangan Air

M1

24,86

60.000

1.491.600

Jumlah

5.625.600

Jumlah PEKERJAAN PAPAN NAMA KANTOR I

78.048.955

PEKERJAAN TANAH a Galian Tanah

M3

2,01

70.000

140.700

b Urugan Tanah Kembali

M3

0,47

51.500

24.205

c Urugan Pasir

M3

0,25

120.000

Jumlah II

30.000 194.905

PEKERJAAN PONDASI 1 Pek. Batu Kosong

M3

0,5

2 Pek. Pasangan Batu

M3

0,71

431.940 489.000

Jumlah III

215.970 347.190 563.160

PEKERJAAN BETON

a

Kolom 1 Pek. Beton f"c 24 Mpa

M3

0,15

1.245.847

186.877

2 Besi Polos Ø 10 mm

Kg

11,10

15.000

166.500

3 Besi Polos Ø 8 mm

M3

7,13

15.000

106.950

4 Bekesting

M2

1,60

257.180

411.488

Jumlah b

13.451.328

871.815 Ring Balok

1 Pek. Beton f"c 24 Mpa

M3

0,04

1.245.847

49.834

2 Besi Polos Ø 10 mm

Kg

4,93

15.000

73.950

Surat Perintah Kerja (SPK)

Page 2 of 3

No

Uraian Pekerjaan

3 Besi Polos Ø 8 mm

Sat M3

4 Bekesting

Vol

2,36

M2

0,78

Harga Satuan Jumlah Harga (Rp) (Rp) 15.000 35.400 257.180

200.600

Jumlah

359.784

No

Uraian Pekerjaan

IV

Sat

Harga Satuan (Rp)

Vol

Jumlah Harga (Rp)

PEKERJAAN DINDING a Pas. Batu Bata

M2

3,52

231.600

Jumlah

815.232

NO

URAIAN

V

815.232

SATUAN

VOLUME HARGA SATUAN

HARGA

PEKERJAAN TEGEL a

Pek. Pemasangan Tegel

M2

1,76

160.425

Jumlah V

282.348 282.348

PEKERJAAN PLASTERAN a.

Pek. Plasteran

M2

15,05

83.540

Jumlah VI

1.257.277 1.257.277

PEKERJAAN ACIAN a Pek.Acian

M2

15,05

37.475

Jumlah VI

563.999 563.999

PEKERJAAN. PEMASANGAN HURUF Ls

a Pek.Huruf

1

4.400.000

4.400.000

Jumlah

4.400.000

Jumlah PEKERJAAN RABAT HALAMAN

9.308.520

I

PEKERJAAN PERSIAPAN a Pek. Pembersihan Lahan

M2

309,6

6.500

Jumlah II

2.012.400 2.012.400

PEK. TIMBUNAN a Pek. Timbunan

M3

148,50

54.000

Jumlah III

8.019.000 8.019.000

PEK. LANTAI KERJA a Pek. Lantai Kerja

M3

52,25

841.510

Jumlah

43.968.898 43.968.898

Jumlah

54.000.298

Jumlah

167.926.766

JUMLAH PPN 10% JUMLAH TOTAL PEMBULATAN

167.926.765,87 16.792.676,59 184.719.442,45 184.710.000,00

Seratus Delapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah INSTRUKSI KEPADA PENYEDIA: Penagihan hanya dapat dilakukan setelah penyelesaian pekerjaan yang diperintahkan dalam SPK ini dan dibuktikan dengan Berita Acara Serah Terima. Jika pekerjaan tidak dapat diselesaikan dalam jangka waktu pelaksanaan pekerjaan karena kesalahan atau kelalaian penyedia maka penyedia berkewajiban untuk membayar denda kepada PPK sebesar 1/1000 (satu per seribu) dari nilai SPK sebelum PPN setiap hari kalender keterlambatan. Selain tunduk kepada ketentuan dalam SPK ini, penyedia berkewajiban untuk mematuhi Standar Ketentuan dan Syarat Umum SPK terlampir. TERBILANG

Cara pembayaran

:

Pembayaran dilakukan dengan cara Termin, Bobot pekerjaan mencapai 55% diberikan pembayarab sebesar 50%. Bobot pekerjaan mencapai 100 % diberikan pembayaran sebesar 95 %. Pembayaran 5 % (Retensi) dilakukan setelah selesai masa pemeliharaan pekerjaan. Untuk dan Atas Nama Kantor Kementerian Agama Kabupaten Konawe Utara Pejabat Pembuat Komitmen

Untuk dan Atas Nama CV. Indotal Jaya

RIDHA, SE NIP. 198405302011011004

Agus Direktur

Surat Perintah Kerja (SPK)

Page 3 of 3

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara

www.konawe,kemenag.go.id SURAT PENUNJUKAN PENYEDIA BARANG/JASA (SPPBJ) Nomor Lampiran

: :

212/KK.24.11/1/KS.01/02/2019 -

Kendari,04 Februari 2019

Kepada Yth. Direktur CV. Indotal Jaya Jl. Mekar No.07 Sodohoa Kendari Barat Perihal

Rp. 184.710.000,00

:

Pemeliharaan Gedung dan Halaman Kantor Kemenag Kab. Konawe Utara

(Seratus Delapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah)

Sebagai tindak lanjut dari Surat Penunjukan Penyedia Barang/Jasa (SPPBJ) ini Saudara diharuskan untuk menandatangani Surat Perjanjian paling lambat 14 (Empat Belas) hari kerja setelah diterbitkannya SPPBJ. Kegagalan Anda untuk menerima penunjukan ini yang disusun berdasarkan evaluasi terhadap penawaran Anda, akan dikenakan sanksi sesuai ketentuan dalam Peraturan Presiden No. 4 Tahun 2015 tentang Perubahan Peraturan Presiden No. 70 Tahun 2012.

Kegagalan Saudara untuk menerima penunjukan ini yang disusun berdasarkan evaluasi terhadap penawaran Saudara akan dikenakan sanksi sesuai dengan ketentuan yang tercantum dalam Dokumen Pengadaan.

Pejabat Pembuat Komitmen Kantor Kementerian Agama Kabupaten Konawe Utara

RIDHA, SE NIP. 198405302011011004 Tembusan Yth : 1. Kepala Kantor Kementerian Agama Kabupaten Konawe Utara 2. Pejabat Pengadaan Kantor Kementerian Agama Kabupaten Konawe Utara Arsip. 3.

SYARAT UMUM SURAT PERINTAH KERJA (SPK) 1.

LINGKUP PEKERJAAN Penyedia yang ditunjuk berkewajiban untuk menyelesaikan pekerjaan dalam jangka waktu yang ditentukan, sesuai dengan volume, spesifikasi teknis dan harga yang tercantum dalam SPK.

2.

HUKUM YANG BERLAKU Keabsahan, interpretasi, dan pelaksanaan SPK ini didasarkan kepada hukum Republik Indonesia.

3.

HARGA SPK a. PPK membayar kepada penyedia atas pelaksanaan pekerjaan dalam SPK sebesar harga SPK. b. Harga SPK telah memperhitungkan keuntungan, beban pajak dan biaya overhead serta biaya asuransi (apabila dipersyaratkan). c. Rincian harga SPK sesuai dengan rincian yang tercantum dalam daftar kuantitas dan harga

4.

HAK KEPEMILIKAN a. PPK berhak atas kepemilikan semua barang/bahan yang terkait langsung atau disediakan sehubungan dengan jasa yang diberikan oleh penyedia kepada PPK. Jika diminta oleh PPK maka penyedia b. Hak kepemilikan atas peralatan dan barang/bahan yang disediakan oleh PPK tetap pada PPK, dan semua peralatan tersebut harus dikembalikan kepada PPK pada saat SPK berakhir atau jika tidak diperlukan lagi oleh penyedia. Semua peralatan tersebut harus dikembalikan dalam kondisi yang sama pada saat diberikan kepada penyedia dengan pengecualian keausan akibat pemakaian yang wajar.

5.

CACAT MUTU PPK akan memeriksa setiap hasil pekerjaan penyedia dan memberitahukan secara tertulis penyedia atas setiap cacat mutu yang ditemukan. PPK dapat memerintahkan penyedia untuk menemukan dan

6.

PERPAJAKAN Penyedia berkewajiban untuk membayar semua pajak, bea, retribusi, dan pungutan lain yang sah yang dibebankan oleh hukum yang berlaku atas pelaksanaan SPK. Semua pengeluaran perpajakan ini dianggap telah termasuk dalam harga SPK.

7.

PENGALIHAN DAN/ATAU SUBKONTRAK Penyedia dilarang untuk mengalihkan dan/atau mensubkontrakkan sebagian atau seluruh pekerjaan, kecuali kepada penyedia spesialis untuk bagian pekerjaan tertentu. Pengalihan seluruh pekerjaan hanya diperbolehkan dalam hal pergantian nama penyedia, baik sebagai akibat peleburan (merger ) atau akibat lainnya.

8.

JADWAL a. SPK ini berlaku efektif pada tanggal penandatanganan oleh para pihak atau pada tanggal yang ditetapkan dalam SP. b. Waktu pelaksanaan SPK adalah sejak tanggal mulai kerja yang tercantum dalam SP. c. Penyedia harus menyelesaikan pekerjaan sesuai jadwal yang ditentukan. d. Apabila penyedia berpendapat tidak dapat menyelesaikan pekerjaan sesuai jadwal karena keadaan diluar pengendaliannya dan penyedia telah melaporkan kejadian tersebut kepada PPK, maka PPK dapat melakukan penjadwalan kembali pelaksanaan tugas penyedia dengan adendum SPK.

9.

ASURANSI a. Apabila dipersyaratkan, penyedia wajib menyediakan asuransi sejak SP sampai dengan tanggal selesainya pemeliharaan untuk: 1) semua barang dan peralatan yang mempunyai risiko tinggi terjadinya kecelakaan, pelaksanaan pekerjaan, serta pekerja untuk pelaksanaan pekerjaan, atas segala risiko terhadap kecelakaan, kerusakan, kehilangan, serta risiko lain yang tidak dapat diduga; 2) pihak ketiga sebagai akibat kecelakaan di tempat kerjanya; dan b. Besarnya asuransi sudah diperhitungkan dalam penawaran dan termasuk dalam harga SPK.

10. PENANGGUNGAN DAN RISIKO a. Penyedia berkewajiban untuk melindungi, membebaskan, dan menanggung tanpa batas PPK beserta instansinya terhadap semua bentuk tuntutan, tanggung jawab, kewajiban, kehilangan, kerugian, denda, gugatan atau tuntutan hukum, proses pemeriksaan hukum, dan biaya yang dikenakan terhadap PPK beserta instansinya (kecuali kerugian yang mendasari tuntutan tersebut disebabkan kesalahan atau kelalaian berat PPK) sehubungan dengan klaim yang timbul dari hal-hal berikut terhitung sejak Tanggal Mulai Kerja sampai dengan tanggal penandatanganan berita acara penyerahan akhir:

1) 2) 3)

kehilangan atau kerusakan peralatan dan harta benda penyedia dan Personil; cidera tubuh, sakit atau kematian Personil; kehilangan atau kerusakan harta benda, dan cidera tubuh, sakit atau kematian pihak ketiga;

b. Terhitung sejak Tanggal Mulai Kerja sampai dengan tanggal penandatanganan berita acara penyerahan awal, semua risiko kehilangan atau kerusakan Hasil Pekerjaan ini, Bahan dan Perlengkapan merupakan risiko penyedia, kecuali kerugian atau kerusakan tersebut diakibatkan oleh kesalahan atau kelalaian PPK. c. Pertanggungan asuransi yang dimiliki oleh penyedia tidak membatasi kewajiban penanggungan dalam syarat ini. d. Kehilangan atau kerusakan terhadap Hasil Pekerjaan atau Bahan yang menyatu dengan Hasil Pekerjaan selama Tanggal Mulai Kerja dan batas akhir Masa Pemeliharaan harus diganti atau diperbaiki oleh penyedia atas tanggungannya sendiri jika kehilangan atau kerusakan tersebut terjadi akibat tindakan atau kelalaian penyedia. 11. PENGAWASAN DAN PEMERIKSAAN PPK berwenang melakukan pengawasan dan pemeriksaan terhadap pelaksanaan pekerjaan yang dilaksanakan oleh penyedia. Apabila diperlukan, PPK dapat memerintahkan kepada pihak ketiga untuk melakukan pengawasan dan pemeriksaan atas semua pelaksanaan pekerjaan yang dilaksanakan oleh penyedia. 12. PENGUJIAN Jika PPK atau Pengawas Pekerjaan memerintahkan penyedia untuk melakukan pengujian Cacat Mutu yang tidak tercantum dalam Spesifikasi Teknis dan Gambar, dan hasil uji coba menunjukkan adanya Cacat Mutu maka penyedia berkewajiban untuk menanggung biaya pengujian tersebut. Jika tidak ditemukan adanya Cacat Mutu maka uji coba tersebut dianggap sebagai Peristiwa Kompensasi. 13. LAPORAN HASIL PEKERJAAN a. Pemeriksaan pekerjaan dilakukan selama pelaksanaan SPK untuk menetapkan volume pekerjaan atau kegiatan yang telah dilaksanakan guna pembayaran hasil pekerjaan. Hasil pemeriksaan pekerjaan dituangkan dalam laporan kemajuan hasil pekerjaan. b. Untuk merekam kegiatan pelaksanaan kegiatan, PPK dapat menugaskan Pejabat Penerima Hasil Pekerjaan membuat foto-foto dokumentasi pelaksanaan pekerjaan di lokasi pekerjaan. 14. WAKTU PENYELESAIAN PEKERJAAN a. Kecuali SPK diputuskan lebih awal, penyedia berkewajiban untuk memulai pelaksanaan pekerjaan pada Tanggal Mulai Kerja, dan melaksanakan pekerjaan sesuai dengan program mutu, serta menyelesaikan pekerjaan selambat-lambatnya pada Tanggal Penyelesaian yang ditetapkan dalam SP. b. Jika pekerjaan tidak selesai pada Tanggal Penyelesaian bukan akibat Keadaan Kahar atau Peristiwa Kompensasi atau karena kesalahan atau kelalaian penyedia maka penyedia dikenakan denda. c. Jika keterlambatan tersebut semata-mata disebabkan oleh Peristiwa Kompensasi maka PPK dikenakan kewajiban pembayaran ganti rugi. Denda atau ganti rugi tidak dikenakan jika Tanggal Penyelesaian disepakati oleh Para Pihak untuk diperpanjang. d. Tanggal Penyelesaian yang dimaksud dalam ketentuan ini adalah tanggal penyelesaian semua pekerjaan. 15. SERAH TERIMA PEKERJAAN a. Setelah pekerjaan selesai 100% (seratus perseratus), penyedia mengajukan permintaan secara tertulis kepada PPK untuk penyerahan pekerjaan. b. Dalam rangka penilaian hasil pekerjaan, PPK menugaskan Pejabat Penerima Hasil Pekerjaan. c. Pejabat Penerima Hasil Pekerjaan melakukan penilaian terhadap hasil pekerjaan yang telah diselesaikan oleh penyedia. Apabila terdapat kekurangan-kekurangan dan/atau cacat hasil pekerjaan, penyedia wajib memperbaiki/menyelesaikannya, atas perintah PPK. d. PPK menerima penyerahan pertama pekerjaan setelah seluruh hasil pekerjaan dilaksanakan sesuai dengan ketentuan SPK dan diterima oleh Pejabat Penerima Hasil Pekerjaan. e. Pembayaran dilakukan sebesar 100% (seratus perseratus) dari harga SPK dan penyedia harus menyerahkan Sertifikat Garansi sebesar 5% (lima perseratus) dari harga SPK. 16. JAMINAN BEBAS CACAT MUTU/GARANSI a. Penyedia dengan jaminan pabrikan dari produsen pabrikan (jika ada) berkewajiban untuk menjamin bahwa selama penggunaan secara wajar oleh PPK, Barang tidak mengandung cacat mutu yang disebabkan oleh tindakan atau kelalaian Penyedia, atau cacat mutu akibat desain, bahan, dan cara kerja. b. Jaminan bebas cacat mutu ini berlaku sampai dengan 12 (dua belas) bulan setelah serah terima Barang.

c. PPK akan menyampaikan pemberitahuan cacat mutu kepada Penyedia segera setelah ditemukan cacat mutu tersebut selama Masa Layanan Purnajual. d. Terhadap pemberitahuan cacat mutu oleh PPK, Penyedia berkewajiban untuk memperbaiki atau mengganti Barang dalam jangka waktu yang ditetapkan dalam pemberitahuan tersebut. e. Jika Penyedia tidak memperbaiki atau mengganti Barang akibat cacat mutu dalam jangka waktu yang ditentukan maka PPK akan menghitung biaya perbaikan yang diperlukan, dan PPK secara langsung atau melalui pihak ketiga yang ditunjuk oleh PPK akan melakukan perbaikan tersebut. Penyedia berkewajiban untuk membayar biaya perbaikan atau penggantian tersebut sesuai dengan klaim yang diajukan secara tertulis oleh PPK. Biaya tersebut dapat dipotong oleh PPK dari nilai tagihan Penyedia. f.

Terlepas dari kewajiban penggantian biaya, PPK dapat memasukkan Penyedia yang lalai memperbaiki cacat mutu ke dalam daftar hitam.

17 PERUBAHAN SPK a. SPK hanya dapat diubah melalui adendum SPK. b. Perubahan SPK bisa dilaksanakan apabila disetujui oleh para pihak, meliputi: 1) perubahan pekerjaan disebabkan oleh sesuatu hal yang dilakukan oleh para pihak dalam SPK sehingga mengubah lingkup pekerjaan dalam SPK; 2) perubahan jadwal pelaksanaan pekerjaan akibat adanya perubahan pekerjaan; 3) perubahan harga SPK akibat adanya perubahan pekerjaan dan/atau perubahan pelaksanaan pekerjaan. c. Untuk kepentingan perubahan SPK, PA/KPA dapat membentuk Pejabat Peneliti Pelaksanaan Kontrak atas usul PPK. 18 PERISTIWA KOMPENSASI a. Peristiwa Kompensasi dapat diberikan kepada penyedia dalam hal sebagai berikut: 1) PPK mengubah jadwal yang dapat mempengaruhi pelaksanaan pekerjaan; 2) keterlambatan pembayaran kepada penyedia;  3) x 4) 5)

penyedia belum bisa masuk ke lokasi sesuai jadwal; PPK menginstruksikan kepada pihak penyedia untuk melakukan pengujian tambahan yang setelah dilaksanakan pengujian ternyata tidak ditemukan kerusakan/kegagalan/penyimpangan; 6) PPK memerintahkan penundaan pelaksanaan pekerjaan; 7) PPK memerintahkan untuk mengatasi kondisi tertentu yang tidak dapat diduga sebelumnya dan disebabkan oleh PPK; 8) ketentuan lain dalam SPK. b. Jika Peristiwa Kompensasi mengakibatkan pengeluaran tambahan dan/atau keterlambatan penyelesaian pekerjaan maka PPK berkewajiban untuk membayar ganti rugi dan/atau memberikan perpanjangan waktu penyelesaian pekerjaan. c. Ganti rugi hanya dapat dibayarkan jika berdasarkan data penunjang dan perhitungan kompensasi yang diajukan oleh penyedia kepada PPK, dapat dibuktikan kerugian nyata akibat Peristiwa Kompensasi. d. Perpanjangan waktu penyelesaian pekerjaan hanya dapat diberikan jika berdasarkan data penunjang dan perhitungan kompensasi yang diajukan oleh penyedia kepada PPK, dapat dibuktikan perlunya tambahan waktu akibat Peristiwa Kompensasi. e. Penyedia tidak berhak atas ganti rugi dan/atau perpanjangan waktu penyelesaian pekerjaan jika penyedia gagal atau lalai untuk memberikan peringatan dini dalam mengantisipasi atau mengatasi dampak Peristiwa Kompensasi. 19 PERPANJANGAN WAKTU a. Jika terjadi Peristiwa Kompensasi sehingga penyelesaian pekerjaan akan melampaui Tanggal Penyelesaian maka penyedia berhak untuk meminta perpanjangan Tanggal Penyelesaian berdasarkan data penunjang. PPK berdasarkan pertimbangan Pengawas Pekerjaan memperpanjang Tanggal Penyelesaian Pekerjaan secara tertulis. Perpanjangan Tanggal Penyelesaian harus dilakukan melalui adendum SPK jika perpanjangan tersebut mengubah Masa SPK. b. PPK dapat menyetujui perpanjangan waktu pelaksanaan setelah melakukan penelitian terhadap usulan tertulis yang diajukan oleh penyedia. 20. PENGHENTIAN DAN PEMUTUSAN SPK a. Penghentian SPK dapat dilakukan karena pekerjaan sudah selesai atau terjadi Keadaan Kahar. b. Dalam hal SPK dihentikan, maka PPK wajib membayar kepada penyedia sesuai dengan prestasi pekerjaan yang telah dicapai, termasuk:

1)

biaya langsung pengadaan bahan dan perlengkapan untuk pekerjaan ini. Bahan dan perlengkapan ini harus diserahkan oleh Penyedia kepada PPK, dan selanjutnya menjadi hak milik PPK;

2) biaya langsung pembongkaran dan demobilisasi hasil pekerjaan sementara dan peralatan; 3) biaya langsung demobilisasi personil. c. Pemutusan SPK dapat dilakukan oleh pihak penyedia atau pihak PPK. d Menyimpang dari Pasal 1266 dan 1267 Kitab Undang-Undang Hukum Perdata, pemutusan SPK melalui pemberitahuan tertulis dapat dilakukan apabila: 1) penyedia lalai/cidera janji dalam melaksanakan kewajibannya dan tidak memperbaiki kelalaiannya dalam jangka waktu yang telah ditetapkan; 2) penyedia tanpa persetujuan Pengawas Pekerjaan, tidak memulai pelaksanaan pekerjaan; 3) penyedia menghentikan pekerjaan selama 28 (dua puluh delapan) hari dan penghentian ini tidak tercantum dalam program mutu serta tanpa persetujuan Pengawas Pekerjaan; 4) penyedia berada dalam keadaan pailit; 5) penyedia selama Masa SPK gagal memperbaiki Cacat Mutu dalam jangka waktu yang ditetapkan oleh PPK; 6) denda keterlambatan pelaksanaan pekerjaan akibat kesalahan penyedia sudah melampaui 5% (lima perseratus) dari harga SPK dan PPK menilai bahwa Penyedia tidak akan sanggup menyelesaikan sisa pekerjaan; 7) Pengawas Pekerjaan memerintahkan penyedia untuk menunda pelaksanaan atau kelanjutan pekerjaan, dan perintah tersebut tidak ditarik selama 28 (dua puluh delapan) hari; 8) PPK tidak menerbitkan SPP untuk pembayaran tagihan angsuran sesuai dengan yang disepakati sebagaimana tercantum dalam SPK; 9) penyedia terbukti melakukan KKN, kecurangan dan/atau pemalsuan dalam proses Pengadaan yang diputuskan oleh instansi yang berwenang; dan/atau 10) pengaduan tentang penyimpangan prosedur, dugaan KKN dan/atau pelanggaran persaingan sehat dalam pelaksanaan pengadaan dinyatakan benar oleh instansi yang berwenang. e. Dalam hal pemutusan SPK dilakukan karena kesalahan penyedia: 1) penyedia membayar denda; dan/atau 2) penyedia dimasukkan dalam Daftar Hitam. f. Dalam hal pemutusan SPK dilakukan karena PPK terlibat penyimpangan prosedur, melakukan KKN dan/atau pelanggaran persaingan sehat dalam pelaksanaan pengadaan, maka PPK dikenakan sanksi berdasarkan peraturan perundang-undangan. 21 PEMBAYARAN a. pembayaran prestasi hasil pekerjaan yang disepakati dilakukan oleh PPK, dengan ketentuan: 1) penyedia telah mengajukan tagihan disertai laporan kemajuan hasil pekerjaan; 2) pembayaran dilakukan dengan [pembayaran secara sekaligus]; 3) pembayaran harus dipotong denda (apabila ada), dan pajak ; b. pembayaran terakhir hanya dilakukan setelah pekerjaan selesai 100% (seratus perseratus) dan Berita Acara penyerahan pekerjaan diterbitkan. c. PPK dalam kurun waktu 7 (tujuh) hari kerja setelah pengajuan permintaan pembayaran dari penyedia harus sudah mengajukan surat permintaan pembayaran kepada Pejabat Penandatangan Surat d. bila terdapat ketidaksesuaian dalam perhitungan angsuran, tidak akan menjadi alasan untuk menunda pembayaran. PPK dapat meminta penyedia untuk menyampaikan perhitungan prestasi sementara dengan mengesampingkan hal-hal yang sedang menjadi perselisihan. 22 DENDA Penyedia berkewajiban untuk membayar sanksi finansial berupa Denda sebagai akibat wanprestasi atau cidera janji terhadap kewajiban-kewajiban penyedia dalam SPK ini. PPK mengenakan Denda dengan memotong angsuran pembayaran prestasi pekerjaan penyedia. Pembayaran Denda tidak mengurangi tanggung jawab kontraktual penyedia. 23 PENYELESAIAN PERSELISIHAN PPK dan penyedia berkewajiban untuk berupaya sungguh-sungguh menyelesaikan secara damai semua perselisihan yang timbul dari atau berhubungan dengan SPK ini atau interpretasinya selama atau setelah pelaksanaan pekerjaan. Jika perselisihan tidak dapat diselesaikan secara musyawarah maka perselisihan akan diselesaikan melalui pengadilan negeri dalam wilayah hukum Republik Indonesia. 24 LARANGAN PEMBERIAN KOMISI Penyedia menjamin bahwa tidak satu pun personil satuan kerja PPK telah atau akan menerima komisi atau keuntungan tidak sah lainnya baik langsung maupun tidak langsung dari SPK ini. Penyedia menyetujui bahwa pelanggaran syarat ini merupakan pelanggaran yang mendasar terhadap SPK ini.

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara Website : www.konut.kemenag.go.id

LAMPIRAN BERITA ACARA SERAH TERIMA DOKUMEN PROSES DAN HASIL PENGADAAN BARANG/JASA Nomor : 192/KK.24.11/1/KS.01/02/2019 Tanggal : 01 Februari 2019 : Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara : Rp. 184.710.000,00 Tahun Anggaran : 2019 Nama Paket Nilai HPS

Uraian

No. 1 2 3 4 5 6 7 8 9

Dokumen Pemilihan Jadwal Pengadaan Langsung Berita Acara Evaluasi Penawaran Lampiran Hasil Evaluasi Penawaran Berita Acara Klarifikasi Teknis Dan Negosiasi Harga/Biaya Lampiran Berita Acara Klarifikasi Teknis Dan Negosiasi Harga/Biaya Berita Acara Hasil Pengadaan Langsung (BAHPL) Penetapan Penyedia Laporan Proses Dan Hasil Pengadaan

Ada

Tidak Ada

Keterangan

        

Pihak Yang Menyerahkan Pejabat Pengadaan

Pihak Yang Menerima Pejabat Pembuat Komitmen

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

RIDHA, SE NIP. 198405302011011004

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara

Website : www.konut.kemenag.go.id BERITA ACARA SERAH TERIMA DOKUMEN PROSES DAN HASIL PENGADAAN BARANG/JASA Nomor : 192/KK.24.11/1/KS.01/02/2019 Tanggal : 01 Februari 2019

Nama Paket

: Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

Nilai HPS Tahun Anggaran

: Rp. 184.710.000,00 : 2019

Dokumen Proses Dan Hasil Pengadaan Barang/Jasa yang diserahterimakan adalah : 1. Dokumen Pemilihan Penyedia Barang/Jasa; 2. Berita Acara Proses Pengadaan Barang/Jasa; dan 3. Dokumen Penawaran penyedia. Demikian berita acara ini.

Pihak Yang Menyerahkan Pejabat Pengadaan

Pihak Yang Menerima Pejabat Pembuat Komitmen

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

RIDHA, SE NIP. 198405302011011004

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara Website : www.konut.kemenag.go.id Nomor Lampiran Perihal

: 191/KK.24.11/1/KS.01/02/2019 Satu Berkas : Laporan Proses dan Hasil Pemilihan Penyedia

:

Kepada Yth. Pejabat Pembuat Komitmen Kantor Kementerian Agama Kabupaten Konawe Utara Di Kendari Berdasarkan Peraturan Presiden Republik Indonesi Nomor 54 Tahun 2010 beserta Perubahannya tentang Pengadaan Barang/Jasa Pemerintah Pasal 17 Ayat (2) huruf i (salah satu tugas dan kewenangan Pejabat Pengadaan Barang/Jasa yaitu membuat laporan mengenai proses dan hasil Pengadaan kepada Menteri/Pimpinan Lembaga/Kepala Daerah/Pimpinan Institusi), maka dengan hormat berikut ini kami sampaikan Laporan Proses dan Hasil Pengadaan Barang/Jasa sebagai berikut : I.

II.

PAKET PEKERJAAN Nama Paket Nilai HPS Tahun Angg.

: Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama : Rp. 184.710.000,00 : 2019

SISTEM PENGADAAN 1. Metode Pengadaan 2. Metode Evaluasi 3. Jenis Kontrak

: Pengadaan Langsung : Sistem Gugur : Harga Satuan

III. HASIL EVALUASI DAN KLARIFIKASI TEKNIS DAN NEGOSIASI HARGA/BIAYA 1. Evaluasi Penawaran No.

Calon Penyedia

Hasil Evaluasi Teknis Hasil Evaluasi Harga

1 CV. Indotal Jaya 2.

Keterangan

Lulus

Lulus

Lulus

Hasil Klarifikasi Teknis

Hasil Negosiasi Harga/Biaya

Keterangan

Rp. 184.710.000,00

Rp. 184.710.000,00

Lulus

Hasil Klarifikasi Teknis Dan Negosiasi Harga/Biaya No.

Nama Peserta

1 CV. Indotal Jaya

III. KESIMPULAN Berdasarkan hasil evaluasi yang telah dilakukan, maka Pejabat Pengadaan Barang/Jasa menetapkan dan mengumumkan Pemenang untuk Paket Pekerjaan tersebut di atas sebagai berikut : Nama Penyedia Nama Direktur Alamat NPWP Harga Penawaran Harga Hasil Negosiasi Terbilang

: : : : : : :

CV. Indotal Jaya Agus Jl. Mekar No.07 Sodohoa Kendari Barat 01.412.302.0-811.000 Rp. 184.710.000,00 Rp. 184.710.000,00 Seratus Delapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah

Demikian Laporan ini kami sampaikan Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003 Tembusan : 1. KPA Kantor Kementerian Agama Kabupaten Konawe Utara 2. APIP Kementerian Agama 3. Pertinggal

Laporan Hasil Dan Proses Pengadaan Barang/Jasa

Page 1 of 1

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara

Website : www.konut.kemenag.go.id

PENGUMUMAN PENYEDIA PENGADAAN BARANG/JASA Nomor Tanggal

: :

190/KK.24.11/1/KS.01/02/2019 01 Februari 2019

Berdasarkan Surat Penetapan Penyedia Barang/Jasa Nomor : 189/KK.24.11/1/KS.01/02/2019 Tanggal 01 Februari 2019 : maka saya selaku Pejabat Pengadaan, mengumumkan Penyedia Barang/Jasa sebagai berikut : A. Paket Pekerjaan Nama Paket Nilai HPS Tahun Anggaran B. Penyedia Nama Penyedia Nama Direktur Alamat NPWP Harga Penawaran Harga Hasil Negosiasi Terbilang

: Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara : Rp. 184.710.000,00 : 2019

: : : : : : :

CV. Indotal Jaya Agus Jl. Mekar No.07 Sodohoa Kendari Barat 01.412.302.0-811.000 Rp. 184.710.000,00 Rp. 184.710.000,00 Seratus Delapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara Website : www.konut.kemenag.go.id BERITA ACARA HASIL PENGADAAN LANGSUNG (BAHPL) Nomor Tanggal Nama Paket Nilai HPS Tahun Anggaran

: : :

: :

188/KK.24.11/1/KS.01/02/2019 01 Februari 2019

Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara Rp. 184.710.000,00 2019

Pada Hari ini Jumat, tanggal 01 Februari 2019 bulan Februari tahun Dua Ribu Sembilan Belas, saya Selaku Pejabat Pengadaan telah menyusun dan Menetapkan Berita Acara Hasil Pengadaan Langsung untuk Paket Pekerjaan tersebut di atas sebagai berikut : I.

II.

SISTEM PENGADAAN 1. Metode Pengadaan 2. Metode Evaluasi 3. Jenis Kontrak

: Pengadaan Langsung : Sistem Gugur : Harga Satuan

INFORMASI HARGA No.

Uraian

Hasil Spesifikasi Teknis

Keterangan

Harga (Rp)

PEKERJAAN PENAMBAHAN RUANGAN KANTOR I

PEKERJAAN PERSIAPAN

II

PEKERJAAN BETON

II

PEKERJAAN PAS. BATA

II

PEKERJAAN PEMASANGAN KUSEN DAN DAUN PINTU

III

PEKERJAAN TEGEL

V

PEKERJAAN PLASTERAN

VI PEKERJAAN ACIAN PEKERJAAN KANOPI MUSHOLA I

PEKERJAAN KUDA-KUDA

II PEMASANGAN ATAP PEKERJAAN REHAB WC I

PEKERJAAN PERSIAPAN

II

PEKERJAAN LANTAI

III

PEKERJAAN DINDING

IV

PEKERJAAN KUSEN PINTU DAN FENTILASI

V

PEKERJAAN KUSEN PINTU DAN FENTILASI

VI

PEKERJAAN PEMASANGAN CLOSET

VII

PEKERJAAN PIPA

VIII PEKERJAAN PENGECATAN PEKERJAAN PARKIRAN MOBIL I

PEKERJAAN PERSIAPAN

II

PEKERJAAN TANAH

II

PEKERJAAN PONDASI

III

PEKERJAAN BETON

IV

PEKERJAAN PAS. DINDING

V

PEKERJAAN PLASTERAN

VI

PEKERJAAN ACIAN

VII

PEKERJAAN KUDA - KUDA

VIII PEK. LANTAI KERJA 1X PEK. ATAP PEKERJAAN PAPAN NAMA KANTOR I

PEKERJAAN TANAH

II

PEKERJAAN PONDASI

III

PEKERJAAN BETON

IV

PEKERJAAN DINDING

V

PEKERJAAN TEGEL

V

PEKERJAAN PLASTERAN

VI

PEKERJAAN ACIAN

VI PEKERJAAN. PEMASANGAN HURUF PEKERJAAN RABAT HALAMAN

III.

I

PEKERJAAN PERSIAPAN

II

PEK. TIMBUNAN

III

PEK. LANTAI KERJA

Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat

1.100.898,00 2.327.084,70 6.577.440,00 396.400,00 385.020,00 1.503.720,00 674.550,00

Memenuhi Syarat Memenuhi Syarat

1.917.440,00 Lulus 1.790.240,00 Lulus

Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat

4.503.240,00 641.700,00 2.142.577,50 343.340,00 895.665,00 501.050,00 275.420,00 593.208,00

Lulus Lulus Lulus Lulus Lulus Lulus Lulus Lulus

Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat

1.643.000,00 2.188.985,00 8.805.991,80 8.673.999,11 13.451.328,00 4.852.003,20 2.042.387,50 26.154.666,80 4.476.833,20 5.625.600,00

Lulus Lulus Lulus Lulus Lulus Lulus Lulus Lulus Lulus Lulus

Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat

194.905,00 690.300,00 1.231.599,31 815.232,00 282.348,00 1.257.277,00 563.998,75 4.400.000,00

Lulus Lulus Lulus Lulus Lulus Lulus Lulus Lulus

Memenuhi Syarat Memenuhi Syarat Memenuhi Syarat

Lulus Lulus Lulus Lulus Lulus Lulus Lulus

2.012.400,00 Lulus 8.019.000,00 Lulus 43.968.897,50 Lulus

UNSUR-UNSUR YANG DIEVALUASI 1. Evaluasi Teknis a) Identitas barang (jenis, tipe dan merek) yang ditawarkan tercantum dengan lengkap dan jelas; b) Spesifikasi teknis barang yang ditawarkan; c) Jadwal waktu penyerahan/pengiriman barang tidak melampaui batas waktu sebagaimana tercantum dalam LDP; 2. Evaluasi Harga Harga penawaran tidak melebihi Harga Perkiraan Sendiri (HPS)

Berita Acara Hasil Pengadaan Langsung (BAHPL)

Halaman 1 dari 2

IV. HASIL EVALUASI No. 1 V.

Evaluasi Penawaran Teknis Lulus

Penyedia CV. Indotal Jaya

Harga Lulus

Keterangan Lulus

HASIL KLARIFIKASI TEKNIS DAN NEGOSIASI HARGA/BIAYA No. 1

Penyedia

Harga Penawaran (Rp)

CV. Indotal Jaya

Rp. 184.710.000,00

Hasil Klarifikasi Teknis Dan Negosiasi Harga/Biaya Keterangan Negosiasi Klarifikasi Teknis Harga/Biaya (Rp) Rp. Lulus Lulus 184.710.000,00

VI. KESIMPULAN Berdasarkan uraian di atas, maka Pejabat Pengadaan berkesimpulan bahwa Peserta tersebut di bawah ini Memenuhi Syarat untuk sebagai Penyedia : Nama Penyedia Nama Pimpinan Alamat NPWP Harga Penawaran Harga Hasil Negosiasi Terbilang

: : : : : : :

CV. Indotal Jaya Agus Jl. Mekar No.07 Sodohoa Kendari Barat 01.412.302.0-811.000 Rp. 184.710.000,00 Rp. 184.710.000,00 Seratus Delapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah

Demikian Berita Acara ini kami buat untuk dipergunakan sebagaimana mestinya. Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

Berita Acara Hasil Pengadaan Langsung (BAHPL)

Halaman 2 dari 2

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara Website : www.konut.kemenag.go.id BERITA ACARA KLARIFIKASI DAN NEGOSIASI TEKNIS DAN BIAYA Nomor Tanggal

: 187/KK.24.11/1/KS.01/02/2019 : 01 Februari 2019

Nama Paket

: Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

Nilai HPS TA

: Rp. 184.710.000,00 : 2019

NO

1

Calon Penyedia

CV. Indotal Jaya

Harga Penawaran (Rp)

Hasil Klarifikasi Teknis

Hasil Negosiasi Harga/Biaya (Rp)

Rp. 184.710.000,00

Lulus

Rp. 184.710.000,00

Uraian Hasil Klarifikasi Teknis dan Negosiasi Harga terlampir. Demikian Berita Acara dibuat dengan benar untuk dipergunakan sebagaimana mestinya.

Calon Penyedia

Agus Direktur

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

LAMPIRAN BERITA ACARA KLARIFIKASI DAN NEGOSIASI TEKNIS DAN BIAYA

Nama Paket Nilai HPS TA

: : :

Nomor : 187/KK.24.11/1/KS.01/02/2019 Tanggal : 01 Februari 2019 Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara Rp. 184.710.000,00 2019

A. Klarifikasi Teknis ASPEK TEKNIS NO. 1 Metode Pelaksanaan 2 Spesifikasi Pekerjaan 3 Jadwal waktu Pelaksanaan

HASIL KLARIFIKASI

KETERANGAN Memenuhi syarat Memenuhi syarat Memenuhi syarat

Sesuai Sesuai Sesuai

B. Negosiasi Harga/Biaya NO

URAIAN

HARGA PENAWARAN Harga Satuan Jumlah Harga (Rp) (Rp)

Sat. Kuantitas

HARGA PERKIRAAN SENDIRI (HPS) Sat.

HASIL NEGOSIASI HARGA/BIAYA

Kuantitas Harga Satuan (Rp) Jumlah Harga (Rp)

Sat.

Kuantitas Harga Satuan (Rp)

Jumlah Harga (Rp)

PEKERJAAN PENAMBAHAN RUANGAN KANTOR I

PEKERJAAN PERSIAPAN a Pek. Pembongkaran Lantai

M3

0,15

643.320

96.498

M3

0,15

643.320

96.498

M3

0,15

643.320

96.498

b Pek. Pemobongkaran Dinding

M3

1,8

558.000

1.004.400

M3

1,8

558.000

1.004.400

M3

1,8

558.000

1.004.400

Jumlah II

1.100.898

1.100.898

1.100.898

PEKERJAAN BETON a Pek. Sloef Beton 12/15 1

Pek. Beton f"c 24 Mpa

M3

0,09

1.261.770

113.559

M3

0,09

1.261.770

113.559

M3

0,09

1.261.770

113.559

2

Besi Polos Ø 10 mm

Kg

12,3

15.000

184.500

Kg

12,3

15.000

184.500

Kg

12,3

15.000

184.500

3

Besi Polos Ø 8 mm

Kg

5,04

15.000

75.600

Kg

5,04

15.000

75.600

Kg

5,04

15.000

75.600

4

Bekisting

M2

1,5

170.585

255.878

M2

1,5

170.585

255.878

M2

1,5

170.585

255.878

Jumlah

629.537

629.537

629.537

b PEK. KOLOM 15/15 1

Pek. Beton f"c 24 Mpa

M3

0,07

1.261.770

88.324

M3

0,07

1.261.770

88.324

M3

0,07

1.261.770

88.324

2

Besi Polos Ø 10 mm

Kg

71,9

15.000

1.078.500

Kg

71,9

15.000

1.078.500

Kg

71,9

15.000

1.078.500

3

Besi Polos Ø 8 mm

Kg

4,52

15.000

67.800

Kg

4,52

15.000

67.800

Kg

4,52

15.000

67.800

5

Bekisting

M2

1,8

257.180

462.924

M2

1,8

257.180

462.924

M2

1,8

257.180

462.924

Jumlah

1.697.548

1.697.548

1.697.548

Jumlah

2.327.085

2.327.085

2.327.085

II

PEKERJAAN PAS. BATA a Pas. Batu Bata

M2

28,4

231.600

Jumlah II

28,4

231.600

6.577.440

M2

28,4

231.600

6.577.440

6.577.440 6.577.440

PEKERJAAN PEMASANGAN KUSEN DAN DAUN PINTU a

III

Pek, Pemasangan Kusen dan Daun Pintu

Ls

1

396.400

a

396.400

Ls

1

396.400

396.400

396.400

Ls

1

396.400

396.400

396.400 396.400

PEKERJAAN TEGEL Pek. Pemasangan Tegel

M2

2,4

160.425

Jumlah

385.020

M2

2,4

160.425

385.020

385.020

M2

2,4

160.425

385.020

385.020 385.020

PEKERJAAN PLASTERAN a Pek.Plasteran

M2

18

83.540

Jumlah VI

M2

6.577.440

Jumlah

V

6.577.440

1.503.720

M2

18

83.540

1.503.720

1.503.720

M2

18

83.540

1.503.720

1.503.720 1.503.720

PEKERJAAN ACIAN a Pek.Acian

M2

18

37.475

674.550

M2

18

37.475

674.550

M2

18

37.475

674.550

Jumlah

674.550

674.550

674.550

Jumlah

12.965.113

12.965.113

12.965.113

PEKERJAAN KANOPI MUSHOLA I

PEKERJAAN KUDA-KUDA a Perakitan Kuda - Kuda Besi Hollow

Ls

1

1.917.440

Jumlah II

1.917.440

Ls

1

1.917.440

1.917.440

1.917.440

Ls

1

1.917.440

1.917.440

1.917.440 1.917.440

PEMASANGAN ATAP a Pekerjaan Atap

Ls

1

1.790.240

1.790.240

Ls

1

1.790.240

1.790.240

Ls

1

1.790.240

1.790.240

Jumlah

1.790.240

1.790.240

1.790.240

Jumlah

3.707.680

3.707.680

3.707.680

Lampiran Berita Acara Klarifikasi Teknis Dan Negosiasi Harga/Biaya

Halaman 1 / 4

NO

URAIAN

HARGA PENAWARAN Harga Satuan Jumlah Harga (Rp) (Rp)

Sat. Kuantitas

HARGA PERKIRAAN SENDIRI (HPS) Sat.

HASIL NEGOSIASI HARGA/BIAYA

Kuantitas Harga Satuan (Rp) Jumlah Harga (Rp)

Sat.

Kuantitas Harga Satuan (Rp)

Jumlah Harga (Rp)

PEKERJAAN REHAB WC KANTOR I

PEKERJAAN PERSIAPAN a Pek. Pembongkaran

M3

7

643.320

Jumlah II

4.503.240

M3

7

643.320

4.503.240

4.503.240

M3

7

643.320

4.503.240

4.503.240 4.503.240

PEKERJAAN LANTAI a Pek. Lantai Keramik 30 x 30

M2

4,0

160.425

Jumlah III

11,1

193.025

641.700

M2

4,0

160.425

641.700

2.142.578

11,1

193.025

2.142.578

641.700 641.700

2.142.578

11,1

193.025

2.142.578

2.142.578 2.142.578

Pintu M3

0,03

8.583.500

M3

0,01

8.583.500

257.505

M3

0,03

8.583.500

85.835

M3

0,01

8.583.500

257.505

M3

0,03

8.583.500

85.835

M3

0,01

8.583.500

257.505

Fentilasi 1 Pek. Kusen Fentilasi

Jumlah V

160.425

PEKERJAAN KUSEN PINTU DAN FENTILASI 1 Pek. Kusen Pintu

b

4,0

PEKERJAAN DINDING a Pek. Dinding Keramik 30 x 30

a

M2

641.700

Jumlah IV

641.700

343.340

343.340

85.835 343.340

PEKERJAAN KUSEN PINTU DAN FENTILASI a

Pek. Kusen Pintu

b

Pek. Pemasangan Daun Pintu

0,03

8.583.500

257.505

0,03

8.583.500

257.505

0,03

8.583.500

257.505

1,2

531.800

638.160

1,2

531.800

638.160

1,2

531.800

638.160

Jumlah VI

895.665

895.665

895.665

PEKERJAAN PEMASANGAN CLOSET a Pek. Pemasangan Closet Duduk

La

1

501.050

Jumlah VII a b

a

La

1

501.050

501.050

501.050

La

1

501.050

501.050

501.050 501.050

PEKERJAAN PIPA Pek. Pipa

M1

4

65.105

260.420

M1

4

65.105

260.420

M1

4

65.105

Keran Air 1/2

Bh

1

15.000

15.000

Bh

1

15.000

15.000

Bh

1

15.000

Jumlah VIII

501.050

275.420

275.420

260.420 15.000 275.420

PEKERJAAN PENGECATAN Pek. Pengecatan

M2

20

29.660

593.208

M2

20

29.660

593.208

M2

20

29.660

593.208

Jumlah

593.208

593.208

593.208

Jumlah

9.896.201

6.772.123

6.772.123

PEKERJAAN PARKIRAN MOBIL I

PEKERJAAN PERSIAPAN a Pek. Pembersihan Lahan

M2

106

15.500

Jumlah II

1.643.000

M2

106

15.500

1.643.000

1.643.000

M2

106

15.500

1.643.000

1.643.000 1.643.000

PEKERJAAN TANAH a Galian Tanah

M3

22,67

70.000

1.586.900

M3

22,67

70.000

1.586.900

M3

22,67

70.000

1.586.900

b Urugan Tanah Kembali

M3

5,19

51.500

267.285

M3

5,19

51.500

267.285

M3

5,19

51.500

267.285

c Urugan Pasir

M3

2,79

120.000

334.800

M3

2,79

120.000

334.800

M3

2,79

120.000

Jumlah III a

2.188.985

334.800 2.188.985

PEKERJAAN PONDASI PEK. PONDASI GARIS 1 Pek. Batu Kosong

M3

5,58

2 Pek. Pasangan Batu

M3

11,46

431.940 489.000

Jumlah b

2.188.985

2.410.225

M3

5,58

5.603.940

M3

11,46

431.940 489.000

8.014.165

2.410.225

M3

5,58

5.603.940

M3

11,46

431.940 489.000

8.014.165

2.410.225 5.603.940 8.014.165

PEK. PONDASI KOLOM 1 Pek. Beton f"c 24 Mpa

M3

0,58

1.261.770

731.827

M3

0,58

1.261.770

731.827

M3

0,58

1.261.770

2 Angkur Ø 8 mm

Kg

4

15.000

60.000

Kg

4

15.000

60.000

Kg

4

15.000

731.827 60.000

Jumlah

791.827

791.827

791.827

Jumlah

8.805.992

8.805.992

8.805.992

III a

PEKERJAAN BETON Sloof 1 Pek. Sloef Beton 12/15 2 Pek. Beton f"c 24 Mpa

M3

0,45

1.261.770

567.797

M3

0,45

1.261.770

567.797

M3

0,45

1.261.770

567.797

3 Besi Polos Ø 10 mm

Kg

61,69

15.000

925.350

Kg

61,69

15.000

925.350

Kg

61,69

15.000

925.350

4 Besi Polos Ø 8 mm

Kg

26,33

15.000

394.950

Kg

26,33

15.000

394.950

Kg

26,33

15.000

394.950

5 Bekisting

M2

8,66

170.585

1.477.266

M2

8,66

170.585

1.477.266

M2

8,66

170.585

1.477.266

Jumlah

Lampiran Berita Acara Klarifikasi Teknis Dan Negosiasi Harga/Biaya

3.365.363

3.365.363

3.365.363

Halaman 2 / 4

NO b

URAIAN

HARGA PENAWARAN Harga Satuan Jumlah Harga (Rp) (Rp)

Sat. Kuantitas

HARGA PERKIRAAN SENDIRI (HPS) Sat.

HASIL NEGOSIASI HARGA/BIAYA

Kuantitas Harga Satuan (Rp) Jumlah Harga (Rp)

Sat.

Kuantitas Harga Satuan (Rp)

Jumlah Harga (Rp)

Kolom 1 Pek. Beton f"c 24 Mpa

M3

0,48

1.245.847

598.007

M3

0,48

1.245.847

598.007

M3

0,48

1.245.847

598.007

2 Besi Polos Ø 10 mm

Kg

58,38

15.000

875.700

Kg

58,38

15.000

875.700

Kg

58,38

15.000

875.700

3 Besi Polos Ø 8 mm

M3

24,20

15.000

363.000

M3

24,20

15.000

363.000

M3

24,20

15.000

363.000

4 Bekesting

M2

13,50

257.180

3.471.930

M2

13,50

257.180

3.471.930

M2

13,50

257.180

3.471.930

Jumlah

5.308.637

5.308.637

5.308.637

Jumlah

8.673.999

8.673.999

8.673.999

IV

PEKERJAAN PAS. DINDING a Pas. Batu Bata

M2

58,08

231.600

Jumlah V

13.451.328

M2

58,08

231.600

13.451.328

13.451.328

M2

58,08

231.600

13.451.328

13.451.328 13.451.328

PEKERJAAN PLASTERAN a.

Pek. Plasteran

M2

58,08

83.540

Jumlah VI

4.852.003

M2

58,08

83.540

4.852.003

4.852.003

M2

58,08

83.540

4.852.003

4.852.003 4.852.003

PEKERJAAN ACIAN a Pek.Acian

M2

54,5

37.475

Jumlah VII

54,5

37.475

2.042.388

M2

54,5

37.475

2.042.388

2.042.388 2.042.388

PEKERJAAN KUDA - KUDA a Perakitan Kuda - Kuda Besi Hollow 6 x 8

M1

200

130.773

26.154.667

M1

200

130.773

26.154.667

26.154.667

M1

200

130.773

26.154.667

26.154.667 26.154.667

PEK. LANTAI KERJA a Pek. Lantai Kerja

M3

5,32

841.510

Jumlah 1X

M2

2.042.388

Jumlah VIII

2.042.388

4.476.833

M3

5,32

841.510

4.476.833

4.476.833

M3

5,32

841.510

4.476.833

4.476.833 4.476.833

PEK. ATAP a Pek. Atap

M2

68,9

60.000

4.134.000

M2

68,9

60.000

4.134.000

M2

68,9

60.000

4.134.000

b Pek. Pemasangan Talangan Air

M1

24,86

60.000

1.491.600

M1

24,86

60.000

1.491.600

M1

24,86

60.000

1.491.600

Jumlah

5.625.600

5.625.600

5.625.600

Jumlah

77.914.795

77.914.795

77.914.795

PEKERJAAN PAPAN NAMA KANTOR I

PEKERJAAN TANAH a Galian Tanah

M3

2,01

70.000

140.700

M3

2,01

70.000

140.700

M3

2,01

70.000

140.700

b Urugan Tanah Kembali

M3

0,47

51.500

24.205

M3

0,47

51.500

24.205

M3

0,47

51.500

24.205

c Urugan Pasir

M3

0,25

120.000

30.000

M3

0,25

120.000

30.000

M3

0,25

120.000

Jumlah II

194.905

194.905

30.000 194.905

PEKERJAAN PONDASI 1 Pek. Batu Kosong

M3

0,5

2 Pek. Pasangan Batu

M3

0,97

431.940 489.000

Jumlah III a

215.970

M3

0,5

474.330

M3

0,97

431.940 489.000

690.300

215.970

M3

0,5

474.330

M3

0,97

431.940 489.000

690.300

215.970 474.330 690.300

PEKERJAAN BETON Kolom 1 Pek. Beton f"c 24 Mpa

M3

0,15

1.245.847

186.877

M3

0,15

1.245.847

186.877

M3

0,15

1.245.847

186.877

2 Besi Polos Ø 10 mm

Kg

11,10

15.000

166.500

Kg

11,10

15.000

166.500

Kg

11,10

15.000

166.500

3 Besi Polos Ø 8 mm

M3

7,13

15.000

106.950

M3

7,13

15.000

106.950

M3

7,13

15.000

106.950

4 Bekesting

M2

1,60

257.180

411.488

M2

1,60

257.180

411.488

M2

1,60

257.180

411.488

Jumlah b

871.815

871.815

871.815

Ring Balok 1 Pek. Beton f"c 24 Mpa

M3

0,04

1.245.847

49.834

M3

0,04

1.245.847

49.834

M3

0,04

1.245.847

49.834

2 Besi Polos Ø 10 mm

Kg

4,93

15.000

73.950

Kg

4,93

15.000

73.950

Kg

4,93

15.000

73.950

3 Besi Polos Ø 8 mm

M3

2,36

15.000

35.400

M3

2,36

15.000

35.400

M3

2,36

15.000

35.400

4 Bekesting

M2

0,78

257.180

200.600

M2

0,78

257.180

200.600

M2

0,78

257.180

200.600

Jumlah

359.784

359.784

359.784

Jumlah

1.231.599

1.231.599

1.231.599

IV

PEKERJAAN DINDING a Pas. Batu Bata

M2

3,52

231.600

Jumlah V

815.232

M2

3,52

231.600

815.232

815.232

M2

3,52

231.600

815.232

815.232 815.232

PEKERJAAN TEGEL a

Pek. Pemasangan Tegel

Jumlah

Lampiran Berita Acara Klarifikasi Teknis Dan Negosiasi Harga/Biaya

M2

1,76

160.425

282.348 282.348

M2

1,76

160.425

282.348 282.348

M2

1,76

160.425

282.348 282.348

Halaman 3 / 4

NO V

HARGA PENAWARAN Harga Satuan Jumlah Harga (Rp) (Rp)

URAIAN

Sat. Kuantitas

HARGA PERKIRAAN SENDIRI (HPS) Sat.

HASIL NEGOSIASI HARGA/BIAYA

Kuantitas Harga Satuan (Rp) Jumlah Harga (Rp)

Sat.

Kuantitas Harga Satuan (Rp)

Jumlah Harga (Rp)

PEKERJAAN PLASTERAN a.

Pek. Plasteran

M2

15,05

83.540

Jumlah VI

M2

15,05

83.540

1.257.277

1.257.277

M2

15,05

83.540

1.257.277

1.257.277 1.257.277

PEKERJAAN ACIAN a Pek.Acian

M2

15,05

37.475

Jumlah VI

1.257.277

563.999

M2

15,05

37.475

563.999

563.999

M2

15,05

37.475

563.999

563.999 563.999

PEKERJAAN. PEMASANGAN HURUF Ls

a Pek.Huruf

1

4.400.000

4.400.000

Ls

1

4.400.000

4.400.000

Ls

1

4.400.000

4.400.000

Jumlah

4.400.000

4.400.000

4.400.000

Jumlah

9.435.660

9.435.660

9.435.660

PEKERJAAN RABAT HALAMAN I

PEKERJAAN PERSIAPAN a Pek. Pembersihan Lahan

M2

309,6

6.500

Jumlah II

M2

309,6

6.500

2.012.400

2.012.400

M2

309,6

6.500

2.012.400

2.012.400 2.012.400

PEK. TIMBUNAN a Pek. Timbunan

M3

148,50

54.000

Jumlah III

2.012.400

8.019.000

M3

148,50

54.000

8.019.000

8.019.000

M3

148,50

54.000

8.019.000

8.019.000 8.019.000

PEK. LANTAI KERJA a Pek. Lantai Kerja

M3

52,25

841.510

43.968.898

M3

52,25

841.510

43.968.898

M3

52,25

841.510

43.968.898

Jumlah

43.968.898

43.968.898

43.968.898

Jumlah

54.000.298

54.000.298

54.000.298

Jumlah PPn 10% Jumlah Total Pembulatan

167.919.745

167.919.745,37

167.919.745,37

16.791.974,54

16.791.974,54

16.791.974,54

184.711.719,90

184.711.719,90

184.711.719,90

184.710.000,00

184.710.000,00

Seratus Delapan Puluh Empat Juta Tujuh Seratus Delapan Puluh Empat Juta Tujuh Ratus Ratus Sepuluh Ribu Rupiah Sepuluh Ribu Rupiah

184.710.000,00

Seratus Delapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah

Calon Penyedia

Pejabat Pengadaan

Agus Direktur

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

Lampiran Berita Acara Klarifikasi Teknis Dan Negosiasi Harga/Biaya

Halaman 4 / 4

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara

www.konawe,kemenag.go.id

Nomor Lampiran

: :

186/KK.24.11/1/KS.01/02/2019 -

:

Undangan Klarifikasi dan Negosiasi dan harga pekerjaan

Kepada Yth. CV. Indotal Jaya Di Kendari Perihal

Sehubungan dengan evaluasi penawaran, maka dengan ini Saudara kami undang untuk menghadiri acara klarifikasi dan Negosiasi Teknis Harga yang dilaksanakan pada: Hari/Tanggal : 01 Februari 2019 Jam : 08 s.d 10.00 Tempat : Kantor Kementrian Agama Kabupaten Konawe Utara

Demikian disampaikan untuk diketahui.

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara Website : www.konut.kemenag.go.id BERITA ACARA HASIL EVALUASI PENAWARAN Nomor : 179/KK.24.11/1/KS.01/02/2019 Tanggal : 31 Januari 2019 Nama Paket Nilai HPS TA

: Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara : Rp. 184.710.000,00 : 2019

Hasil Evaluasi No.

Calon Penyedia

1 CV. Indotal Jaya

Harga Penawaran (Rp)

Rp. 184.710.000,00

Keterangan Teknis

Harga

Memenuhi Memenuhi Syarat Syarat

Memenuhi Syarat

Demikian Berita Acara ini dibuat untuk dipergunakan sebagaimana mestinya.

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

LAMPIRAN HASIL EVALUASI PENAWARAN Nomor Tanggal

: Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara : Rp. 184.710.000,00 : Rp. 184.710.000,00 : CV. Indotal Jaya

Nama Paket Nilai HPS Harga Penawaran Nama Penyedia I.

II.

: 179/KK.24.11/1/KS.01/02/2019 : 31 Januari 2019

EVALUASI TEKNIS PEMENUHAN PERSYARATAN OLEH HASIL (LULUS/GUGUR) PENYEDIA (YA/TIDAK)

NO

URAIAN

1

identitas pekerjaan (Rekapitulasi, RAB dan Upah) yang ditawarkan tercantum dengan lengkap dan jelas;

YA

LULUS

2

spesifikasi teknis yang ditawarkan berdasarkan contoh, memenuhi persyaratan yang ditetapkan dalam Dokumen Pengadaan;

YA

LULUS

4

jadwal pelaksanaan tidak melampaui batas waktu sebagaimana tercantum dalam LDP;

YA

LULUS

KESIMPULAN

:

LULUS

REKOMENDASI

:

LANJUTKAN EVALUASI KE TAHAP BERIKUTNYA

EVALUASI HARGA URAIAN

NO 1

Evaluasi Harga Penawaran

2

Harga Satuan Timpang

3

Kewajaran Harga (%)

HASIL

KETERANGAN

> HPS

GUGUR

Tidak Ada Harga Satuan yang Timpang

Tidak Dilakukan Klarifikasi

KESIMPULAN

:

LULUS

REKOMENDASI

:

LANJUTKAN EVALUASI KE TAHAP BERIKUTNYA

PETUNJUK PENILAIAN Lulus jika harga penawaran sesudah koreksi aritmatik tidak melebihi HPS Evaluasi terhadap adanya harga satuan timpang dilakukan dengan meneliti harga satuan penawaran yang > 110% HPS Jika harga penawaran terkoreksi < 80% HPS, lakukan klarifikasi

III. HASIL EVALUASI DOKUMEN PENAWARAN URAIAN

NO. 1

Evaluasi Teknis

2

Evaluasi Harga

HASIL EVALUASI

KETERANGAN

LULUS LULUS REKOMENDASI

LANJUTKAN EVALUASI KE TAHAP BERIKUTNYA

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

Lampiran Berita Acara Evaluasi Penawaran

Page 1 of 1

LAMPIRAN BERITA ACARA PEMBUKAAN PENAWARAN Nomor Tanggal

: :

178/KK.24.11/1/KS.01/02/2019 31 Januari 2019

Nama Paket

:

Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

Nilai HPS TA

: :

Rp. 184.710.000,00 2019

NO

NAMA PESERTA

1

CV. Indotal Jaya

Keterangan :

1 2 3

KELENGKAPAN DOKUMEN PENAWARAN 1



2

3

4

5







JUMLAH PENAWARAN (Rp)

Rp. 184.710.000,00

√ = Ada, X = Tidak Ada L = Lengkap, TL = Tidak Lengkap HK = Hari Kalender

Kelengkapan Dokumen Penawaran : 1 Surat Penawaran 2 Surat Kuasa (apabila ada) 3 Daftar Kuantitas Dan Harga 4 Formulir isian kulaifikasi 5 Pakta integritas

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

JANGKA WAKTU PELAKSANAAN

KET. (L/TL)

60 (Enam puluh ) hari kalender

L

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara Website : www.konut.kemenag.go.id BERITA ACARA PEMBUKAAN SAMPUL PENAWARAN : 178/KK.24.11/1/KS.01/02/2019 Nomor : 31 Januari 2019 Tanggal Nama Paket

:Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

Nilai HPS Tahun Angg.

:Rp. 184.710.000,00 :2019

Pada hari ini Selasa tanggal Dua puluh Dua bulan Mei tahun Dua Ribu Delapan Belas, Pejabat Pengadaan telah melakukan pembukaan Dokumen Penawaran pada Paket tersebut di atas dengan hasil sebagai berikut :

1. Jumlah peserta yang diundang : 1 (satu) peserta 2. Jumlah sampul penawaran : 1 (satu) sampul 3. Diadakan penelitian kelengkapan dokumen penawaran dari Peserta yang memasukan sampul a. Lengkap (L) : 1 (satu) peserta : 0 (nol) peserta b. Tidak Lengkap (TL) 4. Berdasarkan hasil tersebut diatas, Pengadaan Langsung ini dinyatakan : GAGAL / TIDAK GAGAL 5. Catatan selama pembukaan sampul penawaran : ………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………… Hasil Pembukaan Penawaran terlampir. Demikian Berita Acara ini dibuat untuk dipergunakan seperlunya.

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

Daftar Pemasukan Sampul Penawaran Nama Paket Nilai HPS Tahun Angg. Hari/Tgl. Jam

: : : : :

Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara Rp. 184.710.000,00

2019 31 Januari 2019 08 s.d 11.00

No.

Nama Perusahan

Nama

Jabatan

1

CV. Indotal Jaya

Agus

Direktur

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

Tanda Tangan

Keterangan

Tanda Terima Undangan Pengadaan Langsung Nama Paket :

Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

Nilai HPS TA Hari/Tgl.

Rp. 184.710.000,00 2019 30 Januari 2019

: : :

No.

Nama

Nama Perusahan

Alamat Perusahan

1

Agus

CV. Indotal Jaya

Jl. Mekar No.07 Sodohoa Kendari Barat

Telp/Faks/e-mail

Tanda Tangan

Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

Keterangan

DATA KUALIFIKASI PENYEDIA Satuan Kerja Nama Paket Nilai HPS

: Kantor Kementerian Agama Kabupaten Konawe Utara : Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara : 184.710.000

TA

: 2019

No.

Persyaratan Kualifikasi

Hasil (MS/TMS)

Keterangan

1

Memiliki Ijin Usaha yang sesuai

MS

Lulus

2

Memiliki Nomor Pokok Wajib Pajak (NPWP)

MS

Lulus

3

Memenuhi kewajiban perpajakan tahun terakhir (SPT Tahunan)

MS

Lulus

Keterangan : MS = Memenuhi Syarat TMS = Tidak Memenuhi Syarat Wanggudu, 31 Januari 2019 Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

Data Hasil Survey Harga Dan Kualitas

Page 1 of 1

REKAPITULASI ANGGARAN BIAYA

Satuan Kerja Pekerjaan Lokasi Tahun Anggaran

: : : :

Kantor Kementrian Agama Kab. Konawe Utara Pemeliharaan Gedung dan Halaman Kompleks Kantor Kemenag Kab. Konawe Utara 2019

URAIAN DAN JENIS PEKERJAAN

NO

JUMLAH HARGA 1.100.898 2.327.085 6.577.440 396.400 385.020 1.503.720 674.550

PEKERJAAN PENAMBAHAN RUANGAN KANTOR I PEKERJAAN PERSIAPAN II PEKERJAAN BETON II PEKERJAAN PAS. BATA II PEKERJAAN PEMASANGAN KUSEN DAN DAUN PINTU III PEKERJAAN TEGEL V PEKERJAAN PLASTERAN VI PEKERJAAN ACIAN PEKERJAAN KANOPI MUSHOLA I PEKERJAAN KUDA-KUDA II PEMASANGAN ATAP PEKERJAAN REHAB WC I PEKERJAAN PERSIAPAN II PEKERJAAN LANTAI III PEKERJAAN DINDING IV PEKERJAAN KUSEN PINTU DAN FENTILASI V PEKERJAAN KUSEN PINTU DAN FENTILASI VI PEKERJAAN PEMASANGAN CLOSET VII PEKERJAAN PIPA VIII PEKERJAAN PENGECATAN PEKERJAAN PARKIRAN MOBIL I PEKERJAAN PERSIAPAN II PEKERJAAN TANAH II PEKERJAAN PONDASI III PEKERJAAN BETON IV PEKERJAAN PAS. DINDING V PEKERJAAN PLASTERAN VI PEKERJAAN ACIAN VII PEKERJAAN KUDA - KUDA VIII PEK. LANTAI KERJA 1X PEK. ATAP PEKERJAAN PAPAN NAMA KANTOR I PEKERJAAN TANAH II PEKERJAAN PONDASI III PEKERJAAN BETON IV PEKERJAAN DINDING V PEKERJAAN TEGEL V PEKERJAAN PLASTERAN VI PEKERJAAN ACIAN VI PEKERJAAN. PEMASANGAN HURUF PEKERJAAN RABAT HALAMAN I PEKERJAAN PERSIAPAN II PEK. TIMBUNAN III PEK. LANTAI KERJA A B C D

1.917.440 1.790.240 4.503.240 641.700 2.142.578 343.340 895.665 501.050 275.420 593.208 1.643.000 2.188.985 8.805.992 8.673.999 13.451.328 4.852.003 2.042.388 26.154.667 4.476.833 5.625.600 194.905 690.300 1.231.599 815.232 282.348 1.257.277 563.999 4.400.000 2.012.400 8.019.000 43.968.898

Raal Cost PPN 10% (A) Total Cost Dibulatkan Terbilang

167.919.745 16.791.975 184.711.720 184.710.000 :

Seratus Dealapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah

Mengetahui : CV. Indotal Jaya

Mengetahui : CV. Indotal Jaya

Agus Direktur

Staf Teknik

Nomor

: BG-PL-Konut/02/2019

Lampiran : 1 (Satu) Berkas

Kepada Yth. Pejabat Pengadaan Kantor Kementrian Agama Kabupaten Konawe Utara DiWanggudu

Perihal

: Penawaran Pekerjaan pada Kantor Kementrian Agama Kabupaten Konawe Utara

Sehubungan dengan undangan Pengadaan Langsung Nomor 177/KK.24.11/1/KS.01/02/2019 Tanggal 30 Januari 2019 dan setelah kami pelajari dengan seksama Dokumen Pengadaan. Dengan ini kami mengajukan penawaran untuk pekerjaan Pemeliharaan Gedung dan Halaman Kantor Kementrian Agama Kabupaten Konawe Utara, Sebesar Rp. 184.710.000,00 ( Seratus Delapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah ). Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen pengadaan Langsung untuk melaksanakan pekerjaan tersebut di atas. Kami akan melaksanakan pekerjaan tersebut dengan jangka waktu pelaksanaan pekerjaan selama 60 (Enam Puluh ) Hari kalender. Sesuai dengan Persyaratan, bersama Surat penawaran ini kami lampirkan : 1 2

3

[ Daftar Kuantitas dan Harga, apabila dipersyaratkan }; Dokumken penawaran teknis, terdiri dari : a. Metode Pelaksanaan; b. Jadwal Waktu Pelaksanaan c. Daftar Personil Intil; d. Jenis,kapasitas,komposisi, dan jumlah peralatan utama minimal yang di butuhkan e. Spesifikasi Teknis; f. [Bagian Pekerjaan yang akan disubkontrakkan, apabila ada]. Dokumen Kualifikasi

Surat Penawaran beserta lampirannya kami sampaikan sebanyak 1 (satu) rangkap dokumen asli. Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yang tercantum dalam Dokumen pengadaan.

CV. Indotal Jaya

Agus Direktur

PAKTA INTEGRITAS Nama

:

Agus

Jabatan

:

Direktur

Bertindak untuk dan atas nama :

CV. Indotal Jaya

Dalam rangka pekerjaan Pemeliharaan Gedung dan Halaman Kantor Kementrian Agama Kabupaten Konawe Utara pada Kantor Kementrian Agama Kabupaten Konawe Utara, dengan ini Menyatakan bahwa : 1.

Tidak akan melakukan praktek Korupsi Kolusi dan Nepotisme (KKN);

2.

Akan melaporkan kepada APIP Kementrian Agama dan/atau LKPP apabila mengetahui ada indikasi KKN di dalam proses pengadaan ini;

3.

Akan mengikuti proses pengadaan secara bersih, transparan, dan profesional untuk memberikan hasil kerja terbaik sesuai ketentuan peratuan perundang-undangan;

4.

Apabila melanggar hal-hal yang dinyatakan dalam PAKTA INTEGRITAS ini, bersedia menerima sanksi administratif, menerima sanksi pencantuman dalam Daftar Hitam, digugat secara perdata dan/atau dilaporkan secara pidana

Wanggudu 31 Januari 2019 CV. Indotal Jaya

Agus Direktur

RENCANA ANGGARAN BIAYA ( RAB ) Satuan Kerja Pekerjaan Lokasi

: : : :

Tahun Anggaran NO

URAIAN

SATUAN

Kantor Kementrian Agama Kab. Konawe Utara Pemeharaan Gedung Dan Halaman Kompleks Kantor Kemenag Kab. Konawe Utara 2019 VOLUME

PEKERJAAN PENAMBAHAN RUANGAN KANTOR I PEKERJAAN PERSIAPAN a Pek. Pembongkaran Lantai M3 b Pek. Pemobongkaran Dinding M3 Jumlah II PEKERJAAN BETON a Pek. Sloef Beton 12/15 1 Pek. Beton f"c 24 Mpa M3 2 Besi Polos Ø 10 mm Kg 3 Besi Polos Ø 8 mm Kg 4 Bekisting M2 Jumlah b PEK. KOLOM 15/15 1 Pek. Beton f"c 24 Mpa M3 2 Besi Polos Ø 10 mm Kg 3 Besi Polos Ø 8 mm Kg 5 Bekisting M2 Jumlah Jumlah II PEKERJAAN PAS. BATA a Pas. Batu Bata M2 Jumlah II PEKERJAAN PEMASANGAN KUSEN DAN DAUN PINTU a Pek, Pemasangan Kusen dan Daun Pintu Ls Jumlah III PEKERJAAN TEGEL a Pek. Pemasangan Tegel M2 Jumlah V PEKERJAAN PLASTERAN a Pek.Plasteran M2 Jumlah VI PEKERJAAN ACIAN a Pek.Acian M2 Jumlah Jumlah PEKERJAAN KANOPI MUSHOLA I PEKERJAAN KUDA-KUDA a Perakitan Kuda - Kuda Besi Hollow Ls Jumlah II PEMASANGAN ATAP a Pekerjaan Atap Ls Jumlah Jumlah PEKERJAAN REHAB WC I PEKERJAAN PERSIAPAN a Pek. Pembongkaran M3 Jumlah II PEKERJAAN LANTAI a Pek. Lantai Keramik 30 x 30 M2 Jumlah III PEKERJAAN DINDING a Pek. Dinding Keramik 30 x 30 Jumlah IV PEKERJAAN KUSEN PINTU DAN FENTILASI a Pintu 1 Pek. Kusen Pintu M3 b Fentilasi 1 Pek. Kusen Fentilasi M3 Jumlah V PEKERJAAN KUSEN PINTU DAN FENTILASI a Pek. Kusen Pintu b Pek. Pemasangan Daun Pintu Jumlah VI PEKERJAAN PEMASANGAN CLOSET a Pek. Pemasangan Closet Duduk La Jumlah

HARGA SATUAN

HARGA

0,15 1,8

643.320 558.000

96.498 1.004.400 1.100.898

0,09 12,3 5,04 1,5

1.261.770 15.000 15.000 170.585

113.559 184.500 75.600 255.878 629.537

0,07 71,9 4,52 1,8

1.261.770 15.000 15.000 257.180

88.324 1.078.500 67.800 462.924 1.697.548 2.327.085

28,4

231.600

6.577.440 6.577.440

1

396.400

396.400 396.400

2,4

160.425

385.020 385.020

18

83.540

1.503.720 1.503.720

18

37.475

674.550 674.550 12.965.113

1

1.917.440

1.917.440 1.917.440

1

1.790.240

1.790.240 1.790.240 3.707.680

7

643.320

4.503.240 4.503.240

4,0

160.425

641.700 641.700

11,1

193.025

2.142.578 2.142.578

0,03

8.583.500

257.505

0,01

8.583.500

85.835 343.340

0,03 1,2

8.583.500 531.800

257.505 638.160 895.665

1

501.050

501.050 501.050

VII PEKERJAAN PIPA Pek. Pipa a Keran Air 1/2 b Jumlah VIII PEKERJAAN PENGECATAN a Pek. Pengecatan Jumlah Jumlah PEKERJAAN PARKIRAN MOBIL I PEKERJAAN PERSIAPAN a Pek. Pembersihan Lahan Jumlah II PEKERJAAN TANAH a Galian Tanah b Urugan Tanah c Urugan Pasir Jumlah II PEKERJAAN PONDASI a PEK. PONDASI GARIS 1 Pek. Batu Kosong 2 Pek. Pasangan Batu Jumlah b PEK. PONDASI KOLOM 1 Pek. Beton f"c 24 Mpa 2 Angkur Ø 8 mm Jumlah Jumlah III PEKERJAAN BETON a Sloof 1 Pek. Sloef Beton 12/15 2 Pek. Beton f"c 24 Mpa 3 Besi Polos Ø 10 mm 4 Besi Polos Ø 8 mm 5 Bekisting Jumlah b Kolom 1 Pek. Beton f"c 24 Mpa 2 Besi Polos Ø 10 mm 3 Besi Polos Ø 8 mm 4 Bekesting Jumlah Jumlah IV PEKERJAAN PAS. DINDING a Pas. Batu Bata Jumlah V PEKERJAAN PLASTERAN a. Pek. Plasteran Jumlah VI PEKERJAAN ACIAN a Pek.Acian Jumlah VII PEKERJAAN KUDA - KUDA a Perakitan Kuda - Kuda Besi Hollow 6 x 8 Jumlah VIII PEK. LANTAI KERJA a Pek. Lantai Kerja Jumlah 1X PEK. ATAP a Pek. Atap b Pek. Pemasangan Talangan Air Jumlah Jumlah PEKERJAAN PAPAN NAMA KANTOR I PEKERJAAN TANAH a Galian Tanah b Urugan Tanah Kembali c Urugan Pasir Jumlah II PEKERJAAN PONDASI 1 Pek. Batu Kosong 2 Pek. Pasangan Batu Jumlah

M1 Bh

4 1

65.105 15.000

260.420 15.000 275.420

M2

20

29.660

593.208 593.208 9.896.201

M2

106

15.500

1.643.000 1.643.000

M3 M3 M3

22,67 5,19 2,79

70.000 51.500 120.000

1.586.900 267.285 334.800 2.188.985

M3 M3

5,58 11,46

431.940 489.000

2.410.225 5.603.940 8.014.165

M3 Kg

0,58 4

1.261.770 15.000

731.827 60.000 791.827 8.805.992

M3 Kg Kg M2

0,45 61,69 26,33 8,66

1.261.770 15.000 15.000 170.585

567.797 925.350 394.950 1.477.266 3.365.363

M3 Kg M3 M2

0,48 58,38 24,20 13,50

1.245.847 15.000 15.000 257.180

598.007 875.700 363.000 3.471.930 5.308.637 8.673.999

M2

58,08

231.600

13.451.328 13.451.328

M2

58,08

83.540

4.852.003 4.852.003

M2

54,5

37.475

2.042.388 2.042.388

M1

200

130.773

26.154.667 26.154.667

M3

5,32

841.510

4.476.833 4.476.833

M2 M1

68,9 24,86

60.000 60.000

4.134.000 1.491.600 5.625.600 77.914.795

M3 M3 M3

2,01 0,47 0,25

70.000 51.500 120.000

140.700 24.205 30.000 194.905

M3 M3

0,5 0,97

431.940 489.000

215.970 474.330 690.300

III a

PEKERJAAN BETON Kolom Pek. Beton f"c 24 Mpa Besi Polos Ø 10 mm Besi Polos Ø 8 mm Bekesting

1 2 3 4 Jumlah b Ring Balok 1 Pek. Beton f"c 24 Mpa 2 Besi Polos Ø 10 mm 3 Besi Polos Ø 8 mm 4 Bekesting Jumlah Jumlah IV PEKERJAAN DINDING a Pas. Batu Bata Jumlah V PEKERJAAN TEGEL a Pek. Pemasangan Tegel Jumlah V PEKERJAAN PLASTERAN a. Pek. Plasteran Jumlah VI PEKERJAAN ACIAN a Pek.Acian Jumlah VI PEKERJAAN. PEMASANGAN HURUF a Pek.Huruf Jumlah Jumlah PEKERJAAN RABAT HALAMAN I PEKERJAAN PERSIAPAN a Pek. Pembersihan Lahan Jumlah II PEK. TIMBUNAN a Pek. Timbunan Jumlah III PEK. LANTAI KERJA a Pek. Lantai Kerja Jumlah Jumlah A Raal Cost B PPN 10% (A) C Total Cost D Dibulatkan

M3 Kg M3 M2

0,15 11,10 7,13 1,60

1.245.847 15.000 15.000 257.180

186.877 166.500 106.950 411.488 871.815

M3 Kg M3 M2

0,04 4,93 2,36 0,78

1.245.847 15.000 15.000 257.180

49.834 73.950 35.400 200.600 359.784 1.231.599

M2

3,52

231.600

815.232 815.232

M2

1,76

160.425

282.348 282.348

M2

15,05

83.540

1.257.277 1.257.277

M2

15,05

37.475

563.999 563.999

4.400.000

4.400.000 4.400.000 9.435.660

Ls

1

M2

309,6

6.500

2.012.400 2.012.400

M3

148,50

54.000

8.019.000 8.019.000

M3

52,25

841.510

43.968.898 43.968.898 54.000.298 167.919.745 16.791.975 184.711.720 184.710.000

Mengetahui : CV. Indotal Jaya

Mengetahui : CV. Indotal Jaya

Agus Direktur

Staf Teknik

KUMPULAN ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN No

Uraian

Pemasangan Bowplank TENAGA 1 Pekerja 2 Tukang Katu 3 Kepala Tukang 4 Mandor Jumlah 1 Kayu Balok 5/7 2 Paku 2 - 3 cm 3 Papan 3/20 Jumlah Jumlah PEKERJAAN TANAH Penggalian Tanah TENAGA 1 Pekerja 2 Mandor Jumlah Jumlah Penurugan Tanah TENAGA 1 Pekerja 2 Mandor Jumlah BAHAN 1 Tanah Urug Jumlah Jumlah PEKERJAAN PONDASI/TALUD ( 1 : 4 ) TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang batu 4 Mandor Jumlah BAHAN 1 Batu Belah 2 Pasir Pasang 3 Portland Cement Jumlah Jumlah PEKERJAAN BETON TENAGA 1 Pekerja 2 Tukang batu 4 Kepala tukang 5 Mandor Jumlah BAHAN 1 Semen Portland 2 Pasir beton 3 Kerikil (Maks30mm) Jumlah Jumlah PEKERJAAN PEMBESIAN TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Besi Beton Jumlah Jumlah PEKERJAAN BEKISTING Sloef TENAGA 1 Pekerja 2 Tukang Kayu

Satuan

Koefisien

Harga Satuan ( Rp )

Jumlah Harga ( Rp )

OH OH OH OH

0,1 0,1 0,01 0,01

90.000 120.000 130.000 130.000

M3 Kg M3

0,012 0,02 0,007

1.725.000 24.000 1.725.000

OH OH

0,75 0,025

90.000 130.000

67.500 3.250 70.750 70.750

OH OH

0,5 0,05

90.000 130.000

45.000 6.500 51.500

1

54.000

9.000 12.000 1.300 1.300 23.600 20.700 480 12.075 33.255 56.855

54.000 54.000 105.500

OH OH OH OH

1,50 0,75 0,08 0,08

90.000 120.000 130.000 130.000

135.000 90.000 9.750 9.750 244.500

M3 M3 Kg

1,20 0,52 163,00

218.000 175.000 1.500

261.600 91.000 244.500 597.100,00 489.000,00

OH OH OH

1,65 0,28 0,03

90.000 120.000 130.000

148.500,00 33.000,00 3.640,00

OH

0,08

130.000

10.790,00 195.930,00

Kg M3 M3

406 0,68 1,03

1.500 175.000 328.000

609.000 119.000 337.840 1.065.840,00 1.261.770,00

OH OH OH OH

0,070 0,070 0,007 0,004

90.000 120.000 130.000 130.000

6.300 8.400 910 520 16.130,00

Kg

10,50

15.000

157.500 157.500,00 173.630,00

OH OH

0,52 0,26

90.000 120.000

46.800 31.200

4 Kepala tukang 5 Mandor Jumlah BAHAN 1 Kayu Kelas III 2 Paku 5 - 10 Cm 3 Minyak Beksiting Jumlah Jumlah Kolom TENAGA 1 Pekerja 2 Tukang Kayu 4 Kepala tukang 5 Mandor Jumlah BAHAN 1 Kayu Kelas III 2 Paku 5 - 12 Cm 3 Balok Kayu Kelas II 5 Dolken Kayu ø 8 - 10 cm Balok TENAGA 1 Pekerja 2 Tukang Kayu 4 Kepala tukang 5 Mandor Jumlah BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu(8–10) cmpanjang 4 m Jumlah Jumlah PEK. PASANGAN BATA TENAGA 1 Pekerja 2 Tukang Batu 4 Kepala tukang 5 Mandor Jumlah BAHAN 1 Bata Merah 2 Semen Portland 3 Pasir Pasang Jumlah Jumlah PEK. KUSEN TENAGA 1 Pekerja 2 Tukang Kayu 4 Kepala tukang 5 Mandor Jumlah 1 Balok Kayu 3 Paku 4 Lem Kayu Jumlah Jumlah PEK. DAUN PINTU TENAGA 1 Pekerja 2 Tukang Kayu 4 Kepala tukang 5 Mandor Jumlah BAHAN 1 Papan Kayu 2 Lem Kayu Jumlah Jumlah PEK. PLASTERAN TENAGA 1 Pekerja 2 Tukang batu

OH OH

0,026 0,026

130.000 130.000

3.380 3.380 84.760,00

M3 Kg Liter

0,045 0,3 0,1

1.725.000 24.000 10.000

77.625 7.200 1.000 85.825,00 170.585,00

OH OH OH OH

0,66 0,33 0,033 0,033

90.000 120.000 130.000 130.000

59400 39600 4290 4290 107.580,00

M3 Kg M3 Batang

0,04 0,4 0,015 2,00

1.725.000 24.000 3.400.000 10.000

69.000 9.600 51.000 20.000

OH OH OH OH

0,66 0,33 0,033 0,033

90.000 120.000 130.000 130.000

59.400 39.600 4.290 4.290 107.580

0,04 0,4 0,2 0,018 0,35 2

1.725.000 24.000

69.000 9.600 0 61.200 19.600 26.000 185.400 292.980

0,6 0,2 0,02 0,03

90.000 120.000 130.000 130.000

54.000 24.000 2.600 3.900 84.500,00

140 26,55 0,093

650 1.500 175.000

91.000 39.825 16.275 147.100,00 231.600,00

OH OH OH OH

7 21 2,1 0,35

90.000 120.000 130.000 130.000

M3 Kg Kg

1,1 1,25 1

4.600.000 24.000 25.000

630.000 2.520.000 273.000 45.500 3.468.500,00 5.060.000 30.000 25.000 5.115.000,00 8.583.500,00

OH OH OH OH

0,8 2,4 0,24 0,04

90.000 120.000 130.000 130.000

72.000 288.000 31.200 5.200 396.400,00

M3 Kg

0,024 1

4.600.000 25.000

110.400 25.000 135.400,00 531.800,00

OH OH

0,4 0,2

90.000 120.000

36.000 24.000

OH OH OH OH

Buah Kg M3

3.400.000 56.000 13.000

3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Semen Portland 2 Pasir Pasang Jumlah Jumlah PEK. ACIAN TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Semen Portland Jumlah Jumlah PEK. PEMBONGKARAN TENAGA 1 Pekerja 2 Mandor Jumlah Jumlah PEK. BESI DAN ALMUNIUM PEKERJAAN KUDA - KUDA TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Rangka Metal Hollow 4 x 4 2 Rangka Metal Hollow 6 x 8 Jumlah Jumlah PEKERJAAN ATAP TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Atap Almunium 2 Baut Sekrup Jumlah Jumlah PEK. LANTAI KERAMIK 30 X 30 TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Ubin Keramik 2 Semen Portland 3 Pasir Pasang 4 Semen Warna Jumlah Jumlah PEK. LANTAI KERAMIK 30 X 30 TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Ubin Keramik 2 Semen Portland 3 Pasir Pasinhg 4 Semen Warna Jumlah Jumlah

OH OH

0,02 0,022

130.000 130.000

2.600 2.860 65.460,00

Kg M3

8,32 0,032

1.500 175.000

12.480 5.600 18.080,00 83.540,00

OH OH OH OH

0,2 0,1 0,01 0,01

90.000 120.000 130.000 130.000

18.000 12.000 1.300 1.300 32.600,00

Kg

3,25

1.500

4.875 4.875,00 37.475,00

OH OH

6,667 0,333

90.000 130.000

600.030 43.290 643.320,00 643.320,00

OH OH OH OH

0,25 0,25 0,025 0,013

90.000 120.000 130.000 130.000

22500 30000 3250 1690 57.440,00

M1 M1

60 15

22000 36000

1320000 540000 1.860.000,00 1.917.440,00

OH OH OH OH

0,15 0,075 0,08 0,006

90.000 120.000 130.000 130.000

13.500 9.000 10.400 780 33.680,00

Lbr Kg

1,05 1

60.000 80.000

63.000 80.000 143.000,00 176.680,00

OH OH OH OH

0,7 0,35 0,035 0,035

90.000 120.000 130.000 130.000

63.000 42.000 4.550 4.550 114.100,00

Doos Kg M3 Kg

1,05 10 0,045 0,5

21.000 1.500 175.000 2.800

22.050 15.000 7.875 1.400 46.325,00 160.425,00

OH OH OH OH

0,9 0,45 0,045 0,045

90.000 120.000 130.000 130.000

81.000 54.000 5.850 5.850 146.700,00

Doos Kg M3 Kg

1,05 10 0,045 0,5

21.000 1.500 175.000 2.800

22.050 15.000 7.875 1.400 46.325,00 193.025,00

PEK. RANGKA BESI HOLLOW PEKERJAAN KUDA - KUDA TENAGA 1 Pekerja 2 Tukang Besi 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Rangka Metal Hollow 6 x 8 2 Assesoris ( Perkuatan, Las dll) Jumlah Jumlah PEK. PAVING BLOCK TENAGA 1 Pekerja 2 Tukang Besi 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Paving Block 8 cm 2 Pasir Beton Jumlah Jumlah PEK. PEMBERSIHAN LAHAN TENAGA 1 Pekerja 2 Mandor Jumlah Jumlah PEK. LANTAI KERJA TENAGA 1 Pekerja 2 Tukang Batu 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Semen Portland 2 Pasir Pasang 3 Kerikil 2/3 Jumlah Jumlah PEK. PEMBONGKARAN BATA TENAGA 1 Pekerja Jumlah PEK. PEMBONGKARAN BATA TENAGA 1 Pekerja Jumlah PEK. BATU KOSONG TENAGA 1 Pekerja 2 Tukang Batu 3 Kepala tukang 4 Mandor Jumlah BAHAN Batu Belah Pasir Urug Jumlah Jumlah PEK. PENGECATAN TEMBOK LAMA TENAGA 1 Pekerja 2 Tukang Cat 3 Kepala tukang 4 Mandor Jumlah BAHAN 1 Cat Dasar 2 Cat Penutup 3 Amplas 4 Kuas Rol Jumlah Jumlah

OH OH OH OH

0,25 0,25 0,025 0,013

90.000 120.000 130.000 130.000

22500 30000 3250 1690 57.440,00

M1 Ls

1 100

36.667 36.667

36.667 36.667 73.333,33 130.773,33

OH OH OH OH

0,5 0,5 0,05 0,013

90.000 120.000 130.000 130.000

45.000 60.000 6.500 1.690 Rp113.190,00

M2 M3

1,01 2,07

4.000 175.000

4.040 362.250 366.290,00 479.480,00

OH OH

0,1 0,05

90.000 130.000

9000 6500 15.500,00 15.500,00

OH OH OH OH

1,05 0,25 0,025 0,08

90.000 120.000 130.000 130.000

94500 30000 3250 10400 138.150

OH OH OH

218 0,52 0,87

1.500 175.000 328.000

327.000 91.000 285.360 703.360 841.510,00

OH

4,6

90.000

414.000 414.000

OH

6,2

90.000

558.000 558.000

OH OH OH OH

0,78 0,39 0,039 0,039

90.000 120.000 130.000 130.000

70.200 46.800 5.070 5.070 127.140

M3 M3

1,2 0,432

218.000 100.000

261.600 43.200 304.800 431.940

OH OH OH OH

0,028 0,042 0,0042 0,003

90.000 120.000 130.000 130.000

2.520 5.040 546 390 8.496

Kg Kg Lbr Bh

0,12 0,18 0,5 0,01

47.120 69.500 5.500 25.000

5.654 12.510 2.750 250 21.164 29.660

PEK. PEMASANGAN KLOSED JONGKOK PORSELEN TENAGA 1 Pekerja OH 2 Tukang Cat OH 3 Kepala tukang OH 4 Mandor OH Jumlah BAHAN 1 Closet Jongkok 2 Semen Portland 3 Pasir Pasang Jumlah Jumlah PEK. PEMASANGAN PIPA TENAGA 1 Pekerja OH 2 Tukang Cat OH 3 Kepala tukang OH 4 Mandor OH Jumlah BAHAN 1 Pipa PVC 1/2 M1 2 Perlengkapan 30% % Jumlah Jumlah PEK. PENGURUGAN KEMBALI TANAH TENAGA 1 Pekerja OH 2 Mandor OH Jumlah Jumlah PEK. URUGAN PASIR TENAGA 1 Pekerja OH 2 Mandor OH Jumlah BAHAN 1 Pasir Urug M3 Jumlah Jumlah PEK. PONDASI BATU KOSONG TENAGA 1 Pekerja OH 2 Tukang Cat OH 3 Kepala tukang OH 4 Mandor OH Jumlah TENAGA 1 Batu Belah M3 2 Pasir Urug M3 Jumlah Jumlah PEK. BESIKISTING BALOK

1 1,5 0,15 0,16

90.000 120.000 130.000 130.000

90.000 180.000 19.500 20.800 310.300

1,00 6,00 0,01

180.000 1.500 175.000

180.000 9.000 1.750 190.750 501.050

0,036 0,06 0,006 0,002

90.000 120.000 130.000 130.000

3.240 7.200 780 260 11.480

1,1

37.500 12.375

41.250 12.375 53.625 65.105

0,5 0,05

90.000 130.000

45000 6500 51.500 51.500

0,03 0,01

90.000 130.000

2700 1300 4.000

1,2

100.000

120.000 120.000 124.000

0,78 0,39 0,039 0,039

90.000 120.000 130.000 130.000

70.200 46.800 5.070 5.070 127.140

1,2 0,432

218.000 100.000

261.600 43.200 304.800 431.940

Mengetahui : CV. Indotal Jaya

Mengetahui : CV. Indotal Jaya

Agus Direktur

Staf Teknik

DOKUMEN PENGADAAN Pengadaan Langsung Nomor

: 176/KK.24.11/1/KS.01/02/2019

Tanggal : 30 Januari 2019

Untuk Pekerjaan Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

Pejabat Pengadaan Kantor Kementerian Agama Kabupaten Konawe Utara Tahun Anggaran 2019

BAB I. UNDANGAN PENGADAAN LANGSUNG

KEMENTERIAN AGAMA REPUBLIK INDONESIA KANTOR KEMENTERIAN AGAMA KABUPATEN KONAWE UTARA Kompleks Perkantoran Pemda Kab. Konawe Utara Website : www.konut.kemenag.go.id

Nomor Lampiran

: :

177/KK.24.11/1/KS.01/02/2019 1 (satu) berkas

Wanggudu, 30 Januari 2019

Kepada Yth. CV. Indotal Jaya Di Tempat Perihal : Pengadaan Langsung untuk Paket pekerjaan Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara pada Kantor Kementerian Agama Kabupaten Konawe Utara Dengan ini Saudara kami undang untuk mengikuti proses Pengadaan Langsung paket Pekerjaan Barang sebagai berikut: 1. Paket Pekerjaan Nama paket pekerjaan : Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

Lingkup pekerjaan

:

Pemeliharaan Gedung dan Kabupaten Konawe Utara

Nilai total HPS

:

Sumber pendanaan

:

184.710.000,00 Rp. Seratus Delapan Puluh Empat Juta Tujuh Ratus Sepuluh Ribu Rupiah DIPA Kantor Kementerian Agama Kabupaten Konawe Utara

2. Pelaksanaan Pengadaan Tempat dan alamat : Telepon/Fax Website

: :

Halaman Kantor

Kementerian Agama

Kompleks Perkantoran Pemda Kab. Konawe Utara -

Saudara diminta untuk memasukan penawaran administrasi, teknis dan harga, secara langsung sesuai dengan jadwal pelaksanaan sebagai berikut: No Kegiatan Hari/Tanggal Waktu (WITA) a. Pemasukan Dokumen Kualifikasi Rabu s.d Kamis 08 s.d 11.00 30 Januari s.d 31 Januari 2019

b.

Pembukaan Dokumen Penawaran

c.

Klarifikasi Teknis dan Negosiasi Harga

d.

Penandatanganan SPK

Kamis 31 Januari 2019 Jumat 01 Februari 2019 Minggu 03 Februari 2019

10.00 08 s.d 10.00

Apabila Saudara membutuhkan keterangan dan penjelasan lebih lanjut, dapat menghubungi Kami sesuai alamat tersebut di atas sampai dengan batas akhir pemasukan Dokumen Penawaran. Demikian disampaikan untuk diketahui. Pejabat Pengadaan

Muh. Yamin Saranani, S.Ag NIP. 197610112005011003

BAB III. LEMBAR DATA PENGADAAN (LDP) Lembar Data Pengadaan (LDP)

A. LINGKUP PEKERJAAN 1. Pejabat Pengadaan : Pejabat Pengadaan Kantor Kementerian Agama Kabupaten Konawe Utara 2. Alamat Pejabat Pengadaan

: Kompleks Perkantoran Pemda Kab. Konawe Utara

3. Website

: -

4. Nama paket pekerjaan

: Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

5. Uraian Singkat pekerjaan

: Pemeliharaan Gedung dan Halaman Kantor Kementerian Agama Kabupaten Konawe Utara

6. Jangka Waktu Penyelesaian pekerjaan

: 60 (Enam puluh ) hari kalender

B. SUMBER DANA

Pekerjaan ini dibiayai dari sumber pendanaan DIPA Kantor Kementerian Agama Kabupaten Konawe Utara

C. MASA BERLAKUNYA PENAWARAN

Masa berlakunya surat penawaran 04 April 2019

G. DOKUMEN PENAWARAN

Bagian Pekerjaan yang Disubkontrakkan_______

H. SYARAT PENYEDIA

Memiliki izin usaha bidang Kontraktor, Perdagangan Umum, Barang dan Jasa