Hvac Legends.pdf

  • Uploaded by: Muaz Sayed
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Hvac Legends.pdf as PDF for free.

More details

  • Words: 115,095
  • Pages: 251
A AAV AC AD AFF ATF

DOUBLE LINE DUCT

O AUTOMATIC AIR VENT AIR COMPRESSOR AIR DRYER, AUTOMATIC DRAIN ABOVE FINISHED FLOOR AUTOMATIC TRANSMISSION FLUID

OA ORD

OUTSIDE AIR OVERFLOW ROOF DRAIN

OR

P P

OR PUMP

PIPING

DUCT SECTION (EXHAUST OR RETURN)

THESE NOTES APPLY TO ALL M, FP & P DRAWINGS UNLESS NOTED OTHERWISE SLOPE (DN TOWARD ARROW DIRECTION) DIRECTION OF FLOW

SEE SPECIFICATION DIVISION 15 FOR INSTALLATION AND OTHER REQUIREMENTS FOR MECHANICAL WORK SHOWN ON "M", "FP" AND "P" SERIES DRAWINGS. 1.

THE DESIGN SHOWN ON THE DRAWINGS IS BASED ON THE EQUIPMENT MANUFACTURERS LISTED IN THE MECHANICAL EQUIPMENT SCHEDULES. EQUIPMENT PROPOSED BY THE CONTRACTOR THAT IS NOT LISTED IN THE SCHEDULES SHALL BE SUBMITTED TO CITY/BOROUGH OF JUNEAU AS A REQUEST FOR SUBSTITUTION IN ACCORDANCE WITH DIVISION 1.

2.

PROVIDE ALL MECHANICAL SYSTEMS IN ACCORDANCE WITH THE FIRE WALL, FIRE BLOCKING AND FIRE STOP PROVISIONS SHOWN ON THE ARCHITECTURAL DRAWINGS.

3.

COORDINATE SUPPLY AIR DIFFUSERS AND RETURN/EXHAUST AIR GRILLE LOCATIONS WITH ARCHITECTURAL DRAWINGS. COORDINATE DUCT ROUTING WITH LIGHT FIXTURE LOCATIONS.

4.

MECHANICAL WORK SHOWN IS DIAGRAMMATIC. PROVIDE OFFSETS, TRANSITIONS, AND OTHER DUCTWORK, PIPING AND ASSOCIATED CONSTRUCTION WHERE REQUIRED TO AVOID BUILDING STRUCTURAL ELEMENTS OR THE WORK OF OTHER TRADES.

5.

DUCTWORK DIMENSIONS SHOWN ARE NET INSIDE DIMENSIONS. ENLARGE DUCT DIMENSIONS AS REQUIRED FOR INTERNALLY LINED DUCTWORK, SEE SPECIFICATIONS.

6.

INDICATES LIQUID/GAS TRANSPORTATION BY PIPE, CHWR: CHILLED WATER RETURN CHWS: CHILLED WATER SUPPLY HWR: HEATING WATER RETURN HWS: HEATING WATER SUPPLY

PAINT EXTERIOR PIPING, DUCTWORK, FANS, CURBS AND SHEET METAL WITH URETHANE FINISH, COLOR AS SELECTED BY ARCHITECT. PAINT UNFINISHED STEEL, GALVANIZED, ALUMINUM OR SST EXTERIOR SURFACES, MATERIALS OR EQUIPMENT, PROVIDED UNDER DIVISION 15, COLOR AS SELECTED BY ARCHITECT.

7.

TEMPERATURE SENSORS SHALL BE LOCATED WHERE SHOWN 48 INCHES ABOVE FINISHED FLOOR.

8.

PROVIDE BIRDSCREENS FOR ALL LOUVERS AND ALL OUTSIDE AIR INTAKES.

45° OR 90° OFF BOTTOM

9.

PENETRATE ROOF DECKS AS REQUIRED TO INSTALL MECHANICAL WORK. PROVIDE BLOCKING AROUND PENETRATIONS AND AS NOTED ON STRUCTURAL DRAWINGS. SEAL ALL PENETRATIONS AIR AND WATER TIGHT.

DUCT SECTION (SUPPLY) REDUCER

B B BFF BTUH BW

BOILER BELOW FINISHED FLOOR BRITISH THERMAL UNITS PER HOUR BOOT WASH

C CA CW CFM CO

COMPRESSED AIR, LOW PRESSURE, 100PSIG COLD DOMESTIC WATER CUBIC FEET PER MINUTE CLEANOUT

D E E EA EB EC EF EO1 EO2 EVP EWC EXH EXST EW

EXHAUST EXHAUST AIR ELECTRIC BASEBOARD ELECTRIC CEILING PANEL EXHAUST FAN ENGINE OIL, 15W40 ENGINE OIL, 5W20 EVAPORATOR ELECTRIC WATER COOLER EXHAUST EXISTING EYEWASH

Q R RA RETURN AIR RPBP REDUCED PRESSURE BACKFLOW PREVENTOR RD ROOF DRAIN RF RETURN FAN RG RETURN GRILLE

FCO FD FTU FRL

FLOOR CLEANOUT FLOOR DRAIN FAN TERMINAL UNIT FILTER, REGULATOR, LUBRICATOR

G GPM GR

GALLONS PER MINUTE GREASE

S SA SCF SD SF SHR SL SR SS

SINK SUPPLY AIR SOURCE CAPTURE FAN SUPPLY DIFFUSER SUPPLY FAN SHOWER SLOPE SUPPLY REGISTER STAINLESS STEEL

T T TD TYP

TANK TRENCH DRAIN TYPICAL

UH UR

UNIT HEATER URINAL

H HB HC HW HF HP HWR HWS HV HX

HEADER HOSE BIBB HEATING COIL HOT DOMESTIC WATER HYDRAULIC FLUID HIGH PRESSURE COMPRESSED AIR, 150PSIG HEATING WATER RETURN HEATING WATER SUPPLY HEATING AND VENTILATION UNIT HEAT EXCHANGER

V VFD VL VTR

W WC WH WM

IA IW

INTAKE AIR INDUSTRIAL WATER (NON-POTABLE)

DUCT WITH LINING/INSULATION

STRAINER CHECK VALVE

TURNING VANES WCO WALL CLEANOUT FCO/ FLOOR CLEANOUT/ YARD CLEANOUT YCO COLD DOMESTIC WATER (CW)

SUPPLY DIFFUSER OR GRILLE. THE NUMBER OF ARROWS AND DIRECTION INDICATES 1, 2, 3, OR 4-WAY DEFLECTION

HOT DOMESTIC WATER (HW) HOT DOMESTIC WATER RECIRC (HDWR) VENT

RETURN GRILLE OR REGISTER MOUNTED IN A VERTICAL POSITION

WASTE BELOW SLAB

SUPPLY GRILLE OR REGISTER MOUNTED IN A VERTICAL POSITION

POWER OR GRAVITY ROOF VENTILATOR- EXHAUST

45° OR 90° OFF TOP BALL VALVE

VENT VARIABLE FREQUENCY DRIVE VEHICLE LIFT VENT THRU ROOF

HOSE BIBB PRESSUR GAUGE WITH ISOLATION VALVE

DUCT SECTION DUCT BEND DOWN

PUMP DUCT TEE DOWN

Y Y

YARD CLEANOUT

IN-LINE PUMP

INCLINED DROP IN RESPECT TO AIR FLOW

COMPRESSED AIR STATION, LOW PRESSURE

INCLINED RISE IN RESPECT TO AIR FLOW

COMPRESSED AIR STATION, HIGH PRESSURE

TRANSITION DOUBLE LINE TO SINGLE LINE

M MAXIMUM THOUSAND BRITISH THERMAL UNITS PER HOUR MINIMUM MIXING STATION MOP SERVICE BASIN MAKE UP

14. PROVIDE ALL FLOOR DRAINS, FLOOR SINKS, INDIRECT WASTE CONNECTIONS, AND OPEN HUB DRAINS WITH VENTS AND TRAP PRIMERS, EXCLUDING THE MAINTENANCE AREAS AND FUEL BAY. 15. SURVEY AND FIELD VERIFY ALL INVERT ELEVATIONS SHOWN ON PLUMBING DRAWINGS. INVERT ELEVATIONS SHOWN ARE APPROXIMATE, PROVIDE BUILDING WASTE PLUMBING TO PROPERLY INTERCONNECT WITH SITE WASTE PLUMBING. SEE CIVIL DRAWINGS. 16. T-PULL BRANCH PIPING NOT ALLOWED. ALL CHANGES IN DIRECTION SHALL BE MADE WITH FITTINGS.

VOLUME DAMPER

LAVATORY

12. COORDINATE FLOOR AND WALL CLEANOUT LOCATIONS WITH OFFICE CASEWORK VENDOR DRAWINGS AND OTHER FURNISHINGS, RELOCATE AS REQUIRED. 13. PROVIDE FINAL LOCATIONS FOR ROUGH-IN AND FINISH OF WASTE, VENT, AND WATER SUPPLY. CONNECTIONS AND LOCATIONS PER CASEWORK VENDOR DRAWINGS.

THERMOMETER

L

MAX MBH MIN MS MSB MU

11. INSTALL DUCTWORK TO MAINTAIN SERVICE CLEARANCES, ACCESS DOOR CLEARANCES AND COIL PULL CLEARANCES AT ALL HVAC EQUIPMENT.

CONTROL VALVE

(DUCTWORK LESS THAN 12"WIDE)

K

L

10. PROVIDE ACCESS PANELS FOR ALL MECHANICAL EQUIPMENT OR VALVES ENCLOSED IN PERMANENT CONSTRUCTION OR DUCTWORK.

GATE VALVE FLOW

SINGLE LINE DUCT DUCT END

WASTE WATER CLOSET, WATER COLUMN WATER HEATER WASH MACHINE

X

Z I

WALL CLEANOUT

FAN

V

W H

45° TEE

DUCT SIZE IN INCHES

S

U F

SIZE OF SIDE SHOWN SIZE OF SIDE NOT SHOWN 12x20

T

THERMOSTAT

S

SWITCH

M

MOTOR

P

PRESSURE SENSOR

DM

MOTORIZED DAMPER

MS

MOTOR STARTER

17. ALL PENETRATIONS AND SLEEVES THRU FLOORS/ WALLS SHALL BE SEALED WEATHERTIGHT. 18. ALL CONDENSATE DRAINS SHALL BE ROUTED FULLSIZE TO NEAREST WASTE LINE OR APPROVED EXTERIOR LOCATION. 19. ALL UNDER BUILDING PIPING SHALL BE SLOPED AT 2%, FOR YARD PIPING SLOPES SEE CIVIL DRAWINGS. 20. EXTEND VTR PIPING AS REQUIRED TO MAINTAIN 10' MINIMUM CLEARANCE TO OUTSIDE AIR INTAKE LOUVERS.

SD

SMOKE DETECTOR

AQ

AIR QUALITY SENSOR

DP

DIFFERENTIAL PRESSURE SENSOR

ONE INCH AT FULL SIZE

N IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL ABBREVIATIONS & SYMBOLS

M0.01 31 - 72

NOTES:

L

M

N

O

1.

DRAWINGS SHOW GENERAL INTENT OF THE DEMOLITION WORK. DEMOLITION OF EQUIPMENT AND COMPONENTS SHALL INCLUDE ALL SUPPORTS, PADS, HANGERS, INSULATION, CONTRLS, STARTERS, ACCESSORIES AND APPURTENANCES NOT REQUIRED FOR THE INSTALLATION OF THE NEW SYSTEM.

2.

SEE DWG M1.02 FOR LOCATION OF RELOCATED EQUIPMENT.

3.

ALL OPENINGS CREATED BY THE ABANDONMENT OR REMOVAL OF EXISTING SYSTEMS SHALL BE PATCHED TO MATCH EXISTING.

-

KEY NOTES:

1.

RELOCATE EF-3, LOUVER AND ALL RELATED APPURTENANCES AND PATCH 14E DUCTWORK FOR CONTINUITY. PATCH WALL OPENING TO MATCH EXISTING.

2.

COMPLETELY REMOVE INDICATED DUCTWORK AND RELATED APPURTENANCES AND COORDINATE WITH INSTALLATION OF NEW WORK INDICATED IN DWG M1.02.

P

1

36x28E EXHAUST LOUVER

1

T

2

T

2

26x42S T

RG-1 12x8 275CFM

T

3

T

4

T

150CFM TYP 4

T

T

T

220CFM

5

HVAC DEMOLITION PLAN 8'

0

8'

1 16'

N ONE INCH AT FULL SIZE

SCALE: 1/8"=1'-0"

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL HVAC DEMOLITION PLAN

M1.01 32 - 72

L

M

O

N

Q

P

NOTES: 5E

AQ

1.

RELOCATE EF-3, LOUVER AND RELATED APPURTENANCES. BALANCE EF-3 TO 1325CFM.

2.

SEE P1.02 FOR RADIANT FLOOR ZONING.

3.

PROVIDE WALL SPEED CONTROLLER WITH 300CFM IN LOW SPEED POSITION AND 500CFM IN HIGH SPEED POSITION.

4.

PROVIDE RIGID GALVANIZED DRYER DUCT WITH MAXIMUM NUMBER OF BENDS TO NOT EXCEED TWO 90° ELBOWS. USE TYPE A VENT HOOD WITH NO MESH SCREEN.

5.

REBALANCE FTU-A2 TO 400CFM

6.

PER ADDITIVE ALTERNATE #1, INSTALL PARALLELOGRAM VEHICLE LIFT IN ROOM 117, BAY 2 OF THE EXISTING MAINTENANCE BAYS AREA.

AQ

4E

AQ

3E FLUID HOSE REEL, TYP 4 BAY 3

12S UP

UH-2, SEE NOTE 3

RG-1 12x8 12E 275CFM

10R 12S

8S

6S

SD-1 8x8 LOCKER 200CFMROOM TYP 2

EC-3

T

BAY 2

7S 16S CORRIDOR 18X12R 22X12R

22X12S

OST LIFT MODULE

RELOCATED EF-3, SEE NOTE 1

10S

EB-1 RG-1 200CFM RG-1 200 CFM

RG-2 300CFM TYP 2

T

SR-1 8x6 150CFM TYP 2 MACHINE

6" DN TO EXHAUST HOSE REEL, TYP

SHOP 2

PARALLELOGRAM LIFT CONTROL MODULE

FTU-6

AQ

RG 240

1

LUBE STORAGE

EF-2

8E

EF-6

5

2

SD-1 8x8 200CFM

CONNECT TO EXST DUCT

G

J

H

K

3

8S

1ST FLOOR HVAC PLAN

4

RG-1 250CFM

H-3

WALL EXH VENT CAP

EB-2 TYP 3

8S

RG-1 12x8 275CFM

12S 8S UP

12X10S

OFFICE

OFFICE

VAV-7 12S 22X12S

6S

EB-2

8S

JAN

FTU-A2

6S

T

10"E

SD-1 8x8 200CFM

EC-1 TYP

VAV-4 6S RG-2 6x6 10S 50CFM

SD-1 8x8 200CFM TYP 2

EC-2

EC-1, TYP 4 SD-2 6x6 150CFM MEN'S TYP 2 RESTROOM

SEE M1.02 FOR HWS/R CONTINUATIONS

EB-1 T

14E CONNECT 14E TO EXST DUCT

FTU-5

Q'D CE TYP

16E FTU-3

12R

T

8x8 FM

RG-3 150CFM SECURE STORAGE SR-1 8x6 150CFM 10E

BAY 4

1E

SD-1, 6x6 100CFM CONNECT TO EXST DUCT

12S

8S OFFICE

8S

9E

AQ

SD-1, 8X8 300CFM, TYP2

6S

14X12S

NT NG

2E

PARALLELOGRAM LIFT 6E 8S

RG-2 10X6 175CFM ELECTRICAL TYP 3 ROOM RG-1 200CFM

VP-1

AQ

AQ

DRYER VENT CAP

RG-2, 12X12 300CFM/500CFM 12X12E UP TO EF-5 ON MEZZANINE COMP GAS

AQ

MAINTENANCE BAYS

T

12X10S

K

BAY 1

4"Ø DRYER VENT

RG-2, 6X6 50CFM

12S

HC-1 SD-2, 8X8 300CFM

EF-5 SPEED CONTROLLER, SEE NOTE 3

AQ

SD-1 8x8 H-2MACHINE200CFM SHOP 1 MAINTAIN REQ'D WORKING SPACE TYP 10R

SD-2, 6X6 100CFM, TYP2

10E UP

3

6" DIA. EXH UP THROUGH ROOF

AQ

14X12S

ADD. ALTERNATE #1

1

2

ONE INCH AT FULL SIZE

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL FIRST FLOOR HVAC PLAN

M1.02 33 - 72

L

N

M

O

Q

P

5E SG-1 687 CFM TYP 8

RG-4 1375 CFM TYP 4

4E

22S

28E

22S

OPEN TO BELOW

3E

12S DN

10E DN

36x20IA BELOW

2E

22S 72x48 INTAKE LOUVER

J

H

203D

203C

203B

K

AHU-3

72x48x18 PLENUM

49x15E EF-5 BELOW AHU-3 EXH DUCT

203A

12x12E DN

26x26S RISER 36x26S BELOW

WH-2

B-2

1E

T-3 P-4

1 60x48 EXHAUST LOUVER 24x24 EXHAUST LOUVER

2

MECH ROOM 202

3 2ND FLOOR HVAC PLAN

1

4 201B

ONE INCH AT FULL SIZE

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL SECOND FLOOR HVAC PLAN

M1.03 34 - 72

SA

EA

OA

EA/RA

DM

EXHAUST AIR BYPASS DAMPER HEAT RECOVERY WHEEL

PLAN VIEW - LOWER LEVEL

VFD

7

6

3

3

EXHAUST/RETURN AIR TEMP

PLAN VIEW - UPPER LEVEL

1

DP

T

SD

9 EA

EA/RA EF

1 2 EA

EA/RA

RECIRCULATION BYPASS DAMPER

DM OUTSIDE AIR TEMP

3

P H

SF

4

6

T

H

OA

5

DISCHARGE AIR TEMP

DM

SA

C VFD

DP

DM

7 FILTER DIFFERENTIAL PRESSURE SWITCH, TYPICAL

8 OA

SA

9

SUPPLY AIR BYPASS DAMPER DM

AHU-3 CONTROL SCHEMATIC

AHU-3

2

NTS

DETAIL 9

3

4

6

8

-

1

NTS

5

2

M1.03

ELEVATION VIEW RETURN AIR FROM CEILING PLENUM H

C

H

TO ROOM DIFFUSERS

C PRIMARY AIR

H C

TO ROOM DIFFUSERS

HEATING COIL FTU

HEATING COIL

TERMINAL UNIT CONTROL BOX

THERMOSTAT

NOTES: 1. CONTINUOUS OPERATION

SPEED CONTROLLER IN ROOM LOW (300CFM)/HIGH(500CFM)

EF-3 CONTROL SCHEMATIC NTS

EF-5 CONTROL 3 M1.02

SCHEMATIC NTS

LOCAL VARIABLE SPEED CONTROL

EF-6 CONTROL 4 M1.03

SCHEMATIC NTS

ROOM SENSOR

NOTES: 1. INTERLOCK WITH FTU AS SECOND STAGE OF HEATING

DUCT HEATER CONTROL 5 M1.02

SCHEMATIC NTS

ROOM SENSOR

ELECTRIC BASEBOARD CONTROL 6 M1.02

SCHEMATIC NTS

7 M1.02

FAN TERMINAL UNIT CONTROL SCHEMATIC NTS

8

ONE INCH AT FULL SIZE

M1.02 IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL HVAC DETAILS AND SCHEMATICS

M5.01 35 - 72

DRY WALL VERTICAL SUPPLY DUCT

BRANCH CONNECTION FOR ROUND MAIN CONNECTION USE CONICAL TEE FOR RECTANGULAR MAIN CONNECTION USE SPIN IN

FSD

SHEET METAL SCREW, 10"OC (TYP)

FRAMING, STEEL STUD RUNNER 22 GA SHEET CLOSURE COLLAR

DRY WALL SHEET METAL SCREW, 10"OC (TYP)

FRAMING, STEEL STUD RUNNER

MAIN DUCT

SUPPLY AIRFLOW

WALL OPENING REGISTER OR GRILLE AS SHOWN ON DRAWING

CONCRETE WALL VD

VD

L 2"x4"x1/8" CLOSURE COLLAR

NOTE: 1. CLOSURE COLLAR SHALL BE OF SAME MATERIAL AS DUCT.

PACK OPENING AROUND W/ FIBERGLASS 1/2"MAX CLEARANCE

45° CLINCH COLLAR PER

VERTICAL RETURN DUCT

DETAIL

SEAL ALL AROUND ROUND SHEET METAL DUCT, SIZE SHOWN ON PLAN DRAWINGS

3/8"x4" SST CONCRETE ANCHOR 6"OC MAX

L 2"x4"x1/8" CLOSURE COLLAR

TYP FTU SUPPLY DUCT TAKE OFF

NEOPRENE GASKET ALL AROUND (AIR TIGHT)

WALL PENETRATION

8° VD

ADJUSTABLE ELBOW RINGS

DUCTWORK

AD

TRANSITIONS

1" MIN. ON TOP AND BOTTOM

DETAIL

NTS

4

NTS

2 TYP

TYP

NOTES: 1. SIMILAR INSTALLATION FOR: BACK TO BACK GRILLE, DUCTWORK ATTACHED TO WALL OPENING, AND SINGLE WALL OPENING.

OFF SETS

2. PROVIDE FIRE DAMPERS AND VOLUME DAMPERS WHERE SHOWN ON FLOOR PLANS.

VD

24 GAUGE SHEETMETAL DIFFUSER CAN WITH 1" SOUND LINING FLEX DUCT 7' MAX LENGTH

HANGER

TAP IN

3. CLOSURE COLLAR SHALL BE OF SAME MATERIAL AS DUCT. SUPPLY RETURN

WALL MOUNTED GRILLE AND REGISTER 3

DETAIL NTS

TYPICAL SUPPLY OR RETURN DUCT DETAIL NTS

TYP

ADJUSTABLE DAMPER

1 TYP

PERFORATED METAL DIFFUSER PLATE

CEILING DIFFUSER

TYP CEILING MOUNTED SQUARE NECK DIFFUSER

SUPPLY OUTLET GRIDS AND DAMPERS MUST NOT DAMAGE LINERS

DETAIL

8

NTS

HANGER

EQUALIZING GRID

FLEX DUCT 7' MAX LENGTH

TYP

24 GAUGE SHEETMETAL CAN W/ 1" SOUND LINING TAP IN

ADJUSTABLE DAMPER WHERE NOTED

VOLUME DAMPER

NOTES: 1. REFER TO PLAN DRAWINGS FOR MOUNTING ANGLE ON ROUND DUCT.

TYPICAL DUCT MOUNTED DIFFUSERS TRANSFER GRILLE DETAIL NTS

5

DETAIL

6

NTS

TYP

SUPPLY GRILLE (SG-1) DETAIL NTS

7 TYP

TYP CEILING MOUNTED RETURN/EXHAUST GRILLE DETAIL NTS

8

ONE INCH AT FULL SIZE

TYP IF NOT ONE INCH, SCALE ACCORDINGLY

TYP

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL TYPICAL DETAILS DUCTWORK

M5.02 36 - 72

TABLE A A

B

CONC ANCHOR BOLTS

STEEL I BEAM, MAX FLANGE 15" WIDE x 1.031" THICK

CAPACITY: 3/8" PIPE THROUGH 12" PIPE MAXIMUM ALLOWABLE LOAD 3/8"ROD 1/2"ROD 5/8"ROD 3/4"ROD 7/8"ROD

JAMB NUT

610 LBS 1130 LBS 1810 LBS 2550 LBS 2630 LBS

SUPPORT ROD OR BOLT. SIZE AS REQUIRED

BEAM CLAMP W/ EYE NUT

CAPACITY: 3/8" PIPE THROUGH 12" PIPE

JAMB NUT

MAXIMUM ALLOWABLE LOAD MINIMUM SPACING: A=EDGE DISTANCE B=CENTER TO CENTER 3" 4" 4" 5" 6"

3/8"ROD 1/2"ROD 5/8"ROD 3/4"ROD 7/8"ROD

4" 5" 6" 7" 8"

SEE TABLE A AND TYP SUPPORT ROD FOR PIPES SUBJECT TO HORIZONTAL MOVEMENT DETAIL

3/8"ROD 1/2"ROD 5/8"ROD 3/4"ROD 7/8"ROD

SUPPORT ROD SIZE AS REQUIRED

TYPE B DETAIL 1

DETAIL NTS

NTS

TYP

STL PLATE, SEE TABLE B FOR THICKNESS

STRUCTURAL STEEL

WELDED BEAM ATTACHMENT W/ BOLT AND NUT. WELD TO STRUC STEEL PER MFRS RECOMMENDATIONS

MAXIMUM ALLOWABLE LOAD WELDED EYE ROD SIZE AS REQUIRED

PIPE STANCHION, SIZE AS SPECIFIED IN TABLE B

7. AT LEAST ONE PIPE HANGER OR SUPPORT SHALL BE LOCATED IMMEDIATELY ADJACENT TO THE JOINT OF ANY CONCENTRATED LOAD OR BEND IN THE PIPE SUCH AS VALVES, FITTINGS, ETC., IN ADDITION TO THE MAXIMUM SPANS LISTED ABOVE.

SS ANCHOR BOLT OR CONCRETE ANCHOR WITH FULL THREADED STUDS, TYP., SEE TABLE B

8. TYPICAL DETAILS SHOWN ON THIS DRAWING ARE FOR REFERENCE ONLY. REFER TO SPECIFICATION SECTION 15071 FOR SEISMIC DESIGN REQUIREMENTS. GROUT AFTER LEVELING WITH NON-SHRINK GROUT

FINISH FLOOR

1" T0 4" EMBED DEPTH, SEE TABLE B

LEVELING NUTS NOTE: 1.

TYPE C NTS

2. WHERE MODULARLY SPACED INSERTS ARE REQUIRED SUPPORT PIPES AT INSERT MODULE. NO SPECIAL INSERTS WILL BE ALLOWED FOR INDIVIDUAL PIPE SUPPORTS UNLESS SPECIFICALLY DETAILED OR AUTHORIZED BY THE PROJECT REP.

6. DESIGN WEIGHTS REFER TO THE PIPE SIZE SHOWN SUPPORTED AT THE SPACING LISTED AND SHALL BE USED FOR DESIGN OF ALL SPECIAL HANGER SYSTEMS.

1/4

DETAIL

NOTES: (TABLE A)

5. IN ADDITION TO SUPPORTING DUCTS AND PIPES FOR GRAVITY LOADS, DUCTS AND PIPES SHALL BE SUPPORTED TO RESIST VERTICAL, LATERAL AND LONGITUDINAL SEISMIC FORCES. FORCES ARE TO BE DETERMINED ACCORDING TO 2006 INTERNATIONAL BUILDING CODE. SEISMIC BRACE DESIGN SHALL BE ACCORDING TO THE LATEST "SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEMS" BY SMACNA. THE DESIGN FOR SEISMIC SUPPORTS SHALL BE STAMPED AND SEALED BY A PROFESSIONAL STRUCTURAL ENGINEER REGISTERED IN THE STATE OF ALASKA.

1" TYP

610 LBS 1120 LBS 1810 LBS 2710 LBS 3770 LBS

275 LBS 275 LBS 300 LBS 300 LBS 325 LBS 375 LBS 575 LBS 600 LBS 750 LBS 950 LBS

4. INSTALL AT LEAST ONE HANGER PER PIPE LENGTH. LOCATE AS NEAR THE JOINT OR FITTING AS POSSIBLE.

D + 6"SQ

3/8"ROD 1/2"ROD 5/8"ROD 3/4"ROD 7/8"ROD

3/8"TO 3/4" 1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 4" 6" 8"

3. SPACING BASED ON SCHEDULE 80 PIPE AT 100°F. SCHEDULE 40 PIPE OR HIGHER TEMPERATURE REQUIRE SHORTER SPANS. SEE MANUFACTURER'S RECOMMENDATIONS.

2

TYP

CAPACITY: 3/8" PIPE THROUGH 12" PIPE

DESIGN WEIGHT

1. ROD SIZE IS BASED ON CARRYING SINGLE PIPE. WHEN MORE THAN ONE PIPE IS TO BE SUPPORTED. RODS SHALL BE SIZED USING DESIGN WEIGHTS TO DETERMINE TOTAL LOAD.

610 LBS 1130 LBS 1810 LBS 2710 LBS 3770 LBS

TYPE A

PIPE SIZE

SUPPORT MAXIMUM SPAN, IN FEET, FOR PIPES ROD SIZE NOT IN RACKS SEE NOTE 2. BASED ON PLASTIC CAST IRON SINGLE ROD STEEL COPPER SEE NOTE SEE NOTE SEE NOTE1 3 4 CONTINUOUS 5 5 3/8" 6 5 7 3/8" 7 5 7 3/8" 8 5 9 3/8" 10 8 6 3/8" PRESSURE 10 9 6 1/2" PIPE 12 FT 7 10 10 1/2" SOIL PIPE 5/8" 10 10 7 10 FT. 10 9 3/4" 10 " 10 9 " 7/8" 10

SPACING SHALL BE AS REQUIRED, BUT SHALL NOT EXCEED SPANS SHOWN IN TABLE A.

TYPICAL STRUCTURAL ATTACHMENT

3 TYP

DETAIL NTS

4 TYP

TABLE B - PIPE STANCHION PIPE SIZE

NOMINAL PIPE STANCHION DIA (SCHEDULE 40)

PLATE THICKNESS

BOLT SIZE

BOLT EMBED

2"

1 1/2"

1/4"

3/8"

5"

2 1/2"

1 1/2"

1/4"

3/8"

5"

3"

2"

3/8"

1/2"

5"

4"

3"

3/8"

1/2"

5"

6"

3"

3/8"

1/2"

5"

8"

4"

3/8"

5/8"

8"

10"

4"

3/8"

5/8"

8"

12"

6"

3/8"

5/8"

8"

14"

6"

1/2"

3/4"

8"

16"

6"

1/2"

3/4"

8"

18"

8"

5/8"

7/8"

8"

20"

8"

5/8"

7/8"

8"

24"

8"

3/4"

1"

8"

ONE INCH AT FULL SIZE

10" IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL HVAC DETAILS AND SCHEMATICS

M5.03 37 - 72

SUPPORT ROD SIZE AND SPACING AS SPECIFIED IN TABLE A ON M5.03

SUPPORT ROD SIZE AND SPACING AS SPECIFIED IN TABLE A ON M5.03

NOTE: 1. USE MSS TYPE 4 SINGLE BOLT PIPE CLAMP FOR UNINSULATED PIPE.

SUPPORT ROD SIZE AND SPACING AS SPECIFIED IN TABLE A ON M5.03

SUPPORT ROD SIZE AND SPACING AS SPECIFIED IN TABLE A ON M5.03

JAM NUT JAM NUT

JAM NUT

JAM NUT

ADJUSTABLE STEEL CLEVIS, MSS TYPE 1

ADJUSTABLE STEEL CLEVIS, MSS TYPE 1

NTS

THERMAL SHIELD MSS TYPE 39 SEE NOTE 1

VARIES

TYPE 1

TYPE 1A 1

ADJUSTABLE ROLLER HANGER, MSS TYPE 43

THERMAL SHIELD

DOUBLE-BOLT PIPE CLAMP MSS TYPE 3, SEE NOTE 1

"J" HANGER, MSS TYPE 5

PROTECTIVE INSULATION SHIELD, MSS TYPE 40

DETAIL

JAM NUT

WELDLESS EYE NUT MSS TYPE 17

THERMAL SHIELD

NOTE: 1. WITH COPPER PIPE REPLACE MSS 39 SADDLES WITH CALCIUM SILICATE OR WOOD BLOCKS AND MSS TYPE 40 SHIELDS.

SUPPORT ROD SIZE AND SPACING AS SPECIFIED IN TABLE A ON M5.03

DETAIL

TYP

TYPE 2 2

NTS

DETAIL

TYP

TYPE 3 3

NTS

TYP

TYPE 4

DETAIL

4

NTS

DETAIL

TYP

5

NTS

TYP DESIGN LOADS:

PIPE CLAMP, FRAMING CHANNEL TYPE

DESIGN LOADS:

SUPPORT ROD SIZE AND SPACING AS SPECIFIED IN TABLE A ON M5.03

PIPE STRAP, FRAMING CHANNEL TYPE

SIZE

LOAD (LBS)

3/4"-1 1/2" 2"-3" 4"-5" 6"-12"

190 420 610 870

DOUBLE-BOLT PIPE CLAMP MSS TYPE 3

NOTES: 1.

FRAMING CHANNEL 1-5/8"SQ. X 12 GAGE MIN., GALVANIZE AFTER FABRICATION

DO NOT USE FOR HORIZONTAL PIPES LARGER THAN 2" WHEN FRAMING CHANNEL IS MOUNTED VERTICALLY.

TYPE 5 NTS

3/4" THROUGH 30" PIPE

3/4" THROUGH 12" PIPE FOR VERTICAL PIPE ONLY

TYPE 7

TYPE 8

TYPE 6 6

DETAIL

"Z" SHAPED STEEL STRAP FITTING, TYP 2 SS EXPANSION ANCHORS EACH CLAMP

7

DETAIL

TYP

NTS

8

DETAIL

TYP

NTS

TYP

1/2" THROUGH 30" PIPE

NTS

1 1/2"

FORGED STEEL ELBOW OR PIPE

STEEL CLEVIS MSS TYPE 14 3"

WELDING LUG STEEL PLATE THICKNESS TO MATCH CLEVIS GRIP

PIPE STANCHION, SIZE AS SPECIFIED IN TABLE ON B/M5.03

PLATE TO MATCH BASE ELBOW OR TEE 1/4

4 1/2"

2" THROUGH 12" PIPE 1. 4" THROUGH 8" PIPE

TYPE 10 DETAIL NTS

LUG SHALL BE WELDED TO PIPE BEFORE INTERNAL LINING IS APPLIED.

TYPE 11 11 TYP

2. PIPE HANGERS SHALL BE OVERSIZED AS REQUIRED TO ACCOMMODATE THICKNESS OF INSULATION SPECIFIED. HANGER SHALL NOT COME INTO CONTACT WITH THE INSULATION DIRECTLY, EITHER AT THE VERTICAL YOKE OR AT THE POINT OF SUPPORT. SEE SPECIFICATIONS.

REQUIRED FOR PIPE ATTACHMENTS 1 AND 2 NOTE:

2 1/2" THROUGH 30" PIPE

1. WITH COPPER PIPE PROVIDE A FULL 360° WRAP OF 1/16 INCH THICK NEOPRENE BONDED TO PIPE WITH A COMPATIBLE WATERPROOF ADHESIVE. FOR REQUIREMENTS ON INSULATION USED WITH PIPE HANGERS.

3. REFER TO SPECIFICATION SECTION 15071 FOR SEISMIC DESIGN REQUIREMENTS.

STRUCTURAL ATTACHMENT, 6/M5.03

STRUCTURAL ATTACHMENT, 6/M5.03

TYP

GENERAL NOTES:

2" DRILL 1/8" DIA HOLE BEFORE WELDING

NTS

WELDED LINKED EYE RODS REQUIRED FOR STRUC ATTACHMENTS

TURNBUCKLE

PIPE STANCHION, SIZE AS SPECIFIED IN TABLE B ON M5.03

10

DETAIL

TYP

AS REQUIRED

JAM NUT BASE ELBOW OR BASE TEE

RISER CLAMP, MSS TYPE 8

TYPE 9

SUPPORT ROD SIZE AND SPACING AS SPECIFIED IN TABLE A ON M WELD TO PIPE BEFORE ANY LINING IS APPLIED TO PIPE

390 530 810 1160 1570 2500 2700 2900

FOR VERTICAL PIPE ONLY

9

DETAIL

LOAD (LBS)

4 1/2"

FRAMING CHANNEL 1-5/8"SQ. X 12 GAGE MIN., GALVANIZE AFTER FABRICATION

SIZE 2 1/2" 3" 4" 5" 6" 8"-10" 12"-14" 16"-30"

DETAIL NTS

TYPE 12 12

DETAIL

TYP

NTS

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

TYP SUPPORT ROD 13 TYP

DETAIL NTS

ONE INCH AT FULL SIZE

14 IF NOT ONE INCH, SCALE ACCORDINGLY

TYP

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL TYPICAL DETAILS PIPE HANGERS

M5.04 38 - 72

AIR HANDLING UNIT (AHU) SCHEDULE SUPPLY FAN - DRAW THRU

RETURN FAN

ELECTRIC HEATING COIL

HEAT EXCHANGER FILTERS

SYMBOL

AHU-3

LOCATION

WEIGHT (LBS)

SERVICE

STREET WING

VARIABLE VOLUME

4500

AIRFLOW (CFM)

TOTAL STATIC PRESSURE (IN W.C.)

EXTERNAL STATIC PRESSURE (IN W.C.)

2.7

2.1

6000

ELECTRICAL AIRFLOW (CFM) BHP

HP

VOLT-P-HZ

4.9

7.5

460-3-60

TOTAL STATIC PRESSURE (IN W.C.)

EXTERNAL STATIC PRESSURE (IN W.C.)

2.1

1.0

5550

AIR TEMP (°F)

ELECTRICAL

CAPACITY (KW) BHP

HP

VOLT-P-HZ

ENT.

LVG.

3.8

5

460-3-60

28

70

SELECTION BASED ON MANUFACTURER/MODEL (OR APPROVED EQUAL)

MOTOR VOLT-P-HZ

80

460-3-60

TYPE

WHEEL

MIN. SENSIBLE EFF. (%)

63

HP

FLA

VOLT-P-HZ

M E R V

QTY.

SIZE (IN)

PD (IN)

DEPTH (IN)

0.25

0.4

460-3-60

7

4 8

24x20 16x20

0.08

2

YORK SOLUTIONS AIR HANDLING UNIT

NOTES: NOTES: 1.HEAT HEATRECOVERY RECOVERYPERFORMANCE PERFORMANCEIS ISBASED BASEDON ONCOIL COILEAT EAT28°F 28°FWITH WITH29% 29%RH RHON ONBOTH BOTHSA SAAND ANDRA. RA. 1. VFD'SSHALL SHALLBE BEPROVIDED PROVIDEDBY BYDDC DDCCONTRACTOR CONTRACTORAND ANDINSTALLED INSTALLEDINAT FIELD ON AHU CASING. 2.2.VFDs THE FIELD.

FAN POWER TERMINAL UNIT SCHEDULE SIZE

CFM

NC LEVELS

ELECTRIC HEATING COIL

FAN

SYMBOL

FTU-3

ELECTRICAL MFR/MODEL

UNIT

INLET

OUTLET

MAX

MIN

RAD

DISCH

CFM

ESP

HP

KW

EAT/LAT

VOLT

PH

HZ

C

08

14.1x1.1

600

350

19

13

600

0.20

0.33

5.0

55/95

277

1

60

TITUS/DTFS-F

REMARKS

FTU-3 IS AN OWNER FURNISHED CONTRACTOR INSTALLED ITEM

NOTES: 1. ROOM NC LEVEL SHOWN INCLUDES ATTENUATION TRANSFER FUNCTIONS FROM TABLES IN ARI STANDARD 885-89. 2. SOUND DATA SHALL BE OBTAINED FROM TESTS CONDUCTED IN ACCORDANCE WITH ARI STANDARD 880-94.

FAN SCHEDULE

SYMBOL

LOCATION

TYPE

EF-5

STREET WINGS MEZZANINE

EF-6

KITCHEN HOOD FAN

INLINE INLINE

AIRFLOW (CFM)

STATIC PRESSURE (IN W.C.)

300/ 500

0.3

600

0.5

DRIVE

DIRECT DIRECT

FAN RPM

MOTOR

SOUND POWER (dBA)

1521

54

-

-

CONTROL

MFR/MODEL

GREENHECK SQ-90-D

HP

RPM

VOLT-P-HZ

ENCLOSURE

1/10

1550

115-1-60

TEAO

TWO SPEED SWITCH

-

VARIABLE SPEED CONTROL

1/6

-

120-1-60

FABER INCA PRO 30

FEATURES

WEIGHT (LBS)

ADJUSTABLE SPEED FAN

41

REMOTE SWITCH W/ SPEED CONTROL

-

NOTES: 1. KITCHEN HOOD SHALL INCLUDE TRIM WITH BAFFLE TYPE FILTERS AND LIGHTS.

ELECTRIC HEATER SCHEDULE SYMBOL

TYPE

LOCATION

CAPACITY (KW)

LENGTH (IN)

VOLT-P-HZ

SELECTION BASED ON MANUFACTURER/MODEL (OR APPROVED EQUAL)

AMPS

REMARKS

EB-1

BASEBOARD

LUNCH/TRAINING

1.0

48

277-1-60

3.6

MARKEL 3900 HYDRONIC ELECTRIC

REMOTE T'STAT

EB-2

BASEBOARD

LUNCH/TRAINING

1.5

72

277-1-60

5.4

MARKEL 3900 HYDRONIC ELECTRIC

REMOTE T'STAT

HC-1

DUCT HEATER

SIGN SHOP

4

-

277-1-60

8.3

NAILOR DH

SPACE THERMOSTAT

DIFFUSER/GRILLE/REGISTER SCHEDULE

SYMBOL

TYPE

SELECTION BASED ON MANUFACTURER/MODEL (OR APPROVED EQUAL)

MAX NC

MAX APD (IN WC)

REMARKS

SD-1

CEILING MOUNT

TITUS MCD

30

0.1

-

SD-2

DUCT MOUNT

TITUS MCD

30

0.1

-

SG-1

DUCT MOUNT

TITUS 272RL

30

0.1

WITH OPPOSED BLADE DAMPER

RG-1

CEILING MOUNT

TITUS 350ZRL

30

0.1

-

RG-2

DUCT MOUNT

TITUS 350ZRL

30

0.1

-

RG-4

DUCT MOUNT

TITUS 350ZRL

30

0.1

-

NOTES: 1. CEILING MOUNT TYPE SHALL BE MOUNTED ACCORDINGLY FOR 24" x 24" CEILING MODULE OR GYPBOARD CEILING PER REFLECTED CEILING PLAN. INCLUDE ANY ADDITIONAL APPURTENANCES AS NEEDED.

ONE INCH AT FULL SIZE

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL HVAC EQUIPMENT SCHEDULES

M6.01 39 -- 72

L

M

O

N

Q

P

NOTES:

5E

1.

FIELD VERIFY EXACT SIZE AND LOCATION OF STUB OUT.

2.

RADIANT FLOOR HEATING SYSTEM UNDER SLAB IS NOT SHOWN. DESIGN SHALL BE PROVIDED BY CONTRACTOR IN COMPLIANCE WITH SECTION 15772.

3.

PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS.

4.

PROVIDE ACCESS PANELS FOR ALL IN WALL TRAP PRIMERS.

FCO, TYP 3"W

FCO, TYP UP TO FD-1, TYP 5

4E 6"RD, SEE CIVIL FOR CONNECTION, TYP 4

6"W 3"W

3E FD, UP TO EYEWASH TD-1, TYP 3

3"W 4"W, TYP OIL WATER SEPARATOR SEE 4/P5.01

2E

3"V

FCO 3"W

3"V

FCO

4"W FD-1

4"W FD-1

4"W

2"W

FCO

OFFICE

BAY64CONDUITS FOR FUTURE LIFT INSTALLATION, SEE NOTE 2

FD-1

FD-1

FD-2 WITHOUT TRAP AND VENT

LOCKER ROOM

DN

2

4"W MEN'S RESTROOM 2"W

OFFICE

DN

S-2

2"W JAN

N OFFICE

3"W

3

3"W

FOUNDATION PIPING PLAN

CORRIDOR 6"W

MAINTENANCE BAYS

FD-2

FD-2

2"V

6"W

BAY 6

BAY 1

2"V

UP

BAY 2

PARTS INVENTORY

WOMEN'S LOCKER

FILES/ XEROX 4"W

MACHINEFD-1

1

4 OFFICE

8'

0

8'

16' ONE INCH AT FULL SIZE

SCALE: 1/8"=1'-0"

WC0

"W

3"W

BAY 3

3"W

6"W

BAY 5 FD-2 WITHOUT TRAP AND VENT

FD-2 2"W

WC0

SECURE WC0 STORAGE

MACHINE SHOP 1

1 FCO

2"W

FD-1

FD-1

1E

3"W STUB OUT FOR FUTURE CONNECTION (IE=36" BFF)

TD-2

ELECTRICAL ROOM

4"W

3"W

CORRIDOR

4"W

4"W

FCO

3/4"CA 3/8"CA

COMP GAS

TD-1 4"W

SL SL

CONNECT 6"W TO EXST 6"W STUB OUT, SEE NOTE 1

3"W

6"W

TD-1

TD-1

TD-1

K

6"W

3"RD, SEE CIVIL FOR CONNECTION, TYP 6

J

TRENCH FOR CA PIPING AND ELECTRICAL CONDUIT SEE 12/S5.01 FOR DETAIL AND NOTE 3

4"W

H

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

IF NOT ONE INCH, SCALE ACCORDINGLY

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL FOUNDATION PIPING PLAN

P1.01 40 - 72

L

M

O

N

Q

P

NOTES: 1.

5E

HB-1

RADIANT FLOOR HEATING SYSTEM UNDER SLAB DESIGN (NOT SHOWN) SHALL BE PROVIDED BY CONTRACTOR IN COMPLIANCE WITH SECTION 15772.

HB-2, TYP 3 FD-1, TYP 5

RADIANT FLOOR HEATING SYSTEM ZONE 2 SEE NOTE 1

RADIANT FLOOR HEATING SYSTEM ZONE 1 SEE NOTE 1

6"RD, TYP 4

4E 6"RD, TERMINATE TO DAYLIGHT, SEE CIVIL DWGS

ZONE 2 RADIANT HEATING SYSTEM MANIFOLD P-6 1/2"CA UP AT COMPRESSED AIR STATION, TYP 8

3E

3/4"IW UP, TYP 3

ZONE 1 RADIANT HEATING SYSTEM MANIFOLD 3"V UP 2"IW, 1"CA, 1"HP UP

P-5

J

3"RD, TYP 6

S-2

1/2"IW TO BOOT WASH BW-1

COMP GAS

3/4"IW DN TO HB-2, TYP

3/4" HW 3/4" CW 3"V

2"IW 1"CA 1"HP 3/4"CA

K

1/2" CW 1/2" HW

2E

WASHER SERVICE BOX

H

EW-1

FD-2

6"RD, TERMINATE TO DAYLIGHT, SEE CIVIL DWGS 3"V

3"W FROM FD-2 ABOVE

1E 2"V 3"VTR

2"V 3"V 3/4" CW 3/4" HW

2"IW 3/4"HW 3/4"CW

ELECTRICAL ROOM

6"E UP THROUGH ROOF

BAY 3 3/4"CW

BAY 1 EMERGENCY EYEWASH-2

welding MACHINE table SCF-1 SHOP 1

3/4"HW MEN'S RESTROOM

OFFICE

3/4"IW DN TO HB-1

2"CW

3/4"HW 3/4"CW

OFFICE

JAN

3 2"V RISER

BAY 6

2

1"CW

3"VENT RISER

MAINTENANCE BAYS

EMERGENCY BAY 4 EYEWASH-1

3/4"CW, HW UP TO MEZZANINE

UP

BAY 2 3/4"CA ALONG TOP OF 7' WALL

MACHINE 1"CA SHOP 2

2"IW 1-1/2"HP 1-1/2"CA UP TO UPPER LEVEL PARTS INVENTORY

CORRIDOR WOMEN'S LOCKER 1"HW 2"CW

3"VENT RISER 3/4"CA DN TO

FILES/ XEROX

CORRIDOR

BAY 5

OFFICE

SECURE STORAGE 1-1/2"CW

1

S-1

LOCKER ROOM

1-1/2"CW

WELDING EXHAUST SYSTEM 3/4"CA UP

POINT OF CONNECTIONS AT POINT OF CAPPED CONNECTION LOCATION

N

4 OFFICE

FIRST FLOOR PIPING PLAN

ONE INCH AT FULL SIZE

8'

WH-1

1

1-1/2"HP 1-1/2"CA

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

SEE

OFFICE

0

8'

16'

SCALE: 1/8"=1'-0"

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL FIRST FLOOR PIPING PLAN

IF NOT ONE INCH, SCALE ACCORDINGLY

P1.02 41 - 72

L

M

N

O

Q

P

NOTES: 1.

5E

SLOPE HP AND CA PIPING DOWN TOWARD DRAIN LEG AND PROVIDE DRAIN VALVE AT 3' AFF.

3/4"IW

PROVIDE DRAIN VALVE AT BOTTOM OF RISER, SEE NOTE 1 1/2"CA DN, TYP 8 3/4"CA

3/4"CA

4E

3"RD, TYP 4 1/2"HP DN, TYP 3

OPEN TO BELOW 3/4"HP

DN TO ZONE 2 RADIANT HEATING SYSTEM MANIFOLD

PROVIDE DRAIN VALVE AT BOTTOM OF RISER, SEE NOTE 1

3E 3/4"IW DN, TYP 4 3/4"HP 1"CA 3"VTR

1"HWS 1"HWR

DN TO ZONE 1 RADIANT HEATING SYSTEM MANIFOLD

1"IW

1"CA 3/4"HP

2E

J

H

1"HP PROVIDE DRAIN VALVES AT BOTTOM OF DRAIN LEG, SEE NOTE 1

K

1-1/4"HWS 1-1/4"HWR 1-1/2"HWS 1-1/2"HWR 3"VTR FD-2

3/4"IW DN TO HB-2, TYP

WH-2

3/4"CA DN TO CA STATION, TYP

3"RD, TYP

B-2

T-3

P-4 1/2" MAKE UP WATER TO B-2

1E 1

3/4"CW, HW DN 3"VTR VEHICLE EXHAUST HOSE REEL MOUNTED ON SWING ARM, TYP 2

FOLLOW ROOF SLOPE FOR MAXIMUM CLEARANCE, TYP

MECH ROOM

3/4"CA 1"HP 3/4"IW 3/4"CA

3/4"CA 3/4"IW

FLUID HOSE REELS CA, HF, E01, EO2, ATF, GR, TYP. SEE P5.04 FOR PIPING DETAILS

BRIDGE CRANE TRACKS 2"VTR 3/4"CA

3/4"CA 3/4"IW

2

3"VTR

2"IW 1-1/2"HP 1-1/2"CA UP FROM 1st FLOOR

BALL VALVE, TYP

3 2"IW 1-1/2"HP 1-1/2"CA

SECOND FLOOR PIPING PLAN

1

1"CA 1"HP 1"CA 1"HF 1"EO1 1"EO2 1"ATF 1"GR

3/4"IW 1"CA 1"HF 1"EO1 1"EO2 1"ATF 1"GR

2'IW 1-1/2"HP 1-1/2"CA 1-1/2"HF 1-1/2"EO1

4

ONE INCH AT FULL SIZE

3"VTR

1-1/2"EO2 1-1/2"ATF

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL SECOND FLOOR PIPING PLAN

P1.03 42 - 72

L

M

N

O

P

Q

5E

4E OVERFLOW TYP 4

3"Ø RD TYP 4

3E

2E 3"VTR

J

H

K 1E 3"VTR

SLOPE

SLOPE

1

2 SLOPE

SLOPE

SLOPE

3 ROOF PIPING PLAN

1

4

OPE

OPE

OPE

ONE INCH AT FULL SIZE

SLOPE

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

SLOPE

IF NOT ONE INCH, SCALE ACCORDINGLY

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL ROOF PIPING PLAN

P1.04 43 - 72

1" POC TO EXISTING 2" IW

POC TO EXISTING 1" CW

WATER PIPING SCHEMATIC NTS 3"

2 -

2"

2"

1-1/2" 1-1/2"

1-1/2"

3"

3"

3"

3" 3"

4"

3"

4"

3"

4"

6"

CONNECTION TO EXST 6"W

SANITARY PIPING SCHEMATIC NTS

1 -

ONE INCH AT FULL SIZE

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL PIPING SCHEMATICS

P2.01 44 - 72

AIR SEPARATOR

1/2" MAKEUP WATER

MEZZANINE

MAINTENANCE AREA

NOTES: 1. SEE PLAN DWGS FOR VENT PIPING CONNECTION AND ROUTING.

RPBP

AAV

TO FD 1-1/2"HWR

TO FD

1-1/4"HWR

1"HWR

1-1/4"HWS

1"HWS

2. PROVIDE AIR TIGHT COVERS AND REQUIRED HARDWARE FOR INDOOR INSTALLATION. 3. TOP AND ACCESS PANEL SHALL HAVE H20 VECHICLE LOADING CAPABILITY.

1-1/2"HWS TO FD

NORTH ZONE MANIFOLD

CHEMICAL FEEDER

AAV

SOUTH ZONE MANIFOLD

P-5

P-6 6'-0"

M

B-2

TO FD

HOUSEKEEPING PAD

P-4

M

4" OPENING FOR VENT CONNECTION

NC

T-3

CLEAR ACCESS OPENINGS

A

TO FD

RADIANT HEATING WATER PIPING SCHEMATIC

4'-0"

TO FD

SLAB TEMPERATURE SENSOR IN NORTH ZONE SLAB TEMPERATURE SENSOR IN SOUTH ZONE

1 -

NTS

AIR TIGHT ACCESS COVER, TYP

SLOT FOR BAFFLE AND WEIR PLATES, TYP

OIL WATER SEPARATOR DETAIL

4 -

NTS

1/2" 1/2"CA

T-4

1-1/2" DIA LIFT HOLE, 1 EACH SIDE, BOTH SIDES. CONTRACTOR TO PLUG AFTER INSTALLATION

FRL

1'-0"

WH-2

SEISMIC STRAP

3" VENT PIPE, SEE NOTE 1

1'-0"

3/4"HW

CAP 1'-6"

3/4"CW

CAP

POTABLE WATER HEATER PIPING DETAIL NTS

GRIT/SLUDGE RETAINER WEIR

9"

3/8" QUICK DISCONNECT

1'-4"

TO FD

11"

FLOW DIFFUSER BAFFLE

DRAIN PAN

CA STATIONS 3 -

DETAIL

3

NTS

1'-4"

1'-0"

1'-9"

450 Gallons @ 3'6" Water Depth

6" OUTLET PIPING

1'-11"

5-1/2"

OIL RETAINER BAFFLE

1/2" QUICK DISCONNECT

1'-0"

6" INLET PIPING

TYP

OIL WATER SEPARATOR SECTION NTS

A ONE INCH AT FULL SIZE

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL PIPING DETAILS

P5.01 45 - 72

FORM 2' DIA DISH

HEAVY DUTY FLOOR DRAIN

1'-0"

SANITARY TEE OR COMBINATION WYE 1/8 BEND FOR VENT LINE WHERE SPECIFIED

3" CLEAR

4"

1" MIN

FINISHED FLOOR

2-#3 EW CAST IRON FRAME AND COVER

90° ELBOW

HEAVY DUTY FLOOR DRAIN (FD-1) DETAIL

PROVIDE SMOOTH TRANSITION TO ADJACENT PAVEMENT

2'-0" SQ CLASS E CONCRETE

FLOOR DRAIN

P-TRAP

YARD CLEANOUT

FLOOR DRAIN (FD-2) DETAIL

DETAIL

2

NTS

PACK ANNULAR SPACE WITH JUTE

NTS

TYP

3 TYP

1

NTS

TYP FINISHED WALL SURFACE

FLOOR LEVEL CLEANOUT W/ROUND ACCESS COVER

FLOOR THREADED CLEANOUT PLUG WITH ACCESS COVER

FLOOR CLEANOUT DETAIL NTS

4 TYP

WALL CLEANOUT DETAIL NTS

5 TYP

ONE INCH AT FULL SIZE

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL PIPING DETAILS

P5.02 46 - 72

PLUMBING FIXTURE SCHEDULE CONNECTION SIZES FIXTURE NO.

DESCRIPTION

MODEL

FLUSH VALVE

TRIM CW

REMARKS

HW

TRAP & DRAIN

VENT

S-1

KITCHEN SINK

KOHLER K-3346-3

-

KOHLER 15171-FL

3/8"

3/8"

1-1/2"

1-1/2"

S-2

SERVICE SINK

KOHLER K-6714

-

K-8905

1/2"

1/2"

3"

3"

PROVIDE 3-INCH IRON PIPE TRAP FOR SERVICE SINK

-

HB-1

HOSE BIBB

ZURN Z1300

-

-

3/4"

-

-

-

NON-FREEZE IN-WALL HYDRANT

HB-2

HOSE BIBB

ZURN 195 SERIES

-

-

3/4"

-

-

-

16"X16" HEAVY DUTY DRAIN WITH SLOTTED GRATE

FD-1

FLOOR DRAIN

JOSAM 37840

-

-

-

-

4"

-

FD-2

FLOOR DRAIN

ZURN ZS400B

-

-

-

-

3"

1-1/2"

ROUND WITH SLOTTED OPENINGS

TD-1

TRENCH DRAIN

ZURN Z886

-

-

-

-

4"

1-1/2"

-

TD-2

TRENCH DRAIN

ZURN Z886

-

K-973 SHOWER HEAD

1/2"

-

3"

1-1/2"

BOOT WASH WITH 6' HAND HELD SHOWER HEAD

EW-1

EYE WASH

GUARDIAN G1814

-

-

1/2"

1/2"

-

-

PROVIDE GUARDIAN G3600 THERMOSTATIC MIXING VALVE

BW-1

BOOT WASH

SYMMONS 1-25-FSB

-

-

1/2"

1/2"

-

-

-

ELECTRIC POTABLE WATER HEATER SCHEDULE SYMBOL

LOCATION

INPUT CAPACIT Y (KW)

WH-2

STREET WING MEZZANINE

1.5

STORAGE (GAL)

RECOVERY RATE (GPH)/ TEMP. RISE (°F)

TEMPERATURE RISE (°F)

VOLT-P-HZ

FLA

SELECTION BASED ON MANUFACTURER/MODEL (OR APPROVED EQUAL)

SHIPPING WEIGHT (LBS)

30

21/90

90

120-1-60

-

BRADFORD WHITE M-2-30R6DS

85

ELECTRIC BOILER SCHEDULE

SYMBOL

LOCATION

INPUT CAPACITY (KW)

OUTLET WATER TEMP (°F)

B-2

STREET WING MEZZANINE

54

140

ELEMENTS

QTY

KW

STEPS@KW

3

18

1@18, 1@36

VOLT-P-HZ

SELECTION BASED ON MANUFACTURER/MODEL (OR APPROVED EQUAL)

SHIPPING WEIGHT (LBS)

480-3-60

LOCHINVAR BW 1-054C

600

PUMP SCHEDULE

SYMBOL

LOCATION

TYPE

FLOW (GPM)

SERVICE

MOTOR

TDH (FT H O)

SELECTION BASED ON MFR/MODEL HP

RPM

REMARKS

VOLT-P-HZ

P-4

STREET WING MEZZANINE

INLINE

BOILER

24

15

0.33

1750

115-1-60

P-5

ZONE 1 MANIFOLD

INLINE

RADIANT FLOOR

13

33

0.25

1750

115-1-60

-

P-6

ZONE 2 MANIFOLD

INLINE

RADIANT FLOOR

7

35

0.25

1750

115-1-60

-

BELL & GOSSETT 60 1-1/2x5-1/4

-

RADIANT FLOOR HEATING SCHEDULE SYMBOL

TYPE

ZONE

MIN OUTPUT (BTUH)

NO OF LOOPS

FLOW RATE (GPM)

HEAD LOSS (FT. H20)

SELECTION BASED ON MANUFACTURER/MODEL (OR APPROVED EQUAL)

REMARKS

-

MANIFOLD

1

107000

6

12.9

33.1

HEATLINK

-

-

MANIFOLD

2

55000

3

6.6

35.4

HEATLINK

-

TANK SCHEDULE LENGTH (IN)

TANK VOLUME (GAL)

WEIGHT (LBS)

SELECTION BASED ON MANUFACTURER/MODEL (OR APPROVED EQUAL)

SYMBOL

LOCATION

SERVICE

TYPE

DIAMETER (IN)

T-3

STREET WING MEZZANINE

RADIANT HEATING

EXPANSION TANK

16

34

22

270

BELL AND GOSSETT B-85LA

T-4

STREET WING MEZZANINE

DOMESTIC WATER HEATING

EXPANSION TANK

10

10-3/8

2

21

BELL AND GOSSETT PTA-5 ONE INCH AT FULL SIZE

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

MECHANICAL PLUMBING EQUIPMENT SCHEDULES

P6.01 47 - 72

L L

M

O

N

P

M

N

O

Q

P

Q

NOTES: 1.

SPRINKLER SYSTEM SHALL BE DESIGNED BY LICENSED FIRE PROTECTION ENGINEER.

2.

SPRINKLER DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH NFPA 13 AND APPROVED BY CITY/BOROUGH OF JUNEAU FIRE DEPARTMENT.

5E 3E

4E

MEZZANINE AREA

2E MAINTENANCE BAYS

1E 3E TOOL REPAIR

1 MEZZANINE FP PLAN

2 N

8'

8'

0

SECURE STORAGE

16'

SCALE: 1/8"=1'-0"

2E SIGN SHOP J

H

K

SPRINKLER PIPE POINT OF CONNECTION

LUNCH/TRAINING 1E CORRIDOR 1 CAP PIPE FOR FUTURE CONNECTION

2

FIRST FLOOR FP PLAN

1 N

FIRE SPRINKLER ZONE 8'

0

8'

16'

ZONE

CLASSIFICATION

DENSITY

MAINTENANCE BAYS/ SIGN SHOP

ORDINARY HAZARD GROUP 2

0.25 GPM/SF PER FM GLOBAL STANDARDS

LUNCH/TRAINING/ CORRIDOR

LIGHT HAZARD

0.10 GPM/SF OR PER NFPA 13

TOOL REPAIR/ SECURE STORAGE

ORDINARY HAZARD GROUP 2

0.20 GPM/SF OR PER NFPA 13

MEZZANINE

ORDINARY HAZARD GROUP 2

0.20 GPM/SF OR PER NFPA 13

SCALE: 1/8"=1'-0"

ONE INCH AT FULL SIZE

IF NOT ONE INCH, SCALE ACCORDINGLY

www.tetratech.com 230 South Franklin, Suite 212 Juneau, Alaska 99801 Phone: 907-586-6400 Fax: 907-463-3677

CONSOLIDATED PUBLIC WORKS FACILITY STREETS WING ADDITION, E10-273

FP1.01 FIRE PROTECTION PLAN

48 - 72

GENERAL NOTES

ABBREVIATION MAX MC MFR MIN NIC NTS PC PSIG RPM SHT TOB TOS VEL VFD

DESCRIPTION MAXIMUM MECHANICAL CONTRACTOR MANUFACTURER MINIMUM NOT IN CONTRACT NOT TO SCALE PLUMBING CONTRACTOR POUNDS PER SQUARE INCH GUAGE REVOLUTIONS PER MINUTE SHEET TOP OF BEAM TOP OF STEEL VELOCITY VARIABLE FREQUENCY DRIVE

HVAC ABBREVIATIONS

ABBREVIATION A AAP CA CO EOC HE HP IA LA LV MAC

DESCRIPTION MEDICAL COMPRESSED AIR AREA ALARM PANEL COMPRESSED AIR (NON-MEDICAL) MEDICAL CARBON DIOXIDE EMERGENCY OXYGEN CONNECTION MEDICAL HELIUM HORSEPOWER INSTRUMENT AIR LABORATORY AIR LABORATORY VACUUM MEDICAL AIR COMPRESSER

PC PRV PSC R RA REFL REFS RF RH RTU SA SD SF SP STM TEMP TR UH VAV VTR WB WC WPD WSHPR WSHPS

PUMPED CONDENSATE PRESSURE REDUCING VALVE PUMPED STEAM CONDENSATE REGISTER RETURN AIR REFRIGERANT DX LIQUID REFRIGERANT DX SUCTION GAS RETURN FAN RELATIVE HUMIDITY ROOF TOP UNIT SUPPLY AIR SMOKE DAMPER SUPPLY FAN STATIC PRESSURE STEAM TEMPERATURE TRANSFER UNIT HEATER VARIABLE AIR VOLUME BOX VENT THROUGH ROOF WET BULB TEMPERATURE WATER COLUMN WATER PRESSURE DROP WATER SOURCE HEAT PUMP RETURN WATER SOURCE HEAT PUMP SUPPLY

PLUMBING ABBREVIATIONS DESCRIPTION ACID VENT ACID WASTE BOTTLE/GLASS FILLER BACK FLOW PREVENTOR BATH TUB COMPRESSED AIR (NON-MEDICAL) CONDENSATE DRAIN CLEANOUT CONDENSATE PUMP CLINICAL SINK COLD WATER DRINKING FOUNTAIN DOUBLE GRADE CLEANOUT DEIONIZED WATER DEIONIZED WATER CIRCULATING DEIONIZED HOT WATER DEIONIZED HOT WATER CIRCULATING DISTILLED WATER DISTILLED WATER CIRCULATING DIALYSIS WATER RETURN DIALYSIS WATER SUPPLY DRAIN TILE EMERGENCY EYE WASH EMERGENCY SHOWER EMERGENCY SHOWER AND EYE WASH COMBO EXPANSION TANK ELECTRIC WATER COOLER ENTERING WATER TEMPERATURE FILTER FLOOR CLEANOUT FLOOR DRAIN FLOOR SINK NATURAL GAS GRADE CLEANOUT HOSE BIB HUB DRAIN HORSEPOWER

ABBREVIATION HW HWC L LPG LWT MBH MS NC NO NON-POT PIV PRV RD RO RPZ S SAN SCW SHW SHWC SE SH SO SP SS ST TEMP UR V VTR WB WC WCO WH WS WPD YCO

DESCRIPTION HOT WATER HOT WATER CIRCULATION LAVATORY PROPANE LEAVING WATER TEMPERATURE BTU (1000'S) MOP SINK NORMALLY CLOSED NORMALLY OPEN NON-POTABLE WATER POST INDICATOR VALVE PRESSURE REDUCING VALVE ROOF DRAIN REVERSE OSMOSIS WATER REDUCED PRESSURE ZONE (BACK FLOW PREVENTOR) SINK SANITARY SEWER DOMESTIC SOFT COLD WATER DOMESTIC SOFT HOT WATER DOMESTIC SOFT HOT WATER CIRCULATING SEWAGE EJECTOR SHOWER STORM OVERFLOW SUMP PUMP SERVICE SINK STORM SEWER TEMPERATURE URINAL VENT VENT THROUGH ROOF WALL BOX WATER CLOSET WALL CLEANOUT WATER HEATER WATER SOFTENER WATER PRESSURE DROP YARD CLEANOUT

SYMBOL

DESCRIPTION

ADDITIONAL REMARKS

#

SHEET NOTE

DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS AND IS USED TO DESCRIBE WORK THAT IS TOO LENGHTY TO PLACE ON PLAN.

PIPING - SOLID LINE INDICATES SYSTEM SUPPLY -- DASHED LINE INDICATES SYSTEM RETURN

NUMBER INDICATES NOMINAL DIAMETER IN INCHES, LETTER(S) INDICATES SYSTEM. REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

ABBREVIATION FS PIV SPR

DESCRIPTION FLOW SWITCH POST INDICATOR VALVE SPRINKLER

COORDINATE INTERFACE WITH FIRE ALARM SYSTEM CONTRACTOR

UPRIGHT SPRINKLER PENDANT SPRINKLER CONCEALED SPRINKLER SIDEWALL SPRINKLER

#

#

DUCT, PIPE, OR CEILING MOUNTED CONTROL SENSOR

AUTOMATIC CONTROL VALVE (2-WAY)

F/S

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

FLOW MEASURING STATION

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

FIRE PROTECTION GENERAL NOTES

CHECK VALVE ARROW INDICATES DIRECTION OF NORMAL FLOW

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

A.

FIRE PROTECTION WORK SHALL INCLUDE, BUT NOT LIMITED TO, THE FOLLOWING: REMOVAL OF EXISTING STANDARD RESPONSE HEADS AND BRANCH PIPING AND INSTALLATION OF NEW QUICK RESPONSE HEADS AND ASSOCIATED BRANCH PIPING WITHIN ALL RENOVATED SPACES.

PIPE IN SLEEVE

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

B.

BALANCING DEVICE # INDICATES FLOW TO BE BALANCED IN GPM

CIRCUIT SETTER, AUTOFLOW, ETC. REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

ALL AREAS OF THE BUILDING INDICATED SHALL BE SPRINKLERED ACCORDING TO THE CURRENTLY ADOPTED EDITION OF NFPA STANDARD 13 AND OTHER NFPA STANDARDS AS REQUIRED. ENTIRE SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE STATE FIRE MARSHAL OFFICE, OWNER'S INSURANCE COMPANY AND AUTHORITIES HAVING JURISDICTION.

C.

FIRE SPRINKLER DESIGN SHALL BE BASED ON HYDRAULIC CALCULATIONS ACCORDING NFPA 13, WITH SHOP DRAWINGS PREPARED ACCORDING TO THE REQUIREMENTS OF THE STATE FIRE MARSHAL AND AUTHORITIES HAVING JURISDICTION.

D.

SPRINKLER CONTRACTOR SHALL OBTAIN STATIC AND RESIDUAL WATER PRESSURE AND FLOW PRIOR TO SYSTEM DESIGN AND SHALL SUBMIT RECENT HYDRANT FLOW TEST DATA WITH SHOP DRAWING SUBMITTALS.

E.

DRAWINGS ARE SCHEMATIC IN NATURE, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT OF THE SYSTEM. SPRINKLER SYSTEM INSTALLING CONTRACTOR SHALL COORDINATE SYSTEM ARRANGEMENT WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL COMPONENTS. SPRINKLER PIPING SHALL NOT BE INSTALLED BELOW MECHANICAL EQUIPMENT OR WITHIN CLEARANCE SPACES FOR MECHANICAL EQUIPMENT. PROVIDE SPRINKLER PROTECTION BELOW ALL DUCTS GREATER THAN 48 INCHES IN WIDTH. INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MODIFICATIONS TO THE SYSTEM REQUIRED TO AVOID CONFLICTS.

INDICATES POINT WHERE PIPING CHAGES FROM ONE SIZE TO ANOTHER. SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION. F.

AREAS IDENTIFIED INDICATE THE RECOMMENDED MINIMUM OCCUPANCY CLASSIFICATION, SPRINKLER TEMPERATURE CHARACTERISTIC OR SPRINKLER TYPES TO BE INSTALLED. SPRINKLER SYSTEM SHALL BE DESIGNED TO MEET OR EXCEED THESE RECOMMENDATIONS AND SHALL BE SUBJECT TO APPROVAL BY THE AUTHORITY HAVING JURISDICTION.

G.

A PRE-DESIGN MEETING SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO SUBMITTAL OF PIPING LAYOUT DRAWINGS. ARCHITECT SHALL ISSUE COMMENTS CONCERNING SUBMITTAL PACKAGE PRIOR TO COMMENCEMENT OF WORK.

H.

REFER TO ARCHITECTURAL PLANS FOR SPECIFIC CEILING TYPES AND HEIGHTS, AND AREAS OF EXPOSED STRUCTURE.

I.

COORDINATE PIPING AND SPRINKLERS IN EXPOSED AREAS TO MINIMIZE APPEARANCE. INSTALL SPRINKLERS A MINIMUM OF SIX INCHES FROM DIFFUSERS, GRILLES AND LIGHT FIXTURES. INSTALL SPRINKLERS IN LAY-IN CEILINGS WITHIN THREE INCHES OF THE CENTER OF CEILING TILE.

J.

COORDINATE INSTALLATION OF SPRINKLERS AND PIPING SYSTEMS TO AVOID FREEZING CONDITIONS. NOTIFY ARCHITECT OF AREAS FOR WHERE SYSTEM MAY BE EXPOSED TO FREEZING. INSTALL DRY SIDEWALL SPRINKLERS IN ROOMS INDICATED WHERE ROOMS MAY BE UNCONDITIONED OR EXPOSED TO FREEZING CONDITIONS. PROVIDE AUXILIARY DRAINS WHERE REQUIRED.

K.

EXPOSED SPRINKLER PIPING, EXCEPT IN MECHANICAL AND STORAGE ROOMS, SHALL BE CLEANED, PRIMED AND PREPARED FOR PAINTING.

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

PRESSURE GUAGE

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

THERMOMETER

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING. SECOND SYMBOL APPLIES TO RECTUANGULAR AND OVAL DUCT.

CONTINUATION SYMBOLS

HVAC SYMBOLS DESCRIPTION

ADDITIONAL REMARKS

RECTANGULAR DUCTWORK W = DIMENSION IN VIEW (INCHES) H = DIMENSION PERPENDICULAR TO VIEW (INCHES)

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

ROUND DUCTWORK D = DUCT DIAMETER

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

TURNING VANES

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

DUCT CROSS SECTION - SUPPLY

L. M.

WHERE SPRINKLER PIPING SYSTEM PENETRATES FIRE RESISTIVE RATED ASSEMBLIES, SEAL OPENINGS WITH APPROVED CONSTRUCTION METHODS AND MATERIALS. AVOID ROUTING SPRINKLER PIPING ABOVE ELECTRICAL, DATA, IT AND COMMUNICATION PANELS.

THERMOSTAT/ HUMIDISTAT (ADA)

CROSS SECTION INDICATES DUCT EXTENDING PERPENDICULAR TO THE PAGE. IN PLAN VIEW THIS INDICATES A DUCT RISE OR DROP TO ANOTHER LEVEL. SOLID INTERIOR LINE INDICATES EXTENSION UP. DASHED INTERIOR LINE INDICATES EXTENSION DOWN.

DUCT CROSS SECTION - RETURN DUCT CROSS SECTION - EXHAUST MANUAL BALANCE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE MANUAL BALANCE DAMPERS IN AN ACCESSIBLE LOCATION AND AS CLOSE TO THE MAIN DUCT AS POSSIBLE.

FIRE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

FIRE/SMOKE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

DIFFUSER BLANK OFF

SHADED AREA INDICATES QUADRANT OF DIFFUSER TO BE PROVIDED WITH BLANK OFF PANEL.

FLOW ARROW

ARROW INDICATES DIRECTION OF AIRFLOW FROM DIFFUSERS WITH ADJUSTABLE THROWS.

DIFFUSER TAG D = TYPE # = TYPE NUMBER ### = AIRFLOW IN CFM

REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE D-1 FOR SUPPLY OR G-1 FOR RETURN/EXHAUST. REFER TO SPECIFICATIONS FOR TYPE. REFER TO DETAILS FOR INSTALLATION REQUIREMENTS. MAXIMUM LENGTH SHALL BE 48 INCHES UNLESS NOTED OTHERWISE ON THE PLANS OR IN THE SPECFICATIONS.

FLEXIBLE DUCT

VB-# #.# GPM

DAMPER SHALL BE SAME SIZE AS DUCT UNLESS NOTED OTHERWISE. REFER TO SEQUENCES, SCHEMATICS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

ISOLATION VALVE

REQUIRED SERVICE CLEARANCE FOR EQUIPMENT

VB-# ### CFM

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR REQUIREMENTS

STRAINER WITH BLOW-OFF VALVE

D-# ###

D. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF THE OWNER.

PRESSURE/TEMPERATURE TEST PORT

UNION

FS.D.

REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WHEN SENSOR IS NOT SHOWN ON ELECTRICAL DRAWINGS IT SHALL BE PROVIDED AND INSTALLED BY THE TEMPERATURE CONTROLS CONTRACTOR. REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR ADDITIONAL INFORMATION AND REQUIREMENTS. T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON DIOXIDE, ETC.)

ARROW INDICATES DOWNWARD PIPE SLOPE #/# INDICATES SLOPE IN INCHES PER FOOT

PIPE REDUCER

FR.D. FR.D.

REFER TO MOUNTING HEIGHTS DETAIL FOR MOUTING ELEVATION. T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON MONOXIDE, ETC.)

M

TEE HORIZONTAL

D"Ø

WALL MOUNTED CONTROL DEVICE # INDICATES TYPE

PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.

TEE UP TEE DOWN

W/H

ADDITIONAL REMARKS

AUTOMATIC CONTROL VALVE (3-WAY)

ELBOW UP ELBOW DOWN

SYMBOL

DESCRIPTION

OCCUPANCY SENSOR

#

FLEXIBLE PIPING

REFER TO SPECIFICATIONS FOR TYPE.

VARIABLE AIR VOLUME BOX - NO COIL

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - HOT WATER COIL

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND INSTALLATION REQUIREMENTS.

VAV BOX TAG # = REFERENCE NUMBER IN SCHEDULE ### = AIRFLOW IN CFM VAV BOX TAG # = REFERENCE NUMBER IN SCHEDULE #.# = WATER FLOW RATE IN GPM

REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE D-1 FOR SUPPLY OR G-1 FOR RETURN/EXHAUST. REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE D-1 FOR SUPPLY OR G-1 FOR RETURN/EXHAUST.

B. CONTRACTOR SHALL VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. CONTRACTOR IS ADVISED THAT ALL LOCATIONS ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. THIS CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY ENGINEER. C. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION OF THE ADDITIONS AND REMODELING/ALTERATION OF THE EXISTING BUILDING. SERVICES TO THE EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION EXCEPT DURING SCHEDULED SHUTDOWNS FOR EXTENSION OR MODIFICATION. ALL SHUTDOWNS SHALL BE PLANNED TO BE COMPLETED DURING OFF HOURS TO MINIMIZE IMPACT TO THE OWNER. ALL SHUTDOWNS SHALL BE COORDINATED WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK. THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES WHERE NECESSARY TO ACCOMPLISH ANY SHUTDOWN. THIS INCLUDES BUT IS NOT LIMITED TO STAFFING AND EQUIPMENT FOR FIRE WATCHES, PROVISIONS FOR BOTTLED WATER, AND TEMPORARY HEATING OR COOLING EQUIPMENT. TEMPORARY MEASURES SHALL NOT BE REMOVED UNTIL THE PERMANENT SYSTEMS ARE OPERATIONAL AND HAVE PASSED ALL REQUIRED TESTING.

TEMPERATURE CONTROL SYMBOLS

ARROW INDICATES DIRECTION OF FLOW IN PIPING #/#

REFER TO SPECIFICATIONS FOR TYPES AND FINISHES. PENDANT REFERES TO FULL, SEMI-RECESSECT AND RECESSED TYPES. LOCATIONS FOR EACH ARE INDICATED IN THE SPECIFICATIONS OR ON THE PLANS.

MOTORIZED CONTROL DAMPER

DENOTES CONNECTION OF NEW WORK TO EXISTING SYSTEM

MEDICAL GAS OUTLETS

PLUMBING SYMBOLS SYMBOL

C.O. C.O.

DESCRIPTION

ADDITIONAL REMARKS

PIPING - SINGLE DASH INDICATES DOMESTIC COLD WATER - DOUBLE DASH INDICATES DOMESTIC HOT WATER - TRIPLE DASH INDICATES HOT WATER CIRCULATING - SOLID INDICATES SANITARY ABOVE FLOOR - CONTINUOUS DASHED INDICATES VENT - LONG DASHED LINES INDICATE SANITARY BELOW FLOOR

NUMBER INDICATES NOMINAL DIAMETER IN INCHES, LETTER(S) INDICATES SYSTEM. REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

CLEANOUT

CIRCLE INDICATES UP TO FLOOR OR WALL CLEANOUT. LINE INDICATES END OF PIPE CLEANOUT LOCATED ABOVE A CEILING.

AVERA FACILITY DEVELOPMENT

E. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND REFINISHING SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE. F. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS, "TO BE RETAINED, RELOCATED" OR HEREINAFTER NOTED, ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW CONSTRUCTION AND/OR WITH PROPOSED USAGE OF SPACE BY OWNER AS FOLLOWS: 1. REMOVE ANY PIPING PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP AT THE NEAREST ACTIVE MAIN WITH MATERIAL TO MATCH EXISTING 2. REMOVE ALL FIXTURES, CARRIERS, SUPPLY AND WASTE AND VENT PIPING, STEAM, HEATING HOT WATER, HVAC SUPPLY, RETURN AND EXHAUST AS NOTED. CAP AT NEAREST ACTIVE MAIN. SUPPLY AND RETURN MAINS ON PIPING SYSTEMS CONVEYING WATER OR GASES SHALL BE VALVED AND CAPPED. 3. IN REMODELED/ALTERED AREAS, ANY PIPING OR DUCTWORK PASSING THROUGH THE REMODELED AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR SURROUNDING AREAS THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL AND SHALL BE REROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE TO BE ACCOMPLISHED IN THE REMODELED AREA. 4. REMOVE UNUSED OR ABANDONED HANGERS AND PATCH ABANDONED PENETRATIONS TO MATCH EXISTING. 5. PENETRATIONS THROUGH EXISTING WALLS AND FLOORS FORMERLY OCCUPIED BY REMOVED PIPING OR DUCTWORK SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION. 6. RE-SUPPORT ANY PIPING AND DUCTWORK WHICH WAS SUPPORTED FROM ELEMENTS OF THE BUILDING WHICH WERE REMOVED AS A PART OF THE WORK REQUIRED UNDER THESE DOCUMENTS. 7. RECONNECT ANY CONTROL WIRING OR PNEUMATIC TUBING THAT WAS CONNECTED TO REMOVED EQUIPMENT AND WHICH IS REQUIRED FOR THE CONTINUED PROPER OPERATION OF THE BUILDING AUTOMATION SYSTEM. G. ALL EXISTING EQUIPMENT BEING REMOVED WILL BE HANDED OVER TO OWNER FOR FIRST RIGHT OF SALVAGE. IF OWNER REFUSES SALVAGE ITEMS, REMOVING CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL. H. CONTRACTOR SHALL REFER TO THE DRAWINGS OF ALL TRADES TO FAMILIARIZE THEMSELVES WITH EXTENT OF WORK INCLUDING BUT NOT LIMITED TO WHERE NEW PARTITIONING IS BEING INSTALLED, WHERE EXISTING PARTITIONING IS BEING REMOVED, WHERE CEILINGS ARE BEING REMOVED AND/OR REPLACED, ETC. I. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE SHOWN. THE CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM. J. PERFORM AIR AND FLUID BALANCE PRE-TEST ON ALL DISTRIBUTION EQUIPMENT AND ALL AIR OUTLETS IN THE AREA PRIOR TO COMMENCING WORK. SUBMIT PRE-TEST INFORMATION TO OWNER/ENGINEER. K. PROVIDE ACCESS DOORS IN DUCTWORK AND/OR ARCHITECTURAL ELEMENTS WHERE REQUIRED TO ACCESS ALL EQUIPMENT REQUIRING MAINTENANCE AND ADJUSTMENT. THIS EQUIPMENT INCLUDES BUT IS NOT LIMITED TO SENSORS, DAMPERS, ACTUATORS, CONTROL DEVICES, VALVES, ETC. ACCESS DOORS SHALL BE SIZED TO PROVIDE APPROPRIATE ACCESS BASED ON HEIGHT OF ACCESS REQUIRED AND ACTIVITY. INSTALL SUCH THAT ACCESS DOOR IS FULLY OPERABLE WITHOUT THE REMOVAL OF ARCHITECTURAL ELEMENTS SUCH AS CEILING RUNNERS, SUPPORTS, ETC. INSTALL IN A LOCATION SUCH THAT STEPPING OR LEANING OVER PERMANENT EQUIPMENT OR FURNITURE IS NOT REQUIRED. WHERE ACCESS DOORS ARE REQUIRED IN ARCHITECTURAL ELEMENTS THAT PROVIDE A FIRE AND/OR SMOKE RATING, ACCESS DOOR SHALL MAINTAIN THE REQUIRED RATING. L. SEAL ALL WALL PENETRATIONS (DUCTWORK, PIPING, CONTROLS, CONDUITS, ETC.) INTO ROOMS THAT REQUIRE PRESSURE CONTROL OR SOUND ISOLATION. M. PIPING AND DUCTWORK SHALL NOT BE ROUTED OVER ELECTRICAL AND TELECOM ROOMS. WHERE ROUTING OVER SUCH ROOMS IS UNAVOIDABLE, CONTRACTOR SHALL COORDINATE WITH OWNER, DESIGN TEAM, AHJ, AND OTHER TRADES REGARDING LOCATION OF PANELS AND UTILITY ROUTING AND SHALL PROVIDE DRIP PANS UNDER ALL UTILITIES WITH MOISTURE SENSORS OR DRAIN PIPING AS REQUIRED BY THE SPECIFICATIONS.

ED

FESSION PRO AL REG

. NO.

10229 ERIC G. SHERMAN U

T H

K D A

O

11/25/14

No.

Description

Date

N. REMOVAL AND REINSTALLATION OF CEILINGS IN AREAS NOT PART OF THE REMODEL AREA OR NOT INDICATED BY THE ARCHITECTURAL PLANS TO BE REMOVED IS THE RESPONSIBILITY OF THIS CONTRACTOR. CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED CEILING COMPONENTS TO MATCH EXISTING. WHERE AN IDENTICAL MATCH IS NO LONGER AVAILABLE, CONTRACTOR SHALL PROVIDE A SIMILAR REPLACEMENT UPON APPROVAL FROM THE OWNER.

60" 48"

1

O. REGARDLESS OF THE LENGTH SHOWN ON THE DRAWINGS, THE MAXIMUM LENGTH OF 60" SHALL NOT BE EXCEEDED FOR FLEXIBLE DUCTWORK. FLEX DUCT INSTALLATION SHALL BE AT TERMINAL ENDS ONLY. CONNECTIONS AT VAV BOX INLETS SHALL BE SOLID HARD DUCT. THE DUCTWORK AT ANY FIRE AND/OR FIRE SMOKE DAMPER SHALL BE HARD DUCT.

A. COORDINATE ELEVATION OF DEVICES WITH ALL ADJACENT DEVICES INCLUDING THOSE WITH OTHER TRADES. ALL DEVICES WHICH HAVE ADA AND NON-ADA HEIGHTS LISTED SHALL BE MOUNTED TO COMPLY WITH ADA EXCEPT WHERE NOTED ON THE PLANS AS NON-ADA. B. GROUP DEVICES IN AN ORGANIZED AND UNIFORM MANNER.

P. LOCATE PIPING AND DUCTWORK IN EXTERIOR BUILDING WALLS ON THE WARM SIDE IF THE BUILDING AND VAPOR BARRIER. COORDINATE INSTALLATION OF BUILDING INSULATION TO RUN CONTINUOUS BETWEEN PIPING AND BUILDING WALL.

C. REFER TO ARCHITECTURAL ELEVATIONS FOR ADDITIONAL REQUIREMENTS. WHERE THESE REQUIREMENTS DIFFER FROM THE ARCHITECTURAL PLANS, THE ARCHITECTURAL PLANS SHALL TAKE PRECEDENCE. D. REFER TO ARCHITECTURAL ELEVATIONS FOR ALL PLUMBING FIXTURES. E. ALL DEVICES SHALL BE COORDINATED SO AS NOT TO INTERRUPT A BACK SPLASH OR MATERIAL TRANSITIONS. REFER TO ARCHITECTURAL ELEVATION TO CONFIRM DEVICE IS NOT LOCATED WITHIN TRANSITION AREA. F. PROVIDE BACKING IN WALLS WHERE WALL MOUNTED DEVICES OR EQUIPMENT ARE INSTALLED. REFER TO ARCHITECTURAL SPECIFICATIONS.

Q. SUPPORT ALL DUCTWORK, PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. HOLD PIPING TIGHT TO BOTTOM OF STRUCTURAL MEMBERS OR RUN THROUGH JOIST WEBS IF POSSIBLE. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK AND/OR ELECTRICAL CONDUITS. DO NOT SUPPORT FROM WOOD TONGUE AND GROOVE ROOF DECK. SUPPORT FROM BOTTOM CHORD OF BAR JOISTS ONLY AT PANEL POINTS.

MECHANICAL EQUIPMENT MOUNTING HEIGHTS DETAIL NONE

R. PROVIDE CONSTRUCTION FILTERS ON AHUS SERVING THE CONSTRUCTION AREA AS WELL AS ALL RETURN/EXHAUST DUCT PENETRATIONS COMING FROM THE CONSTRUCTION AREA. AT THE COMPLETION OF WORK, REMOVE ALL TEMPORARY AND CONSTRUCTION FILTERS AND PROVIDE NEW FILTERS FOR ALL AHUS. S. PROTECT ALL DUCTWORK AND PIPING DURING CONSTRUCTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. AT A MINIMUM, DUCTWORK AND PIPING ENDS SHALL BE COVERED AND SEALED TO PREVENT THE COLLECTION OF DUST AND DEBRIS. CLEAN ALL INTERIOR SURFACES PRIOR TO INSTALLATION AND PROTECT ONCE INSTALLED. MEDICAL GAS PIPING SHALL BE PROTECTED IN ACCORDANCE WITH NFPA 99 REQUIREMENTS. T. AT THE COMPLETION OF WORK, CLEAN ALL STRAINERS LOCATED PROVIDED AS A PART OF THE WORK AS WELL AS PRIMARY SYSTEM STRAINERS LOCATED AT PUMPS WHERE SYSTEMS WERE EXTENDED. ON EXISTING EQUIPMENT, COORDINATE WORK WITH OWNER. U. PROVIDE INTERMEDIATE TESTING AND BALANCING AT THE COMPLETION OF EACH PHASE AND AS REQUIRED TO MAINTAIN PROPER OPERATION OF SYSTEMS SERVING OCCUPIED AREAS OF THE FACILITY. V. REFER TO SHEETS M500 THROUGH M502 FOR GENERAL CONSTRUCTION DETAILS. 2014

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS.

DESCRIPTION BACK FLOW PREVENTOR FIRE PROTECTION FIRE DEPARTMENT CONNECTION

FLOW SWITCH

DIAMETER

FIRE PROTECTION ABBREVIATIONS ABBREVIATION BFP F FDC

F

GENERAL MECHANICAL SYMBOLS

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS.

ABBREVIATION AV AW BF BFP BT CA CD CO CP CS CW DF DGCO DI DIC DIH DIHC DIS DISC DR DS DT EEW ES ESEW ET EWC EWT F FCO FD FS G GCO HB HD HP

ADDITIONAL REMARKS

R GINEE EN

DESCRIPTION HEATING COIL HORSEPOWER HIGH PRESSURE STEAM CONDENSATE HIGH PRESSURE STEAM SUPPLY (86 PSIG AND ABOVE) HEAT RECOVERY CHILLER HUMIDIFIER HYDRONIC HOT WATER RETURN HYDRONIC HOT WATER SUPPLY LOW PRESSURE STEAM CONDENSATE LOW PRESSURE STEAM SUPPLY (0-12 PSIG) LOUVER LEAVING WATER TEMPERATURE BTU (1000'S) MANUAL DAMPER MOTOR OPERATED DAMPER MEDIUM PRESSURE STEAM CONDENSATE MEDIUM PRESSURE STEAM SUPPLY (13-85 PSIG) NORMALLY CLOSED NORMALLY OPEN OUTDOOR AIR PUMP

DESCRIPTION

O

ABBREVIATION HC HP HPC HPS HRC HUM HWR HWS LPC LPS LV LWT MBH MD MOD MPC MPS NC NO OA P

SYMBOL

S

DESCRIPTION AIR BLENDER AIR CONDITIONING UNIT (SPLIT SYSTEM INDOOR UNIT) AIR HANDLING UNIT BOILER FEED UNIT BOILER CONSTANT AIR VOLUME BOX COOLING COIL CONDENSATE DRAIN CUBIC FEET PER MINUTE CHILLER CONDENSATE PUMP CONDENSER WATER RETURN CONDENSER WATER SUPPLY COOLING TOWER CONDENSING UNIT CABINET UNIT HEATER CHILLED WATER RETURN CHILLED WATER SUPPLY DIFFUSER DUAL DUCT DIRECT EXPANSION EXHAUST AIR ENTERING AIR TEMPERATURE EXHAUST FAN EFFICIENCY ENERGY RECOVERY COIL ENERGY RECOVERY WHEEL EXPANSION TANK ENTERING WATER TEMPERATURE FILTER BANK (CONSISTING OF ONE OR MORE FILTERS) FAN COIL UNIT FLOW MEASURING STATION FUEL OIL RETURN FUEL OIL SUPPLY FUEL OIL VENT FIRE DAMPER FIRE SMOKE DAMPER FINNED TUBE RADIATOR GRILLE GLYCOL CHILLED WATER RETURN GLYCOL CHILLED WATER SUPPLY GRAVITY EXHAUST GLYCOL HOT WATER RETURN GLYCOL HOT WATER SUPPLY GRAVITY INTAKE

DESCRIPTION MASTER ALARM PANEL MEDICAL VACUUM PUMP MEDICAL NITROGEN MEDICAL NITROUS OXIDE MEDICAL OXYGEN PRESSURE REDUCING VALVE MEDICAL VACUUM VALVE BOX MEDICAL WASTE ANESTHESIA GAS DISPOSAL WATER COLUMN

SYMBOL

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS.

ABBREVIATION AB AC AHU BFU BLR CAV CC CD CFM CH CP CR CS CT CU CUH CWR CWS D DD DX EA EAT EF EFF ERC ERW ET EWT FB FCU FMS FOR FOS FOV FRD FSD FTR G GCWR GCWS GE GHWR GHWS GI

ABBREVIATION MAP MVP N NO O PRV VAC VB WAGD WC

A

DESCRIPTION ACCESS DOOR/PANEL ABOVE FINISHED FLOOR AMBIENT BOTTOM OF BEAM DIAMETER DOWN EXISTING ELECTRICAL CONTRACTOR EFFICIENCY FEET PER MINUTE FEET PER SECOND GENERAL CONTRACTOR GALLONS PER MINUTE LENGTH LINEAR FEET

A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, PLUMBING, TEMPERATURE CONTROLS, AND FIRE PROTECTION WORK.

T

ABBREVIATION AD AFF AMB BOB DIA DN E EC EFF FPM FPS GC GPM L LF

FIRE PROTECTION SYMBOLS

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS.

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS.

REGIST ER

LABORATORY AND MEDICAL GAS ABBREVIATIONS

GENERAL ABBREVIATIONS

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SACRED HEART 4TH & 5TH MECHANICAL COVER SHEET

Date

SES PROJECT # 14041

11/25/2014 4:37:13 PM

M000 Scale

NONE

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

SHEET NOTES 1 REMOVE EXISTING FAN COIL LOOP PUMP AND APPURTANCES. REMOVE HWS/R AND CWS/R TO MAIN AND CAP. PUMPS SERVING 2ND FLOOR SHALL REMAIN IN SERVICE. COORDINATE REMOVAL WITH PHASE OF CONSTRUCTION FOR FAN COILS SERVED. 2 REMOVAL OF AHU-10 INCLUDING ASSOCIATED DUCTWORK, CONTROLS, PIPING CONNECTIONS, COILS, HUMIDIFIERS AND REHEAT COILS TO BE COMPLETED BY OWNER.

A1 B B.0

P-13

P-15

3 REMOVE EXISTING SUPPLY DUCT SERVING NEGATIVE AIR ROOMS DURING PHASE 2. CAP DUCT AT MAIN.

1

4 REMOVE EXISTING SUPPLY DUCT SERVING ISOLATION ROOMS DURING PHASE 3. CAP DUCT AT MAIN.

2

1.7

2.1

5 REMOVE EXISTING SUPPLY DUCT BETWEEN NEW AHU 10 AND EXISTING SUPPLY MAIN DURING PHASE 1. PROVIDE TEMPORARY CONNECTION TO SERVE EXISTING ROOMS UNTIL PHASE 3.

3

B1.1

6 REMOVE PORTION OF EXISTING DUCT TO ALLOW FOR INSTALLATION OF NEW WORK. REFER TO SHEET M131 FOR NEW WORK SCOPE.

1 2

C

2

2

P-16

2

C1

P-14 1

2

1

2 2

3

6

D

1 P-12

FESSION PRO AL . NO.

10229 ERIC G. SHERMAN

O

U

A

S

D1

REG

T

ED

R GINEE EN

REGIST ER

1

T H

K D A

O

11/25/14

E

No.

Description

Date

5

E1

1

5

4

1 P-11

P-18

F F1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

THIRD LEVEL DEMOLITION - HVAC AND PIPING 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH THIRD LEVEL DEMOLITION - HVAC AND PIPING Date

SES PROJECT # 14041

11/25/2014 4:37:17 PM

M031 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

SHEET NOTES 1 REMOVE FAN COIL UNIT AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN, ACCESSORIES, CONTROLS AND APPURTANENCES. COORDINATE REMOVAL WITH WORK ON 3RD AND 5TH FLOORS. COORDINATE WORK WITH PHASING TO ENSURE CONTINUOUS SYSTEM OPERATION FOR EQUIPMENT OUTSIDE OF CURRENT PHASE.

PHASE 4 1

1

3 6"x6"

1.7

3

3

1

1

1 1/2"ø 1 1/2"ø

2"ø 2"ø

1

1

3

2 PATCH PIPING PENETRATIONS THROUGH FLOOR. PATCH METHOD SHALL MAINTAIN EXISTING FIRE RESISTANCE RATING OF FLOOR. 3

RAD CONTROLLER (ABOVE CEILING)

3 3

3

3

3 4

2.1

3

3 REMOVE DIFFUSER/GRILLE AND ALL ASSOCIATED DUCTWORK, ACCESSORIES, AND APPURTANENCES. COORDINATE WORK WITH PHASING TO ENSURE CONTINUOUS SYSTEM OPERATION FOR ROOMS OUTSIDE OF CURRENT PHASE.

4

4 REMOVE EXISTING FINNED TUBE RADIATION. REMOVE ALL ASSOCIATED PIPING AND CONTROLS.

3 2

T

B1.1

T

T

T

T

T

3 6"x4"

10"x4"

12"x8"

T

T

T

3

12"x10"

1

16"x10" 3

3

3

3

3

3

3

3

3

3

T

T

3

1

18"x10" 18"x10"

T

26"x8" SA

1

1 1/2"ø 2"ø

3

3 3

1

T

B

1

FS.D.

1

FS.D.

A1

3

3

CAP PIPING AT ACTIVE MAINS

3/4" HWS/R

8"x6" 3

3

32"x12"

16"x8"

1 1/2"ø 1 1/2"ø

2

2"ø 2"ø

3 1

16"x8" 10"x12"

3 T

1 1/4"ø 1 1/4"ø PHASE 2

3 16"x8"

10"x8"

1

1 1/2"ø 1 1/2"ø

2"ø 2"ø

2

1

3

3

3 REGIST ER

22"x10"

16"x8"

3

ED

FESSION PRO AL

S O

1

D1

1

3

E

10229 ERIC G. SHERMAN U

T H

K D A

O

CAP PIPING AT ACTIVE MAINS

No.

Description

Date

T

T

3/4" HWS/R

. NO.

11/25/14

T

T

3

REG

R GINEE EN

26"x8" SA

16"x8"

A

32"x12"

12"x14" SA

T

T

12"x14" 3

T

D

1 1/4"ø 1 1/4"ø

PHASE 3

3 10"x12"

T

3 1

1

26"x8" SA

1

24"x10"

C1

20"x10"

T

T

C

3

3 3

12"x8"

12"x8"

3

3

3

14"x8"

1

3

3

T

T

3

16"x10"

3

18"x10"

20"x10"

22"x10"

T

T

T

2

T

1

T T

RAD CONTROLLER (ABOVE CEILING)

3 3

4

3

3

3

26"x8" SA

T

3

16"x8"

3

E1

3

3

3

2"ø 2"ø

3

3

3

1

3

T

3

3

2"ø 1 1/2"ø

T

4

3

3

1 1/2"ø 1 1/2"ø

F 1

F1

1

1

1

1

1

1

1

1

PHASE 1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

FOURTH LEVEL DEMOLITION - HVAC AND PIPING 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FOURTH LEVEL DEMOLITION - HVAC AND PIPING Date

SES PROJECT # 14041

11/25/2014 4:37:21 PM

M041 Scale

1/8" = 1'-0"

98.5

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

SHEET NOTES 1

REMOVE EXISTING PLUMBING TO FIXTURES ABOVE INCLUDING ALL APPURTENANCES. REMOVE ASSOCIATED COLD WATER, HOT WATER, SANITARY, AND VENT PIPING TO ABOVE CEILING AND EXTEND TO NEW FIXTURES. COMPLETE WORK WITHIN ASSOCIATED PHASE. MAINTAIN PROPER SYSTEM OPERATION TO ALL EXISTING AREAS AND COMPLETED PHASES. REFER TO NEW WORK SHEETS FOR ADDITIONAL INFORMATION.

2

REMOVE EXISTING PLUMBING FIXTURE INCLUDING ALL APPURTENANCES. REMOVE ASSOCIATED COLD WATER, HOT WATER, SANITARY, AND VENT PIPING TO NEAREST ACTIVE MAIN AND CAP. COMPLETE WORK WITHIN ASSOCIATED PHASE. MAINTAIN PROPER SYSTEM OPERATION TO ALL EXISTING AREAS AND COMPLETED PHASES.

3

EXISTING PIPING IS LOCATED IN VICINITY OF NEW DUCT MAINS. ADJUST PIPE HANGERS AND LOCATION AS REQUIRED TO ACCOMMODATE NEW WORK INSTALLATION.

PHASE 4

A1 B B.0

3

3

3

3

1/2"ø

3

1

1

2 1 1/2"ø 2

3/4"ø

1.7

1

2.1 3/4"ø 3/4"ø 1 1/2"ø

3

B1.1 1

1 1

1

1

1

1

1

1

1

1

1 1

3

1

1

1 1

1

3

1

1 1

C

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

C1

1

3 3

1

1

1

1

1

1

1

1

1

1

PHASE 2

1

FESSION PRO AL

S O

D1

1

1

REG

. NO.

10229 ERIC G. SHERMAN U

A

3

ED

R GINEE EN

REGIST ER

3

T

D

PHASE 3

1

T H

K D A

O

11/25/14

E

1

1

1

1

1

1

1

1

No.

1

1

1

1

1

1

1

1

Date

1

1

3

Description

1 1

1

1

1 1

1

1

1 1

1 1

1

1

1 1

1

1

1

E1 3/4"ø

3

3/4"ø 3/4"ø 1 1/2"ø 1/2"ø

1

1 1/2"ø

T

1 1/2"ø 3/4"ø 1

F

1 1/2"ø

3

3

3

3

3

F1 PHASE 1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

FOURTH LEVEL DEMOLITION - PLUMBING AND MED GAS 1/8" = 1'-0"

2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FOURTH LEVEL DEMOLITION PLUMBING AND MED GAS Date

SES PROJECT # 14041

11/25/2014 4:37:24 PM

M042 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

SHEET NOTES 1 REMOVE FAN COIL UNIT AND ALL ASSOCIATED PIPING, CONDENSATE DRAIN, ACCESSORIES, CONTROLS AND APPURTANENCES. COORDINATE REMOVAL WITH WORK ON 3RD AND 4TH FLOORS. COORDINATE WORK WITH PHASING TO ENSURE CONTINUOUS SYSTEM OPERATION FOR EQUIPMENT OUTSIDE OF CURRENT PHASE.

PHASE 4

1

1

4

1

4

1

1

4

2

1

4

2

2

2

RAD CONTROLLER (ABOVE CEILING)

2

2

2

1

2

2

2

4 PATCH PIPING PENETRATIONS THROUGH FLOOR. PATCH METHOD SHALL MAINTAIN EXISTING FIRE RESISTANCE RATING OF FLOOR.

5 2

T T

T

T

T

T

T

4

T

5 REMOVE EXISTING EXHAUST DUCT AND FAN. PREPARE EXISTING CURB FOR NEW FAN. 6

2 6"x4"

6

10"x4"

2

2

12"x10"

2

2

2

16"x10" 2

2

6 REMOVE EXISTING GRILLES AND DIFFUSERS IN CORRIDOR, CLEAN AND REINSTALL IN NEW CEILING GRID. REFER TO EXISTING DRAWINGS ISSUED FOR REFERENCE.

18"x10" 2

2

2

2

T

T

6"x6"

12"x8"

1

2

18"x10"

T

26"x8"

T

1

3 REMOVE EXISTING FINNED TUBE RADIATION. REMOVE ALL ASSOCIATED PIPING AND CONTROLS.

3

2.1

4

B1.1

2

3

2

1.7

2 REMOVE DIFFUSER/GRILLE AND ALL ASSOCIATED DUCTWORK, ACCESSORIES, AND APPURTANENCES. COORDINATE WORK WITH PHASING TO ENSURE CONTINUOUS SYSTEM OPERATION FOR ROOMS OUTSIDE OF CURRENT PHASE.

1

2

2

2

1

T

B B.0

4

FS.D.

1

FS.D.

A1

C T

T

6 6

CAP PIPING AT ACTIVE MAINS

C1 2

8"x6"

2

1

26"x8"

1

2

3/4" HWS/R

20"x10"

6

2

4 1

2

4 32"x12"

16"x8"

1

2

T

10"x6"

PHASE 3

6

PHASE 2

6

6

T

12"x14"

T

D

10"x12"

T

2

2

24"x10"

16"x8"

2

2

32"x12" 16"x8"

22"x10"

2

1 4

26"x8"

1

2

6

1 2

ED

FESSION PRO AL

S O

D1 2

2 6

E 12"x8"

No.

2

6

6

2

2

2

2

14"x8"

2

2

2

16"x8"

2

2

4

T

16"x10"

18"x10"

20"x10"

2

T

T

T

T

T

T

T

5

2 2

FS.D.

FS.D.

3

2

2

2

2

2

1

4

1

1

4

4

1

2

1

F1

1

2

2

1

1

2

1

4

1

1

4

1

PHASE 1

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

FIFTH LEVEL DEMOLITION - HVAC AND PIPING 1/8" = 1'-0"

Date

RAD CONTROLLER (ABOVE CEILING)

F

1b

Description

2

T

3

O

4

T

2 2

K D A

22"x10"

T

2

T H

2

2

26"x8"

E1

U

6

CAP PIPING AT ACTIVE MAINS

12"x8"

1

10229 ERIC G. SHERMAN

T

T

3/4" HWS/R

. NO.

11/25/14

T

T

6

REG

R GINEE EN

4

16"x8"

A

16"x8"

T

10"x8"

REGIST ER

2

1

2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FIFTH LEVEL DEMOLITION - HVAC AND PIPING Date

SES PROJECT # 14041

11/25/2014 4:37:28 PM

M051 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

SHEET NOTES 1

REMOVE EXISTING PLUMBING FIXTURE INCLUDING ALL APPURTENANCES. REMOVE ASSOCIATED COLD WATER, HOT WATER, SANITARY, AND VENT PIPING TO NEAREST ACTIVE MAIN AND CAP. COMPLETE WORK WITHIN ASSOCIATED PHASE. MAINTAIN PROPER SYSTEM OPERATION TO ALL EXISTING AREAS AND COMPLETED PHASES.

2

DISCONNECT MEDICAL GASES FROM EXISTING HEADWALL UNIT. SALVAGE EXISTING OUTLETS FROM HEADWALL FOR REINSTALLATION. PROVIDE NEW MOUNTING BRACKETS AND HARDWARE AS REQUIRED. REMOVE PIPING TO NEAREST ACTIVE MAIN AND CAP. COMPLETE WORK WITHIN ASSOCIATED PHASE. MAINTAIN PROPER SYSTEM OPERATION TO ALL EXISTING AREAS AND COMPLETED PHASES. COORDINATE WORK TO MINIMIZE OUTAGES. COORDINATE WORK TO CONSOLIDATE NUMBER OF CERTIFICATION VISITS.

3

CAP MEDICAL GAS PIPING AT MAIN. COORDINATE CAPPING ACTIVITIES WITH PHASE 0 NEW WORK MEDICAL GAS PIPING. WORK SHALL BE COORDINATED SUCH THAT ONE MEDICAL GAS CERTIFICATION IS REQUIRED.

4

CAP MEDICAL GAS PIPING AT MAIN. COORDINATE CAPPING ACTIVITIES WITH PHASE 1 NEW WORK MEDICAL GAS PIPING. WORK SHALL BE COORDINATED SUCH THAT ONE MEDICAL GAS CERTIFICATION IS REQUIRED.

5

CAP MEDICAL GAS PIPING AT MAIN. COORDINATE CAPPING ACTIVITIES WITH PHASE 3 NEW WORK MEDICAL GAS PIPING. WORK SHALL BE COORDINATED SUCH THAT ONE MEDICAL GAS CERTIFICATION IS REQUIRED.

6

REMOVE EXISTING PLUMBING FIXTURE AND PREPARE EXISTING PIPING FOR ACCEPTANCE AND INSTALLATION OF NEW FIXTURE.

PHASE 4

A1 B B.0

1/2"ø 2

6

1 2

3/4"ø 1

2

1.7

2

2

2

2

2

2

B1.1

1 1/2"ø

2

2.1

6

3/4"ø 3/4"ø 1 1/2"ø 1

1

1

1

1

1

1

6

2

4

1 1/2"ø

1/2"ø

3/4"ø

1 1

1 2

1

C

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1 1

1

1 5

1

2

1

1

2

1 2

C1

2

1

1

1

1

1

1

2

1

1

PHASE 3

PHASE 2 1 1

2

1

1

2

ED

FESSION PRO AL

S O

D1

1 2

1

. NO.

10229 ERIC G. SHERMAN U

T H

K D A

O

1 2

1

1

1

11/25/14

3

E

REG

R GINEE EN

REGIST ER

1

A

1

T

D

1

1

No.

Description

Date

1

1

1

2

1 2 1

1

1 1

1

1

E1 3/4"ø

1

1 1

1

1

2

2

1

1

1

1 1

1 1

1

1

1 1

1

1

1

1

1

1

1

2

2

2

2

2

3/4"ø 3/4"ø 1 1/2"ø

3

1/2"ø 6 6 2

1 1/2"ø 6

1 1/2"ø 3/4"ø

2

F

2

1/2"ø

F1 PHASE 1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

FIFTH LEVEL DEMOLITION - PLUMBING AND MED GAS 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FIFTH LEVEL DEMOLITION PLUMBING AND MED GAS Date

SES PROJECT # 14041

11/25/2014 4:37:32 PM

M052 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

SHEET NOTES 1 REMOVE EXISTING SPRINKLER AND BRANCH PIPING TO MAIN AND CAP. COMPLETE WORK WITHIN ASSOCIATED PHASE. MAINTAIN PROPER SYSTEM OPPERATION TO ALL EXISTING AREAS AND COMPLETED PHASES.

PHASE 4

A1

2 CLEAN EXISTING SPRINKLER HEAD AND CENTER IN NEW CEILING GRID. REFER TO EXISTING DRAWINGS ISSUED FOR REFERENCE.

T

B B.0

1.7

1

1 1/4"ø

2.1

1 1

B1.1

1

1

1

1

1

1

1

1

1

1

1

2

1

1 1/4"ø

1

1 1/4"ø

1

1 1/4"ø

1

1 1/4"ø

1 1/4"ø

1

1 1/4"ø

1

1 1/4"ø

1

1 1/4"ø

1

1 1/4"ø

1

1 1/4"ø

1 1/4"ø

1 1/4"ø

1

1

C 2

C1

1

2

2

2

2

2

2

2

2

1 1/4"ø

2

1

1 1

1

6" STANDPIPE

ZONE 13W

1 INSPECTOR'S TEST CONNECTIONS

1 1/4"ø 2

D

1

1 1/4"ø

2 2

PHASE 3

PHASE 2

2 1

2

1

ZONE 14W

6" STANDPIPE

1 1

1

FESSION PRO AL

S

1

1 1/4"ø

1

1 1/4"ø

2

2

2

2

2

2

2

2

2

O

D1

E1

1

2

1

1

1

1

1

1

10229 ERIC G. SHERMAN U

T H

K D A

O

Description

Date

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

1 1/4"ø

No.

1 1/4"ø

. NO.

11/25/14

2

E

1

REG

R GINEE EN

2

ED

A

1 1/4"ø

T

2

REGIST ER

1 1/4"ø

1

1

1

1

1 1/4"ø

2

1

1 1

1

1

1

1

1

1

1

1

1 1

1

1 1/4"ø

1 1"ø

1

T

1

F F1 PHASE 1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

FIFTH LEVEL DEMOLITION - FIRE PROTECTION 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FIFTH LEVEL DEMOLITION - FIRE PROTECTION Date

SES PROJECT # 14041

11/25/2014 4:37:36 PM

M053 Scale

1/8" = 1'-0"

98.5

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

SHEET NOTES 1 PROVIDE TEMPORARY CONNECTION TO EXISTING SUPPLY DUCT. PROVIDE BALANCING DAMPER FOR CONTROLLED OPERATION UNTIL PHASE 3 WHEN DUCTWORK IS REMOVED. 2 REMOVE EXISTING PLENUM WALL AND DOOR FOR INSTALLATION OF AHU. REINSTALL PLENUM WALL AND DOOR TO MATCH ORIGINAL INSTALLATION.

A1 7

P-15 EF-17

38"x38" EA

HX-CW1 UP

EF-14

44"x24" SA

48"x24"

9

24"x30" RA UP 10"x20" RA UP

20"x10" 24"x12" 88"x24" SA

9

9

9

30"x26"

30"x32" SA UP

20"x18"

60"x24" AHU-09

32"x20" EA 16"x12" RA 26"x22" RA UP 32"x20" EA UP 16"x12" RA UP

26"x22" RA

O

36"x22" SA DN

9

48"x18"

24"x30" RA

AHU-06

44"x20" SA

E 54"x14" RA

AHU-02

60"x22" RA

P-18

72"x22" RA

72"x12" RA DN

K D A

O

Description

Date

44"x20" RA

9 30"x18"

P-17

2 48"x18"

9

F

T H

20"x18" 70"x16"

4

5 1

AHU-04

110"x20"

48"x24"

VFD-RF-10B

9 AHU-08

18"x18"

48"x18"

VFD-RF-10A

U

9

24"x30" RA AHU-07

112"x30"

E1

10229 ERIC G. SHERMAN

30"x32" SA

24"x30" RA

9

. NO.

110"x20"

AHU-05

REG

11/25/14

No. 30"x32" SA

FESSION PRO AL

S

44"x24" SA UP

ED

R GINEE EN

AHU-10

D1

12"x26" RA 9

VFD-SF-10A VFD-SF-10B

30"x32" SA

20"x18"

26"x22" RA

60"x22" RA 6

32"x20" EA

30"x24" SA

44"x20" RA ABOVE 44"x24" SA BELOW

10

48"x24"

D

12"x24" RA UP

10"x14" EA 30"x14" EA DN

10 RELOCATE EXISTING SANITARY WASTE PIPING, CONTROL TUBING, WIRING, CONDUITES, AND HANGERS TO ACCOMMODATE INSTALLATION OF DUCT THROUGHT WALL.

9

9

44"x20" RA DN 26"x14" EA DN 22"x10" EA DN 16"x10" EA DN 44"x24" SA DN

9 AREA IS CONGESTED WITH EXISTING DUCTWORK AND PIPING WHICH MAY NOT ALLOW FOR DIRECT INSTALLATION. PROVIDE ADDITIONAL OFFSETS AND RELOCATE EXISTING DUCTWORK AND PIPING AS REQUIRED TO FACILITATE INSTALLATION OF NEW WORK.

P-16

REGIST ER

30"x26"

9

30"x14" EA 44"x24" RA DN 44"x24" SA DN 30"x24" SA UP

44"x20" SA DN

20"x10" 24"x12"

10"x14" EA

20"x18"

BELOW DN

60"x12" RA

20"x10" RA

60"x22" RA DN 60"x26" SA BELOW DN

DN

8 CONNECT TO EXISTING 24x14 SUPPLY DUCT.

44"x24" SA

20"x10" RA

44"x24" SA

54"x12"

AHU-11

AHU-03

24"x12" RA

44"x24" RA

30"x26"

C1

24"x12" RA

16"x20" EA DN 10"x20" EA DN 24"x24" EA DN

6 EXTEND CONCRETE HOUSEKEEPING PAD TO ACCOMMODATE NEW AHU. 7 DUCT UP TO 4TH FLOOR. SAW CUT FLOOR TO ALLOW FOR INSTALLATION OF NEW DUCT. COORDINATE LOCATION WITH STRUCTURAL CONCRETE TEES.

28"x10" RA

C

5 RELOCATE EXISTING PLENUM ACCESS DOOR TO THIS LOCATION.

9

20"x10" EA 44"x24" RA

44"x20" SA ABOVE 44"x24" RA BELOW

30"x12" RA

10"x22" EA

20"x10" EA

26"x14" EA

10"x16" EA

EF-20

VB-3-1 1500 CFM COOLING ONLY

EF-07 EF-18

30"x32" SA

22"x14" SA

12"x26"

22"x16" SA

12"x16"

24"x16" SA

16"x16"

32"x20" EA

28"x28" EA

38"x16" SA

B1.1

4 106"x26" RELIEF AIR DUCT BELOW. TOP OF DUCT TO BE ALIGNED WITH TOP OF RELIEF AIR PLENUM (APPROX. 9' A.F.F.). 106"x24" OUTDOOR AIR DUCT ABOVE. BOTTOM OF DUCT TO BE ALLIGNED WITH BOTTOM OF OUTDOOR AIR PLENUM (APPROX 9'-6" A.F.F.).

9

20"x20"

2.1

28"x16" SA

38"x16" SA

8

22"x22"

10"x14" EA

1.7

24"x14"

EF-16 EF-15

A

9

3 REMOVE EXISTING LOUVER AND DOOR FOR INSTALLATION OF AHU. REINSTALL LOUVER AND DOOR TO MATCH ORIGINAL INSTALLATION.

T

EF-21

30"x14" EA

B B.0

9

9 9

7

3

F1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

4TH & 5TH THIRD LEVEL - HVAC

THIRD LEVEL- HVAC 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:37:39 PM

M131 Scale

1/8" = 1'-0"

98.5

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

6"ø GCWS

6"ø GCWR

A

SHEET NOTES 1 ROUTE PIPING UP TO NEW VAV TERMINAL UNITS ON FLOORS 4 AND 5 DURING PHASE 1.

5

6"ø GCWR 6"ø GCWS

A1

2 ROUTE PIPING UP TO NEW VAV TERMINAL UNITS ON FLOORS 4 AND 5 DURING PHASE 3.

4 6

6 6"ø GCWR

1.7

6

HX-CW1

B1.1 1"ø HWR

3/4"ø

2 1/2"ø CWR 2 1/2"ø CWS

2"ø HWR

3/4"ø HWS

6 RELOCATE EXISTING HANGERS, SUPPORTS AND CONDUIT TO ALLOW FOR INSTALLATION OF NEW CHILLED WATER PIPING.

4"ø HWS

1"ø HWR

1"ø HWS

1"ø HWR

5 PROVIDE OFFSETS REQUIRED TO MAKE CONNECTIONS. HALLWAY OUTSIDE MECHANICAL ROOM IS CONGESTED AND WILL REQUIRE ADDITIONAL OFFSETS TO ACCOMMODATE INSTALLATION.

6"ø CWS

6"ø CWR

2"ø CWS 2"ø CWR

3/4"ø HWR

4

M502

PROVIDE DRAIN PAN WITH MOISTURE SENSOR TIED TO BAS FOR NEW PIPING.

2.1

4 PROVIDE 3-WAY DIVERTER VALVE AT PIPE JUNCTION. REFER TO CHILLED WATER CONTROL DETAIL FOR ADDITIONAL REQUIREMENTS.

2

6"ø CWS

6

6"ø CWS

3

6"ø CWS

2

6"ø GCWS

6"ø CWR

6

8"ø CWS

B B.0

3 CORE DRILL PENETRATIONS IN STRUCTURAL SLAB. COORDINATE LOCATIONS WITH EXISTING STRUCTURAL TEES.

2 1/2"ø CWS 2 1/2"ø CWR

AHU-03

1"ø HWR 1"ø HWS

4"ø HWR

4"ø HWR

AHU-11

4"ø HWR 6"ø HWR 3"ø MPC DN

2"ø CWS DN 2"ø CWR DN

8"ø CR DN 8"ø CS DN

2 1/2"ø HWR 2 1/2"ø HWS

1 1/2"ø CWS 1 1/2"ø CWR

2"ø MPS

2 1/2"ø HWS 2 1/2"ø HWR 3"ø MPS

AHU-09

1 1/2"ø CWS 1 1/2"ø CWR

4"ø HWR

1 1/2"ø CWS 1 1/2"ø CWR 4

EXISTING PRV

O

M501 2

2"ø LPS

AHU-05

E1

2 1/2"ø HWS 3"ø HWS 3"ø HWS

2"ø HWS

M501 2

6"ø HPS 4"ø HWR 3"ø HWR

1 1/4"ø HWR 1 1/4"ø HWS

1 4"ø HWR 3"ø HWR

6"ø CWS

1 1/4"ø HWS 1 1/4"ø HWR

6

1 1/2"ø HWS 1 1/2"ø HWR 1"ø HPC

6"ø CWR 2"ø HWR

2 1/2"ø HWS 3"ø HWR 1 1/4"ø LPS

3"ø CWR 3"ø CWS

2 1/2"ø HWR 2 1/2"ø HWS 2"ø HWS 4"ø HWR 2"ø HWS 4"ø HWR 6"ø CWR 6"ø CWS

2"ø LPS

3"ø HWS

3"ø HWR 1 1/4"ø HWR 1 1/4"ø HWS

1 1/4"ø HWS 1 1/4"ø HWR AHU-07 3"ø CWS 3"ø CWR

AHU-08

No.

1"ø CWR 1"ø CWS

3"ø CWS

2 1/2"ø 2 1/2"øCWR CWS

10229 ERIC G. SHERMAN U

T H

K D A

O

Description

Date

2"ø CWR 2"ø CWS

AHU-02

AHU-04

M501

. NO.

11/25/14

3"ø HWS

2 1/2"ø HWR 6"ø CWR 4"ø CWS

REG

2 1/2"ø HWS

5 M501

FESSION PRO AL

S

AHU-10

1"ø HPC

ED

A

2

3"ø CWS 3"ø CWR

T

2"ø HWR

1

6"ø HPS REGIST ER

STEAM RELIEF VENT UP 6"ø 6"ø STEAM RELIEF VENT UP

2"ø HWS

M501

4"ø CWR 4"ø CWS

E

6"ø MPS

4"ø HWS DN

6"ø MPS 4"ø HWS

1 1/2"ø MPC DN

2"ø HWS

1 1/2"ø HWS

8"ø CWS

1 1/2"ø MPC 1 1/4"ø HPC DN

6"ø HPS

2"ø HWS 2"ø HWR

AHU-06

2"ø HWR

6"ø MPS

M502

D1

3"ø MPC DN

R GINEE EN

3"ø CWR

4"ø HWR

2 1/2"ø HWS 2 1/2"ø HWR 8"ø CWS 3"ø CWR 4"ø HWR 1 1/2"ø HWS 4"ø HWR 1"ø HWS

D

8"ø CR 8"ø CS

1"ø HWS DN 4"ø HWR DN 6"ø HPS DN

1 1/2"ø CWR 1 1/2"ø CWS

1 1/4"ø HWR 1 1/4"ø HWS

2 1/2"ø HWR

C1

8"ø CWS

4"ø HWS

2 1/2"ø CWR 4"ø HWR 1"ø HWS

8"ø CR 8"ø CWS 8"ø CS

4"ø HWS

C

1 3

2"ø HDTS 2"ø HDTR

F F1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

4TH & 5TH THIRD LEVEL PIPING

THIRD LEVEL- PIPING 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:37:43 PM

M132 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS. B. PIPING TO INDIVIDUAL VAV BOXES SHALL BE 3/4" UNLESS NOTED OTHERWISE. ELEVATOR LINK 4900

SHEET NOTES 1 SEAL EXISTING AND NEW PENETRATIONS WITHIN ROOM AIR TIGHT.

PHASE 4 D-3 100 CFM

D-3 100 CFM

D-3 100 CFM

D-3 100 CFM

26"x12" SA

G-1 200 CFM

1 1/2"ø 1 1/2"ø

1.7

2.1

D-1 200 CFM

12"x8" SA

12"x8" SA

12"x8" SA

VB-4-26 300PATIENT CFM RM

VB-4-25 PATIENT 300 RM CFM

400

1 1/2"ø VB-4-23 PATIENT RM 300 CFM

VB-4-24 PATIENT 300 CFM RM

402

404

1"ø VB-4-22 PATIENT RM 300 CFM

1 1/2"ø

406

12"x8" 1 1/2"ø VB-4-28 200 CFM

G-1 125 CFM

OFFICE 460

410

G-2 100 CFM

MECH 459

G-1 200 CFM

G-1 200 CFM

10"x4"

12"x8" G-1 200 CFM G-2 100 CFM

G-2 100 CFM

G-2 100 CFM

G-1 200 CFM

12"x8"

18"x10" G-2 100 CFM

G-2 100 CFM

G-2 100 CFM

G-2 100 CFM

D-3 100 CFM

PATIENT RM D-1 422

100 CFM

26"x8" RA

VB-4-15 200 CFM 1"ø 1"ø

20"x10"

G-1 125 CFM

8"x16" RA UP 16"x12" RA DN

16"x8"

OMNI CELL 545

6"ø 6"ø STEAM RELIEF VENTS TO ROOF

1"ø

D-1 100 CFM

G-1 125 CFM

G-2 100 CFM

D-3 100 CFM

D-3 100 CFM

D-1 100 CFM

12"x8"

G-1 125 CFMANTERIOR RM

12"x8"

450

16"x8" RA

26"x8"

12"x8"

12"x8" VB-4-34 550 CFM

M500

G-2 100 CFM

TYP

16"x10"

18"x10" G-1 200 CFM

G-1 200 CFM 26"x8" RA

G-1 200 CFM

G-1 200 CFM

12"x8"

12"x8"

G-2 100 CFM

20"x10" G-1 200 CFM

22"x10"

1

16"x8"

G-2 200 CFM

G-2 G-2 200 CFM 100 CFM

FS.D.

16"x8"

4

D-1 12"x8" SA 200 CFM

1"ø 12"x8" SA

12"x8" SA D-1 200 CFM

VB-4-4

VB-4-5

PATIENT300 RM CFM 1"ø 442

PATIENT300 RMCFM 440

1 1/2"ø

438

12"x8" SA

12"x8" SA

12"x8" SA D-1 200 CFM

D-1 200 CFM

1 1/2"ø

VB-4-6 300PATIENT CFM RM

VB-4-7

434

12"x8" SA

12"x8" SA

D-1 200 CFM

D-1 200 CFM

D-1 200 CFM

VB-4-8 300PATIENT CFM RM

PATIENT RM 300 CFM 436

VB-4-9

PATIENT 300 RM CFM 432

12"x8" SA

D-1 200 CFM

26"x12" RAD-2

2b

D-3 100 CFM

D-3 100 CFM

3c

D-3 100 CFM

D-3 100 CFM

3A

4 4a

D-3 100 CFM

PHASE 1

5

U

T H

K D A

O

Description

Date

D-3 100 CFM

D-1 100 CFM

5.1

D-3 100 CFM

M500

6 M500

TYP D-3 100 CFM

6

D-3 100 CFM

D-1 100 CFM

1 1/2"ø 1 1/2"ø

3 D-3 100 CFM

G-1 125 CFM

2

D-1 200 CFM

RESTROOM 429

STORAGE 431

10"x10" SA

G-2 200 CFM

M500

1c

3/4"ø

VB-4-3 PATIENT RM 300 CFM 3/4"ø 444

16"x12" SA 10"x8"

F1

1 RESTROOM D-1 451 150 CFM

VB-4-2

PATIENT RM 300 CFM 446

10229 ERIC G. SHERMAN

7

D-3 100 CFM

M501

B1.2 7

12"x8" 16"x12"

3

FS.D.

D-3 100 CFM

VB-4-1 RM PATIENT 300 CFM 448

. NO.

G-1 125 CFM

22"x8"

FS.D.

10"x10"

No.

12"x8"

G-2 100 CFM

REG

16"x12"

2

G-2 100 CFM 16"x8" G-1 200 CFM

G-2 100 CFM

1

D-1 300 CFM

1

G-1 200 CFM

G-2 100 CFM

VB-4-11 200 CFM

G-2 100 CFM

14"x8"

E1

F

G-1 G-1 200 CFM 200 CFM

G-2 100 CFM

VB-4-10 200 CFM

12"x8" EA

G-2 100 CFM

26"x8"

VB-4-33 200 CFM

D-1 100 CFM

D-3 100 CFM

G-2 100 CFM

FESSION PRO AL

11/25/14

3/4" HWS/R G-2 100 CFM

ED

A

12"x8" 3/4"ø VB-4-32 200 CFM

16"x8" RA

TYP

E

12"x8"

G-2 100 CFM

5 M500

3/4"ø

32"x12" EA

16"x8"

O

10"x8" EA G-2 100 CFM

D-1 100 CFM

S

12"x8"

1"ø

G-1 125 CFM

LOCKER ROOM 547

546

14"x26" RA UP 26"x22" RA DN 32"x12" EA UP 32"x20" EA DN

NUTRITION 543

12"x8"

R GINEE EN

SOILED 542

D-3 100 CFM

PHASE 2 26"x14" RA CONFERENCE

G-1 125 CFM CLEAN UTILITY 541

G-2 100 CFM

30"x24" SA DN

30"x16" SA

WAITING ROOM 538

G-1 125 CFM

30"x16" SA UP

PATIENT RM 424

T

VB-4-31 200 CFM

12"x14" RA

EQUIPMENT 540

32"x12"

REGIST ER

STORAGE 539

12"x14" RA

1"ø

26"x8" RA UP 12"x26" RA DN

18"x30" RA UP 24"x30" RA DN 10"x12" RA UP DIET 10"x20" RA DN 12"x14" RA544UP 12"x24" RA DN 30"x20" SA UP 30"x32" SA DN

24"x18" RA 10"x12" RA

G-2 100 CFM

10"x10"

DIRTY UTILITY 549 TOILET 548

10"x12"

D-3 100 CFM

1"ø

VB-4-30 200 CFM

CLEAN UTILITY 550

D-1 100 CFM

12"x8"

VB-4-14 200 CFM

16"x12"

16"x8" RA

G-2 100 CFM

G-1 125 CFM

OFFICE 537

TOILET 535

RESTROOM 455

D-1 100 CFM

G-2 100 CFM

VB-4-13 200 CFM 1"ø 1"ø

HSKG 536

10"x6" EA

10"x10"

G-1 125 CFM

VB-4-12 200 CFM

1"ø

1"ø

G-1 125 CFM

12"x8"

PHASE 3

D-1 100 CFM

G-1 200 CFM

16"x10"

ELEC 534

12"x8"

D-1 100 CFM

D1

G-2 100 CFM

D-1 250 CFM

3/4" HWS/R

16"x8"

D-3 100 CFM

G-2 100 CFM

12"x8" RA

G-1 200 CFM

420

VB-4-18 300 CFM

16"x8"

D-3 100 CFM

16"x8" EA 10"x10" NEGATIVE AIR

24"x10"

12"x8"

G-2 100 CFM 16"x8" 8"x6" G-1 125 CFM

D-3 100 CFM

D-3 100 CFM

G-1 200 CFM

12"x10"

100

G-2 200 CFM 1

16"x8" EA

22"x10"

VB-4-29 200 CFM

D-3 100 CFM

D

G-1 200 CFM

1

PATIENT RM 416

414

G-2 200 CFM

G-2 100 CFM

RESTROOM 421

D-1 100 CFM

C1

6"x4"

26"x8" RA

12"x8" SA

VB-4-19 PATIENT 300 CFM RM

412

RESTROOM 418 G-2

26"x8" RA

C

G-2 100 CFM

1 1/2"ø

D-1 100 CFM

G-1 200 CFM

12"x8"

12"x8" SA 3/4"ø 3/4"ø VB-4-20 PATIENT RM 300 CFM

RAD-1

D-1 200 CFM 12"x8" SA

1"ø

VB-4-21 300PATIENT CFM RM

408

22"x8" D-3 100 CFM

12"x8" SA 1"ø

1"ø

D-1 200 CFM

D-1 200 CFM

12"x8" SA

12"x8" SA

1 1/2"ø

1 1/2"ø

D-1 200 CFM

D-1 200 CFM

D-1 200 CFM

D-1 200 CFM

26"x8"

16"x12"

D-1 100 CFM

FS.D.

FS.D.

B1.1

2

1 1/2"ø

D-1 200 CFM

16"x12" SA

26"x8" RA

18"x16"

3 26" x 18" SA DUCT UP TO FIFTH FLOOR. 26" x 30" SA DUCT DOWN TO THIRD FLOOR.

M500

M500

10"x10" SA

16"x12"

OFFICE VB-4-27 200 CFM 4621 1/2"ø

4

6

3

D-3 100 CFM

2 2" HWS/HWR UP TO FIFTH FLOOR. 2-1/2" HWS/HWR DOWN TO THRID FLOOR.

M501

M500

B B.0

1

7

D-3 100 CFM

D-3 100 CFM

VB-4-16 200 CFM 3/4"ø 3/4"ø

D-3 100 CFM

18"x10"

4

D-3 100 CFM

FS.D.

A1

D-3 100 CFM

4 M500 REBALANCE TO 75 CFM

SACRED HEART

8

4TH & 5TH FOURTH LEVEL HVAC AND PIPING

FOURTH LEVEL - HVAC AND PIPING 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:37:54 PM

M141 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS. B. PIPING TO INDIVIDUAL VAV BOXES SHALL BE 3/4" UNLESS NOTED OTHERWISE.

SHEET NOTES 1 SEAL EXISTING AND NEW PENETRATIONS WITHIN ROOM AIR TIGHT.

PHASE 4 D-3 100 CFM

4

D-3 100 CFM

M500

D-3 100 CFM

D-3 100 CFM

D-3 100 CFM

D-3 100 CFM

D-3 100 CFM

2 REBALANCE EXISTING EXHAUST GRILLE TO 75 CFM.

D-3 100 CFM

4

3 2" HWS/HWR DOWN TO 4TH FLOOR.

M500 26"x12"

1 1/2"ø

1.7

1 1/2"ø

2.1

VB-5-26 300 CFM

VB-5-25 300 CFM

12"x8"

1 1/2"ø VB-5-23 300 CFM

VB-5-24 300 CFM

12"x8"

12"x8"

1 1/2"ø

12"x8"

1"ø VB-5-22 300 CFM

G-1 200 CFM

G-1 200 CFM

12"x8"

G-1 200 CFM

10"x4"

1"ø

1 1/2"ø 1 1/2"ø VB-5-28 200 CFM

G-2 100 CFM

D-1 200 CFM

12"x8"

1

D-1 200 CFM

G-1 200 CFM

G-1 200 CFM

12"x10"

G-2 100 CFM

G-2 100 CFM

G-2 100 CFM

12"x8"

12"x8" G-1 200 CFM

G-1 125 CFM

G-1 200 CFM

16"x10"

G-2 100 CFM

12"x8"

16"x8" 10"x12"

G-2 100 CFM

G-2 100 CFM 10"x12"

20"x10"

VB-5-15 200 CFM 1"ø 1"ø

D-3 100 CFM

12"x8"

PHASE 2 16"x8"

G-2 100 CFM

26"x8" RA

12"x8"

G-2 100 CFM

G-2 75 CFM

12"x8"

G-1 200 CFM

G-1 125 CFM

14"x8" G-1 200 CFM

G-1 200 CFM 12"x8"

16"x8" 12"x8"

10"x10"

14"x10"

1

D-3 100 CFM

D-1 150 CFM

FS.D.

18"x10" 1 G-2 200 CFM

G-2 200 CFM

1

G-2 100 CFM

12"x8"

VB-5-1 300 CFM

D-1 200 CFM

G-2 200 CFM

12"x8" VB-5-2 300 CFM 3/4"ø D-1 200 CFM

G-2 100 CFM

G-2 100 CFM

16"x8"

VB-5-34 550 CFM

D-1 300 CFM

G-2 100 CFM

G-2 100 CFM

12"x8"

E1

F

12"x8"

26"x8"

VB-5-33 200 CFM

G-2 100 CFM

M500

VB-5-3 300 CFM 3/4"ø

1"ø

G-1 200 CFM 26"x8"

12"x8"

G-2 100 CFM

G-1 200 CFM

12"x8" VB-5-5 300 CFM 1 1/2"ø

1 1/2"ø

12"x8"

D-1 200 CFM

12"x8"

VB-5-6 300 CFM

G-2 100 CFM

VB-5-9 300 CFM D-1 200 CFM

VB-5-13 200 CFM 1"ø 1"ø D-1 100 CFM

D-1 100 CFM

G-1 125 CFM

3

D-1 200 CFM

2b

D-3 100 CFM

3c

D-3 100 CFM

D-3 100 CFM

3A

4 4a

D-3 100 CFM

PHASE 1

5

10229 ERIC G. SHERMAN U

T H

K D A

O

Description

Date

D-3 100 CFM

5.1

D-3 100 CFM

3 M500

D-3 100 CFM

16"x12"

26"x12" 6

4

M500 D-3 100 CFM

. NO.

12"x8"

2

D-1 200 CFM RAD-3

D-3 100 CFM

1c

22"x10"

12"x8"

VB-5-8 300 CFM

D-1 200 CFM

16"x12"

M500

1

12"x8"

G-1 200 CFM

G-1 200 CFM

4

F1

No.

G-2 100 CFM 20"x10"

12"x8" VB-5-7 300 CFM

D-1 200 CFM

D-1 200 CFM

REG

G-1 125 CFM

12"x8"

1"ø

10"x10"

G-2 100 CFM

22"x8"

VB-5-4 300 CFM

FESSION PRO AL

11/25/14

12"x8"

18"x10"

G-1 200 CFM

ED

TYP

16"x10"

G-1 200 CFM

12"x8"

VB-5-11 200 CFM

2

D-3 100 CFM

D-1 100 CFM

VB-5-10 200 CFM

3/4"ø

G-2 100 CFM

D-3 100 CFM

TYP

6

D-3 100 CFM

7

D-3 100 CFM

M501

B1.2 7

4 M500

FS.D.

M500

G-2 100 CFM

TYP

3/4" HWS/R CAPPED

D-1 100 CFM

G-1 125 CFM

5

E D-3 100 CFM

16"x8"

FS.D.

1"ø

10"x8" G-1 125 CFM

3/4"ø VB-5-32 200 CFM

1"ø

6"ø 6"ø STEAM RELIEF VENTS TO ROOF

D-1 100 CFM

R GINEE EN

10"x10"

G-1 125 CFM

G-1 125 CFM

22"x10"

12"x8"

16"x8"

12"x8"

O

D-1 100 CFM

G-2 100 CFM

S

D1

32"x12"

16"x12"

VB-5-31 200 CFM

D-1 100 CFM

D-3 100 CFM

1

D-3 100 CFM

10"x6"

D-3 100 CFM

99

VB-5-14 200 CFM 1"ø 1"ø

VB-5-30 200 CFM

D-1 100 CFM

G-1 125 CFM

12"x14"

1b

D-1 100 CFM

D-1 100 CFM

24"x10"

1"ø 1"ø 16"x12"

12"x8"

PHASE 3

D-3 100 CFM

32"x12"

16"x8"

D-1 100 CFM

14"x10" D-1 250 CFM

G-2 100 CFM

G-1 125 CFM

8"x6" G-1 125 CFM

D-3 100 CFM

D

3/4" HWS/R CAPPED

16"x8" G-1 125 CFM

12"x8"

D-3 100 CFM

12"x8"

18"x10" G-2 100 CFM

G-2 100 CFM

G-2 100 CFM 12"x8"

D-3 100 CFM

1

16"x8"

26"x8" RA

C1

VB-5-29 200 CFM

D-1 100 CFM

G-2 200 CFM

10"x10" VB-5-17 350 CFM

D-1 100 CFM

C

G-2 200 CFM

G-2 100 CFM

16"x8"

VB-5-18 300 CFM 12"x8"

G-1 200 CFM G-2 100 CFM

G-2 100 CFM

G-2 100 CFM

VB-5-19 300 CFM

12"x8"

26"x8" G-1 200 CFM

3/4"ø 3/4"ø VB-5-20 300 CFM

1"ø

VB-5-21 300 CFM

12"x8" G-2 6"x4" 100 CFM

D-1 200 CFM

A

12"x8"

G-1 125 CFM

1"ø

12"x8"

22"x8" D-3 100 CFM

D-1 200 CFM

G-2 100 CFM

1 1/2"ø

1 1/2"ø

D-1 200 CFM

REGIST ER

G-1 200 CFM

D-1 200 CFM

D-1 200 CFM

VB-5-12 200 CFM

B1.1

16"x12"

D-3 100 CFM

VB-5-27 200 CFM 1 1/2"ø 1 1/2"ø D-1 100 CFM

D-1 200 CFM

10"x10"

3

FS.D.

16"x12"

D-1 200 CFM

VB-5-16 200 CFM 3/4"ø 3/4"ø

18"x16"

FS.D.

4

26"x8"

FS.D.

B B.0

4 26" x 18" SA DUCT DOWN TO 4TH FLOOR.

T

A1

D-3 100 CFM

NOTE BACKGROUND IS SHOW CORRECTLY ON ARCHITECTURALS. FEILD VERIFY.

SACRED HEART

8

FIFTH LEVEL - HVAC AND PIPING 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FIFTH LEVEL - HVAC AND PIPING

Date

SES PROJECT # 14041

11/25/2014 4:38:02 PM

M151 Scale

1/8" = 1'-0"

AVERA FACILITY DEVELOPMENT

GENERAL NOTES

2.4

3.4

A. REFER TO MECHANICAL COVER SHEET M000 AND ELECTRICAL COVER SHEET E000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

3.6

A1 B B.0 EF-1

1.7

2.1

8 M501

B1.1

C C1

FESSION PRO AL . NO.

10229 ERIC G. SHERMAN

O

U

A

S

D1

REG

T

ED

R GINEE EN

REGIST ER

D

T H

K D A

O

11/25/14

E

No.

Description

Date

E1 EF-2 8 M501

F F1

1 1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

8

SACRED HEART

MECHANICAL ROOF PLAN 1/8" = 1'-0"

2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH MECHANICAL ROOF PLAN

Date

SES PROJECT # 14041

11/25/2014 4:38:04 PM

M161 Scale

1/8" = 1'-0"

AVERA FACILITY DEVELOPMENT

GENERAL NOTES

2.4

3.4

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

3.6

ELEVATOR LINK 4900

SHEET NOTES 1 CONNECT TO EXISTING PIPING SERVING REMOVED FIXTURE. 2 OFFSET EXISTING WASTE AND VENT STACK AND DOMESTIC WATER RISERS SERVING 5TH FLOOR TO EXISTING CHASE AS REQUIRED (TYPICAL PATIENT RESTROOM GROUPS). COORDINATE ROUTING OF PIPING WITH NEW AND EXISTING DUCTWORK.

PHASE 4

A1

4"ø V 4"ø SAN

B B.0

RESTROOM 418

2"ø SAN

OFFICE 462

B1.1

1.7

PATIENT RM 2400

PATIENT RM 402

PATIENT RM 2 404

2

PATIENT RM 408

PATIENT RM 2 410

2

PATIENT RM 412

PATIENT RM 2 414

2

2

1"ø CW

PATIENT RM 416

NEGATIVE AIR 420

1/2"ø

3/4"ø

1 1/2"ø

T

T

OFFICE 460 2

7&8

7&8

7&8

7&8

7&8

7&8

7&8

7&8

7&8

M500

M500

M500

M500

M500

M500

M500

M500

M500

PATIENT RM 422

2"ø V 2

MECH 459

C

2

2

2

2

2

2

2

2 RESTROOM 421

2

2

ELEC 534

T

T

6"ø ST UP/DN

2 RESTROOM 455

PHASE 3

OFFICE 537

TOILET 535

3/4"ø O 3/4"ø A 1 1/2"ø VAC

3/4"ø O 3/4"ø A 1 1/2"ø VAC

STORAGE 539

2

T

PHASE 2

2 CONFERENCE 546

LOCKER ROOM 547

5"ø ST

2

T

CLEAN UTILITY 541

SOILED 542

OMNI CELL 545

NUTRITION 543

T

ED

FESSION PRO AL

S O

D1 2

REG

. NO.

R GINEE EN

EQUIPMENT 540

5"ø ST UP/DN

WAITING ROOM 538

1 1/2"ø VAC 3/4"ø A 3/4"ø O

T

T

PATIENT RM 424

TOILET 548

1 1/2"ø VAC 3/4"ø A 3/4"ø O DN

DIET 544

2

DIRTY UTILITY 549

2

DN

5"ø ST UP/DN

CLEAN UTILITY 550

10229 ERIC G. SHERMAN U

A

HSKG 536

T

T

REGIST ER

C1

D

PATIENT RM 406 2

T H

K D A

O

2 11/25/14

E

2

2

2

2

3/4"ø 3/4"ø 1 1/2"ø

7&8 M500

E1

2

2

2

7&8

7&8

7&8

7&8

7&8

7&8

7&8

7&8

M500

M500

M500

M500

M500

M500

M500

M500

No.

1"ø HW

2

1"ø CW 1 1/2"ø CW 3/4"ø HW 4"ø4"ø SAN 2"ø 2"øV

Date

T

T

PATIENT RM 448

2

Description

2

ANTERIOR RM 450

T

F

2

2

2

2

PATIENT RM 446

PATIENT RM 444

2

2

PATIENT RM 442

2

PATIENT RM 440

2

PATIENT RM 438

2

PATIENT RM 436

PATIENT RM 434

T

2 PATIENT RM 432

RESTROOM 451

2"ø HW 2"ø V 2"ø CW STORAGE 2"ø V 431 4"ø SAN

2

RESTROOM 429

F1 PHASE 1

1 1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

FOURTH LEVEL - PLUMBING AND MED GAS 1/8" = 1'-0"

2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FOURTH LEVEL PLUMBING AND MED GAS Date

SES PROJECT # 14041

11/25/2014 4:38:12 PM

M241 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

ELEVATOR LINK 5900

SHEET NOTES 1 REINSTALL EXISTING MEDICAL GAS OUTLETS IN ARCHITECTURAL HEADWALL. REFER TO ARCHITECTURAL HEADWALL ELEVATIONS FOR ARRANGEMENT AND DIMENSIONAL INFORMATION. PROVIDE ONE VACUUM SLIDE FOR EACH VACUUM OUTLET LOCATION. PROVIDE ADDITIONAL OUTLETS AS REQUIRED TO MEET QUANTITY SHOWN.

SH-1

L-1

SH-1

L-1

L-1

L-1

VS O

WC-2 5

FD-2 L-1

CORRIDOR 5901

SH-1

1

C

V

O

O

A

V

7&8

7&8

M500

M500

VS

WC-1

L-1

L-1

WC-1 FD-2

VS

FD-1 FD-1

WC-1 WC-1

4

V

O

O

A

V

VS

FD-2

SH-1

1

7&8

7&8

M500

M500

FD-1 FD-1 7&8 M500

WC-1

L-1

L-1

L-1

4

4 VS

FD-1

WC-1 WC-1

4

7&8

M500

M500 L-1

L-1

WC-1 WC-1

4

A

O

O

V

VS

SH-1

1 1/2"ø O 1"ø VAC 1/2"ø A

V

A

5

L-1

L-1

3 VALVES AND PIPING TO EXISTING MAINS SHALL BE DONE PRIOR TO BEGINNING DEMOLITION OF EXISTING MEDICAL GAS. COORDINATE CONNECTION TO EXISTING MAINS WITH PHASE 1 DEMOLITION WORK. WORK SHALL BE COORDINATING SUCH THAT ONE MEDICAL GAS CERTIFICATION IS REQUIRED.

SH-1

FD-2 7&8

7&8

M500

M500 2"ø V 4"ø SAN

4

WC-1

4

WC-1 2

2

5 CONNECT TO EXISTING PIPING SERVING REMOVED FIXTURE.

2"ø V

L-1 WC-1

L-1

L-1

4 ROUTE NEW VENT STACK TO EXISTING VENT THROUGH ROOF. COORDINATE ROUTE WITH OTHER UTILITIES.

3/4"ø O 1 1/4"ø VAC L-2 1/2"ø A

WC-1

FD-2

FD-2

2"ø V 4"ø SAN

1 1/2"ø SAN SH-1 2"ø SAN

1

VS

V

A

O

O

V

VS

VS

V

A

O

O

V

VS

2"ø SAN SH-1 1 1/2"ø SAN

1

4

C1

L-1

L-1

2"ø V L-2

L-2

5"ø ST UP/DN

L-1

O

O

A

V

VS

WC-1 4

VS

V

O

O

A

V

VS

FD-2

SH-1

1

3/4"ø O 3/4"ø A 1 1/2"ø VAC

WC-1

5"ø ST UP/DN

1 1/2"ø VAC 3/4"ø A 3/4"ø O DN

4"ø SAN WC-1

FD-2

1

VS

V

A

O

O

V

VS

VS

V

A

O

O

V

VS

PHASE 2

4 WC-1

4"ø SAN

FD-2

5"ø ST L-1

1 1/2"ø SAN SH-1 2"ø SAN

L-1

2"ø SAN SH-1

1

1 1/2"ø SAN 2"ø V

L-1 L-2

L-2

O

D1

S

L-2

FESSION PRO AL

L-1 SH-1

4

VS

V

A

O

M500 FD-1

M500 FD-1

VS

FD-2

V

SH-1

A

O

U

T H

K D A

O

11/25/14

O

V

VS

O

V

VS

No.

Description

Date

1

WC-1 7&8

L-1

M500 FD-2

L-2

L-1

SH-1

V

VS

O

1

V

O V

O

O

A

A

A O

1

O

1

L-1

V

V

VS A O O

SH-1

VS

SH-1 VS

L-1

VS

1

L-1

V

V

O

O

O

A

A

V

VS

1

1

SH-1 VS

SH-1

V

L-1

SH-1

O

L-1

V

V

1

WC-1

T

L-1

M500 FD-1

4

10229 ERIC G. SHERMAN

SH-1

VS

SH-1

A

A O

O

1/2"ø A

1

L-1

VS

VS

M500 FD-1

V

V

M500 FD-1

L-1 7&8 WC-1 WC-1 7&8

VS

A

L-1 7&8 WC-1 WC-1 7&8

V

O

5 WC-2

L-1

A

1"ø VAC 1/2"ø O

VS O

M500 FD-1

SH-1

V

V

5

1 1/2"ø CW 3/4"ø HW 4"ø SAN 2"ø V

VS

F

SH-1

4

L-1

V

L-1

5

L-1 7&8

L-1 L-1

1

SH-1

. NO.

1

VS

FD-2

SH-1

1/2"ø O 1"ø VAC 1/2"ø A

L-1

M500 FD-1

4

4 WC-1

7&8 WC-1 WC-1 7&8

M500

L-2 3/4"ø O 1 1/2"ø VAC 1/2"ø A

VS

4

L-1

7&8

L-1

2"ø V

1

4

WC-1 L-1

E1

3

V

FD-2

SH-1

1

3

4

WC-1

FD-2

O

VS

VS

WC-1

O

V

WC-1

O

A

VS

V

O

V

VS

O

A

VS

V

O

O

VS

O

O

E

V

V

VS

VS

FD-2

VS

1

L-1

REG

R GINEE EN

L-2

1/2"ø A 1 1/2"ø VAC 1/2"ø O

ED

A

V

2"ø V

T

VS

2"ø V

L-1

REGIST ER

FD-2

L-2

3/4"ø O 3/4"ø A 1 1/2"ø VAC DN

SH-1

1 PHASE 3

3/4"ø O 3/4"ø A 1 1/2"ø VAC

6"ø ST UP/DN

L-2

D

V

VS

SH-1

FD-1 FD-1 7&8

VS

L-1

B1.1 L-2

5

O

O V VS

SH-1

2 VALVES AND PIPING TO EXISTING MAINS SHALL BE DONE PRIOR TO BEGINNING DEMOLITION OF EXISTING MEDICAL GAS. COORDINATE CONNECTION TO EXISTING MAINS WITH PHASE 2 DEMOLITION WORK. WORK SHALL BE COORDINATING SUCH THAT ONE MEDICAL GAS CERTIFICATION IS REQUIRED.

V

V

1

A

V

A

SH-1

1

O

V O O

O A V VS

SH-1

VS

VS

VS

1

O

V O O V VS

A

L-1

SH-1

1

V

VS

VS O O VS

V

A

A V VS

1

V

VS O

O O A

L-1

V

VS

L-1

SH-1

VS

2.1 V

1.7

1

O

V

V O O A

OFFICE 5902

1

V

VS

VS

B B.0

1

1

VS

PHASE 4

A1

F1 PHASE 1

1 1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

FIFTH LEVEL - PLUMBING AND MED GAS 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FIFTH LEVEL PLUMBING AND MED GAS Date

SES PROJECT # 14041

11/25/2014 4:38:21 PM

M251 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS. B. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING LAYOUT.

PHASE 4

A1

AREA DESIGN REQUIREMENTS

B B.0 1

1

1

1

1

1

1

1

1

1

SPR-3 1 SPR-3

1

1.7

2.1

MARK

CLASSIFICATION

COVERAGE DENSITY

1

LIGHT HAZARD

0.10 GPM OVER 1500 SQ. FT.

2

ORDINARY HAZARD GROUP 1

0.15 GPM OVER 1500 SQ. FT.

3

ORDINARY HAZARD GROUP 2

0.20 GPM OVER 1500 SQ. FT.

B1.1 1

1

1

1

1

1

1

1

1

1

1

FIRE SPRINKLER HATCHING LEGEND

1 1

C

EXISTING SPRINKLER COVERAGE TO REMAIN 1

1

EXISTING SPRINKLER SYSTEM TO BE REVISED TO ACCOMMODATE NEW WORK

1

1

C1

F

FLOW SWITCH

FIRE SPRINKLER FINISH LEGEND ALL SPRINKLERS SHALL BE RECESSED, CHROME PLATED UNLESS NOTED OTHERWISE. SPR-1 CONCEALED, WHITE 1

6"ø F 1 1 PHASE 3

CONCEALED, BRUSHED COPPER

SPR-3

CONCEALED, GASKETED, WHITE

SPR-4

CONCEALED, MRI RATED, WHITE

SPR-5

UPRIGHT, ROUGH BRONZE, PROTECTIVE WIRE CAGE

PHASE 2 1

1 1

1

O

D1

FESSION PRO AL REG

. NO.

10229 ERIC G. SHERMAN U

A

S

1

ED

R GINEE EN

REGIST ER

6"ø F

T

D

1

SPR-2

T H

K D A

O

1 11/25/14

1

1

E

No.

Description

Date

1

1

1

1 1

1

1

1

1

1

1

1

1

E1

1 1

SPR-3

SPR-3 1

1

1

1

1

1

1

1

1

1

1

1

SPR-3

F W

F F1 PHASE 1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

FIFTH LEVEL FIRE PROTECTION 1/8" = 1'-0"

2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH FIFTH LEVEL - FIRE PROTECTION

Date

SES PROJECT # 14041

11/25/2014 4:38:28 PM

M351 Scale

1/8" = 1'-0"

WALL OPENING SHALL BE 1/8" LARGER THAN DAMPER PER LINEAR FOOT IN HEIGHT AND WIDTH. (NOT LESS THAN 1/4" LARGER.)

WALL

MAIN RETURN AIR DUCT

MAIN SUPPLY AIR DUCT

BREAKAWAY CONNECTION

ACOUSTIC LINING WHERE INDICATED

AVERA FACILITY DEVELOPMENT

INSULATION WHEN DUCT IS LINED OR WRAPPED. (ALL AROUND DUCT ON BOTH SIDES OF WALL.)

DUCTWORK AIR FLOW AIR FLOW SUPPLY DUCT COLLAR FLEX DUCT

FUSIBLE LINK

MAX. 5'-0" 45°

FLEX DUCT SIZE SHALL MATCH NECK SIZE

*

HIGHEFFICIENCY TAKE-OFF

HIGHEFFICIENCY TAKE-OFF L.P. BRANCH DUCT HAND VOLUME DAMPER

SLEEVE THRU WALL. EXTEND SLEEVE 3" MIN. TO 6" MAX. ON THIS SIDE OF WALL

*

45°

*-EQUALS WIDTH OF BRANCH DUCT UP TO 12" 12" FOR ALL BRANCH DUCTS LARGER THAN 12"

CEILING

SUPPLY AIR

CEILING DIFFUSER

TYPICAL DIFFUSER CONNECTION DETAIL

3

2

NONE

OPERATING SPRING SLEEVE THRU WALL. EXTEND SLEEVE 3" MIN. TO 16" MAX. ON ACCESS DOOR SIDE OF WALL.

RETURN AIR BRANCH DUCT

SEE SPECIFICATIONS FOR CONNECTION

DUCTWORK

HAND VOLUME DAMPER 1 1/2" x 1 1/2" MINIMUM 14 GAUGE ANGLE ON ALL SIDES OF OPENING AND BOTH SIDES OF WALL. ANGLES SHALL OVERLAP OPENING BY 1" MINIMUM AND COVER CORNERS OF OPENING

HAND DAMPER OPPOSED BLADE DAMPER

AIR FLOW

*-EQUALS WIDTH OF BRANCH DUCT UP TO 12" 12" FOR ALL BRANCH DUCTS LARGER THAN 12"

ANCHOR DAMPER AND ANGLES TO SLEEVE IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. DO NOT FASTEN ANGLES TO WALL.

EXHAUST/RETURN AIR

TYPE "B"

TYPICAL BRANCH DUCT TAKE-OFF DETAIL

1

NONE

NOTE: PROVIDE ACCESS DOORS FOR ALL FIRE DAMPERS AND LABEL WITH 1/2" HIGH LETTERING "FIRE DAMPER".

FIRE DAMPER THROUGH WALL DERTAIL NONE

INSULATE RADIANT CEILING PANEL WITH 3" FIBERGLASS INSULATION WITH FOIL SKRIM FACING UP. OVERLAP ALL SIDES AT LEAST THREE INCHES. SUPPORT INDEPENDENTLY FROM CEILING (TYP.)

3" MINIMUM

WALL OPENING SHALL BE 1/8" LARGER THAN DAMPER PER LINEAR FOOT IN HEIGHT AND WIDTH. (NOT LESS THAN 1/4" LARGER.)

3" MINIMUM WALL OR FLOOR.

1

1

INSULATION WHEN DUCT IS LINED OR WRAPPED. (ALL AROUND DUCT ON BOTH SIDES OF WALL.)

1/2" DEEP 10 GAUGE MINIMUM GALVANIZED CHANNEL IF DUCT IS TIGHT TO STRUCTURE.

METAL NOSING. (IF DUCT IS LINED.)

CROSS CHANNEL BRACE

NORMALLY CLOSED ELECTRIC OPERATOR AND LINKAGE OUTSIDE OF AIRSTREAM. BREAKAWAY CONNECTION TILE

TILE

PANEL PIPING

NOTE: PROVIDE ACCESS DOORS FOR ALL FIRE AND SMOKE DAMPERS. LABEL WITH 1/2" HIGH LETTERING:

WALL ANGLE MOLDING

"FIRE/SMOKE DAMPER"

CEILING GRID "T" VARIES

WIRING BY A.T.C. A.T.C. SHALL PROVIDE TRANSFORMER IF REQUIRED.

ANCHOR DAMPER AND ANGLES TO SLEEVE IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. DO NOT FASTEN ANGLES TO WALL.

NONE

O

RADIANT CEILING PANEL DETAIL

REG

. NO.

10229 ERIC G. SHERMAN U

T H

K D A

O

ARD

1-1/2" x 1-1/2" MINIMUM 14 GAUGE ANGLE ON ALL SIDES OF OPENING AND BOTH SIDES OF WALL. ANGLES SHALL OVERLAP OPENING BY 1" MINIMUM AND COVER CORNERS OF OPENING.

ROUTE NEW VENT STACK TO EXISTING VENT THROUGH ROOF. COORDINATE ROUTE WITH OTHER UTILITIES.

FESSION PRO AL

S

6

INSULATE RADIANT PANEL WITH 3" FIBERBLASS INSULATION WITH FOIL SKRIM FACING UP. OVERLAP ALL SIDES AT LEAST THREE INCHES.

ED

R GINEE EN

1

TO FIRE SMOKE DAMPERS AS REQUIRED.

M

A

NOTE:

T

SLEEVE THRU WALL. EXTEND SLEEVE 3" MIN. TO 6" MAX. ON THIS SIDE OF WALL.

REGIST ER

24" GRID CEILING OPENING

SLEEVE THRU WALL. EXTEND SLEEVE 3" MIN. TO 16" MAX. ON ACTUATOR SIDE OF WALL.

11/25/14 WIRING BY E.C.

TEMPERATURE CONTROLS RELAY

No.

Description

Date

4"ø V JUNCTION BOX BY E.C.

1 1/2"ø V

NOTES: 1. CONNECTION OF DAMPER TO SLEEVE SHALL BE AS SHOWN IN FIGURE 1 OF SMACNA "FIRE DAMPER AND HEAT STOP GUIDE FOR AIR HANDLING SYSTEMS", SECOND EDITION.

1 1/2"ø V 2 1/2"ø V

SH-1

1/2"ø CW 1/2"ø HW

SH-1

2 1/2"ø V L-(1)(2)

L-1

L-(1)(2)

DAMPER CLOSES BY SPRING ACTION IN EVENT OF HIGH TEMPERATURE.

3.

FLOOR MOUNTED DAMPER SIMILAR WITH ACTUATOR ON SIDE WITH ACCESS DOOR.

4.

WHERE DUCT SMOKE DETECTORS CANNOT BE ACCESSED BY THE DAMPER ACCESS DOOR THE ELECTRICAL CONTRACTOR SHALL FURNISH A DUCT ACCESS DOOR FOR THE DETECTOR. THE MECHANICAL CONTRACTOR SHALL INSTALL THE DOOR IN THE DUCT.

5.

SEE SMOKE DAMPER CONTROLLER SCHEMATIC DETAIL ON ELECTRICAL DRAWINGS FOR WIRING DETAILS. A.T.C. SHALL PROVIDE RELAYS TO CLOSE FIRE SMOKE DAMPERS IN NON-FIRE EVENTS. REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS.

L-1

1 1/2"ø CW WC-1 1"ø CW 1"ø HW

2. 1 1/2"ø V

WC-1

FD-(1)(2)

FD-(1)(2)

4

COMBINATION FIRE AND SMOKE DAMPER THROUGH WALL DERTAIL NONE

MAINTAIN MIN. 3 DUCT DIAMETERS OF STRAIGHT RIGID DUCT MATCHING INLET SIZE

NOTE: REFER PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES

4"ø SAN

HI-EFFICIENCY DUCT TAKEOFF

AIR TERMINAL UNIT BUILT WITH INSULATED FIBER FREE LINER

1 1/2"ø V

SACRED HEART

FLOW SENSOR GRID VAV CONTROLLER BY CONTROLS CONTRACTOR

4TH & 5TH MECHANCIAL DETAILS

AUTOMATIC FLOW CONTROL VALVE NOTE: REFER PLUMBING FIXTURE SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES

1 1/2"ø CW

REHEAT COIL

2014 BALL VALVE (TYP)

2"ø SAN

UNOBSTRUCTED ACCESS LOCATED AT ACCESS PANEL OR ABOVE CEILING TILE

STRAINER WITH BLOW-DOWN VALVE 2-WAY CONTROL VALVE UNION WITH P/T PLUG

7

DOMESTIC WATER ISOMETRIC NONE

8

WASTE AND VENT ISOMETRIC NONE

5

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS.

TERMINAL UNIT DETAIL

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520

NONE www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:31 PM

M500 Scale

NONE

FULL SIZE CONDENSATE DRAIN, CONNECT TO DRAIN PAN AS RECOMMENDED BY MANUFACTURER.

RISER CLAMP

INSTALL CLAMP ON ALL PIPES LESS THAN 4"Ø

CLEANOUT PLUG (TYP.)

THREADED ROD CLEVIS HANGER INSULATION

PIPE INSULATION. (TYP.)

INSULATION AND NEOPRENE MOUNTS.

THREADED ROD. (TYP.)

INSULATION HIGH DENSITY INSULATION INSERT.

HIGH DENSITY INSULATION INSERT. H

INSULATION SHIELD. (TYP.)

1

H/2

OVERSIZE HANGER TO ALLOW LONGITUDINAL PIPE EXPANSION AND PIPE INSULATION TO PASS THROUGH UNBROKEN. (TYP.)

UNI-STRUT OR EQUIVALENT

TRAPEZE HANGER ROUTE DIRECTLY ABOVE FLOOR DRAIN

LUG, COUPLING, OR HUB

STRUT CLAMP HANGERS

INSULATION SHIELD

CLEVIS HANGER

AVERA FACILITY DEVELOPMENT

FLOOR

STEEL PIPE SADDLE, TACK WELDED TO PIPE, FILL SADDLE WITH INSULATION.

INSULATION

ROLLER SUPPORT

VERTICAL PIPE SUPPORT

PIPE SUPPORT DETAIL NONE

NOTE: 1. FOR DRAW-THROUGH SYSTEMS, DIMENSION FOR EVERY UNIT. H= FAN INLET PRESSURE (IN W.C.) + 1 INCH. (2" MIN.)

WALL WITH INSULATION SUPPORT

2

CONDENSATE TRAP DETAIL (NEGATIVE PRESSURE SECTION) NONE

FLANGES ON EACH SIDE OF WALL. CAULK AT WALL AND SLEEVE.

PACK AROUND PIPE WITH FIBERGLASS INSULATION

4" TO 8"

CLEANOUT PLUG (TYP.)

FULL SIZE CONDENSATE DRAIN, CONNECT TO DRAIN PAN AS RECOMMENDED BY MANUFACTURER.

ESCUTCHEON PLATES ON BOTH SIDES

TYP. ON BOTH SIDES

PIPE

1" +/- 1/4" 1/4" FOR ITEMS LESS THAN 4"

SHEET METAL SLEEVE, 2" LARGER THAN PIPE OVERALL DIAMETER.

PENETRATING ITEM

H

ESCUTCHEON (TYP. ON BOTH SIDES.)

12" ROUTE DIRECTLY ABOVE FLOOR DRAIN

ACOUSTICAL SEALANT FOAM BACKER ROD SLEEVE

SAFING BATT INSULATION

NOT REQUIRED FOR ITEMS LESS THAN 4" DIAMETER

WALL

NOTE: 1. FOR BLOW-THROUGH SYSTEMS, DIMENSION FOR EVERY UNIT. H= FAN OUTLET PRESSURE (IN W.C.) + 1 INCH. (2" MIN.)

CONDENSATE TRAP DETAIL (POSITIVE PRESSURE SECTION) NONE

NOTES: 1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTIONS ARE TO CONTINUE THE INSULATION AND VAPOR BARRIER THROUGH ALL PENETRATIONS, PERMIT THERMAL EXPANSION WITHOUT DAMAGING THE INSULATION, AND SEAL AIRTIGHT AROUND INSULATED AND UNINSULATED PIPES FOR NOISE TRANSMISSION CONTROL.

REGIST ER

NONE

FESSION PRO AL

S O

FULL SIZE BYPASS WITH MANUAL THROTTLING VALVE

FULL SIZE BYPASS WITH MANUAL THROTTLING VALVE 2-WAY MODULATING VALVE (TYP)

. NO.

10229 ERIC G. SHERMAN U

T H

K D A

O

11/25/14

2-WAY MODULATING VALVE (TYP)

ISOLATION VALVE (TYP)

REG

R GINEE EN

3

NOISE CONTROL WALL PENETRATION DETAIL

ED

A

2. METHODS THAT ARE LISTED FOR THE REQUIRED HOURLY RATINGS MUST BE USED FOR FIRE RATED WALLS. ALL OF THE INTENTIONS IN NOTE 1 MUST BE MET BY THE SYSTEM SELECTED.

T

4

CONCRETE/MASONARY WALL CONSTRUCTION

GYPSUM WALL CONSTRUCTION

No.

Description

Date

ISOLATION VALVE (TYP)

AIRFLOW

MANUAL AIR VENT (TYP)

PIPE WELLS FOR CONTROLS (TYP)

ROOF FAN HEATING COIL

SECURE FAN BASE TO CURB MIN. 2 LOCATIONS EACH SIDE AND ON 6" CENTERS FOR CURBS OVER 18"x18"

STRAINER WITH BLOW-DOWN VALVE (TYP)

MANUAL AIR VENT (TYP)

PIPE WELLS FOR CONTROLS (TYP)

STRAINER WITH BLOW-DOWN VALVE (TYP)

COOLING COIL AUTOFLOW BALANCING VALVE

AUTOMATIC BALANCING VALVE INTERMEDIATE DRAIN PAN MANUAL AIR VENT (TYP)

MANUAL AIR VENT (TYP)

P/T PLUG (TYP) CONDENSATE DRAIN PIPE. REFER TO PIPING MATERAL SCHEDULE AND SPECIFICATIONS FOR MATERIAL REQUIREMENTS

HEATING COIL

EXISTING FAN CURB

3/4 DRAIN VALVE (TYP) 12" MIN.

SEE SPECIFICATIONS/ SCHEDULE FOR DAMPER TYPE

8

UNION WITH P/T PLUG (TYP)

6

AHU HEATING COIL PIPING DETAIL

5

NONE

P/T PLUG (TYP)

COOLING COIL 3/4 DRAIN VALVE (TYP) PRIMARY DRAIN PAN

UNION WITH P/T PLUG (TYP)

AHU COOLING COIL PIPING DETAIL NONE

SACRED HEART

Exhaust Fan Detail

4TH & 5TH MECHANICAL DETAILS

STRAINER

NONE

3/4" HWS TO RADIANT PANEL 2014

AUTOFLOW VALVE 3/4" HWR FROM RADIANT PANEL 2-WAY CONTROL VALVE

7

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520

RADIANT PANEL CONNECTION DETAIL

Date

SES PROJECT # 14041

M501

NONE www.specializedeng.com

11/25/2014 4:38:32 PM

Scale

NONE

CONTROL VALVE FOR BMS SHUTOFF DUCTWORK OR IN UNIT AS SHOWN ON PLAN

AVERA FACILITY DEVELOPMENT

RETURN DISPERSION TUBE DISCHARGE AGAINST AIRFLOW. MANUAL AIR VENT (TYP)

UNION (TYP.) DRIP TRAP

PLATE AND FRAME HEAT EXCHANGER SUPPLY CONTROL VALVE ISOLATION VALVE

HUMIDIFIER SEPARATOR

AIR FLO W

2-WAY MODULATING VALVE (TYP).

HOUSEKEEPTING PAD THERMOMETER (TYP) UNION (TYP) PTT PORT (TYP)

PROVIDE MULTIPLE TUBES AND MANIFOLD IF REQUIRED TO SUPPLY CAPACITY SPECIFIED.

DRAIN (TYP) PIPE WELLS FOR CONTROLS (TYP)

TRAP FURNISHED WITH HUMIDIFIER

FULL SIZE DIRT LEG 10" LONG. (TYP.)

PRESSURE GAUGE (TYP)

TEMPERATURE SWITCH FURNISHED WITH HUMIDIFIER.

RETURN

NONE

1

HUMIDIFIER DETAIL (DIRECT INJECTION) NONE

FESSION PRO AL REG

. NO.

R GINEE EN

ED

S

10229 ERIC G. SHERMAN

O

U

A

PLATE AND FRAME HEAT EXCHANGER CONNECTION DETAIL

REGIST ER

2

T

SUPPLY

T H

K D A

O

11/25/14

No.

Description

Date

SACRED HEART

2014

C

4TH & 5TH MECHANICAL DETAILS

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:33 PM

M502 Scale

NONE

SECTION 23 73 13 2.4 FAN SECTION A. Fan-Section Construction: Belt-driven centrifugal fans consisting of housing, wheel, fan shaft, bearings, motor and disconnect switch, drive assembly, and support structure and equipped with formed-steel channel base for integral mounting of fan, motor, and casing panels. Mount fan with spring vibration isolation. B. Centrifugal Fan Housings: Formed- and reinforced-steel panels to make curved scroll housings with shaped cutoff, spun-metal inlet bell, and access doors or panels to allow entry to internal parts and components. 1. Panel Bracing: Steel angle- or channel-iron member supports for mounting and supporting fan scroll, wheel, motor, and accessories. 2. Performance Class: AMCA 99-2408, all Classes. 3. Horizontal Flanged Split Housing: Bolted construction. 4. Plug Fans: With steel cabinet. Fabricate without fan scroll and volute housing. C. Fan Assemblies: Statically and dynamically balanced and designed for continuous operation at maximum rated fan speed and motor horsepower. D. Airfoil-Fan Wheels: Steel construction with smooth-curved inlet flange, heavy backplate, and hollow die-formed airfoil-shaped blades continuously welded at tip flange and backplate; cast-iron or cast-steel hub riveted to backplate and fastened to shaft with set screws. E. Shafts: Statically and dynamically balanced and designed for continuous operation at maximum rated fan speed and motor horsepower, with final alignment and belt adjustment made after installation. 1. Turned, ground, and polished hot-rolled steel with keyway. Ship with a protective coating of lubricating oil. 2. Designed to operate at no more than 70 percent of first critical speed at top of fan's speed range. F. Grease-Lubricated Shaft Bearings: Self-aligning, pillow-block-type, ball or roller bearings with adapter mount and two-piece, cast-iron housing. 1. Ball-Bearing Rating Life: ABMA 9, L10 of 100,000 hours. 2. Roller-Bearing Rating Life: ABMA 11, L10 of 100,000 hours. G. Vibration Control: Install fans on open-spring vibration isolators having a minimum of 1-inch static deflection and side snubbers. H. Fan-Section Source Quality Control: 1. Sound Power Level Ratings: Comply with AMCA 301, "Methods for Calculating Fan Sound Ratings from Laboratory Test Data." Test fans according to AMCA 300, "Reverberant Room Method for Sound Testing of Fans." Fans shall bear AMCA-certified sound ratings seal. 2. Factory test fan performance for flow rate, pressure, power, air density, rotation speed, and efficiency. Establish ratings according to AMCA 210, "Laboratory Methods of Testing Fans for Rating." 2.5 MOTORS A. Motors shall be NEMA Design B; T -FRAME mounted on an adjustable steel base. All motors shall be tested to IEEE standard 112 test method B and rated per NEMA MG1, Part 31 "Inverter Fed Motors, premium efficiency. All motors shall be specifically designed to meet or exceed all (EPAct) requirements for energy efficiency and include Class F insulation. Motors shall be as manufactured by Baldor, Toshiba, Reliance, or equal. All motors shall include shaft grounding: Aegis or equal. Provide NEMA premium efficiency motors. 2.6 COILS A. Coil Sections: Common or individual, insulated, stainless steel casings for cooling and galvanized steel casings for heating. Design and construct to facilitate removal and replacement of coil for maintenance and to ensure full airflow through coils. B. Water Coils: Self-draining coil fabricated according to ARI 410. 1. Piping Connections: Threaded, on same end, Red Brass. 2. Tubes: Copper. 3. Fins: Aluminum. 4. Headers: Carbon-steel with drain and air vent tappings. 5. Frames: Galvanized-steel channel frame for heating coils, 0.052 inch. 6. Frames: Stainless steel, 0.0625 inch for cooling coils. 7. Ratings: Design tested and rated according to ASHRAE 33 and ARI 410. a. Working-Pressure Ratings: 200 psig, 325 deg F. 8. Source Quality Control: Test to 300 psig and to 200 psig underwater. 2.7 DAMPERS A. General: Leakage rate, according to AMCA 500, "Laboratory Methods for Testing Dampers for Rating," shall not exceed 2 percent of air quantity at 2000-fpm face velocity through damper and 4-inch wg pressure differential. B. Supply and Return Isolation Dampers: Heavy-duty steel assembly with channel frame and sealed ball bearings, and parallel blades constructed of two plates formed around and welded to shaft, with blades linked out of airstream to single control lever. Install on supply and return duct openings of unit. C. Low-Leakage, Outdoor-Air and Relief-Air Dampers: Double-skin, airfoil-blade galvanized-steel dampers with compressible jamb seals and extruded-vinyl blade edge seals, in opposed-blade arrangement with steel operating rods rotating in stainless-steel sleeve bearings mounted in a single galvanized-steel frame, and with operating rods connected with a common linkage. Leakage rate shall not exceed 5 cfm/sq. ft. at 1-inch wg and 9 cfm/sq. ft. at 4-inch wg. D. Mixing Boxes: Parallel-blade galvanized-steel dampers mechanically fastened to steel operating rod in reinforced, galvanized-steel cabinet. Connect operating rods with common linkage and interconnect linkages so dampers operate simultaneously. E. Provide damper actuators for all dampers listed above, including supply, return, outdoor, relief, and mixing dampers. F. Provide backdraft dampers on fan inlet on units with multiple fans in parallel. 2.8 FILTER SECTION A. Filters: Comply with NFPA 90A. B. Filter Section: Provide filter holding frames arranged for flat or angular orientation, with access doors on both sides of unit. Filters shall be removable from one side. C. Extended-Surface, Disposable Panel Filters: Factory-fabricated, dry, extended-surface filters with holding frames. 1. Media: Fibrous material formed into deep-V-shaped pleats and held by self-supporting wire grid. 2. Media and Media-Grid Frame: Nonflammable cardboard. 3. Duct-Mounting Frames: Welded, galvanized steel with gaskets and fasteners, suitable for bolting together into built-up filter banks. D. Final Filters: Factory-fabricated filters with holding casing. 1. Media: UL 586, fibrous glass, constructed of continuous sheets with closely spaced pleats with aluminum separators. 2. Frame Material: Aluminum. 3. Media to Frame Side Bond: Neoprene adhesive. 4. Face Gasket: Neoprene expanded rubber. 5. Duct-Mounting Frames: Construct downstream corners of holding device with cushion pads to protect media. Provide bolted filtersealing mechanism to mount and continuously seal each individual filter. 2.9 BLANK SECTIONS A. Provide an 18 inch blank section for future humidifier grid. Provide knock out holes in cabinet to accept future humidifier grid. 2.10 ELECTRICAL A. Fan Motors 1. Each fan motor shall be separately wired to a junction box mounted on the outside of the unit. Wiring shall include separate ground for each motor. 2. VFDs will be furnished and installed by the Temperature Controls Contractor. B. Lighting Circuits 1. Each section shall be provided with a vapor proof LED light fixture with a guard and mounted not to interfere with service including filter replacement. Wiring shall include separate ground for each motor. 2. All lighting rigid, not flexible, conduit to be installed by manufacturer and terminated to a switch location at the front of the unit. Provide empty junction box next to switch for receptacle furnished and installed by Electrical Contractor. 3. Wiring sizing shall be determined, and installed, in accordance with applicable NEC standard. 4. Furnish small flexible metal conduit splices for Electrical Contractor to install at shipping splits for lighting circuit. C. UV Lights 1. All UV lights shall be separately wired to a junction box mounted on the outside of the unit. Wiring shall include separate ground for each motor. 2. VFDs will be furnished and installed by the Temperature Controls Contractor. D. Duct Detectors 1. Duct smoke detectors for supply and return sections will be furnished and installed by AHU manufacturer. Electrical Contractor will wire up to detectors for fire alarm interface.

2.11 ULTRAVIOLET LIGHTS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Steril-aire. 2. UV Resources. 3. Ultraviolet Devices, Inc. B. Provide UV-C emitters/lamps downstream of all cooling coils and above all drain pans to control airborne and surface microbial growth and transfer. C. Lamps shall be manufactured, selected, and installed specific for the unit. Provide all safety interlocks including on/off switch(es), external fusing, ETL listing to UL 1598, and lamp monitor. D. Voltage shall be 120V. Electrical wiring shall be separately wired to a junction box mounted on the outside of the unit. Furnish and install separate disconnect and associated wiring outside of each applicable section. E. Provide UV protected glass in applicable sections for access doors with integral window PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas and conditions for compliance with requirements for installation tolerances and other conditions affecting performance. B. Examine roughing-in of steam, hydronic, and condensate drainage piping systems and electrical services to verify actual locations of connections before installation. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 FIELD TESTING A. Field-Leak Testing. The Mechanical Contractor shall provide a field leak test on units at 1.5 times design total static pressure (minimum 8 inches w.g.) across the cabinet exterior walls and L/240 deflection at 8 inch w.g. Cabinet leakage is not to exceed 1 percent of specified airflow on the operating side of the unit. A written test report shall be prepared by the Mechanical Contractor submitted for review by the Engineer prior to placement into service, and be included with the operation and maintenance manual. 3.3 FIELD QUALITY CONTROL A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including piping and electrical connections. Report results in writing. 1. Leak Test: After installation, fill water and steam coils with water and test coils and connections for leaks. Repair leaks and retest until no leaks exist. 2. Fan Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation. Remove malfunctioning units, replace with new units, and retest. 3. Final Filter Operational Test: Pressurize housing to a minimum of 3-inch wg or to designed operating pressure, whichever is higher; test housing joints, door seals, and sealing edges of filter for air leaks according to ASME N510, pressure-decay method. 4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. 3.4 STARTUP SERVICE A. Engage a factory-authorized service representative to perform startup service. B. Final Checks before Startup: Perform the following: 1. Verify that shipping, blocking, and bracing are removed. 2. Verify that unit is secure on mountings and supporting devices and that connections to piping, ducts, and electrical systems are complete. Verify that proper thermal-overload protection is installed in motors, starters, and disconnect switches. 3. Perform cleaning and adjusting specified in this Section. 4. Disconnect fan drive from motor, verify proper motor rotation direction, and verify free fan wheel rotation and smooth bearing operations. Reconnect fan drive system, align belts, and install belt guards. 5. Lubricate bearings, pulleys, belts, and other moving parts with factory-recommended lubricants. 6. Set face-and-bypass dampers to full face flow. 7. Comb coil fins for parallel orientation. 8. Install clean filters. C. Starting procedures for modular indoor air-handling units include the following: 1. Energize motor; verify proper operation of motor, drive system, and fan wheel. Adjust fan to indicated rpm. Replace fan and motor pulleys as required to achieve design conditions. 2. Measure and record motor electrical values for voltage and amperage. 3. Manually operate dampers from fully closed to fully open position and record fan performance. 3.5 DEMONSTRATION A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain modular indoor air-handling units. END OF SECTION 23 73 13

HUM-10

5

FESSION PRO AL REG

. NO.

U

A

10229 ERIC G. SHERMAN

T

O

MARK

ED

R GINEE EN

REGIST ER

FOR REFERENCE ONLY

T H

K D A

O

11/25/14

STEAM FLOW [#/HR]

DISPERSION TUBE SPACING [IN]

MAXIMUM NOT-WETTING DISTANCE [IN]

CASING DIMENSIONS (WxH) [IN]

MAXIMUM PRESSURE DROP [IN.W.C.]

108

12

24

86x94

0.01

No.

FILTER SCHEDULE

STEAM HUMIDIFIER SCHEDULE STEAM PRESSURE IN [PSIG]

AVERA FACILITY DEVELOPMENT

S

MODULAR INDOOR AIR-HANDLING UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes variable-volume, modular air-handling units with coils for indoor installations. 1.3 SUBMITTALS A. Product Data: For each type of modular indoor air-handling unit indicated. Include the following: 1. Certified fan-performance curves with system operating conditions indicated. 2. Certified fan-sound power ratings. 3. Certified coil-performance ratings with system operating conditions indicated. 4. Motor ratings, electrical characteristics, and motor and fan accessories. 5. Material gages and finishes. 6. Filters with performance characteristics. 7. Dampers, including housings, linkages, and operators. 8. Ultraviolet lights. B. Shop Drawings: Signed and sealed by a qualified professional engineer. 1. Design Calculations: Calculate requirements for selecting vibration isolators and seismic restraints and for designing vibration isolation bases. 2. Vibration Isolation Base Details: Detail fabrication including anchorages and attachments to structure and to supported equipment. Include auxiliary motor slides and rails, and base weights. 3. Wiring Diagrams: Power, signal, and control wiring. C. Field Quality-Control Test Reports: From manufacturer. 1.4 QUALITY ASSURANCE A. Source Limitations: Obtain modular indoor air-handling units through one source from a single manufacturer. B. Product Options: Drawings indicate size, profiles, and dimensional requirements of modular indoor air-handling units and are based on the specific system indicated. Refer to Division 01 Section "Product Requirements." C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. D. NFPA Compliance: Modular indoor air-handling units and components shall be designed, fabricated, and installed in compliance with NFPA 90A, "Installation of Air Conditioning and Ventilating Systems." E. ARI Certification: Modular indoor air-handling units and their components shall be factory tested according to ARI 430, "Central-Station AirHandling Units," and shall be listed and labeled by ARI. F. Comply with NFPA 70. 1.5 EXTRA MATERIALS A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Filters: One set for each modular indoor air-handling unit, to be installed at time of project completion. 1.6 WARRANTY A. Air Handling Unit Warranty: Manufacturer's standard form in which manufacturer agrees to replace any component of AHUs that fail in materials or workmanship within specified warranty period. 1. Warranty Period: Manufacturer's standard, but not less than two years from date of shipment from factory. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Carrier. 2. Daikin/McQuay. 3. Huntair. 4. Trane. 2.2 MANUFACTURED UNITS A. Modular indoor air-handling units shall be factory assembled and consist of fans, motor and drive assembly, coils, dampers, plenums, filters, condensate pans, mixing dampers, dehumidification wheels, and ultraviolet lights. 2.3 CABINET A. Materials: Formed and reinforced double-wall insulated panels, fabricated to allow removal for access to internal parts and components, with joints between sections sealed. 1. Outside Casing: Galvanized steel, 0.0299 inch or 22 gauge thick. 2. Inside Casing (fan sections and discharge plenums): Galvanized steel, 0.0299 inch or 22 gauge thick, perforated. 3. Inside Casing (all other sections): Galvanized steel, 0.0299 inch or 22 gauge thick, solid. 4. Floor Plate: Aluminum, 0.1382 inch thick with tread plate flooring. 5. Factory Base Rail: 6 inch on low/medium pressure units. B. Cabinet Insulation: Comply with NFPA 90A or NFPA 90B. 1. Cabinets will have 2” foam insulation (minimum R-13 insulation value). 2. Materials: ASTM C 1071 with coated surface exposed to airstream to prevent erosion of glass fibers. 3. Thickness: 2 inches. 4. Thermal Conductivity (k-Value): 0.26 at 75 deg F mean temperature. 5. Fire-Hazard Classification: Maximum flame-spread index of 25 and smoke-developed index of 50, when tested according to ASTM C 411. 6. Liner Adhesive: Comply with NFPA 90A or NFPA 90B and ASTM C 916. 7. Mechanical Fasteners: Galvanized steel, suitable for adhesive attachment, mechanical attachment, or welding attachment to duct without damaging liner when applied as recommended by manufacturer and without causing leakage in cabinet. 8. Location and Application: Factory applied with adhesive and mechanical fasteners to the internal surface of section panels downstream from and including the cooling coil section. 9. Location and Application: Encased between outside and inside casing. C. Access Panels and Doors: Same materials and finishes as cabinet, complete with hinges, latches, handles, and gaskets. Access panels and doors shall be sized and located to allow periodic maintenance and inspections. All sections with access doors shall have viewing windows. Provide access panels and doors in the following locations: 1. Fan Sections: Access door on main access side of unit, access panels on other two (2) sides. 2. Access Sections: Access door on both sides of unit. 3. Coil Sections: Access panel on both sides of unit. 4. Damper Sections: Access door on main access side, access panel on other side of unit. 5. Surgery Dehumidification Sections: Access door on main access side, access panel on other side of unit. 6. UV Lights Sections: Access door on main access side, access panel on other side of unit. 7. Filter Sections: Access door on main access side, access panel on other side of unit. D. Condensate Drain Pans: Formed sections of stainless-steel sheet complying with requirements in ASHRAE 62. Fabricate pans with slopes in two planes to collect condensate from cooling coils (including coil piping connections and return bends) and humidifiers when units are operating at maximum catalogued face velocity across cooling coil. 1. Double-Wall Construction: Fill space between walls with foam insulation and seal moisture tight. 2. Pan-Top Surface Coating: Elastomeric compound. 3. Units with stacked coils shall have an intermediate drain pan or drain trough to collect condensate from top coil. 5. Duct-Mounting Frames: Construct downstream corners of holding device with cushion pads to protect media. Provide bolted filtersealing mechanism to mount and continuously seal each individual filter.

MANUFACTURER DRI-STEEM

MODEL

REMARKS

ULTRA-SORB

(1)(2)

MARK

LOCATION

TYPE

THICKNESS

MAX. FACE VELOCITY [FPM]

FB-10A

PRE FILTER

PLEATED

2"

437

MERV 8

RIGID

12"

437

MERV 14

FB-10B FINAL FILTER

EFFICIENCY/ QUANTITY MERV

SIZE

12 3 12 3

INITIAL PRESSURE LOSS [IN.W.C.]

MANUFACTURER

MODEL

REMARKS

0.20

CAMFIL FARR

30/30

(1)(2)

0.47

CAMFIL FARR

RIGA-FLO

(1)(2)

24x24 20x24 24x24 20x24

Description

Date

REMARKS (1) PROVIDE MAGNAHELIC GAUGE ACROSS HOUSING. (2) PROVIDE FILTER BANK HOLDING FRAME, BASIS OF DESIGN: CAMFIL FARR TYPE 8.

REMARKS (1) CONTRACTOR TO PIPE UNIT AS INDICATED FROM FACTORY. (2) DISPERSION SYSTEM SHALL BE REMOVABLE FROM AHU THROUGH ACCESS DOORS OR REMOVABLE PANEL WITHOUT REMOVAL OF OTHER EQUIPMENT.

AIR HANDLING UNIT SCHEDULE MARK

EXH

SUPPLY AIR PLENUM

FILTER BANK #2 (FB-10B)

SUPPLY FANS

UV LIGHTS

COOLING COIL (CC-10)

HUMIDIFIER (HUM-10)

HEATING COIL (HC-10)

FILTER BANK #1 (FB-10A)

AIR BLENDER

MIXING CHAMBER

RETURN FANS

RETURN AIR PLENUM

AHU-10

OA SA

LOCATION 3RD FLOOR

TYPE VAV

TYPE

# FANS

CFM

S.P. [IN.]

HP

VOLTS/Ø

TYPE

# FANS

CFM

S.P. [IN.]

HP

VOLTS/Ø

CHILLED WATER COIL MARK

PLENUM ARRAY

2

24,000

6.57

40

460/3

PLENUM ARRAY

2

16,150

2.87

20

460/3

CC-1

SUPPLY FAN

MIN. OA [CFM] 7,850

RETURN FAN

FILTER DATA BANK #1

FILTER DATA BANK #2

MANUFACTURER

REMARKS

HC-1

MERV 7

MERV 14

MCQUAY

(1)(2)(3)(4)(5)(6)(7)(8)

REMARKS (1) PROVIDE WITH UV LIGHTS ON DOWN STREAM FACE OF COOLING COIL WITH EXTERIOR CONRTOL SWITCH AND DOOR INTERLOCK SWITCH. (2) PROVIDE WITH INTEGRAL VFD WITH CONTROL CENTER. (3) MOUNT ON 4" HOUSEKEEPING PAD. (4) PROVIDE WITH STRUCTURAL BASE RAIL. (5) PROVIDE WITH PRESSURE RELIEF DOORS. (6) PROVIDE MAGNAHELIC GAUGE ACROSS HOUSING AT FILTERS. (7) PROVIDE WITH AIR BLENDER. (8) AHU SELECTION SHALL ALLOW FOR 70% AIRFLOW WITH ONE FAN NOT OPERATING. AHU MUST BE CAPABLE OF STABLE OPERATION AT 15% OF TOTAL AIRFLOW.

RA

SACRED HEART

HYDRONIC COIL SCHEDULE MARK

1

HEATING WATER COIL MARK

AHU-10 DETAIL NONE

SERVES

FLUID TYPE

2014

AIR FLOW [CFM]

MIN. ROWS

MAX. FINS PER INCH

MAX. VELOCITY [FPM]

MAX. AIR P.D. [IN. WC.]

ENTERING DB/WB [°F]

LEAVING DB/WB [°F]

TOTAL CAPACITY [MBH]

SENS. CAPACITY [MBH]

FLOW [GPM]

EWT/LWT [°F]

MAX. P.D. [FT.]

FLUID DATA MANUFACTURER

REMARKS

CC-10

AHU-10

WATER

24,000

8

10

489

0.51

82/68

52/52

1,185

785

186.0

44/56

18.8

MCQUAY

(1)(2)(3)(4)

HC-10

AHU-10

WATER

24,000

2

8

503

0.16

45

95

1,359

-

87.5

180/150

7.3

MCQUAY

(1)(3)(4)

C

4TH & 5TH MECHANICAL PRE-PURCHASED EQUIPMENT

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS.

REMARKS (1) MAINTAIN COIL PULL SPACE ON INSTALLATION. (2) PROVIDE DOUBLE SLOPED DRAIN PAN. (3) CONTRACTOR TO PIPE UNIT AS INDICATED FROM FACTORY, COUNTERFLOW. (4) VALUES GIVEN ARE FOR ENTIRE BANK. COIL BANK SHALL CONSIST OF 2 COILS.

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:35 PM

M503 Scale

NONE

PLATE AND FRAME HEAT EXCHANGER SCHEDULE EWT

LWT

PD [PSI]

PLATE FRAME

HX-CW1

30% PROP. GLYCOL

456

55

45

9.94

6

FLUID

GPM

EWT

LWT

PD [PSI]

WATER

430

57

47

6.96

NUMBER OF PASSES

MFGR

MODEL

2

BELL AND GOSSETT

GPX P62 BY5432

2,162

6

OPERATING TEMPERATURE RANGE (DEG F)

SYSTEM DESCRIPTION

MATERIAL (1)

SIZE RANGE

TYPE L COPPER

0" TO 2" REMARKS (1) PROVIDE INSULATED JACKET FOR HEAT EXCHANGER ASSEMBLY.

HEATING WATER SUPPLY AND RETURN

DUCT CONSTRUCTION SCHEDULE

ASTM A53 SCHEDULE 40 , TYPE E, GRADE B STEEL PIPE

SYSTEM DESCRIPTION

DUCT FUNCTION

DESCRIPTION

SUPPLY SUPPLY SUPPLY RETURN RETURN RELIEF EXHAUST

AHU-10

EF-1,2

MATERIAL (1)

LOCATION

FAN DISCHARGE TO VAV BOX FAN DISCHARGE TO VAV BOX VAV BOX TO DIFFUSER GRILLE TO FAN INLET GRILLE TO FAN INLET LOUVER TO AHU/FAN HOUSING GRILLE TO FAN INLET

ABOVE CEILING EXPOSED ABOVE CEILING ABOVE CEILING EXPOSED EXPOSED ABOVE CEILING

INSULATION (2)

GALVANIZED STEEL GALVANIZED STEEL GALVANIZED STEEL GALVANIZED STEEL GALVANIZED STEEL GALVANIZED STEEL GALVANIZED STEEL

FINISH (3)

2" EXTERNAL WRAP 2" EXTERNAL WRAP 2" EXTERNAL WRAP 2" EXTERNAL WRAP 2" EXTERNAL WRAP 2" EXTERNAL WRAP 2" EXTERNAL WRAP

FSK JACKET FSK JACKET FSK JACKET FSK JACKET FSK JACKET FSK JACKET FSK JACKET

DUCT CLEANLINESS LEVEL (6)

REMARKS

6" 6" 2" -3" -3" +/-6" -1"

A A A A A A B

ADVANCED ADVANCED ADVANCED ADVANCED ADVANCED ADVANCED INTERMEDIATE

-

REMARKS (1) REFER TO PROJECT SPECIFICATIONS FOR MATERIAL REQUIREMENTS. (2) REFER TO PROJECT SPECIFICATIONS FOR INSULATION MATERIAL DESCRIPTIONS AND REQUIREMENTS. PROVIDE INSULATION WITHIN 10 FEET OF EXTERIOR PENETRATIONS FOR ALL DUCT SYSTEMS. (3) REFER TO PROJECT SPECIFICATIONS FOR FINISH DESCRIPTIONS AND REQUIREMENTS. (4) REFER TO SMACNA DUCT CONSTRUCTION STANDARDS, CURRENT EDITION FOR CONSTRUCTION REQUIREMENTS. (5) REFER TO SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL FOR REQUIREMENTS. (6) REFER TO SMACNA DUCT CLEANLINESS FOR NEW CONSTRUCTION GUIDELINES FOR REQUIREMENTS.

MAX. S.P. [IN. W.C.]

DESCRIPTION

LOUVERED FACE STYLE SUPPLY DIFFUSER

D-1

LOUVERED FACE STYLE SUPPLY DIFFUSER

D-2

LINEAR SLOT STYLE SUPPLY DIFFUSER

D-3

DUCTED PERFORATED RETURN GRILLE

G-1

DUCTED PERFORATED RETURN GRILLE

G-3

DUCTED PERFORATED RETURN GRILLE

0.1

0.1

0.1

0.1

0.1

STEEL

STEEL

STEEL

STEEL

STEEL

STEEL

FINISH

FACE SIZE

WHITE

24"x24"

WHITE

12"x12"

24"x4" 2 SLOTS @ 1"

WHITE

WHITE

24"x12"

WHITE

AIRFLOW

6" 8" 10" 12" 14" 6" 8" -

0-185 186-290 291-410 411-540 541-685 0-155 156-230 -

8"

0-100

6"x6" 8"x8" 10"x10" 12"x12" 14"x14" 6"x6" 8"x8" 10"x10" 12"x12" 6"x6" 8"x8" -

24"x24"

WHITE

NECK SIZE

12"x12"

0-195 196-290 291-400 401-500 500-730 0-195 196-290 291-400 401-500 0-195 196-290 -

REMARKS

TITUS KRUEGER PRICE

TDX SH SMD

(1)(2)(3)

TDX SH SMD

0-80 PSIG 2-1/2" AND ABOVE

0-80 PSIG

PAR 6490 PFR

TITUS KRUEGER PRICE

PAR 6490 PFR

125

150

125

150

45-60

ALL

TYPE L COPPER

125

DOMESTIC HOT WATER AND HOT WATER RECIRCULATING

110-120

0" TO 4"

ASTM B88 TYPE L COPPER

125

DOMESTIC COLD WATER SOFT COLD WATER

40-60

0" TO 4"

ASTM B88 TYPE L COPPER

125

GRAVITY SOIL AND WASTE AND VENT

AMBIENT

ALL SIZES

PVC DWV

N/A

0" TO 2"

STANDARD WEIGHT BLACK STEEL PIPE

125

2-1/2" AND ABOVE

STANDARD WEIGHT BLACK STEEL PIPE OR SCHEDULE 10 BLACK STEEL PIPE WITH ROLLGROOVED ENDS

125

FIRE PROTECTION

AMBIENT

(1)(2)(3)

(1)(2)(3)

(1)(2)(3)

INSULATION (1)

FINISH (1)(3)

REMARKS

2" PREFORMED FIBERGLASS 2" PREFORMED FIBERGLASS 2" PREFORMED FIBERGLASS 2" PREFORMED FIBERGLASS 2" PREFORMED FIBERGLASS 2" PREFORMED FIBERGLASS 1-1/2" PREFORMED FIBERGLASS 1-1/2" PREFORMED FIBERGLASS 1-1/2" PREFORMED FIBERGLASS 1-1/2" PREFORMED FIBERGLASS 1-1/2" PREFORMED FIBERGLASS 1-1/2" PREFORMED FIBERGLASS 4.5" PREFORMED FIBERGLASS 4.5" PREFORMED FIBERGLASS 4.5" PREFORMED FIBERGLASS 4.5" PREFORMED FIBERGLASS 4.5" PREFORMED FIBERGLASS 4.5" PREFORMED FIBERGLASS 2.5" PREFORMED FIBERGLASS 2.5" PREFORMED FIBERGLASS 2.5" PREFORMED FIBERGLASS 3" PREFORMED FIBERGLASS 3" PREFORMED FIBERGLASS 3" PREFORMED FIBERGLASS 1" PREFORMED FIBERGLASS 1" PREFORMED FIBERGLASS 1" PREFORMED FIBERGLASS 1.5" PREFORMED FIBERGLASS 1.5" PREFORMED FIBERGLASS 1.5" PREFORMED FIBERGLASS 1" PREFORMED FIBERGLASS 1" PREFORMED FIBERGLASS 1" PREFORMED FIBERGLASS NONE NONE NONE NONE NONE NONE

ASJ JACKET PAINT TO MATCH ASJ JACKET ASJ JACKET PAINT TO MATCH ASJ JACKET NONE PAINT TO MATCH NONE NONE PAINT TO MATCH NONE ASJ JACKET PAINT TO MATCH ASJ JACKET ASJ JACKET PAINT TO MATCH ASJ JACKET ASJ JACKET PAINT TO MATCH ASJ JACKET ASJ JACKET PAINT TO MATCH ASJ JACKET NONE PAINT TO MATCH NONE ASJ JACKET PAINT TO MATCH ASJ JACKET NONE PAINT TO MATCH NONE NONE NONE NONE NONE PAINT TO MATCH NONE

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 -

ABOVE CEILING

NONE

NONE

-

EXPOSED - FINISHED SPACE

NONE

PAINT TO MATCH

-

EXPOSED - UNFINISHED SPACE

NONE

NONE

-

ABOVE CEILING WROUGHT-COPPER, CLEANED, EXPOSED - FINISHED SPACE PURGED AND BAGGED FOR OXYGEN SERVICE EXPOSED - UNFINISHED SPACE ABOVE CEILING EXPOSED - FINISHED SPACE WROUGHT-COPPER EXPOSED - UNFINISHED SPACE

NONE NONE NONE NONE NONE NONE

NONE NONE NONE NONE NONE NONE

5 5 5 5 5 5

FITTINGS

LOCATION (2)

ABOVE CEILING EXPOSED - FINISHED SPACE EXPOSED - UNFINISHED SPACE ABOVE CEILING THREADED/FLANGED CAST IRON OR OR EXPOSED - FINISHED SPACE GROOVED MECHANICAL-JOINT GROOVED MECHANICAL-JOINT EXPOSED - UNFINISHED SPACE ABOVE CEILING 95/5 SOLDER WROUGHT COPPER OR OR EXPOSED - FINISHED SPACE PRESSURE SEAL PRESSURE SEAL EXPOSED - UNFINISHED SPACE ABOVE CEILING THREADED/FLANGED CAST IRON OR OR EXPOSED - FINISHED SPACE GROOVED MECHANICAL-JOINT GROOVED MECHANICAL-JOINT EXPOSED - UNFINISHED SPACE ABOVE CEILING THREADED CAST IRON EXPOSED - FINISHED SPACE EXPOSED - UNFINISHED SPACE ABOVE CEILING WELDED OR WROUGH STEEL EXPOSED - FINISHED SPACE FLANGED EXPOSED - UNFINISHED SPACE ABOVE CEILING THREADED CAST IRON EXPOSED - FINISHED SPACE EXPOSED - UNFINISHED SPACE ABOVE CEILING WELDED OR WROUGH STEEL EXPOSED - FINISHED SPACE FLANGED EXPOSED - UNFINISHED SPACE ABOVE CEILING 95/5 SOLDER WROUGHT COPPER OR OR EXPOSED - FINISHED SPACE PRESSURE SEAL PRESSURE SEAL EXPOSED - UNFINISHED SPACE ABOVE CEILING 95/5 SOLDER WROUGHT COPPER OR OR EXPOSED - FINISHED SPACE PRESSURE SEAL PRESSURE SEAL EXPOSED - UNFINISHED SPACE ABOVE CEILING 95/5 SOLDER WROUGHT COPPER OR OR EXPOSED - FINISHED SPACE PRESSURE SEAL PRESSURE SEAL EXPOSED - UNFINISHED SPACE ABOVE CEILING SOLVENT CEMENT PVC DRAINAGE FITTINGS EXPOSED - FINISHED SPACE EXPOSED - UNFINISHED SPACE ABOVE CEILING THREADED GRAY -IRON THREADED EXPOSED - FINISHED SPACE EXPOSED - UNFINISHED SPACE 95/5 SOLDER OR PRESSURE SEAL

WROUGHT COPPER OR PRESSURE SEAL

THREADED GRAY -IRON THREADED OR OR GROOVED MECHANICAL-JOINT GROOVED-MECHANICAL JOINT

(1)(2)(3)

PAR 6490 PFR

TITUS KRUEGER PRICE

125

CONDENSATE DRAIN

(1)(2)(3)

ML 1900 SDS

TITUS KRUEGER PRICE

ASTM A53 SCHEDULE 40, TYPE S, GRADE B STEEL PIPE ASTM A53 SCHEDULE 40, TYPE E, GRADE B STEEL PIPE ASTM A53 SCHEDULE 80, TYPE S, GRADE B STEEL PIPE ASTM A53 SCHEDULE 80, TYPE E, GRADE B STEEL PIPE

2-1/2" AND ABOVE

MODEL

TITUS KRUEGER PRICE

ASTM A53 SCHEDULE 40 , TYPE E, GRADE B STEEL PIPE

0" TO 2"

CONDENSATE

MANUFACTURER

TITUS KRUEGER PRICE

45-60 2-1/2" AND ABOVE

STEAM AND RELIEF VENT

125

CONNECTIONS (4)

MEDICAL COMPRESSED AIR, OXYGEN

AMBIENT

ALL

ASTM B819 TYPE K COPPER CLEANED FOR OXYGEN SERVICE

150

BRAZED

MEDICAL VACUUM

AMBIENT

ALL

ASTM B819 TYPE L

150

BRAZED

AVERA FACILITY DEVELOPMENT

REMARKS (1) REFER TO PROJECT SPECIFICATIONS FOR REQUIREMENTS. (2) FINISHED SPACES INCLUDE BUT ARE NOT LIMITED TO NORMALLY OCCUPIED SPACES, STORAGE ROOMS WITHOUT CEILINGS, LOADING AREAS, ETC. UNFINSHED SPACES INCLUDE BUT ARE NOT LIMITED TO SHELL SPACES, UTILITY ROOMS, EQUIPMENT ROOMS, ETC. (3) PROVIDE PVC JACKET FOR FITTINGS AND ELBOWS. PROVIDE REMOVABLE JACKETS ON VALVES AND CONTROL DEVICES. (4) WHERE MORE THAN ONE TYPE IS LISTED, THE CONTRACTOR HAS THE OPTION OF UTILIZING ONE OR A COMBINATION OF THE TYPES LISTED. USE OF MULTIPLE TYPES WITHIN THE SAME SYSTEM SHALL BE APPROVED BY THE ENGINEER. PRESSURE SEAL SYSTEM BASED ON VIEGA PROPRESS. OTHER SYSTEMS WILL BE CONSIDERED THROUGH THE APPROVAL PROCESS. GROOVED MECHANICAL-JOINT SYSTEM BASED ON VICTAULIC AGS. OTHER SYSTEMS WILL BE CONSIDERED THROUGH THE APPROVAL PROCESS. (5) FOR PIPE CONNECTIONS REQUIRING HOT WORK, CONTRACTOR SHALL FOLLOW OWNER'S HOT WORK PROCEDURES AND PROVIDE ALL NECESSARY EQUIPMENT AND PERSONNEL REQUIRED.

ED

FESSION PRO AL

S O

REMARKS (1) COORDINATE EXACT MODEL AND FRAME WITH CEILING/WALL TYPE. (2) PROVIDE REMOTE DAMPER ACTUATION IN HARD CEILINGS. (3) PROVIDE BLACKOUT PANELS ON TRANSFER GRILLES.

TYPE

. NO.

10229 ERIC G. SHERMAN U

T H

K D A

O

11/25/14

MAX. WEIGHT [LBS.]

AIR FLOW [CFM]

TOTAL S.P. [IN.W.C.]

MAX. FAN RPM

MAX. FAN BHP

No.

VARIABLE FREQUENCY DRIVE SCHEDULE

FAN SCHEDULE MARK

REG

R GINEE EN

G-2

0.1

CONST. MATERIAL

CHILLED WATER SUPPLY AND RETURN

125

TYPE K COPPER

0" TO 2"

DIFFUSER, REGISTER, AND GRILLE SCHEDULE MARK (1)

TYPE L COPPER

0" TO 2" SMACNA DUCT SEAL CLASS (5)

125

TYPE K COPPER

110-180 2-1/2" AND ABOVE

DUCT PRESSURE CLASS (4)

SYSTEM PRESSURE CLASS (PSI)

A

GPM

HEAT CONNECTION EXCHANGER SIZE [INCHES] [MBH]

HOT SIDE

T

FLUID

CONNECTION SIZE [INCHES]

TYPE

REGIST ER

COLD SIDE MARK

HVAC PIPE CONSTRUCTION SCHEDULE

ELECTRICAL DATA HP

VOLTS/PHASE

MANUFACTURER

MODEL

REMARKS

EF-1

UPBLAST

110

1000

0.75

1504

0.25

1/2

115/1

TWIN CITY

DCRU-110BE

(1)(2)(3)(4)(5)

EF-2

UPBLAST

114

1400

1.00

1539

0.43

3/4

115/1

TWIN CITY

DCRU-120BE

(1)(2)(3)(4)(5)

REMARKS (1) PROVIDE DISCONNECT. (2) PROVIDE ECM MOTOR WITH SPEED CONTROLLER. (3) PROVIDE AUTOMATIC BACKDRAFT DAMPER INTERLOCKED WITH MOTOR. (4) PROVIDE BIRDSCREEN. (5) PROVIDE VIBRATION ISOLATION.

ELECTRICAL DATA CONNECTED VOLTS/PHASE MOTOR HP

MARK

SERVES

VFD-SF-10A

SF-10A

480/3

20

(1)

VFD-SF-10B

SF-10B

480/3

20

(1)

VFD-RF-10A

RF-10A

480/3

10

(1)

VFD-RF-10B

RF-10B

480/3

10

(1)

Description

Date

REMARKS

REMARKS (1) REMOVE FACTORY PROVIDED VFD AND CONNECT NEW VFDS. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. PATCH ALL CASING PENETRATIONS. PROVIDE NEW UNISTRUT STAND FOR NEW VFDS. STAND SHALL BE SUPPORTED FROM THE FLOOR.

RADIANT PANEL SCHEDULE MARK

SIZE [IN]

MAX. BTU PER FLOW RATE NUMBER OF PRESSURE LINEAL FT. [GPM] TUBES DROP [FT]

MEAN WATER MANUFACTURER TEMP. [DEG F]

MODEL

REMARKS

RAD-1 24 x 48

375

2

4

3

170

AIRTEX

HPH

(1)(2)(3)(4)

RAD-2 24 x 48

375

2

4

3

170

AIRTEX

HPH

(1)(2)(3)(4)

RAD-3 24 x 48

375

2

4

3

170

AIRTEX

HPH

(1)(2)(3)(4)

REMARKS (1) COORDINATE PANEL WITH CEILING SYSTEM. (2) INSULATE BACK OF RADIANT PANEL. (3) PROVIDE TRIM RING IN HARD CEILINGS. (4) COLOR TO BE SELECTED BY ARCHITECT FROM MANUFACTURER STANDARD FINSIHES.

SACRED HEART

2014

C

4TH & 5TH MECHANICAL SCHEDULES

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:37 PM

M600 Scale

NONE

PLUMBING FIXTURE SCHEDULE

HYDRONIC VARIABLE VOLUME BOX SCHEDULE

COLD WATER WATER HAMMER ARRESTERS - PROVIDE BELLOWS OR PISTON TYPE WATER HAMMER ARRESTERS AT EACH FIXTURE GROUP. SIZE AND INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND PDI STANDARD WH 201. INSTALL IN AN ACCESSIBLE LOCATION AND PROVIDE ACCESS DOOR IN CEILING AND/OR WALL WHERE REQUIRED FOR PROPER ACCESS.

PDI# / SFU

PDI# / SFU

AA / 1-3 A / 1-11 B / 12-32 C / 33-60 D / 61-113 E / 114-154 F / 155-330

AA / 1-3 A / 1-11 B / 12-32 C / 33-60 D / 61-113 E / 114-154 F / 155-330

FLOOR DRAIN - 3.75" WIDE BY 60" LONG STAINLESS STEEL CHANNEL DRAIN WITH MEMBRANE CLAMP, 2" BOTTOM OUTLET, FRAMELESS TILEABLE GRATE ASSEMBLY. SCHLUTER KERDI-LINE KLV 60 E 150 WITH KLDRE 150 OR APPROVED EQUAL.

-

FLOOR DRAIN - 3.75" WIDE BY 36" LONG STAINLESS STEEL CHANNEL DRAIN WITH MEMBRANE CLAMP, 2" BOTTOM OUTLET, FRAMELESS TILEABLE GRATE ASSEMBLY. SCHLUTER KERDI-LINE KLV 60 E 90 WITH KLDRE 90 OR APPROVED EQUAL.

PRE-CHARGED, BELLOWS TYPE, ALL STAINLESS STEEL CONSTRUCTION, ASSE 1010 APPROVED, PDI CERTIFIED.

NONE WATER HAMMER ARRESTER

FD-1 SHOWER DRAIN

FD-2 SHOWER DRAIN

HOT WATER

PRE-CHARGED WITH 60 PSIG AIR, COPPER BODY, BRASS OR HIGH HEAT POLYPROPYLENE PISTON WITH DUAL EDPM O-RING SEALS LUBRICATED WITH FDA APPROVED SILICONE LUBRICANT. PDI CERTIFIED, A.S.S.E. 1010 APPROVED FOR SEALED WALL INSTALLATION.

WASTE

VENT

-

-

-

2"

1-1/2"

-

-

2"

1-1/2"

1/2"

1/2"

1-1/2"

1-1/4"

1/2"

1/2"

1-1/2"

1-1/4"

3/4"

3/4"

-

-

BOWL - SINGLE COMPARTMENT SINK INTEGRAL TO COUNTERTOP BY ARCHITECT.

BOWL L-1

TRIM - TWO HANDLE MIXING FAUCET, CHROME PLATED, SWING GOOSENECK SPOUT WITH 5" REACH AND PRESSURE COMPENSATING LAMINAR FLOW OUTLET IN FAUCET BASE, WITHOUT INLET SCREEN, 4" WRIST BLADE HANDLES AT 4" CENTERS, PERFORATED DRAIN GRATE WITH 1-1/2" 17 GAUGE TAILPIECE, CHROME PLATED CAST BRASS "P" TRAP WITH CLEANOUT, 3/8" CHROME PLATED HEAVY BRASS ANGLE SUPPLIES AND LOOSE KEY STOPS WITH CHROME PLATED SOFT COPPER RISERS. MAXIMUM FLOW TO BE 1.5 GPM IN COMPLIANCE WITH ENERGY POLICY ACT OF 1992 AND ASME/ANSI STANDARD A112.18.1M. PROVIDE RESTRICTIVE DEVICE AS REQUIRED. MOEN MODEL 8279SM WITH 52652 INSERT OR APPROVED EQUAL.

TRIM

BOWL L-2

TRIM

BOWL - WALL MOUNTED, WHITE VITREOUS CHINA, 4" HIGH CONTOURED BACKSPLASH, 20" X 18", 4" CENTERS, DRILLED FOR CONCEALED ARM CARRIER. FURNISH SUPPORT CARRIER BOLTED SECURELY TO FLOOR. PROVIDE 29" MINIMUM CLEARANCE FROM FLOOR TO BOTTOM OF APRON IN COMPLIANCE WITH ANSI A117.1-1986 AND ADA SECTION 4.19. TOP OF BASIN RIM TO BE MAXIMUM OF 34" ABOVE FLOOR IN COMPLIANCE WITH ADA SECTION 4.19. PROVIDE OFFSET DRAIN AND TAILPIECE. PRE-MANUFACTURED P-TRAP, STOP VALVE AND SUPPLY LINE INSULATION KIT. AMERICAN STANDARD MODEL 0355.012 OR APPROVED EQUAL. TRIM - TWO HANDLE MIXING FAUCET, CHROME PLATED, SWING GOOSENECK SPOUT WITH 5" REACH AND PRESSURE COMPENSATING LAMINAR FLOW OUTLET IN FAUCET BASE, WITHOUT INLET SCREEN, 4" WRIST BLADE HANDLES AT 4" CENTERS, PERFORATED DRAIN GRATE WITH 1-1/2" 17 GAUGE TAILPIECE, CHROME PLATED CAST BRASS "P" TRAP WITH CLEANOUT, 3/8" CHROME PLATED HEAVY BRASS ANGLE SUPPLIES AND LOOSE KEY STOPS WITH CHROME PLATED SOFT COPPER RISERS. MAXIMUM FLOW TO BE 1.5 GPM IN COMPLIANCE WITH ENERGY POLICY ACT OF 1992 AND ASME/ANSI STANDARD A112.18.1M. PROVIDE RESTRICTIVE DEVICE AS REQUIRED. MOEN MODEL 8279SM WITH 52652 INSERT OR APPROVED EQUAL. ENCLOSURE - BY ARCHITECT. TRIM - SINGLE HANDLE COMBINATION PRESSURE BALANCED AND THERMOSTATIC MIXING FAUCET, BRASS OR BRONZE CONSTRUCTION, WASHERLESS DESIGN, OFFCOLDHOT TEMPERATURE RANGE INDICATOR DIAL, POLISHED CHROME CAST METAL LEVER HANDLE, INTEGRAL CHECK STOPS, ADJUSTABLE TEMPERATURE LIMIT STOP SET TO 110 DEGREE F DISCHARGE. ASSE 1016 LISTED. INSTALL ALL CONTROLS BETWEEN 38" AND 48" ABOVE FINISHED FLOOR IN COMPLIANCE WITH ADA.

SH-1

TRIM

ACCESSORIES - ADJUSTABLE SPRAY HAND HELD SHOWER, CHROME PLATED 36" MOUNTING RAIL, SWIVEL CONNECTOR, 60" CHROME PLATED METAL HOSE, CHROME PLATED BRASS SUPPLY ELBOW WITH FLANGE, CHROME PLATED ELEVATED VACUUM BREAKER WITH CHROME PLATED PIPING AND FLANGES. MAXIMUM FLOW TO BE 1.5 GPM IN COMPLIANCE WITH ENERGY POLICY ACT OF 1992 AND ASME/ANSI STANDARD A112.18.1M. LAWLER MODEL M7800 SC1-RB HS3 EVB OR APPROVED EQUAL.

1"

-

3"

HEATING

12" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 6"

55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F 55 °F

55 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F 110 °F

0 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F 180 °F

0.0 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 3.3 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 2.1 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.8 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 1.2 GPM 3.3 GPM

0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger Krueger

MODEL

REMARKS

LMHS-12 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06 LMHS-06

(1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4) (1)(2)(3)(4)

AVERA FACILITY DEVELOPMENT

ED

FESSION PRO AL

1-1/2"

REG

. NO.

R GINEE EN

FLUSH VALVE

FLUSH VALVE - EXPOSED, CHROME PLATED 1" I.P.S. SCREWDRIVER STOP-CHECK VALVE, CHEMICAL RESISTANT MATERIAL, VACUUM BREAKER, WALL AND SPUD FLANGES, BED PAN WASHER DIVERTER, 1.6 GALLONS PER FLUSH. 3 YEAR WARRANTY. FLUSH HANDLE SHALL BE LOCATED ON THE WIDE SIDE OF THE TOILET STALL AND SHALL BE 12" MAXIMUM ABOVE BOWL RIM AND OPERATE WITH NO GREATER THAN 5 LB FORCE, IN COMPLIANCE WITH ADA SECTION 4.16.5 AND 4.27.4. CONTRACTOR TO VERIFY EQUIPMENT REQUIREMENTS AND ROUGH-IN LOCATIONS. SLOAN MODEL BPW-1150 OR APPROVED EQUAL.

WC-1

1500 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 550 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 350 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 300 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 200 CFM 550 CFM

COOLING

O

WATER CLOSET

SEAT - WHITE EXTRA HEAVY OPEN FRONT INJECTION MOLDED SOLID PLASTIC SEAT WITH CHECK HINGE AND STAINLESS STEEL OR PLATED STEEL POSTS AND NUTS AND ANTIMICROBIAL COATING. BEMIS MODEL 2155C OR APPROVED EQUAL.

VB-3-1 VB-4-1 VB-4-2 VB-4-3 VB-4-4 VB-4-5 VB-4-6 VB-4-7 VB-4-8 VB-4-9 VB-4-10 VB-4-11 VB-4-12 VB-4-13 VB-4-14 VB-4-15 VB-4-16 VB-4-18 VB-4-19 VB-4-20 VB-4-21 VB-4-22 VB-4-23 VB-4-24 VB-4-25 VB-4-26 VB-4-27 VB-4-28 VB-4-29 VB-4-30 VB-4-31 VB-4-32 VB-4-33 VB-4-34 VB-5-1 VB-5-2 VB-5-3 VB-5-4 VB-5-5 VB-5-6 VB-5-7 VB-5-8 VB-5-9 VB-5-10 VB-5-11 VB-5-12 VB-5-13 VB-5-14 VB-5-15 VB-5-16 VB-5-17 VB-5-18 VB-5-19 VB-5-20 VB-5-21 VB-5-22 VB-5-23 VB-5-24 VB-5-25 VB-5-26 VB-5-27 VB-5-28 VB-5-29 VB-5-30 VB-5-31 VB-5-32 VB-5-33 VB-5-34

BOX INLET

NUMBER OF HEATING ROWS MANUFACTURER

S

ACCESSIBLE WATER CLOSET - FLOOR MOUNTED, REAR DISCHARGE FLUSH VALVE TYPE, WHITE VITREOUS CHINA, SIPHON JET, WATER SAVING, ELONGATED BOWL, 1-1/2" TOP SPUD, BEDPAN LUGS BOLT CAPS. TOP OF SEAT AT 17" TO 19" ABOVE FINISHED FLOOR. INTERFACE WITH FLOOR AND WALL SHALL FORM A STRAIGHT EDGE FOR EASY CLEANING. AMERICAN STANDARD MODEL 3313.001 OR APPROVED EQUAL.

SUPPLY MARK AIR FLOW

ENTERING WATER COIL TEMP FLOW

10229 ERIC G. SHERMAN U

A

DESCRIPTION

T

TYPE

REGIST ER

LEAVING AIR TEMP.

PIPING CONNECTIONS MARK

T H

K D A

O

11/25/14 REMARKS (1) (2) (3) (4)

No.

MAXIMUM FULL FLOW AIR PRESSURE DROP ACROSS THE BOX ASSEMBLY INCLUDING HEATING COIL SHALL BE 0.75 IN. W.C. MAXIMUM FULL FLOW WATER PRESSURE DROP THROUGH THE COIL SHALL BE 5 FT. MAXIMUM RADIATED SOUND LEVEL BASED ON ARI 880-98 AT 1.0 IN.W.C. DIFFERENTIAL PRESSURE SHALL NOT EXCEED NC 30. MAXIMUM DISCHARGE SOUND LEVEL BASED ON ARI 880-98 AT 1.0 IN.W.C. DIFFERENTIAL PRESSURE SHALL NOT EXCEED NC 25.

Description

Date

ACCESSIBLE WATER CLOSET - FLOOR MOUNTED, BOTTOM DISCHARGE FLUSH VALVE TYPE, WHITE VITREOUS CHINA, SIPHON JET, WATER SAVING, ELONGATED BOWL, 11/2" TOP SPUD, BEDPAN LUGS BOLT CAPS. TOP OF SEAT AT 17" TO 19" ABOVE FINISHED FLOOR. INTERFACE WITH FLOOR AND WALL SHALL FORM A STRAIGHT EDGE FOR EASY CLEANING. AMERICAN STANDARD MODEL 3043.001 OR APPROVED EQUAL.

WATER CLOSET WC-2

FLUSH VALVE

SEAT - WHITE EXTRA HEAVY OPEN FRONT INJECTION MOLDED SOLID PLASTIC SEAT WITH CHECK HINGE AND STAINLESS STEEL OR PLATED STEEL POSTS AND NUTS AND ANTIMICROBIAL COATING. BEMIS MODEL 2155C OR APPROVED EQUAL.

1"

-

3"

1-1/2"

FLUSH VALVE - EXPOSED, CHROME PLATED 1" I.P.S. SCREWDRIVER STOP-CHECK VALVE, CHEMICAL RESISTANT MATERIAL, VACUUM BREAKER, WALL AND SPUD FLANGES, BED PAN WASHER DIVERTER, 1.6 GALLONS PER FLUSH. 3 YEAR WARRANTY. FLUSH HANDLE SHALL BE LOCATED ON THE WIDE SIDE OF THE TOILET STALL AND SHALL BE 12" MAXIMUM ABOVE BOWL RIM AND OPERATE WITH NO GREATER THAN 5 LB FORCE, IN COMPLIANCE WITH ADA SECTION 4.16.5 AND 4.27.4. CONTRACTOR TO VERIFY EQUIPMENT REQUIREMENTS AND ROUGH-IN LOCATIONS. SLOAN MODEL BPW1150 OR APPROVED EQUAL.

SACRED HEART

2014

C

4TH & 5TH MECHANICAL SCHEDULES

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:40 PM

M601 Scale

NONE

98.5

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

A1 B B.0

1.7

2.1

2 M991 HX-CW1

B1.1

C

MODIFY EXISTING FAN COIL CHANGE OVER PANEL TO REFLECT REMOVAL OF 4TH AND 5TH FLOOR SYSTEMS.

C1

FESSION PRO AL . NO.

10229 ERIC G. SHERMAN

O

U

A

S

D1

REG

T

ED

R GINEE EN

REGIST ER

D

T H

K D A

O

11/25/14 AHU-10

E

No.

Description

Date

1 M990

E1

F F1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

4TH & 5TH THIRD LEVEL CONTROLS

THIRD LEVEL- CONTROLS 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:42 PM

M931 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

ELEVATOR LINK 4900

SHEET NOTES

PHASE 4

A1

1 REPLACE EXISTING THERMOSTAT.

B B.0 RAD-1 RESTROOM 418

M991

OFFICE 462

1.7

2.1

T

1

B1.1

1

T

VB-4-27

1

1 PATIENT RM M991 400 VB-4-26

1

1

M991 PATIENT RM VB-4-25

PATIENT RM M991 404 VB-4-24

402

1

1

M991 PATIENT RM 406

VB-4-23

1

M991 PATIENT RM 408 VB-4-22

PATIENT RM M991 410 VB-4-21

1

1

M991 PATIENT RM 412 VB-4-20

PATIENT RM M991 414 VB-4-19

T

1 M991 PATIENT RM VB-4-18 416

3

2

M991

M992

NEGATIVE AIR 420

T

1

1

T

T

T

T

T

T

T

T

T

T

VB-4-16

1

PATIENT RM 422

VB-4-28

M991 OFFICE

1

460

1

M991 MECH 459

C

RESTROOM 421

1 M991

VB-4-15

VB-4-29

C1

1 1

ELEC 534

T

1

T

M991 HSKG 536

1 M991

1

T CLEAN UTILITY 550

OFFICE 537

DIRTY UTILITY 549

1

TOILET 535

T

PATIENT RM M991 424

TOILET 548

1

VB-4-14

VB-4-30

STORAGE 539

PHASE 2

DIET 544

CONFERENCE 546

LOCKER ROOM 547

1 M991

1

VB-4-13

VB-4-31 1 T T

CLEAN UTILITY 541

SOILED 542

OMNI CELL 545

NUTRITION 543

T

1

1

O

D1

FESSION PRO AL

S

VB-4-32

ED

1

REG

. NO.

R GINEE EN

EQUIPMENT 540

1

T

10229 ERIC G. SHERMAN U

A

WAITING ROOM 538

T

M991

REGIST ER

D

RESTROOM 455

PHASE 3

T H

K D A

O

VB-4-12

M991

1

11/25/14

M991

E

No. 1

M991

VB-4-33

1

VB-4-1

1

PATIENT RM 448

M992

T

T

T

T

T

T

T

T

T

VB-4-34

T

T

E1

VB-4-11 ANTERIOR RM 450

T

Date

1

M991

1

Description

RESTROOM 451

VB-4-2

1

1

M991

M991

VB-4-3 PATIENT RM 446

PATIENT RM 444

VB-4-4

1

1

M991

M991

VB-4-5 PATIENT RM 442

1

VB-4-6 PATIENT RM 440

PATIENT RM 438

M991

VB-4-7

1

1

M991

M991

VB-4-8 PATIENT RM 436

PATIENT RM 434

T

VB-4-9

1

1

M991

M991

1

1

PATIENT RM 432

1 M991

T

VB-4-10

3 M991

STORAGE 431 RAD-2

RESTROOM 429

F F1 PHASE 1

99 1

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

4TH & 5TH FOURTH LEVEL CONTROLS

FOURTH LEVEL - CONTROLS 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:45 PM

M941 Scale

1/8" = 1'-0"

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

GENERAL NOTES

A

A. REFER TO MECHANICAL COVER SHEET M000 FOR GENERAL REQUIREMENTS, SYMBOLS, ABBREVIATIONS, AND MOUNTING ELEVATION REQUIREMENTS.

ELEVATOR LINK 5900

SHEET NOTES

PHASE 4

A1

1 REPLACE EXISTING THERMOSTAT.

B B.0

1 1

T

M991 VB-5-27

M991

1

PATIENT RM VB-5-23 506

M991

M991

M991

PATIENT RM VB-5-22 508

PATIENT RM VB-5-21 510

T

T

SHOWER

SHOWER

PATIENT RM VB-5-20 512

SHOWER

1

1

M991

M991

PATIENT RM 514 VB-5-19

SHOWER

3

NEGATIVE EF-1 AIR M992 520

2

PATIENT RM 516

VB-5-18

SHOWER

ON ROOF

M992

VB-5-17

SHOWER

T

M991

SHOWER

1

T

SHOWER

T

M991 PATIENT RM 504 VB-5-24

M991 PATIENT RM VB-5-25 502

SHOWER

1

1

T

B1.1

M991 PATIENT RM VB-5-26 500

1

T

T

1

2.1

1

T

1.7

1

T

1

OFFICE 5902

VB-5-16 RESTROOM 501

RESTROOM 503

RESTROOM 505

RESTROOM 507

RESTROOM 509

RESTROOM 511

RESTROOM 513

RESTROOM 515

1

RESTROOM 517

M991

C

1 T

1

T

MECH. 565

1

T

T

SHOWERSHOWER

1

SHOWERSHOWER

VB-5-28

1

M991 VB-5-29

1 M991

VB-5-15

ELEC 551 HSKG 552

EQUIPMENT 553

VB-5-14

M991

CLEAN UTILITY 558

1 M991

STORAGE 554

T

1 M991

M991

PATIENT RM 1 548

PATIENT RM 546 1

M991

M991

PATIENT RM 542

PATIENT RM 1 544

VB-5-7

PATIENT RM 540 1

1

M991

VB-5-6

M991

M991

RESTROOM 535

T

T

VB-5-5

VB-5-4

RESTROOM 537

T

10229 ERIC G. SHERMAN U

T H

K D A

O

11/25/14

Description

Date

T

1

VB-5-8

VB-5-9

PATIENT RM 1 538

PATIENT RM 536 1

M991

M991

M991

T

1

PATIENT RM 1 534

1

M991

554

M991 VB-5-10

T

1

. NO.

1

T

EF-2 ON ROOF ISOLATION

VB-5-3

T

SHOWER

SHOWER

PATIENT RM 1 550

SHOWER

M992

T

T

T

T

VB-5-2

T

T

SHOWERSHOWER

VB-5-1

SHOWER

1 M992

SHOWER

3

SHOWER

VB-5-34

RESTROOM 539 SHOWER

E1

REG

VB-5-11 RESTROOM 541

VB-5-33

1

No.

RESTROOM 543

T

RESTROOM 545

SHOWER

RESTROOM 547

SHOWER

T

CORRIDOR 5901

1 M991

O

1

SHOWERSHOWER

E

FESSION PRO AL

S

VB-5-12

M991 1

ED

R GINEE EN

SOILED UTILITY 555

VB-5-32

1

M991

VB-5-13 NUTRITION 556

1 1

VB-5-31

STOREROOM 557

D1

SOILED UTILITY 559

PHASE 2

A

T

1

1

T

T

PHASE 3

SHOWERSHOWER

1

SHOWERSHOWER

M991

REGIST ER

1

D

1

VB-5-30

T

C1

RAD-3

F 3

F1

M991 PHASE 1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

SACRED HEART

8

4TH & 5TH FIFTH LEVEL CONTROLS

FIFTH LEVEL - CONTROLS 1/8" = 1'-0" 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:48 PM

M951 Scale

1/8" = 1'-0"

42

RELIEF AIR

12 13

44

ACTUATOR

CO2

CO2 BLENDER

H

C

AVERA FACILITY DEVELOPMENT

RETURN FAN

ACTUATOR

ACTUATOR

C

01

03

02

04

VFD

06

CO2 43

07 08 09 10 11

18

16 17

05

C

19

20

VFD

21

14 ACTUATOR 15

24

25

22

26

23

27

ACTUATOR

SMOKE DETECTOR

DP 41

DP HWR

DP

MOTOR

LPS

MOTOR

CWS

SMOKE DETECTOR

CWR

DP

SUPPLY FAN

HWS

RETURN AIR

29

30 31 32 33 34

DP

DP

35

36

37 38

39

40

28

OUTDOOR AIR

SEQUENCE OF OPERATION

DIRECT DIGITAL CONTROL POINTS LIST POINT ID

POINT DESCRIPTION

SOURCE (1)

TYPE (2)

I/O (3)

SETPOINT ADJUSTMENT

ALARMS (4)

APPLICATIONS (5)

UNITS

01

RETURN DUCT DIFFERENTIAL STATIC PRESSURE

E

A

I

YES

-

T, A, G

INCHES W.C.

02

AHU RETURN AIR ISOLATION DAMPER POSITION

E

B

I

NO

-

E, A, G

OPEN/CLOSED

03

RETURN AIR TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

04

RETURN AIR HUMIDITY

E

A

I

NO

-

T, A, G

05

RETURN AIR HUMIDITY SETPOINT

E

A

O

YES

-

T, A, G

06

RETURN FAN SUCTION STATIC PRESSURE SWITCH

E

B

I

YES

C, H

E, A, G

INCHES W.C.

07

RETURN FAN VFD STATUS

E

B

I

NO

G, F

E, A

-

08

RETURN FAN VFD START/STOP

E

B

0

NO

-

-

-

09

RETURN FAN VFD SPEED CONTROL

E

A

O

YES

-

T, A, G

% SPEED

10

RETURN FAN CURRENT STATUS SWITCH

E

B

I

NO

G, F

E, A, G

ON/OFF

11

RETURN FAN AIRFLOW VOLUME

E

A

I

NO

-

T, A, G

CFM

12

RELIEF AIR DAMPER ACTUATOR

E

A

O

NO

-

-

-

13

RELIEF AIR DAMPER POSITION

E

A

I

NO

-

T, A, G

% OPEN

14

OUTDOOR AIR DAMPER ACTUATOR

E

A

O

NO

-

-

-

15

OUTDOOR AIR DAMPER POSITION

E

A

I

NO

-

T, A, G

% OPEN

16

RETURN AIR DAMPER ACTUATOR

E

A

O

NO

-

-

-

17

RETURN AIR DAMPER POSITION

E

A

I

NO

-

T, A, G

% OPEN

18

OUTDOOR AIRFLOW

E

A

I

NO

-

T, A, G

CFM

19

MIXED AIR TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

DESCRIPTION:

THE AIR HANDLING UNIT IS A VARIABLE AIR VOLUME UNIT AND CONSISTS OF A SUPPLY FAN WITH VFD, RETURN FAN WITH VFD, OUTDOOR AIR DAMPER, RETURN AIR DAMPER, RELIEF AIR DAMPER, BLENDER, PRE-FILTER BANK, HOT WATER HEATING COIL, CHILLED WATER COOLING COIL, STEAM HUMIDIFIER, FINAL FILTER BANK AND UNIT ISOLATION DAMPERS.

SUPPLY FAN CONTROL:

START/STOP: THE DDC SYSTEM SHALL START THE SUPPLY FAN VIA THE VFD WITH A TIME DELAY TO ALLOW ALL FIRE/SMOKE AND SMOKE DAMPERS IN THE AIR HANDLING SYSTEM TO OPEN PRIOR TO SUPPLY FAN OPERATION. VFD RESET: IN CASE OF VFD FAULT DETECTION, THE DDC SYSTEM SHALL WAIT 30 SECONDS (ADJUSTABLE) AND THEN CALL THE VFD TO START. IF THE VFD DOES NOT START, THE DDC SYSTEM SHALL CALL A SECOND TIME. IF THE VFD STILL HAS NOT STARTED, AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE. CURRENT STATUS SWITCH: IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION IN VFD OR BYPASS MODE, THE UNIT SHALL SHUT DOWN AND SEND AN ALARM TO THE OPERATOR INTERFACE. SPEED CONTROL: THE PURPOSE OF THE SUPPLY FAN CONTROL IS TO MAINTAIN A MINIMUM STATIC PRESSURE IN THE SUPPLY DUCTWORK TO INSURE PROPER TERMINAL AIR BOX OPERATION. THE DDC SYSTEM SHALL CONTROL THE SUPPLY FAN VFD FROM THE SUPPLY DUCT DIFFERENTIAL PRESSURE TRANSMITTER SIGNAL. INITIAL SETPOINT SHALL BE +1.0" W.C. (ADJUSTABLE). FINAL SETPOINT SHALL BE OPTIMIZED BY THE BALANCING CONTRACTOR. ON A DECREASE IN SYSTEM LOAD, THE DDC SYSTEM SHALL UTILIZE FEEDBACK FROM ALL TERMINAL AIR BOX POSITIONS TO RESET AND REDUCE THE SUPPLY DUCT DIFFERENTIAL STATIC PRESSURE UNTIL ONE TERMINAL AIR BOX DAMPER IS 95% OPEN. ON AN INCREASE IN SYSTEM LOAD, THE DDC SYSTEM SHALL UTILIZE FEEDBACK FROM ALL TERMINAL AIR BOX POSITIONS TO INCREASE THE SUPPLY DUCT DIFFERENTIAL STATIC PRESSURE (NOT-TO-EXCEED THE FINAL SETPOINT) UNTIL ONE TERMINAL AIR BOX DAMPER IS 95% OPEN.

% RELATIVE HUMIDITY % RELATIVE HUMIDITY

HIGH PRESSURE LIMIT: DIFFERENTIAL PRESSURE SWITCH SHALL BE A MANUAL RESET TYPE AND WIRED IN SERIES WITH THE START/STOP CONTROL OF THE SUPPLY FAN. THE DDC SYSTEM SHALL MONITOR THE STATUS OF THE DIFFERENTIAL PRESSURE SWITCH. INITIAL SETPOINT SHALL BE +3.0" W.C. (ADJUSTABLE). RETURN FAN CONTROL:

START/STOP: THE DDC SYSTEM SHALL START THE RETURN FAN VIA THE VFD WITH A TIME DELAY TO ALLOW ALL FIRE/SMOKE AND SMOKE DAMPERS IN THE AIR HANDLING SYSTEM TO OPEN PRIOR TO RETURN FAN OPERATION. VFD RESET: IN CASE OF VFD FAULT DETECTION, THE DDC SYSTEM SHALL WAIT 30 SECONDS (ADJUSTABLE.) AND THEN CALL THE VFD TO START. IF THE VFD DOES NOT START, THE DDC SYSTEM SHALL CALL A SECOND TIME. IF THE VFD STILL HAS NOT STARTED, AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE. CURRENT STATUS SWITCH: IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION IN VFD OR BYPASS MODE, THE UNIT SHALL SHUT DOWN AND SEND AN ALARM TO THE OPERATOR INTERFACE. SPEED CONTROL: THE PURPOSE OF THE RETURN FAN CONTROL IS TO MAINTAIN A SLIGHTLY POSITIVE BUILDING PRESSURE, +0.05 W.C. (ADJUSTABLE). THE RETURN FAN VFD SHALL MODULATE TO MAINTAIN A CONSTANT CFM OFFSET FROM THE SUPPLY FAN BASED ON AIRFLOW MEASUREMENT TO ACCOUNT FOR TOTAL EXHAUST FROM THE BUILDING WHILE MAINTAINING A SLIGHTLY POSITIVE PRESSURE. IN THE EVENT OF A SENSOR FAILURE, PROVIDE AN ADJUSTABLE FREQUENCY OFFSET ALGORITHM FOR THE RETURN FAN RELATIVE TO THE SUPPLY FAN. WORK WITH THE BALANCER TO ESTABLISH THE CORRECT RETURN FAN VFD SPEED RELATIVE TO THE SUPPLY FAN SPEED TO ACHIEVE CORRECT AIRFLOW BALANCE AT 100% OF THE MAXIMUM SUPPLY CFM AND AT 50% OF THE MAXIMUM SUPPLY CFM. A LINEAR EQUATION SHALL THEN BE DEVELOPED FOR THE RETURN FAN SPEED. LOW PRESSURE LIMIT: DIFFERENTIAL PRESSURE SWITCH SHALL BE A MANUAL RESET TYPE AND WIRED IN SERIES WITH THE START/STOP CONTROL OF THE RETURN FAN. INITIAL SETPOINT SHALL BE -2.0" W.C. (ADJUSTABLE).

DISCHARGE AIR CONTROL:

WHENEVER THE DISCHARGE AIR TEMPERATURE IS ABOVE THE SETPOINT, THE FOLLOWING SHALL OCCUR IN SEQUENCE: 1. THE HEATING COIL CONTROL VALVE(S) SHALL MODULATE CLOSED. 2. IF THE OUTSIDE AIR ENTHALPY IS BELOW THE RETURN AIR ENTHALPY, THE OUTSIDE AIR DAMPER SHALL MODULATE OPEN. THIS SHALL CONTINUE UNTIL THE SETPOINT IS ACHIEVED OR THE DAMPER IS IN THE 100% OUTSIDE AIR POSITION. 3. IF THE OUTSIDE AIR ENTHALPY IS ABOVE THE RETURN AIR ENTHALPY, THE OUTSIDE AIR DAMPER(S) SHALL CLOSE TO THEIR MINIMUM OUTSIDE AIR POSITION(S). 4. IF THE SETPOINT CANNOT BE ACHIEVED BY MODULATION OF THE OUTSIDE AIR DAMPER, THE DDC SYSTEM SHALL MODULATE THE CHILLED WATER CONTROL VALVE(S) OPEN. 5. IF THE SETPOINT CANNOT BE ACHIEVED BY MODULATION OF THE OUTSIDE AIR DAMPER, THE DDC SYSTEM SHALL ENABLE THE ASSOCIATED CONDENSING UNIT CONTROLS TO MAINTAIN THE DISCHARGE AIR TEMPERATURE SETPOINT. 6. IF THE DISCHARGE AIR TEMPERATURE IS MORE THAN 10ºF (ADJUSTABLE) ABOVE THE SETPOINT, SEND AN ALARM TO THE OPERATOR INTERFACE.

I

NO

-

T, A, G

21

PRE-FILTER DIFFERENTIAL PRESSURE

E

A

I

YES

G, H

T, E, A, G

22

HEATING WATER COIL CONTROL VALVE

E

A

O

NO

-

-

-

23

HEATING WATER TEMPERATURE - RETURN

E

A

I

NO

-

T, A, G

DEGREES F

24

HEATING COIL DISCHARGE AIR TEMPERATURE

E

A

I

NO

G, H, L

T, A, G

DEGREES F

E

B

I

NO

F

E, A, G

NORMAL/ALARM

26

CHILLED WATER COIL CONTROL VALVE

E

A

O

NO

-

-

-

27

CHILLED WATER TEMPERATURE - RETURN

E

A

I

NO

-

T, A, G

DEGREES F

28

HUMIDIFIER CONTROL VALVE

E

A

O

NO

-

-

-

29

HUMIDITY HIGH LIMIT ALARM

E

B

I

NO

F

E, A, G

-

30

SUPPLY FAN VFD STATUS

E

B

I

NO

G, F

E, A

-

31

SUPPLY FAN VFD START/STOP

E

B

0

NO

-

-

-

32

SUPPLY FAN VFD SPEED CONTROL

E

A

O

YES

-

T, A, G

% SPEED

33

SUPPLY FAN CURRENT STATUS SWITCH

E

B

I

NO

G, F

E, A

ON/OFF

34

SUPPLY FAN AIRFLOW VOLUME

E

A

I

NO

-

T, A, G

CFM

35

SUPPLY FAN DISCHARGE STATIC PRESSURE SWITCH

E

B

I

YES

C, H

E, A, G

INCHES W.C.

36

FINAL FILTER DIFFERENTIAL PRESSURE

E

A

I

YES

G, H

T, E, A, G

INCHES W.C.

37

SUPPLY AIR TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

38

SUPPLY AIR TEMPERATURE SETPOINT

E

A

O

YES

-

T, A, G

DEGREES F

39

SUPPLY AIR HUMIDITY

E

A

I

NO

-

T, A, G

% RELATIVE HUMIDITY

40

AHU SUPPLY AIR ISOLATION DAMPER POSITION

E

B

I

NO

-

E, A, G

OPEN/CLOSED

41

SUPPLY DUCT DIFFERENTIAL STATIC PRESSURE

E

A

I

YES

-

T, A, G

42

CARBON DIOXIDE LEVEL - RETURN AIR

E

A

I

NO

C, H

T, A, G

43

CARBON DIOXIDE LEVEL - OUTDOOR AIR

E

A

I

NO

C, H

T, A, G

44

CARBON DIOXIDE LEVEL - SUPPLY AIR

E

A

I

NO

C, H

T, A, G

-

OUTDOOR AIR REFERENCE TEMPERATURE

S

A

I

NO

-

T, A, G

DEGREES F

-

OUTDOOR AIR REFERENCE HUMIDITY

S

A

I

NO

-

T, A, G

% RELATIVE HUMIDITY

-

HEATING WATER TEMPERATURE - SUPPLY

S

A

I

NO

-

T, A, G

DEGREES F

-

CHILLED WATER TEMPERATURE - SUPPLY

S

A

I

NO

-

T, A, G

DEGREES F

-

FIRE ALARM STATUS

S

B

I

NO

C, F

E, A

NORMAL/ALARM

VENTILATION AIR CONTROL:

O

FREEZESTAT ALARM

FESSION PRO AL

S

25

HUMIDIFIER CONTROL: THE RETURN AIR RELATIVE HUMIDITY SETPOINT SHALL BE 30% (ADJUSTABLE). THE HUMIDIFIER CONTROL VALVE SHALL MODULATE TO MAINTAIN THE RETURN AIR RELATIVE HUMIDITY SETPOINT. THE DDC SYSTEM SHALL OVERRIDE THE SIGNAL TO THE HUMIDIFIER CONTROL VALVE TO LIMIT THE SUPPLY AIR RELATIVE HUMIDITY TO A MAXIMUM OF 70% (ADJUSTABLE). IF THE SUPPLY AIR RELATIVE HUMIDITY EXCEEDS 75% (ADJUSTABLE) AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE. WHENEVER THE OUTDOOR AIR DRY BULB REFERENCE TEMPERATURE IS ABOVE 40ºF (ADJUSTABLE), THE DDC SYSTEM SHALL CLOSE THE HUMIDIFIER CONTROL VALVE AND DISABLE THE ALARM.

ED

REG

. NO.

10229 ERIC G. SHERMAN U

A

A

T

E

REGIST ER

MIXED AIR HUMIDITY

R GINEE EN

WHENEVER THE DISCHARGE AIR TEMPERATURE IS BELOW THE SETPOINT, THE FOLLOWING SHALL OCCUR IN SEQUENCE: 1. THE CHILLED WATER CONTROL VALVE(S) SHALL MODULATE CLOSED. 2. IF THE OUTSIDE AIR ENTHALPY IS BELOW THE RETURN AIR ENTHALPY, THE OUTSIDE AIR DAMPER SHALL MODULATE CLOSED. THIS SHALL CONTINUE UNTIL THE SETPOINT IS ACHIEVED OR THE DAMPER IS IN THE MINIMUM OUTSIDE AIR POSITION. 3. IF THE SETPOINT CANNOT BE ACHIEVED BY DAMPER MODULATION, THE HEATING COIL CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN SETPOINT. 4. IF THE SETPOINT CANNOT BE ACHIEVED BY DAMPER MODULATION, THE HEATING COIL CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN SETPOINT. THE HEATING COIL PUMP SHALL START ON A CALL FOR HEAT IF THE OUTDOOR AIR REFERENCE TEMPERATURE IS BELOW 40° F (ADJUSTABLE). IF THE CURRENT STATUS SWITCH ON THE PUMP DOES NOT PROVE OPERATION, SEND AN ALARM TO THE OPERATOR INTERFACE. 5. IF THE SETPOINT CANNOT BE ACHIEVED BY DAMPER MODULATION, THE HEATING COIL CONTROL VALVE SHALL BE FULLY OPEN AND THE FACE AND BYPASS DAMPERS SHALL MODULATE TO MAINTAIN SETPOINT. 6. IF THE DISCHARGE AIR TEMPERATURE IS MORE THAN 10ºF (ADJUSTABLE) BELOW THE SETPOINT, SEND AN ALARM TO THE OPERATOR INTERFACE.

% RELATIVE HUMIDITY INCHES W.C.

20

DISCHARGE AIR TEMPERATURE SETPOINT SHALL BE 55ºF (ADJUSTABLE).

T H

K D A

O

11/25/14

MINIMUM OUTSIDE AIR: WHENEVER THE AIR HANDLING UNIT IS IN OCCUPIED MODE, THE OUTSIDE AIR DAMPER SHALL BE OPEN TO AT LEAST ITS MINIMUM POSITION. MIXED AIR TEMPERATURE: MONITOR THE MIXED AIR TEMPERATURE.

No.

Description

Date

AIRFLOW STATION: THE RETURN AIR DAMPER AND THE RELIEF AIR DAMPER SHALL MODULATE IN OPPOSITION TO MAINTAIN THE MINIMUM SCHEDULED OUTSIDE AIR CFM.

INCHES W.C. PARTS PER MILLION PARTS PER MILLION PARTS PER MILLION

CARBON DIOXIDE: THE OUTSIDE AIR DAMPER SHALL HAVE A MINIMUM POSITION THAT CORRESPONDS TO 5% (ADJUSTABLE) OF FULL AIRFLOW. THE OUTSIDE AIR DAMPER SHALL MODULATE TO MAINTAIN A RETURN AIR CARBON DIOXIDE LEVEL OF 700 PPM (ADJUSTABLE) ABOVE THE OUTSIDE AIR REFERENCE CARBON DIOXIDE LEVEL. THE MIXED AIR TEMPERATURE SHALL NOT BE ALLOWED TO FALL BELOW 40° F (ADJUSTABLE). AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE IF THE RETURN AIR CARBON DIOXIDE LEVEL EXCEEDS 1800 PPM. THE RETURN AIR DAMPER SHALL MODULATE IN OPPOSITION TO THE OUTSIDE AIR DAMPER AND THE RELIEF AIR DAMPER SHALL MODULATE IN UNISON WITH THE OUTSIDE AIR DAMPER. THE OUTSIDE AIRFLOW QUANTITY SHALL BE THE MAXIMUM OF THE DISCHARGE AIR CONTROL OR CARBON DIOXIDE CONTROL. UNIT SHUTDOWN:

THE SUPPLY, AND RETURN, AND RELIEF FANS SHALL STOP. THE OUTSIDE AIR DAMPERS AND RELIEF AIR DAMPERS SHALL CLOSE AND THE RETURN DAMPERS SHALL OPEN. THE CHILLED WATER CONTROL VALVE(S) SHALL CLOSE. THE ASSOCIATED CONDENSING UNIT SHALL BE DISABLED. THE HUMIDIFIER CONTROL VALVE AND THE HUMIDIFIER SHUT-OFF VALVE SHALL CLOSE. THE HEATING COIL CONTROL VALVE(S) SHALL CLOSE. FREEZESTAT SHALL OVERRIDE HEATING CONTROL VALVE(S) AS REQUIRED. ALL FIRE/SMOKE AND SMOKE DAMPERS ASSOCIATED WITH THE AIR HANDLING SYSTEM SHALL CLOSE.

UNOCCUPIED CONTROL:

OCCUPIED/UNOCCUPIED SCHEDULE SHALL BE SET AT THE OPERATOR INTERFACE. THE SUPPLY AND RETURN FANS SHALL SHUTDOWN. WHEN USING CONSTANT VOLUME OFFSET FOR RETURN AIR FAN CONTROL, THE OFFSET SHALL GO TO ZERO AND SUPPLY FAN SHALL BE LIMITED TO THE MAXIMUM RETURN FAN AIRFLOW. THE MINIMUM OUTSIDE AIR, OUTSIDE AIR, AND RELIEF AIR DAMPERS SHALL CLOSE AND THE RETURN AIR DAMPER SHALL OPEN. ECONOMIZER CYCLE SHALL TAKE PRECEDENCE OVER DAMPER POSITION. IF ANY OF THE SPACE TEMPERATURES FALL BELOW 60ºF (ADJUSTABLE), THE DDC SYSTEM SHALL RESTART THE SUPPLY AND RETURN FANS AND COOLING CAPABILITIES SHALL BE DISABLED. THE FANS SHALL CONTINUE RUNNING UNTIL THE SPACE TEMPERATURE RISES 5ºF (ADJUSTABLE). IF ANY OF THE SPACE TEMPERATURES RISE ABOVE 80ºF (ADJUSTABLE), THE DDC SYSTEM SHALL RESTART THE SUPPLY AND RETURN FANS AND MAINTAIN THE DISCHARGE AIR TEMPERATURE SETPOINT. THE FANS SHALL CONTINUE RUNNING UNTIL THE SPACE TEMPERATURE FALLS 5ºF (ADJUSTABLE). HEATING OPTIMUM START-UP: THIS CYCLE SHALL OVERRIDE THE UNOCCUPIED CYCLE. IF THE SYSTEM WAS OPERATING AS A RESULT OF THE UNOCCUPIED CYCLE, THE SYSTEM SHALL CONTINUE TO OPERATE. THE DDC SYSTEM SHALL MEASURE EACH OF THE SPACE TEMPERATURES AND THE OUTSIDE AIR DRY BULB REFERENCE TEMPERATURE TO DETERMINE THE MINIMUM RUN TIME TO WARM THE SPACES TO THEIR SETPOINT. WHEN THE COMPUTED START TIME IS REACHED, THE DDC SYSTEM SHALL START THE AIR HANDLING SYSTEM AND OPERATE WITH THE OUTSIDE AIR AND RELIEF AIR DAMPERS CLOSED AND THE RETURN AIR DAMPER OPEN. THE AIR HANDLING UNIT DISCHARGE AIR TEMPERATURE SHALL BE MAINTAINED AT A SETPOINT OF 85ºF (ADJUSTABLE). THE SYSTEM SHALL CONTINUE TO OPERATE IN THIS MODE UNTIL ALL TEMPERATURES EXCEED A SETPOINT OF 65ºF (ADJUSTABLE). AT THAT TIME, THE DDC SYSTEM SHALL SWITCH TO OCCUPIED CONTROL. THE VENTILATION AIR CONTROL SHALL BE INACTIVE. COOLING OPTIMUM START-UP: THE DDC SYSTEM SHALL MEASURE EACH OF THE SPACE TEMPERATURES AND THE OUTSIDE AIR DRY BULB REFERENCE TEMPERATURE TO DETERMINE THE MINIMUM RUN TIME TO COOL THE SPACES TO THEIR SETPOINT. WHEN THE COMPUTED START TIME IS REACHED, THE DDC SYSTEM SHALL START THE AIR HANDLING SYSTEM AND OPERATE WITH OUTSIDE AIR AND RELIEF AIR DAMPERS CLOSED AND THE RETURN AIR DAMPER OPEN. THE AIR HANDLING UNIT DISCHARGE AIR TEMPERATURE SHALL BE MAINTAINED AT A SETPOINT OF 55ºF (ADJUSTABLE). THE SYSTEM SHALL CONTINUE TO OPERATE IN THIS MODE UNTIL ALL SPACE TEMPERATURES ARE LESS THAN A SETPOINT OF 78ºF (ADJABLE). AT THAT TIME, THE DDC SYSTEM SHALL SWITCH TO OCCUPIED CONTROL. THE ECONOMIZER CYCLE SHALL TAKE PRECEDENCE OVER THIS MODE OF CONTROL. THE VENTILATION AIR CONTROL SHALL BE INACTIVE.

FILTER MONITORING:

FOR EACH FILTER BANK WITH RATING OF MERV 8 AND BELOW, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 0.75" W.C. (ADJUSTABLE). FOR EACH FILTER BANK WITH RATING OF MERV 14 AND ABOVE, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 1.25" W.C. (ADJUSTABLE).

ALARM MONITORING:

FREEZESTAT: INSTALL AN ELECTRIC FREEZESTAT, LOCATED DOWNSTREAM OF THE HEATING COIL PER MANUFACTURER'S RECOMMENDATION, TO SHUT DOWN THE UNIT IF THE TEMPERATURE DOWNSTREAM OF THE HEATING COIL DROPS BELOW 35ºF (ADJUSTABLE). THE ELECTRIC FREEZESTAT SHALL ACT INDEPENDENTLY OF THE DDC SYSTEM VIA RELAYS AND SHALL OVERRIDE THE DDC SYSTEM TO SHUT DOWN THE AIR HANDLING UNIT. A SECOND SET OF CONTACTS SHALL NOTIFY THE DDC SYSTEM THAT SHALL SEND AN ALARM TO THE OPERATOR INTERFACE (MANUAL RESET TYPE). FIRE ALARM INTERFACE: UPON ACTUATION OF THE FIRE ALARM SYSTEM, THE UNIT SHALL BE SHUT DOWN AND ALL FIRE/SMOKE AND SMOKE DAMPERS WITHIN THIS SYSTEM SHALL CLOSE. THE FIRE ALARM SYSTEM SHALL NOTIFY THE OPERATOR INTERFACE WHENEVER AN ALARM CONDITION IS EXPERIENCED.

GENERAL NOTES REMARKS (1) E = ELECTRIC (2) A = ANALOG (3) I = INPUT (4) G = GENERAL (5) T = TRENDING

1

P = PNEUMATIC B = BINARY O = OUTPUT C = CRITICAL E = EVENT HISTORY

S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK

H = HIGH LIMIT A = ARCHIVE

L = LOW LIMIT TT=TOTALIZATION

O = BY OTHERS

F = FAILURE G = GRAPHICAL POINT

1. 2. 3. 4. 5.

SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES AND MUST BE WITHIN 3 FEET OF CEILING. WIRE ALL SENSORS AND CONTROL DEVICES BACK TO CONTROLLER. COORDINATE ALL CASING AND DUCT PENETRATIONS WITH FURNISHING CONTRACTOR. ENSURE ALL PENETRATIONS ARE PROPERLY SEALED. DUCT STATIC PRESSURE SENSORS SHALL BE LOCATED APPROXIMATELY 2/3 OF THE DUCT RUN AWAY FROM THE AIR HANDLING EQUIPMENT. REFER TO FLOOR PLANS FOR LOCATIONS.

SACRED HEART

2014

C

4TH & 5TH CONTROL SCHEMATICS

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520

AHU-10 CONTROL NONE www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:49 PM

M990 Scale

NONE

LOOP #1

LOOP #2

5

TO/FROM SECONDARY PUMPS

10

TO/FROM PRIMARY PUMPS

TO/FROM LOAD

SPACE BOUNDARY

TO/FROM LOAD

AVERA FACILITY DEVELOPMENT H

4

9

T 8

06

6

02

1

3

04

05

HWR

ACTUATOR CHILLED WATER SYSTEM INTERCONNECTION HEAT EXCHANGER

T

C CONTROLLER

HWS

2

S

03

08

01

07 7 TEMPERATURE CONTROL WIRING (TYP.)

DIRECT DIGITAL CONTROL POINTS LIST

DIRECT DIGITAL CONTROL POINTS LIST POINT ID

SPACE BOUNDARY

SOURCE (1)

TYPE (2)

I/O (3)

SETPOINT ADJUSTMENT

ALARMS (4)

APPLICATIONS (5)

UNITS

POINT ID

SOURCE (1)

TYPE (2)

I/O (3)

SETPOINT ADJUSTMENT

ALARMS (4)

APPLICATIONS (5)

UNITS

01

LOOP #1 HEAT EXCHANGER ENTERING TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

01

TERMINAL AIR BOX DISCHARGE AIR TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

02

LOOP #1 HEAT EXCHANGER LEAVING TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

02

SPACE TEMPERATURE SETPOINT

E

A

I

YES

-

T, A, G

DEGREES F

03

LOOP #1 HEAT EXCHANGER CONTROL VALVE

E

A

O

NO

-

G

100% OPEN

03

SPACE TEMPERATURE

E

A

I

NO

G, H, L

T, A, G

DEGREES F

04

LOOP #1 DIVERTER VALVE

E

A

O

NO

-

G

SUPPLY/RETURN

04

TERMINAL AIR BOX DAMPER ACTUATOR

E

A

O

NO

-

-

-

05

LOOP #1 SELECTOR VALVE

E

A

O

NO

-

G

HX/LOOP

05

TERMINAL AIR BOX DAMPER POSITION

E

A

I

NO

-

T, A, G

% OPEN

1.

SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER.

06

LOOP #2 HEAT EXCHANGER ENTERING TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

06

AIRFLOW VOLUME

E

A

I

NO

-

T, A, G

CFM

2.

CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES AND MUST BE WITHIN 3 FEET OF CEILING.

07

LOOP #2 HEAT EXCHANGER LEAVING TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

07

REHEAT COIL CONTROL VALVE

E

A

O

NO

-

-

-

3.

WHERE MULTIPLE SPACES ARE SEVERED BY A SINGLE TERMINAL AIR BOX, WIRE ALL OCCUPANCY SENSORS TO TERMINAL AIR BOX CONTROLLER.

08

LOOP #2 HEAT EXCHANGER CONTROL VALVE

E

A

O

NO

-

G

100% OPEN

08

OCCUPANCY SENSOR

E

B

I

NO

-

T, A, G

OCC/UNOCC

09

LOOP #2 DIVERTER VALVE

E

A

O

NO

-

G

SUPPLY/RETURN

10

LOOP #2 SELECTOR VALVE

E

A

O

NO

-

G

HX/LOOP

SEQUENCE OF OPERATION H

T PERIMETER RADIATION

02

REMARKS (1) E = ELECTRIC (2) A = ANALOG (3) I = INPUT (4) G = GENERAL (5) T = TRENDING

CONTROLLER TEMPERATURE CONTROL WIRING (TYP.)

ON A FALL IN SPACE TEMPERATURE THE PERIMETER RADIATION CONTROL VALVE SHALL MODULATE OPEN IN UNTIL SETPOINT IS MAINTAINED.

HWS

WHEN THE OUTDOOR REFERENCE TEMPERATURE IS ABOVE 65°F (ADJUSTABLE) THE PERIMETER RADIATION CONTROL VALVE SHALL BE CLOSED. WHEN THE OUTDOOR REFERENCE TEMPERATURE IS BELOW 65°F (ADJUSTABLE) THE PERIMETER RADIATION CONTROL VALVE SHALL BE ALLOWED TO OPERATE BASED ON THE FOLLOWING:

HWR

C

03

DESCRIPTION

DIRECT DIGITAL CONTROL POINTS LIST

O = BY OTHERS

HEAT EXCHANGER CONTROL:

SOURCE (1)

TYPE (2)

I/O (3)

SETPOINT ADJUSTMENT

ALARMS (4)

APPLICATIONS (5)

UNITS

E

A

I

YES

-

T, A, G

DEGREES F

02

SPACE TEMPERATURE

E

A

I

NO

G, H, L

T, A, G

DEGREES F

03

PERIMETER RADIATION CONTROL VALVE

E

A

O

NO

-

-

-

04

OUTDOOR REFERENCE DRY BULB TEMPERATURE

S

A

I

NO

-

-

-

SEQUENCE OF OPERATION H = HIGH LIMIT A = ARCHIVE

L = LOW LIMIT TT=TOTALIZATION

F = FAILURE G = GRAPHICAL POINT

EACH ZONE HAS A TERMINAL AIR BOX WITH A HOT WATER REHEAT COIL, REHEAT COIL CONTROL VALVE, AND DIRECT DIGITAL CONTROLLER. INSTALL A SINGLE POINT TEMPERATURE SENSOR 2'-0" DOWNSTREAM OF THE REHEAT COIL. INSTALL A WALL MOUNTED TEMPERATURE SENSOR TO MAINTAIN SPACE TEMPERATURE OF 72°F (ADJUSTABLE) WITH A DEAD BAND RANGE OF 5°F WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS REDUCED TO A MINIMUM. SEE DRAWINGS FOR TEMPERATURE SENSOR REQUIREMENTS.

THE SYSTEM CONSISTS OF A PLATE AND FRAME HEAT EXCHANGER INTERCONNECTING TWO EXISTING CHILLED WATER LOOPS. LOOP #1 IS A CONSTANT PRIMARY, VARIABLE SECONDARY ARRANGEMENT CONSISTING OF TWO WATER COOLED CHILLERS. LOOP #2 IS A VARIABLE PRIMARY ARRANGMENT CONSISTING OF ONE AIR COOLED CHILLER.

WHEN THE SENSOR INDICATES THAT THE ROOM IS OCCUPIED, THE TERMINAL AIR BOX SERVING THE ROOM WILL OPERATE IN ITS NORMAL MODE. WHEN THE SENSOR INDICATES THAT THE ROOM IS UNOCCUPIED, THE TERMINAL AIR BOX SERVING THE ROOM WILL GO TO UNOCCUPIED MODE. IN UNOCCUPIED MODE, THE TERMINAL AIR BOX WILL INITIALLY CLOSE, OVERRIDING THE MINIMUM AIRFLOW SETTING. THE TERMINAL AIR BOX WILL THEN OPERATE TO MAINTAIN THE SPACE TEMPERATURE ABOVE 55 DEGREES (ADJUSTABLE) AND BELOW 85 DEGREES (ADJUSTABLE). WHERE MULTIPLE ROOMS ARE SERVED BY A SINGLE TERMINAL AIR BOX, THE TERMINAL AIR BOX WILL OPERATE IN THE OCCUPIED MODE WHENEVER ANY ONE OF THE ROOMS BEING SERVED IS DETERMINED TO BE OCCUPIED. ALL ROOMS MUST BE DETERMINED TO BE UNOCCUPIED TO INITIATE THE UNOCCUPIED MODE.

THE PRIMARY FUNCTION OF THE INTERCONNECTION IS TO PROVIDE SWING SEASON CHILLED WATER TO THE EQUIPMENT SERVED BY LOOP #1. THE SECONDARY FUNCTION IS TO PROVIDE EMERGENCY BACKUP TO THE EQUIPMENT SERVED BY LOOP #2.

AT FULL COOLING, THE TERMINAL AIR BOX SHALL BE OPEN TO MAXIMUM CFM POSITION. THE REHEAT COIL CONTROL VALVE SHALL BE CLOSED.

WHEN ALL CHILLERS ARE ENABLED AND AVAILABLE, THE CONTROL VALVES FOR THE HEAT EXCHANGER SHALL BE CLOSED AND NO HEAT TRANSFER SHALL OCCUR.

ON A FALL IN SPACE TEMPERATURE, THE TERMINAL AIR BOX SHALL MODULATE CLOSED UNTIL SPACE SETPOINT IS MAINTAINED OR UNTIL IT REACHES ITS MINIMUM CFM POSITION. THE REHEAT COIL CONTROL VALVE SHALL BE CLOSED.

WHEN THE AIR COOLED CHILLER IS ENABLED AND AVAILABLE AND THE WATER COOLED CHILLERS ARE DISABLED, THE FOLLOWING SHALL OCCUR:

ON A FURTHER FALL IN SPACE TEMPERATURE THE TERMINAL AIR BOX AND REHEAT COIL CONTROL VALVE SHALL MODULATE OPEN IN UNISON UNTIL SETPOINT IS MAINTAINED OR UNTIL SPECIFIED MAXIMUM HEATING CFM POSITION IS REACHED.

1. 2. 3. 4. 5.

THE LOOP #1 CONTROL VALVE SHALL BE 100% OPEN. THE LOOP #2 CONTROL VALVE SHALL MODULATE TO MAINTAIN LOOP #1 SUPPLY WATER TEMPERATURE SETPOINT. THE LOOP #1 DIVERTER VALVE SHALL BE SET TO SEND RETURN WATER TO FROM THE HEAT EXCHANGER TO THE SUPPLY MAIN. THE LOOP #2 DIVERTER VALVE SHALL BE SET TO SEND RETURN WATER TO FROM THE HEAT EXCHANGER TO THE RETURN MAIN. THE LOOP #1 SELECTOR VAVLE SHALL BE 50% OPEN (ADJUSTABLE). BALANCER SHALL DETERMIN %OPEN REQUIRED FOR PROPER OPERATION AND VALUE SHALL BE RECORDED WITHIN THE BAS. 6. THE LOOP #2 SELECTOR VALVE SHALL BE 100% OPEN.

RADIANT PANEL CONTROL NONE

H = HIGH LIMIT A = ARCHIVE

L = LOW LIMIT TT=TOTALIZATION

1. 2. 3. 4. 5. 6.

O = BY OTHERS

F = FAILURE G = GRAPHICAL POINT

2

OCCUPANCY OPTIMUM RECOVERY: THIS CYCLE SHALL OVERRIDE THE OCCUPIED CONTROL CYCLE. IF THE SPACE TEMPERATURE IS MORE THAN 3 DEGREES (ADJUSTABLE) BELOW THE OCCUPIED SETPOINT AND ANY OCCUPANCY SENSOR INDICATES OCCUPANCY, THE VAV BOX AND REHEAT COIL CONTROL VALVE SHALL MODULATE TO FULLY OPEN AND SHALL REMAIN FULLY OPEN UNTIL SETPOINT IS REACHED. ONCE SETPOINT IS REACHED, CONTROL SHALL RETURN TO NORMAL OPERATION. IF THE SPACE TEMPERATURE IS MORE THAN 3 DEGREES (ADJUSTABLE) ABOVE THE OCCUPIED SETPOINT AND ANY OCCUPANCY SENSOR INDICATES OCCUPANCY, THE VAV BOX SHALL MODULATE TO FULLY OPEN AND THE REHEAT COIL CONTROL VALVE SHALL MODULATE TO FULLY CLOSED AND THEY SHALL REMAIN AT THESE OPERATING POINTS UNTIL SETPOINT IS REACHED. ONCE SETPOINT IS REACHED, CONTROL SHALL RETURN TO NORMAL OPERATION.

FESSION PRO AL REG

. NO.

10229 ERIC G. SHERMAN U

T H

K D A

O

11/25/14

No.

Description

Date

THE DDC SYSTEM SHALL UTILIZE FEEDBACK FROM ALL TERMINAL AIR BOX POSITIONS TO RESET THE SUPPLY DUCT DIFFERENTIAL STATIC PRESSURE.

THE LOOP #1 CONTROL VALVE SHALL MODULATE TO MAINTAIN LOOP #1 SUPPLY WATER TEMPERATURE SETPOINT. THE LOOP #2 CONTROL VALVE SHALL BE 100% OPEN. THE LOOP #1 DIVERTER VALVE SHALL BE SET TO SEND RETURN WATER TO FROM THE HEAT EXCHANGER TO THE RETURN MAIN. THE LOOP #2 DIVERTER VALVE SHALL BE SET TO SEND RETURN WATER TO FROM THE HEAT EXCHANGER TO THE SUPPLY MAIN. 5. THE 5. THE LOOP #1 SELECTOR VAVLE SHALL BE 100% OPEN. THE LOOP #2 SELECTOR VALVE SHALL BE 100% CLOSED.

CHILLED WATER SYSTEM INTERCONNECTION CONTROL NONE

ED

IF HEATING WATER SYSTEM TEMPERATURE IS 5°F (ADJUSTABLE) BELOW SETPOINT ON A CALL FOR HEATING THE TERMINAL AIR BOX SHALL REMAIN AT ITS MINIMUM CFM POSITION.

WHEN THE AIR COOLED CHILLER IS DISABLED AND THE WATER COOLED CHILLERS ARE ENABLED AND AVAILABLE, THE FOLLOWING SHALL OCCUR: S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK

F = FAILURE G = GRAPHICAL POINT

L = LOW LIMIT TT=TOTALIZATION

O

SPACE TEMPERATURE SETPOINT

P = PNEUMATIC B = BINARY O = OUTPUT C = CRITICAL E = EVENT HISTORY

H = HIGH LIMIT A = ARCHIVE

S

01

REMARKS (1) E = ELECTRIC (2) A = ANALOG (3) I = INPUT (4) G = GENERAL (5) T = TRENDING

O = BY OTHERS

R GINEE EN

POINT DESCRIPTION

S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK

S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK

SEQUENCE OF OPERATION

IF HEATING WATER SYSTEM TEMPERATURE IS 5°F (ADJUSTABLE) BELOW SETPOINT ON A CALL FOR HEATING AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE.

POINT ID

P = PNEUMATIC B = BINARY O = OUTPUT C = CRITICAL E = EVENT HISTORY

P = PNEUMATIC B = BINARY O = OUTPUT C = CRITICAL E = EVENT HISTORY

A

01

REMARKS (1) E = ELECTRIC (2) A = ANALOG (3) I = INPUT (4) G = GENERAL (5) T = TRENDING

T

EACH ZONE HAS A DIRECT DIGITAL CONTROLLER AND PERIMETER RADIATION WITH PERIMETER RADIATION CONTROL VALVE. INSTALL A WALL MOUNTED TEMPERATURE SENSOR TO MAINTAIN SPACE TEMPERATURE OF 68°F (ADJUSTABLE) WITH A DEAD BAND RANGE OF 5°F WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS REDUCED TO A MINIMUM. SEE DRAWINGS FOR TEMPERATURE SENSOR REQUIREMENTS.

3

POINT DESCRIPTION

REGIST ER

GENERAL NOTES

POINT DESCRIPTION

GENERAL NOTES 1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER. 2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES AND MUST BE WITHIN 3 FEET OF CEILING. 3. WHERE MULTIPLE SPACES ARE SEVERED BY A SINGLE TERMINAL AIR BOX, WIRE ALL OCCUPANCY SENSORS TO TERMINAL AIR BOX CONTROLLER.

1

VAV BOX CONTROL - TYPICAL NONE

SACRED HEART

2014

C

4TH & 5TH CONTROL SCHEMATICS

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:51 PM

M991 Scale

NONE

ROOM EXHAUST BALANCED TO 12 ACH.

ROOM EXHAUST BALANCED TO 12 ACH.

NEGATIVE AIR ROOM

H MECHANICAL AIRFOW INDICATOR

CONTROLLER

06

T

C

03

02

ACTUATOR

01

04

05

CONTROLLER

07

MECHANICAL AIRFOW INDICATOR

03

01

07

TEMPERATURE CONTROL WIRING (TYP.)

TOILET ROOM

ROOM EXHAUST BALANCED TO 10 ACH.

TEMPERATURE CONTROL WIRING (TYP.)

DIRECT DIGITAL CONTROL POINTS LIST POINT ID

POINT DESCRIPTION

DIRECT DIGITAL CONTROL POINTS LIST

SOURCE (1)

TYPE (2)

I/O (3)

SETPOINT ADJUSTMENT

ALARMS (4)

APPLICATIONS (5)

UNITS

POINT ID

POINT DESCRIPTION

SOURCE (1)

TYPE (2)

I/O (3)

SETPOINT ADJUSTMENT

ALARMS (4)

APPLICATIONS (5)

UNITS

01

TERMINAL AIR BOX DISCHARGE AIR TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

01

TERMINAL AIR BOX DISCHARGE AIR TEMPERATURE

E

A

I

NO

-

T, A, G

DEGREES F

02

SPACE TEMPERATURE SETPOINT

E

A

I

YES

-

T, A, G

DEGREES F

02

SPACE TEMPERATURE SETPOINT

E

A

I

YES

-

T, A, G

DEGREES F

03

SPACE TEMPERATURE

E

A

I

NO

G, H, L

T, A, G

DEGREES F

03

SPACE TEMPERATURE

E

A

I

NO

G, H, L

T, A, G

DEGREES F

04

TERMINAL AIR BOX DAMPER ACTUATOR

E

A

O

NO

-

-

-

04

TERMINAL AIR BOX DAMPER ACTUATOR

E

A

O

NO

-

-

-

05

TERMINAL AIR BOX DAMPER POSITION

E

A

I

NO

-

T, A, G

% OPEN

05

TERMINAL AIR BOX DAMPER POSITION

E

A

I

NO

-

T, A, G

% OPEN

06

AIRFLOW VOLUME

E

A

I

NO

-

T, A, G

CFM

06

AIRFLOW VOLUME

E

A

I

NO

-

T, A, G

CFM

07

REHEAT COIL CONTROL VALVE

E

A

O

NO

-

-

-

07

REHEAT COIL CONTROL VALVE

E

A

O

NO

-

-

-

REMARKS (1) E = ELECTRIC (2) A = ANALOG (3) I = INPUT (4) G = GENERAL (5) T = TRENDING

P = PNEUMATIC B = BINARY O = OUTPUT C = CRITICAL E = EVENT HISTORY

S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK

O = BY OTHERS

H = HIGH LIMIT A = ARCHIVE

F = FAILURE G = GRAPHICAL POINT

L = LOW LIMIT TT=TOTALIZATION

REMARKS (1) E = ELECTRIC (2) A = ANALOG (3) I = INPUT (4) G = GENERAL (5) T = TRENDING

P = PNEUMATIC B = BINARY O = OUTPUT C = CRITICAL E = EVENT HISTORY

S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK

O = BY OTHERS

H = HIGH LIMIT A = ARCHIVE

F = FAILURE G = GRAPHICAL POINT

L = LOW LIMIT TT=TOTALIZATION

EACH ZONE HAS A TERMINAL AIR BOX WITH A HOT WATER REHEAT COIL, REHEAT COIL CONTROL VALVE, AND DIRECT DIGITAL CONTROLLER. INSTALL A SINGLE POINT TEMPERATURE SENSOR 2'-0" DOWNSTREAM OF THE REHEAT COIL. INSTALL A WALL MOUNTED TEMPERATURE SENSOR TO MAINTAIN SPACE TEMPERATURE OF 72°F (ADJUSTABLE) WITH A DEAD BAND RANGE OF 5°F WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS REDUCED TO A MINIMUM. SEE DRAWINGS FOR TEMPERATURE SENSOR REQUIREMENTS.

EACH ZONE HAS A TERMINAL AIR BOX WITH A HOT WATER REHEAT COIL, REHEAT COIL CONTROL VALVE, AND DIRECT DIGITAL CONTROLLER. INSTALL A SINGLE POINT TEMPERATURE SENSOR 2'-0" DOWNSTREAM OF THE REHEAT COIL. INSTALL A WALL MOUNTED TEMPERATURE SENSOR TO MAINTAIN SPACE TEMPERATURE OF 72°F (ADJUSTABLE) WITH A DEAD BAND RANGE OF 5°F WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS REDUCED TO A MINIMUM. SEE DRAWINGS FOR TEMPERATURE SENSOR REQUIREMENTS.

AT FULL COOLING, THE TERMINAL AIR BOX SHALL BE OPEN TO MAXIMUM CFM POSITION. THE REHEAT COIL CONTROL VALVE SHALL BE CLOSED.

AT FULL COOLING, THE TERMINAL AIR BOX SHALL BE OPEN TO MAXIMUM CFM POSITION. THE REHEAT COIL CONTROL VALVE SHALL BE CLOSED.

ON A FALL IN SPACE TEMPERATURE THE REHEAT COIL CONTROL VALVE SHALL MODULATE OPEN IN UNISON UNTIL SETPOINT IS MAINTAINED.

ON A FALL IN SPACE TEMPERATURE THE REHEAT COIL CONTROL VALVE SHALL MODULATE OPEN IN UNISON UNTIL SETPOINT IS MAINTAINED.

IF THE SPACE TEMPERATURE VARIES MORE THAN 5°F (ADJUSTABLE) FROM SETPOINT, SEND ALARM TO THE OPERATOR INTERFACE.

IF THE SPACE TEMPERATURE VARIES MORE THAN 5°F (ADJUSTABLE) FROM SETPOINT, SEND ALARM TO THE OPERATOR INTERFACE.

THE DDC SYSTEM SHALL UTILIZE FEEDBACK FROM ALL TERMINAL AIR BOX POSITIONS TO RESET THE SUPPLY DUCT DIFFERENTIAL STATIC PRESSURE.

THE DDC SYSTEM SHALL UTILIZE FEEDBACK FROM ALL TERMINAL AIR BOX POSITIONS TO RESET THE SUPPLY DUCT DIFFERENTIAL STATIC PRESSURE.

GENERAL NOTES 1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER. 2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES AND MUST BE WITHIN 3 FEET OF CEILING. 3. WHERE MULTIPLE SPACES ARE SEVERED BY A SINGLE TERMINAL AIR BOX, WIRE ALL OCCUPANCY SENSORS TO TERMINAL AIR BOX CONTROLLER. 4. SEAL ALL SPACE BOUNDARY PENETRATIONS AIR TIGHT. PENETRATION SEALS MUST INCLUDE EXTERIOR AND INTERIOR OF CONDUITS.

GENERAL NOTES 1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER. 2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES AND MUST BE WITHIN 3 FEET OF CEILING. 3. WHERE MULTIPLE SPACES ARE SEVERED BY A SINGLE TERMINAL AIR BOX, WIRE ALL OCCUPANCY SENSORS TO TERMINAL AIR BOX CONTROLLER. 4. SEAL ALL SPACE BOUNDARY PENETRATIONS AIR TIGHT. PENETRATION SEALS MUST INCLUDE EXTERIOR AND INTERIOR OF CONDUITS.

REGIST ER

SEQUENCE OF OPERATION

ED

FESSION PRO AL

S O

2

NEGATIVE AIR ROOM CONTROL

1

NONE

ISOLATION ROOM CONTROL NONE

REG

. NO.

R GINEE EN

SEQUENCE OF OPERATION

10229 ERIC G. SHERMAN U

A

05

HWR

04

HWS

02

ACTUATOR

T

T

C

MECHANICAL AIRFOW INDICATOR

TOILET ROOM

T

06

AVERA FACILITY DEVELOPMENT

ANTEROOM

H

HWS

T

ROOM SUPPLY AIR BALANCED TO MAINTAIN -0.01IN W.C. DIFFERENTIAL PRESSURE BETWEEN ROOM AND CORRIDOR.

HWR

ROOM SUPPLY AIR BALANCED TO MAINTAIN -0.01IN W.C. DIFFERENTIAL PRESSURE BETWEEN ROOM AND CORRIDOR.

NEGATIVE AIR ROOM

ROOM EXHAUST BALANCED TO 10 ACH.

ANTIROOM EXHAUST BALANCED TO 12 ACH.

T H

K D A

O

11/25/14

No.

Description

Date

GENERAL NOTES 1.

SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER.

2.

CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES. THE TERMINAL BOX CONTROLLER MUST BE WITHIN 3 FEET OF CEILING.

FAN

MOTOR CONTROLLER 01 02

SEQUENCE OF OPERATION EACH FAN HAS AN ISOLATION DAMPER WITH END SWITCH TO PROVE DAMPER OPEN AND CURRENT STATUS SWITCH TO PROVE FAN OPERATION. IF THE END SWITCH DOES NOT PROVE OPEN, SEND AN ALARM TO THE OPERATOR INTERFACE. IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, SEND AND ALARM TO THE USER INTERFACE.

ACTUATOR 03

04

FAN SHALL RUN CONTINUOUSLY. MOTORIZED DAMPER SHALL CLOSE ON LOSS OF POWER TO FAN.

DIRECT DIGITAL CONTROL POINTS LIST POINT ID

POINT DESCRIPTION

TYPE (2)

I/O (3)

SETPOINT ADJUSTMENT

ALARMS (4)

APPLICATIONS (5)

UNITS

01

EXHAUST FAN STATUS

E

B

I

NO

G, F

E, A, G

ON/OFF

02

EXHAUST FAN START/STOP

E

B

0

NO

-

-

-

03

EXHAUST FAN ISOLATION DAMPER ACTUATOR

E

A

O

NO

-

T, A, G

-

04

EXHAUST FAN ISOLATION DAMPER POSITION

E

B

I

NO

F

T, A, G

OPEN/CLOSED

REMARKS (1) E = ELECTRIC (2) A = ANALOG (3) I = INPUT (4) G = GENERAL (5) T = TRENDING

3

SOURCE (1)

P = PNEUMATIC B = BINARY O = OUTPUT C = CRITICAL E = EVENT HISTORY

S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK

H = HIGH LIMIT A = ARCHIVE

L = LOW LIMIT TT=TOTALIZATION

SACRED HEART

2014

C

4TH & 5TH CONTROL SCHEMATICS

COPYRIGHT

O = BY OTHERS

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW.

F = FAILURE G = GRAPHICAL POINT

DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520

EXHAUST FAN CONTROL NONE www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 4:38:52 PM

M992 Scale

NONE

ELECTRICAL SYMBOLS LIGHTING AND POWER

CEILING TROFFER FIXTURE

X

STRIP FIXTURE

LINEAR WALL FIXTURE

X

WALL FIXTURE

DOWN LIGHT FIXTURE SHADED FIXTURES REPRESENT BATTERY PACKS OR EMERGENCY CIRCUIT

WALL MOUNTED EXIT SIGN WITH DIRECTIONAL ARROW X

CEILING MOUNTED EXIT SIGN WITH DIRECTIONAL ARROW

X X

3 D

4

SWITCH - 4-WAY

SWITCH - 3-WAY WALL BOX DIMMER

MC

SWITCH - MOMENTARY CONTACT

Z

CEILING OCCUPANCY SENSOR (CONTROL PANEL RELAY - ZONE) RECEPTACLE - SINGLE RECEPTACLE - DOUBLE DUPLEX

G

RECEPTACLE - DUPLEX - GFCI

* T

RECEPTACLE - DUPLEX - EXTRA HEAVY DUTY RECEPTACLE - DUPLEX - SAFETY TYPE (TAMPER RESISTANT)

RECEPTACLE - DOUBLE DUPLEX - EMERGENCY (RED)

RECEPTACLE - DUPLEX - EMERGENCY (RED) RECEPTACLE - DUPLEX - CEILING MOUNTED

RECEPTACLE - SPECIAL PURPOSE - (NEMA CONFIG. AS NOTED) MULTI-OUTLET ASSEMBLY - LENGTH AS INDICATED

3

RACO 697

3-1/2"

CONDUIT SIZE 1"

CONDUIT STUB LOCATION DOME LIGHT

REMARKS NOTE 1

AVERA FACILITY DEVELOPMENT

DOME LIGHT

352000

1

RACO 695

3-1/2"

1"

CABLE TRAY

NOTE 1

RACO 695

3-1/2"

1"

CABLE TRAY

NOTE 1

RACO 695

3-1/2"

1"

DOME LIGHT

NOTE 1

RACO 695

3-1/2"

1"

DOME LIGHT

NOTE 1

RACO 695

3-1/2"

1"

DOME LIGHT

NOTE 1

VERIFY

3-1/2"

VERIFY

VERIFY

--

RACO 695

3-1/2"

NOTE 4

CABLE TRAY

NOTE 1

VERIFY

VERIFY

VERIFY

VERIFY

--

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION. NC ZONE

ZONE LIGHT

352000

1

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION. NC PULL

BRANCH CIRCUIT CONCEALED IN CEILING OR WALL

TELEVISION OUTLET: REFER TO SUPPLEMENTAL SYMBOL LEGENDS AND DETAILS FOR FURTHER REQUIREMENTS.

TV

J J J PHOTOCELL

PULL CORD

354001

1

CIRCUIT UP CONDUIT STUB-OUT

SPECIAL PURPOSE HOMERUN AS INDICATED

CIRCUIT BREAK

SAFETY SWITCH - FUSED UNLESS OTHERWISE NOTED

COMBINATION MAGNETIC STARTER/DISCONNECT SWITCH & FUSE FLOOR SLEEVE DESIGNATION

"W" INDICATES WALL MOUNTED UNLESS NOTED OTHERWISE

AUTOMATIC SMOKE DETECTOR - CEILING

F

STROBE - CEILING

AUTOMATIC HEAT DETECTOR - CEILING

F

SAMPLING TUBE TYPE SMOKE DETECTOR

F

HORN - CEILING HORN & STROBE COMBINATION - CEILING

F

SPEAKER - CEILING

F

MAGNETIC DOOR HOLDER

F

SPEAKER & STROBE COMBINATION - CEILING CHIME - CEILING

F

FIRE SPRINKLER VALVE TAMPER SWITCH

F

CHIME & STROBE COMBINATION - CEILING

F F

FIRE SPRINKLER FLOW SWITCH

F CM

CONTROL MODULE

MANUAL STATION

F MM

MONITORING MODULE

CEILING SPEAKER

IC

INTERCOM STATION

IC

INTERCOM CONTROL PANEL

F1

SOUND EXAMPLE C5 C5S

FLOOR COMMUNICATIONS FIRE RATED PATHWAY: PROVIDE "EZ-PATH" FIRE RATED PATHWAY THROUGH FLOOR. INSTALL PER MANUFACTURERS RECOMMENDATIONS. SLEEVE DESIGNATIONS PER PLANS. PROVIDE SLEEVES AS FOLLOWS: (F1) - CATALOG NO. EZDP144FK. (1-4"x4" PATHWAY) (F2) - PROVIDE EZ-PATH GRID SYSTEM CATALOG NO. EZDG444 AND (1) PATHWAY MODULE CATALOG NO. EZD444MB. (4-4"x4" PATHWAYS) (F3) - PROVIDE EZ-PATH GRID SYSTEM CATALOG NO. EZG844 AND (1) PATHWAY MODULE CATALOG NO. EZD444MB. (4-4"x4" PATHWAYS AND 4-4"x4" SPACES) (F4) - PROVIDE EZ-PATH GRID SYSTEM CATALOG NO. EZG844 AND (2) PATHWAY MODULES CATALOG NO. EZD444MB. (8-4"x4" PATHWAYS) (F5) - PROVIDE EZ-PATH GRID SYSTEM CATALOG NO. EZG1644 AND (2) PATHWAY MODULES CATALOG NO. EZD444MB. (8-4"x4" PATHWAYS AND 8-4"x4" SPACES) (F6) - PROVIDE EZ-PATH GRID SYSTEM CATALOG NO. EZG1644 AND (3) PATHWAY MODULES CATALOG NO. EZD444MB. (12-4"x4" PATHWAYS AND 4-4"x4" SPACES) (F7) - PROVIDE EZ-PATH GRID SYSTEM CATALOG NO. EZG1644 AND (4) PATHWAY MODULES CATALOG NO. EZD444MB. (16-4"x4" PATHWAYS)

NC PB

DOOR CONTACT CR

CARD READER

DO

DOOR OPENER

SC DP

SECURITY CONTROL PANEL DOOR PLATE

C5E

MISCELLANEOUS

12x4

RT

SUBSCRIPT "RT" APPLIED TO ANY SYMBOL INDICATES RAINTIGHT NEMA 3R OR EQUIVALENT

E

SUBSCRIPT "E" ADDED TO ANY SYMBOL INDICATES EXISTING

P

SUBSCRIPT "P" ADDED TO ANY SYMBOL INDICATES PILOT LIGHT

V

SUBSCRIPT "V" ADDED TO ANY SYMBOL INDICATES VOICE

SUBSCRIPT "W" ADDED TO ANY SYMBOL INDICATES WALL PHONE

D

SUBSCRIPT "D" ADDED TO ANY SYMBOL INDICATES DATA

W #

R

SUBSCRIPT "R" ADDED TO ANY SYMBOL INDICATES REUSED

C

SUBSCRIPT "C" ADDED TO ANY SYMBOL INDICATES CEILING

PART

12x4

SHEET NOTE SUBSCRIPT "PART" ADDED TO ANY SYMBOL INDICATES PARTIAL

NC BED

EXTENSION MODULE: PROVIDE EXTENSION MODULE "EZ-PATH" CATALOG NO. EZD33E AT FIRE RATED PATHWAYS INDICATED WITH A SUBSCRPT 'E'. PROVIDE (1) EXTENSION MODULE PER SLEEVE. VERIFY QUANTITIES PER PLAN. WHERE FIRE RATED PATHWAY IS INDICATED WITH (2) 'E', PROVIDE (1) EXTENSION MODULES ON EACH END. VERTICAL CABLE MANAGEMENT: DIMENSIONS ARE INDICATED IN INCHES. FIRST NUMBER INDICATES WIDTH, SECOND NUMBER INDICATES DEPTH. REFER TO SPECIFICATIONS FOR FURTHER REQUIREMENTS. CABLE TRAY: TYPE INDICATED PER SPECIFICATION. DIMENSIONS ARE INDICATED IN INCHES. FIRST NUMBER INDICATES WIDTH, SECOND NUMBER INDICATES DEPTH. REFER TO SPECIFICATIONS FOR FURTHER REQUIREMENTS.

CONDUIT SLEEVE(S) WITH BUSHINGS: LOCATE ABOVE CEILING. SIZE AND QUANTITY AS INDICATED. REFER TO SPECIFICATIONS FOR FURTHER REQUIREMENTS.

NC MASTER

NC CP

C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION. SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND CONSTRUCTION. THESE PLANS ARE BASED ON PAST PROJECT DRAWINGS AND SITE OBSERVATIONS. THE DRAWINGS ARE PROVIDED TO THE CONTRACTOR AS AN AID IN DETERMINING THE EXTENT OF WORK REQUIRED FOR DEMOLITION AND TO PROVIDE GENERAL INFORMATION ABOUT EXISTING SYSTEMS. THESE DRAWINGS MAY NOT BE ACCURATE IN ALL AREAS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS AND IS ENCOURAGED TO REVIEW FACILITY DRAWINGS PRIOR TO THE BID DATE. D. THE OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL ITEMS REMOVED. IF OWNER REFUSES SALVAGE, CONTRACTOR IS RESPONSIBLE FOR DISPOSAL. E.

WHERE EXISTING WALLS ARE TO BE REMOVED, ALL ASSOCIATED ELECTRICAL EQUIPMENT SHALL BE REMOVED. DISCONNECT POWER SO THAT DEVICES AND EQUIPMENT MAY BE REMOVED WITH WALLS. SEE ARCHITECTURAL DRAWINGS FOR WALLS TO BE REMOVED. ABANDON CONCEALED CONDUITS WHERE WALLS ARE NOT REMOVED. CONCEALED CONDUITS MAY BE REUSED WHERE AVAILABLE. WHERE EXISTING CIRCUITING/CABLING IS TO BE DEMOLISHED AND NOT REUSED, REMOVE CONDUCTORS AND ASSOCIATED ACCESSIBLE RACEWAYS/CONDUIT BACK TO THE SOURCE. WHERE EXISTING ELECTRICAL CONDUITS SERVING CIRCUITS TO BE DEMOLISHED ARE EMBEDDED IN CONCRETE FLOORS OR WALLS, CONDUITS MAY BE ABANDONED IN PLACE. EXISTING CONDUCTORS SHALL BE REMOVED BACK TO SOURCE AND CONDUITS SHALL BE CUT AT SURFACE OF CONCRETE AND FILLED. EXISTING BACK BOXES AND CONDUITS REMAINING FROM DEVICES BEING REMOVED MAY BE UTILIZED FOR NEW DEVICES WHERE LOCATIONS PERMIT. REMOVE AND PATCH WHERE BOXES ARE NOT REUSED.

MASTER STATION

351200

1

CONTROL PANEL

NC2828

VERIFY

GENERAL NOTES: 1. PROVIDE NURSE CALL DEVICE ROUGH-IN PER THE SCHEDULE. COORDINATE MOUNTING DEPTH (OR PLASTER RING WHERE APPLICABLE) TO ACCOMMODATE WALL FINISH. PROVIDE CONDUIT STUBBED FROM BOX TO ASSOCIATED NURSE CALL CORRIDOR DOME LIGHT. WHERE AN ASSOCIATED NURSE CALL CORRIDOR DOME LIGHT IS NOT AVAILABLE, STUB CONDUIT TO NEAREST CORRIDOR J-HOOK. PROVIDE DEVICE BOX WITH BACK-SIDE SUPPORT. ROUGH-INS SHALL NOT BE MOUNTED BACK-TO-BACK AND SHALL NOT SHARE CONDUITS, UNLESS SPECIFICALLY NOTED OR APPROVED BY THE MANUFACTURER. ROUTE CONDUITS CONCEALED IN WALLS AND CEILINGS. REFER TO ARCHITECTURAL INTERIOR ELEVATIONS FOR EXACT DEVICE MOUNTING LOCATIONS. WHERE DEVICES ARE NOT SHOWN IN ELEVATION, SEEK CLARIFICATION FROM ARCHITECT. PROVIDE MOCK-UPS WHERE REQUESTED. SPAN WALL STUDS WITH BRACKETS WHERE REQUIRED TO ACCOMMODATE DEVICE PLACEMENT. 2. WHERE LOCATED IN AN ARCHITECTURAL WALL, CONDUIT SHALL STUB TO THE CORRIDOR DOME LIGHT. 3. RAULAND RESPONDER V IS USED AS BASIS OF DESIGN FOR SPECIFIED NURSE CALL SYSTEM ROUGH-IN REQUIREMENTS. VERIFY FINAL MANUFACTURER AND PRODUCTS AND COORDINATE REQUIREMENTS WITH OWNER PRIOR TO INSTALLATION. 4. PROVIDE 1" METALLIC SURFACE RACEWAY, MOUNT TO VERTICAL MULLION, AT LOCATION OF CURRENT SURFACE RACEWAY FOR NURSE CALL CABLING. 5. NURSE CALL SYSTEM AND CABLES SHALL BE OWNER FURNISHED AND OWNER INSTALLED. 6. PROVIDE INDIVIDUAL 1" CONDUIT STUB OUTS FOR EACH NURSE CALL ROUGH-IN INDICATED.

A.

LIGHTING GENERAL NOTES

POWER GENERAL NOTES

(LIGHTING GENERAL NOTES SHALL APPLY TO ALL SHEETS)

(POWER GENERAL NOTES SHALL APPLY TO ALL SHEETS)

LIGHTING CONTROL DEVICES ARE INDICATED WITHOUT CONNECTION TO FIXTURE(S) BEING CONTROLLED. WITHIN EACH AREA, CONNECT CONTROL DEVICE TO SERVE LIGHT FIXTURE(S) LOCATED WITHIN SAME AREA. WHERE LIGHT FIXTURES ARE INDICATED WITH A SUBSCRIPT LETTER IDENTIFYING INDIVIDUAL LIGHTING CONTROL ZONES, CONTROL DEVICE SERVING AREA WITH MATCHING SUBSCRIPT SHALL CONTROL CORRESPONDING LIGHT FIXTURES.

B.

BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75'-0" SHALL UTILIZE #10 AWG CONDUCTORS. C. SWITCHES SERVING UNDERCABINET TASK LIGHTING SHALL MATCH RECEPTACLE HEIGHT ABOVE COUNTER. D. LIGHTING CONTROL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS. CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS. E.

CONTRACTOR SHALL COORDINATE ALL LIGHTING CONTROL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE ARCHITECTURAL DRAWINGS. COORDINATE ROUTING OF ALL ELECTRICAL BRANCH CIRCUITS AND CONDUIT WITH OTHER TRADES TO ALLOW FOR SERVICE AND MAINTENANCE AND TO MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, WORK TO INSTALL PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT. REFER TO PROJECT MANUAL AND ARCHITECTURAL DRAWINGS FOR LIMITS OF CONSTRUCTION FOR EACH PHASE.

G. REFER TO DETAILS, SCHEDULES, AND SUPPLEMENTAL LEGENDS FOR ADDITIONAL REQUIREMENTS.

A.

ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS. CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH ARCHITECTURAL INTERIOR ELEVATIONS. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER ARCHITECT, MOUNT DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.

B.

CONTRACTOR SHALL COORDINATE ALL ELECTRICAL DEVICE ROUGH-IN LOCATIONS AND ELEVATIONS WITH ARCHITECTURAL DRAWINGS TO ASSURE COMPATIBILITY WITH FINISHES SPECIFIED ON THE ARCHITECTURAL DRAWINGS. ROUTE ALL ELECTRICAL BRANCH CIRCUITS AND CONDUITS SPECIFIED, TO COORDINATE WITH OTHER TRADES AND TO ALLOW FOR SERVICE AND MAINTENANCE AND TO MINIMIZE THE USE OF ACCESS PANELS. WHERE ACCESS PANELS CANNOT BE AVOIDED, ARRANGE WORK TO INSTALL PANELS IN LOCATIONS ACCEPTABLE TO ARCHITECT.

C. BRANCH CIRCUIT WITH A TOTAL LENGTH LONGER THAN 75'-0" SHALL UTILIZE #10 AWG CONDUCTORS. D. REFER TO DETAILS, SCHEDULES, AND SUPPLEMENTAL LEGENDS FOR ADDITIONAL REQUIREMENTS. E. BRANCH CIRCUITS SERVING PATIENT CARE AREAS SHALL UTILIZE A CONTINUOUS METALLIC CONDUIT PATH FOR GROUNDING IN ADDITION TO AN INSULATED EQUIPMENT GROUNDING CONDUCTOR. REFER TO SPECIFICATIONS FOR CONDUIT AND CABLE WIRING METHODS ALLOWED AND DISALLOWED FOR APPLICATION ON THIS PROJECT. F.

ED

FESSION PRO AL RE

G . NO.

10206 TRACY J. HAUSER U

T H

K D A

O

11/25/14

No.

Description

Date

REDUNDANT GROUNDING METHODS REQUIRED FOR PATIENT CARE AREAS. REFER TO NEC FOR REQUIREMENTS AND TO PROJECT SPECIFICATIONS FOR ACCEPTABLE METHODS/APPLICATIONS.

G. REFER TO PROJECT MANUAL AND ARCHITECTURAL DRAWINGS FOR LIMITS OF CONSTRUCTION FOR EACH PHASE.

FIRE ALARM GENERAL NOTES

(ELECTRICAL DEMOLITION NOTES APPLY TO ALL ELECTRICAL DEMOLITION PLANS AND ALL ELECTRICAL DEMOLITION WORK)

ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A SUBSCRIPT 'D' OR SHOWN HATCHED SHALL BE REMOVED (DDEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT 'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).

1

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION.

ELECTRICAL DEMOLITION GENERAL NOTES

B.

NCBED5

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION.

F. TELECOMMUNICATIONS RACK: PROVIDE 7' TELECOMMUNICATIONS RACK.

THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK. EXISTING ELECTRICAL SYSTEMS (DEVICES, FIXTURES, EQUIPMENT, WIRING, AND RACEWAYS INCLUDING DATA/COMMUNICATION SYSTEMS) WITHIN LIMITS OF DEMOLITION AND NOT SERVING ADJACENT AREAS, SHALL BE REMOVED UNLESS OTHERWISE INDICATED. RE-SUPPORT EXISTING CONDUITS AND CABLES THAT MUST REMAIN.

FEATURE BED RECEPTACLE

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION.

PLYWOOD BACKING: 4' WIDE x 8' TALL PLYWOOD BACKING. REFER TO SPECIFICATIONS FOR FURTHER REQUIREMENTS.

A.

1

CABLE SPILLWAY: PROVIDE CABLE SPILLWAY "EZ-PATH" CATALOG NO. RCM33 AT FIRE RATED PATHWAYS INDICATED WITH A SUBSCRPT 'S'. PROVIDE (1) SPILLWAY PER SLEEVE. VERIFY QUANTITIES PER PLAN.

CONDUIT SLEEVE WITH BUSHINGS: REFER TO SPECIFICATIONS FOR FURTHER REQUIREMENTS.

(4)-4"C.

354010

GINEER EN

WP

SUBSCRIPT "WP" APPLIED TO ANY SYMBOL INDICATES WEATHERPROOF NEMA TYPE 4 OR EQUIVALENT

PUSH BUTTON CALL CANCEL

O

BELL

1

S

CHIME

354000

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION.

SECURITY SYSTEMS EXAMPLE C5

PULL CORD - AUDIO

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION.

WALL COMMUNICATIONS FIRE RATED PATHWAY: PROVIDE "EZ-PATH" FIRE RATED PATHWAY THROUGH WALL ABOVE CEILING. INSTALL PER MANUFACTURERS RECOMMENDATIONS. SLEEVE DESIGNATIONS PER PLANS. PROVIDE SLEEVES AS FOLLOWS: (A1) - CATALOG NO. EZDP133CWK. (1-3"x3" PATHWAY) (A2) - CATALOG NO. EZDP233GK. (2-3"x3" PATHWAY) (A3) - CATALOG NO. EZDP333GK. (3-3"x3" PATHWAY) (A4) - CATALOG NO. EZDP433GK. (4-3"x3" PATHWAY) (A5) - (1) CATALOG NO. EZDP233GK. AND (1) CATALOG NO. EZDP333GK. (5-3"x3" PATHWAY) (STACKED) (A6) - (2) CATALOG NO. EZDP333GK. (6-3"x3" PATHWAY) (STACKED) (A7) - CATALOG NO. EZDP733GK. (7-3"x3" PATHWAY) (A8) - (2) CATALOG NO. EZDP433GK. (8-3"x3" PATHWAY) (STACKED) (B1) - CATALOG NO. EZD22. (1-2"x2" PATHWAY) (C1) - CATALOG NO. EZDP44. (1-4"x4" PATHWAY) (C2) - (2) CATALOG NO. EZDP44 & (1)-EZP544W. (2-4"x4" PATHWAY) (C3) - (3) CATALOG NO. EZDP44. & (1)-EZP544W. (3-4"x4" PATHWAY) (C4) - (4) CATALOG NO. EZDP44. & (1)-EZP544W. (4-4"x4" PATHWAY) (C5) - (5) CATALOG NO. EZDP44. & (1)-EZP544W. (5-4"x4" PATHWAY) (C5) - (6) CATALOG NO. EZDP44. & (1)-EZP544W. (6-4"x4" PATHWAY)

JUNCTION BOX - FLOOR PHOTOCELL

HOMERUN TO PANEL (NUMBER OF ARROWS INDICATES NUMBER OF CIRCUITS)

SINGLE POLE MANUAL MOTOR STARTER WITH THERMAL O.L. AND PILOT LIGHT

A1

JUNCTION BOX - CEILING

CIRCUIT DOWN

COMBINATION FIRE/SMOKE DAMPER

WALL SLEEVE DESIGNATION

JUNCTION BOX - WALL

BRANCH CIRCUIT CONCEALED IN FLOOR OR BELOW GRADE

FIRE ALARM SYSTEM

NC APULL

RECEPTACLE - DOUBLE DUPLEX - ISOLATED GROUND

J

DISTRIBUTION PANEL, SWITCHBOARD OR MOTOR CONTROL CENTER BRANCH CIRCUIT - EXPOSED

C

353000

BOX DEPTH

CEILING COMMUNICATIONS OUTLET: REFER TO SUPPLEMENTAL SYMBOL LEGENDS FOR FURTHER REQUIREMENTS.

WALL SWITCH OCCUPANCY SENSOR (LOCAL RELAY)

LIGHTING PANEL

S

NC DOME

CEILING OCCUPANCY SENSOR (LOCAL RELAY)

PUSH BUTTON RECEPTACLE - DUPLEX

FSD OR SD

BEDSIDE STATION

(3) DEVICE MODEL NO. ROUGH-IN GANG QTY BOX TYPE

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION. SWITCH - SINGLE POLE

LIGHTING CONTACTOR

TE

DEVICE

COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL NURSE CALL EQUIPMENT SELECTION.

COMBINATION FLOOR OUTLET - POWER & COMMUNICATIONS: REFER TO SUPPLEMENTAL SYMBOL LEGENDS FOR FURTHER REQUIREMENTS.

COVE FIXTURE

UNDERCABINET FIXTURE

NC BSID

FLOOR COMMUNICATIONS OUTLET: REFER TO SUPPLEMENTAL SYMBOL LEGENDS FOR FURTHER REQUIREMENTS.

PENDENT FIXTURE

X

PLAN SYMBOL

COMMUNICATIONS OUTLET: OUTLET TYPE INDICATED PER PLAN. OUTLETS WITH NO CABLING DESIGNATION SHALL BE EMPTY WITH BLANK COVERPLATE. CABLING DESIGNATIONS TYPICAL FOR FLOOR AND CEILING DEVICES. REFER TO INFORMATION DELIVERY DETAILS, OUTLET DETAIL, AND SPECIFICATIONS FOR FURTHER REQUIREMENTS. PROVIDE CABLING AS FOLLOWS: A = 1 ANALOG VOICE CABLE V = 1 DIGITAL VOICE CABLE D = 1 DATA CABLE W = 1 DIGITAL VOICE CABLE WITH PHONE MOUNTING BRACKET FACEPLATE AT 48" AFF.

EMERGENCY BATTERY FIXTURE

X

DESCRIPTION

A

X

SYMBOL

T

X

"X" INDICATES FIXTURE NUMBER IN SCHEDULE

ELECTRICAL SUPPLEMENTAL SYMBOL LEGEND - NURSE CALL SYSTEM ROUGH-IN

REGIST ER

X

TELECOM SUPPLEMENTAL SYMBOLS

(FIRE ALARM GENERAL NOTES SHALL APPLY TO ALL SHEETS) F.

SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL ELECTRICAL DEMOLITION ITEMS. DISCONNECT AND REMOVE ELECTRICAL DEVICES, EQUIPMENT AND ASSOCIATED WIRING AS REQUIRED TO ACCOMMODATE NEW WORK. IF THE CONTRACTOR IS UNCLEAR REGARDING A SPECIFIC ITEM TO REMAIN OR BE REMOVED, THE CONTRACTOR SHALL SEEK CLARIFICATION FROM THE ARCHITECT.

A.

FIRE ALARM CABLING SHALL BE INSTALLED IN CONDUIT WHERE PLENUM RATED CABLING IS NOT UTILIZED.

B.

PROVIDE DUCT SMOKE DETECTION WITHIN SUPPLY AND RETURN DUCTS OF AHU-10. LOCATIONS WITHIN SUPPLY DUCTS SHALL BE DOWNSTREAM OF SERVING UNIT AND BEFORE BRANCH DUCTS. LOCATIONS WITHIN RETURN DUCTS SHALL BE UPSTREAM OF SERVING UNIT AND BRANCH DUCTS. PROVIDE CONNECTIONS SO THAT SMOKE SENSING WILL SHUT DOWN SERVING UNIT. REFER TO MECHANICAL SCHEDULES FOR UNIT CFM OUTPUT.

G. SYSTEMS SERVING ADJACENT AREAS AND ITEMS THAT REMAIN SHALL BE MAINTAINED AT ALL TIMES. MODIFY SYSTEMS AS REQUIRED THROUGHOUT CONSTRUCTION TO MAINTAIN CONTINUITY OF SERVICE. DO NOT INTERRUPT SERVICE WITHOUT OWNER'S PRIOR WRITTEN APPROVAL. LIMIT DURATION OF INTERRUPTION ONLY TO THE TIME NECESSARY FOR DISCONNECTION AND IMMEDIATE RECONNECTION. INTERRUPTION TO SERVICE DEEMED BY OWNER AS ESSENTIAL MAY REQUIRE PREMIUM TIME AND SHALL BE INCLUDED WITH THE BID. EXTREME CARE SHALL BE TAKEN BY THE CONTRACTOR TO IDENTIFY EXISTING SYSTEM COMPONENTS ASSOCIATED WITH THESE SERVICES. APPROPRIATE METHODS OF MARKING THESE SHALL OCCUR TO ELIMINATE THE POSSIBILITY OF ACCIDENTAL INTERRUPTION.

C. PROVIDE MONITORING/CONTROL MODULE FOR EACH FIRE/SMOKE (F/S) DAMPER SYSTEM. REFER TO ELECTRICAL FLOOR PLANS FOR DAMPER LOCATIONS, PROVIDE POWER CONNECTION FOR FIRE/SMOKE DAMPERS AS IDENTIFIED ON FLOOR PLANS. REFER TO DETAIL 5 ON SHEET E501 FOR CONNECTION REQUIREMENTS. PROVIDE ALL CONNECTIONS FOR A COMPLETE SYSTEM.

H. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND LIGHTING AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO PROCEED.

E.

I.

PROTECT EXISTING ELECTRICAL EQUIPMENT THAT REMAINS. IF DAMAGED OR DISTURBED IN THE COURSE OF THE WORK, REMOVE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY, QUALITY, AND FUNCTIONALITY.

J.

PATCH AND REPAIR OPENINGS IN EXISTING WALLS AND FLOORS RESULTANT FROM SPECIFIED ELECTRICAL DEMOLITION. PATCH SHALL MATCH EXISTING CONSTRUCTION, FIRE RATING, AND FINISH. SEE ARCHITECTURAL SPECIFICATIONS FOR MEANS AND METHODS.

K.

CONSTRUCTION SHALL BE PHASED. SEE PROJECT MANUAL AND ARCHITECTURAL PLANS FOR DETAILS AND LIMITS OF DEMOLITION FOR EACH PHASE. SYSTEM SERVICES TO AREAS NOT IN THE CURRENT PHASE OF CONSTRUCTION SHALL BE MAINTAINED AT ALL TIMES.

L.

CHANGES REQUIRED FOR EXISTING VOICE AND DATA CABLING AND OUTLETS IN ROOMS NOT BEING RENOVATED BY THIS PROJECT WILL BE PROVIDED BY THE OWNER.

M. PROVIDE RECIRCUITING, AS REQUIRED, OF EXISTING TO REMAIN ELECTRICAL ITEMS AFFECTED BY DEMOLITION OF PERIMETER FAN COIL UNITS ON FOURTH FLOOR. PROVIDE $30,000 BID ALLOWANCE FOR ASSOCIATED RECIRCUITING OF FOURTH FLOOR PATIENT ROOM BRANCH CIRCUITS.

D. PROVIDE DUCT SMOKE DETECTOR WITHIN 5' OF EACH FIRE/SMOKE DAMPER WITH CONNECTION TO LOCAL FIRE ALARM SYSTEM. ALARM OF DUCT DETECTOR SHALL ACTIVATE DAMPER.

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

PROVIDE REMOTE STATUS INDICATOR FOR EACH DUCT SMOKE DETECTOR, LOCATE ADJACENT TO AHU-10. COORDINATE EXACT LOCATIONS WITH OWNER PRIOR TO INSTALLATION.

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SACRED HEART 4TH & 5TH ELECTRICAL COVER SHEET

Date

SES PROJECT # 14041

11/25/2014 2:15:32 PM

E000 Scale

NONE

98.5

1.3

2.4

3.4

3.6

AVERA FACILITY DEVELOPMENT

A

SHEET NOTES 1

DEMOLISH EXISTING ELECTRICAL CONNECTIONS SERVING AHU10. REMOVE BRANCH CIRCUIT CONDUCTORS FROM EXISTING CONDUIT AND DISCONNECT FROM SOURCE FUSIBLE SWITCH. LABEL FUSIBLE SWITCH COMPARTMENT AS SPARE. EXISTING BRANCH CIRCUIT CONDUIT IS SHARED WITH OTHER MECHANICAL EQUIPMENT NEARBY. EXISTING MECHANICAL EQUIPMENT NOT SERVING AHU-10, SHARING COMMON CONDUIT, SHALL REMAIN OPERATIONAL.

2

DEMOLISH ELECTRICAL CONNECTIONS SERVING PUMP. REMOVE BRANCH CIRCUIT CONDUCTORS FROM EXISTING CONDUIT AND DISCONNECT FROM SOURCE FUSIBLE SWITCH. LABEL FUSIBLE SWITCH COMPARTMENT AS SPARE. EXISTING BRANCH CIRCUIT CONDUIT IS SHARED WITH OTHER MECHANICAL EQUIPMENT NEARBY. EXISTING ELECTRICAL EQUIPMENT NOT SERVING PUMP INDICATED, SHARING COMMON CONDUIT, SHALL REMAIN OPERATIONAL. EXISTING TO REMAIN PUMP INDICATED ON FLOOR PLAN, NEAR PUMP BEING DEMOLISHED, HAS BRANCH CIRCUIT SHARING CONDUIT WITH BRANCH CIRCUIT SHARING DEMOLISHED PUMP.

3

EXISTING THIRD LEVEL MAIN TELECOM ROOM.

4

EXISTING VOICE WALL FIELD.

A1 B B.0 E 4

1.7

D

E

2 P-13

P-15

E

E

2.1

MCC-3

MCC-2 DSWB

B1.1

AHU-10 1 MCC-1

3

EMCC-1 AHU-03 D

C P-16 E

C1

E

AHU-11

2

P-14 D

E

D

P-12 2 D

AHU-09

FESSION PRO AL

O

E

E

AHU-06

RE

G . NO.

U

A

10206 TRACY J. HAUSER

T

S

D1

RF-9C

ED

GINEER EN

RF-9A

REGIST ER

E

T H

K D A

O

11/25/14

E No.

Description

Date

AHU-05 AHU-02 AHU-07 AHU-08

AHU-04

E1 E E

E

E P-18

D

E

E

P-11 2

E

P-17

E

F F1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

8

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER

THIRD LEVEL DEMOLITION - ELECTRICAL 1/8" = 1'-0" 2014

C

4TH & 5TH THIRD LEVEL DEMOLITON ELECTRICAL

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:32 PM

E031 Scale

1/8" = 1'-0"

98.5

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

SHEET NOTES

A

1

1

PHASE 4

A1 D

B B.0

1.7

D

D

D

D

D

D

D

D

1

DEMOLISH ELECTRICAL CONNECTIONS SERVING PERIMETER FAN COIL UNIT, DEMOLISH FAN COIL BRANCH CIRCUIT BACK TO SOURCE ELECTRICAL PANEL. DISONNECT BRANCH CIRCUIT FROM SOURCE CIRCUIT BREAKER AND LABEL BREAKER AS SPARE. (TYPICAL FOR PATIENT ROOM FAN COIL UNITS)

2

EXISTING TO REMAIN TELEPHONE CABINET. (TYPICAL FOR 'TTC' CABINETS)

3

EXISTING TO REMAIN CATV AND MUSIC SYSTEMS CABINET. (TYPICAL FOR 'TVC' CABINETS)

4

EXISTING TO REMAIN PUBLIC ADDRESS INTERCOM CABINET. (TYPICAL FOR 'ICC' CABINETS)

5

EXISTING TO REMAIN FIRE ALARM TERMINAL CABINET. (TYPICAL FOR 'FATC' CABINETS)

6

EXISTING TO REMAIN DICTATION SYSTEM CABINET. (TYPICAL FOR 'DCTC' CABINETS)

7

CONSTRUCTION PHASE (TYPICAL)

D

2.1 D

B1.1 1

D

C

E

1

D

E NP4B

TTC4B 2

E

C1

E 3 TVC4 4 ICC4

D

TTC4A

D

E E

E

5 FATC4 DCTC4 6

D

D E NP4C E CP4B

PHASE 2

7

D PHASE 3

NP4A

E E

CP4A

D

O

E

RE

G . NO.

10206 TRACY J. HAUSER U

A

S

D1

FESSION PRO AL

T

D

ED

GINEER EN

D

REGIST ER

D

T H

K D A

O

TTC4C 11/25/14 NP4D

E

E

LS4A

TTC4D 1

E

No.

E

D

Description

Date

D

E1 D D

F

D

D

D

D

D

D

D

D

D

F1 PHASE 1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

8

FOURTH LEVEL DEMOLITION - ELECTRICAL 1/8" = 1'-0" 2014

C

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER

4TH & 5TH FOURTH LEVEL DEMOLITION ELECTRICAL

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:33 PM

E041 Scale

1/8" = 1'-0"

98.5

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

SHEET NOTES

A

1

A1 B B.0

D

D

D

D

D

D

D

D

TV

V/2D

TV

V/2D

TV

V/2D

TV

V/2D

TV

V/2D

TV

TV

TV

V V/2D

DEVICES INDICATED ON THIS FLOOR PLAN, WITHIN THIS BOUNDARY ARE DIAGRAMATIC, REFER TO TYPICAL NORTH & SOUTH ROOM LAYOUT - 4TH/5TH LEVEL - DEMOLITION PLAN (DETAIL 1, SHEET E400) FOR SPECIFIC DEMOLITION REQUIREMENTS WITHIN THIS BOUNDARY.

2

EXISTING TO REMAIN TELEPHONE CABINET. (TYPICAL FOR 'TTC' CABINETS)

3

EXISTING TO REMAIN CATV AND MUSIC SYSTEMS CABINET. (TYPICAL FOR 'TVC' CABINETS)

4

EXISTING TO REMAIN PUBLIC ADDRESS INTERCOM CABINET. (TYPICAL FOR 'ICC' CABINETS)

5

EXISTING TO REMAIN FIRE ALARM TERMINAL CABINET. (TYPICAL FOR 'FATC' CABINETS)

6

EXISTING TO REMAIN DICTATION SYSTEM CABINET. (TYPICAL FOR 'DCTC' CABINETS)

7

DEMOLISH ELECTRICAL CONNECTIONS SERVING PERIMETER FAN COIL UNIT, DEMOLISH BRANCH CIRCUIT BACK TO SOURCE ELECTRICAL PANEL. DISONNECT BRANCH CIRCUIT FROM SOURCE CIRCUIT BREAKER AND LABEL BREAKER AS SPARE. (TYPICAL FOR PATIENT ROOM FAN COIL UNITS)

8

OWNER TO PROVIDE DEMOLITION OF EXISTING NURSE CALL MASTER STATION AND CONTROL PANEL, PROVIDE DEMOLITION OF EXISTING SURFACE RACEWAY AT NURSE STATION.

9

DISCONNECT EXISTING ELECTRICAL CONNECTIONS TO EXHAUST FAN SERVING THIS ROOM. EXHAUST FAN LOCATED ON ROOF ABOVE, DEMOLISH DISCONNECT SWITCH RETAIN EXISTING CONDUIT FOR REUSE.

10

LOCATION OF EXISTING DATA AND VOICE RACK CABINET. PROVIDE PER DETAIL 2 ON SHEET E501.

11

PROVIDE SUPPORT DURING CEILING REPLACEMENT FOR EXISTING TO REMAIN CEILING MOUNT DEVICES LOCATED WITHIN COORIDOR. REMOVE AND REINSTALL IF REQUIRED. CLEAN AND REINSTALL EXISTING CEILING DEVICES UPON COMPLETION OF NEW CEILING WORK. REFER TO EXISTING PLAN E12 AND E13, INCLUDED FOR REFERENCE ONLY AS A PART OF ADDENDUM #3, FOR EXISTING CEILING DEVICES AND QUANTITIES.

12

CONSTRUCTION PHASE (TYPICAL).

13

LIGHTING, POWER AND SYSTEMS SHALL BE EXISTING TO REMAIN EXCEPT SPECIFIED DEMOLITION OF FAN COIL UNIT. (THIS ONE ROOM ONLY).

7

12 PHASE 4

D

1

V/3D

V/3D

13

1.7

D

2.1

TV

9

D

1

B1.1 TV

D

TV

D

LIMITS OF ELECTRICAL DEMOLITION E TTC5B 2

C

E NP5B

1 E400 11

C1

E E 3 TVC5

TV

4 ICC5 5 FATC5

E E

MASTER D

E

TV

E

D

8

DCTC5 5

TV

D

TTC5A NC

D

TV

D

2

NP5C

E501

E 11

CP5B

12 PHASE 3

PHASE 2 12

10

T5

11 D

TV

NP5A

E

CP5A

E TV

D

TV

D

O

D1

FESSION PRO AL

S

D

ED

4

E

RE

G . NO.

GINEER EN

REGIST ER

11

10206 TRACY J. HAUSER U

A

NC

8 CP D

T

D

T H

K D A

O

E400

TTC5C

11/25/14 NP5D

E

E

11

1

LS5A

TTC5D

No.

Description

Date

E

E

LIMITS OF ELECTRICAL DEMOLITION

D

TV

TV

1

D

E1 V/2D

F

D

D

D

D

D

D

V/2D

V/2D

D

D

TV

V/2D

TV

V/2D

TV

V/2D

TV

V/2D

TV

TV

V/2D

TV

D

TV

TV

4D

9

TV

D

V/2D

D

F1 12 PHASE 1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

8

FIFTH LEVEL DEMOLITION - ELECTRICAL 1/8" = 1'-0" 2014

C

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER

4TH & 5TH FIFTH LEVEL DEMOLITION ELECTRICAL

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:34 PM

E051 Scale

1/8" = 1'-0"

98.5

1.3

2.4

3.4

3.6

AVERA FACILITY DEVELOPMENT

A

SHEET NOTES 1

DEVICES INDICATED ON THIS FLOOR PLAN, WITHIN THIS BOUNDARY ARE DIAGRAMATICAL, REFER TO TYPICAL NORTH & SOUTH ROOM LAYOUT - 5TH LEVEL - LIGHTING PLAN (DETAIL 2, SHEET E400) FOR SPECIFIC LIGHTING REQUIREMENTS WITHIN THIS BOUNDARY.

2

PROVIDE INDIVIDUAL 120V, 20A TOGGLE SWITCH FOR CONTROL OF EXAM PORTION OF LIGHT FIXTURE. PROVIDE ENGRAVED FACEPLATE, PER SPECIFICATIONS, WITH LABEL INDICATING 'EXAM LIGHT'.

3

AMBIENT (ZONE 'd') AND READING (ZONE 'e') PORTION OF LIGHT FIXTURE SHALL BE CONTROLLED BY NURSE CALL PILLOW SPEAKER. PROVIDE RELAY(S) TO INTERCONNECT NURSE CALL SYSTEM WITH AMBIENT AND READING PORTION OF LIGHT FIXTURE.

4

LIGHTING IN THIS ROOM SHALL BE EXISTING TO REMAIN.

5

CONNECT TO EXISTING NORMAL SOURCE 120V, 20A LIGHTING BRANCH CIRCUIT PREVIOUSLY SERVING DEMOLISHED DEVICES, MADE AVAILABLE DURING DEMOLITION OF THIS PROJECT.

6

WHERE MULTIPLE BRANCH CIRCUIT HOME RUNS ARE INDICATED WITH IDENTICAL BRANCH CIRCUIT NUMBERS, COMBINE INDIVIDUAL ROOM BRANCH CIRCUITS INTO SINGLE HOME RUN BACK TO SOURCE PANELBOARD. (TYPICAL)

7

CONNECT TO NEAREST AVAILABLE 120V 20A LIFE SAFETY LIGHTING BRANCH CIRCUIT.

8

CONSTRUCTION PHASE (TYPICAL).

9

DEVICES INDICATED ON THIS FLOOR PLAN, WITHIN THIS BOUNDARY ARE DIAGRAMATICAL, REFER TO TYPICAL WEST & EAST ROOM LAYOUT - 5TH LEVEL - LIGHTING PLAN (DETAIL 5, SHEET E400) FOR SPECIFIC LIGHTING REQUIREMENTS WITHIN THIS BOUNDARY.

ELEVATOR LINK 5900

8 D

D

D

D1

D1

PATIENT RM 504

H1

D1

D1

1.7

2.1

D1

PATIENT RM 506

PATIENT RM 508

H1

H1

PATIENT RM 510

H1

D1

D1

U2

D1

D1

D1

D1

D1

U2

U2 D1 W2

D2

D1

U2

U2

U2

U2

D2

U2

U2 D1

U2

D1

D2

D1

W1

D1

D1

U2

D2

D1

D2

W2

U2

U2

D1

W1

D1

A1

W1

W1

TTC5B

CP5A2-9

D1

CP5A2-10

CP5A2-9

W1 H1

A1

CP5A2

CP5A2-10

CP5A2-10

CP5A2-10 6

CP5A2-10

522

U2

W1

A1

CP5A2-14

D

CP5B2-15

D2

D1

D2

D1

D1

D1

H1

W1

E

Room 524

U2

TTC5A

9

D1

D

D1 ELEC 551

D1

D1

HSKG 552

D1 Room

EQUIPMENT 553

D

D1

W2

D1 Room 526

U2 W1

D

D

CP5A2-14 D2

D1

D

E NP5C

D1

D1

W2

D1

E H1

D1 Room

A1

E NP5B

1

CP5A2-9

2

D1

W2

D1

D

W1

A1

D1

E400

562

D1

D1 W2

D2

CP5A2-14

CP5B2-15

A1

W2

PHASE 3

NEGATIVE AIR 520

D

D1 D

W1

A1

H1

U2

D1

W2

D

A1

D1

D

A1

D1

D

D1 W1

W2

8

W2

E

U2 D1

D1

D2

D1

D

W1

CORRIDOR 5901

W1

D1

A1

D1 D

D1

D1

D

D2

D2

Room 564

D2

D1

D1

D1

W2 W2

D

D

D1

U2

D1

D1

D2

H1

D

A1

9

C1

PATIENT RM 516

CP5A2-10 A1

H1

PATIENT RM 514

H1

D

D1

H1

D1

H1

D1

D

D1

MECH. W1 565

C

PATIENT RM 512

A1

D1

U2

B1.1

D1

D1

W2 W2

D1

D1

D1

D

OFFICE 558

Room 566

D1

D1

PATIENT RM 502

4

D1

D1

D

D

PATIENT RM 500

H1

D

D1

D1

D

B B.0

D1

D

D1 D1

D

A1

PHASE 4

CP5B

A1

A1

CP5B2-27

D

D2

D1

H1

D1

D2

D1

H1

D1

PHASE 2

8

CP5B2-15 A1

A1 CP5B2-18

D

W1 CLEAN UTILITY 558

U2 D

D1 D1

W2

STOREROOM 557

W2

SOILED UTILITY 555

D1

W2

D1

STORAGE 554

D1

D1

D

E

NP5D

CP5B2 D2

D1

H1

c H1 d,e 3

F

D2 U2

bW2 g D1 b U2 D1 b D2 i

g

a

D2

D

W1 i h

D1

A1

D1

W2 W2

U2 U2

U2

D1

D2

U2

D1

U2

1

1

1c

D2

D2

D1

U2

U2

7 A1

A1

D2

D2

D1

D1

D2

D1

No.

D1

H1

W1

K D A

O

Description

Date

U2

A1

W2 W2

U2

U2

W2

U2

D2

U2

D1

U2

D1

D1 U2

L1

D1

D1

H1

PATIENT RM 550

h

D1

D1 PATIENT RM 548

D1

D1 PATIENT RM 546

H1 D1

D1

D1

D1

D1

D1

D

2b

H1

D1 PATIENT RM 540

H1

D1

D1

PATIENT RM 538

D1

D1

H1

PATIENT RM 536

H1

D1

D

3A

4 4a

D

D1

D1

D

D1

D1

D

D1

D1

D

D1

D1

D1

LS

U2

A1

A1 LS

D1

A1

PATIENT RM 534

D1

FAMILY WAITING 558

W1

D1 D1

H1

A1 5 E501

A1

A1

STORAGE 560

D1

D

3c

D1

W2

D1 W2

D1

D1 D

D1

PATIENT RM 542

PATIENT RM 544

8

99

A1

T H

W1

F W

D1

1b

A1

D1 W2

W2 W2

L1

i

A1

D1

U2 D1

U2

D1 a

D1

F1

D2

D1 CP5B2-2

W1

W1

A1

D

D

f

A1

W1

U

D

554

A1

W1

10206 TRACY J. HAUSER

11/25/14 5

D

5

W2 2 D1 ISOLATION f

D1

W1

CP5B2-12

TTC5D E

G . NO.

D1

D1

c

A1

W1

D

E1

CP5B2-2

D1 CP5B2-2

W1

CP5B2-12

CP5B2-12

E D

D1

U2

D

D

Room 556

D1 f

W1

W1

D

D1

CP5B2-12

1

LS5A E

CP5B2-18

A1

CP5B2-12

RE

D

CP5B2-2

CP5B2-2

CP5B2-18

D

A1

CP5B2-27

D

D2

D

D1

D

H1

E400

O

TTC5C D1

5

Room 530

E

FESSION PRO AL

S

W1

D

D1

ED

GINEER EN

D1

NUTRITION 556

A

D1

Room 528

U2

CP5A

T

D1

W1

E

REGIST ER

Room 560

NP5A E

SOILED UTILITY 559

D

D2

D1

D

H1

D1

F W

A1

F W

RESTROOM 559

D

PHASE 1

5

5.1

6

B1.2 7

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

8

FIFTH LEVEL - LIGHTING

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER

1/8" = 1'-0"

2014

C

4TH & 5TH FIFTH LEVEL LIGHTING PLAN

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:39 PM

E151 Scale

1/8" = 1'-0"

98.5

1.3

2.4

1937

HSKG 1933

3.4 3.6

UTILITY 1932

AVERA FACILITY DEVELOPMENT ELEC / DISCONNECT 1904

TELECOM 1903

ELEVATOR 2 2331

SHEET NOTES

'MSB11' PHYS/ COUR ENTRANCE 1942

CONFERENCE ROOM 1907

MAIL ROOM 1941

E E E E

ELEVATOR 1 2330

FIRE SPRINKLER ROOM 1905

E

UP

CORRIDOR 1902

OFFICE 1943

EXISTING 800KW DIESEL GENERATOR VOLUNTEER OFFICE 1909

GENERATOR ROOM 1970

OFFICE 1944

'HGEN'

ESSENTIAL BRANCHES ROOM

E 'EDP-A'

1971

5 ATS-3 3 'GDP' E E E

A

E

4 ATS-1 E

ELEVATOR 3 2332

CATH LAB E 6 ATS-2 E 1 'EDP' E

CRITICAL DISTRUBITION PANEL (CDP).

3

NON-ENERGIZED EQUIPMENT.

4

LIFE SAFETY TRANSFER SWITCH.

5

EQUIPMENT TRANSFER SWITCH.

6

CRITICAL TRANSFER SWITCH.

7

RECOMMENDED LOCATION FOR ROUTING OF NEW EP3A 2" CONDUIT AND TWO ATS-CDP2 2" CONDUITS UP TO 3RD LEVEL. CORE DRILL CONCRETE FLOOR IN PAN PORTION OF STRUCTURE, AS CLOSE TO COLUMN AS POSSIBLE. REFER TO ARCHITECTURAL DRAWINGS FOR CONDUIT CHASE CONSTRUCTION REQUIREMENTS. COORDINATE EXACT CONDUIT ROUTING WITH OWNER PRIOR TO INSTALLATION. PERFORM WORK WITH MINIMAL IMPACT TO OWNER. SEAL ALL FLOOR PENETRATIONS AND PENETRATIONS THROUGH RATED WALLS.

8

ROUTE TWO (2) 2" CONDUITS FOR ATS-CDP2 THROUGH EXISTING TUNNEL TO MECHANICAL ROOM 1031. FROM MECHANICAL ROOM ROUTE CONDUITS OVER TO COLUMN INDICATED BY SHEET NOTE 7 FOR ROUTING UP TO THIRD LEVEL.

E

E

REGISTRATION WAITING 1911

CONFERENCE 1945 CORRIDOR 1940

GIFT SHOP 1005

'EP1A'

8

LOBBY 1900

COPY CENTER 1947

'CDP' 2

CORRIDOR 1946

EXISTING TUNNEL

REGISTRATION 1912

REGISTRATION 1913

STORAGE 1949

MECHANICAL 1031

A1 B B.0

OUTLINE OF PATIENT TOWER ABOVE. ROOM 1006

WORKROOM 1914

HSKG 1950 CONFERENCE 1704

ROOM 1007

MCC-4

CORRIDOR 1017

UNASSIGNED 1008

'US-1'

B1.1 SURGEON LOUNGE 1807

MEDITATION ROOM 1009

1030A PHYSICIAN LOUNGE 1703

EXIT PASSAGE 1034

WOMEN'S LOCKER ROOM 1803

EQUIPMENT 1555

WOMEN'S TOILET 1028

'MSWB'

OFFICE 1702

RECEPTION 1600

7

IMAGING WAITING 1961

STAIR 1

TOILET 1538A

PRE/POST 1538

TOILET 1541A PRE/POST 1549

PRE/POST 1545

PRE-OP 1611

MED. AFFAIRS OFFICE 1614

TOILET 1545A

PRE/POST 1536

PRE-OP 1612

HALLWAY 1603

D1 E

PRE/POST 1551

TOILET 1535A

PRE/POST 1547

PRE/POST 1543

TOILET 1551A

NURSE STATION 1520

PACU 1527

PACU 1525

IMAGING RECEPTION 1962

RE

G . NO.

10206 TRACY J. HAUSER U

T H

K D A

O

11/25/14

No.

Description

Date

TOILET 1620A PRE-OP 1618

SOILED HOLD 1020

PRE-OP 1620 HSKPG 1621

TOILET 1619

NURSE STATION 1519

PACU 1523

IMAGING WAITING 1963

CLEAN SUPPLY 1628

TOILET 1617 PRE-OP / INPT HOLD 1616

PRE/POST 1535

OFFICE 1011

HALLWAY 1602

HSKPG 1537 TOILET 1536A

O

OFFICE 1556

CONSULT (FUTURE PRE-OP) 1608

FESSION PRO AL

S

D

PRE/POST 1541

REGIST ER

TOILET 1549A

ED

GINEER EN

EXIT PASSAGE 1033

A

MEN'S LOCKER ROOM 1801

MEN'S TOILET 1029

HOSP. MAIN ELEC ROOM

T

TOILET 1802

TOILET 1804

C C1

2

VOLUNTEER WORKROOM 1910

E

OLD GENERATOR ROOM

EQUIPMENT DISTRIBUTION PANEL (EDP) 600A 3PH 3W.

ENTRY 1000

RECEPTION 1901

CONFERENCE 1908

1

HALLWAY 1622

E1

SOILED HOLD 1532 STAFF TOILET 1531

CONTROL DESK 1625 PACU 1529

F F1

PACU 1528

PACU 1526

PACU ISOLATION 1522

PACU 1524

ANES. OFFICE 1627

PACU ISOLATION 1521

SERVICE ACCESS 1604 HSKP 1512A

DECONTAM 1508

HALLWAY 1022

SUB STERILE 1507

Stair 3

O.R. 2 1501

98

1

DIRECTOR'S OFFICE 1626

BREAK ROOM 1021

STAFF TOILET 1019

1b

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

8

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER

FIRST LEVEL - POWER 3/32" = 1'-0"

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

2014

C

4TH & 5TH FIRST LEVEL POWER PLAN

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:40 PM

E211 Scale

3/32" = 1'-0"

98.5

1.3

2.4

3.4

3.6

GENERATOR ROOM

EXISTING EMERGENCY SWITCHBOARD 'HGEN'

A

AVERA FACILITY DEVELOPMENT

LOCATED ON FIRST FLOOR APPROXIMATELY 20FT NORTH & 56FT WEST OF THIS LOCATION

SHEET NOTES 1

EQUIPMENT BRANCH DIST. PANEL 'EDP-A'

OLD GENERATOR ROOM

RECOMMENDED LOCATION FOR ROUTING OF NEW EP3A 2" CONDUIT AND TWO ATS-CDP2 2" CONDUITS FROM 1ST LEVEL BELOW. CORE DRILL CONCRETE FLOOR IN PAN PORTION OF STRUCTURE, AS CLOSE TO COLUMN AS POSSIBLE. ROUTE CONDUITS ON THIS FLOOR OVERHEAD TO ELECTRICAL EQUIPMENT BEING SERVED. COORDINATE EXACT CONDUIT ROUTING WITH OWNER PRIOR TO INSTALLATION. PERFORM WORK WITH MINIMAL IMPACT TO OWNER. SEAL ALL FLOOR PENETRATIONS AND PENETRATIONS THROUGH RATED WALLS.

A1 B B.0

E P-15 E

1.7

E

E

2.1

MCC-2

MCC-3

DSWB

B1.1

HOSP. MAIN ELEC ROOM

MCC-1

LOCATED ON FIRST FLOOR APPROXIMATELY 23FT WEST OF THIS LOCATION

C

EMCC-1 AHU-03

EXISTING NORMAL SWITCHBOARD 'MSWB'

1

P-16 E

C1

AHU-11

E

E

D AHU-09 EP3A CDP-2 XFMR-CDP2

S

D1

RF-9C

O

E

RE

G . NO.

10206 TRACY J. HAUSER U

A

RF-9A

FESSION PRO AL

T

E

ED

GINEER EN

REGIST ER

ATS-CDP2

T H

K D A

O

E

AHU-06

11/25/14

E

AHU-10

No.

Description

Date

AHU-05 AHU-02 AHU-07 AHU-08

AHU-04

E1 E E E

E P-18 E

E

E P-17

E

F F1

98 1

1b

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

8

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER

THIRD LEVEL - POWER 1/8" = 1'-0" 2014

C

4TH & 5TH THIRD LEVEL POWER PLAN

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:41 PM

E231 Scale

1/8" = 1'-0"

98.5

1.3

2.4

3.4

3.6 AVERA FACILITY DEVELOPMENT

A

SHEET NOTES 1

CONNECT FIRE/SMOKE DAMPERS TO A COMMON 120V 20A LIFE SAFETY BRANCH CIRCUIT FROM PANEL 'LS4A'. PROVIDE 20/1 CIRCUIT BREAKER WITHIN PANEL, MATCH EXISTING MANUFACTURER AND RATINGS OF EXISTING. PROVIDE #10 CONDUCTORS. PROVIDE ONE DUCT TYPE SMOKE DETECTOR WITHIN 5' OF EACH SIDE OF FIRE/SMOKE DAMPER (TOTAL OF TWO (2) DETECTORS PER FIRE/SMOKE DAMPER). (TYPICAL)

A1 B B.0

1

FS.D.

FS.D.

FS.D.

1

1

1.7

2.1

B1.1

E

C

E

TTC4B

NP4B

E

C1

E TVC4 ICC4 FATC4

TTC4A

E E

E DCTC4

E NP4C E CP4B

D NP4A

E E

FESSION PRO AL

O

E TTC4C

NP4D

E

E

E

E

G . NO.

U

A

10206 TRACY J. HAUSER T H

K D A

O

11/25/14

TTC4D

LS4A

RE

T

S

D1

ED

GINEER EN

REGIST ER

CP4A

No.

Description

Date

E1

FS.D.

1

1 FS.D.

FS.D.

F

1

F1

1b 1

99

1

1c

2b

3c

3A

4 4a

5

5.1

6

B1.2 7

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

8

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER

FOURTH LEVEL - POWER 1/8" = 1'-0" 2014

C

4TH & 5TH FOURTH LEVEL POWER AND SYSTEMS PLAN

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:42 PM

E241 Scale

1/8" = 1'-0"

98.5

1.3

2.4

3.4

3.6

AVERA FACILITY DEVELOPMENT

A

SHEET NOTES 1

DEVICES INDICATED ON THIS FLOOR PLAN, WITHIN THIS BOUNDARY ARE DIAGRAMATICAL, REFER TO TYPICAL NORTH & SOUTH ROOM LAYOUT - 5TH LEVEL - POWER PLAN (DETAIL 3, SHEET E400) FOR SPECIFIC POWER & SYSTEMS REQUIREMENTS WITHIN THIS BOUNDARY.

2

REFER TO ENLARGED FLOOR PLAN FOR BRANCH CIRCUITING REQUIREMENTS.

3

CONNECT FIRE/SMOKE DAMPERS TO A COMMON 120V 20A LIFE SAFETY BRANCH CIRCUIT FROM PANEL 'LS5A'. PROVIDE 20/1 CIRCUIT BREAKER WITH PANEL, MATCH EXISTING MANUFACTURER AND RATINGS OF EXISTING. PROVIDE #10 CONDUCTORS. (TYPICAL)

4

CONNECT TO EXISTING NORMAL SOURCE 120V, 20A RECEPTACLE BRANCH CIRCUIT PREVIOUSLY SERVING DEMOLISHED DEVICES, MADE AVAILABLE DURING DEMOLITION OF THIS PROJECT.

5

REFER TO TYPICAL NORTH & SOUTH ROOM LAYOUT - 5TH LEVEL POWER PLAN (DETAIL 3, SHEET E400) FOR SPECIFIC HEADWALL DEVICE LOCATIONS AND BRANCH CIRCUITING REQUIREMENTS.

6

NEW EXHAUST FAN EF-1 (1/2HP, 120V) LOCATED ON ROOF ABOVE AT APPROXIMATELY THIS LOCATION. SEE SHEET M161.

7

NEW EXHAUST FAN EF-2 (3/4HP, 120V) LOCATED ON ROOF ABOVE AT APPROXIMATELY THIS LOCATION. SEE SHEET M161

8

POWER AND SYSTEMS IN THIS ROOM SHALL BE EXISTING TO REMAIN EXCEPT SPECIFIED DEMOLITION OF FAN COIL UNIT.

9

CONSTRUCTION PHASE (TYPICAL).

10

DEVICES INDICATED ON THIS FLOOR PLAN, WITHIN THIS BOUNDARY ARE DIAGRAMATICAL, REFER TO TYPICAL WEST & EAST ROOM LAYOUT - 5TH LEVEL - POWER PLAN (DETAIL 6, SHEET E400) FOR SPECIFIC POWER & SYSTEMS REQUIREMENTS WITHIN THIS BOUNDARY.

ELEVATOR LINK 5900

9

PHASE 4

A1

10 FS.D.

B B.0

NC

NC

NC

EF-1 6

FS.D.

NC

2 CP5A2-12

E, 65" E, 65" E TV

NC NC

NC

NC CP5A2-19 2

TV

Room 522

NC

NC

NEGATIVE AIR 520

3

NC

NC NC

CP5A2-8 2

NC

NC

NC

NC

TV

TV

NC NC

NC

NC

NC NC NC

NC

NC

NC

TV

TV

NC NC

NC

NC

TV

NC

NC

NC

TV

TV

NC

E TTC5B

NC

NC

NC

NC

NC

NC

E

NC

CP5A2

NC

NP5B

1

3

NC

NC

NC

NC

NC

NC

NC NC

E TVC5 NC

E ELEC

ICC5

551

E

FATC5

NC

MASTER E

DCTC5 NC

EQUIPMENT 553

TV

CP5A2-20 NC CP5A2-21 2

1 NC

NC TV

2

E NP5C

E501

(3) 4"C.

Room 526

E CP5B

NC NC

NC

NC

NC

NC

NC

NC T51 T52 8"x 2" T53 T54

NC

NC

CP CLEAN UTILITY 558

2 CP5B2-23

TV

NC

NC

NC

NC

NC

NC

E

NC

2 CP5A2-22

NC

NC

STORAGE 554

E400

O

TTC5C

FESSION PRO AL RE

G . NO.

GINEER EN

6

Room 530

E

ED

S

D1

SOILED UTILITY 555

TV

NC

CP5B2-22 2

TV

NUTRITION 556

Room 528

CP5A

NC STOREROOM 557

9

NC

NP5A E

SOILED UTILITY 559

8"x 2"

Room 560

NC

PHASE 2

10206 TRACY J. HAUSER U

A

Room 562

NC

T

CP5B2-24 2

HSKG 552

Room 524

2

REGIST ER

TV

TTC5A NC

2 CP5B2-25 NC

D

CP5A2-7 2

CP5A2-6 2

NC

NC

E

TV

PHASE 3

PATIENT RM 516

E400

Room 564

9

CP5A2-5 2

PATIENT RM 514

NC

NC

NC

C1

CP5A2-3 2

PATIENT RM 512

8"x 2"

C

NC

MECH. NC565 NC

PATIENT RM 510

CP5A2-4 2

NC

CORRIDOR 5901

PATIENT RM 508

NC

Room 566

10

PATIENT RM 506

NC

TV

CP5A2-2 2

NC

NC

CP5B2-26 2

CP5A2-1 2 NC

NC

NC

2.1

NC

1.7

PATIENT RM 504

NC

OFFICE 5902

B1.1

PATIENT RM 502

NC

8

PATIENT RM 500

NC

NC

FS.D.

3

TV

3

NC

NC

T H

K D A

O

NC

E

NC

NC

NC

NC

NC

NC

CP5B2

NP5D NC

NC

1

LS5A E

NC

E

TTC5D

NC

NC

NC

NC

11/25/14 NC

E

NC

NC

NC

NC

NC

NC

NC

4

NC

NC

T

TV

PATIENT RM 536

TV

NC

NC

PATIENT RM 538

FAMILY WAITING 558

NC

NC

NC NC TV

TV

PATIENT RM 540

TV

NC

NC

CP5B2-3

2

NC

NC

NC

NC

NC

NC NC

NC NC

PATIENT RM 542

Date

CP5B2-4

NC

NC TV

PATIENT RM 544

NC

NC NC TV

TV

PATIENT RM 546

NC

NC NC

NC

NC

NC

NC

NC

NC NC

NC

2 CP5B2-7

NC

NC

NC TV

PATIENT RM 548

2 CP5B2-6

Description

PATIENT RM 534

G 44" STORAGE 560

RESTROOM 559

T 3

APULL

3

T

FS.D.

F

PULL

PATIENT RM 550

CP5B2-8

2

2 CP5B2-5

2 CP5A2-23

FS.D.

NC BED

NC

TV

V/D BSID2D NC

G

G 44" 3

NC

2D

CP5B2-13 2

NC

E, 65" 7 EF-2

2 CP5B2-9

NC

ISOLATION 554

2 CP5B2-10 CP5B2-11

FS.D.

4

TV 5

2

2

NC E, 65"

NC

NC

NC

NC

E1

NC

NC

2 CP5B2-21

TV

NC

NC

Room 556

4

No.

NC

F1 9

1b 1

99

1

1c

2b

3c

3A

4 4a

PHASE 1

5

5.1

6

B1.2 7

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

8

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER

FIFTH LEVEL - POWER 1/8" = 1'-0"

2014

C

4TH & 5TH FIFTH LEVEL POWER AND SYSTEMS PLAN

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:49 PM

E251 Scale

1/8" = 1'-0"

SHEET NOTES

GENERAL NOTES

1

A.

PROVIDE DEVICE'S MOUNTING HEIGHTS PER ARCHITECTURAL INTERIOR ELEVATIONS.

B.

PROVIDE FOR PATIENT ROOMS RENOVATED BY THIS PROJECT PER TYPICAL PATIENT ROOMS INDICATED ON THIS SHEET.

2

EXISTING BACK BOX AND CONDUIT IN FOOTWALL SHALL REMAIN, DEMOLISH EXISTING DEVICE AND CRITICAL BRANCH CIRCUIT BACK TO SOURCE PANELBOARD. PROVIDE NEW DEVICE AND BRANCH CIRCUIT AS INDICATED ON NEW WORK FLOOR PLAN.

3

DEMOLISH EXISTING COMMUNICATIONS OUTLET AND ASSOCIATED CONDUIT IN WALL. EXISTING TWISTED PAIR VOICE CABLING, DISCONNECT AT BOTH ENDS AND DEMOLISH BACK TO SOURCE CORRIDOR TELEPHONE CABINET. RETAIN EXISTING DATA CABLING, FIELD VERIFY QUANTITIES INDICATED ON FLOOR PLAN. COIL CABLING UP IN CEILING ABOVE AND PROTECT DURING CONSTRUCTION FOR REUSE. REUSE EXISTING CABLING TO SERVE DEVICE(S) INDICATED ON NEW WORK FLOOR PLAN. (TYPICAL FOR COMMUNICATIONS OUTLETS INDICATED AS DEMO)

4

EXISTING BRANCH CIRCUITS SERVING DEMOLISHED ELECTRICAL DEVICES SHALL BE REUSED AS INDICATED PER ENLARGED FLOOR PLANS. WHERE EXISTING BRANCH CIRCUITS SHARE COMMON NEUTRAL CONDUCTOR, PROVIDE ADDITIONAL NEUTRAL CONDUCTOR(S) WITHIN EXISTING CONDUIT AS REQUIRED FOR ALL 120V BRANCH CIRCUITS TO HAVE DEDICATED NEUTRAL CONDUCTORS.

5

DEMOLISH WALL MOUNT NURSE CALL DOME LIGHT AT THIS LOCATION.

6

UTILIZE EXISTING DATA CABLING PREVIOUSLY SERVING DEMOLISHED DATA OUTLET.

7

EXISTING TELEVISION POWER RECEPTACLE BRANCH CIRCUITS AND DEMOLISHED FAN COIL UNIT BRANCH CIRCUIT SHARE COMMON NEUTRAL. REFER TO FLOOR PLANS FOR BRANCH CIRCUITS SERVING EXISTING TO REMAIN RECEPTACLES. PROVIDE ONE (1) ADDITIONAL NEUTRAL CONDUCTOR FOR DEDICATED NEUTRALS FOR EXISTING TO REMAIN BRANCH CIRCUITS.

8

DISCONNECT EXISTING CATV CABLING FROM DEMOLISHED OUTLET AND COIL ABOVE CEILING FOR REUSE. PROTECT CABLING DURING CONSTRUCTION, EXTEND CABLING TO NEW LOCATION AS INDICATED ON NEW WORK FLOOR PLAN. DEMOLISH UNUSED CATV CABLING BACK TO SOURCE.

9

PROVIDE INDIVIDUAL120V, 20A TOGGLE SWITCH FOR CONTROL OF EXAM PORTION OF LIGHT FIXTURE. PROVIDE ENGRAVED FACEPLATE, PER SPECIFICATIONS, WITH LABEL INDICATING 'EXAM LIGHT'.

10

AMBIENT (ZONE 'd') AND READING (ZONE 'e') PORTION OF LIGHT FIXTURE SHALL BE CONTROLLED BY NURSE CALL PILLOW SPEAKER. PROVIDE RELAY(S) TO INTERCONNECT NURSE CALL SYSTEM WITH AMBIENT AND READING PORTION OF LIGHT FIXTURE.

11

UTILIZE EXISTING CATV CABLING TO SERVE NEW OUTLET ON NEW WALL. (TYPICAL)

12

CONNECT TO EXISTING NORMAL SOURCE 120V, 20A RECEPTACLE BRANCH CIRCUIT PREVIOUSLY SERVING DEMOLISHED DEVICES, MADE AVAILABLE DURING DEMOLITION OF THIS PROJECT.

13

REFER TO 1/8" SCALE FLOOR PLANS FOR CRITICAL BRANCH CIRCUIT SERVING EACH PATIENT ROOM.

14

REFER TO FLOOR PLANS FOR CRITICAL LIGHTING BRANCH CIRCUIT SERVING EACH PATIENT ROOM. WHERE BRANCH CIRCUIT IS INDICATED IN MULTIPLE PATIENT ROOMS, ASSOCIATED LIGHTING SHALL SHARE COMMON BRANCH CIRCUIT INDICATED.

15

CONNECT TO EXISTING NORMAL SOURCE 120V, 20A LIGHTING BRANCH CIRCUIT PREVIOUSLY SERVING DEMOLISHED DEVICES, MADE AVAILABLE DURING DEMOLITION OF THIS PROJECT.

1

A1

A1

A1 D

f

c

2D

B B.0

f

H1

10

D

6

PB

9 54"

2

D1 b

D1 b

c b

U2

B1.1

NC

W2

B1.1

PULL

g

U2

a D1

B1.1

SHOWER D2

CP5A2-9 14

12

A1

NC

APULL D1

G 44"

a g a

DOME NC

W1 5

15

TYPICAL NORTH & SOUTH PATIENT ROOM LAYOUT 5TH LEVEL - POWER AND SYSTEMS

2

1/4" = 1'-0"

E, 65"

TYPICAL NORTH & SOUTH PATIENT ROOM LAYOUT 5TH LEVEL - DEMO (SIMILAR FOR EAST & WEST PATIENT ROOMS)

1

1/4" = 1'-0"

1/4" = 1'-0"

b W2 g

TV E, 65"

c

D

15 D1 a

DOME

D1

D

g U2

D1

W1 CP5B2-27 14

BSID NC

TYPICAL EAST & WEST PATIENT ROOM LAYOUT 5TH LEVEL - POWER AND SYSTEMS 1/4" = 1'-0"

A1

D2

5

b

U

T H

K D A

O

Description

Date

D1 f

D1

TYPICAL EAST & WEST PATIENT ROOM LAYOUT 5TH LEVEL - LIGHTING 1/4" = 1'-0"

10206 TRACY J. HAUSER

H1

E

8

G . NO.

11/25/14

No.

V/D

RE

4

12

SHOWER

6

SHOWER

E

PULL NC

f

c

6 APULL NC

E, 65"

O

a

G, 44"

2D BED NC

7 E, 65"

D1

FESSION PRO AL

S

12

CP5A2-24 13

b

f

D1

TV

ED

D

NC

TYPICAL NORTH & SOUTH PATIENT ROOM LAYOUT 5TH LEVEL - LIGHTING

GINEER EN

NC PB

D1

3

42"

CP5B2-1 13

3

4

E, 65" 7

D

NC

BED

2D 54"

D V/2D

E, 65"

d,e

A

(EXAM) NC

BSID NC

TV

E, 65"

D1

f

T

B B.0

V/D

E, 65"

D1

AVERA FACILITY DEVELOPMENT

REGIST ER

12

TV

B B.0

UNLESS OTHERWISE NOTED, PROVIDE DEMOLITION OF LIGHTING, POWER, & SYSTEMS DEVICES AS REQUIRED FOR DEMOLITION, LOCATED WITHIN BOUNDARY. RETAIN LIGHTING AND POWER BRANCH CIRCUITS. DEMOLISH BACK TO SOURCE CABINET INTERCOM AND DICTATION SYSTEM DEVICES.

3

10 de

E

8 4

V

D

8

FIFTH LEVEL DEMOLITION - ELECTRICAL - Callout 1 1/4" = 1'-0"

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS. INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER 2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SACRED HEART 4TH & 5TH ENLARGED FLOOR PLANS & TYPICAL ROOM LAYOUTS Date

SES PROJECT # 14041

11/25/2014 2:15:50 PM

E400 Scale

NONE

EQUIPMENT CONNECTION SCHEDULE MARK

DESCRIPTION

AHU-10-RF-1 AHU-10-RF-2 AHU-10-SF-1 AHU-10-SF-2 EF-1 EF-2

AIR HANDLING UNIT AIR HANDLING UNIT AIR HANDLING UNIT AIR HANDLING UNIT EXHAUST FAN EXHAUST FAN

HP/KW/ FLA VOLTS PHASE MCA 10 HP 10 HP 20 HP 20 HP 1/2 HP 3/4 HP

480 V 480 V 480 V 480 V 120 V 120 V

3 3 3 3 1 1

MOCP

LOAD.

STARTER/ CONTROLLER

35 35 70 70 20 35

11639 VA 11639 VA 22447 VA 22447 VA 1176 VA 1656 VA

VFD VFD VFD VFD DIV 15 DIV 15

17.5 17.5 33.8 33.8 17.3 17.3

LIGHTING FIXTURE SCHEDULE

CONTROL TYPE DISCONNECT DDC/FA STOP DDC/FA STOP DDC/FA STOP DDC/FA STOP CONT. CONT.

FEEDER

DIV 15 DIV 15 DIV 15 DIV 15 DIV 15 DIV 15

PANEL. GEN

(1M) (1/2 - 10 HP 480V) 3-#12, #12 GND - 3/4"C. (1M) (1/2 - 10 HP 480V) 3-#12, #12 GND - 3/4"C. (3M) (20 HP 480V) 3-#8, #8 GND - 1"C. (3M) (20 HP 480V) 3-#8, #8 GND - 1"C. (1M1) (1/6 - 1 HP 120V) 2-#12, #12 GND - 3/4"C. (1M1) (1/6 - 1 HP 120V) 2-#12, #12 GND - 3/4"C.

EP3A MCC-1 EP3A MCC-1 CP5A2 CP5B2

Yes No Yes No Yes No

FIXTURE NO. SUBS MANUFACTURER

KEY NOTES

A1 D1 D2 H1 L1 U2 W1 W2

NOTE 1 NOTE 1

KEY NOTES: (EQUIPMENT CONNECTION SCHEDULE)

P P P P P P P P

LITHONIA WILA GOTHAM KENALL LITHONIA HEALTHCARE TECH LIGHTING HEALTHCARE

CATALOG NO. (NOTE A)

LAMP

2VT8-2-17-ADP-MVOLT-GEB10IS 621-549-DA60-80-120-DFS-BDIM EVO-35-10-6-DFR-MVOLT MPC24-G-1/1/3-50B-120-L-LVC SP8-G-2-32-A12125-MVOLT-GEB10RS HUC523-120-LED35-AM 700BCLYNN-W-S-LED HNL610-MVOLT-LEDAMB-AM

(2) 17W T8 LED LED (5) F50TT (BIAX) 2 -32W T8 LED LED LED

INPUT VOLTAGE WATTS 120 V 120 V 120 V 120 V 120 V 120 V 120 V 120 V

36 W 15 W 22 W 278 W 66 W 14 W 20 W 3W

MOUNTING

DESCRIPTION

NOTES

CEILING RECESSED CEILING RECESSED CEILING RECESSED CEILING RECESSED CEILING RECESSED SURFACE WALL SURFACE WALL RECESSED

2x2 VOLUMETRIC - 2 LAMP 4" LOW PROFILE DOWNLIGHT 6" SHOWER LIGHT 2x4 MULTIFUNCTION EXAM LIGHT 2x4 LENSED TROFFER 2' UNDERCABINET TASK LIGHT VANITY NIGHT LIGHT

NOTE 1 NOTE 1

AVERA FACILITY DEVELOPMENT

1. PROVIDE NEW FUSED SWITCH WITHIN EXISTING MOTOR CONTROL CENTER, SWITCH SHALL MATCH MANUFACTURER AND RATINGS OF EXISTING. KEY NOTES: 1. WALL MOUNTING - COORDINATE EXACT MOUNTING LOCATION WITH ARCHITECT AND ARCHITECTURAL DETAILS.

GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)

2. PENDANT/SUSPENSION MOUNTING - COORDINATE EXACT LOCATION, MOUNTING ELEVATION, AND REQUIRED PENDANT/SUSPENSION LENGTH WITH ARCHITECT AND ARCHITECTURAL DETAILS.

A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY QUANTITY ON PLANS. REFER TO DEFINITIONS BELOW FOR CLARIFICATION OF CONNECTION REQUIREMENTS. B. ITEMS NOTED AS "NA" ARE NOT APPLICABLE TO THE CONNECTION. C. "STARTER/CONTROLLER" - PROVIDE STARTER AND ASSOCIATED CONNECTIONS TO EQUIPMENT AND BRANCH CIRCUIT: ·"MAG" = COMBINATION MAGNETIC MOTOR STARTER WITH DISCONNECT (COORDINATE COIL VOLTAGE WITH CONTROL SOURCE). ·"MAN" = COMBINATION MANUAL MOTOR STARTER WITH DISCONNECT. ·"DIV 15" = STARTER OR CONTROLLER IS FURNISHED BY MECHANICAL CONTRACTOR, TEMPERATURE CONTROLS CONTRACTOR, OR PROVIDED WITH ·EQUIPMENT. ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR THESE LOOSE STARTERS AND CONTROLLERS. ·"VFD-___" = VARIABLE FREQUENCY DRIVE CONTROLLER FURNISHED BY MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE VFD CONTROLLERS FURNISHED BY THE MECHANICAL CONTRACTOR. REFER TO MECHANICAL DOCUMENTS FOR VFD LOCATIONS AND QUANTITIES. ·"INT" = STARTER/CONTROLLER IS MANUFACTURED INTEGRAL TO THE EQUIPMENT. ·LOCATE STARTER/CONTROLLER ADJACENT TO INDOOR EQUIPMENT - PROVIDE WITH STRUT MOUNTING AS REQUIRED. ·WHERE STARTER SERVES OUTDOOR EQUIPMENT, LOCATE STARTER IN THE SOURCE ELECTRICAL ROOM. D. "CONTROL TYPE" - PROVIDE CONTROL AND CONNECTIONS: ·"INT" = CONTROLS ARE MANUFACTURED INTEGRAL TO THE EQUIPMENT (SELF-CONTAINED). ·"CONT" = EQUIPMENT OPERATES CONTINUOUSLY (NO CONTROLS). ·"NONE" = EQUIPMENT OPERATES CONTINUOUSLY OR CONTROLS ARE SELF-CONTAINED. ·"DDC" = CONTROL SIGNAL FROM TEMPERATURE CONTROL SYSTEM PROVIDED BY MECHANICAL CONTRACTOR OR TEMPERATURE CONTROLS CONTRACTOR. ·"TIME SW" = CONTROL SIGNAL FROM TIME SWITCH PROVIDED BY ELECTRICAL CONTRACTOR. TIME SWITCH SHALL BE 7-DAY DIGITAL TYPE WITH AUTOMATIC DAYLIGHT SAVINGS ADJUSTMENTS AND BATTERY BACKUP. LOCATE TIMESWITCH IN NEAREST MECHANICAL OR ELECTRICAL UTILITY ROOM. LABEL TIME SWITCH. COORDINATE TIME SCHEDULE WITH OWNER AND MECHANICAL ENGINEER. ·"WALL SW" = CONTROL SIGNAL FROM WALL SWITCH PROVIDED BY ELECTRICAL CONTRACTOR. COORDINATE LOCATION OF WALL SWITCH WITH OWNER. LABEL WALL SWITCH. ·"FA STOP" = FANS WITH CFM OF 2000 OR GREATER AND FANS SERVING DUCTS CONTAINING SMOKE DAMPERS. FIRE ALARM SYSTEM SHALL SHUTDOWN FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT. PROVIDE WITH INDIVIDUAL ADDRESSABLE CONTROL MODULE AT MOTOR CONTROLLER/STARTER AND CONNECT TO SHUTDOWN FAN. ·"FA START" = FANS USED FOR SMOKE EVACUATION OR PRESSURIZATION. FIRE ALARM SYSTEM SHALL START FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT. PROVIDE WITH INDIVIDUAL ADDRESSABLE CONTROL MODULE AT MOTOR CONTROLLER/STARTER AND CONNECT TO START FAN. ·"DATA" = PROVIDE WITH DATA CONNECTION FROM NEAREST DATA NETWORK COMMUNICATIONS ROOM. ·"CONDUIT" = PROVIDE EMPTY 3/4" CONTROLS CONDUIT BETWEEN INDOOR AND OUTDOOR UNIT TO ACCOMMODATE CONTROL CABLING BY MECHANICAL OR TEMPERATURE CONTROLS CONTRACTOR. E. "DISCONNECT" - PROVIDE DISCONNECT/RECEPTACLE AT EQUIPMENT LOCATION AND ASSOCIATED CONNECTION TO EQUIPMENT AND BRANCH CIRCUIT: ·"NEMA-___" = DUPLEX (TYP) RECEPTACLE TO ACCOMMODATE CORD AND PLUG CONNECTION (CORD AND PLUG FURNISHED WITH EQUIPMENT UNLESS NOTED OTHERWISE) ·"REC/SW" = PROVIDE 20A 120V RECEPTACLE OR 20A TOGGLE SWITCH DISCONNECT. COORDINATE REQUIRED SELECTION WITH EQUIPMENT. ·"NF" = NON-FUSED DISCONNECT. SIZE AND POLE QUANTITY AS INDICATED. 20/1 AND SMALLER SHALL BE TOGGLE SWITCH DISCONNECT. ·"F" = FUSED DISCONNECT. SIZE AND POLE QUANTITY AS INDICATED. FUSE PER MANUFACTURER'S RECOMMENDATIONS. ·"FUSTAT" = SWITCH AND FUSTAT. FUSE SIZE PER EQUIPMENT MANUFACTURER. LOCATE SWITCH IN CONCEALED ACCESSIBLE LOCATION. ·"ENCL CB" = ENCLOSED CIRCUIT BREAKER DISCONNECT. SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED. ·"ENCL MCSW" = ENCLOSED MOLDED CASE SWITCH DISCONNECT. SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED. ·"SHUNT ENCL CB" = SHUNT TRIP ENCLOSED CIRCUIT BREAKER DISCONNECT. SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED. PROVIDE WITH INTEGRAL 120V CONTROL TRANSFORMER SERVED FROM LINE SOURCE WITH PRIMARY AND SECONDARY FUSING. COORDINATE ENCLOSURE AND COVER SIZE TO ACCOMMODATE TRANSFORMER. PROVIDE WITH EQUIPMENT GROUND BAR AND SEPARATE INSULATED ISOLATED GROUND BAR. WHERE NEUTRAL CONDUCTOR IS UTILIZED, PROVIDE SOLID NEUTRAL BAR. CONNECT SHUNT TRIP VOLTAGE SOURCE AND ACTUATOR TO ASSOCIATED EMERGENCY POWER OFF (EPO) SWITCHES. PROVIDE EPO AND COORDINATE LOCATION. ·"DIV 15" = DISCONNECT IS FURNISHED BY MECHANICAL CONTRACTOR OR PROVIDED WITH MECHANICAL EQUIPMENT. ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY THE MECHANICAL CONTRACTOR. ·INT" = DISCONNECT IS MANUFACTURED INTEGRAL TO THE EQUIPMENT. ·"HW" = HARDWIRE. DISCONNECT NOT REQUIRED. ·LOCATE DISCONNECT ADJACENT TO EQUIPMENT PER NEC - PROVIDE WITH STRUT MOUNTING AS REQUIRED. ·LOCATE RECEPTACLE OR JUNCTION BOX TO DIRECTLY SERVE EQUIPMENT. COORDINATE EXACT LOCATION WITH ARCHITECT, ARCHITECTURAL DETAILS, AND EQUIPMENT MANUFACTURER'S REQUIREMENTS. ·WHERE DISCONNECT SERVES OUTDOOR EQUIPMENT, PROVIDE AS NEMA-3R. ·PROVIDE DISCONNECT WITH EQUIPMENT GROUND KIT. ·WHERE FEEDER INDICATED UTILIZES A NEUTRAL, PROVIDE DISCONNECT WITH SOLID NEUTRAL KIT. ·WHERE FEEDER INDICATED UTILIZES AN ISOLATED GROUND, PROVIDE DISCONNECT WITH ADDITIONAL INSULATED GROUND KIT. ·DISCONNECTS NOT SHOWN AS "F" OR "NF" SHALL BE NON-FUSED. ·DISCONNECTS OF MOTORS SERVED FROM A VFD SHALL CONTAIN AUXILIARY CONTACTS CONNECTED TO THE VFD TO DISABLE VFD UPON DISCONNECTION. ·WHERE STARTERS VFD'S CONTAIN INTEGRAL DISCONNECTS AND ARE LOCATED PER NEC TO SATISFY AS THE EQUIPMENT DISCONNECT, AN ADDITIONAL EQUIPMENT DISCONNECT IS NOT REQUIRED. F. "GEN" ·EQUIPMENT IS SERVED FROM A SOURCE PANEL PROVIDED WITH GENERATOR BACK-UP.

GENERAL NOTES: A. CATALOG NUMBER VERIFICATION - CONTRACTOR SHALL VERIFY LIGHTING FIXTURE INSTALLATION REQUIREMENTS AND CATALOG NUMBER PRIOR TO ORDERING. B. SUBSTITUTIONS - WHERE INDICATED WITH 'N' (NO), NO SUBSTITUTIONS WILL BE ACCEPTED. WHERE INDICATED WITH 'P' (PRIOR APPROVAL), SUBSTITUTIONS MUST BE APPROVED PRIOR TO BID WITH ACCEPTANCE ISSUED BY ADDENDUM. WHERE INDICATED WITH 'Y' (YES), THE FOLLOWING MANUFACTURER'S ARE CONSIDERED ACCEPTABLE EQUIVALENT MANUFACTURER'S, PROVIDED THE EQUIVALENT FIXTURE IS OF THE SAME QUALITY, EFFICIENCY, PERFORMANCE AND CHARACTERISTICS AS THAT SCHEDULED: 1. ACUITY BRANDS 2. COOPER 3. HUBBELL 4. WILLIAMS SEE PROJECT SPECIFICATIONS FOR SPECIFIC MANUFACTURER/MODEL EQUIVALENCY OF COMMONLY USED LIGHTING FIXTURE TYPES. ABSENCE OF A SELECTION INDICATES THAT PRIOR APPROVALS ARE REQUIRED. C. DOWNLIGHT CEILING TRIM FINISH/COLOR SELECTION: PROVIDE DOWNLIGHT REFLECTOR FINISH/COLOR AS SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE. SELECT CEILING TRIM FINISH/COLOR TO COORDINATE WITH CEILING TYPE. "WHITE" TRIM FOR DOWNLIGHTS MOUNTED IN WHITE ACOUSTICAL TILE CEILINGS. "CLEAR" (TO MATCH REFLECTOR FINISH/COLOR) FOR DOWNLIGHTS MOUNTED IN PAINTED GYPSUM BOARD CEILINGS. D. PRIOR APPROVALS - THE FOLLOWING MANUFACTURERS ARE APPROVED EQUALS FOR THE FIXTURE TYPE INDICATED: A1 - COLUMBIA LIGHTING D1 & D2 - PRESCOLITE H1 - NEW STAR LIGHTING L1 - COLUMBIA P1 - AFX INC. W1 - ACCESS LIGHTING W2 - NEW STAR LIGHTING

MMP20

3M TO EP3A

3M

SENSOR

PLUG

Ir (tr)

Isd (tsd)

Ii

JKS FUSE

CLASS J

200

--

--

--

--

SQUARE D

TYP. 120V BRANCH CIRCUIT

SQUARE D

QO

SQUARE D

5

6 H203 W1

DETAIL NOTE A

3M 3M

SF-1

3

PE 20HP

27-32A

DISCONNECT AHU SUPPLY FANS FROM FURNISHED VFD. PROVIDE INDIVIDUALLY MOUNTED 20 HP VFDS AND CONNECT SUPPLY FANS AS INDICATED.

NB

(136) MMP60

3M

3

4 H602 V1

M

5

6 H603 W1

3M 3M

3

SF-2

PE 20HP

27-32A

GROUND

NB

AHU-10 SUPPLY FANS CONNECTION DETAIL

JGE

250

100

A 100 (7)

12 (J,K,L)

FIXED

LD

250

250

250 (4)

--

12

HD

150

150

100 (FIXED)

3 (FIXED)

15

--

20

--

FIXED

--

--

MARK

NOMINAL SIZE

1M 1M1 3M 10N 11 11N 14 16T

---110 A 125 A 125 A 200 A 250 A

ED

FESSION PRO AL RE

G . NO.

10206 TRACY J. HAUSER U

A

3M

MTR6

3M

T

TO MCC1

2 H601 U1

REGIST ER

3M

1

GINEER EN

FRAME

CDP2 BRANCH

CDP2 MAIN

CUTLER HAMMER

M

T H

K D A

O

NOT TO SCALE

FEEDER SCHEDULE

TYPE

JG WITH DIGITRIP 310 POWERPACT WITH MICROLOGIC 3.3 TU POWERPACT WITH MICROLOGIC 3.3 TU

HGEN - CDP2

4 H202 V1

O

BUSSMANN

3

S

MSWB - CDP2

MTR2

3M

GROUND

OVERCURRENT DEVICE SETTINGS SCHEDULE MANUFACTURER

2 H201 U1

PROVIDE INDIVIDUALLY MOUNTED COMBINATION H.D. NON-FUSED SAFETY SWITCH AND VFD-20HP(70A FUSES)

1 DEVICE

3M

1

11/25/14

WIRE AND CONDUIT No.

MMP10

3-#12, #12 GND - 3/4"C. 2-#12, #12 GND - 3/4"C. 3-#8, #8 GND - 1"C. 4-#1, #6 GND - 2"C. 3-#1, #6 GND - 1-1/2"C. 4-#1/0, #6 GND - 2"C. 3-#3/0, #6 GND - 2"C. 4-300 KCMIL, #2 GND - 3"C.

1M TO EP3A

1M

1

2 H101 U1

MTR1

3

4 H102 V1

M

1M

6 H103 W1

1M

3

PE 10HP

11-16A

GROUND PROVIDE INDIVIDUALLY MOUNTED COMBINATION H.D. NON-FUSED SAFETY SWITCH AND VFD-10HP(35A FUSES)

GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)

Date

DETAIL NOTE A

1M 5

1M

RF-1

Description

DISCONNECT AHU SUPPLY FANS FROM FURNISHED VFD. PROVIDE INDIVIDUALLY MOUNTED 20 HP VFDS AND CONNECT SUPPLY FANS AS INDICATED.

NB

(136) MMP50

A. DEVICES AND SETTINGS HAVE BEEN SELECTED TO ENSURE SELECTIVE COORDINATION TO 0.01 SECONDS. ANY SUBSTITUTIONS SHALL BE APPROVED BY THE ENGINEER OF RECORD, PROVIDE SELECTIVE COORDINATION STUDY FOR ANY SUBSTITUTIONS. 1M TO MCC1

1M 1M

1

2 H501 U1

MTR6

3

4 H502 V1

M

5

6 H503 W1

1M 1M 1M

11-16A

3

PE 10HP

GROUND

2

RF-2

NB

AHU-10 RETURN FANS CONNECTION DETAIL NOT TO SCALE

INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH CIRCUITS.

SACRED HEART

INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V OR 277V PHASE CONDUCTOR SERVED FROM A SINGLE POLE CIRCUIT BREAKER 2014

C

4TH & 5TH ELECTRICAL SCHEDULES

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:50 PM

E500 Scale

NONE

GENERAL NOTES

D D

IN PATIENT FLOORS CORRIDORS. SUPPORT CABLE WITH J-HOOK TYPE CABLE SUPPORT OR APPROVED EQUAL, MAX OF 5' ON CENTER

CABLE TRAY PER PLANS

SHEET NOTES

A. COORDINATE RACKS LAYOUTS WITH OWNERS IT REPRESENTATIVE PRIOR TO STARTING WORK. B. PROVIDE #6 AWG CU GREEN GROUND FROM TELECOM RACKS TO GROUND BAR OF NEW CRITICAL PANEL ON ROOF.

1

2 3

PROVIDE WITH BUSHING

ROOF 2092"

ROOF 174' - 4"

ROUTE COMMUNICATIONS CABLES ABOVE ACCESSIBLE CEILING TO FLOOR SERVING EQUIPMENT

4' - 7 15/16"

4

1' - 8 5/8" PROVIDE 1" CONDUIT STUBBED UP ABOVE NEAREST ACCESSIBLE CORRIDOR CEILING

TV OR

2' - 11" MAXIMUM 12" BETWEEN BOX CENTERS UNLESS SPECIFICALLY NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL DETAILS.

PROVIDE 4" SQUARE BY 2-1/8" DEEP BOX WITH SINGLE GANG PLASTER RING

GENERAL NOTES: 1. PROVIDE CABLING PER SPECIFICATIONS AND PLANS. 2. LABEL CABLES PER ANSI/TIA/EIA-606 STANDARDS.

T5 3

3

5

EXISTING DOOR TO REMAIN.

6

EXISTING WALL TO REMAIN.

7

SEE ARCHITECTURAL DRAWINGS FOR RACKS ENCLOSURE ASSEMBLY.

8

PROVIDE RACKS T51 AND T52 FIRST. OWNER WILL MIGRATE ELECTRONICS, PATCH PANELS, AND SWITCHES SERVING EXISTING OUTLETS TO THESE RACKS. REMOVE CABINETS T5. THEN PROVIDE RACKS T53 AND T54.

9

PROVIDE 30/1 125V SIMPLEX RECEPTACLE (CRITICAL BRANCH SOURCE) VIA #10 AWG. SEE ELECTRICAL DRAWINGS. PROVIDE 30/1 CIRCUIT BREAKER TO MATCH RATING OF EXISTING.

8

CR

10 EXISTING CABLES ROUTE THROUGH OPENING IN WALL. ALL REROUTED AND NEW CABLES SHALL BE ROUTED FROM ABOVE, NOT IN EXSTING WALL CAVITY.

9

11 OWNER FURNISHED, OWNER INSTALLED 25PR COPPER FROM RACK TO 3RD FLOOR TELECOM ROOM PHONE WALL FIELD. OWNER TO PROVIDE TERMINATION ON 110 WALL MOUNTED BLOCKS ON 3RD FLOOR AND ON RACK PATCH PANELS ON 5TH FLOOR.

10

5 11

2

RECEPTACLE PER PLAN

T54

T52

FIFTH LEVEL 1940"

FIFTH LEVEL 161' - 8"

T53

T51

TYPICAL CORRIDOR PHONE CABINET 'TTC__'

T5 D D

T54

EXISTING COPPER PAIRS BUNDLE

T52

AVERA FACILITY DEVELOPMENT FIFTH LEVEL

COPPER CABLING FURNISHED AND INSTALLED BY OWNER FOURTH LEVEL

E

SERVICE PROVIDER VOICE ROUTER, PRIMARY PROTECTION, AND WALL FIELD.

1

1.

PROVIDE WALL RACKS T51 AND T52.

2.

PROVIDE 120V 30/1 RECEPTACLES.

Communications or CATV Outlet

3.

PROVIDE FIBER TERMINATION EQUIPMENT.

4.

OWNER TO PROVIDE PHONE RISER CABLE.

NOT TO SCALE

5.

OWNER WILL MIGRATE EXISTING SWITCHES, RACK PATCH PANELS, UPS'S, ELECTRONICS AND EXISTING CABLES TO RACKS T51 AND T52.

6.

AFTER MIGRATION OF EXISTING ELECTRONICS AND CABLES TO RACKS T51 AND T52 IS COMPLETE, PROVIDE WALL RACKS T53 AND T54.

7.

PROVIDE NEW DATA AND VOICE OUTLETS AND CABLES AS REQUIRED BY CONSTRUCTION SPECIFICATIONS.

OWNER FURNISHED, OWNER INSTALLED WALL MOUNT 110 BLOCKS TO ACCOMMODATE COPPER BACKBONE AND CROSS CONNECT TO SERVER.

E

12 EXISTING CRITICAL BRANCH RECEPTACLE SHALL BE RELOCATED OUT OF FOOTPRINT OF NEW WALL MOUNT TELECOM RACKS. RECONNECT TO EXISTING CRITICAL BRANCH CIRCUIT PREVIOUSLY SERVING DEVICE.

DESCRIPTION OF WORK

2

EXISTING DATA CABINET

NURSES STATION

NURSES STATION

CP5A2-11 T51

1

TERMINATE CABLES AND PROVIDE FACEPLATE PER SPECIFICATIONS, PROVIDE BLANK COVERPLATES FOR LOCATIONS WITHOUT CABLING

CABLE TRAY, REFER TO FLOOR PLANS FOR SIZES.

6 T53

EXISTING 25PR COPPER FROM 48 PORT ORTRONICS RACK MOUNT, VOICE PATCH PANEL ON 5TH LEVEL TO 3RD FLOOR VOICE WALL FIELD. RELOCATION BY OWNER IT. (5TH FLOOR ONLY) EXISTING (TO BE RELOCATED AND RECONNECTED BY OWNER IT) 12 STRAND FIBER CABLE. EXISTING WALL MOUNTED SWING OPEN TYPE 19" VOICE AND DATA RACK.(T5). REMOVE T5 AFTER T51 AND T52 ARE INSTALLED AND SERVING EXISTING OUTLETS. PROVIDE T5 TO OWNER.

4

7 12

PROVIDE AT PLAN SYMBOL

TELECOM RACK (TYP.)

THIRD LEVEL

Telecommunications Cabling Routing Schematic NOT TO SCALE

Data Closet Elevation 1/4" = 1'-0"

FIRE ALARM CONTROL RELAY. PROVIDE (1) RELAY PER AIR HANDLING UNIT ZONE (TYP)

TO ADDITIONAL RELAYS

TO ADDITIONAL DAMPERS SERVING SAME AIR HANDLING UNIT ZONE. (TYP)

M CIRCUIT PER PLANS PROVIDE HORIZONTAL CABLING PER SPECIFICATIONS UNSWITCHED BRANCH CIRCUIT SOURCE PER PLAN

LABELING TO MATCH LOCATION SERVED BY OWNER

M LEGEND

LOW VOLTAGE WIRING PER MANUFACTURER'S RECOMMENDATIONS

XXX

120V. POWER F.A. CONTROL CIRCUIT

PROVIDED LABELING SCHEME AS DIRECTED BY OWNER

NOTES: 1. VERIFY ARRANGEMENT OF AIR HANDLING UNIT ZONES WITH MECHANICAL 2.

Typical Voice Information Delivery

FIRE ALARM CONTROL PANEL

UNDERCABINET LIGHT FIXTURE(S) (WHERE APPLICABLE)

NOT TO SCALE

LINE VOLTAGE TOGGLE SWITCH

LINE VOLTAGE TOGGLE OR DIMMER SWITCH (ROOMS WITH MULTIPLE ZONES) LINE VOLTAGE TOGGLE SWITCH

INDIVIDUAL ROOM/CORRIDOR

1. PROVIDE ALL NECESSARY COMPONENTS FOR A COMPLETE INSTALLATION. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 2. WHERE CEILING LIGHT FIXTURES ARE 277V, PROVIDE ADDITIONAL RELAYS AND POWER PACKS AS NECESSARY TO CONTROL 120V UNDERCABINET LIGHTING. DATA SWITCH(ES) PROVIDED BY OWNER

OWNER PROVIDED 48 PORT PATCH PANEL(S) (TYPICAL)

PROVIDE HORIZONTAL CABLING PER SPECIFICATION

FIBER ENCLOSURE

OWNER PROVIDED LABELING TO MATCH LOCATION SERVED EXISTING FIBER BACKBONE CABLE

OWNER WILL PROVIDE 2 STRAND FIBER WITH CONNECTORS EACH END

RACK MOUNT

NOTES: 1. CONTRACTOR SHALL PROVIDE AND INSTALL PATCH PANELS (TYPICAL). SEE ELECTRICAL DRAWINGS FOR COMMUNICATION DEVICES. CONTRACTOR IS RESPONSIBLE FOR DEVICE COUNT AND QUANTITY OF PATCH PANELS REQUIRED PLUS 1 SPARE PATCH PANEL. 2. COORDINATE INSTALLATIONS WITH OWNER'S IS/IT REPRESENTATIVE.

7

Typical Data Information Delivery NOT TO SCALE

3. WHERE BI-LEVEL SWITCHING IS BEING IMPLEMENTED: 3 LAMP FIXTURES - SWITCH CLOSEST TO DOOR SHALL CONTROL OUTER TWO LAMPS IN EACH FIXTURE. SECOND SWITCH SHALL CONTROL CENTER LAMP IN EACH FIXTURE. 2 LAMP FIXTURES - EACH SWITCH SHALL CONTROL 50% OF THE LIGHT LEVEL IN EACH FIXTURE.

COMMUNICATIONS OUTLET (TYPE INDICATED PER PLAN)

PLAN SYMBOL COMBINATION

3.

RELAY SHALL INTERRUPT DAMPER POWER CIRCUIT UPON ALARM FROM VERIFIED SPOT TYPE DETECTOR WITHIN THE ASSOCIATED AIR HANDLING UNIT ZONE UNLESS OTHERWISE INDICATED.

4.

PROVIDE BREAKER LOCKS ON 120V. CIRCUITS.

G . NO.

10206 TRACY J. HAUSER U

T H

K D A

O

11/25/14

No.

Description

Date

Smoke Damper Connection NOT TO SCALE

CONTROL CONFIGURATION

OCCUPANCY SENSOR WITH DIMMER AND SWITCH

D -OR-

D

OCCUPANCY SENSOR WITH DIMMER OR SWITCH OCCUPANCY SENSOR WITH BILEVEL SWITCHING

3 3

OCCUPANCY SENSOR WITH BILEVEL SWITCHING - MULTIPLE LOCATIONS OCCUPANCY SENSOR ONLY (EXCLUDE WALL SWITCH INDICATED IN DETAIL)

XXX OWNER WILL PROVIDE PATCH CORD(S)

LABEL EACH RELAY WITH THE NAME OF THE AIR HANDLING SERVING THE SMOKE ZONE AND WITH THE WORDS "SMOKE DAMPER CONTROL".

RE

ADDITIONAL LINE VOLTAGE TOGGLE SWITCH FOR BI-LEVEL SWITCHING

NOTES:

PROVIDE FIBER ENCLOSURE(S) WITH CAPACITIES TO ACCOMMODATE EXISTING FIBER CABLES

4

O

PRIMARY LIGHTING ZONE

LOW VOLTAGE CEILING OCCUPANCY SENSOR

FESSION PRO AL

S

NOTES: 1. CONTRACTOR SHALL PROVIDE AND INSTALL PATCH PANELS (TYPICAL). SEE ELECTRICAL DRAWINGS FOR COMMUNICATION DEVICES. CONTRACTOR IS RESPONSIBLE FOR DEVICE COUNT AND QUANTITY OF PATCH PANELS REQUIRED PLUS 1 SPARE PATCH PANEL. 2. COORDINATE INSTALLATIONS WITH OWNER'S IS/IT REPRESENTATIVE.

ED

GINEER EN

OWNER WILL PROVIDE PATCH CORD(S)

6

ADDITIONAL LIGHTING ZONES (WHERE APPLICABLE)

COMMUNICATIONS OUTLET (TYPE INDICATED PER SPECIFICATIONS)

A

TO 3RD FLOOR TELECOM ROOM

POWER PACK(S) IN JUNCTION BOX

T

OWNER PROVIDED 48 PORT PATCH PANEL(S) (TYPICAL)

REGIST ER

OWNER PROVIDED BACKBONE CABLE PER SPECIFICATIONS

120V. MOTORIZED SMOKE DAMPER BY MECHANICAL (TYP)

PROVIDED LABELING SCHEME AS SPECIFIED

5

SACRED HEART

CEILING OCC SENSOR WITH SWITCH OR DIMMER 1/8" = 1'-0"

2014

C

4TH & 5TH ELECTRICAL DETAILS

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

Date

SES PROJECT # 14041

11/25/2014 2:15:50 PM

E501 Scale

NONE

Lighting Panel: CDP-2 Location: Supply From: Branch: Mounting: Ckt Circuit Description 1 3 5 7 9 CP5A2 11 13 15 17 19 21 23 25 27 29

Volts: Phases: Wires: Available SCC (kA):

3RD LEVEL ATS-CDP2 CRITICAL Surface

Opt Rati... Poles

A

9441 VA 100 A

Rating: Mains Type: Panel Poles: Sections:

120/208 Wye 3 4 9.8

B

250 A MCB 30 1

Poles Rati... Opt

C

Circuit Description

9623 VA

3

7390 VA

3

9183 VA 7640 VA

100 A

CP5B2

7820 VA

AVERA FACILITY DEVELOPMENT Ckt 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30

Lighting Panel Remarks: 1. Spare Circuit Breakers: Provide the following spare branch circuit breakers in addition to circuit breakers listed above. Spares: 2-100/3 General Lighting Panel Notes: 1. Panel AIC (Interrupting) Rating shall be minimum 120% of the available SCC (Short Circuit Current). 2. Circuit Breaker Options: 'S' or 'ST' - Provide Shunt Trip Circuit Breaker / 'G' or 'GFCI' - Provide GFCI Circuit Breaker / 'GFP' - Provide GFP Circuit Breaker.

Lighting Panel: CP5A2

20 A 20 A 20 A

1 1 1

540 VA

B 1620 VA

C 1620 VA 1620 VA

940 VA

1410 VA 2000 VA

Poles 1 1 1620 VA 1 1 1 1320 VA 1 1

Rati... Opt Circuit Description 20 A PWR - CNV SPACE 525 20 A PWR - CNV SPACE 523 20 A PWR - CNV SPACE 521 20 A PWR - CNV SPACE 519 20 A LTG ROOM 505,506,507,508 20 A PWR - CNV SPACE 517 20 A LTG SPACE 1845

720 VA

540 VA 540 VA

540 VA 540 VA

540 VA

1 1 1

20 A 20 A 20 A

PWR - CNV SPACE 515 PWR - CNV SPACE 513 PWR - CNV SPACE 512

ED

FESSION PRO AL RE

G . NO.

GINEER EN

Ckt 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42

10206 TRACY J. HAUSER

O

U

A

PWR - CNV PWR - CNV SPACE 514 PWR - CNV

Opt Rati... Poles A 20 A 1 1620 VA 1620 VA 20 A 1 20 A 1 20 A 1 1620 VA 1620 VA 20 A 1 20 A 1 20 A 1 1176 VA 705 VA 20 A 1

100 A MLO 42 1

T

Circuit Description PWR - CNV SPACE 527 PWR - CNV SPACE 524 PWR - CNV SPACE 522 PWR - CNV SPACE 520 LTG ROOM 500,501,502,503,504 PWR SPACE 1949 HVAC PWR - CNV SPACE 512

Rating: Mains Type: Panel Poles: Sections:

120/208 Wye 3 4 4.1

S

Ckt 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Volts: Phases: Wires: Available SCC (kA):

Space 1974 CDP-2 Critical Recessed

REGIST ER

Location: Supply From: Branch: Mounting:

T H

K D A

O

11/25/14

Lighting Panel Remarks: 1. Spare Circuit Breakers: Provide the following spare branch circuit breakers in addition to circuit breakers listed above. Spares: 10-20/1

No.

Description

Date

General Lighting Panel Notes: 1. Panel AIC (Interrupting) Rating shall be minimum 120% of the available SCC (Short Circuit Current). 2. Circuit Breaker Options: 'S' or 'ST' - Provide Shunt Trip Circuit Breaker / 'G' or 'GFCI' - Provide GFCI Circuit Breaker / 'GFP' - Provide GFP Circuit Breaker.

Lighting Panel: CP5B2 Location: Supply From: Branch: Mounting: Ckt 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Circuit Description PWR - CNV SPACE 526 PWR - CNV SPACE 509 PWR - CNV SPACE 507 PWR - CNV SPACE 505 PWR - CNV SPACE 503 PWR - CNV SPACE 501 PWR - CNV SPACE 535 ROOM 529, 1884

Lighting Panel: EP3A Volts: Phases: Wires: Available SCC (kA):

Space 1975 CDP-2 Critical Recessed

Opt Rati... Poles A 20 A 1 720 VA 1307 VA 20 A 1 20 A 1 20 A 1 1620 VA 1620 VA 20 A 1 20 A 1 35 A 1 1620 VA 1656 VA 20 A 1

B 1620 VA

C 1620 VA 1620 VA

1620 VA

Rating: Mains Type: Panel Poles: Sections:

120/208 Wye 3 4 3.9

1620 VA 1620 VA

Poles 1 1 1620 VA 1 1 1 1175 VA 1 1

PWR - CNV SPACE 534 PWR - CNV SPACE 532 PWR - CNV SPACE 530 LTG SPACE 1860

20 A 20 A 20 A 20 A

1 1 1 1

540 VA

540 VA 540 VA

540 VA

Rati... Opt Circuit Description 20 A LTG ROOM 509,510,511,512,513 20 A PWR - CNV SPACE 508 20 A PWR - CNV SPACE 506 20 A PWR - CNV SPACE 504 20 A PWR - CNV SPACE 502 20 A LTG ROOM 514,515,516,517 20 A HVAC

705 VA 705 VA

540 VA 705 VA

213 VA

540 VA

Location: Supply From: Branch: Mounting:

100 A MLO 42 1

1

20 A

ROOM 532, 1873

1 1 1 1

20 A 20 A 20 A 20 A

PWR - CNV SPACE 533 PWR - CNV SPACE 531 PWR - CNV SPACE 529 LTG SPACE 512

Lighting Panel Remarks: 1. Spare Circuit Breakers: Provide the following spare branch circuit breakers in addition to circuit breakers listed above. Spares: 10-20/1 General Lighting Panel Notes: 1. Panel AIC (Interrupting) Rating shall be minimum 120% of the available SCC (Short Circuit Current). 2. Circuit Breaker Options: 'S' or 'ST' - Provide Shunt Trip Circuit Breaker / 'G' or 'GFCI' - Provide GFCI Circuit Breaker / 'GFP' - Provide GFP Circuit Breaker.

Ckt 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42

Ckt Circuit Description 1 3 AHU-10-SF-1 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

3RD LEVEL

Volts: Phases: Wires: Available SCC (kA):

EDP Equipment Surface

Opt Rati... Poles

A 7482 VA

70 A

3

Rating: Mains Type: Panel Poles: Sections:

480/277 Wye 3 4 4.1

B

Poles Rati... Opt

C

100 A MLO 42 1

Circuit Description

3880 VA 7482 VA

3

3880 VA 7482 VA

35 A

AHU-10-RF-1

3880 VA

Lighting Panel Remarks: 1. Spare Circuit Breakers: Provide the following spare branch circuit breakers in addition to circuit breakers listed above. Spares:

Ckt 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42

SACRED HEART

2014

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS.

General Lighting Panel Notes: 1. Panel AIC (Interrupting) Rating shall be minimum 120% of the available SCC (Short Circuit Current). 2. Circuit Breaker Options: 'S' or 'ST' - Provide Shunt Trip Circuit Breaker / 'G' or 'GFCI' - Provide GFCI Circuit Breaker / 'GFP' - Provide GFP Circuit Breaker.

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH ELECTRICAL PANEL SCHEDULES

Date

SES PROJECT # 14041

11/25/2014 2:15:51 PM

E502 Scale

NONE

AVERA FACILITY DEVELOPMENT

RISER DIAGRAM NOTES PROVIDE 208/120V 100A MLO PANEL

CP5A2 3 4

PROVIDE 208/120V 100A MLO PANEL

CP5B2 3

4

1

PROVIDE 100/3 NEW CIRCUIT BREAKER 'HGEN-CDP2' IN EXISTING SWITCHBOARD. CIRCUIT BREAKER SHALL MATCH MANUFACTURER AND RATINGS OF EXISTING. INSTALL CIRCUIT BREAKER IN CRITICAL SECTION OF SWITCHBOARD.

2

PROVIDE 200/3 NEW FUSED SWITCH 'MSWB-CDP2' IN EXISTING SWITCHBOARD. FUSES AND SWITCH SHALL MATCH MANUFACTURER AND RATINGS OF EXISTING. INSTALL FUSED SWITCH IN CRITICAL SECTION OF SWITCHBOARD.

3

PROVIDE #6 AWG CU GROUND CONDUCTOR FROM NEW CRICTICAL PANELBOARDS TO EXISTING NORMAL BRANCH PANELBOARDS AND EXISTING CRITICAL BRANCH PANELBOARD LOCATED ON SAME FLOOR. BOND CRITICAL PANELBOARDS AND NORMAL PANELBOARDS TOGETHER PER NEC.

4

STUB UP FIVE (5) SPARE 1"C. CONDUITS FROM TOP OF PANELBOARDS TO ACCESSIBLE CORRIDOR CEILING SPACE ABOVE.

5

REFER TO SHEET E211 - FIRST LEVEL - POWER PLAN FOR SWITCHBOARD LOCATION.

6

PROVIDE 100/3 CIRCUIT BREAKER IN EXISTING DISTRIBUTION PANEL. CIRCUIT BREAKER SHALL MATCH MANUFACTURER AND RATINGS OF EXISTING.

7

PROVIDE 200/3 DISCONNECT ON PRIMARY FEEDERS OF TRANSFORMER PER NEC.

8

COORDINATE ROUTING OF FEEDERS WITHIN EXISTING HOSPITAL WITH OWNER. ROUTE FEEDERS FROM GENERATOR ROOMS THROUGH EXISTING TUNNEL.

FIFTH LEVEL 10N

10N

FOURTH LEVEL

3 PROVIDE CDP-2 PANEL 208/120V 250A MCB

PROVIDE 480/277V 100A MLO PANEL

E503

EP3A 14 16T

7

PROVIDE XFMR-CDP2 480/277V TO 208Y/120V 75KVA TRANSFORMER

2 E503

THIRD LEVEL ATS-CDP2 480/277V 200A 3-POLE TRANSFER SW. SCCR: 8.5KA

11N

HOSP. MAIN ELEC ROOM 1030A

EXISTING TUNNEL

GENERATOR ROOM 1970

OLD GENERATOR ROOM 1971

14 11 E 2

EXISTING HOSPITAL SWITCHBOARD 'MSWB' 480/277V 3-PHASE 2500A

5

8

E

1

CRITICAL SECTION

6

E

E ATS-3 (EQUIP BRANCH) 480/277V 600A

CRITICAL SECTION

FIRST LEVEL HOSPITAL EMERGENCY SWITCHBOARD 'HGEN' 480/277V 3-PHASE 1600A

1980 ORIGINAL HOSPITAL

2012 NORTHERN LIGHTS HOSPITAL ADDITION

Partial Hospital Riser Diagram FESSION PRO AL RE

G . NO.

GINEER EN

S

10206 TRACY J. HAUSER

O

U

A

ED

T

NOT TO SCALE REGIST ER

1

5

EQUIPMENT BRANCH DISTRIBUTION PANEL 'EDP-A' 5 480/277V 3-PHASE 600A

T H

K D A

O

11/25/14

No.

PHASE

Description

Date

PHASE

ATS-CDP2 3-POLE SOLID NEUTRAL AUTOMATIC TRANSFER SWITCH

EXISTING SERVICE ENTRANCE PHASE

PHASE

EXISTING OUTPUT CIRCUIT BREAKER GENERATOR

PHASE (TYPICAL) XO TERMINAL

N

NEUTRAL

NEUTRAL BUS (TYPICAL)

N

N

PHASE

PHASE

G

GROUND BUS (TYPICAL)

G

G

GROUND GROUND TO CABINET

EQUIPMENT GROUND Transformer Ground Schedule Transformer kVA Grounding Mark

3

3, 6

G1

#12 IN 3/4" CONDUIT

9

G2

#10 IN 3/4" CONDUIT

15,30,45

G3

#6 IN 3/4" CONDUIT

75

G4

#2 IN 3/4" CONDUIT

112.5

G5

#1/0 IN 3/4" CONDUIT

150

G6

#2/0 IN 1" CONDUIT

150+

G7

#3/0 IN 1" CONDUIT

Dry-Type Transformer Grounding Detail NOT TO SCALE

SACRED HEART

Size CONNECT TO LOCAL GROUND BAR (SEE SCHEDULE FOR SIZE)

GROUND TO FRAME EXISTING SERVICE GROUNDING ELECTRODE

GROUND TO CABINET

TO LOAD

2014

2

Generator Grounding with 3-Pole A.T.S. NOT TO SCALE

C

COPYRIGHT

PERMISSION TO REPRODUCE ANY PART OF THIS DOCUMENT IS HEREBY GRANTED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE PROJECT OR THE ARCHIVING OF THIS PROJECT. UNAUTHORIZED USE OF THIS DOCUMENT WITHOUT THE WRITTEN PERMISSION OF SPECIALIZED ENGINEERING SOLUTIONS IS PROHIBITED BY COPYRIGHT LAW. DO NOT SCALE DRAWING. ALL DIMENSIONS AND CLEARANCES SHALL BE VERIFIED FROM APPROPRIATE SOURCES. ALL WORK SHALL BE COORDINATED PRIOR TO INSTALLATION. SEE SPECIFICATIONS. 10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

4TH & 5TH ELECTRICAL RISER DIAGRAM

Date

SES PROJECT # 14041

11/25/2014 2:15:51 PM

E503 Scale

NONE

NOTES:

FIRST FLOOR PIPING DEMOLITION PLAN

NOTES:

SECOND FLOOR PIPING DEMOLITION PLAN

NOTES:

THIRD FLOOR PIPING DEMOLITION PLAN

NOTES:

FIRST FLOOR UNDER SLAB HVAC DEMOLITION PLAN

NOTES:

FIRST FLOOR (CEILING SPACE) HVAC DEMOLITION PLAN

NOTES:

SECOND FLOOR HVAC DEMOLITION PLAN

NOTES:

THIRD FLOOR HVAC DEMOLITION PLAN

NOTES:

ROOF PLAN

NOTES:

FIRST FLOOR WASTE & VENT PIPING PLAN

NOTES:

FIRST FLOOR DOMESTIC PIPING PLAN

NOTES:

SECOND FLOOR PIPING PLAN

NOTES:

THIRD FLOOR PIPING PLAN

NOTES:

FIRST FLOOR HVAC PLAN

NOTES:

SECOND FLOOR HVAC PLAN

NOTES:

THIRD FLOOR HVAC PLAN

NOTES:

ROOF PLAN

PLUMBING / MECHANICAL ABBREVIATED SPECIFICATIONS

GENERAL MECHANICAL NOTES

DESIGN CONDITIONS

GAS LOAD: PLUMBING / MECHANICAL ABBREVIATIONS

PLUMBING / MECHANICAL LEGEND

PACKAGED MAKE UP AIR UNITS

PLUMBING FIXTURES

FAN SCHEDULE

GRILLE & REGISTER SCHEDULE

SPLIT SYSTEM GAS FURNACES

WATER HEATER SCHEDULE

CIRCULATING PUMPS

14

9

5

1

15

10

6

2

16

11

7

3

12

8

4

13

A.

Provide all materials and equipment and perform all labor required to install complete and operable mechanical systems as indicated on the drawings, as specified, and as required by authorities having jurisdiction.

B.

Contract document drawings for mechanical work (HVAC and plumbing) are diagrammatic and are intended to convey scope and general arrangement only.

Z.

Install all mechanical equipment and appurtenances in accordance with manufacturers' recommendations, contract documents, and applicable codes and regulations.

PIPING

C.

D.

Provide vibration isolation for all mechanical equipment to prevent transmission of vibration to building structure.

E.

Provide vibration isolators for all piping supports connected to, and within 50 feet of, isolated equipment (except at base elbow supports and anchor points) throughout mechanical equipment rooms.

F.

The location of existing underground utilities is shown in an approximate way only. The contractor shall determine the exact location of all existing utilities before commencing work. The contractor shall pay for and repair all damages caused by failure to exactly locate and preserve any and all underground utilities unless otherwise noted.

BUILDING AUTOMATION SYSTEM

MCA

MINIMUM CIRCUIT AMPACITY

BFF

BELOW FINISHED FLOOR

MEZZ

MEZZANINE

BFG

BELOW FINISHED GRADE

MFS

MAXIMUM FUSE SIZE

BHP

BRAKE HORSE POWER

MIN

MINIMUM

BTU

BRITISH THERMAL UNIT

MISC

MISCELLANEOUS

BTUH

BTU PER HOUR

MOP, MOCP

MAXIMUM OVER CURRENT PROTECTION

CA

COMPRESSED AIR

CPVC

CU IN

CUBIC INCH

DIAMETER

DN

DOWN

EA

EACH

EL

ELEVATION

Install all piping without forcing or springing.

R.

J.

All piping shall clear doors and windows.

Provide access doors in ductwork for the operation, adjustment, and maintenance of all fans, valves, and mechanical equipment.

K.

All valves shall be adjusted for smooth and easy operation.

S.

L.

All piping work shall be coordinate with all trades involved. Offsets in piping around obstructions shall be provided at no additional cost to the owner.

Smoke detectors shall be furnished and wired by the electrical contractor. The mechanical contractor shall be responsible for mounting the smoke detector in ductwork as shown on the drawings and in accordance with the manufacturer's printed instructions.

T.

Terminate gas vents for unit heaters, water heaters, high-pressure parts washers, high-pressure cleaners, and other gas appliances a minimum of 30 inches above the roof with rain cap.

U.

See specifications for ductwork gauges, bracing, hangers, and other requirements.

Where two or more items of the same type of equipment are required, the product of one manufacturer shall be used. Coordinate all equipment connections with manufacturers' certified drawings. Coordinate and provide all duct and piping transitions required for final equipment connections to furnished equipment. Field verify and coordinate all duct and piping dimensions before fabrication.

N.

All control wire and conduit shall comply with the National Electric Code and Division 26 of the specification.

O.

Where beams are indicated to be penetrated with ductwork or piping, coordinate ductwork and piping layout with beam opening size and opening locations. Coordination shall be done prior to the fabrication of ductwork, cutting of piping, or fabrication of beams. When mechanical work (HVAC, plumbing, sheet metal, etc.) is subcontracted, it shall be the mechaincal contractor's responsibility to coordinate subcontractors and the associated contracts. When discrepancies arise pertaining to which contractor provides a particular item of the mechanical contract or which contractor provides final connections for a particular item of the mechanical contract, it shall be brought to the attention of the mechanical contractor, whose decision shall be final. The locations of all items shown on the drawings or called for in the specifications that are not definitely fixed by dimensions are approximate only. The exact locations necessary to secure the best conditions and results must be determined by the project site conditions and shall have the approval of the engineer before being installed. Do not scale drawings.

R.

All miscellaneous steel required to ensure proper installation and as shown in details for piping, ductwork, and equipment (unless otherwise noted) shall be furnished and installed by the mechanical contractor.

S.

Provide access panels for installation in walls and ceilings, where required, to service dampers, valves, smoke detectors, and other concealed mechanical equipment. Access panels shall be turned over to the general contractor for installation.

ESP

EXTERNAL STATIC PRESSURE

EWT

ENTERING WATER TEMPERATURE

FLA

FULL LOAD AMPERES

FPS GA GAL GALV GPD GPH GPM HG

M.

Provide flexible connections in all piping systems connected to pumps, chillers, cooling towers, and other equipment which require vibration isolation except water coils. Flexible connections shall be provided as close to the equipment as possible or as indicated on the drawings.

N.

Slope refrigerant piping one percent in the direction of oil return. Liquid lines may be installed level.

O.

Provide line size liquid indicators in the main liquid line leaving the condenser or receiver. Install moisture-liquid indicators in liquid lines between filter dryers and thermostatic expansion valves, and in liquid line to receiver.

P.

Provide a line size strainer upstream of each automatic valve. Provide a shutoff valve on each side of a strainer.

Q.

Provide permanent filter dryers in low-temperature systems and systems using hermetic compressors.

R.

Provide replaceable cartridge filter dryers with a three-valve bypass assembly for solenoid valves, adjacent to receivers.

S.

Provide refrigerant charging valve connections in the liquid line between the receiver shutoff valve and the expansion valve.

HVAC/SHEET METAL A.

Provide all materials and equipment and perform all labor required to install complete and operable HVAC systems as indicated on the drawings, and as specified and required by authorities having jurisdiction.

B.

Certain items such as rises and drops in ductwork, access doors, volume dampers, etc., are indicated on the contract document drawings for clarity for a specific location requirement and shall not be interpreted as the extent of the requirements for these items.

C.

In corridors where ceiling speakers and air diffusers are indicated between the same light fixtures, install both devices at the quarter points between the same fixture.

D.

Unless otherwise shown, locate all room thermostats and humidistats 4'-0" (centerline) above the finished floor. Notify the engineer of any rooms where the preceding location cannot be maintained or where there is a question on location.

W. Locations and sizes of all floor, wall, and roof openings shall be coordinated with all other trades involved.

E.

All ductwork shall clear doors and windows.

X.

F.

All ductwork dimensions, as shown on the drawings, are internal clear dimensions and duct size shall be increased to compensate for duct lining thickness.

G.

Provide all 90-degree square elbows with double radius turning vanes unless otherwise indicated. Elbows in

T.

All equipment, piping, ductwork, etc., shall be supported as detailed, specified, and required to provide a vibration-free isolation.

U.

All ductwork, piping, and equipment supported from structural steel shall be coordinate with the general contractor. All attachments to steel bar joists, trusses, or joist girders shall be at panel points. Provide beam clamps meeting MSS standards. Welding to structural members shall not be permitted. The use of C-clamps shall not be permitted. Mechanical equipment, ductwork, and piping shall not be supported from a metal deck.

All openings in fire walls due to ductwork, piping, conduit, etc., shall be fire stopped with a product similar to 3M or an approved equal.

HVAC SYMBOLS

LINETYPES

TWO LINE ACCESS PANEL

HVAC CONDENSATE ELBOW, RADIUS

BALANCING VALVE

PUMP

CHECK VALVE - SWING

PRESSURE GAUGE PRESSURE GAUGE W/ COIL SYPHON

OC

ON CENTER

END CAP

SAFETY RELIEF VALVE

OD

OUTSIDE DIAMETER

FLANGE OR UNION CONNECTION

SHUT-OFF VALVE

FLEXIBLE CONNECTOR

SOLENOID VALVE

POLYVINYL CHLORIDE

REQD

REQUIRED

RPM

REVOLUTIONS PER MINUTE

SENS

SENSIBLE

FEET PER MINUTE SPEC

SPECIFICATION

SQ FT

SQUARE FEET

SQ IN

SQUARE INCHES

SS

STAINLESS STEEL

STD

STANDARD

TEMP

TEMPERATURE

T-STAT

THERMOSTAT

TYP

TYPICAL

V

VOLTS

VFD

VARIABLE FREQUENCY DRIVE

ROUND RETURN/EXHAUST, UP/DN

PRESSURE REGULATING VALVE

TAKE-OFF GLOBE VALVE

STRAINER - Y-PATTERN

IMMERSION THERMOSTAT

STRAINER - Y-PATTERN W/ DRAIN

METER

TEE UP/DOWN

MIXING VALVE

TEE UP/DOWN W/ VALVE IN DROP

SYMBOLS M

B

F

POINT OF CONNECTION

THERMOMETER

POINT OF DISCONNECTION

TRAP (RUNNING)

DRAWING INDEX

DAMPER - BYPASS

H

DAMPER - FIRE

C2

(TAG)

(TAG) FS

DAMPER - FIRE/SMOKE

C (TAG)

DAMPER - MOTORIZED

DP (TAG)

S

DAMPER - SMOKE

H2 (TAG)

FLOW ARROW

PD (TAG)

GALVANIZED DG

DOOR GRILLE

GALLONS PER DAY

HR

HOUR

HZ

HERTZ

ID

INSIDE DIAMETER

IN, "

INCHES

KW

KILOWATT

LBS

POUNDS

RH (TAG)

UC

DOOR UNDERCUT

RT (TAG)

POINT OF CONNECTION

WATTS

WG

WATER GAUGE

W/

WITH

W/O

WITHOUT

HUMIDISTAT H001T

ABBREVIATIONS, GENERAL NOTES, AND SYMBOLS

H201T

AREA 'H' HVAC PLAN

H202T

AREA 'H' MEZZANINE HVAC PLAN

SENSOR - DEWPOINT

H203T

AREA 'J' & 'K' HVAC PLANS

SENSOR - HYDROGEN

H240T

AREA 'H' HVAC ROOF PLAN

H501T

DETAILS

H801T

EQUIPMENT SCHEDULES

SENSOR - CARBON DIOXIDE SENSOR - CARBON MONOXIDE

SENSOR - PRESSURE DIFFERENTIAL SENSOR - RELATIVE HUMIDITY SENSOR - ROOM TEMPERATURE SENSOR (W/ EQUIPMENT TAG)

S (TAG)

POINT OF DISCONNECTION

SMOKE DETECTOR

SD

THERMOSTAT (W/ EQUPMENT TAG)

T (TAG)

W

CPS ENERGY PO BOX 1771 SAN ANTONIO, TX 78296 (210) 353-4050

SUPPLY/INTAKE, UP/DN

GALLON

MERCURY

119296

ROUND SUPPLY/INTAKE, UP/DN

GAUGE

GALLONS PER MINUTE

JONATHAN R. OLSON

NATURAL GAS UTILITY CONTACT INFORMATION:

RETURN/EXHAUST, UP/DN

M

GALLONS PER HOUR

COOLING 75°F COOLING 50% RH HEATING 70°F TRUCK MAINTENANCE BAYS COOLING 80°F HEATING 55°F

REDUCER

FEET PER SECOND

HORSE POWER

OFFICE

MANUAL BALANCING DAMPER

ELBOW UP/DOWN W/ VALVE IN DROP

PVC

ENGINEERING FIRM NO. F-9414

ROOM DESIGN CONDITIONS: FLEXIBLE DUCT

NOT TO SCALE

POINT OF DISCONNECTION

2013 ASHRAE FUNDAMENTALS LOCATION COOLING OADB 99.0°F COOLING OAWB 73.5°F HEATING OADB 29.2°F

ELBOW W/VANES

NTS

POD

APPLICABLE CODES: 2012 INTERNATIONAL PLUMBING CODE (IPC) 2012 INTERNATIONAL MECHANICAL CODE (IMC) 2012 INTERNATIONAL FUEL GAS CODE (IFGC) 2012 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

PROJECT DESIGN CONDITIONS:

REFRIGERANT

ELBOW UP/DOWN

POINT OF CONNECTION

AP

AP

NATURAL GAS

FEET

HP

DESIGN INFORMATION SINGLE LINE

NATURAL GAS

NG

POC

Runs of flexible duct shall not exceed 5 feet in length.

I.

Testing, adjusting, and balancing agency shall be a member of the Associated Air Balance Council (AABC) or the National Environmental Balancing Bureau (NEBB). Testing, adjusting, and balancing shall be performed in accordance with the AABC standards.

NORMALLY OPEN

PSI GAUGE

O.

Provide access doors in ductwork to provide access for all smoke detectors, fire dampers, smoke dampers, volume dampers, humidifiers, coils, and other items located in the ductwork that require service and/or inspection.

N/O

PSIG

Unless otherwise noted, all ductwork is overhead, tight to the underside of the structure, with space for insulation if required.

Q.

NORMALLY CLOSED

POUNDS PER SQUARE INCH

N.

Unions and/or flanges shall be installed at each piece of equipment, in bypasses, and in long piping runs (100 feet or more) to permit disassembly for alteration and repairs.

N/C

PSI

Provide flexible connections in all ductwork systems (supply, return, and exhaust) connected to air handling units, fans, and other equipment that require vibration isolation. Flexible connections shall be provided at the point of connection to the equipment unless otherwise indicated.

H.

DEGREES

DIA, Ø

FPM

NOT APPLICABLE

M.

All ductwork shall be coordinated with all trades involved. Offsets in ducts, including divided ducts and transitions around obstructions, shall be provided at no additional cost to the owner.

CHORINATED POLYVINYL CHLORIDE CUBIC FEET

FT,'

N/A

Finned tube radiation enclosures shall be wall-to-wall unless otherwise indicated.

P.

CAST IRON

CU FT

DEG, °

MOTOR

L.

Locate all temperature, pressure, and flow measuring devices in accessible locations with the straight section of pipe or duct up- and downstream as recommended by the manufacturer to ensure accuracy of measurements.

All balancing valves and butterfly valves shall be provided with position indicators and the maximum adjustable stops (memory stops).

SYMBOLS MTR

Locate all mechanical equipment (single duct, dual duct, variable volume, constant volume, and fan-powered boxes; fan-coil units; cabinet heaters; unit heaters; unit ventilators; coils; steam humidifiers; etc.) for unobstructed access to unit access panels, controls, and valving.

J.

COND

CI

Unless otherwise noted, all piping is overhead, tight to the underside of the structure or slab, with space for insulation if required.

MAXIMUM

BAS

K.

Unless otherwise noted, all valves (except control valves) and strainers shall be the full size of the pipe before reducing in size to make connections to equipment and controls.

LEAVING WATER TEMPERATURE

BTU PER HOUR (THOUSAND)

CUBIC FEET PER MINUTE

C.

PIPING SYMBOLS

MBH

CFM

Elevations shown on the drawings are to the bottom of all pressure piping an to the invert of all gravity piping unless otherwise noted.

G.

NG

CUBIC FEET PER HOUR

B.

All tests shall be completed before any mechanical equipment or piping insulation is applied.

ABBREVIATIONS

APPROXIMATE, APPROXIMATELY

All air handling units shall operate without moisture carryover.

I.

V.

APPROX

J.

F.

Q.

CFH

Provide all materials and equipment and perform all labor required to install complete and operable piping systems as indicated on the drawings, and as specified and required by authorities having jurisdiction.

Maintain a minimum 6'-8" clearance to the underside of pipes, ducts, conduits, suspended equipment, etc., throughout access routes in mechanical rooms.

P.

MAX

Field-erected and factory-assembled air handling unit coils shall be arranged for removal from the upstream side without dismantling supports. Provide galvanized structural steel support for all coils (except the lowest coil) in banks over two coils high to permit the independent removal of any coil.

All valves shall be installed so that the valve remains in service when equipment or piping on the equipment side of the valve is removed.

M.

ABOVE FINISHED GRADE

I.

Refer to typical details for ductwork, piping, and equipment installation.

E.

L.

AFG

Coordinate diffuser, register, and grille locations with architectural reflected ceiling plans, lighting, and other ceiling items and make minor duct modifications to suit.

Coordinate construction of all mechanical work with architectural, structural, civil, electrical work, etc., shown on other contract document drawings.

K.

LWT

H.

Install piping so all valves, strainers, unions, traps, flanges, and other appurtenances requiring access are accessible.

H.

ABOVE FINISHED FLOOR

A.

dishwasher, kitchen, and laundry exhausts shall be of unvaned, smooth radius construction with a radius equal to 1-1/2 times the width of the duct. Provide access doors upstream of all elbows with turning vanes.

D.

G.

AFF

All air-conditioning condensate drain lines from each air handling unit and rooftop unit shall be piped full size of the unit drain outlet, with "P" trap, and piped to the nearest allowable drain in accordance with the authority having jurisdiction. See the details shown in the drawings or contract specifications for the depth of the air conditioning condensate trap.

950 Walnut Ridge Drive Hartland, WI 53029 262.369.3535 T 262.369.3592 F

Y.

SMART BUILDING SOLUTIONS

GENERAL

DESIGN SERVICES

GENERAL NOTES

12/19/16

H1

H2

H3

H4

2.

18"Ø EXHAUST AIR DUCT UP THROUGH ROOF.

3.

22"X60" SUPPLY AIR DUCT FROM MAKE-UP AIR.

4.

22x28 OUTSIDE AIR AND 18x46 EXHAUST UP TO DEDICATED OUTSIDE AIR UNIT.

5.

22x18 SUPPLY DOWN FROM MAKE-UP AIR UNIT. INSTALL MANUFACTURER'S THREE-WAY DIFFUSER AT 16'-0" AFF.

6.

PROVIDE 20x20 ROOF OPENING AND EXHAUST DUCT.

7.

PROVIDE 18x18 ROOF OPENING AND EXHAUST DUCT.

8.

PROVIDE 20x20 ROOF OPENING AND EXHAUST DUCT. PROVIDE DRIP PAN 12" BELOW PRECAST PLANK.

9.

CARMON MODEL 55-S8 PLUG-IN FLOOR CONNECTION FOR CLOSE CAPTURE EXHAUST SYSTEM.

10.

MOUNT TOP OF LOUVER 1'-0" BELOW ROOF.

11.

42"Ø EXHAUST DUCT FROM PAINT BOOTH FAN CONNECTION, UP THROUGH ROOF, TERMINATE ON ROOF WITH MANUFACTURERS EXHAUST PACKAGE.

12.

SPUNSTRAND OR EQUAL FRP DUCT WITH WATER TIGHT JOINTS.

13.

12"X12" EXHAUST AIR DUCT UP TO EXHAUST FAN. SEE DETAIL 2/H501T.

14.

CARMON MODEL 55-S5 PLUG-IN FLOOR CONNECTION FOR CLOSE CAPTURE EXHAUST SYSTEM.

15.

PROVIDE (2) 5Ø BY 20 FOOT CARMON TYPE HTC FLEX HOSE ASSEMBLIES WITH CTA-5 ADAPTER & PLUG-IN ASSEMBLY. PROVIDE (3) 8Ø BY 20 FOOT CARMON TYPE HTC HOSE ASSEMBLIES WITH CTA-8 ADAPTER & PLUG-IN ASSEMBLY. PROVIDE (2) CARMON MODEL DCA-R AND (3) CARMON MODEL DCA-8 DIESEL CANE ASSEMBLIES. PROVIDE (3) CARMON PORTABLE STORAGE CARTS FOR HOSE ASSEMBLIES AND (5) CARMON WALL HANGERS FOR DIESEL CANE ASSEMBLIES.

1.

SEE APPLICABLE NOTES ON SHEET H001T.

H6

H7

950 Walnut Ridge Drive Hartland, WI 53029 262.369.3535 T 262.369.3592 F

30"X30" EXHAUST AIR DUCT UP TO EXHAUST FAN. SEE DETAIL 2/H501T.

SMART BUILDING SOLUTIONS

SHEET GENERAL NOTES

1.

H5

DESIGN SERVICES

SHEET KEY NOTES

#

H8

30"X30" EA DUCT FROM 12" AFF, END OF DUCT OPEN TO ROOM WITH BIRDSCREEN.

HA EWH-1T

30"X30"

34"X34" SA DUCT DOWN TO PAINT BOOTH SUPPLY AIR PLENUM.

ROUTE HORIZONTAL DUCT IN JOIST SPACE

1

20X40

6

MOUNT BOTTOM OF SUPPLY DUCT AT 20'-0" AFF.

30"X18" SR-1 1800CFM

1-1/4" NG FROM ROOF TO WATER HEATER. 8Ø

9

10Ø

X" NG FROM ROOF TO WATER HEATER

8"Ø EA DUCT OPEN TO PIT, 12"AFF OF PIT. PROVIDE SS BIRDSCREEN. (215CFM)

36"X36" SR-1 5100CFM

15

12Ø

CG-4 75CFM

36"X36" SR-1 5100CFM

12Ø

119296

15

1-1/2" NG FROM ROOF TO PRESSURE WASHER

12

30"X18" SR-1 1800CFM

PITCH

CD-1 50

5

15



UC

11

JONATHAN R. OLSON

PITCH

H









T MAU-1T & 2T

CG-3

12/19/16

CG-4 100



CD-1 150

MOUNT BOTTOM OF SUPPLY DUCT AT 20'-0" AFF. 20X40

20x14





26x14

ROUTE DUCT IN JOIST SPACE

18Ø

12x14 6Ø

26x14

12"X12"

14Ø

H



CD-3 400

10Ø

8"Ø EA DUCT FROM BFF

10Ø

10Ø

MOUNT BOTTOM OF SUPPLY DUCT AT 20'-0" AFF.

RTU-1T T

12"X12" EA DUCT UP THRU MEZZANINE

ENGINEERING FIRM NO. F-9414

2

10Ø

10Ø

CD-3 400

HB

36"X36" SR-1 5100CFM 9

CD-3 400

13

12

16X40

UC

3 CD-3 400

7

PITCH

CG-4 75CFM

12x12 6Ø

CG-4 100

CD-1 190

16X40

3

CG-4 100 8Ø





9

36"X36" SR-1 5100CFM

8"Ø EA DUCT OPEN TO PIT, 12"AFF OF PIT. PROVIDE SS BIRDSCREEN. (215CFM)



CG-3

8"Ø EA DUCT OPEN TO PIT, 12"AFF OF PIT. PROVIDE SS BIRDSCREEN. (135CFM)

1

CD-1 190 CG-5 100

8

ROUTE HORIZONTAL DUCT IN JOIST SPACE

30"X30"

CG-3

CD-1 250

MOUNT BOTTOM OF SUPPLY DUCT AT 20'-0" AFF.

20"X20" EA DUCT UP TO EF, PROVIDE DRIP PAN MOUNTED 12" BELOW BOTTOM OF CONCRETE PLANK. SEE DETAIL 1/H501T MAU-4T T

HC 30"X30" EA DUCT FROM 12" AFF, END OF DUCT OPEN TO ROOM WITH BIRDSCREEN.

10

AREA 'K'

LVR-1T AREA 'H'

AREA 'J'

AREA 'L' AREA 'B' AREA 'E'

AREA 'A'

AREA 'F'

AREA 'C'

AREA 'D'

MAIN BUILDING (AREAS A, B, C, D, E & F) IS PART OF A SEPARATE DRAWING SET

H1

SEE APPLICABLE NOTES ON SHEET H001T.

950 Walnut Ridge Drive Hartland, WI 53029 262.369.3535 T 262.369.3592 F

1.

SMART BUILDING SOLUTIONS

DESIGN SERVICES

SHEET GENERAL NOTES

H2

HA

ENGINEERING FIRM NO. F-9414

32"X18" SUPPLY AND RETURN UP TO ROOF TO UNIT.

HB

JONATHAN R. OLSON 26X14

119296

26X14

12/19/16

26"X14" SUPPLY AND RETURN DOWN

12"X12" EA DUCT FROM BELOW

12"X12" EA DUCT UP TO EF-7T, SEE DETAIL 2/H501T

12X12

HC

AREA 'K' AREA 'H'

AREA 'J'

AREA 'L' AREA 'B' AREA 'E'

AREA 'A'

AREA 'F'

AREA 'C'

AREA 'D'

MAIN BUILDING (AREAS A, B, C, D, E & F) IS PART OF A SEPARATE DRAWING SET

SEE APPLICABLE NOTES ON SHEET H001T.

2.

ROUTE CONDENSATE FROM ROOF TOP UNIT TO DOWN SPOUT SCUPPER.

SHEET KEY NOTES

#

J1

1.

10"x10" EXHAUST DUCT UP TO EF-1G.

2.

16"x16" SUPPLY AND 14"X24" RETURN AIR DUCT UP TO RTU-1G.

950 Walnut Ridge Drive Hartland, WI 53029 262.369.3535 T 262.369.3592 F

1.

SMART BUILDING SOLUTIONS

DESIGN SERVICES

SHEET GENERAL NOTES

J2

JA CD-2 100



CG-5 100

JB CG-4 50

CG-5 100 6Ø





EF-1G (ON ROOF)



CD-2 100

8x10 CD-1 100

WEATHERHOOD

UC

WALL OUTLET EXHAUST TERMINAL

JC 1 CG-3

19"x8"

6Ø CD-1 100



2

EF-1FP

EF-2FP

UC RTU-1G T H

MOUNT BOTTOM OF EXHAUST FAN AT 8'-0" AFF.

16x14

10x10

12x14

MOUNT BOTTOM OF EXHAUST FAN AT 6'-0" AFF. RTU-1G (ON ROOF)

12Ø CD-1 400

12Ø CD-1 400

ENGINEERING FIRM NO. F-9414

JD

JONATHAN R. OLSON EUH-1FP

REVERSE ACTING

119296 MOUNT BOTTOM OF UNIT HEATER AT 7'-0" AFF.

EF-2FP REV.

T

EUH-1FP

T

MOUNT BOTTOM OF LOUVER AT 16" AFF.

12/19/16

LVR-1FP

AREA 'K' AREA 'H'

AREA 'J'

AREA 'L' AREA 'B' AREA 'E'

AREA 'A'

AREA 'F'

AREA 'C'

AREA 'D'

MAIN BUILDING (AREAS A, B, C, D, E & F) IS PART OF A SEPARATE DRAWING SET

H1

H2

H3

H4

H5

SEE APPLICABLE NOTES ON SHEET H001T.

H6

H7

950 Walnut Ridge Drive Hartland, WI 53029 262.369.3535 T 262.369.3592 F

1.

SMART BUILDING SOLUTIONS

DESIGN SERVICES

SHEET GENERAL NOTES

H8

2" NATURAL GAS SERVICE PRESSURE = 10 PSIG CONNECTED LOAD = 4,670 CFH LONGEST LENGTH = 1,275 FT 2" (2509 CFH)

2" (3641 CFH)

HA NG

NG 1-1/4" (1132 CFH)

NG

2" (2509 CFH)

NG

EF-3T

NG

MAU-3T

EF-4T

1" (199 CFH) NG

MAU-1T

1-1/4" (898 CFH)

NG

1-1/2" (2310 CFH)

1-1/4" NG DOWN TO WATER HEATER EF-8T

NG 1-1/4" (1029 CFH)

NG

3/4" (131 CFH)

EF-6T

NG

NG

X" (199CFH) NG DOWN TO WATER HEATER 1-1/4" (1230 CFH)

1-1/4" (398 CFH)

1-1/4" (1080 CFH)

ENGINEERING FIRM NO. F-9414

EF-1T

HB

42"Ø EXHAUST DUCT FROM PAINT BOOTH FAN. TERMINATE WITH MANUFACTURERS EXHAUST DUCTWORK PACKAGE.

RTU-1T

MAU-4T

1-1/2" (500 CFH)

1-1/2" NG DOWN TO PRESSURE WASHER. JONATHAN R. OLSON

119296

NG

12/19/16 MAU-2T

NG 1-1/4" (1080 CFH)

EF-2T

EF-5T

HC

AREA 'K' AREA 'H'

AREA 'J'

AREA 'L' AREA 'B' AREA 'E'

AREA 'A'

AREA 'F'

AREA 'C'

AREA 'D'

MAIN BUILDING (AREAS A, B, C, D, E & F) IS PART OF A SEPARATE DRAWING SET

FACTORY MOUNTED AND WIRED DISCONNECT

HINGED BASE WITH CURB SEAL. FINISH TO MATCH FAN.

REMOVABLE CAP TO ALLOW CONNECTION OF A PRESSURE MEASURING INSTRUMENT. MINIMUM (10) PIPE DIAMETERS

EXHAUST DUCT

1" MIN

GALVANIZED BAND SADDLE REGULATOR RELIEF VENT. PROVIDE VENT PROTECTOR.

INSULATED FLEXIBLE DUCT

GALVANIZED BAND SUPPORT

UNION OPENING IN ROOF DECK PER MANUFACTURERS RECOMMENDATIONS.

EQPT

DAMPER

DRIP PAN WITH WATERTIGHT SOLDERED OR WELDED SEAMS. MINIMUM DEPTH = 2 INCHES. PROVIDE SUPPORTS AS NECESSARY AND INSTALL ABOVE BOTTOM OF JOISTS.

FILL EXPOSED OPENINGS IN ROOF DECK AROUND CURB WITH FOAM-IN-PLACE INSULATION.

950 Walnut Ridge Drive Hartland, WI 53029 262.369.3535 T 262.369.3592 F

GALVANIZED WIRES

SMART BUILDING SOLUTIONS

ROOF MOUNTED EXHAUST FAN WITH INSULATED CURB. SEE MECHANICAL AND ARCHITECTURAL DETAILS FOR CURB INSTALLATION AND FLASHING.

DESIGN SERVICES

POWER WIRING TO DISCONNECT BY ELECTRICAL CONTRACTOR. DO NOT ROUTE WIRING THROUGH DAMPER.

UNION GAS PRESSURE REGULATOR GAS COCK

1" MIN

GALVANIZED BAND CLAMP

DIRT LEG WITH REMOVABLE CAP TO ALLOW CONNECTION OF A PRESSURE MEASURING INSTRUMENT AND SERVE AS A SEDIMENT TRAP.

INSULATED FLEXIBLE DUCT

NOTES 1. SUPPORT SYSTEM MUST NOT DAMAGE DUCT OR DEFORM DUCT SHAPE. 2. MAXIMUM PERMISSIBLE SAG IS 1/2" PER FOOT OF SPACING BETWEEN SUPPORTS. A CONNECTION TO ANOTHER DUCT OR EQUIPMENT CONSTITUTES A SUPPORT POINT. 3. THE SUPPORT SADDLE MUST COVER ONE-HALF THE CIRCUMFERENCE OF THE OUTSIDE DIAMETER OF THE FLEXIBLE DUCT AND FIT NEATLY AROUND THE LOWER HALF OF THE DUCT'S OUTER CIRCUMFERENCE.

ROOF MOUNTED EXHAUST FAN WITH INSULATED CURB. SEE MECHANICAL AND ARCHITECTURAL DETAILS FOR CURB INSTALLATION AND FLASHING.

POWER WIRING TO DISCONNECT BY ELECTRICAL CONTRACTOR. DO NOT ROUTE WIRING THROUGH DAMPER.

FACTORY MOUNTED AND WIRED DISCONNECT

HINGED BASE WITH CURB SEAL. FINISH TO MATCH FAN.

ANCHOR PIPE TO SUPPORT STAND

DUCT, SEE PLANS FOR SIZE COLUMN

DUCT THRU CURB

10 ' -0

OPENING IN ROOF DECK PER MANUFACTURERS RECOMMENDATIONS.

DAMPER

EXHAUST DUCT

"M AX

2 IM UM

D EN B F "O '-0

FINISHED FLOOR

UNDERGROUND DUCT SP AC ING

TOP DRILLED PIER

DRIP PAN MINIMUM DEPTH = 2 INCHES.

DRILLED PIER SYNTHETIC PIPE SUPPORT. MIFAB C-PORT MODEL C610 OR APPROVED EQUAL.

SEALANT AND BACKER ROD (TYP)

PROVIDE INSULATED ROOF CURB OR KNOCKDOWN CURB WITH ROOF INSULATION. PROVIDE SHIMS/BLOCKING AS NECESSARY FOR LEVEL INSTALLATION.

FLASHING BY ROOFING CONTRACTOR. SEE ARCHITECTURAL DRAWINGS FOR PROPER FLASHING OF ROOF CURB.

INSULATED PLENUM SIDE OF DIFFUSER TO PREVENT CONDENSATION.

SEE TABLE BELOW FOR GREENHECK FASTENING REQUIREMENTS. REFER TO MANUFACTURER'S FASTENING RECOMMENDATIONS FOR OTHER EQUIPMENT.

OPERATOR LINKAGE AT CENTER OF BLADES

GALVANIZED SHEET METAL STRAP HANGER

INSECT SCREEN

INSULATED FLEXIBLE DUCTWORK (5'-0" MAX LENGTH)

CONTINUOUS INTEGRAL BLADE HINGE

SUPPLY AIR BRANCH DUCT VOLUME DAMPER WITH LOCKABLE HAND QUADRANT

ROOF CURB SUPPORT

ALUMINUM BLADE BRACKET

ENGINEERING FIRM NO. F-9414

ALUMINUM ADJUSTABLE BLADE

STEEL DECK ANCHORING OF ROOF CURB TO ROOF DECK

060 - 141

GREENHECK CURB CAP SIZE INCHES 17x17 - 22x22

MINIMUM FASTENERS PER SIDE (3) 1/4"

MINIMUM FASTENERS TOTAL (12) 1/4"

GB/CUBE

161 - 300

26x26 - 40x40

(3) 1/4"

(12) 1/4"

R/RB

18 - 24

14x14 - 30x30

(3) 5/16"

(12) 5/16"

R/RB

30 - 36

31x31 - 51x51

(3) 5/16"

(12) 5/16"

R/RB

42

52x52 - 72x72

(4) 5/16"

(16) 5/16"

GREENHECK FAN MODEL

GREENHECK FAN SIZE

GB/CUBE

OPERATOR LINKAGE CONNECTING ARM SUPPLY DUCT MAIN SHEET METAL SHIELD 2 RADIUS ELBOW

CEILING NOTES 1. CURB SUPPORT FRAMING PROVIDED BY STRUCTURAL CONTRACTOR. COORDINATE LOCATION OF UNIT PRIOR TO INSTALLATION.

SUPPLY DIFFUSER LIGHT FIXTURE (FOR ILLUSTRATION ONLY)

3.

INSTALL ONE FASTENER AT EACH CORNER & IN CENTER OF EACH SIDE. ADD ADDITIONAL FASTENERS AS NECESSARY TO MAINTAIN A MAXIMUM OF 8" ON CENTER.

16 GAUGE WALL SLEEVE

FOLLOW MANUFACTURER'S INSTALLATION REQUIREMENTS FOR EQUIPMENT NOT SHOWN IN CHART.

WEATHERHOOD WITH BIRDSCREEN FOR OA INTAKE

MAKE-UP AIR UNIT

ACCESS PANEL (ALTERNATE LOCATION)

TURNING VANES PER SMACNA RECOMMENDATIONS

W

2.

R= 1.5 x W

HVAC CONTRACTOR FABRICATED PLENUM BOX WITH 12" THICK, BLACK ACCOUSTICAL LINING. PROVIDE CONNECTION SIZED PER PLAN.



INSULATE DECK FOR SOUND ATTENUATION. MATCH SURROUND ROOF INSULATION.

ACCESS PANEL W

VOLUME DAMPER WITH LOCKABLE HAND QUADRANT.

INSULATE DECK OPENINGS FOR SOUND ATTENUATION. CURB

INSULATED FLEXIBLE DUCTWORK (5'-0" MAX LENGTH)

EXHAUST/RETURN DUCT

RADIUS ELBOW

MITERED ELBOW 30° MAX

60° MAX

FLEXIBLE CONNECTION

CONCENTRIC TRANSITION (INCLUDING SQUARE-TO-ROUND)

ECCENTRIC TRANSITION (INCLUDING SQUARE-TO-ROUND)

ROUND BRANCH SPIN-IN FITTING

LAY-IN CEILING

45 °

L=W/4 W

NOTES 1. CURB SUPPORT FRAMING PROVIDED BY STRUCTURAL CONTRACTOR. COORDINATE LOCATION OF UNIT PRIOR TO INSTALLATION.

RECTANGULAR BRANCH

RECTANGULAR MAIN W/ BRANCH CONNECTIONS

COORDINATE WITH CEILING CONTRACTOR. IF GRILLE IS SMALLER THAN CEILING GRID SPACING, IT SHALL BE CENTERED ON THE CEILING TILE AND GRILLE SHALL BE PROVIDED WITH SURFACE MOUNT BORDER. CEILING GRID ASSEMBLY AND TILE WORK SHALL BE PERFORMED BY CEILING CONTRACTOR.

JONATHAN R. OLSON

119296

12/19/16

HEATING PERFORMANCE DATA

ELECTRICAL DATA

MAXIMUM SUPPLY-AIR CFM

MINIMUM SUPPLY-AIR CFM

OUTSIDE-AIR CFM

ESP INCHES WC

MOTOR HP

NOMINAL TONS

TOTAL CAPACITY MBH

SENSIBLE CAPACITY MBH

EADB DEG-F

EAWB DEG-F

LADB DEG-F

LAWB DEG-F

(S)EER

IEER

STAGES

TYPE

INPUT MBH

OUTPUT MBH

EAT DEG-F

LAT DEG-F

STAGES

VOLTS

PHASE

HERTZ

MCA

MOP

WEIGHT LBS

REFERENCE NOTES

GUARD HOUSE ROOF

1,200

1,200

250

0.75

0.75

3

36.0

27.0

80

67

60

58

15.0

-

1

ELECTRIC

12.0

-

60

91

-

208

3

60

40.0

45.0

700

1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 13

TRUCK MAINT. GARAGE ROOF

2,430

2,430

650

1.00

3

7.5

88

64

80

67

57

56

12.5

-

2

NATURAL GAS

150

120

60

105

2

460

3

60

19.5

25.0

1,500

1, 3, 4, 5, 6, 7, 9, 10, 13

TAG

BASIS OF DESIGN

TYPE

LOCATION

RTU-1G

TRANE THC037

UNITARY COOLING ROOFTOP

RTU-1T

TRANE YHC092

UNITARY COOLING ROOFTOP

SCHEDULE DEFINITIONS AFUE = ANNUAL FUEL UTILIZATION EFFICIENCY BTUH = BRITISH THERMAL UNITS PER HOUR CFM = CUBIC FEET PER MINUTE dBA = A-WEIGHTED SOUND PRESSURE DECIBELS

COOLING PERFORMANCE DATA

DEG-F = DEGREES FAHRENHEIT EADB = ENTERING AIR DRY-BULB TEMPERATURE EAWB = ENTERING AIR WET-BULB TEMPERATURE EAT = ENTERING AIR TEMPERATURE

EER = ENERGY EFFICIENCY RATIO ESP = EXTERNAL STATIC PRESSURE IEER - INTEGRATED ENERGY EFFICIENCY RATIO LADB = LEAVING AIR DRY-BULB TEMPERATURE

LAWB = LEAVING AIR WET-BULB TEMPERATURE LAT = LEAVING AIR TEMPERATURE LBS = POUNDS MBH = BTUH x 1000

MCA = MINIMUM CIRCUIT AMPACITY MOP = MAXIMUM OVERCURRENT PROTECTION SEER = SEASONAL ENERGY EFFICIENCY RATIO VAV = VARIABLE AIR VOLUME

VVT = VARIABLE VOLUME AND TEMPERATURE

SCHEDULE GENERAL NOTES 1. PROVIDE THE PRODUCT INDICATED OR A COMPARABLE PRODUCT BY ONE OF THE MANUFACTURERS LISTED IN SPECIFICATION SECTIONS 237416 AND 237417. 2. UNIT WEIGHT IS APPROXIMATE AND INCLUDES ACCESSORIES. SCHEDULE REFERENCE NOTES 1. PROVIDE UNIT WITH FACTORY-MOUNTED DISCONNECT AND THROUGH-THE-BASE ELECTRICAL CONNECTIONS. 2. PROVIDE UNIT WITH POWERED CONVENIENCE OUTLET. POWER SHALL BE UNAFFECTED BY DISCONNECT POSITION. 3. PROVIDE UNIT WITH HINGED ACCESS PANELS. 4. PROVIDE UNIT WITH 14-INCH ROOF CURB. 5. PROVIDE UNIT WITH HAIL GUARD FOR CONDENSER COIL.

6. PROVIDE UNIT WITH PLEATED, DISPOSABLE MERV-8 FILTERS. 7. PROVIDE UNIT WITH 0-100% COMPARATIVE DRY-BULB ECONOMIZER WITH MODULATING OUTDOOR-AIR DAMPER. 8. PROVIDE UNIT WITH POWERED EXHAUST RELIEF. 9. PROVIDE UNIT WITH FAN STATUS AND DIRTY FILTER SWITCHES. 10. PROVIDE UNIT WITH STAINLESS-STEEL DRAIN PAN.

950 Walnut Ridge Drive Hartland, WI 53029 262.369.3535 T 262.369.3592 F

AIR-HANDLING DATA

SMART BUILDING SOLUTIONS

DESIGN SERVICES

PACKAGED ROOFTOP UNIT SCHEDULE

11. PROVIDE UNIT WITH HUMIDIMIZER HOT-GAS REHEAT (HGRH) DEHUMIDIFICATION CONTROL. 12. SMOKE DETECTORS TO BE FURNISHED AND WIRED BY ELECTRICAL CONTRACTOR. INSTALL DETECTOR IN DUCTWORK AND PROVIDE CONTROL WIRING AS NECESSARY TO DISABLE UNIT. 13. PROVIDE UNIT WITH COMMUNICATION INTERFACE FOR BUILDING AUTOMATION SYSTEM.

MAKE-UP AIR UNIT SCHEDULE AIR-HANDLING DATA

COOLING PERFORMANCE DATA

REHEAT PERFORMANCE DATA

HEATING PERFORMANCE DATA

ELECTRICAL DATA

CURB DATA WEIGHT LBS

REFERENCE NOTES

14

7,500

1, 2, 3, 4, 5, 6

-

14

7,500

1, 2, 3, 4, 5, 6

60.0

GREENHECK

12

3,000

1, 2, 3, 5, 8

15.0

GREENHECK

12

1,100

1, 2, 3, 5, 7, 8

MAXIMUM SUPPLY-AIR CFM

MINIMUM SUPPLY-AIR CFM

ESP INCHES WC

MOTOR HP

TYPE

TOTAL CAPACITY MBH

SENSIBLE CAPACITY MBH

EADB DEG-F

EAWB DEG-F

LADB DEG-F

LAWB DEG-F

EER

TYPE

CAPACITY MBH

TYPE

INPUT MBH

OUTPUT MBH

AFUE %

EAT DEG-F

TEMP. RISE DEG-F

STAGES

VOLTS

PHASE

HERTZ

MCA

MOP

BASIS OF DESIGN

HEIGHT INCHES

DX COOLED INDIRECT GAS-FIRED

12,000

12,000

0.75

(2) 5

DX

735

478

99

78

60

60

-

HOT-GAS

128

NG

1080

864

-

30

95

10:1

480

3

60

140

150

-

AAON RN-070

DX COOLED INDIRECT GAS-FIRED

12,000

12,000

0.75

(2) 5

DX

735

478

99

78

60

60

-

HOT-GAS

128

NG

1080

864

-

30

95

10:1

480

3

60

140

150

MAU-3T

GREENHECK DGX-125-H35

DIRECT-FIRED GAS

21,435

21,435

0.5

20

-

-

-

-

-

-

-

-

-

-

DIRECT

1,132

1,041

30

45

30:1

480

3

60

35.0

MAU-4T

GREENHECK DGX-110-H12

DIRECT-FIRED GAS

2,800

2,800

0.5

2

-

-

-

-

-

-

-

-

-

-

DIRECT

131

121

30

40

30:1

480

3

60

4.6

TAG

BASIS OF DESIGN

DESCRIPTION

MAU-1T

AAON RN-070

MAU-2T

SCHEDULE DEFINITIONS AFUE = ANNUAL FUEL UTILIZATION EFFICIENCY BTUH = BRITISH THERMAL UNITS PER HOUR CFM = CUBIC FEET PER MINUTE dBA = A-WEIGHTED SOUND PRESSURE DECIBELS

DEG-F = DEGREES FAHRENHEIT EADB = ENTERING AIR DRY-BULB TEMPERATURE EAWB = ENTERING AIR WET-BULB TEMPERATURE EAT = ENTERING AIR TEMPERATURE

EER = ENERGY EFFICIENCY RATIO ESP = EXTERNAL STATIC PRESSURE HGRH = HOT-GAS REHEAT HP = HORSEPOWER

IEER = INTEGRATED ENERGY EFFICIENCY RATIO LADB = LEAVING AIR DRY-BULB TEMPERATURE LAWB = LEAVING AIR WET-BULB TEMPERATURE LAT = LEAVING AIR TEMPERATURE

-

LBS = POUNDS MBH = BTUH x 1000 MCA = MINIMUM CIRCUIT AMPACITY MOP = MAXIMUM OVERCURRENT PROTECTION

SCHEDULE GENERAL NOTES 1. PROVIDE THE PRODUCT INDICATED OR A COMPARABLE PRODUCT BY ONE OF THE MANUFACTURERS LISTED IN SPECIFICATION SECTION 237423 AND 237433. 2. UNIT FURNISHED WITH FACTORY-MOUNTED AND WIRED DISCONNECT. INTERNALLY MOUNTED CONTROL CENTER INCLUDES MOTOR STARTERS, 24 VAC CONTROL TRANSFORMERS AND CONTROL CIRCUIT FUSING. 3. UNIT WEIGHT IS APPROXIMATE AND INCLUDES ACCESSORIES. SCHEDULE REFERENCE NOTES 1. PROVIDE UNIT WITH LOW-LEAKAGE, MOTORIZED OUTDOOR-AIR DAMPER. 2. PROVIDE UNIT WITH 2" PLEATED, DISPOSABLE MERV-8 FILTERS AND DIRTY FILTER SENSORS. 3. PROVIDE UNIT WITH BUILDING AUTOMATION SYSTEM INTERFACING. 4. PROVIDE UNIT WITH HAIL GUARDS. 5. PROVIDE UNIT WITH BAKED ENAMEL FINISH. COLOR TO BE DETERMINED DURING SUBMITTAL PROCESS. 6. INTAKE WEATHERHOOD WITH BIRDSCREEN.

7. PROVIDE MANUFACTURER'S THREE DIFFUSER. 8. PROVIDE WEATHERHOOD WITH ALUMINUM MESH FILTERS.

POWER VENTILATOR SCHEDULE MOTOR DATA

ELECTRICAL DATA

ELECTRIC UNIT HEATER SCHEDULE

CURB INFORMATION

DAMPER INFORMATION SONES

TAG

BASIS OF DESIGN

TYPE

AREA SERVED

AIRFLOW CFM

THROW FT

MOUNTING HEIGHT FT

CAPACITY KW

STAGES

VOLTS

PHASE

HERTZ

FLA

WEIGHT LBS

REFERENCE NOTES

-

-

300

2

EUH-1FP

MARKEL UH SERIES

HORIZONTAL UNIT HEATER

K101

800

45

7

15.0

1

480

3

60

18.0

54

1, 2

30x30

66

15.6

300

1, 5

120V

30x30

66

15.6

300

1, 5

GREENHECK WD-100

GRAVITY

-

73

22

200

1, 5

18

GREENHECK WD-100

GRAVITY

18x18

57

7.9

150

1, 3, 5

-

18

GREENHECK WD-100

GRAVITY

12x12

59

11

100

1, 3, 5

GREENHECK GPI

-

18

GREENHECK WD-100

GRAVITY

12x12

57

9

100

1, 3, 5

60

GREENHECK GPI

22X22

18

GREENHECK WD-100

GRAVITY

16X16

65

13.1

150

1, 5

1

60

GREENHECK GPI

17x17

18

GREENHECK WD-100

GRAVITY

10x10

54

7.1

75

1, 3, 5

3

60

-

-

-

GREENHECK VCD-23

120V

44x44

70

18

650

2, 6, 7, 8, 9

TYPE

AIRFLOW CFM

ESP INCHES WC

DRIVE

BHP

HP

RPM

VOLTS

PHASE

HERTZ

BASIS OF DESIGN

SIZE INCHES

HEIGHT INCHES

BASIS OF DESIGN

ACTUATOR

SIZE INCHES

dBA

EF-1T

CARMON CMB-25

UTILITY SET

3,600

4.00

BELT

-

7 1/2

-

480

3

60

N/A

-

-

INTEGRAL

-

-

EF-2T

GREENHECK GB-300

DOWNBLAST CENTRIFUGAL

8,820

0.50

BELT

-

2

630

480

3

60

GREENHECK GPI

-

18

GREENHECK VCD-23

120V

EF-3T

GREENHECK GB-300

DOWNBLAST CENTRIFUGAL

8,820

0.50

BELT

-

2

630

480

3

60

GREENHECK GPI

-

18

GREENHECK VCD-23

EF-4T

GREENHECK CUE-200

UPBLAST CENTRIFUGAL

5,400

0.50

DIRECT

-

2

1140

460

3

60

GREENHECK GPI

-

18

EF-5T

GREENHECK GB-180

DOWNBLAST CENTRIFUGAL

2,575

0.25

BELT

-

1/2

780

208

3

60

GREENHECK GPI

-

EF-6T

GREENHECK G-098-VG

DOWNBLAST CENTRIFUGAL

565

0.80

DIRECT

-

1/4

1660

120

1

60

GREENHECK GPI

EF-7T

GREENHECK G-099-VG

DOWNBLAST CENTRIFUGAL

550

0.75

DIRECT

-

1/4

1405

120

1

60

EF-8T

GREENHECK CUBE-161

UPBLAST CENTRIFUGAL

2,500

0.50

BELT

-

3/4

1598

480

3

EF-1G

GREENHECK G-085-VG

DOWNBLAST CENTRIFUGAL

250

0.50

DIRECT

-

1/10

1500

120

EF-2FP

GREENHECK SBE-2L-42

THRU WALL PROPELLER

14,000

0.25

BELT

-

1 1/2

440

480

ENCL = ENCLOSURE ESP = EXTERNAL STATIC PRESSURE EXP = EXPLOSTION PROOF

TENV = TOTALLY ENCLOSED, NOT VENTILATED VDC = VOLTAGE DIRECT CURRENT WC = WATER COLUMN

ODP = OPEN DRIP PROOF RPM = REVOLUTIONS PER MINUTE TEFC = TOTALLY ENCLOSED, FAN-COOLED

SCHEDULE GENERAL NOTES 1. PROVIDE PRODUCT INDICATED OR A COMPARABLE PRODUCT BY ONE OF THE MANUFACTURERS LISTED IN SPECIFICATION SECTION 233423. 2. ALL FANS SHALL HAVE AMCA-CERTIFIED PERFORMANCE RATINGS AND SHALL BEAR THE AMCA-CERTIFIED RATINGS SEAL. 3. POWER VENTILATORS SHALL COMPY WITH UL 705. SCHEDULE REFERENCE NOTES 1. PROVIDE UNIT WITH FACTORY-MOUNTED AND WIRED, NEMA-1 TOGGLE DISCONNECT. 2. PROVIDE UNIT WITH FACTORY-MOUNTED AND WIRED, NEMA-3R TOGGLE DISCONNECT. 3. PROVIDE MOTOR WITH SPEED CONTROL DIAL ON MOTOR. 4. PROVIDE UNIT WITH 0-10 VDC SIGNAL SPEED CONTROL. 5. PROVIDE UNIT WITH HINGED BASE AND CURB SEAL.

4. FAN WEIGHTS ARE APPROXIMATE AND INCLUDE ACCESSORIES. 5. ALL SINGLE-PHASE FAN MOTORS SHALL INCLUDE THERMAL OVERLOAD PROTECTION. 6. ALL THREE-PHASE FAN MOTORS SHALL BE PREMIUM EFFICIENCY AND INVERTER-DUTY RATED.

6. PROVIDE FLUSH EXTERIOR WALL HOUSING WITH OSHA GUARD. 7. PROVIDE UNIT WITH CLOSURE ANGLES. 8. PROVIDE 45 DEGREE WEATHERHOOD WITH BIRDSCREEN. 9. PROVIDE PERMATECTOR COATING FOR FAN, WALL HOUSING, GUARD, DAMPER, AND WEATHERHOOD.

NOMINAL DIMENSIONS

AIRFLOW CFM

FREE-AREA VELOCITY FPM

PRESSURE DROP INCHES WC

NET FREE AREA SQ FT

ACTUATOR

TAG

BASIS-OF-DESIGN

TYPE

LVR-1T

GREENHECK ECD-601

COMBINATION INTAKE LOUVER/DAMPER

H114

54

31

6

1

2,575

500

0.04

5.20

NEMA 3R

1

CLOSED

120

1

LVR-1FP

GREENHECK ECD-601

COMBINATION INTAKE LOUVER/DAMPER

K101

96

88

6

2

14,700

485

0.03

30.30

NEMA 3R

2

OPEN

120

1

LENGTH INCHES

HEIGHT INCHES

DEPTH INCHES

LOUVER SECTIONS

QUANTITY

TYPE

SCHEDULE GENERAL NOTES 1. ALL LOUVERS SHALL HAVE AMCA-CERTIFIED PERFORMANCE RATINGS AND SHALL BEAR THE AMCA-CERTIFIED RATINGS SEAL. SCHEDULE REFERENCE NOTES 1. PROVIDE UNIT WITH INTERNAL INSECT & BIRDSCREEN. 2. PROVIDE UNIT WITH 2-INCH FLANGED FRAME. 3. FINISH COLOR TO BE CUSTOM COLOR SELECTED BY ARCHITECT DURING SUBMITTAL PHASE.

ELECTRIC WALL AND CEILING HEATER SCHEDULE TAG

BASIS OF DESIGN

TYPE

LOCATION

AIRFLOW CFM

EWH-1T

MARKEL 3320 SERIES

WALL HEATER

H101

175

COIL kW 2.3

ENCLOSURE

ELECTRICAL DATA

LENGTH INCHES

HEIGHT INCHES

MOUNTING

VOLTS

PHASE

HERTZ

FLA

REFERENCE NOTES

16

21

SURFACE

277

1

60

10.8

1, 2

SCHEDULE GENERAL NOTES 1. PROVIDE THE PRODUCT INDICATED OR A COMPARABLE PRODUCT BY ONE OF THE MANUFACTURERS LISTED IN SPECIFICATION SECTION 238239. 2. COLOR TO BE SELECTED FROM MANUFACTURER'S STANDARD COLORS BY ARCHITECT DURING SUBMITTAL PROCESS. SCHEDULE REFERENCE NOTES 1. PROVIDE UNIT WITH FACTORY-MOUNTED AND WIRED DISCONNECT. 2. PROVIDE UNIT WITH INTEGRAL, VANDAL-PROOF, DOUBLE-POLE THERMOSTAT.

SCHEDULE GENERAL NOTES 1. SEE SPECIFICATION SECTION 238238. 2. MOUNTING HEIGHTS ARE MANUFACTURER'S RECOMMENDED MAXIMUM MOUNTING HEIGHT. COORDINATE/ADJUST MOUNTING HEIGHTS AS NECESSARY IN FIELD. 3. SUPPORT UNITS FROM BUILDING STRUCTURE. DO NOT SUPPORT UNITS FROM INSULATED METAL PANELS. PROVIDE ALL MOUNTING HARDWARE AS NECESSARY. SCHEDULE REFERENCE NOTES 1. PROVIDE UNIT WITH FACTORY-MOUNTED AND WIRED DISCONNECT. 2. PROVIDE UNIT WITH REMOTE THERMOSTAT, TRANSFORMER, AND HEAT PURGE FAN DELAY SWITCH.

CEILING VENTILATOR SCHEDULE ELECTRICAL DATA

TAG

BASIS-OF-DESIGN

TYPE

LOCATION

AIRFLOW CFM

ESP INCHES WC

WATTS

VOLTS

PHASE

HERTZ

EF-1FP

GREENHECK SP-A700

CEILING EXHAUST FAN

K101

700

0.25

350

120

1

60

FAIL POSITION

VOLTS

PHASE

HERTZ

FINISH

REFERENCE NOTES

60

KYNAR 70% THREE-COAT

1, 2, 3

60

KYNAR 70% THREE-COAT

1, 2, 3

SONES

WEIGHT LBS

REFERENCE NOTES

5

50

1, 2, 3, 4, 5

SCHEDULE GENERAL NOTES 1. PROVIDE PRODUCT INDICATED OR A COMPARABLE PRODUCT BY ONE OF THE MANUFACTURERS LISTED IN SPECIFICATION SECTION 233423. 2. ALL FANS SHALL HAVE AMCA-CERTIFIED PERFORMANCE RATINGS AND SHALL BEAR THE AMCA-CERTIFIED RATINGS SEAL. 3. VENTILATORS SHALL COMPLY WITH UL 507. 4. FAN WEIGHTS ARE APPROXIMATE AND INCLUDE ACCESSORIES.

ENGINEERING FIRM NO. F-9414

SCHEDULE REFERENCE NOTES 1. UNIT FURNISHED WITH INTERNAL DISCONNECT HARNESS PLUG. EXTERNAL DISCONNECT SWITCH PROVIDED BY ELECTRICAL CONTRACTOR. 2. PROVIDE UNIT WITH FACTORY-MOUNTED AND WIRED SPEED CONTROL. 3. PROVIDE UNIT WITH ISOLATION KIT. 4. PROVIDE UNIT WITH ALUMINUM GRILLE WITH WHITE ENAMEL FINISH. 5. PROVIDE UNIT WITH WALL OUTLET EXHAUST TERMINAL.

JONATHAN R. OLSON

TAG

BASIS OF DESIGN

TYPE

MOUNTING

PANEL SIZE INCHES

NECK SIZE INCHES

FINISH

REFERENCE NOTES

CD-1

TITUS OMNI

SQUARE PLAQUE DIFFUSER

LAY-IN

24 x 24

-

WHITE

1

CD-2

TITUS OMNI

SQUARE PLAQUE DIFFUSER

SURFACE

24 x 24

-

WHITE

1

CD-3

TITUS TRITEC

LOW VELICTY PERFORATED DIFFUSER (TWO-WAY THROW)

LAY-IN

24 x 24

-

WHITE

1

CD-4

TITUS TRITEC

LOW VELICTY PERFORATED DIFFUSER (TWO-WAY THROW)

LAY-IN

24 x 48

-

WHITE

1

CG-1

TITUS 50FF

FILTERED, EGG CRATE RETURN GRILLE

LAY-IN

24 x 24

22 x 22

WHITE

CG-2

TITUS 50FF

FILTERED, EGG CRATE RETURN GRILLE

LAY-IN

24 x 12

22 x 10

WHITE

CG-3

TITUS 50F

EGG CRATE RETURN GRILLE

LAY-IN

24 x 24

22 x 22

WHITE

CG-4

TITUS 50F

EGG CRATE RETURN GRILLE

LAY-IN

24 x 12

22 x 10

WHITE

CG-5

TITUS 50F

EGG CRATE RETURN GRILLE

SURFACE

24 x 12

22 x 10

WHITE

CG-6

TITUS 50F

EGG CRATE RETURN GRILLE

LAY-IN

48 x 24

46 x 22

WHITE

LD-1

TITUS TBDI-80-24-2HP-8-1.5

LINEAR 2-SLOT DIFFUSER PLENUM

LAY-IN

-

-

BLACK

4, 5

LD-2

TITUS TBDI-80-48-4HP-8-.75

LINEAR 4-SLOT DIFFUSER PLENUM

LAY-IN

-

-

BLACK

4, 5

RG-1

TITUS 350RL

SINGLE DEFLECTION RETURN GRILLE

SURFACE

-

-

WHITE

SG/R-1

TITUS 122RL

DOUBLE-DEFLECTION SUPPLY GRILLE

SURFACE

-

-

WHITE

1

SG/R-2

TITUS S300FL

DOUBLE-DEFLECTION SUPPLY GRILLE

SURFACE

-

-

PRIMER

3

SCHEDULE GENERAL NOTES 1. PROVIDE THE PRODUCT INDICATED OR A COMPARABLE PRODUCT BY ONE OF THE MANUFACTURERS LISTED IN SPECIFICATIONSECTION 233713. 2. SCHEDULE IS TYPICAL FOR BOTH DISTRIBUTION FACILITY AND TRUCK MAINTENANCE FACILITY. ALL DEVICES MAY NOT BE USED IN BOTH DRAWING SETS. SCHEDULE REFERENCE NOTES 1. NECK SIZE TO MATCH BRANCH DUCT SIZE AS INDICATED ON PLANS. 2. PROVIDE UNIT WITH OPPOSED BLADE DAMPER FOR AIR-BALANCING. 3. PROVIDE UNIT WITH AIR SCOOP DAMPER. 4. PROVIDE CROSS NOTCH AS NECESSARY. 5. COORDINATE CEILING TRIM TEES WITH GENERAL CONTRACTOR.

119296

12/19/16

DIFFUSER, GRILLE, AND REGISTER SCHEDULE

LOUVER SCHEDULE LOCATION

ELECTRICAL DATA

REFERENCE NOTES

BASIS OF DESIGN

SCHEDULE DEFINITIONS BHP = BRAKE HORSE POWER CFM = CUBIC FEET PER MINUTE dBA = A-WEIGHTED SOUND PRESSURE DECIBELS

HEATING DATA

WEIGHT LBS

TAG

HVAC Characteristics Information on the characteristics of the heating, ventilation, and air conditioning (HVAC) system(s) in the entire BASE building including types of ventilation, equipment configurations, and operation and maintenance issues was acquired by examining the building plans, conducting a building walk-through, and speaking with the building owner, manager, and/or operator. This information was collected using standard forms available in the appendices of the protocol during the building preliminary visit, and verified by the field team during the study week.

Exhibit Contents  1. Type of Ventilation

2. Cooling System Equipment - Primary and Secondary

3. Heating System Equipment - Primary and Secondary

4. Heating and Cooling Profiles - Number of Space Conditioning Days Per Week and Weekend

5. Heating and Cooling Profiles - Number of Space Conditioning and Ventilation Hours Per Day 6. Primary HVAC Control Implementation

7. Primary HVAC Control Response Strategy

8. Particle Filtration Systems - Frequency of Maintenance Actions for Different Configurations 9. Frequency of Inspection for HVAC Components 10. Frequency of Cleaning for HVAC Components

11. Frequency of Maintenance Actions for Fan Coil Units and Terminal Units 12. Control System - Frequency of Inspection and Sensor Calibration 13. Frequency of Testing and Balancing

 

BASE Buildings HVAC Characteristics: Type of Ventilation

Type of Ventilation Mechanical Natural Total Number of Buildings Reporting

Number of Buildings Reporting1 98 3 100

1

Column total adds up to greater than the total number of buildings reporting as one building used a combination of mechanical ventilation and natural ventilation (the building's study space employed natural ventilation, while mechanical ventilation was used in another portion of the building).

Variable Descriptions: Type of Ventilation defines the primary means of providing outdoor air to the building. The following categories apply: Mechanical ventilation employs a powered system to bring outdoor air into the building. Natural ventilation operates without external power, employing pressure differences caused by wind and temperature to induce airflow through the building, and includes any un-powered ventilation approach such as operable windows, ventilation shafts, intentional ventilation openings in walls, and envelope leakage. A building with a natural ventilation system may still have powered exhaust systems serving certain areas in the building.

BHC-1

BASE Buildings HVAC Characteristics: Cooling System Equipment - Primary and Secondary

Cooling System Equipment Chillers Packaged AC Units Heat Pump Ducted Air Distribution Fan Coil Units Individual Room AC Central System With Cooling Coils Split AC System Makeup Air Units Total Number of Buildings Reporting

Number of Buildings Reporting Primary Secondary Cooling System 1 Cooling System 1 72 0 9 23 2 10 94 2 6 20 4 68 80 1 9 21 16 13 99 99

Notes: Based on those buildings in the dataset that had cooling systems (n=99). Values within each column add up to greater than 99 as some buildings had more than one primary or secondary cooling system equipment entered into the database. 1

Variable Descriptions: Primary Cooling System is the equipment that provides cooling to the majority of the building. Secondary Cooling System is the equipment that provides cooling to the remaining areas of the building or serves as back up to the primary system. The following cooling system categories apply: Chillers are evaporators that chill water or other liquids and provide a chilled liquid to a central air handling system. Packaged AC Units are factory assembled air conditioning units equipped with the ability to heat or cool. Cooling is provided using a direct expansion refrigeration cycle. Heat Pumps are factory assembled units with the capacity to heat and cool. A single system can be used to condition an entire building or individual zones. Heat pump types include air-to-air, water-to-air, air-to-water, and water-to-water. Ventilation air may be supplied by a central system to the individual units through a system of ductwork or the individual units may provide ventilation. Ducted Air Distribution a network of ducts to carry the air to the rooms to be heated or cooled. Fan-Coil Units consist of a finned-tube coil supplied with hot or chilled water from a central source and a fan that circulates room air over the coil. These units are sometimes provided with an outdoor air connection through the exterior wall. Individual Room AC is a unit that is located in and provides cooling for an individual room. Central System with Cooling Coils are air conditioning systems that are centrally located in the building, or on the building roof. These units may provide cooling using a chilled water cooling coil. Split AC System is a system used for cooling where the condenser and compressor are in one package located outdoors, and the fan and evaporator coil are located inside the building. Makeup Air Units are fan units that solely provide outdoor air to the building.

BHC-3

BASE Buildings HVAC Characteristics: Heating System Equipment - Primary and Secondary

Heating System Equipment Steam or Hot Water Boiler Central System With Heating Coils Reheat Coils in Air Distribution System Packaged Units Forced Air Furnace Heat Pump Ducted Air Distribution Fan Coil Units Individual Space Heating Fin-Tube Radiators Electric Baseboard Makeup Air Units Total Number of Buildings Reporting

Number of Buildings Reporting Secondary Primary 1 Heating System 1 Heating System 60 1 49 9 41 19 4 11 2 2 2 10 81 6 8 25 1 7 26 17 1 20 9 8 100 100

Notes: Based on those buildings in the dataset that had heating systems (n=100). Values within each column add up to greater than 100 as some buildings had more than one primary or secondary heating system equipment entered into the database. 1

Variable Descriptions: Primary Heating System is the equipment that provides heating to the majority of the building. Secondary Heating System is the equipment that provides heating to the remaining areas of the building or serves as back up to the primary system. The following heating system categories apply: Steam or Hot Water Boilers produce hot water or steam which is delivered through pipes to space heating equipment. Key components to a boiler are the combustion chamber, burner, and the heat exchanger. Central System with Heating Coils are air conditioning systems that are centrally located in the building, or on the building roof. These units may provide heating using a hot water or steam heating coils. Reheat Coils in Air Distribution System are heating coils that are located in the ductwork near the distribution point to control the temperature in an individual zone. Packaged Units are factory assembled air conditioning units equipped with the ability to heat or cool. Heating is generally provided using gas fired heat exchanger or electric resistance heating coils. Forced Air Furnace heats by delivering warmed air to the spaces in a building. Components of the furnace are a heat exchanger, fuel burner, and air blower. Heat Pumps are factory assembled units with the capacity to heat and cool. A single system can be used to condition an entire building or individual zones. Heat pump types include air-to-air, water-to-air, air-to-water, and water-to-water. Ventilation air may be supplied by a central system to the individual units through a system of ductwork or the individual units may provide ventilation. Ducted Air Distribution a network of ducts to carry the air to the rooms to be heated or cooled. Fan Coil Units consist of a finned-tube coil supplied with hot or chilled water from a central source and a fan that circulates room air over the coil. These units are sometimes provided with an outdoor air connection through the exterior wall. Temperature controllers in the unit meter the chilled or hot water to the coil. Individual Space Heating is a unit that is located in and provides heat for the room where it is located. Fin-Tube Radiators are hydronic terminal units equipped with metal fins that dissipate the heat from the hot water in the piping through natural convection. Electric Baseboard are electric terminal units that heat by electrical resistance and natural convection. Makeup Air Units are fan units that solely provide outdoor air to the building.

BHC-4

BASE Buildings HVAC Characteristics: Heating and Cooling Profiles - Number of Space Conditioning and Ventilation Days Per Week and Weekend

Number of Buildings Reporting Number of Space Number of Space Number of Space Conditioning Weekdays Conditioning Weekend Ventilation Weekdays Per Week 2 Per Week Days Per Week 1 0 17 2 0 23 0 0 59 0 0 0 0 0 0 0 100 0 97 100 99 99

Days Per Week None One Two Three Four Five Total Number of Buildings Reporting Notes: 1 Number of space conditioning days per weekend was not reported for one building. 2 Number of ventilation days weekdays per week was not reported for one building. 3 Number of ventilation days per weekend was not reported for two buildings.

Number of Space Ventilation Weekend Days Per Week 3 20 24 54 0 0 0 98

Variable Descriptions: Number of Space Conditioning Weekdays Per Week refers to the number of weekdays per week that the building's space conditioning systems are reported to be operating. Number of Space Conditioning Weekend Days Per Week refers to the number of days per weekend that the building's space conditioning systems are reported to be operating. Number of Space Ventilation Weekdays Per Week refers to the number of weekdays per week that the building's ventilation systems are reported to be operating. Number of Space Ventilation Weekend Days Per Week refers to the number of days per weekend that the building's ventilation systems are reported to be operating.

BHC-5

BASE Buildings HVAC Characteristics: Heating and Cooling Profiles - Number of Space Conditioning and Ventilation Hours Per Day

Number of Buildings Reporting Mean (Arithmetic) Standard Deviation Minimum 10th Percentile 25th Percentile 50th Percentile 75th Percentile 90th Percentile Maximum

Number of Space Conditioning Hours Per Weekday 100 17 5 7 11 12 16 24 24 24

Number of Space Conditioning Hours Per Weekend Day 1 98 13 9 0 0 5 12 24 24 24

Number of Ventilation Hours Per Weekday 2 99 17 6 0 11 12 16 24 24 24

Number of Ventilation Hours Per Weekend Day3 97 12 9 0 0 5 9 24 24 24

Notes: Two buildings did not report the number of space conditioning hours per weekend day. 2 One building did not report the number of ventilation hours per weekday. 3 Two buildings did not report the number of ventilation hours per weekend day. 1

Variable Descriptions: Number of Space Conditioning Hours Per Weekday refers to the number of hours per weekday that the building's space conditioning systems are reported to be operating. Number of Space Conditioning Hours Per Weekend Day refers to the number of hours per weekend day that the building's space conditioning systems are reported to be operating. Number of Ventilation Hours Per Weekday refers to the number of hours per weekday that the building's ventilation systems are reported to be operating. Number of Ventilation Hours Per Weekend Day refers to the number of hours per weekend day that the building's ventilation systems are reported to be operating.

BHC-6

BASE Buildings HVAC Characteristics: Primary HVAC Control Implementation

Primary HVAC Control Implementation Pneumatic Low Voltage Analog Electric Direct Digital Pneumatic / Low Voltage Analog Electric Combination Pneumatic / Direct Digital Combination Low Voltage Analog Electric / Direct Digital Combination Pneumatic / Low Voltage Analog Electric / Direct Digital Combination Total Number of Buildings Reporting

Number of Buildings Reporting 1 42 8 20 2 18 3 4 97

Notes: Based on those buildings reporting a primary HVAC control implementation method (n=97).

1

Variable Descriptions: Primary HVAC Control Implementation refers to the control system in place to control the operation of the heating, ventilating, and air conditioning system. The following categories apply: Pneumatic systems use compressed air as the source of energy to actuate the control devices of the heating, ventilating, and air conditioning system. Low Voltage Analog Electric systems use electrical energy to actuate the control devices of the heating, ventilating, and air conditioning system. Direct Digital systems use digital signals to control the devices of the heating, ventilating, and air conditioning system.

BHC-7

BASE Buildings HVAC Characteristics: Primary HVAC Control Response Strategy

Primary HVAC Control Response Strategy Two-Position Proportional Floating Point Proportional-Integral Proportional-Integral-Derivative Total Number of Buildings Reporting

Number of Buildings Reporting1 9 79 3 5 22 98

Notes: Number of buildings based on those buildings reporting a primary HVAC control response strategy (n=98). Column total adds up to greater than the total number of buildings reporting as some buildings used a combination of these methods. 1

Variable Descriptions: Primary HVAC Control Response Strategy refers to the primary control response strategy for the building HVAC systems. The following categories apply: Two-Position refers to a control system in which the device being controlled is either full on or full off, with no intermediate operating positions available. Proportional refers to a control algorithm or method in which the final control device (e.g. damper or valve) moves to a position proportional to the deviation from the setpoint value of the controlled variable such as a temperature setpoint. Floating Point refers to a system where the controlled device is still operated by a two position controller, but the device moves gradually between full open and full closed. There is a neutral zone where no signal is transmitted and the controlled device "floats" in an intermediate position until a new signal is received. Proportional-Integral also known as "proportional plus reset" refers to a proportional control system where the control point is changed automatically back toward the setpoint when an offset occurs. Proportional-Integral-Derivative offers the same features as proportional-integral, but also controls the rate at which the control point is moved back to the setpoint.

BHC-8

BASE Buildings HVAC Characteristics: Particle Filtration Systems - Frequency of Maintenance Actions for Different Configurations Number of Buildings Reporting Frequency of Actions None As Needed Daily Weekly Bi-Weekly Monthly Semi-Quarterly Quarterly Semi-Annually Annually Total Number of Buildings Reporting

Frequency of Panel Filters Replacement1 1 4 0 0 0 10 2 47 17 12 93

Frequency of Manual Roll Filters Advancement2 0 4 0 0 0 6 3 2 2 1 18

Frequency of Automatic Roll Filters Inspection3 0 0 0 2 0 0 0 0 1 1 4

Notes: Data represent panel filter replacement frequencies for 93 BASE buildings equipped with this filter type. 2 Data represent frequency of manual roll filter advancement for 18 BASE buildings equipped with this filter type. 3 Data represent frequency of automatic roll filter inspection for 4 BASE buildings equipped with this filter type. 1

Variable Descriptions: Frequency of Panel Filters Replacement refers to the frequency that panel filters are changed out by building facilities personnel. Panel filters are manufactured in rectangular panels that are placed alongside each other in the filter bed. They are removed and either replaced or cleaned when dirty. Frequency of Manual Roll Filters Advancement refers to the frequency that manual roll filters are advanced by building facilities personnel. Manual roll filters consist of a fabric roll mounted on a spool that moves across the airstream. The media is manually wound on a take up spool to expose new filter material when necessary. Frequency of Automatic Roll Filters Inspection refers to the frequency that automatic roll filters are inspected by building facilities personnel. Automatic roll filters consist of a fabric roll mounted on a spool that moves across the airstream. The media is automatically wound on a take up spool to expose new filter. The movement of the media is often controlled by a pressure switch which senses the pressure drop across the media, or by an automatic timer. The frequency categories are as follows: None means that filters are not changed, advanced or inspected. As needed means that filters are changed, advanced or inspected only when deemed necessary. Daily means that filters are changed, advanced or inspected each day. Weekly means that filters are changed, advanced or inspected once per week. Bi-weekly means that filters are changed, advanced or inspected twice a month. Monthly means that filters are changed, advanced or inspected once per month. Semi-Quarterly means that filters are changed, advanced or inspected twice every three months. Quarterly means that filters are changed, advanced or inspected every three months. Semi-annually means that filters are changed, advanced or inspected once every six months. Annually means that filters are changed, advanced or inspected once a year.

BHC-9

BASE Buildings HVAC Characteristics: Frequency of Inspection for HVAC Components Number of Buildings Reporting Frequency of Inspection None As Needed Daily Weekly Bi-Weekly Monthly Semi-Quarterly Quarterly Semi-Annually Annually Total Number of Buildings Reporting Notes:

Air Handler Housing1 25 10 7 2 1 14 1 23 5 10 98

Heating and Cooling Coils2 6 7 0 1 0 14 2 29 13 26 98

Drain Pans 8 7 3 4 1 15 3 27 6 22 96

3

Air Distribution Ductwork4 59 32 0 0 0 1 0 2 1 4 99

Humidifiers 4 4 1 0 1 9 0 9 4 6 38

5

Evaporative Coolers6 1 0 0 0 1 1 0 0 0 4 7

Air Washers7 1 0 0 0 0 0 0 0 0 0 1

Cooling Towers8 0 1 19 11 3 17 1 10 3 2 67

1

Data represent 98 BASE buildings, which indicated an inspection frequency for air handling unit housing inspections. Data represent 98 BASE buildings, which indicated an inspection frequency for coil inspections. 3 Data represent 96 BASE buildings, which indicated an inspection frequency for drain pans. 4 Data represent 99 BASE buildings, which indicated an inspection frequency for ductwork. 5 Data represent 38 BASE buildings, which indicated an inspection frequency for humidifiers. 6 Data represent 7 BASE buildings, which indicated an inspection frequency for evaporative coolers. 7 Data represent 1 BASE building, which indicated an inspection frequency for air washers. 8 Data represent 67 BASE buildings, which indicated an inspection frequency for cooling towers. 2

Page 1 of 2

BHC-10

Variable Descriptions: Air Handler Housing refers to the inspection frequency of the air handling housing. The housing is a casing that is usually made up of galvanized sheet metal that contains the air handling unit components. Cooling Coils refers to the inspection frequency of the air handling unit cooling coils. Heating Coils refers to the inspection frequency of the air handling unit heating coils. Drain Pans refers to the inspection frequency of the cooling coil condensate drain pans. The drain pan is generally located under the cooling coil to collect and drain away water vapor that condenses on the cooling coil. Air Distribution Ductwork refers to the inspection frequency of the air handling unit air distribution ductwork. Humidifiers refers to the inspection frequency of humidifiers. Evaporative Coolers refers to the inspection frequency of evaporative coolers. Evaporative coolers are non-refrigerant systems that cool air by exchanging sensible heat for latent heat, reducing temperatures, but raising humidity. Air Washers refers to the inspection frequency of air washers. In some applications, air washers serve as evaporative coolers or humidifiers as their operating principle is similar to that of evaporative coolers. These may also be used to filter wettable dust from the airstream by drawing air through a mist (caused by spray nozzles) and then through eliminators to remove dust and the water particles not evaporated in the air. Cooling Towers refers to the inspection frequency of cooling towers. Cooling towers are used primarily to reject building heat to the atmosphere. The frequency categories are as follows: None refers to no inspections taking place in the building. As Needed refers to an inspection schedule where inspection occurs only when deemed necessary. Daily refers to an inspection schedule where inspection occurs each day. Weekly refers to an inspection schedule where inspection occurs on a once per week. Bi-weekly refers to an inspection schedule where inspection occurs twice a month. Monthly refers to an inspection schedule where inspection occurs once per month. Semi-Quarterly refers to an inspection schedule where inspection occurs twice every three months. Quarterly refers to an inspection schedule where inspection occurs every three months. Semi-annually refers to an inspection schedule where inspection occurs every six months. Annually refers to an inspection schedule where inspection occurs once a year.

Page 2 of 2

BHC-10

BASE Buildings HVAC Characteristics: Frequency of Cleaning for HVAC Components

Frequency of Cleaning None As Needed Daily Weekly Bi-Weekly Monthly Semi-Quarterly Quarterly Semi-Annually Annually Total Number of Buildings Reporting

Air Handler Housing1 36 17 0 0 0 2 0 14 4 24 97

Heating and Cooling Coils2 13 25 0 0 0 0 0 5 8 47 98

Drain Pans3 14 24 0 0 0 1 0 7 10 40 96

Air Distribution Ductwork4 77 16 0 0 0 0 0 1 0 2 96

Humidifiers5 7 14 0 0 0 0 1 3 3 8 36

Evaporative Coolers6 0 1 0 0 1 0 0 0 0 5 7

Air Washers7 0 1 0 0 0 0 0 0 0 0 1

Cooling Towers8 (surface cleaning)

1 9 0 0 0 2 1 7 10 36 66

Notes: Data represent 97 BASE buildings, which indicated a cleaning frequency for air handling unit-housing cleaning. For one building, the response was left blank. 2 Data represent 98 BASE buildings, which indicated a cleaning frequency for heating and cooling coils. 3 Data represent 96 BASE buildings, which indicated a cleaning frequency for drain pans. 4 Data represent 96 BASE buildings, which indicated a cleaning frequency air distribution duct work. 5 Data represent 36 BASE building, which indicated a cleaning frequency for humidifiers. 6 Data represent 7 BASE buildings, which indicated a cleaning frequency for evaporative coolers. 7 Data represent 1 BASE buildings, which indicated a cleaning frequency for air washers. 8 Data represent 66 BASE buildings, which indicated a cleaning frequency for cooling towers. 1

Page 1 of 2

BHC-11

Variable Descriptions: Air Handler Housing refers to the cleaning frequency of the air handling housing. The housing is a casing that is usually made up of galvanized sheet metal that contains the air handling unit components. Cooling Coils refers to the cleaning frequency of the air handling unit cooling coils. Heating Coils refers to the cleaning frequency of the air handling unit heating coils. Drain Pans refers to the cleaning frequency of the cooling coil condensate drain pans. The drain pan is generally located under the cooling coil to collect and drain away water vapor that condenses on the cooling coil. Air Distribution Ductwork refers to the cleaning frequency of the air handling unit air distribution ductwork. Humidifiers refers to the cleaning frequency of humidifiers. Evaporative Coolers refers to the cleaning frequency of evaporative coolers. Evaporative coolers are non-refrigerant systems that cool air by exchanging sensible heat for latent heat, reducing temperatures, but raising humidity. Air Washers refers to the cleaning frequency of air washers. In some applications, air washers serve as evaporative coolers or humidifiers as their operating principle is similar to that of evaporative coolers. These may also be used to filter wettable dust from the airstream by drawing air through a mist (caused by spray nozzles) and then through eliminators to remove dust and the water particles not evaporated in the air. Cooling Towers refers to the cleaning frequency of cooling towers. Cooling towers are used primarily to reject building heat to the atmosphere. The frequency categories are as follows: None refers to no cleaning implemented on these systems. As Needed refers to a cleaning schedule where cleaning occurs only when deemed necessary. Daily refers to a cleaning schedule where cleaning occurs each day. Weekly refers to a cleaning schedule where cleaning occurs on a once per week. Bi-weekly refers to a cleaning schedule where cleaning occurs twice a month. Monthly refers to a cleaning schedule where cleaning occurs once per month. Semi-Quarterly refers to a cleaning schedule where cleaning occurs twice every three months. Quarterly refers to a cleaning schedule where cleaning occurs every three months. Semi-annually refers to a cleaning schedule where cleaning occurs every six months. Annually refers to a cleaning schedule where cleaning occurs once a year.

Page 2 of 2

BHC-11

BASE Buildings HVAC Characteristics: Frequency of Maintenance Actions for Fan Coil Units and Terminal Units

Frequency of Actions None As Needed Daily Weekly Bi-Weekly Monthly Semi-Quarterly Quarterly Semi-Annually Annually Total Number of Buildings Reporting

Number of Buildings Reporting Fan Coil Units Fan Coil Units Terminal Units Frequency of Frequency of Filter Frequency of 1 2 Inspection Changing Inspection3 7 2 21 2 5 41 1 0 0 1 0 0 0 1 0 9 4 1 0 1 1 11 14 6 6 3 4 8 9 9 45 39 83

Notes: Data represent 45 BASE buildings, which indicated an inspection frequency for fan coil units. 2 Data represent 39 BASE buildings, which indicated a filter changing frequency for fan coil units. 3 Data represent 83 BASE buildings, which indicated an inspection frequency for terminal units. 1

Variable Descriptions: Fan Coil Units - Frequency of Inspection refers to the frequency of inspection for fan coil units. Fan Coil Units - Frequency of Filter Changing refers to the frequency that fan coil unit filters are changed out by building facilities personnel. Terminal Units - Frequency of Inspection refers to the frequency of inspection for terminal units. The frequency categories are as follows: None means that no inspection or filter change out takes place. As Needed refers to a maintenance schedule where maintenance occurs only when deemed necessary. Daily refers to a schedule where inspection or filter change out occurs each day. Weekly refers to a schedule where inspection or filter change out occurs once per week. Bi-weekly refers to a schedule where inspection or filter change out occurs twice a month. Monthly refers to a schedule where inspection or filter change out occurs once per month. Semi-Quarterly refers to a schedule where inspection or filter change out occurs twice every three months. Quarterly refers to a schedule where inspection or filter change out occurs every three months. Semi-annually refers to a schedule where inspection or filter change out occurs every six months. Annually refers to a schedule where inspection or filter change out occurs once a year.

BHC-12

BASE Buildings HVAC Characteristics: Control System - Frequency of Inspection and Sensor Calibration

Frequency of Actions None As Needed Daily Weekly Bi-Weekly Monthly Semi-Quarterly Quarterly Semi-Annually Annually Total Number of Buildings Reporting

Number of Buildings Reporting Frequency of Control Frequency of Sensor System Inspection1 Calibration2 12 15 28 58 14 0 2 0 1 0 4 4 0 0 12 3 11 7 14 10 98 97

Notes: Data represent 98 BASE buildings, which indicated an inspection frequency.

1 2

Data represent 97 BASE buildings, which indicated a calibration frequency.

Variable Descriptions: Frequency of Control System Inspection refers to the frequency of inspection for the heating, ventilating, and air conditioning system control system. Frequency of Sensor Calibration refers to the frequency of sensor calibration for the heating, ventilating, and air conditioning system control system. The frequency categories are as follows: None means that no inspections or calibrations take place. As Needed refers to an inspection or calibration schedule that occurs only when deemed necessary. Daily refers to an inspection or calibration schedule where inspection occurs each day. Weekly refers to an inspection or calibration schedule where inspection occurs on a weekly cycle. Bi-weekly refers to an inspection or calibration schedule where inspection occurs twice a month. Monthly refers to an inspection or calibration schedule where inspection occurs on a monthly schedule. Semi-Quarterly refers to an inspection or calibration schedule where inspection occurs twice every three months. Quarterly refers to an inspection or calibration schedule where inspection occurs every three months. Semi-annually refers to an inspection or calibration schedule where inspection occurs every six months. Annually refers to an inspection or calibration schedule where inspection occurs once a year.

BHC-13

BASE Buildings HVAC Characteristics: Frequency of Testing and Balancing

Frequency of Testing and Balancing None As Needed Daily Weekly Bi-Weekly Monthly Semi-Quarterly Quarterly Semi-Annually Annually Total Number of Buildings Reporting

Number of Buildings Reporting1 43 52 0 0 0 0 0 0 0 3 98

Notes: Data represent 98 BASE buildings, which indicated a frequency for testing and balancing. 1

Variable Descriptions: Frequency of Testing and Balancing refers to the frequency that testing and balancing is implemented on the building's air distribution system. The frequency categories are as follows: None means that no testing and balancing takes place. As Needed refers to a schedule where testing and balancing occurs only when deemed necessary. Daily refers to a schedule where testing and balancing occurs each day. Weekly refers to a schedule where testing and balancing occurs on a weekly cycle. Bi-weekly refers to a schedule where testing and balancing occurs twice a month. Monthly refers to a schedule where testing and balancing occurs on a monthly schedule. Semi-Quarterly refers to a schedule where testing and balancing occurs twice every three months. Quarterly refers to a schedule where testing and balancing occurs every three months. Semi-annually refers to a schedule where testing and balancing occurs every six months. Annually refers to a schedule where testing and balancing occurs once a year.

BHC-14

HVAC SPECIFICATIONS:

GENERAL NOTES: 1.

2.

3.

4.

IT IS THE INTENT OF THESE SPECIFICATIONS TO COVER FIRST CLASS WORKMANSHIP THROUGHOUT. PERSONNEL SHALL BE THOROUGHLY TRAINED AND EXPERIENCED IN THE PRODUCTS INVOLVED AND RECOMMENDED METHODS FOR THEIR FABRICATION AND INSTALLATION. NO ALLOWANCE SHALL BE MADE FOR LACK OF SKILL ON THE PART OF THE WORKMAN IN THE ACCEPTANCE AND/OR REJECTION OF COMPLETED WORK. MATERIALS AND EQUIPMENT SHALL BE NEW AND INSTALLED AS INDICATED ON THE DRAWINGS AND/OR SPECIFICATIONS. THEY SHALL BE INSTALLED PLUMB, LEVEL, AND TRUE-TO-LINE WITH ADJACENT WORK. WHERE INSTALLATION METHODS ARE NOT SPECIFICALLY COVERED BY THE DRAWINGS AND/OR SPECIFICATIONS, FIRST CLASS TRADE PRACTICES AND MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS SHALL GOVERN. CAREFULLY EXAMINE ALL ARCHITECTURAL, STRUCTURAL, PLUMBING, HVAC, FIRE PROTECTION, AND ELECTRICAL DRAWINGS PERTAINING TO THE CONSTRUCTION. COOPERATE WITH OTHER TRADES IN LOCATING DUCTWORK, PIPING, EQUIPMENT, ETC., IN ORDER TO AVOID CONFLICT WITH OTHER TRADES' WORK. NO CLAIM FOR COSTS WILL BE ALLOWED FOR RELOCATING EQUIPMENT, PIPING, DUCTWORK, ETC., WHICH INTERFERES WITH OTHER TRADES' WORK. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF DUCTWORK, PIPING AND EQUIPMENT. DO NOT SCALE DRAWINGS. THE EXACT LOCATION AND/OR ROUTING OF EQUIPMENT, DUCTWORK, PIPING, ETC., UNLESS SPECIFICALLY DIMENSIONED ON THE DRAWINGS, SHALL BE DETERMINED IN THE FIELD. MAKE REASONABLE MODIFICATIONS IN THE INSTALLATION SO ALL DUCTWORK FITS PROPERLY AND EQUIPMENT CAN BE SERVICED.

5.

HVAC EQUIPMENT AND INSTALLATION SHALL CONFORM TO THE LATEST EDITION OF THE STATE PLUMBING CODE, STATE MECHANICAL CODE, STATE FIRE CODE, STATE BUILDING CODE, APPLICABLE OSHA AND NFPA STANDARDS, COUNTY AND CITY BUILDING REGULATIONS AND CODES.

6.

FABRICATION AND INSTALLATION OF DUCTWORK SHALL BE IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS, STATE MECHANICAL CODE AND APPLICABLE NFPA STANDARDS.

7.

19.

MECHANICAL CONTRACTOR SHALL HAVE THE FINAL START-UP OF ALL HVAC EQUIPMENT SUPERVISED AND MONITORED BY A FACTORY AUTHORIZED TECHNICIAN. CONTRACTOR SHALL SUBMIT A WRITTEN HVAC SYSTEM START-UP SUPERVISION VERIFICATION FORM.

20.

PROVIDE ACCESS TO ALL DAMPERS AS REQUIRED FOR MAINTENANCE.

21.

FIRE DAMPERS WITH ACCESS DOORS SHALL BE INSTALLED IN ALL DUCTWORK PASSING THROUGH FIRE SEPARATING WALLS, PARTITIONS, AND FIRE RATED CEILINGS.

23.

HVAC UNIT LEVELING SHALL BE BY MECHANICAL CONTRACTOR.

INSULATED DOUBLE WALL DUCT SHALL BE FABRICATED WITH AN OUTER SHELL AND A PERFORATED INNER LINER WITH 1" FIBERGLASS INSULATION BETWEEN THE SHELL AND LINER. (DUCT DIMENSIONS SHOWN ARE EXTERIOR SHEET METAL DIMENSIONS.)

24.

MECHANICAL CONTRACTOR SHALL PROVIDE CONDENSATE TRAP AT EACH AIR HANDLING UNIT.

ELBOWS & TEES SHALL INCLUDE TURNING VANES.

25.

FRESH AIR INTAKE SHALL BE MINIMUM OF 10'-0" FROM ANY EXHAUST FAN, FLUE OR PLUMBING VENT. COORDINATE WITH GENERAL CONTRACTOR.

PROVIDE FLEXIBLE CONNECTIONS AT EQUIPMENT.

26.

MECHANICAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND CATALOG SHEETS TO ARCHITECT/ENGINEER AND SHALL INCLUDE: FANS

B.

ELECTRIC WALL HEATERS

C.

GRILLES, REGISTERS, AND DIFFUSERS

D.

HVAC CONTROLS

E.

VIBRATION ISOLATORS

F.

INSULATION

8.

MECHANICAL CONTRACTOR SHALL ARRANGE AND PAY FOR MECHANICAL PERMITS AND INSPECTIONS AS REQUIRED BY LOCAL ORDINANCES.

9.

DELIVER MATERIALS TO PROJECT IN GOOD CONDITION. STORE MATERIALS OFF GROUND AND PROTECTED FROM THE ELEMENTS.

G.

AIR TERMINAL UNITS

10.

VERIFY DIMENSIONS IN FIELD. VERIFY STRUCTURAL DETAILS BEFORE INSTALLING DUCTWORK. NO EXTRA COMPENSATION WILL BE ALLOWED BECAUSE OF DIFFERENCES BETWEEN ACTUAL MEASUREMENTS AND DIMENSIONS AND THOSE INDICATED ON THE DRAWINGS. NOTIFY ARCHITECT/ENGINEER IN WRITING OF ANY DIFFERENCE WHICH MAY BE FOUND BEFORE PROCEEDING WITH WORK

H.

ROOFTOP UNITS

I.

GAS REGULATORS

MECHANICAL CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ALL DUCTWORK AND EQUIPMENT WHICH DEVIATED FROM THE DRAWINGS. AT COMPLETION OF WORK, CONTRACTOR SHALL SUBMIT A MARKED SET OF DESIGN PRINTS INDICATING CHANGES.

12.

ALL PENETRATIONS THROUGH WALLS SHALL BE PROVIDED WITH PROPER SIZED SLEEVES. SEAL ALL PIPE SLEEVES WITH APPROPRIATE CAULKING. ALL SIX (6) INCH AND SMALLER PIPE PENETRATIONS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE INSTALLED IN ACCORDANCE WITH APPROPRIATE 3M FIRESTOP SYSTEM (OR APPROVED EQUAL). ALL PIPING SLEEVES SHALL BE SCHEDULE 40, CARBON STEEL, ASTM A53, GRADE B. ANY CUTTING OR PATCHING OF NEW OR EXISTING SURFACES THAT IS REQUIRED SHALL BE BY THIS CONTRACTOR AND SHALL BE REPLACED WITH MATERIAL OF THE SAME QUALITY AND THICKNESS AS THE EXISTING SURFACE. ANY DAMAGES TO EXISTING MATERIALS SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING.

13.

14.

ALL DUCTWORK SHALL BE IDENTIFIED AFTER INSULATION WITH PLASTIC DUCT MARKERS. THESE MARKERS SHALL BE THE MANUFACTURER'S STANDARD LAMINATED PLASTIC IN THE FOLLOWING COLOR CODES: A.

BLUE: SUPPLY AIR.

B.

RED: RETURN AND MIXED AIR.

C.

YELLOW: OUTSIDE AIR.

ABBREVIATIONS AFF BHP BOD BOP CFM D DWG EA EAT EF EWH FFE FIN FL FV G.C. HP LAT M M.C. MD NC N.C. NG NO NTS P.C. PD PRV RA RH RTU SA SF SHT SP TBE TOD TOP TYP UNO VAV VFD VIF

ELBOW

ALL SUPPLY DUCT FROM RTU-17 TO AIR TERMINAL UNITS SHALL BE GALVANIZED SHEET METAL OF GAUGE AND CONSTRUCTION AS REQUIRED BY SMACNA 6" W.G. PRESSURE CLASS. (DUCT DIMENSIONS SHOWN ARE SHEET METAL DIMENSIONS.) SEAL ALL DUCTWORK PER SMACNA CLASS A.

MAINTAIN A MINIMUM DISTANCE OF 10'-0" FROM ROOF MOUNTED HVAC EQUIPMENT TO THE EDGE OF THE ROOF.

MECHANICAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, TOOLS, AND EQUIPMENT TO INSTALL ALL HVAC SYSTEMS AS INDICATED ON THESE DRAWINGS.

11.

DUCTWORK SUPPLY: UNLESS OTHERWISE NOTED, SUPPLY AIR DUCT SHALL BE GALVANIZED SHEET METAL OF GAUGE & CONSTRUCTION AS REQUIRED BY SMACNA 2 in-wg PRESSURE CLASS. (DUCT DIMENSIONS SHOWN ARE SHEET METAL DIMENSIONS. NO INCREASE IN SIZE REQUIRED FOR DUCT LINER). SEAL ALL DUCTWORK PER SMACNA CLASS B.

22.

A.

MECHANICAL LEGEND

RECTANGULAR TEE

RECTANGULAR/ROUND TRANSITION

RETURN: UNLESS OTHERWISE NOTED, RETURN AIR DUCT SHALL BE GALVANIZED SHEET METAL OF GAUGE & CONSTRUCTION AS REQUIRED BY SMACNA 2 in-wg PRESSURE CLASS. (DUCT DIMENSIONS SHOWN ARE SHEET METAL DIMENSIONS. NO INCREASE IN SIZE REQUIRED FOR DUCT LINER). SEAL ALL DUCTWORK PER SMACNA CLASS B.

HIGH-EFFICIENCY TAKE-OFF

ELBOWS & TEES SHALL INCLUDE TURNING VANES.

RECTANGULAR BEVELED TAP

PROVIDE FLEXIBLE CONNECTIONS AT EQUIPMENT. EXHAUST/TRANSFER: UNLESS OTHERWISE NOTED, EXHAUST AIR DUCT SHALL BE GALVANIZED SHEET METAL OF GAUGE & CONSTRUCTION AS REQUIRED BY SMACNA 2 in-wg PRESSURE CLASS. (DUCT DIMENSIONS SHOWN ARE SHEET METAL DIMENSIONS. NO INCREASE IN SIZE REQUIRED FOR DUCT LINER). SEAL ALL DUCTWORK PER SMACNA CLASS B.

RECTANGULAR/ROUND EXTERNALLY INSULATED DUCT

RECTANGULAR/ROUND INTERNALLY INSULATED DUCT ELBOWS & TEES SHALL INCLUDE TURNING VANES. PROVIDE FLEXIBLE CONNECTIONS AT EQUIPMENT.

27.

PROVIDE PIPE MARKERS FOR NATURAL GAS PIPING SYSTEMS. PIPE MARKERS SHALL BE PRESSURE SENSITIVE VINYL, CONFORM TO ANSI A13.1 AS MANUFACTURED BY SETON NAMEPLATE CORPORATION, OR APPROVED EQUAL. PIPE MARKERS SHALL BE APPLIED NEAR EACH BRANCH CONNECTION, EVERY TWENTY FEET IN STRAIGHT RUNS, AND INCLUDE FLOW ARROWS.

INSULATION DUCTWORK: INTERNAL FIBERGLASS DUCT LINER: JOHNS MANVILLE LINACOUSTIC RC FIBERGLASS DUCT LINER WITH REINFORCED COATING (OR APPROVED EQUAL) INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION SPECIFICATIONS.

28.

CONTRACTOR SHALL FIELD DETERMINE ALL DUCT TRANSITIONS PER DUCT SIZES INDICATED, AIR HANDLING EQUIPMENT INLETS/OUTLETS AND/OR SUPPLY/RETURN AIR GRILLES/DIFFUSERS. PROVIDE FLEXIBLE CONNECTIONS AT ALL EQUIPMENT AND AT ALL CEILING MOUNTED SUPPLY/RETURN/EXHAUST GRILLES/DIFFUSERS..

EXTERNAL FIBERGLASS DUCT WRAP: JOHNS MANVILLE MICROLITE FORMALDEHYDE-FREE FIBERGLASS DUCT WRAP (OR APPROVED EQUAL) INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION SPECIFICATIONS.

29.

PROVIDE DUCT TRANSITIONS AT ALL EQUIPMENT CONNECTIONS. TRANSITION DETAIL SHALL BE DETERMINED IN THE FIELD.

30.

MECHANICAL CONTRACTOR SHALL PROVIDE MISCELLANEOUS STEEL AS REQUIRED TO INSTALL NEW HVAC EQUIPMENT, DUCTWORK AND PIPING.

31.

MECHANICAL CONTRACTOR IS RESPONSIBLE FOR MAKING PIPING MODIFICATIONS DUE TO FINAL SELECTION OF EQUIPMENT, INSTRUMENTS AND PIPING COMPONENTS.

RECTANGULAR 1.5xCL RADIUS ELBOW

ABOVE FINISHED FLOOR BRAKE HORSEPOWER BOTTOM OF DUCT BOTTOM OF PIPE CUBIC FEET PER MINUTE DRAIN DRAWING EXHAUST AIR ENTERING AIR TEMPERATURE EXHAUST FAN ELECTRIC WALL HEATER FINISHED FLOOR ELEVATION FINISHED FLOOR FIELD VERIFY GENERAL CONTRACTOR HORSEPOWER LEAVING AIR TEMPERATURE MANUAL VOLUME DAMPER MECHANICAL CONTRACTOR MOTORIZED DAMPER NORMALLY CLOSED NOISE CRITERIA NATURAL GAS NORMALLY OPEN NOT TO SCALE PLUMBING CONTRACTOR PRESSURE DROP PRESSURE REDUCING VALVE RETURN AIR RELATIVE HUMIDITY ROOF TOP UNIT SUPPLY AIR SUPPLY FAN SHEET STATIC PRESSURE THREADED BOTH ENDS TOP OF DUCT TOP OF PIPE TYPICAL UNLESS NOTED OTHERWISE VARIABLE AIR VOLUME VARIABLE FREQUENCY DRIVE VERIFY IN FIELD

ROUND 1.5xCL RADIUS GORED ELBOW

INSIDE BUILDING: SUPPLY DUCTWORK FROM RTU-17 TO AIR TERMINAL UNITS TO HAVE 2” THICK FIBERGLASS DUCT WRAP WITH FOIL FACING. SUPPLY DUCTWORK DOWNSTREAM OF AIR TERMINAL UNITS TO HAVE 1” FIBERGLASS DUCT LINER. RETURN DUCTWORK TO HAVE 1” FIBERGLASS DUCT LINER. ROUND 1.5xCL RADIUS STAMPED ELBOW

32.

MAKE WELDS TO EXISTING/NEW STEEL WITH LOW HYDROGEN ELECTRODES. STORE ELECTRODES IN ACCORDANCE WITH AWS SPECIFICATIONS. WELDING PROCESSES SHALL BE PRE-QUALIFIED PER AWS D1.1 FOR DUCT SUPPORTS AND MISCELLANEOUS SUPPORT STEEL.

33.

MECHANICAL CONTRACTOR SHALL PROVIDE ZINC-RICH COATING TO ALL WELDS.

ALL OTHER CONCEALED SUPPLY AND RETURN AIR DUCTWORK SHALL BE INTERNALLY INSULATED. UNLESS OTHERWISE NOTED, EXHAUST DUCTWORK SHALL BE UNINSULATED.

D.

GREEN: EXHAUST AIR.

E.

TERMINOLOGY: INCLUDE DIRECTION OF AIRFLOW; DUCT SERVICE SUCH AS SUPPLY, RETURN, AND EXHAUST; DUCT ORIGIN, DUCT DESTINATION, AND DESIGN FLOW.

FLEXIBLE DUCTWORK TO BE INSULATED FLEX MASTER TYPE 3 OR APPROVED EQUAL.

RECTANGULAR/ROUND INSULATED FLEXIBLE DUCT

NATURAL GAS (2 PSI AND UNDER) PIPING: 2" & SMALLER: SCHEDULE 40, CARBON STEEL, T&C ENDS, SEAMLESS OR ERW, ASTM A53 GRADE B.

SUPPLY AIR RISER EXHAUST AIR RISER

15.

ENGAGE AN INDEPENDENT TESTING, ADJUSTING AND BALANCING AGENT CERTIFIED BY EITHER AABC OR NEBB FOR ALL TESTING, ADJUSTING AND BALANCING. THE INDEPENDENT AGENT SHALL BE RESPONSIBLE FOR THE FOLLOWING:

2-1/2" AND LARGER: SCHEDULE 40, CARBON STEEL, PLAIN ENDS, SEAMLESS OR ERW, ASTM A53 GRADE B.

A.

TESTING, ADJUSTING, AND BALANCING CONFERENCE WITH THE OWNER'S AND ARCHITECT'S REPRESENTATIVES SHALL BE SCHEDULED WITH 7 DAYS ADVANCE NOTICE SUPPLIED TO ALL INVOLVED.

FITTINGS: 2" & SMALLER: 150 LB., MALLEABLE IRON, THREADED, ASTM A197.

SET HVAC SYSTEM AIR FLOW RATES WITHIN THE FOLLOWING TOLERANCES:

2-1/2" AND LARGER: STANDARD WEIGHT, CARBON STEEL, BUTTWELD ENDS, SEAMLESS, ASTM A234 GRADE WPB.

RETURN AIR RISER

B.

C.

D.

i.

SUPPLY, RETURN, AND EXHAUST FANS AND EQUIPMENT WITH FANS: +5% TO +10%

ii.

AIR OUTLETS AND INLETS: ±5%

EXHAUST AIR GRILLE AIRFLOW INDICATOR C

CO2 SENSOR

A FINAL REPORT SHALL BE PROVIDED TO OWNER. TYPE WRITTEN OR COMPUTER PRINTOUT IN LETTER-QUALITY FONT ON STANDARD BOND PAPER IN A 3-RING BINDER TABULATED INTO SECTIONS BY THE TESTING OF CFM SETTINGS, ZONE SETTINGS, O/A SETTINGS AND FAN SPEEDS SHALL BE INCLUDED IN THIS REPORT.

BOLTS: HEAVY HEX HEAD MACHINE BOLTS, WITH HEAVY HEX HEAD NUT CARBON STEEL, ASTM A307.

S

REMOTE SENSOR

T

THERMOSTAT

X-X CFM

DIFFUSER TAG CFM

17.

PROVIDE ONE DAY OF TRAINING FOR START-UP AND OPERATION OF ALL HVAC EQUIPMENT.

18.

SEISMIC RESTRAINT HANGERS & SUPPORTS FOR ALL DUCTWORK, PIPING, AND EQUIPMENT: ALL MECHANICAL EQUIPMENT, PIPING AND DUCTWORK SHALL BE RESTRAINED TO RESIST SEISMIC FORCES. RESTRAINTS SHALL MAINTAIN EQUIPMENT, PIPING AND DUCTWORK IN A CAPTIVE POSITION. RESTRAINT DEVICES SHALL BE DESIGNED AND SELECTED TO MEET THE SEISMIC REQUIREMENTS AS DEFINED IN THE LATEST ISSUE OF THE STATE BUILDING CODE OR LOCAL JURISDICTION BUILDING CODE. CONTRACTOR TO PROVIDE SEISMIC CALCULATIONS TO FM GLOBAL, FOR APPROVAL, FOR ANY EQUIPMENT OR SUPPORTS REQUIRING SEISMIC CALCULATIONS.

B.

PROVIDE CALCULATIONS TO DETERMINE RESTRAINT LOADS RESULTING FROM SEISMIC FORCES PRESENTED IN LATEST EDITION OF THE LOCAL BUILDING CODE OR STATE BUILDING CODE. SEISMIC CALCULATIONS SHALL BE CERTIFIED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF INDIANA AND IN THE DIRECT EMPLOY OF THE SEISMIC EQUIPMENT MANUFACTURER. THESE CALCULATIONS SHALL BE PROVIDED TO THE OWNER FOR SUBMISSION TO FM GLOBAL FOR REVIEW. PROVIDE CALCULATIONS FOR ALL EQUIPMENT 20 POUNDS OR GREATER.

C.

CALCULATIONS MUST SHOW THE ENTIRE LOAD PATH FROM THE EQUIPMENT TO THE BUILDING STRUCTURE AND INDICATE THE METHOD OF ATTACHMENT OF THE EQUIPMENT TO THE SEISMIC RESTRAINT AND THE SEISMIC RESTRAINT TO THE BUILDING STRUCTURE.

D.

ALL DUCTWORK, PIPING AND EQUIPMENT NOT REQUIRING CALCULATIONS SHALL BE SEISMICALLY SUPPORTED AND BRACED PER THE SEISMIC SUPPLIER'S INSTRUCTIONS.

E.

INSTALLATION INSTRUCTIONS MUST BE SUBMITTED TO THE ENGINEER PRIOR TO THE INSTALLATION OF THE EQUIPMENT.

F.

THE IMPORTANCE FACTOR Ip = 1.25

G.

THE SEISMIC SUPPLIER SHALL BE AMBER / BOOTH COMPANY, MASON INDUSTRIES, THE HILL CO. OR APPROVED EQUAL.

H.

THE CONTRACTOR SHALL PROVIDE ANY MISCELLANEOUS STEEL REQUIRED FOR MOUNTING THE EQUIPMENT AND SEISMIC RESTRAINTS TO THE STRUCTURE. THE CONTRACTOR SHALL SUBMIT DETAIL OF HOW SEISMIC ROOF CURB WILL BE ATTACHED TO THE BUILDING ROOF STEEL.

I.

A REPRESENTATIVE OF THE SEISMIC SUPPLIER SHALL VISIT THE JOB SITE PRIOR TO THE INSTALLATION OF ANY PIPING, DUCTWORK, EQUIPMENT, ETC. AND SHALL INSTRUCT THE CONTRACTOR ON THE PROPER INSTALLATION OF THE SEISMIC RESTRAINTS. THE REPRESENTATIVE SHALL CERTIFY IN WRITING AND SUBMIT TO THE ENGINEER, THAT THE INSTRUCTION HAS OCCURRED.

J.

AT THE COMPLETION OF THE PROJECT A REPRESENTATIVE OF THE SEISMIC SUPPLIER SHALL VISIT THE JOB SITE TO VERIFY THAT ALL SEISMIC RESTRAINTS ARE INSTALLED PER CODE PROVIDE A WRITTEN REPORT TO THE ENGINEER OF ANY DEFICIENCIES. THE REPRESENTATIVE SHALL THEN REVISIT THE JOB SITE FOR A FINAL INSPECTION TO VERIFY THAT ALL DEFICIENCIES HAVE BEEN CORRECTED. THE REPRESENTATIVE SHALL PROVIDE TO THE ENGINEER A WRITTEN CERTIFICATION THAT ALL SEISMIC RESTRAINTS ARE INSTALLED AS REQUIRED BY CODE AND SEISMIC SUPPLIER INSTALLATION INSTRUCTIONS.

L.

UNIONS: 2" & SMALLER: 150 LB., MALLEABLE IRON, THREADED, GROUND POINT. FLANGES: 2-1/2" AND LARGER: 150 LB., RAISED FACE OR FLAT FACE, WELDNECK OR SLIP-ON, STANDARD WEIGHT BORE, F&D TO ANSI B16.5, ASTM A105.

ALL THERMOSTATS SHALL BE MOUNTED AT 60" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. IF ELECTRICAL SWITCHES OR OTHER DEVICE IS MOUNTED IN THE SAME LOCATION, ALL DEVICES SHALL BE ALIGNED VERTICALLY. VERIFY ALL THERMOSTAT LOCATIONS WITH ARCHITECT/ENGINEER PRIOR TO INSTALLATION.

K.

RETURN AIR GRILLE

SUBMIT (6) COPIES OF TESTING, ADJUSTING & BALANCING REPORTS TO ENGINEER. USE TESTING, ADJUSTING & BALANCING STANDARD FORMS. FORMS TO BE STAMPED & CERTIFIED BY THIS TESTING & BALANCING AGENCY.

16.

A.

SUPPLY AIR DIFFUSER

SEE EQUIPMENT SCHEDULES ON DWG. M-601 FOR EQUIPMENT REQUIRING SEISMIC CURBS, SPRING ISOLATORS AND EQUIPMENT RAILS.

GASKETS: NON-METALLIC GASKETS FOR PIPE FLANGES (DURABLA, GARLOCK, CRANITE, ETC.), ANSI B16.21. VALVES: PLUG VALVES: 2" & SMALLER: 200 LB. WOG, THREADED, SHORT PATTERN, SEMI-STEEL LUBRICATED PLUG COCK WITH STANDARD PATTERN CAST IRON HANDLE, HOMESTEAD FIG. 611 OR APPROVED EQUAL. 2-1/2" AND LARGER: 200 LB. WOG, ANSI 125 LB. FLANGED, SHORT PATTERN, SEMI-STEEL LUBRICATED PLUG COCK WITH STANDARD PATTERN OPERATING WRENCH, HOMESTEAD FIG. 612 OR APPROVED EQUAL. NATURAL GAS VALVES ON ROOF SHALL BE TWO PIECE, FULL PORT, BRONZE BALL VALVE WITH BRONZE TRIM. REGULATOR: SENSUS OR APPROVED EQUAL. CONSULT MANUFACTURER FOR ORIFICE SIZE PER APPLICATION. SEE REGULATOR SCHEDULE SHEET M-601.

D C B A

04/07/16 03/18/16 02/29/16 02/05/16

ISSUED FOR BIDDING ISSUED FOR OWNER REVIEW ISSUED FOR 50% BID ISSUED FOR 30% BID

PCIS PCIS PCIS PCIS

ISSUE

DATE

DESCRIPTION

APP BY

ALL ROOF CURBS SHALL BE 14" ABOVE FINISHED ROOF SURFACE.

401 N.W. First St. Evansville, IN 47708

812 425 4264

PROPOSED HIGH SCHOOL

EVANSVILLE CHRISTIAN SCH. WARRICK COUNTY NEWBURGH, IN The drawings, specifications and other documents, including those in electronic form prepared by PCI Skanska Inc. for this project are Instruments of Service, and may be used solely with respect to this project. The documents may not be reproduced without first obtaining the express written consent of PCI Skanska Inc. Authorized use of electronic media or file does not guarantee that these files contain complete and accurate information. In order to insure the accuracy of the information contained and that no changes or modifications have been made, either intentional or unintentional, these files must be compared to the project's contract documents with stamped and sealed certification and applicable approved modifications. There shall be no unauthorized use or material modification of such drawings, specifications and other documents, including those in electronic form prepared by PCI Skanska Inc. for this project. By and through any use, including any unauthorized use, or any material modification, or in connection with, related to, or arising out of such use or modification, the user agrees that: PCI Skanska Inc. will not be liable or responsible for such use or modification; the user will not assert a claim or file any suit, including for contribution or indemnification, against PCI Skanska Inc. for such use or modification; and the user will indemnify and hold PCI Skanska Inc. harmless from any loss, damage, liability or cost including reasonable attorney's fees. CREATED BY: CHECKED BY:

DATE:

TNF II

PRINTED DATE:

SRP

PROJECT NUMBER:

01/04/16 4/8/2016 7:59:47 AM

20150351.00.00

HVAC NOTES

M-001 SHEET NUMBER

ISSUE

D 04/07/16

ISSUED FOR BIDDING/NOT FOR CONSTRUCTION

HVAC LEGEND & SYMBOLS

AIR DISTRIBUTION SCHEDULE

SYM.

CD-1

SERVICE LOUVERED SUPPLY REGISTER

DESCRIPTION * FOUR-WAY DEFLECTION * FACE AIR VOLUME CONTROL

EGGCRATE RETURN CR-1 GRILLE

* FREE PATTERN

MATERIAL

A. RECTANGULAR DUCT: * MANUAL OPPOSED BLADE DAMPER WITH LOCKING QUADRANT. LEVER OPE RATOR, OF STEEL CONSTRUCTION. * LOUVERS & DAMPERS MODEL CD-400; KRUEGER MODEL 0BD-DM

TYPE 2 OPERATION FOR LESS THAN 10" WIDE.

B. ROUND DUCT: * ROUND BLADE CONTROL DAMPER OF STEEL CONSTRUCTION WITH MA NUAL OPERATOR * LOUVERS AND DAMPERS MODEL CD-600.

MFG & MOD ACCESSORIES & FEATURES

STEEL CONSTRUCTION WITH WHITE BAKED ENAMEL FINISH

PRICE SCDA

ALUMINUM CONSTRUCTION WITH WHITE BAKED ENAMEL FINISH

PRICE 80

* OPPOSED BLADE DAMPER

OR

* NC < 35 * FACE VELOCITY TO BE BETWEEN 500-700 FPM

* NC < 35 * MAX FACE VELOCITY <500 FPM

OR

EGGCRATE EXHAUST GRILLE

* FREE PATTERN

ALUMINUM CONSTRUCTION WITH WHITE BAKED ENAMEL FINISH

PRICE 80

* RECTANGULAR ELBOW WITH SINGLE THICKNESS TURNING

VANE S OF STEEL CONSTRUCTION.

* NC < 35 * MAX FACE VELOCITY <500 FPM

* CONSTRUCT ALL BRANCH CONNECTIONS WITH 45° FITTING PER

SMACNA STANDARDS.

* SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR MOUNTING TYPE REQUIRED.

45°

BINDING EDGE

* ALTERNATE MANUFACTURERS: METALAIRE AMD TITUS

L

* DIMENSION: L = 1/4W, 4"MINIMUM

W

*

* SHEET METAL CONNECTORS, INC. HIGH EFFICIENCY TAKEOFF WITH DAMPER AND LO CKING QUADRANT FOR ROUND DUCT TAKEOFFS FROM RECTANGULAR DUCTWORK. INCREASE MAIN DUCT SIZE AT FITTING TO ACCOMMODATE ITS INSTALLATION IF REQUIRED TO MEET SMACNA AND MANUFACTU RER'S INSTRUCTIONS. D

*

* DIMENSION: D = RUNOUT DIAMETER (6"-14") * SUPPLY DUCT * RETURN DUCT * EXHAUST DUCT * SUPPLY DUCT RISER * SUPPLY DUCT DROP * ROUND SUPPLY DUCT RISER * ROUND SUPPLY DUCT DROP * FLEXIBLE DUCT EQUAL TO FLEXMASTER TYPE 3 INSULATED FLEXIBLE DUCT

WITH ALUMINUM FOIL JACKET AND ALUMINUM FOIL FIBERGLASS POLYESTER

LAMINATE LINER. INSTALL IN ACCORDANCE WITH SECTION III OF SMACNA'S

VAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE". "H

BINDING EDGE

SUPPLY DUCT RETURN DUCT MAKE-UP AIR SUPPLY DUCT EXHAUST DUCT XX XX

DG

1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS BEFORE FABRICATION OF H.V.A.C. COMPONENTS OR PURCHASE OF EQUIPMENT. 2. CONTRACTOR SHALL COORDINATE ALL OTHER TRADES WITH THE INSTALLATION OF H.V.A.C. SYSTEM. 3. H.V.A.C. LEGEND MAY CONTAIN SYMBOLS AND ABBREVIATIONS NOT USED ON THIS SPECIFIC PROJECT, LEGEND SHALL BE USED FOR REFERENCE PURPOSES. 4. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE H.V.A.C. SYSTEM AS IT RELATES TO DRAWINGS AND SPECIFICATIONS. 5. CONTRACTOR IS REQUIRED TO REVIEW ARCHITECTURAL PLANS FOR RATED ASSEMBLIES. CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF FIRE AND/OR SMOKE DAMPERS IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE BUILDING CODES. 6. "STANDARD" ACCESSORIES OR CONTROLS ON H.V.A.C. EQUIPMENT SHALL BE THOSE WHICH MANUFACTURER PROVIDES ON THE MAJORITY OF STOCK MERCHANDISE. 7. BRAND NAMES AND MODEL NUMBERS ARE PROVIDED TO ESTABLISH A LEVEL OF QUALITY AND PERFORMANCE. "EQUAL TO" ITEMS MAY BE SUBMITTED FOR CONSIDERATION BY THE ENGINEER AND OWNER. 8. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATE THE APPROXIMATE ROUTING OF PIPING AND DUCTWORK. CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES. MINOR OFFSETS AND ADJUSTMENTS SHALL BE PROVIDED WHERE REQUIRED AT NO ADDITIONAL COST TO THE OWNER. 9. COORDINATE CEILING DIFFUSERS AND REGISTER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLAN.

HVAC NOTES: 1. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE SUPPLY, RETURN AND EXHAUST DUCT AS FOLLOWS: DUCTWORK TO BE DESIGNED, BRACED, AND SUPPORTED IN ACCORDANCE WITH SMACNA FOR LOW PRESSURE APPLICATIONS, SEAL CLASS C PER SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE DUCTWORK (FLEXIBLE DUCT MAX. 10') SMACNA-06). SING LE WIRE HANGERS SHALL NOT BE ALLOWED FOR FLEXIBLE DUCTWORK SUPPORT. FLEXIBLE DUCTWORK SHALL BE SUPPORTED IN A MANNER THAT PREVENTS CONSTRICTION OR DIPS. INSULATION SHALL BE AS NOTED BELOW. 2. ALL DUCT ELBOWS SHALL BE 1.5 R/D, UNLESS NOTED OTHERWISE. 3. MANUAL, OPPOSED BLADE DAMPERS SHALL BE PLACED IN EACH BRANCH OF SUPPLY DUCTWORK FOR FINAL BALANCING PURPOSES. BALANCING DEVICES SHALL BE IN ACCORDANCE WITH IMC (2006) 603.17. 4. CONTRACTOR SHALL FIELD VERIFY ALL DUCT ROUTING DIMENSIONS AND TERMINAL DEVICES TO AVOID INTERFERENCES. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL SUPPORTS FOR PIPING AND DUCTWORK. 5. CONDENSATE DRAIN PIPING SHALL BE FULL SIZE PER EQUIPMENT CONNECTION ROUTED TO INDIRECT CONNECTION WITHOUT CREATING AN OBSTRUCTION. ALL SUPPORTS FOR THE CONDENSATE DRAIN PIPING IS BY THE MECHANICAL/HVAC CONTRACTOR. 6 PROVIDE MINIMUM 10 FEET SEPARATION BETWEEN OUTSIDE AIR INTAKES AND EXHAUST VENTS, PLUMBING VENTS, ETC. 7. PROVIDE SMOKE DETECTORS IN THE SUPPLY AND RETURN AIR DUCTS OF ALL UNITS 2000 CFM AND OVER. LOCATE DETECTOR IN THE RETURN AIR DUCT UPSTREAM OF FRESH AIR MIXING, AND UPSTREAM OF EXHAUST IN ACCORDANCE WITH IMC 606.2.1. LOCATE DETEC TOR IN THE SUPPLY AIR DUCT DOWNSTREAM OF THE FILTERS AND UPSTREAM OF THE FIRST BRANCH CONNECTION IN ACCORDANCE WITH NFPA 90A. DETECTORS SHALL BE WIRED INTO BUILDING FIRE ALARM SYSTEM AND SHALL BE WIRED TO SHUT UNIT/S DOWN UPON DETECTION OF SMOKE. 8. THERMOSTATS SHALL BE MOUNTED 48" ABOVE FINISHED FLOOR UNLESS INDICATED OTHERWISE. 9. PROVIDE ACCESS DOOR (12"x12" MIN) AS REQUIRED FOR DAMPER AND CONTROL ACCESS IN WALLS AND CEILINGS.

DUCT SEALING:

* DU CT TRANSITION

SD

SD

* SMOKE DAMPER * INDI CATES 3/4" UNDERCUT DOOR

HWS

* HOT WATER SUPPLY PIPING

HWR

* HOT WATER RETURN PIPING

15012 550 W. MAIN STREET, SUITE 300 KNOXVILLE, TENNESSEE 37902 CONTACT:

DOUG McCARTY [email protected]

TELEPHONE:

(865) 544-2000

FACSIMILE:

(865) 544-0402

INTERNET:

mhminc.com

PROJECT INFORMATION

CONTRACT:

SBC - 166/005-02-2013

NEW FOOTBALL STADIUM -EA ST TENNESSEE STATE UNIVERSITY 1415 MURFREESBORO ROAD, SUITE 664 NASHVILLE , TENNESSEE 37614 ACTIVE DESIGN PHASE



SCHEMATIC DESIGN



DESIGN DEVELOPMENT



REDI-CHECK



CONSTRUCTION BIDDING PHASE

 

CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS



AS-BUILT RECORDS

SEAL:

© McCarty Holsaple McCarty, Inc.

Do NOT scale drawings, use given dimensions only.

If not shown, verify correct dimension with ARCHITECT.

Contractor shall check and verify all dimensions and

conditions at job site.

CONSULTANT INFORMATION

A. PRESSURE SENSITIVE TAPE USED AS THE PRIMARY SEALANT IS CERTIFIED AND SHALL COMPLY WITH UL-181A OR UL-181B. B. PROVIDE LONGITUDINAL SEAMS ON RIGID DUCT AND TRANSVERSE SEAMS ON ALL DUCTS. C. PROVIDE MECHANICAL FASTENERS AND SEALANTS SHALL BE USED TO CONNECT DUCTS AND AIR DISTRIBUTION DEVICES.

1. SLEEVES SHALL BE INSTALLED WHERE DUCTS, LOUVERS, OR PIPING PENETRATE NON-RATED EXTERIOR WALLS, PARTITIONS, FLOORS, OR ROOF. PACK AR OUND SLEEVES AND SEAL WEATHER TIGHT. IN STALL FLASHING AS REQUIRED. SLEEVES SHALL BE MINIMUM 16 GAUGE GALVANIZED STEEL AND SHALL BE FIRMLY SET IN BUILDING STRUCTURE.

* FIRE DAMPER

ARCHITECTS & INTERIOR DESIGNERS

1

10. PROVIDE MANUAL VALVES FOR AIR RELEASE AT ALL HIGH POINTS IN HYDRONIC SYSTEMS. 11. FIRE DAMPERS ARE NOT REQUIRED IN ONE OR MORE HOUR FIRE WALLS AS LONG AS ALL EXCEPTIONS STATED IN IMC 607.5.3 ARE MET.

PENETRATIONS:

FD

Mc C A R T Y H O LSAPLE Mc C A R T Y

EMAIL:

* INDIC ATES NEW HVAC EQUIPMENT

* DOOR GRILLE

U/C

GENERAL NOTES:

CODES OFFICIAL REVIEW

* 3-WAY VALVE * 2-WAY VALVE * BALL VALVE

BINDING EDGE

* BUTT ERFLY VALVE T

* WALL MOUNTED THERMOSTAT

S

* WALL MOUNTED SENSOR

CO2

* WALL MOUNTED CO2 SENSOR

SP

* DUCT MOUNTED STATIC PRESSURE SENSOR

KEY PLAN:

* SUPPLY DIFFUSER W/FLEX DUCT * RETUR N GRILLE * EXHAUST G RILLE OR EXHAUST FAN (REFER TO DRAWINGS FOR CLARIFICATION) * S IDEWALL SUPPLY GRILLE

REVISION INFORMATION

No. Date Description 1 2/12/2016 SFMO Revisions

* SIDE WALL RETURN GRILLE

DRAWING INFORMATION

SCALE:

1/8" = 1'-0"

SCALE GUIDE: DWG ISSUED:

12.30.15

PRJ MGR:

S. WEBB

PA / PC:

TIME / DATE:

2/18/2016 1:35:31 PM

DRAWN BY: CHECKED BY:

S. BUTCHER / C. MOELLENDICK SGP JMK/LTH

DRAWING TITLE:

MECHANICAL NOTES

& LEGENDS

DRAWING NO:

M001

CONTROL SYMBOLS 140 Park Avenue

New City, NY 10956 www.shilale.com

WELDING Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1

GENERAL NOTES:

M-001

PIPING CONT'D.

DIFFUSER SYMBOLS

NOTES & SYMBOLS

1/2

MECHANICAL SYMBOLS: IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

MECHANICAL ABBREVIATIONS:

DUCTWORK SYMBOLS SINGLE LINE DOUBLE LINE

PIPING SYMBOLS

DELIVERY, STORAGE, AND HANDLING

IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

1 1/2

0

CIRCULAR BRANCH CONNECTON TO SINGLE OUTLET

PIPE HANGER DETAIL

CG-A CG-B CG-C TR

0-1100 0-1100 151-270 -

RET / EXH RET / EXH RET / EXH SUPPLY

10X10 SEE DWGS

24X24 24X24 10X10 SEE DWGS

REMARKS

12x4 SEE DWGS

XAC35LD W/ LIGHT SHIELD PAINTED BLACK X3HD-81-L FILTER GRILLE X35H-D W/ LIGHT SHIELD PAINTED BLACK S20V WITH OPPOSED BLADE DAMPERS

EPL EPL EPL EPL

NOTES: 1. SEE HVAC FLOOR PLAN FOR CFM'S. 2. COORDINATE BORDER AND FRAME TYPES WITH ARCHITECTUAL CEILING DETAILS. 3. PROVIDE VOLUME DAMPERS AT ALL BRANCH OUTLETS. 4. PROVIDE ALL DIFFUSERS WITH FLOW EQUALIZING DEFLECTORS. 5. PROVIDE ALL DIFFUSERS AND REQISTERS WITH OPPOSED BLADE DAMPERS. 6. ALL DIFFUSERS, GRILLES AND REGISTERS TO HAVE MANUFACTURERS STANDARD WHITE BAKED-ON FINISH.

TOILET EXHAUST ROOF CURB/HOOD DETAIL TOWN OF ORANGETOWN COUNTY OF ROCKLAND

SUPPLY SUPPLY SUPPLY SUPPLY

TYP. BRANCH DUCT SIZE 12x4 14x6 16x6 16x8

ROUND DUCT HANGERS

New City, NY 10956 www.shilale.com

Tel 845-708-9200

FAN COIL UNIT SCHEDULE

335 WESTERN HIGHWAY TAPPAN, NY 10983

0-175 176-350 351-450 451-650

NOMINAL FACE SIZE - W x L (IN.) 24X24 24X24 24X24 24X24

FAX: 845-562-7007

CD-A CD-B CD-C CD-D

NECK SIZE (IN.)/ NO. OF SLOTS 6 8 10 12

HOMES FOR HEROES

SERVICE

TEL: 845-562-7005

CFM

NEW WINDSOR, NY 12553

DESIGNATION

3062 ROUTE 9W, SUITE 500

DIFFUSER, GRILLE AND REGISTER SCHEDULE (ANEMOSTAT AS STD.)

M-002

PIPE PENETRATION THROUGH ROOF DETAIL

DETAILS & SCHEDULES

140 Park Avenue

AIR-COOLED CONDENSING UNIT SCHEDULE

M-100

140 Park Avenue

New City, NY 10956 www.shilale.com

Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

T

HOMES FOR HEROES

T FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

T

FLOOR PLAN

T 1/2

1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

ELECTRICAL ONE-LINE DIAGRAM

E-001

140 Park Avenue

New City, NY 10956 www.shilale.com

FEEDER SCHEDULE. Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

3,1

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1/2

LIST

NOTES & SYMBOLS

SYMBOL 1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

ELECTRICAL

J

E-100

FLOOR PLAN

140 Park Avenue

New City, NY 10956 www.shilale.com

Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1/2

1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

P-001

NOTES & SYMBOLS

140 Park Avenue

New City, NY 10956 www.shilale.com

Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1/2

1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

P-002

DETAILS 1 OF 2

140 Park Avenue

New City, NY 10956 www.shilale.com

Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1/2

1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

P-003

DETAILS 2 OF 2

140 Park Avenue

New City, NY 10956 www.shilale.com

Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1/2

1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

PLUMBING FLOOR PLAN

P-100

140 Park Avenue

New City, NY 10956 www.shilale.com

WATER SERVICE MECHANICAL ROOM PART PLAN Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1/2

1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

FP-001

NOTES & SYMBOLS

140 Park Avenue

New City, NY 10956 www.shilale.com

Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1/2

1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

FP-100

FLOOR PLAN

140 Park Avenue

New City, NY 10956 www.shilale.com

Tel 845-708-9200 335 WESTERN HIGHWAY TAPPAN, NY 10983

TOWN OF ORANGETOWN COUNTY OF ROCKLAND

HOMES FOR HEROES

FAX: 845-562-7007

TEL: 845-562-7005

NEW WINDSOR, NY 12553

3062 ROUTE 9W, SUITE 500

1/2

1 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE

0

PIPING SYMBOLS

DESCRIPTION

SYMBOL

ABBREVIATIONS

ABBREV

DESCRIPTION

EXHAUST AIR DUCT SECTION

FLOW CONTROL

SUPPLY AND OUTSIDE AIR SECTION

THERMOMETER WELL

4

ABBREVIATIONS

ABBREV

DESCRIPTION

DESCRIPTION

AC

AIR CONDITIONING UNIT, AIR COMPRESSOR

G

NATURAL GAS

AD

ACCESS DOOR

GA

GAUGE

AFF

ABOVE FINISHED FLOOR

GD

GLYCOL DRAIN

AP

ACCESS PANEL

GFH

GAS FIRED HEATER

ARCH

ARCHITECTURE

HC

HEATING COIL

5

ABBREVIATIONS

ABBREV

DESCRIPTION

S

SOIL

SA

SUPPLY AIR

SAD

SUPPLY AIR DUCT

SD

SMOKE DETECTOR

SF

SUPPLY FAN

GENERAL NOTES 1.

PRESSURE TAP, PETE’S PLUG

RETURN AIR DUCT SECTION

UNION R

DUCT RISE S

D

SLOPE LINE DOWN IN DIRECTION OF ARROW D

DUCT DROP CONCENTRIC REDUCER TURNING VANES ECCENTRIC REDUCER

AS

AIR SEPARATOR

HD

HEAT DETECTOR

BC

BRANCH CONTROL

HWR

HEATING HOT WATER RETURN

BDD

BACK DRAFT DAMPER

HWS

HEATING HOT WATER SUPPLY

BLDG

BUILDING

HS

HAND SWITCH

BOD

BOTTOM OF DUCT

HOA

HAND OFF AUTO

BODF

BOTTOM OF DIFFUSER

HP

HORSEPOWER, HEAT PUMP

SP

STATIC PRESSURE

SR

SUPPLY REGISTER

THE INSTALLATION OF MECHANICAL SYSTEMS SHALL COMPLY WITH: A. UNIFIED FACILITIES CRITERIA. B. 2006 INTERNATIONAL BUILDING CODE C. 2006 INTERNATIONAL MECHANICAL CODE D. 2006 INTERNATIONAL PLUMBING CODE E. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) F. CURRENT EDITIONS OF THE FOUR AMERICAN SOCIETY OF HEATING REFRIGERATION AND AIR CONDITIONING (ASHRAE) HANDBOOKS: APPLICATIONS, SYSTEMS AND EQUIPMENT, REFRIGERATION AND FUNDAMENTALS. G. HVAC DUCT CONSTRUCTION STANDARD (SMACNA) H. SEISMIC RESTRAINT MANUAL (SMACNA) I. LOCAL COUNTY CODES AND REQUIREMENTS. J. ENERGY POLICY ACT OF 2005. K. ASHRAE STANDARDS. L. ARMY RESERVE IT MANUAL.

2.

THE INSTALLATION OF SYSTEMS SHALL BE IN STRICT ACCORDANCE WITH THE LATEST STANDARDS BY THE AMERICAN SOCIETY OF HEATING, REFRIGERATING, AND AIR CONDITIONING ENGINEERS (ASHRAE), SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION (SMACNA).

3.

EQUIPMENT, PIPING, AND DUCTWORK SHALL BE SEISMICALLY SECURED TO THE STRUCTURE IN COMPLIANCE WITH UNIFIED FACILITIES CRITERIA AND MANUFACTURER RECOMMENDATIONS.

SS

STAINLESS STEEL

TG

TRANSFER GRILLE

4.

ROOM THERMOSTATS SHALL BE INSTALLED 48" ABOVE THE FINISHED FLOOR, UNLESS OTHERWISE NOTED ON PLANS.

U/C

UNDERCUT (DOOR)

5.

UTR

UP THRU ROOF

DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSION. WHERE DUCT LINER IS INSTALLED IN DUCT, INCREASE DUCT SIZE TO PROVIDE INSIDE CLEAR DIMENSIONS SHOWN ON DRAWINGS. EXPOSED DUCT LINER IS NOT PERMITTED UPSTREAM OF VAV BOXES.

6. V

VOLT

DUCT BRANCHES SHALL HAVE A MANUAL VOLUME DAMPER IN AN ACCESSIBLE LOCATION. PROVIDE ACCESS PANELS WHERE NOT ACCESSIBLE. COORDINATE LOCATIONS WITH ARCHITECT.

VAV

VARIABLE AIR VOLUME

7.

MAINTAIN COORDINATION OF EQUIPMENT, DUCTWORK AND PIPING WITH OTHER TRADES TO AVOID INTERFERENCES.

VD

VOLUME DAMPER

8.

PROVIDE SUPPORTS (THRUST RESTRAINTS, ETC.) FOR PIPING AT POINTS WHERE EQUIPMENT IS DISCONNECTED FROM THE SYSTEM.

9.

CONNECTION, DEMOLITION OR INTERRUPTION TO EXISTING SERVICES SHALL BE MINIMIZED AND COORDINATED WITH THE CONTRACTING OFFICER REPRESENTATIVE.

US Army Corps of Engineers LOUISVILLE DISTRICT

Appr.

HVAC SYMBOLS

SYMBOL

*** Safety Pays ***

2

Date

1

AIR EXTRACTOR OBD

PRESSURE RELIEF VALVE

GLOBE VALVE

BOP

BOTTOM OF PIPE

HU

HUMIDIFIER UNIT

BOT

BOTTOM

HVU

HEATING VENTILATION UNIT

BR

BASEBOARD RADIATOR

HWP

HOT WATER PUMP

VF

VENTILATION FAN

CA

COMPRESSED AIR

IA

INSTRUMENT AIR

VFD

VARIABLE FREQUENCY DRIVE

AIRFLOW MEASURING/MONITORING STATION

GATE VALVE BACK DRAFT DAMPER

PLUG VALVE VI

VIBRATION ISOLATOR

CC

COOLING COIL

IV

INTAKE VENTILATOR

WB

WET BULB

CD

CEILING DIFFUSER

JC

JANITOR’S CLOSET

WG

WATER GAGE

KILOWATT

INTAKE GRAVITY LOUVERED PENTHOUSE

CHEMICAL POT FEEDER

KW

WIH

CHM

LAT

LEAVING AIR TEMPERATURE

WMS

WIRE MESH SCREEN

M

MALE

MAU

MAKE-UP AIR UNIT

MAX

MAXIMUM

CER

CEILING EXHAUST REGISTER

CFM

CUBIC FEET PER MINUTE

BALANCE VALVE

CONT

CONTINUATION

COMPR

COMPRESSOR

CRG

CEILING RETURN GRILLE

CRR

CEILING RETURN REGISTER

MBH

THOUSAND BRITISH THERMAL UNITS PER HOUR

MFR

MANUFACTURER

MIN

MINIMUM

16. DUCTWORK AND PIPING SHALL PASS THROUGH WALLS WITHOUT RIGID CONNECTIONS. PENETRATION POINTS SHALL BE SLEEVED TO ALLOW PASSAGE OF PIPING OR DUCTWORK AND TO MAINTAIN 3/4" MIN. & 1-1/4" MAX. CLEARANCE AROUND THE OUTSIDE SURFACE. THIS CLEARANCE SHALL BE TIGHTLY PACKED WITH ONE POUND DENSITY GLASS FIBER AND CAULKED AIRTIGHT WITH NON-HARDENING SEALANT AFTER INSTALLATION OF PIPING OR DUCTWORK. INTEGRITY OF FIRE RATED WALLS AND FLOORS SHALL BE MAINTAINED WITH SUITABLE FIRE STOPPING.

MVC

MANUAL VOLUME CONTROL

17. INDICATE DUCT SIZES ON SHOP DRAWINGS WITH DIMENSIONS FOR LOCATION.

MVD

MANUAL VOLUME DAMPER

NAT’L

NATIONAL

FIRE DAMPER

EXPANSION COMPENSATOR RECTANGULAR SMOOTH RADIUS ELBOW PIPE GUIDE CS

CONDENSER WATER SUPPLY

PIPE ANCHOR

CV

CONSTANT VOLUME BOX

BUTTERFLY VALVE DB

DRY BULB

D

DRAIN

OUTSIDE SCREW & YOKE GATE VALVE

FLOW METER

OUTSIDE AIR

EXHAUST AIR

OAU

OUTSIDE AIR UNIT

EAD

EXHAUST AIR DUCT

OAL

OUTSIDE AIR LOUVER

ROUND CEILING SUPPLY DIFFUSER

POINT OF CONNECTION

CFM

OBD

OPPOSED BLADE DAMPER

EAT

OED

OPEN END DUCT W/ INSECT SCREEN

ENTERING AIR TEMPERATURE

24x24 MS

SIDE WALL REGISTER

MOTOR STARTER

EC

24. EXHAUST DUCTWORK SHALL BE RIGID, NO FLEX. 25. HVAC DRAWINGS ARE SCHEMATIC AND DIAGRAMMATIC. THE CONTRACTOR WILL COORDINATE WITH OTHER TRADES PRIOR TO INSTALLATION TO AVOID CONFLICTS. CONFLICTS THAT ARISE DUE TO LACK OF COORDINATION WILL BE REMEDIED BY THE CONTRACTOR AT NO ADDITIONAL COST.

EVAPORATIVE COOLER

200 CFM 12x8

EXHAUST REGISTER

EF

EXHAUST FAN

ER

EXHAUST REGISTER

ERV

ENERGY RECOVERY VENTILATOR

RETURN REGISTER PIPE TURNING UP

18x12

PIPE TURNING DOWN ESP

EUH

M

EXH

F

POINT OF CONNECTION

SYMBOL

FC

DESCRIPTION

FCO SECTION NO.

SHEET NO.

DETAIL NO.

SHEET NO.

SECTION REFERENCE

X X

PVC

POLYVINYL CHLORIDE

RA

RETURN AIR

RAD

RETURN AIR DUCT

RCP

REMOTE CONTROL PANEL

RG

RETURN GRILLE

RH

RELATIVE HUMIDITY

RL

REFRIGERANT LIQUID LINE

RM

ROOM

RN-1

ROOF NOZZLE (EQUIP. NUMBER)

RLA

RELIEF AIR

RPM

REVOLUTIONS PER MINUTE

FLEXIBLE CONNECTION

Mark

FLOOR CLEANOUT

FD

FIRE DAMPER

FF

FINISHED FLOOR

FLA

FULL LOAD AMP

FOB

FLAT ON BOTTOM

FOT

FLAT ON TOP

EQUIPMENT IDENTIFICATION TAG FPM

FEET PER MINUTE

FRP

FIBERGLASS REINFORCED PLASTIC

FSD

FIRE SMOKE DAMPER

RR

RETURN REGISTER

FT

FOOT/FEET

RS

REFRIGERANT SUCTION LINE

RV

RELIEF VENTILATOR

SHEET NOTE REFERENCE TAG

7/22/2011

X

PRESSURE RELIEF DAMPER

DETAIL REFERENCE

X X

PRD

27. TO THE EXTENT POSSIBLE, PROVIDE MIN 1" CLEARANCE BETWEEN MECHANICAL EQUIPMENT IN CEILING AND OTHER EQUIPMENT, STRUCTURAL, BUILDING COMPONENTS, ETC.

FILTERS, FEMALE

X X

PHASE

EXHAUST

3-WAY CONTROL VALVE

UNIT HEATER

PH

ELECTRIC UNIT HEATER

2-WAY CONTROL VALVE M

PRESSURE DROP

EXTERNAL STATIC PRESSURE

CAPPED PIPE CABINET UNIT HEATER

PD

26. CONTRACTOR TO MAINTAIN A SAFE WORKING ENVIRONMENT AT THE CONSTRUCTION SITE AND SURROUNDING AREAS. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

U.S.ARMY

SCREENED DUCT OPENING 200 CFM SC.

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-0010.dgn

OUTLET VELOCITY

U.S.ARMY

300 CFM

A

OV

RESERVE CENTER

12x8

PRESSURE REGULATOR VALVE

OVERFLOW NOZZLE (EQUIP. NUMBER)

CENTRIFUGAL PUMP

300 CFM

PRESSURE RELIEF VALVE

ON-1

7/22/2011

EA

23. MECHANICAL SYSTEMS SHALL BE TESTED, BALANCED AND OPERATED T0 DEMONSTRATE TO THE CONTRACTING OFFICER REPRESENTATIVE OR DESIGNATED REPRESENTATIVE THAT THE INSTALLATION AND PERFORMANCE OF THE SYSTEMS CONFORM TO THE DESIGN INTENT. TESTING AND BALANCING SHALL BE PERFORMED BY A QUALIFIED INDEPENDENT AGENCY CERTIFIED BY THE ASSOCIATION AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TEST RESULTS SHALL BE DOCUMENTED AND SUBMITTED FOR APPROVAL.

Pl ot scal e:NONE

DIFFERENTIAL PRESSURE

Pl ot date:

DP

AIR FILTER REGULATOR

B SD-#

OA

22. ACCURATE "AS-BUILT" DRAWINGS SHALL BE MAINTAINED DURING CONSTRUCTION AND SUBMITTED FOR APPROVAL UPON COMPLETION OF INSTALLATION.

FAX (714) 327-1601

CEILING SUPPLY DIFFUSER

NOT TO SCALE

TEL (714) 327-1600

CFM

NTS DOWN

R SD-#

NON-POTABLE WATER

Fi l e nam e:LCARC_M 0010. dgn

ORIFICE

NP

21. UNIT OR DUCT MOUNTED SMOKE DETECTORS SHALL BE INTERLOCKED WITH ASSOCIATED MECHANICAL EQUIPMENT TO SHUT DOWN THE UNIT UPON SMOKE DETECTION. COORDINATE WIRING WITH ELECTRICAL CONTRACTOR.

DIAMETER

CEILING RETURN DIFFUSER CFM

NUMBER, NORMALLY OPEN

M .BETZ

O /

NO

20. UNIONS SHALL BE PROVIDED AND INSTALLED PRIOR TO EQUIPMENT CONNECTIONS. PROVIDE DIELECTRIC UNIONS, GASKETS AND FASTENERS AT DISSIMILAR METAL CONNECTIONS OR CONTACT POINTS.

Subm i tted by:

DN

RR-#

NOT IN CONTRACT

HUTTON CENTRE DRI VE,SUI TE 800

FLEX CONNECTION

NIC

SANTA ANA, CALI FORNI A 92707

DIA., CEILING EXHAUST REGISTER

NORMALLY CLOSED

4

FM

ER-#

NC

19. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIRING AREAS, PIPING, DUCTWORK, ETC., EXISTING OR NEW, DAMAGED AS A RESULT OF THE WORK. REPAIR TO MATCH EXISTING CONDITIONS.

F-171-40-160

UNDER CUT DOOR

DIRECTION OF AIR FLOW

CFM

COOLER UNIT

MANUAL AIR VENT, 3/8" BALL W/DISCHARGE TO DRAIN

DOOR LOUVER L

U

CU

AUTOMATIC CONTROL VALVE

Project Code:

D

CEILING SUPPLY DIFFUSER

Revi ewed by:

INFRARED RADIANT HEATER

CSD

18. THE LOCATION OF ACCESS PANELS FOR CONCEALED VALVES, FUSIBLE LINKS, DAMPER OPERATORS AND EQUIPMENT SHALL BE COORDINATED WITH THE ARCHITECT. ACCESS PANELS SHALL BE PROVIDED FOR CONCEALED EQUIPMENT INCLUDING FAN COILS AND HOT WATER COILS.

A.REED

RECTANGULAR SMOOTH RADIUS WYE

NOTE: NOT ALL ABBREVIATIONS AND

COVER SHEET

STRAINER W/BLOW DOWN SMOKE DAMPER

W 912QR-11-R-0071

SD

Sol i ci tati on No.

PRESSURE REDUCING VALVE

CONDENSER

C.KORPASH

FD

COND

Ckd by:

FIRE & SMOKE DAMPER

15. DUCT AND PIPE PENETRATIONS AT FIRE-RATED WALLS AND AT FLOORS SHALL BE SLEEVED AND SEALED WITH FIRE STOP TO PREVENT THE PASSAGE OF SMOKE.

Dwn by:

FSD

13. DUCT CONNECTIONS TO CEILING DIFFUSERS IN EXPOSED LOCATIONS SHALL BE MADE WITH RIGID DUCT. NO FLEX DUCT WILL BE ALLOWED AT THESE CONNECTIONS. 14. FIRE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS SHALL BE PROVIDED AT FIRE RATED DUCT PENETRATIONS AND SHALL CONFORM TO THE REQUIREMENTS OF THE STATE OF NEW MEXICO. PROVIDE DUCT MOUNTED SMOKE DETECTOR FOR COMBINATION FIRE/SMOKE DAMPERS.

CHECK VALVE

DUCT FLEXIBLE CONNECTION

11. PROVIDE AND INSTALL VOLUME DAMPERS ON SUPPLY, RETURN AND EXHAUST AIR BRANCH DUCTS AS REQUIRED FOR PROPER BALANCING OF THE SYSTEM. 12. INSTALL PIPING AND DUCTWORK OUT OF NATURAL WALKWAYS.

FLOW CONTROL VALVE (B & G CIRCUIT SETTER)

SPLITTER DAMPER

C

INFORMATION

I .FRANCO

TRANSITION DUCT

INFOR.

LOUI SVI LLE DI STRI CT

GAS COCK

CENTERLINE

LOUI SVI LLE,KENTUCKY

BALL VALVE

LINED DUCTWORK

C L

MEXI CO

DUCT WIDTH x DEPTH(INCHES)

LAS CRUCES,NEW

20 x 10

10. PREPARE AND SUBMIT PROFESSIONAL SHOP DRAWINGS TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF ANY WORK.

Rev.

BDD

Mark

HEIGHT

Date:

EMERGENCY SHUTOFF VALVE

HT

072811

DIAPHRAGM VALVE DUCT SMOKE DETECTOR

BOTTOM OF UNIT

Desi gned by:

SD

BOU

Date

SOLENOID VALVE MOTORIZED LOW LEAKAGE DAMPER

Appr.

M

A.REED

S

Descri pti on

VOLUME DAMPER

CORPS OF ENGI NEERS

VD

Descri pti on

OPPOSED BLADE DAMPER

SHEET REFERENCE NUMBER:

SYMBOLS SHOWN HEREIN ARE UTILIZED.

M-0010 of 222

9:59:03

m oraja

AM

Sheet 121

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

1

2

4

5

3 16

GENERAL NOTES

C4 HVU 1-1 M-5020

STAGING

ARMORER

AREA

WORK AREA

A110

A109

16

MATCH

19 SUPPLY

T

OFFICE A111

B

14 FC 3

D 21

17

20

23 20

ARMS

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

5.

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

HP 4

(TYP 3) T

2.

HP 3

VAULT

DH 1

A108

8x8 (TYP 3) 230 CFM (TYP 3)

UH 3

G

LOUISVILLE DISTRICT

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET.

FC 4

23

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

Appr.

UH 4

1.

Date

A

SEE SHEET M-112A

LI NE

US Army Corps of Engineers

UH 6

Descri pti on

UH 5

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

18

11. FOR EMERGENCY AIR DISTRIBUTION STOP SWITCH SEE M-112A

C

C2 EF 1-5 M-5020

UH 8

1

44x18 SA DUCT THRU WALL WITH FSD ONTO ROOF TO EC 1-1.

2

8x8 SS EA DUCT UTR TO EF 1-8 ON ROOF.

3

BLANK OFF UNUSED PORTIONS OF CONTINUOUS 1 1/2" SLOT DIFFUSER. CUSTOM BEND TO RADIUS OF CEILING SOFFIT.

4

14x12 WELDED GREASE DUCT IN 1-HOUR RATED SHAFT UTR SEE DETAIL A1

Appr.

UH 7

Mark

KEY NOTES

Date

M-5020

5

10x8 WELDED GREASE DUCT DN TO HOOD.

6

12x8 WELDED GREASE DUCT DN TO HOOD.

7

12x10 MAKE-UP AIR DUCT DN TO HOOD.

8

16x16 MAKE-UP AIR DUCT UTR.

9

36x24 RA DUCT UTR TO EC 1-1.

F C UH 2

UNIT STORAGE

10 24x14 SA DUCT UTR TO EC 1-6.

UH 1

A107

11 24x14 RA DUCT UTR TO EC 1-6. T

15

A

C2

C2 EF 1-6 M-5020

EF M-5020 1-7

14

Descri pti on

12 26x14 RA DUCT UTR TO EC 1-7. 100 CFM

13 26x14 SA DUCT UTR TO EC 1-7. 14

15

BELLMOUTH OPENING WITH WMS.

STORAGE

15 18x18 EA DUCT UTR TO RV ON ROOF.

A106

C

J

1100 CFM

17 ROUTE 3/8" RL AND 5/8" RS TO HP-3.

S

275 CFM (TYP 8)

C

16 18x18 OSA DUCT UTR TO IV ON ROOF.

TRANSFER DUCT

(TYP)

22

C

100 CFM

J

300 CFM

WEAPONS

20x18

18 12x12 EA DUCT UTR TO RV-3. 19 ROUTE 3/8" RL AND 5/8" RS TO HP-4. D3

20 MOUNT HP UNITS ON PLATFORM. FOR DETAIL SEE

CONTROL

SIMULATOR RM.

21 8x8 TRANSFER AIR OPENING IN WALL.

ROOM

A105A

22

A105B

8 1100 CFM

M-5020

C

C 4

20x18

300 CFM

PROVIDE CO2, RH, AND TEMPERATURE SENSOR MOUNTED ON WALL. D1

23

M-5010

GOOSENECK, SEE

Mark

A

100 CFM

12"

K

(TYP 4)

525 CFM (TYP 4)

C

ASSEMBLY A102

LI NE

26x18

MATCH

Q

C1 M-300A

B

A1 N

A2

ARC

ARC-FIRST FLOOR PLAN-SECTOR ONE KEY PLAN

SCALE :1/8"=1’-0"

N

7/22/2011

Pl ot scal e:AS NOTED

Pl ot date:

F-171-40-160

Project Code:

FAX (714) 327-1601 TEL (714) 327-1600

HUTTON CENTRE DRI VE,SUI TE 800

SANTA ANA, CALI FORNI A 92707

4

SHEET REFERENCE NUMBER:

M-111A Sheet 122

of 222

8:55:54

m oraja

AM

A1

W 912QR-11-R-0071

OMS

ARC-FI RST FLOOR PLAN-SECTOR ONE

A

U.S.ARMY

475 CFM

A

475 CFM

MECHANI CAL

A

A

RESERVE CENTER

26x18

700 CFM (TYP 3)

3

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-111A.dgn

P

U.S.ARMY

A

640 CFM (TYP 5)

26x18

E

400 CFM

LOUI SVI LLE DI STRI CT

A

LOUI SVI LLE,KENTUCKY

22 A

450 CFM

CORPS OF ENGI NEERS

44x18

A103C

S 400 CFM

150 CFM

26x18

JANITOR

H

C

M .BETZ

22

SEE SHEET M-112A

1875 CFM (TYP 4)

FC 5

Subm i tted by:

36x24

Revi ewed by:

1

S

A.REED

A101

M 24

Sol i ci tati on No.

Rev.

LOBBY

OFFICE

10 A103B

2

C.KORPASH

9

MEXI CO

11

A1 M-301A

LAS CRUCES,NEW

25

75 CFM

Desi gned by:

D

150 CFM

Ckd by:

A

A104

Date:

CHAIR STORAGE

23

A103A

TABLE AND

Dwn by:

7

KITCHEN

072811

420 CFM A (TYP 5)

B

25 6x6 EA DUCT UTR TO EF-14

12

I .FRANCO

6

A.REED

DAC 1

13

Fi l e nam e:LCARC_M 111A. dgn

24 ROUTE 3/8" RL AND 5/8" RS TO HP-5

5

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

*** Safety Pays ***

2

4

5

6

7

4

8

9.8

9

5

10

11

US Army Corps of Engineers

1.

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

2.

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

LOUISVILLE DISTRICT

Appr.

SEE SHEET M-111A

MATCH

LI NE

GENERAL NOTES

Date

1

D

11 C2

EF M-5020 1-1

VESTIBULE

VESTIBULE

A120B

A123B

C2 EF 1-2 M-5020 125

A

CFM

A

125

550

CFM

CFM

5.

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

Descri pti on

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET.

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

A 11. FOR ENLARGE MECHANICAL ROOM PLAN SEE A1/M-400B

D

T UH 10 MECHANICAL

B

LOCKER

SD

24

15

M

12

D CFM EF

16

A113

14

SD

300

14x14

CFM

A

CFM

A

A112

SD

18

CAFE

E 250

16x14 WOMENS

900 CFM 14x12

CFM SD

TOILET

JANITORIAL

A115

14x12

I

MENS

SD

STORAGE

T

36x20 TRANSFER GRILLE WITH SMOKE DAMPER

5

12x12 EA DUCT UTR TO EF 1-12 AND DN TO E CFM

6

10x10 EA DUCT UTR TO EF 1-10

7

12x12 EA DUCT UTR TO EF 1-4

8

3/8"RL AND 5/8"RS UP TO HP-1 UNIT ON ROOF

9

3/8"RL AND 5/8" RS UP TO HP-2 UNIT ON ROOF

300

I

A124T

A121

21

19

TOILET

22x20

A119T

C

4

12x10

S

A M

40x18 SA AND RA DUCTS UTR TO EC 1-2 ON ROOF. TRANSITION TO UNIT OPENINGS AS REQUIRED WITHIN CURB.

20

SD

SIPRNET

3 SD

SD

SD

17

24x20 SA AND RA DUCTS UTR TO EC 1-4 ON ROOF. TRANSITION TO UNIT OPENINGS AS REQUIRED WITHIN CURB.

CFM

14x14

TER

A

10x14

18x18

22

550

A125

A124S 450

A122

18x18

M

13

MECH

A119S

(TYP2)

2

LOCKER

300 MENS CFM SHOWER

16x16

SHOWER

46x18 SA AND RA DUCTS UTR TO EC 1-3 ON ROOF. TRANSITION TO UNIT OPENINGS AS REQUIRED WITHIN CURB.

MENS

CFM

WOMENS

A118

600

I

1

CFM (TYP 3)

16x16

T SD

G FC 1-2

FC 1-1

21

20x16

8

B FACILITY MAINTENANCE

9

CFM

D

VESTIBULE 150 CFM A120A

325

(TYP 3)

A116

B

WOMENS

I

400

CFM

26

I

200

250

CFM

CFM

Mark

WOMENS

A117 23

100

Appr.

A114

KEY NOTES

12x12

Date

UH 9

ELECTRICAL

C

MENS VESTIBULE

595

C

CFM

540

595

C

CFM

10 EMERGENCY AIR DISTRIBUTION STOP SWITCH. KELE

CFM

ST120 BREAK GLASS TYPE. REFER TO CONTROL DIAGRAMS

(TYP 4)

25

A123A

(TYP 4)

H

11 48x24 EX LOUVER IN WALL. CONNECT EA PLENUM Descri pti on

TO EF 1-1, 1-2

S

12 16x16 OSA DUCT UTR TO IV-5 WITH MD 13 10x10 OSA DUCT UTR TO IV-3 WITH MD 24x20 (TYP)

14 18x18 OSA DUCT UTR TO IV-4 WITH MD 15 16x16 EA DUCT DN TO

D 1300 CFM, 12" AFF

16 10x10 EA DUCT DN TO

D 300 CFM

17 8x8 EA DUCT DN TO

D 200 CFM

18 8x8 OSA DUCT DN TO

B 200 CFM

INTERIOR PHYSICAL YARD READINESS

12"

A126

(TYP 8)

24x20

19 INTERIOR

A

CORRIDOR A150

RESTROOM

20

420

28x16 SA AND RA DUCTS UTR TO EC 1-5 ON ROOF. TRANSITION TO UNIT OPENINGS AS REQUIRED WITHIN CURB. PROVIDE TEMPERATURE AND RH WALL MOUNTED SENSOR.

CFM (TYP 8)

21 GOOSENECK, SEE

1

Mark

A146

C

A140

A137

A136

A133

A132

A130

A139

10

12"

J 375 CFM A

5

E J

E

4

46x20

(TYP)

10"

CFM

CFM

OFFICE

310 CFM

24x18

S

14" 12"

STORAGE

FSD

25 PROVIDE TEMPERATURE, CO2, AND RH WALL MOUNTED SENSOR

A1

8"

M-301A

26 10x10 EA DUCT UTR TO EF-13

M

A129

24x18

FSD

J

27 MOTORIZED EMERGENCY SHUTOFF DAMPER (LOW

100 CFM

FSD

25

D

LEAKAGE TYPE)

700 CFM

18x14 (TYP 4)

C 12" 24x14

300

27 J

12"0

300

A

400 CFM

UNIT

A143

C

A

3-WAY COMMON SPACE

CFM

$

J

J

10"

DUCT UTR TO EF

10"

A144

CFM

20

S

6"

CFM

240

E

C 1535

350

16" GENERAL

8"

20x18

24x14

A148

S

100 CFM 10"

10"

FSD

12"

14" TRAINING AID

FSD

8"

12"

8"

14x14 EA

FSD

46x14

(TYP)

400 CFM

CLASSROOM

CLASSROOM

A134

A131

UNIT EXCLUSIVE

1500 CFM (TYP 4)

46x18

SPACE

2-WAY A135

(TYP 6)

1535

400 CFM

CFM

3-WAY

10" 350

A

CFM

J

C

375

18x18

CFM

10"

(TYP) 24x18

34x18

(TYP)

A

350 CFM (TYP 8)

SORTING

J

ROOM A149A

10

300

18x12

A

CFM 10"

7/22/2011

F-171-40-160

350 CFM

(TYP 8)

B

OMS

A1

N

ARC

ARC-FIRST FLOOR PLAN-SECTOR TWO KEY PLAN

SCALE :1/8"=1’-0"

N

SHEET REFERENCE NUMBER:

M-112A Sheet 123

of 222

8:56:37

m oraja

AM

A1

A2

ARC-FI RST FLOOR PLAN-SECTOR TW O

U.S.ARMY

MATCH

SEE SHEET M-111A

LI NE

A

MECHANI CAL

A149B

MEXI CO

ROOM

LAS CRUCES,NEW

RESERVE CENTER

DISTRIBUTION

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-112A.dgn

N

Pl ot scal e:AS NOTED

A138

A127

PUMP CONTROL PANEL WITH VFD’s AND CONTROLS, SECURED TO WALL

Pl ot date:

CENTER

SD

12"

CFM

STORAGE

$

330

CFM RETENTION

10"

210

READING

20x18

C

CFM

SPACE

A145

6

210

OFF. SPACE

24

FAX (714) 327-1601

12"

OFF. SPACE OFF. SPACE

CFM

TEL (714) 327-1600

8" ELEC

7

CFM

OFF. SPACE

A128

A147

240

LIBRARY

M .BETZ

A141

UNIT EXCLUSIVE

350

Subm i tted by:

A142

FULL TIME

J

HUTTON CENTRE DRI VE,SUI TE 800

OFF. SPACE

FULL TIME

AREA

SANTA ANA, CALI FORNI A 92707

OFF. SPACE

FULL TIME

STOR

4

SUPPORT

FULL TIME

FSD LEARNING

10"

BOILER CONTROL PANEL WITH 120V POWER, SECURED TO WALL

Project Code:

FULL TIME

FSD LIBRARY

BREAK

23

Revi ewed by:

FULL TIME

12" 8"

L

A.REED

26x14

FAMILY

12"

CFM

W 912QR-11-R-0071

18x16

TO WALL

CFM

Sol i ci tati on No.

CFM

22 DDC CONTROL PANEL WITH 120V POWER, SECURED

400

J

C.KORPASH

C

A

46x18

CFM 35

Ckd by:

CFM

(TYP 2)

100

35

Dwn by:

375

26x18

26x18

C

I .FRANCO

J

C

C

LOUI SVI LLE DI STRI CT

(TYP 6)

250 CFM

CFM

Rev.

12"

240 CFM

C

LOUI SVI LLE,KENTUCKY

C

CFM

Date:

3

2

M-5010

072811

10" (TYP)

EF 1-11

2

CFM

100

Desi gned by:

CFM

10"

UTR

A

310

A.REED

CFM

B

130

J

(TYP 6)

500

U.S.ARMY

330

C

CORPS OF ENGI NEERS

J

8" EA DUCT

240 CFM

Fi l e nam e:LCARC_M 112A. dgn

D1

K

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

2

3 A5 UH 5 M-5000

UH M-5000 4

MATCH

1-1/4" HWS/R STAGING

ARMORER

AREA

WORK AREA

A110

A109

SUPPLY OFFICE

HVU 1-1

A111

B

US Army Corps of Engineers LOUISVILLE DISTRICT

1.

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

2.

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

Appr.

A

SEE SHEET M-114A

GENERAL NOTES LI NE

3/4" HWS/R TO EA. UH (TYP)

A5

5

Date

1

4

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET. 1-1/2" HWS/R

D

5.

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

VAULT A108

A5

UH M-5000 3

A5

UH 6 M-5000

Descri pti on

ARMS

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

C

3/4" HWS/R

KEY NOTES 1

UH 7

2-1/2" HWS/R

1" HWS/R

1" HWS/R

1" HWS/R

4

2 (TYP)

1-1/4" HWS/R

1" HWS/R PIPING UTR TO EC 1-7. ROUTE PIPING THRU ROOF CURB.

3

1" HWS/R PIPING UTR TO EC 1-6. ROUTE PIPING THRU ROOF CURB.

4

FOR PIPE HANGER DETAILS SEE

Mark

UH 8

1-1/4" HWS/R PIPING UTR TO EC 1-1. ROUTE PIPING THRU ROOF CURB.

D3

D5 Appr.

1-1/2" HWS/R

Date

M-5010 M-5010

F 3/4" HWS/R

C

U H 2

A5 D5 SEE FOR PIPE HANGER DETAIL M-5010

M-5000

A5 UH 1 M-5000

UNIT STORAGE

Descri pti on

A107

STORAGE A106

J

WEAPONS CONTROL

SIMULATOR RM.

ROOM

A105A

2-1/2" HWS/R (TYP)

Mark

4

A105B

ASSEMBLY A102

7/22/2011 Pl ot date:

Pl ot scal e:AS NOTED TEL (714) 327-1600

FAX (714) 327-1601

M .BETZ

Subm i tted by:

F-171-40-160

Project Code:

HUTTON CENTRE DRI VE,SUI TE 800

U.S.ARMY

A103C

LOUI SVI LLE DI STRI CT

CORPS OF ENGI NEERS

JANITOR

SANTA ANA, CALI FORNI A 92707

M

4

1

Revi ewed by:

Desi gned by:

A103B

A.REED

A101

OFFICE

A.REED

LOBBY

W 912QR-11-R-0071

(TYP)

C.KORPASH

4

Ckd by:

2" HWS/R

Dwn by:

A104

3

Date:

CHAIR STORAGE

A103A

072811

TABLE AND

KITCHEN

I .FRANCO

B

LOUI SVI LLE,KENTUCKY

1-1/2" HWS/R

Sol i ci tati on No.

Rev.

2

Fi l e nam e:LCARC_M 113A. dgn

K

A1 N

A2

ARC

ARC-FIRST FLOOR PIPING PLAN-SECTOR ONE KEY PLAN

SCALE :1/8"=1’-0"

N

MECHANI CAL

SHEET REFERENCE NUMBER:

M-113A Sheet 124

of 222

8:57:18

m oraja

AM

A1

MEXI CO

OMS

ARC-FI RST FLOOR PI PI NG PLAN-SECTOR ONE

B

LAS CRUCES,NEW

RESERVE CENTER

MATCH

U.S.ARMY

Q

SEE SHEET M-114A

LI NE

A

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-113A.dgn

P

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

6

7

4

8

9.8

9

5

10

11

US Army Corps of Engineers

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

2.

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

LOUISVILLE DISTRICT

Appr.

1.

Date

SEE SHEET M-113A

MATCH

LI NE

GENERAL NOTES

5.

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

D

A5 UH 9 M-5000

VESTIBULE

VESTIBULE

A120B

A123B

A5 UH 10 M-5000

Descri pti on

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET.

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

KEY NOTES

ELECTRICAL

1

MECHANICAL

3/4" HWS/R

WOMENS

A117

3/4" HWS/R

2 1/2" HWS/R

LOCKER A118

MENS WOMENS

MENS

SHOWER

SHOWER

6 (TYP)

MECH

A119S

LOCKER A125

2

1 -1/4" HWS/R PIPING UTR TO EC 1-3. ROUTE PIPING WITHIN ROOF CURB.

3

1 " HWS/R PIPING UTR TO EC 1-4. ROUTE PIPING WITHIN ROOF CURB.

4

1 -1/4" HWS/R PIPING UTR TO EC 1-5. ROUTE PIPING WITHIN ROOF CURB.

A124S

A122

EF

1 -1/4" HWS/R PIPING UTR TO EC 1-2. ROUTE PIPING WITHIN ROOF CURB.

Mark

A114

Appr.

A113

5

SIPRNET TER

CAFE

A112

A115

WOMENS 1 1/4" TOILET HWS/R A119T

2 1/2" HWS/R

C

4

MENS

JANITORIAL

M-400A

TOILET

STORAGE

3" HWS/R PIPING POC, FOR CONT. SEE ENLARGED DWG A1

6

FOR PIPE HANGING DETAILS SEE

A124T

A121

WOMENS

MENS

MAINTENANCE

VESTIBULE

VESTIBULE

A116

A120A

A123A

D5

D3

M-5010

M-5010

Descri pti on

FACILITY

Date

5

INTERIOR PHYSICAL YARD READINESS A126

INTERIOR CORRIDOR A150

RESTROOM

A140

A139

LEARNING

OFF. SPACE

OFF. SPACE

SPACE

READING

STORAGE

CENTER

A138

A137

A136

A133

A132

A130

A145

A128

A127

TRAINING AID STORAGE

1-1/2" HWS/R

A129

7/22/2011

F-171-40-160

AREA

W 912QR-11-R-0071

STOR

Pl ot scal e:AS NOTED

LIBRARY

Pl ot date:

LIBRARY

M .BETZ

A141

ELEC

UNIT EXCLUSIVE

Subm i tted by:

A142

A147

OFF. SPACE OFF. SPACE

FULL TIME

Project Code:

OFF. SPACE

FULL TIME

Revi ewed by:

OFF. SPACE

FULL TIME

A.REED

SUPPORT

FULL TIME

C.KORPASH

FULL TIME

Ckd by:

Date:

FULL TIME

Desi gned by:

FAMILY

A.REED

BREAK

2" HWS/R

072811

6 (TYP)

Dwn by:

1

B

I .FRANCO

1" HWS/R

Sol i ci tati on No.

Rev.

3

2

Fi l e nam e:LCARC_M 114A. dgn

Mark

A146

SPACE

COMMON SPACE

A135

SORTING

A149A

U.S.ARMY

MATCH

SEE SHEET M-113A

LI NE

A

B

OMS

A1

N 8:57:56 AM

m oraja

A1

MECHANI CAL

A149B

MEXI CO

ROOM

LAS CRUCES,NEW

RESERVE CENTER

DISTRIBUTION

A2

ARC

ARC-FIRST FLOOR PIPING PLAN-SECTOR TWO KEY PLAN

SCALE :1/8"=1’-0"

1

2

*** Support Value Engineering - It Pays ***

4

5

N

ARC-FI RST FLOOR PI PI NG PLAN-SECTOR TW O

ROOM

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-114A.dgn

A143

FAX (714) 327-1601

A131

TEL (714) 327-1600

UNIT

A134

HUTTON CENTRE DRI VE,SUI TE 800

UNIT EXCLUSIVE

CLASSROOM

SANTA ANA, CALI FORNI A 92707

A144

CLASSROOM

4

OFFICE

U.S.ARMY

GENERAL

LOUI SVI LLE DI STRI CT

A148

LOUI SVI LLE,KENTUCKY

CORPS OF ENGI NEERS

RETENTION

SHEET REFERENCE NUMBER:

M-114A Sheet 125

of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS. REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

Appr.

2.

LOUISVILLE DISTRICT

Date

1.

US Army Corps of Engineers

1

2

3

4

5.

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

D

24x24 EA LOUVER, 50% FA, BIRDSCREEEN. SEE ARCH FOR DETAIL

ELEC

MECH

24x24 EA LOUVER, 50% FA, DETAIL

A5

UH 12

B102

BIRDSCREEEN. SEE ARCH FOR

C2 EF 2-4 M-5020

B103

M-5000

FOR ENLARGED PLAN SEE

27

A1

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

C2

EF 2-2 M-5020

M-400B

Descri pti on

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET.

11. FOR SOLAR HEAT PIPING INSIDE MECHANICAL ROOM SEE ENLARGED PLAN A1

24

M-400B

A T

KEY NOTES 9

29 EF 2-7 M-5020

A5

UH M-5000 11

AREA 23

16

23

B101B

2

7

26

C2

EF 2-3 M-5020

20x16

3

17

23

15

C5 2 AND FOR UNDERSLAB RADIANT HEATING DETAIL SEE M-5000 M-7000

EMERGENCY AIR DISTRIBUTION STOP SWITCH. KELE ST120 BREAK GLASS TYPE. REFER TO CONTROL DRAWINGS.

3

18 8

T

VX 2-2

VENTILATOR.

14

20

Mark

STAGING

1

C2

4

36x36 MAKE-UP DUCT AIR FOR CAR EXHAUST. 2800 CFM MAX. COVER WITH 1/2" WELDED WIRE MESH.

5

FOUR BUTTON MOUNTED CONTROL STATION FOR CAR EXHAUST SYSTEM.

6

12x12 OUTSIDE AIR UP TO INTAKE VENTILATOR ON ROOF. GD 1 CARBON MONOXIDE AND NO2 CONTROLLER

F 645 CFM

Appr.

T

SD CFM 250

B105

C

CFM

C

5

EQUIPMENT ALCOVE

A

25

SD

STOR

7

16x14

J

19

F 640 CFM

WORK

250

B104 CFM

WITH LOCAL ALARM STROBE. REFER TO CONTROL DRAWINGS

20x16

BAYS B116

200

J CFM

SD EF 2-6

21 C

200 CFM

EF 2-5

11 10x10 TRANSFER GRILLE.

CFM

12 13

SD

100 CFM

TOOLS B107

CFM

10

18

PUMP CONTROL PANEL WITH VFD’S AND CONTROLS.

19

20x16 RAD UTR TO EC2-1.

FLOOR RADIANT

C

ROUTED WITHIN PIPE CHASE OF UNIT.

SHOP

5 23 FULLSIZE EA DUCT WITH BELLMOUT OPENING AND

300

CFM

CFM

8

J

VX 2-1

3/4" HWS/R TO UNIT HEATERS (TYP).

25 DDC CONTROL PANEL WITH 120 V POWER 9

SECURED TO WALL.

26 BOILER CONTROL PANEL WITH 120 V POWER

OFFICE

C

B112

J

200 CFM

200

SECURED TO WALL.

3

CFM

J

27 WALL MOUNT UNDERSLAB RADIANT HEATING

20x16

VALVE MANIFOLD.

320

28 PROVIDE C02, RH, AND TEMPERATURE SENSOR

CFM

MOUNTED ON WALL.

C

U.S.ARMY

29 ROUTE UNDERSLAB RADIANT HEATING PIPING

LOUI SVI LLE DI STRI CT

SHOP

B110

320

24

CORPS OF ENGI NEERS

F

Desi gned by:

UTR

A.REED

WMS.

F 645 CFM OFFICE

BELOW WALL AND AROUND CONCRETE FOOTINGS. C2

EF M-5020 2-1

7/22/2011 Pl ot date:

Pl ot scal e:AS NOTED FAX (714) 327-1601

22 1-1/2" HWS/R PIPING UP THRU ROOF. PIPE

$

TEL (714) 327-1600

CFM

Date:

300

Fi l e nam e:LCARC_M 110B. dgn

WITHIN PIPE CHASE OF UNIT.

2

M .BETZ

21 3/4" HWS/R PIPING UP THRU ROOF. PIPE ROUTED

Subm i tted by:

B115

B114

HUTTON CENTRE DRI VE,SUI TE 800

B

SANTA ANA, CALI FORNI A 92707

VESTIBULE F 640 CFM

CFM HALL

4

B113

CFM

110

WATER PIPING TO MECHANICAL EQUIPMENT. FOR A1 ENLARGED PLAN SEE M-400B

1

HVU 2-1

A

F-171-40-160

120

20 1-1/2" HWS/R PIPING POC FOR HEATING HOT

Project Code:

11 A

ZONE

11

28

CFM

Revi ewed by:

180

HEATING

A.REED

T

W 912QR-11-R-0071

4

Mark

FSD

S

VESTIBULE

12x12 OSA DUCT UTR TO IV-6 ON ROOF.

22

100 CFM

A

17

Sol i ci tati on No.

A

16x16 OSA DUCT UTR TO IV-7 ON ROOF.

C.KORPASH

B

16

Ckd by:

J

18x14

DUCT UTR

300

Dwn by:

CFM

16x16 OSA DUCT DOWN TO 6" AFF WITH 1/2" WIRE MESH SCREEN IN ELECTRICAL ROOM.

24x24 DN

430

14x14 OSA

15

I .FRANCO

13

WIRE MESH SCREEN. SD

LOUI SVI LLE,KENTUCKY

C

14 12x12 OSA DUCT DOWN TO 6" AFF WITH 1/2"

F 640 CFM

Rev.

16"

MEN’S B109

24x24 THRU WALL TO HVU 2-1 ON ROOF. SEE M-130B FOR CONT.

072811

M-300B

10

300

TR

B106

A

B101A

20x16 DOWN TO 12" AFF. COVER INLET WITH 1/2" WELDED WIRE MESH. 1920 CFM.

12 20x20 SAD UTR TO EC 2-1 ON ROOF.

B108

A1

9

C

20x20

STORAGE

WOMEN’S

C2 VEHICLE EXHAUST FAN, COORDINATE WITH M-5000 OVERHEAD CRANE SYSTEM. FOR DETAIL SEE

SD

F 640 CFM

UNHEATED

8

Descri pti on

190

Date

EAD UTR

7/22/2011

B

OMS

A1

A1

OMS-FLOOR PLAN SCALE :1/4"=1’-0"

A2

ARC

8:54:51 AM

KEY PLAN

m oraja

U.S.ARMY

A

MECHANI CAL

RESERVE CENTER

B111

OMS-FLOOR PLAN

OFFICE MEXI CO

M-300B

LAS CRUCES,NEW

C1

N

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-110B.dgn

SHOP

1

2

*** Support Value Engineering - It Pays ***

4

5

N

SHEET REFERENCE NUMBER:

M-110B Sheet 126

of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

*** Safety Pays ***

2

B2 IV 1 M-5000

A

5

GENERAL NOTES 4 1.

18x18 OSA DUCT DN

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

2.

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

US Army Corps of Engineers LOUISVILLE DISTRICT

Appr.

B2 IV 2 M-5000

4

Date

3 LI NE

2

MATCH

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET.

B

D

5.

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN. Descri pti on

1

SEE SHEET M-121A

1

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT. B2 RV 3 M-5000

12x12 EA DUCT DN

C

KEY NOTES 1 14x12 WELDED GREASE EXHAUST DUCT DN THRU ROOF 2

TERMINATE 14x12 WELDED GREASE EXHAUST DUCT 40" DUCT THRU WALL SEE

A1

4

24x14 SA AND RA DUCTS DN THRU ROOF

5

16x16 MAKE-UP AIR DUCT DN THRU ROOF

6

26x14 SA AND RA DUCTS DN THRU ROOF

7

36x24 RA DUCT DN THRU ROOF

Appr.

REFRIGERANT PIPING DN THRU ROOF

Date

3

Mark

M-5020

D2

8

44x18 SA DUCT DN THRU WALL SEE M-5010

9

PROVIDE MINIMUM OF 42" CLEARANCE FOR ACCESS TO HIGH VOLTAGE VFD’S, MOTOR CONTROLS, AND PANELS, ETC ALL ACCESSED FROM ONE SIDE OF THE UNIT.

F C

10 PROVIDE MINIMUM OF 30" CLEAR ON OPPOSITE SIDE OF UNIT. NO EQUIPMENT OR COMPONENTS THAT REQUIRE MAINTENANCE SHALL BE INSTALLED ON THIS SIDE OF THE UNIT. ALL ACCESS SHALL BE FROM INSIDE THE UNIT.

11 PROVIDE MINIMUM OF 18" CLEAR ON OPPOSITE SIDE OF UNIT.

18x18 EA DUCT DN

18x18 EA DUCT DN

B2 RV 1 M-5000

B2 RV 2 M-5000

Descri pti on

NO EQUIPMENT OR COMPONENTS THAT REQUIRE MAINTENANCE SHALL BE INSTALLED ON THIS SIDE OF THE UNIT. ALL ACCESS SHALL BE FROM INSIDE THE UNIT.

12 6x6 EA DUCT DN

J

A1 EF 1-9 M-5020

A1 KSF 1-1 M-5020

C1 EC 1-7 M-5020

2

7/22/2011

Pl ot scal e:AS NOTED TEL (714) 327-1600

F-171-40-160

Pl ot date:

FAX (714) 327-1601

M .BETZ

Subm i tted by:

C.KORPASH

Project Code:

HUTTON CENTRE DRI VE,SUI TE 800

U.S.ARMY

4

CORPS OF ENGI NEERS

8x8 EA DUCT DN

Revi ewed by:

Ckd by:

8

C1 EC 1-6 M-5020

MATCH

LI NE

Q

SECTOR ONE

AND LOW ER ROOF PLAN -

ARC-OVERALL PLENUM

LEVEL

MEXI CO

OMS

A1 A2

ARC

ARC-OVERALL PLENUM LEVEL AND LOWER ROOF PLAN - SECTOR ONE KEY PLAN

SCALE :1/8"=1’-0"

N

SHEET REFERENCE NUMBER:

M-120A Sheet 127

of 222

8:58:33

m oraja

AM

A1

SEE SHEET M-121A

7/22/2011

B

MECHANI CAL

U.S.ARMY

A

LAS CRUCES,NEW

RESERVE CENTER

P

N

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-120A.dgn

Dwn by:

10

LOUI SVI LLE DI STRI CT

4

Desi gned by:

EF M-5000 1-8

A.REED

C1 EC 1-1 M-5020

B4

M

I .FRANCO

EF

M-5000 1-14

A.REED

9

12

LOUI SVI LLE,KENTUCKY

B5

6

Date:

7

3

072811

9 9

W 912QR-11-R-0071

HP 5

B

Sol i ci tati on No.

Rev.

K

Fi l e nam e:LCARC_M 120A. dgn

11

SANTA ANA, CALI FORNI A 92707

5

Mark

1

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES 6

7

8

9.8

9

10

11 1.

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

2.

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN

US Army Corps of Engineers

Appr.

LOUISVILLE DISTRICT

AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

Date

MATCH

5

SEE SHEET M-120A

4

LI NE

3

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET. FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN. Descri pti on

D

5.

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

KEY NOTES

B2 IV 5 M-5000

B2 IV 3 M-5000

18x18 OSA DUCT DN

SOLAR HEATING COLLECTORS (TYP) SEE A1

3

18x46 SA AND RA DUCTS DTR

4

16x28 SA AND RA DUCTS DTR

M-5010

M-400A

10x10 OSA DUCT DN

6

PROVIDE MINIMUM OF 42" CLEARANCE FOR HIGH VOLTAGE VFD’S, MOTOR CONTROLS, AND PANELS, ETC. ALL ACCESSED FROM ONE SIDE OF THE UNIT.

7

PROVIDE MINIMUM OF 30" CLEARANCE ON OPPOSITE SIDE OF UNIT. NO EQUIPMENT OR COMPONENTS THAT REQUIRE MAINTENANCE SHALL BE INSTALLED ON THIS SIDE OF THE UNIT. ALL ACCESS SHALL BE FROM INSIDE THE UNIT.

E HP 2

C1 EC 1-5 M-5020

6

10x10 EA DUCT DN

HP 1

D1

5

C 6

B5

EF M-5000 1-13

Appr.

B2 IV 4 M-5000

18x26 SA AND RA DUCTS DTR

Date

16x16 OSA DUCT HD 1 DN

2

Mark

1 18x40 SA AND RA DUCTS DTR

D

7

G

D1

D1

M-5010

M-5010

4

M-5000 Descri pti on

DTR

DUCT DTR

RS/RL PIPES DTR SEE D3

Mark

H

2

7/22/2011

Pl ot scal e:AS NOTED

F-171-40-160

Project Code:

Pl ot date:

FAX (714) 327-1601

CORPS OF ENGI NEERS U.S.ARMY

TEL (714) 327-1600

M 10x10 EA DUCT DN

M .BETZ

6

Subm i tted by:

B5 EF 1-3 M-5000

HUTTON CENTRE DRI VE,SUI TE 800

EC 1-3 M-5020

SANTA ANA, CALI FORNI A 92707

1

12x12 EA DUCT DN

C1

4

C1 EC 1-4 M-5020

6

W 912QR-11-R-0071

6

LOUI SVI LLE DI STRI CT

B5 EF 1-12 M-5000

6

Revi ewed by:

12x12 EA DUCT DN

12x12 EA DUCT DN

CONDENSING UNIT PART OF EC 1-2

A.REED

CU 1

LOUI SVI LLE,KENTUCKY

EF M-5000 1-4

Desi gned by:

7

B5 EF 1-10 M-5000

B5

C.KORPASH

L

Ckd by:

Date:

6 072811

5

Dwn by:

C1 EC 1-2 M-5020

A.REED

B

I .FRANCO

7

Sol i ci tati on No.

Rev.

K

Fi l e nam e:LCARC_M 121A. dgn

3

SECTOR TW O

AND LOW ER ROOF PLAN -

ARC-OVERALL PLENUM

MECHANI CAL

LEVEL

MEXI CO

OMS

A1 A2

ARC

ARC-OVERALL PLENUM LEVEL AND LOWER ROOF PLAN - SECTOR TWO KEY PLAN

SCALE :1/8"=1’-0"

N

SHEET REFERENCE NUMBER:

M-121A Sheet 128

of 222

8:59:15

m oraja

AM

A1

SEE SHEET M-120A

MATCH

LI NE

7/22/2011

B

LAS CRUCES,NEW

RESERVE CENTER U.S.ARMY

A

N

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-121A.dgn

N

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

US Army Corps of Engineers

GENERAL NOTES

LOUISVILLE DISTRICT

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

2.

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

Date

Appr.

1.

1

2

3

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET.

4

5.

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

Descri pti on

D

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

A

KEY NOTES B2

IV M-5000 7

1 3/4" HWS/R PIPING FROM BELOW PIPE SHALL

2

B2 RV 7 M-5000

1-1/2" HWS/R PIPING FROM BELOW. PIPE SHALL BE ROUTED INSIDE PIPE CHASE OF UNIT.

3

Mark

B2 IV 6 M-5000

16x16 DN

BE ROUTED INSIDE PIPE CHASE OF UNIT

B2 RV 5 M-5000

PROVIDE MINIMUM OF 42" CLEARANCE FOR Appr.

ACCESS TO HIGH VOLTAGE VFD’S, MOTOR CONTROLS, AND PANELS, ETC ALL ACCESSED

12x12 DN

Date

FROM ONE SIDE OF THE UNIT.

3 DN

4

OPPOSITE SIDE OF UNIT. NO EQUIPMENT OR

16x20 RA DUCT

C

PROVIDE MINIMUM OF 12" CLEARANCE ON COMPONENTS THAT REQUIRE MAINTENANCE SHALL

DTR

BE INSTALLED ON THIS SIDE OF THE UNITS. ALL ACCESS SHALL BE FROM INSIDE THE UNIT.

5

EC 2-1 SHALL HAVE ECONOMIZER OUTSIDE AIR INLET ONLY ON THIS SIDE OF UNIT.

C1 EC 2-1 M-5020

Descri pti on

1

5

20x20 SA DUCT DTR

IV 8

B2 M-5000

4 EXHAUST AIR DUCT ROOF

3 24x24 THRU WALL

CAP (TYP)

14x14 DN

D2

M-5010

IV 9

B2 M-5000

B

B

OMS-ROOF PLAN

N

A1

A2

SCALE :1/4"=1’-0" ARC KEY PLAN

8:59:50 AM

7/22/2011 Pl ot date:

Pl ot scal e:AS NOTED TEL (714) 327-1600

FAX (714) 327-1601

M .BETZ

Subm i tted by: HUTTON CENTRE DRI VE,SUI TE 800

OMS-ROOF PLAN

4

SANTA ANA, CALI FORNI A 92707

F-171-40-160

Project Code:

Revi ewed by:

C.KORPASH

A.REED

Ckd by: Dwn by:

OMS

A1

m oraja

MECHANI CAL

U.S.ARMY

RESERVE CENTER U.S.ARMY

A

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-130B.dgn

C

MEXI CO

RV M-5000 4

LOUI SVI LLE DI STRI CT

CORPS OF ENGI NEERS

B2

LAS CRUCES,NEW

Desi gned by:

RV 6 M-5000

A.REED

B2

LOUI SVI LLE,KENTUCKY

Date:

072811

3

I . FRANCO

Sol i ci tati on No.

OUTSIDE AIR HOOD

B

W 912QR-11-R-0071

Rev.

C1 HVU 2-1 M-5020

Fi l e nam e:LCARC_M 130B. dgn

Mark

2

1

2

*** Support Value Engineering - It Pays ***

4

5

N

SHEET REFERENCE NUMBER:

M-130B Sheet 129

of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

*** Safety Pays ***

2

4

5

GENERAL NOTES

K

M

P

Q

US Army Corps of Engineers

1.

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

2.

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

GREASE

LOUISVILLE DISTRICT

Appr.

1

A1

WALL SEE

C1 EC 1-6 M-5020

M-5020

Date

DUCT THRU

DISCHARGE DUCT 40" ABV ROOF

A1 KSF 1-1 M-5020

D

A1 EF 1-9 M-5020 (BEYOND) 16x16

1" HWS/R

MAKE-UP

TO EC 1-6

AIR DUCT DTR

E

26x18 SA

DUCT

E

640 CFM

26x18 SA DUCT

DUCT

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

640 CFM LINEAR DIFFUSER

10" SA 26x14 SA

H

DUCT

DUCT

1875 CFM

SOFFIT PERIMETER.

(TYP 4)

BLANK-OFF UNUSED

700 CFM

PORTIONS

16x16 MAKE-UP AIR

A

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

A

AROUND ENTIRE

12"

26x14 RA

275 CFM

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

14x24 SA

A

5.

Descri pti on

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET.

GREASE

36x24

DUCT

FC 5

A

275 CFM

420 CFM

RA DUCT

A1

WEAPONS

M-5000

SIMULATOR KITCHEN A103A

ASSEMBLY A102

OFFICE A103B

Date

Appr.

Mark

A105

C

ARC-SECTION SCALE :1/4"=1’-0"

Descri pti on

C1

EXHAUST AIR

THRU WALL TO

PLENUM CONNECTED

RM A116 WITH A5

UH M-5000 10

HX-1

MECHANICAL A117

A1

M-400A

3" HWS

D4 B 1 M-5010

3" HWR

8x8 OSA

10x10 EA DUCT THRU

16x16 EA DUCT THRU

DUCT THRU

WALL TO RM A113

WALL TO RM A114 WITH

WALL TO RM

WITH SMOKE DAMPER

SMOKE DAMPER

A116 WITH

U.S.ARMY

HST 1

SMOKE

ARC-MECHANICAL ROOM SECTION

A3

SCALE :1/4"=1’-0"

RESERVE CENTER

A1

ARC-MECHANICAL ROOM SECTION SCALE :1/4"=1’-0"

U.S.ARMY

A

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-300A.dgn

DAMPER

7/22/2011 Pl ot date:

Fi l e nam e:LCARC_M 300A. dgn

F-171-40-160

Project Code:

Pl ot scal e:AS NOTED FAX (714) 327-1601

FOR CONT SEE

HWS TO

TEL (714) 327-1600

2" VENT FROM HWT-1

(TYP 3)

HUTTON CENTRE DRI VE,SUI TE 800

400 CFM

1-1, 1-2

4

UTR

TO LOUVER AND EF

SMOKE DAMPER

B

M .BETZ

(TYP 2)

Subm i tted by:

600 CFM

8x8 EA DUCT

2" VENT FROM HWT-1

GFA 1

ARCH

ARC-SECTI ONS

3" HWS/R

DAMPER

BIRDSCREEN. SEE

D

Revi ewed by:

B 2

1-1/2"

INTAKE THRU WALL

D1 ET 2 M-5020

HWP M-5000 2B 2" SHWS/R

MOTORIZED

A.REED

AS 2

3" HWS

4" COMBUSTION AIR (TYP 2)

C3

MECHANICAL A117

50%FA, WITH

MECHANI CAL

HWP M-5000 2B

(TYP)

Desi gned by:

C3

48x24 EA LOUVER,

CORPS OF ENGI NEERS

C4 AS 1 M-5000

WALL

W 912QR-11-R-0071

DUCT TO

HWP 3

Sol i ci tati on No.

Date:

SECURE

C.KORPASH

DUCT

Ckd by:

18x18 EA

18x18

B

Dwn by:

3/4" HWS/R

M-400A 1-1/2" HWR

LOUI SVI LLE DI STRI CT

D5

ET M-5020 1

C2 EF 1-2 M-5020

A1

I . FRANCO

CONT SEE

MEXI CO

HWP M-5000 4

LAS CRUCES,NEW

FLUE THRU M-5000 ROOF

C3

B2 IV 4 M-5000

SYSTEM. FOR

SANTA ANA, CALI FORNI A 92707

POC TO HEATING C3

D

Mark

E

LOUI SVI LLE,KENTUCKY

G

Rev.

D

072811

E

A.REED

G

SHEET REFERENCE NUMBER:

M-300A of 222

9:00:27

m oraja

AM

Sheet 130

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

4

5

A1 EF 1-9 M-5020

A1

KSF M-5020 1-1

C1 EC (BEYOND) 1-7 M-5020

B5

B5 EF 1-10 M-5000

EF M-5000 1-4

GENERAL NOTES 1.

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

2.

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

3.

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

B5 EF 1-12 M-5000

16x16 MAKE-UP AIR 1" HWS/R TO

DUCT DTR

EC 1-6

D

14x12 WELDED

HWS/R

12x12 EA

10x10 EA

GREASE DUCT

PIPING TO

DUCT DTR

DUCT DTR

THRU ROOF

EC 1-1 C1

EC 1-1 M-5020

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET. 12x12 EA DUCT DTR

2" HWS/R

5.

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

PIPING

DAC 1

16x16

20x18 RA DUCT TO

20x18 SA

MAKE-UP

WEAPONS

DUCT TO

AIR DUCT

SIMULATOR ROOM

WEAPONS

36x24 RA DUCT

GREASE DUCT TO

(TYP)

A103

HOOD

CFM

10x8 WELDED

A

KITCHEN

AIR DUCT TO

420 CFM

GREASE DUCT TO

TABLE AND

TYPE 1 HOOD

CHAIR

12x10 MAKE-UP AIR

STORAGE

FAMILY

LOBBY

SUPPORT A147

A101

LI NE

A104

5

6

MATCH

SEE ABOVE

LI NE

DUCT TO HOOD

MATCH

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

330

7

Mark

12x10 MAKEUP

ROOM

Appr.

A103

C

Date

A

CFM

130 CFM

J

330 CFM

FROM EC 1-1 DTR

TYPE 1 HOOD A103

DUCT

SIMULATOR

12x8 WELDED

KITCHEN

A

26x14 RA

SEE BELOW

SA

420

LOUISVILLE DISTRICT

Descri pti on

EC 1-6 M-5020

KITCHEN

US Army Corps of Engineers

1-1/4"

C1

HP 5

4

Appr.

3

SEE BELOW

2

MATCH

1

Date

*** Safety Pays ***

2

LI NE

1

C C1 EC 1-2 M-5020

DUCT THRU

18x46 RA

1 -1/4"

ROOF SEE

DUCT DTR

HWS/R

FROM EC 1-2

PIPINGTO

M-5020

CU 1

EC 1-2 26x18 RA 1 -1/2" HWS/R PIPING

1-1/2"

26x18 RA

20x46 SA

HWS/R

10" RA

DUCT

PIPING

10" RA

10" RA

10" RA

12" RA

18x16 RA

12" SA

12" RA

Descri pti on

D1

10" RA 14" RA

12" SA

10" RA

EF 1-11

18x26 RA

26x14 RA

J

C

J

C

240

240

240

240

CFM

CFM

CFM

CFM

C

J

J

C

J

C

240

240

240

240

240

240

CFM

CFM

CFM

CFM

CFM

CFM

C

J

240

240 CFM

CFM

RESTROOM A146 FULLTIME

FULLTIME

FULLTIME

OFFICE A142

OFFICE A141

OFFICE A140

OFFICE A139

OFFICE A138

C

J

C

1535

245

245

375

CFM

CFM

CFM

CFM

UNIT

UNIT

FULLTIME

COMMON

EXCLUSIVE

OFFICE A137

SPACE

SPACE

A136

A136

LIBRARY READING A133

1 -1/2"

DUCT DTR

UTR TO

DUCT DTR

DUCT OVER

UTR TO

46x18 SA

EC 1-3

DUCT DTR

7/22/2011

Pl ot scal e:AS NOTED

Pl ot date:

Fi l e nam e:LCARC_M 301A. dgn

FAX (714) 327-1601

M .BETZ

Subm i tted by:

F-171-40-160

Project Code:

Revi ewed by:

C.KORPASH

W 912QR-11-R-0071

Ckd by:

A.REED

HUTTON CENTRE DRI VE,SUI TE 800

TEL (714) 327-1600

HWS/R

24x20 SA

EC 1-4

HWS/R

14x14 EA

12" FSD

FSD

DUCT UTR FSD

12"

12" RA DUCT

12" SA

8"

6"

6"

DUCT

46x18

C C

A

J

C

A

J

C

375

375

100

100

310

310

CFM

CFM

CFM

CFM

CFM

CFM

LIBRARY READING A133

C

A

46x18 RA

100

35

35

DUCT

CFM

CFM

CFM

J

D

350

700

CFM

CFM

LIBRARY

LEARNING

TRAINING

STORAGE

BREAK

STORAGE A

CENTER A130

STORAGE A129

A128

AREA A127

B

OMS

A1 A2

A1

ARC-SECTI ONS

FSD

MECHANI CAL

FSD

MEXI CO

12" RA

LAS CRUCES,NEW

8"

U.S.ARMY

8"

RESERVE CENTER

10"

8"

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-301A.dgn

1" HWS/R

24x20 SA

SANTA ANA, CALI FORNI A 92707

DUCT DTR 1-1/4"

4

B5 EF 1-3 M-5000

18x48 RA

LOUI SVI LLE DI STRI CT

C1 EC 1-3 M-5020

Dwn by:

11

LOUI SVI LLE,KENTUCKY

Date:

C1 EC 1-4 M-5020

Desi gned by:

10

A.REED

9.8

9

CORPS OF ENGI NEERS

8

U.S.ARMY

SEE ABOVE

LI NE MATCH

7

072811

B

I . FRANCO

Sol i ci tati on No.

Rev.

Mark

FULLTIME

FULLTIME

C

ARC-SECTION ARC

SCALE :1/4"=1’-0"

M-301A Sheet 131

of 222

9:01:54

m oraja

AM

KEY PLAN

N

SHEET REFERENCE NUMBER:

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES

US Army Corps of Engineers LOUISVILLE DISTRICT

D

EC M-5020 2-1

3/4"

1-1/2"

HWS/R TO

HWS/R TO

EC 2-1

HVU 2-1

C1 HVU 2-1 M-5020

IV M-5000 7

ROOF SEE

FLEXIBLE DUCTWORK CONNECTIONS TO DIFFUSERS AND REGISTERS SHALL BE 6’-0" MAXIMUM IN LENGTH.

6.

INSULATE SUPPLY AND RETURN AIR DUCTWORK PER SPECIFICATIONS.

7.

MOUNT TEMPERATURE, HUMIDITY, C02 SENSORS ON WALL 4’-0" ABOVE FINISHED FLOOR. REFER TO CONTROL DRAWINGS.

8.

INTAKE LOUVERS TO BE A MINIMUM OF 10’-0" ABOVE FINISHED GRADE PER ATFP REQUIREMENTS.

9.

INTERLOCK SMOKE DETECTORS FOR UNIT SHUT DOWN.

Appr. Date

HEATING SYSTEM, SEE

HWS/R

A1

M-400B

24x24 EA LOUVER,

12" RA

ET 4

BIRDSCREEN. SEE ARCH

5.

POC TO

3/4"

50% FREE AREA, WITH

MAINTAIN COORDINATION OF SUPPLY DIFFUSERS AND RETURN AND EXHAUST REGISTERS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

HWS/R

DUCT DTR

M-5000

3.

1-1/2"

16x16 OSA

D5

REFER TO MECHANICAL SCHEDULES ON SHEETS M-6000, M-6010 AND 6020.

10. PROVIDE FLEXIBLE DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.

B2

BOILER FLUES THRU

2.

4. PROVIDE VOLUME DAMPER FOR EVERY SUPPLY, RETURN AND EXHAUST BRANCH OUTLET.

C

C1

REFER TO SHEET M0010 FOR MECHANICAL SYMBOLS, NOTES AND ABBREVIATIONS.

Descri pti on

A

1.

20x16 RA

20x20 SA

UTR

UTR

12" RA

FOR DETAIL

12" SA 8" SA 18x14

DUCT

C2

A5

UH M-5000 11

A

M-5020

HWP 7B

GFA 2

DUCT

D1

AS 3

B 3,4

26x10 RA

8" SA

190 CFM

10" SA

8" RA

Mark

HWP 6A

J

200 CFM

200

C

300

CFM CFM

EXTERIOR

B103

CFM

TRANSFER

B105

GRILLE

TR

FOR PIPING IN THE

A

C

10x10

ALCOVE

HST 2

MECH

110

J

J

C

300

200

CFM

CFM

Appr.

ET 5

200 CFM

Date

EF 2-4 M-5020

HALL B114

B106

MECHANICAL ROOM SEE

C

SHEET M-400B AND DIAGRAM M-7020

SECURE DUCT TO 16x16 OSA DUCT

WALL (TYP)

TO ELEC ROOM B102 WITH 1/2"

Descri pti on

WMS

OMS-SECTION SCALE :1/4"=1’-0"

640 CFM

WORK BAYS

DUCT DTR

F

8" EA DUCT

B116

U.S.ARMY

20x20 SA DUCT EF 2-5

CFM

J

TOOLS

C

100 CFM

430 CFM

B107

B3

A

MENS

7/22/2011

Pl ot scal e:AS NOTED

Pl ot date:

Fi l e nam e:LCARC_M 300B. dgn

M .BETZ

F-171-40-160

Project Code:

UNHEATED STORAGE B101A

B109 HALL

DETAIL M-5000 SEE

B

OMS-SECTI ONS

MECHANI CAL

U.S.ARMY

A

MEXI CO

RESERVE CENTER

B114

LAS CRUCES,NEW

FOR

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-300B.dgn

300

FAX (714) 327-1601

14x14 OSA

16x14 RA

TEL (714) 327-1600

WITH BIRDSCREEN

LOUI SVI LLE DI STRI CT

ROOF TO ROOF CAP

HUTTON CENTRE DRI VE,SUI TE 800

B2 IV 8 M-5000

M-5010

CORPS OF ENGI NEERS

EF M-5020 2-1

4

D2

C2

Revi ewed by:

Desi gned by:

WALL

A.REED

DUCT THRU

A.REED

24x24 SA

16x20

C.KORPASH

Date:

C1 HVU 2-1 M-5020

072811

B

Ckd by:

Sol i ci tati on No.

Rev.

C2 VX 2-1 M-5000

W 912QR-11-R-0071

B2 RV 4 M-5000

IV M-5000 9

Subm i tted by:

B2

Dwn by:

RV M-5000 7

1

I . FRANCO

B2

2

Mark

3

SANTA ANA, CALI FORNI A 92707

4

LOUI SVI LLE,KENTUCKY

C1

OMS

A1

OMS-SECTION SCALE :1/4"=1’-0"

A1 N

A2

ARC

M-300B Sheet 132

of 222

9:01:12

m oraja

AM

KEY PLAN

N

SHEET REFERENCE NUMBER:

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

4

5

6

7

US Army Corps of Engineers

8

Date

Appr.

LOUISVILLE DISTRICT

D

SC 30

D

SC 29

SC 28

SC 27

SC 26

SC 25

SC 24

SC 22

SC 23

SC 21

SC 20

SC 19

SC 18

SC 17

SC 16

SC 15

1" SHWR

SC 14

SC 13

SC 12

SC 11

SC 10

SC 9

SC 8

SC 6

SC 7

1" SHWS 2"

1-1/2" SHWR 1-1/2" SHWS

SC 3

SC 2

SC 1

18 TYP

1" SHWR 1-1/4" SHWR

SC 4

1" SHWR

1" SHWR 1" SHWS

SC 5

1-1/4" SHWR 1-1/2" SHWS

1" SHWS

1" SHWS

1" SHWR

1" SHWS

1-1/4" SHWS

Descri pti on

2"

16 HD 1

20

17

ARC-PARTIAL ROOF PLAN

MOUNT VERTICAL INLINE PUMP OVERHEAD. PROVIDE SPRING VIBRATION ISOLATORS. SEE C3/M-5000

2

3" HWS&R PIPING FOR CONTINUATION SEE SHEET M-114A

3

INSTALL EXPANSION TANK ON 6" CONCRETE HOUSE KEEPING PAD. PIPE DRAIN TO NEAREST FLOOR SINK. CHARGE TANK TO SYSTEM DESIGN PRESSURE.

4

2" SHWS&R PIPES UP THROUGH ROOF TO SOLAR COLLECTORS.

5

3" HWS CONNECTION TO HST-1. PROVIDE PRESSURE RELIEF VALVE AT TANK AND PIPE DISCHARGE TO NEAREST FLOOR SINK.

6

CONNECT 2" SOLAR HOT WATER SUPPLY AND RETURN PIPING TO HST-1 INTERNAL HEAT EXCHANGER CONNECTIONS. PROVIDE 3/4" DRAIN VALVE AT LOWEST POINTS IN SYTEM. CONNECT 3" HWS&R/ SUPPLY FROM BOILER CONNECTION SHALL BE HIGH AND THE RETURN CONNECTION TO THE BOILER SHALL BE LOW. PROVIDE ISOLATION BALL VALVES IN PIPE RISERS DOWN TO TANK.

7

INSTALL EXPANSION TANK ABOVE. SUSPEND FROM DECK ABOVE WITH THREADED ROD. SEE DETAIL D1/M-5020.

8

INSTALL B-1 AND B-2 IN STACKED CONFIGURATION ON 6" CONCRETE HOUSEKEEPING PAD. PROVIDE PRESSURE RELIEF VALVES ON CONDENSATE P-TRAP. PIPE PSV AND CONDENSATE DRAIN DISCHARGE TO NEAREST FLOOR SINK. SEE PLUMBING DRAWINGS FOR NATURAL GAS PIPING.

9

2" DHWS TERMINATE WITH ISOLATION VALVE AT 9’-6" AFF SEE PLUMBING DRAWINGS FOR CONTINUATION.

C

13

HWT 1

Date

5

1

Appr.

KEYED NOTES:

SCALE :1/4"=1’-0"

Descri pti on

C1

Mark

E

1-1/2" DHWR

2" DHWS 2" DHWR

1-1/2" DHWS

2" VENT

10 2" DHWR TERMINATE AT 9’-6" AFF FOR CONTINUATION BY PLUMBING CONTRACTOR AND CONNECTION TO DOMESTIC WATER SUPPLY AND HOT WATER RETURN FROM THE DOMESTIC WATER RECIRCULATING PUMP.

12

3" 2" SHWS&R

6 19 4" COMBUSTION AIR INTAKE ROUTE FROM BOILER TO EXTERIOR

HWP 4 HWP 2A

1

HWP 2B

7/22/2011

Pl ot scal e:AS NOTED

Pl ot date:

F-171-40-160

Project Code:

W 912QR-11-R-0071

FAX (714) 327-1601

3’-0" ABOVE NEARBY EQUIPMENT AND ROOF SEE DETAIL D5/M-5000. HORIZONTAL OFFSETS SHALL BE SLOPED 1/4" PER FOOT TOWARD BOILER.

1 PROVIDE MANUAL EMERGENCY BOILER SHUTDOWN SWITCH. INTERLOCK 21

E

SWITCH WITH MAIN GAS SOLENOID SHUTOFF VALVE SHOWN ON P-411A. SWITCH SHALL CLOSE GAS SUPPLY AND TURN OFF 120V POWER TO BOILERS. MOUNT SWITCH 48" ABOVE FLOOR. FOR CONTROL DIAGRAM SEE M-8050.

3"

2 22 PROVIDE EMERGENCY SHUTOFF ALARM/STROBE IN WEATHER PROOF

U.S.ARMY

SURFACE MOUNTED BOX. KELE #868STR. MOUNT STROBE/HORN 8’-0" ABOVE FLOOR.

A

B

OMS

ARC-SOLAR HEAT ENLARGED PLANS

15

1

20 ROUTE VENT EXHAUST UP THROUGH ROOF. TERMINATE AT LEAST

AS 2

MECHANI CAL

3/4"

WALL AND TERMINATE WITH WALL CAP WITH BACKDRAFT DAMPER.

1

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-400A.dgn

5

HWP 3

TEL (714) 327-1600

1

SUPPORTS PROVIDED BY MANUFACTURER. GROUP COLLECTORS IN ARRAYS OF SIX COLLECTORS EACH. PROVIDE AIR VENT AND PRESSURE RELIEF VALVE AT AHWR CONNECTIO. COLLECTORS SHALL BE INSTALLED AT 0^ AZIMUTH AND 47^ SLOPE. OFFSET EACH ARRAY OF COLLECTORS TO ALLOW CLEARANCE FOR PIPING OF ADJACENT ARRAYS.

HUTTON CENTRE DRI VE,SUI TE 800

HWP 1B

INSTALL FLAT PLATE SOLAR COLLECTORS ON STRUCTURAL 18

SANTA ANA, CALI FORNI A 92707

1

4

HWP 1A

LOUI SVI LLE DI STRI CT

4

3"

20 HST 1

2" PIPE. PROVIDE AUTOMATIC AIRVENT, FLEXIBLE CONNECTIONS, 3-WAY MOTORIZED CONTROL VALVE AND BALANCING VALVE.

LOUI SVI LLE,KENTUCKY

3

14

17 INSTALL HEAT-DUMP DRYCOOLER ON ROOF. CONNECT TO SHWS WITH

MEXI CO

1" ET 1

3

LAS CRUCES,NEW

3"

ROOF PIPE PENETRATION. ET 3

CORPS OF ENGI NEERS

1"

16 2" SHWS&R PIPES DOWN THROUGH ROOF. SEE DETAIL D3/M5000 FOR

U.S.ARMY

ET 2

PIPING OF HWP-1A AND HWP-1B WITH 3/4" PIPE. PROVIDE ISOLATION BALL VALVES AND PIPE 1/2" DRAIN TO NEAREST FLOOR SINK.

HX 1

RESERVE CENTER

B 2

1-1/2" HW S

7

8

15 CONNECT CHEMICAL POT FEEDER TO SUCTION AND DISCHARGE

1-1/2" HW R

GFA 1

AS 1

B 1

Revi ewed by:

1

2"

Sol i ci tati on No.

REDUCING VALVE SET AT 15 PSIG. TERMINATE AT 10’-0" AFF WITH BALL VALVE FOR MAKE-UP WATER POC, SEE PLUMBING DRAWING C1/P-411A FOR CONTINUATION.

A.REED

21

HWP 5

Ckd by:

9

Dwn by:

11

14 1" MAKE-UP WATER SUPPLY, PROVIDE CHECK VALVE AND PRESSURE

R.SALLW ASSER C.KORPASH

10

Date:

D

EPO

072811

B

Desi gned by:

A4/M-5020. PROVIDE MANHOLE AND EXTENSION TO GRADE . TOP OF TANK SHALL BE A MINIMUM OF 48" BELOW GRADE. PROVIDE ANCHOR SLAB AND TIE DOWN STRAPS PER DETAIL. BACKFILL WITH PEA GRAVEL.

D.O’ CALLAHAN

UNDERGROUND POTABLE WATER STORAGE TANK. SEE DETAIL 13

19

Rev.

22

Fi l e nam e:LCARC_M 400A. dgn

Mark

DOMESTIC HOT WATER SUPPLY AND RETURN TO DISTRIBUTION POINTS. PIPES SHALL BE LOCATED A MINIMUM OF 36" BELOW GRADE OF BELOWFROST LINE. PROVIDE ISOLATION VALVES IN RISERS WITHIN MECHANICAL ROOM.

M .BETZ

12 1-1/2" DOMESTIC HOT WATER SUPPLY AND RETURN TO HX-1 AND 2"

Subm i tted by:

RELIEF VALVE. PIPE DISCHARGE TO NEAREST FLOOR SINK.

111510

11 TERMINATE HWFI VENT AT 9’6" AFF WITH THERMOSTATIC PRESSURE

G A1

N

22

ARC

ARC-ENLARGED MECHANICAL ROOM PLAN KEY PLAN

SCALE :1/4"=1’-0"

N

M-400A Sheet 133

of 222

9:02:37

m oraja

AM

A1

A2

SHEET REFERENCE NUMBER:

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

US Army Corps of Engineers

2

3

Date

1

Appr.

LOUISVILLE DISTRICT

Descri pti on

D

A

13

1"

10 SC 31

SC 32

Date

Appr.

Mark

11

1"

C

KEYED NOTES: MOUNT VERTICAL INLINE PUMP OVERHEAD. PROVIDE SPRING VIBRATION ISOLATORS. SEE C3/M-5000

2

2" HWS&R PIPING FOR CONTINUATION SEE SHEET M-110B

3

1" SHWS&R PIPES UP THROUGH ROOF TO SOLAR COLLECTORS.

4

PROVIDE PRESSURE RELIEF VALVE AT HST-2 AND PIPE DISCHARGE TO NEAREST FLOOR SINK.

5

CONNECT 1" HOT WATER SUPPLY AND RETURN PIPING TO HST-2 CONNECTIONS. PROVIDE 3/4" DRAIN VALVE AT LOWEST POINTS IN SYTEM. CONNECT 2" HWS&R. SUPPLY CONNECTIONS FROM BOILERS AND HPAK-1 SHALL BE HIGH AND THE RETURN CONNECTIONS TO THE BOILERS AND HPAK-1 SHALL BE LOW. PROVIDE ISOLATION VALVES IN PIPE RISERS DOWN TO TANK.

6

INSTALL EXPANSION TANK ABOVE. SUSPEND FROM DECK ABOVE WITH THREADED ROD. SEE DETAIL D1/M-5020

7

INSTALL B-3 AND B-4 IN STACKED CONFIGURATION ON 6" CONCRETE HOUSEKEEPING PAD. PROVIDE PRESSURE RELIEF VALVES ON CONDENSATE P-TRAP. PIPE PSV AND CONDENSATE DRAIN DISCHARGE TO NEAREST FLOOR SINK. SEE PLUMBING DRAWINGS FOR NATURAL GAS PIPING.

8

1" MAKE-UP WATER SUPPLY. PROVIDE CHECK-VALVE AND REDUCING VALVE SET AT 15 PSIG. TERMINATE AT 10’-0" AFF WITH BALL VALVE FOR MAKE-UP WATER POC, SEE PLUMBING DRAWING C1/P-411B FOR CONTINUATION

9

CONNECT CHEMICAL POT FEEDER TO SUCTION AND DISCHARGE PIPING OF HWP-6A AND HWP-6B WITH 3/4" PIPE. PROVIDE ISOLATION BALL VALVES AND PIPE 1/2" DRAIN TO NEAREST FLOOR SINK.

8

2"

1"

1

7

B 4

7

1"

HWP 6B

ET 4

16

1-1/2" HWS/ R DOWN TO RADIANT HEATING VALVE MANIFOLD AND UNIT HEATER UH-11

17

3/4" HWS/ R TO UNIT HEATER UH-12

6

HST 2

HWP 7A

1

4

5

1

2" B ET 5

2

6

7/22/2011

Pl ot scal e:AS NOTED

Pl ot date:

Fi l e nam e:LCARC_M 400B. dgn

F-171-40-160

Mark

OMS

N 9:03:19 AM

A1

A2

ARC

OMS-ENLARGED MECHANICAL ROOM PLAN KEY PLAN

SCALE :1/2"=1’-0"

1

2

*** Support Value Engineering - It Pays ***

4

5

N

OMS - SOLAR HEAT ENLARGED PLANS

2" HWP 7B

U.S.ARMY

A

MECHANI CAL

HPAK 1

LAS CRUCES,NEW

RESERVE CENTER

AS 4

3

MEXI CO

2"

A1

m oraja

Ckd by:

HWP 6A

1"

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-400B.dgn

1

B 3

M .BETZ

PROVIDE EMERGENCY SHUTOFF ALARM/STROBE IN WEATHER PROOF SURFACE MOUNTED BOX. KELE #868STR. MOUNT STROBE/HORN 8’-0" ABOVE FLOOR.

AS 3

3/4"

Subm i tted by:

15

14

FAX (714) 327-1601

GFA 2

TEL (714) 327-1600

9

HUTTON CENTRE DRI VE,SUI TE 800

PROVIDE MANUAL EMERGENCY BOILER SHUTDOWN SWITCH. INTERLOCK SWITCH WITH MAIN GAS SOLENOID SHUTOFF VALVE SHOWN ON P-411B. SWITCH SHALL CLOSE GAS SUPPLY AND TURN OFF 120V POWER TO BOILERS. MOUNT SWITCH 48" ABOVE FLOOR. FOR CONTROL DIAGRAM SEE M-8050.

SANTA ANA, CALI FORNI A 92707

14

EPO

4

ROUTE VENT EXHAUST UP THROUGH ROOF. TERMINATE AT LEAST 3’-0" ABOVE NEARBY EQUIPMENT AND ROOF SEE DETAIL D5/M-5000.

Dwn by:

13

LOUI SVI LLE DI STRI CT

A

4" COMBUSTION AIR INTAKE ROUTE FROM BOILER TO EXTERIOR WALL AND TERMINATE WITH WALL CAP WITH BACKDRAFT DAMPER.

D.O’ CALLAHAN

13

12

CORPS OF ENGI NEERS

12

U.S.ARMY

15 RADIANT HEATING VALVE MANIFOLD

Desi gned by:

SUPPORTS PROVIDED BY MANUFACTURER. PROVIDE AIR VENT AND PRESSURE RELIEF VALVE AT HWR CONNECTION. COLLECTORS SHALL BE INSTALLED AT 0^ AZIMUTH AND 47^ SLOPE. MINIMUM DISTANCE BETWEEN SOLAR COLLECTOR ROWS IS 14’-0".

Project Code:

11 INSTALL FLAT PLATE SOLAR COLLECTORS ON STRUCTURAL

Revi ewed by:

1" SHWS&R PIPES DOWN THROUGH ROOF. SEE DETAIL D3/M-5000 FOR ROOF PIPE PENETRATION. Date:

10

A.REED

B

W 912QR-11-R-0071

3

Sol i ci tati on No.

SCALE :1/4"=1’-0"

R.SALLW ASSER C.KORPASH

B1

OMS-PARTIAL ROOF PLAN

LOUI SVI LLE,KENTUCKY

B

Descri pti on

1

Rev.

SC 34

111510

SC 33

SHEET REFERENCE NUMBER:

M-400B Sheet 134

of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

DRAW BAND

US Army Corps of Engineers

PIPING THROUGH ROOF ROUND COPPER WEATHER CAP, CAULK THE SEAM BETWEEN THE CAP AND THE ALUMINUM JACKET

WITH INSULATION AND ALUMINUM JACKET

LOUISVILLE DISTRICT

WEATHERPROOF CAP Appr.

SQUARE SHAPED COPPER FLASHING WITH FLANGE BASE, SET IN

ROOFING NAILS

WITH PLASTIC CEMENT

TWO LAYERS 15 LB. FELT, SET IN BEDS OF PLASTIC CEMENT

FINISH ROOF AS DETAILED

D

8" MIN.

AND EXTENDED MIN. 3" AND 6"

ON ARCHITECTURAL DRAWINGS

BEYOND EDGE OF FLASHING ON

STORM COLLAR

EACH SIDE AND MOP INTO EXISTING ROOFING

FLASHING

I N

CORRUGATED METAL ROOF ROOF

WITH RIGID INSULATION AND

AS SPECI FI ED

GUY WIRES IF REQUIRED BY HEIGHT (3 TYPICAL)

WITH 8 EVENLY SPACED SEAL ENDS OF INSULATION

ACCORDANCE W I TH

SECURE FLASHING IN PLACE

Date

NFPA

METAL FLUE

BED OF PLASTIC CEMENT

BUILT-UP ROOFING TREATED WOOD NAILER, SECURED TO METAL DECK FROM BELOW WITH LAG BOLT, TYP.

Descri pti on

4 LAG BOLTS, ONE EACH SIDE

METAL FLUE LONG RADIUS ELBOW

PIPE

HEAT RESISTANT

D5

N.T.S.

FLUE THRU ROOF DETAIL N.T.S.

ROOF 5 8" DIA PEX TUBING COMPRESSION TANK

THIMBLE THRU

@ 9" O.C. SECURED

ROOF

TO WIRE MESH WITH

CHARGE VALVE FOR TANK PRESSURIZATION AIR VENT

UNION (UP TO 2-1/2") MANUFACTURER

STRUCTURE.

PROVIDED

INCLUDE SWAY

ROOF

BRACING

CURB

CONCRETE

SERVICE VALVE

FLANGE (3" & OVER)

CHECK VALVE (OPTIONAL) SWING TYPE JOINT TYP THIS LINE SLOPE MIN OF

PRESSURE GAUGE W/GAGECOCK

TRANSITION TO

SLAB

NON-STRUCTURAL

BLADDER

WATER SUPPLY

WIRE MESH

PRV Date

FASTEN TO

WIRE TIES

Mark

EXHAUST

PIPING THRU ROOF DETAIL

Appr.

MI N. 3’ TO

12" STEEL

ROOF

D3

1" IN 5’-0"

12" DIA SERVICE VALVE

EXHAUST AT DISCHARGE

WATER MAKE-UP

GATE VALVE

IN-LINE PUMP

EXHAUST FAN

CHECK VALVE

Y-STRAINER W/

VEHICLE EXHAUST

BALANCING VALVE

C

BACKFLOW PREVENTER

TO FLOOR DRAIN

STRAINER REMOVAL SPACE

BLOW-OFF VALVE

DRUM HANGER SUPPORTS 2 SIDES

8" HOSE

FROM HEATING EQUIPMENT

REDUCER (IF REQ’D) TO PUMP

W/ CLIP

NOTE:

AIR SEPARATOR

PROVIDE 4-BUTTON CONTROLLER MOUNTED 5’ A.F.F. TO COLUMN BELOW

DRAIN VALVE

COMPACTED

2" EXPANDED POLYSTYRENE

GRADE

FOAM INSULATION BOARD

Descri pti on

NOZZLE

WITH VAPOR BARRIER

VEHICLE EXHAUST FAN DETAIL

C3

N.T.S.

VERTICAL INLINE PUMP PIPING DETAIL

C4

N.T.S.

HEATING HOT WATER PIPING DIAGRAM

C5

N.T.S.

RADIANT SLAB CROSS-SECTION DETAIL N.T.S.

AI R FLOW

C2

SECURE HOOD TO CURB WITH LAG MANUFACTURER PROVIDED ROOF CURB.

EXHAUST DUCT SIZE VARIES

MANUFACTURER’S ROOF CURB

N.T.S.

B5

ROOF MOUNTED EXHAUST FAN N.T.S.

SEE NOTE 3, BALANCING PLUG VALVE (SEE NOTE NO. 1) FASTEN FLASHING SCREWS & SEAL

1/4" MANUAL AIR VENT

REMOVABLE CAP W/SELF

THERMOMETER WITH SEPARABLE SOCKET

ALL FLASHING

WITH 1/4" N.P.T.

ALIGNING O-RING SEAL

COIL AIR VENT

20 GA.

3/4" N.P.T.

BOTH SIDES OF CONTROL AND BALANCE VALVE IF REQD AS SHOWN (TYP)

REDUCER SECURE TO STRUCTURE

SEE NOTE 6

BALANCING VALVE

SUPPLY

METAL FLASHING

2"x6" CURB

3/4" BALL VALVE HWR UNION (TYP.)

PUMP SUCTION GALVANIZED HANGER STRAP PER IMC AND SMACNA

1-1/2" x 1-1/2" x 1/4"

TO FLASHING

ANGLE IRON STAND

A

BALL VALVE (UP TO

5 GALLON MINIMUM 10 GAUGE TANK SHELL

R AI

1-1/2")

W O FL

DISCHARGE

BUSHING W/NIPPLE

1/2" GLOBE VALVE W/HOSE COUPLING

AND MATERIALS DIFFER 2 PETE’S PLUG SHOWN

3/4" DRAIN W/GATE VALVE & HOSE COUPLING

3/4" TO 1/2"

ROOF

3 WHEN TAPPING INTO TOP OF MAINS, AIR VENTS ARE REQD AS SHOWN

3/4" COIL DRAIN VALVE W/HOSE COUPLING

4 NORMALLY USE MANUAL AIR VENT; AUTOMATIC VENT ACCEPTABLE ONLY WITH BLADDER COMPRESSION TANK

3" x 3" x 1/4" STEEL PAD BOLTED

6" CONCRETE PAD

MANUAL OR AUTOMATIC AIR VENT IF TAP PROVIDED BY COIL MFG (SEE NOTE 4)

1 PROVIDE DIELECTRIC UNIONS WHERE PIPING

PRESSURE GAUGE W/GATE VALVE

3/4" TEE

SWIVEL COCK

NOTES:

Y-STRAINER w/ BLOW-OFF VALVE

AND HEADS

3/4" FROM PUMP

ROOF (TYP.)

NOTES:

TO CONCRETE PAD

1. WHERE 3-WAY MODULATING VALVES ARE REQUIRED, PROVIDE ADDITIONAL PIPING AND ADDITIONAL ACCESSORIES AS SHOWN.

5 ARRANGEMENT SHOWN FOR HOT WATER COIL WITH FULL FLOW THROUGH COIL ON FAILURE

RECTANGULAR DUCTWORK

6 WHERE SIZE PERMITS, ELIMINATION OF BALANCE VALVE AND LEAVING SERVICE VALVE W/CIRCUIT SETTER IS PERMISSIBLE

DUCT THRU ROOF DETAIL N.T.S.

A2

CHEMICAL POT FEEDER DETAIL N.T.S.

A3

HEATING COIL DETAIL N.T.S.

A4

STANDARD DUCT SUPPORT N.T.S.

A5

7/22/2011

Pl ot scal e:AS SHOW N

Pl ot date:

F-171-40-160

Project Code:

Revi ewed by:

A.REED

W 912QR-11-R-0071

Sol i ci tati on No.

CAPPED HOSE BIBB AT LOWEST POINT FOR DRAINAGE IF NOT SUPPLIED ON COIL

SHEET REFERENCE NUMBER:

M-5000

UNIT HEATER DETAIL

Sheet 135

of 222

N.T.S.

9:03:48

m oraja

AM

A1

BRACKET WITH

PLUGS (SEE NOTE 2)

HWS

ROOFING UP

STRUCTURE

PROVIDE WALL

GAUGES AND GAUGE COCK W/THERMOWELLS OR PETE’S

3/4" TO

FLASHING

DUCT THROUGH

TO WALL N O

SEE NOTE 1

GALVANIZED SHEET METAL COUNTER

SEE NOTE 5 BOLT UNIT HEATER

BALANCE VALVE

SERVICE VALVE

20 GA. CANT STRIP

C.KORPASH

OPTIONAL PRESSURE TAP

UNION

HOT WATER COIL

GALVANIZED SHEET

INSTALL CONCENTRIC REDUCERS

U.S.ARMY

WITH MASTIC

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-5000.dgn

WITH SHEET METAL

4 (TYP)

2-WAY MODULATING VALVE (SEE NOTE NO. 1)

AIR VENT (3/4" GATE VALVE WITH CAP)

RETURN

FAX (714) 327-1601

N.T.S.

UPBLAST EXHAUST FAN MOUNTING DETAIL

TEL (714) 327-1600

B4

HUTTON CENTRE DRI VE,SUI TE 800

FLOOR LEVEL EXHAUST DETAIL

DETAI LS

N.T.S.

B3

MEXI CO

ROOF MOUNTED INTAKE/RELIEF PENTHOUSE

LAS CRUCES,NEW

B2

4

GRATE IN FLAMMABLE STORAGE ROOM.

LOUI SVI LLE DI STRI CT

EXTEND DUCT TO 2" FROM METAL

RESERVE CENTER

NOTE:

CORPS OF ENGI NEERS

FINISHED FLOOR

Ckd by:

BACKDRAFT DAMPER

U.S.ARMY

ROOF OPENING FRAMING, REFER TO STRUCTURAL DRAWINGS

PROVIDE 1/2" WIRE MESH SCREEN AT INLET

Dwn by:

Desi gned by:

2"

A.REED

ROOF STRUCTURE

METAL GUARD

18"

BACKDRAFT DAMPER

I .FRANCO

Date:

DUCTWORK

LOUI SVI LLE,KENTUCKY

CANT STRIP

072811

B

AI R FLOW

CURB FLASHING

Rev.

ROOF CURB.

Fi l e nam e:LCARC_M 5000. dgn

MANUFACTURER PROVIDED

M .BETZ

40" MIN

FRAMING

Subm i tted by:

SECURE TO WALL

Mark

2X NAILING STRIP

ROOF STRUCTURE

SANTA ANA, CALI FORNI A 92707

BOLTS

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

SEISMIC BRACE PER SMACNA AND

24 GA. FLASHING-SECURE ANGLE IRON REINFORCING FRAME WHERE REQUIRED

W/ SHEETMETAL SCREWS

UFC 3-301-01 (TYP.)

OR RIVETS TO WALL & SEAL ALL ROUND (TYP.)

STANDARD DUCT MADE WATER TIGHT. STIFFENERS

SCREEN

US Army Corps of Engineers

5’-0" MAX SHEET METAL (20 GA.)

NOTE

LOUISVILLE DISTRICT

"A" = PIPE AND INSULATION

24 GA. MIN. COUNTER-

DIAMETER PLUS ONE INCH MINIMUM

FLASHING

RESILIENT CAULKING

MAY BE INSIDE.

"A"

HANGER ROD

"A"

Appr.

METAL SCREEN

ANGLE RIVETED OR SPOT WELDED AS REQUIRED.

5 13

Date

SIZED FOR LOAD BOLTS

BOILER EXTERIOR PANEL 2 MAX 1 MIN

MI N

INSULATION (RIGID INSULATION 18" LONG CENTERED ON

.

DUCT SIZE + 25%

1 ADJUSTABLE WROUGHT CLEVIS

SUPPORT) WELD

1/2" SCREEN

R

N. 12" MI

D N. 18" MI

PIPE

W R = W/2

ANGLE IRON

18 GAGE GALV SADDLE 12" LONG

18 GAGE GALVANIZED SEE NOTE 3

SEE NOTE 4 (TYP.)

SADDLE 12" LONG

NOTE:

SEE NOTE 5 (TYP.) MATCH OD OF INSULATION FOR INSULATED LINE, MATCH OD OF PIPE FOR UNINSULATED LINES. REFER TO SMACNA SEISMIC RESTRAINT MANUAL AND UFC 3-301-01

PENETRATING DUCT

U.S.G. THERMA FIBER OR EQUAL DENSITY PACKING (TYP.)

FIRE STOP SYSTEM (TYP.)

NOTES:

CONCRETE CURB

EXPANSION ANCHOR

1. ANCHOR BOLT SIZE AND QUANTITY PER SMACNA REQUIREMENTS.

EXTERIOR

Descri pti on

2. PIPE INSULATION IS NOT SHOWN FOR CLARITY.

NOTES:

3. PROVIDE DOUBLE WASHER AND NUT ASSEMBLY.

INTERIOR

1. SEE ARCHITECTURAL DRAWINGS FOR ROOF PENETRATION DETAILS.

4. OPTIONAL HORIZONTAL SEISMIC RESTRAINT. NOTES 1.

D1

SEE NOTE 3

GOOSENECK DETAIL

D2

N.T.S.

DUCT THRU WALL DETAIL

D3

N.T.S.

PIPE HANGER DETAIL - SINGLE PIPE

D4

N.T.S.

5. STRUCTURAL MEMBER, REFER TO STRUCTURAL PLANS.

SUBMIT FOR STRUCTURAL REVIEW

BOILER ANCHOR DETAIL TO CONCRETE CURB N.T.S.

D5

N.T.S.

SECURE TO STRUCTURE ABOVE

METAL SLEEVE

SECURE TO STRUCTURE ABOVE PER SMACNA SEISMIC GUIDELINES

MAX. 6’-0" LENGTH FLEXIBLE DUCT

PIPE HANGER DETAIL - TRAPEZE TYPE

SECURE TO STRUCTURE ABOVE

PIPE

1-1/2" MIN. 1-1/2" MIN.

4’-0" MAX.

Mark

WIRE TO BE SECURED TO STRUCTURE ABOVE

SUPPLY AIR VOLUME DAMPER

WALL CONSTRUCTION VARIES

Appr.

SILICONE SEALANT 1-1/2" MIN.

SPIRAL DUCT

Date

FLEX DUCT 6’ MAX.

4" WIDE SHEET METAL FLEXIBLE DUCT SUPPORT STRAP DUCT MINERAL FIBER PACKING

C SAFETY HANGER 12 GA. WIRE OR

SAG 1/2" PER FOOT OF SUPPORT SPACING

18 GA. 1" METAL STRAP #10 SCREWS

FLEXIBLE DUCT CLAMPING DEVICE (TYP.)

CEILING NOTES:

CEILING DIFFUSER OR GRILLE

1.INSTALL DUCTWORK PER SMACNA NOTE:

1.LOCATE VOLUME DAMPER AS FAR AWAY FROM DIFFUSER OR GRILLE AS POSSIBLE

Descri pti on

NOTES:

2.SUPPORT PIPES & DUCTS ON EITHER SIDE OF WALL.

LAY-IN DIFFUSER/GRILLE CONNECTION DETAIL

C3

N.T.S.

DUCT/PIPE PENETRATION THRU NON RATED WALL

C4

N.T.S.

FLEXIBLE DUCTWORK HANGER DETAIL N.T.S.

ANY UL CLASSIFIED CONCRETE BLOCKS*. MAX DIAMETER. OF OPENING IS 18 IN.

3.

THROUGH PENETRATE - NOM 4 IN. (102 MM) DIAM.. (OR SMALLER) TYPE L (OR HEAVIER) COPPER PIPE, NOM 12 IN. (305 MM) DIAM.. (OR SMALLER) SERVICE WEIGHT

SLEEVE

(OR HEAVIER) CAST IRON SOIL PIPE, NOM 12 IN. (305 MM) DIAM.. (OR SMALLER) CLASS 50 (OR HEAVIER) DUCTILE IRON PRESSURE PIPE OR NOM 12 IN. (305 MM)

(SEE NOTES #2 & #3)

DIAM.. (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE CENTERED IN THE OPENING AND RIGIDLY SUPPORTED ON BOTH SIDES OF THE FLOOR OR WALL

SLEEVE

ASSEMBLY.

(SEE NOTES #2 & #3) 4.

6" MAX. ON ALL SIDES

PIPE COVERING* - NOM 1/2 TO 2 IN. (13 TO 15 MM) THICK HOLLOW CYLINDRICAL HEAVY DENSITY (MIN... 3.5 PCF OR 56kg/m‡) GLASS FIBER UNITS JACKETED ON

7/22/2011

Pl ot scal e:AS SHOW N

Pl ot date:

F-171-40-160

Project Code:

SECURED WITH METAL FASTENERS OR FACTORY -APPLIED SELF - SEALING LAP TAPE. TRANSVERSE JOINTS SECURED WITH METAL FASTENERS OR WITH BUTT STRIP TAPE SUPPLIED WITH THE PRODUCT. WALL CONSTUCTION

6" MAX. ON ALL SIDES

NOTES A.

A

1. OPENING IN WALL SHALL BE A MINIMUM 1/8" PER FOOT LARGER THAN OVERALL SIZE OF DAMPER AND SLEEVE ASSEMBLY FOR GALVANIZED STEEL DAMPERS AND A MINIMUM 3/16" PER FOOT FOR STAINLESS STEEL DAMPERS. MAXIMUM OPENING NOT TO EXCEED 1/8" PER FOOT PLUS ONE INCH FOR GALVANIZED STEEL DAMPERS. OPENING SHALL NOT BE LESS THAN 1/4" LARGER FOR ANY SIZE DAMPER AND SLEEVE ASSEMBLY.

TO BE RECESSED FROM TOP SURFACE OF FLOOR OR SLEEVE OR FROM BOTH SURFACES OF WALL AS REQUIRED TO ACCOMMODATE THE REQUIRED THICKNESS OF

3. IF ANY OTHER DUCT-SLEEVE CONNECTIONS ARE USED, SLEEVE SHALL BE MINIMUM OF 16 GAGE FOR DAMPERS UP TO

CAULK FILL MATERIAL (ITEM B).

36"Wx24"H AND 14 GAGE IF DAMPER WIDTH EXCEEDS 36" OR HEIGHT EXCEEDS 24".

B.

4. MOUNTING ANGLES SHALL BE A MINIMUM OF

THE ANNULAR SPACE (BETWEEN THE PIPE COVERING MATERIAL AND THE EDGE OF THE CIRCULAR THROUGH OPENING), AS SHOWN IN THE FOLLOWING TABLE:

2. SLEEVE GAGE SHALL BE AT LEAST EQUAL TO THE GAGE OF BOTTOM (SEE ILLUSTRATION). MOUNTING THE DUCT AS DEFINED BY THE APPROPRIATE SMACNA DUCT ANGLES SHALL OVERLAP WALL A MINIMUM OF ONE INCH. CONSTRUCTION STANDARD AND DESCRIBED IN NFPA 90A WHEN ONE OR MORE OF THE FOLLOWING DUCT-SLEEVE

FIRE DAMPER

MIN FLOOR OR WALL

MAX PIPE

NOM PIPE COVERING

ANNULAR SPACE

F RATING

T RATING

W RATING

THKNS IN. (mm)

DIAM IN. (mm)

THKNS IN. (mm)

IN. (mm)

HR

HR

CLASS

2-1/2 (64)

4 (102)

1 OR 1-1/2 (25 OR 38)

1/2 TO 2-3/8 (13 OR 60)

2

1

1

4-1/2 (114)

4 (102)

2 (51)

1/4 TO 3-5/8 (6 OR 92)

2

1-1/2

1

2-1/2 (64)

12 (305)

1 (25)

1/2 TO 1-1/2 (13 OR 38)

2

1/2

1

4-1/2 (114)

12 (305)

1 (25)

1/2 TO 2-3/8 (13 OR 60)

3

1

1

2-1/2 (64)

12 (305)

1/2 (13)

1/2 TO 2-3/8 (13 OR 60)

2

0

1

A2

N.T.S.

1

2

A MAXIMUM SPACING OF 6" FOR STAINLESS STEEL AND 12" FOR GALVANIZED WITH A MINIMUM OF TWO CONNECTIONS IN

EXCEED 1/8" PER FOOT PLUS ONE INCH FOR GALVANIZED STEEL DAMPERS. OPENING SHALL NOT

EACH SIDE, TOP, AND BOTTOM (SEE ILLUSTRATION). MOUNTING ANGLES SHALL OVERLAP WALL A MINIMUM OF ONE INCH.

5. 2. SLEEVE GAGE SHALL BE AT LEAST EQUAL TO THE GAGE OF THE DUCT AS DEFINED BY THE APPROPRIATE SMACNA DUCT CONSTRUCTION STANDARD AND DESCRIBED IN NFPA 90A WHEN ONE OR MORE OF THE FOLLOWING DUCT-SLEEVE CON- NECTIONS ARE USED

FIRESTOP SYSTEM ARE DEPENDENT UPON THE THICKNESS OF THE FLOOR OR WALL, THE SIZE OF PIPE, THE THICKNESS OF PIPE COVERING MATERIAL AND THE SIZE OF

CONNECTIONS ARE USED (PLAIN ’S’ SLIP, HEMMED ’S’ SLIP, STANDARD ’S’ SLIP, REINFORCED STANDING ’S’ SLIP, INSIDE SLIP JOINT, AND DOUBLE ’S’ SLIP.)

9:04:16 AM

FILL, VOID OR CAVITY MATERIAL* - CAULK SEALANT - APPLIED TO FILL THE ANNULAR SPACE FLUSH WITH THE TOP SURFACE OF THE FLOOR OR SLEEVE OR

NOM PIPE COVERING THICKNESS IS 1-1/2IN. (38 MM) OR LESS, MIN.. THICKNESS OF CAULK FILL MATERIAL IS 1 IN. (25 MM). THE HOURLY F AND T RATINGS OF THE

1 1/2" X 1 1/2" X 14 GAGE AND BOLTED, WITH 1/4" - 20 BOLT, WELDED, OR SCREWED WITH NO. 10 SCREWS TO SLEEVE AT A MAXIMUM

AND A MINIMUM 3/16" PER FOOT FOR STAINLESS STEEL DAMPERS. MAXIMUM OPENING NOT TO

BE LESS THAN 1/4" LARGER FOR ANY SIZE DAMPER AND SLEEVE ASSEMBLY.

FLUSH WITH BOTH SURFACES OF WALL. WHEN NOM PIPE COVERING THICKNESS IS 2 IN. (51MM), MIN.. THICKNESS OF CAULK FILL MATERIAL IS 2 IN. (51 MM). WHEN

SPACING OF 6" FOR STAINLESS STEEL AND 12" FOR GALVANIZED WITH A MINIMUM OF TWO CONNECTIONS IN EACH SIDE, TOP, AND

A1

PACKING MATERIAL - MIN.. 1 IN. (25 MM) THICKNESS OF FIRMLY PACKED MINERAL WOOL BATT INSULATION USED AS A PERMANENT FORM. PACKING MATERIAL

(PLAIN ’S’ SLIP, HEMMED ’S’ SLIP, STANDARD ’S’ SLIP, REINFORCED STANDING ’S’ SLIP, INSIDE SLIP JOINT, AND DOUBLE ’S’ SLIP.)

3. IF ANY OTHER DUCT-SLEEVE CONNECTIONS ARE USED, SLEEVE SHALL BE MINIMUM OF 16 GAGE FOR DAMPERS

FASTENED WITH NO. 10 BOLTS OR SCREWS, 3/16" RIVET OR 1/2" TACK WELD STAGGERED INTERMITTENTLY, AND SPACED 12" MAXIMUM C-C FOR GALVANIZED AND 6" MAXIMUM C-C FOR STAINLESS STEEL.

6. FURNISH WITH DUCT SMOKE DETECTOR 7. FOR APPLICATIONS REQUIRING MULTIPLE ACTUATORS, COORDINATE POWER REQUIREMENTS WITH ELECTRICAL. SHEET REFERENCE NUMBER:

UP TO 36" WX 24" H AND 14 GAGE IF DAMPER WIDTH EXCEEDS 36" OR HEIGHT EXCEEDS 24".

FIRE RATED PIPE PENETRATION

A3

N.T.S.

*** Support Value Engineering - It Pays ***

WHEN MULTIPLE DAMPER ASSEMBLIES ARE JOINED OR WHEN FASTENING DAMPER TO SLEEVE, DAMPERS SHALL BE

4

DETAI LS

FIRESTOP SYSTEM - THE DETAILS OF THE FIRESTOP SYSTEM SHALL BE AS FOLLOWS:

4. MOUNTING ANGLES SHALL BE A MINIMUM OF 1 1/2" X 1 1/2" X 14 GAGE AND BOLTED, WITH 1/4" - 20 BOLT, WELDED, OR SCREWED WITH NO. 10 SCREWS TO SLEEVE AT

MEXI CO

1. OPENING IN WALL SHALL BE A MINIMUM 1/8" PER FOOT LARGER THAN OVERALL SIZE OF DAMPER AND SLEEVE ASSEMBLY FOR GALVANIZED STEEL DAMPERS

LAS CRUCES,NEW

WALL CONSTUCTION

U.S.ARMY

NOTES

INDEX OF 50 OR LESS MAY BE USED.

RESERVE CENTER

SEE PIPE AND EQUIPMENT COVERING - MATERIALS* (BRGU) CATEGORY IN BUILDING MATERIALS DIRECTORY FOR NAMES OF MANUFACTURERS. ANY PIPE COVERING MATERIAL MEETING THE ABOVE SPECIFICATIONS AND BEARING THE UL CLASSIFICATION MARKING WITH A FLAME SPREAD INDEX OF 25 OR LESS AND A SMOKE DEVELOPED

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-5010.dgn

THE OUTSIDE WITH AN ALL SERVICE JACKET. LONGITUDINAL JOINTS SEALED WITH METAL FASTENERS OR FACTORY-APPLIED SELF-SEALING LAP TAPE. TRANSVERSE JOINTS

m oraja

U.S.ARMY

STYLE "B"

DUCT SMOKE DETECTOR

OR WALL SURFACES. T RATING IS 0 HR WHEN SLEEVE IS USED.

FAX (714) 327-1601

DIAM.. (OR SMALLER) SLEEVE FABRICATED FROM NOM 0.019 IN. (0.48 MM) THICK GALV STEEL CAST OR GROUTED INTO FLOOR OR WALL ASSEMBLY FLUSH WITH FLOOR

RE-USEABLE FUSIBLE LINK

TEL (714) 327-1600

ASSEMBLY. SLEEVE MAY EXTEND A MAX OF 2 IN. (51 MM) ABOVE TOP OF FLOOR OR BEYOND EITHER SURFACE OF WALL. AS AN ALTERNATE, NOM 10 IN. (254 MM)

HUTTON CENTRE DRI VE,SUI TE 800

STEEL SLEEVE - (OPTIONAL, NOT SHOWN) - NOM 10 IN. (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL SLEEVE CAST OR GROUTED INTO FLOOR OR WALL

4

2.

LOUI SVI LLE DI STRI CT

(TYPICAL)

CORPS OF ENGI NEERS

DUCT CONNECTION

1A. SEE CONCRETE BLOCK (CAZT) CATEGORY IN THE FIRE RESISTANCE DIRECTORY FOR NAMES OF MANUFACTURERS. DUCT CONNECTION (TYPICAL)

M .BETZ

FLOOR WALL ASSEMBLY - MIN.. 2-1/2 IN. THICK REINFORCED LIGHTWEIGHT OR NORMAL WEIGHT (100-150 PCF OR CONCRETE. WALL MAY ALSO BE CONSTRUCTED OF

Revi ewed by:

Desi gned by:

SEE NOTE #4

A.REED

SEE NOTE #4

A.REED

1/4"MIN. CLEARANCE

SECTION A-A

1.

W 912QR-11-R-0071

Sol i ci tati on No.

1" MIN. OVERLAP (4 SIDES)

4A

C.KORPASH

A

072811

Date:

1/4"MIN. CLEARANCE

Ckd by:

1

1" MIN. OVERLAP (4 SIDES)

Dwn by:

4A

B

I .FRANCO

3

LOUI SVI LLE,KENTUCKY

3

Rev.

4B

Subm i tted by:

2

SANTA ANA, CALI FORNI A 92707

2

A

Fi l e nam e:LCARC_M 5010. dgn

Mark

C2

GUIDELINES. REFER TO "SMACNA DUCT CONSTRUCTION STANDARDS,"LATEST EDITION.

1.REFER TO SPECIFICATIONS FOR ESCUTCHEON PLATE REQUIREMENTS.

COMBINATION FIRE/SMOKE DAMPER

M-5010 Sheet 136

of 222

N.T.S.

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

LIFTING RING

EXPANSION TANK SUPPORT RODS

PRESSURE GAGE

TYP CHARGING VALVE

US Army Corps of Engineers

1/8

WITH DOUBLE NUTS AT TOP

3/4" FROM SUCTION SIDE OF PUMP

CHARGING VALVE

AND BOTTOM (TYP 4)

LOUISVILLE DISTRICT

BLADDER TYPE EXPANSION TANK,

Appr.

SEE SCHEDULE FOR SIZE

Date

MANUAL AIR VENT

"A" DIA

BLADDER TYPE EXPANSION TANK, SEE SCHEDULES FOR SIZES

CLIP ANGLE WELD TO SUPPORT ANGLE

D

NUTS AND WASHERS PROVIDE OPENING IN THE MOUNTING SEISMIC BRACE (TYP 1 FOR EACH

ANGLE "B"X"C"X"D"

1" HOSE GATE VALVE

RING TO ALLOW ACCESS FOR THE DRAIN VALVE

CORNER). INSTALL PRESSURE GAUGE

FROM AIR SEPARATOR

GAL 0-50

1/2"

0-100

D1

A

5/8"

B C 2"

2"

3"

3"

EXPANSION ANCHOR FOR SEISMIC

D

TYP

SUPPORT (TYP)

1/8

1/4"

SUSPENDED EXPANSION TANK DETAIL

TO FLOOR DRAIN

N.T.S.

6" CONCRETE PAD

PLATFORM FOR SUSPENDING EQUIPMENT FROM ABOVE

D3

3/4" DRAIN LINE, ROUTE

MOUNTING RAIL

PROVIDE 5mm STEEL CHECKER PLATE. MOUNT EQUIPMENT TO STEEL PLATE WITH NEOPRENE PAD.

1/4"

3/4" GATE VALVE

Descri pti on

TO SYSTEM PUMP

SIDE RAILS. SLOPE

D5

N.T.S.

EXPANSION TANK DETAIL N.T.S.

INTAKE VENTILATOR

Mark

ROOF STRUCTURE

FAN

COORDINATE WITH

DUCT SUPPORT CROSS MEMBER

INSULATION (UNIT)

DUCT FLANGE

CURB MOUNTING ANGLE 2’x2"x1/4"

C UNIT BASE

SPRING VIBRATION ISOLATION, TYP. REFER TO SPECS

PLAN

SEALING GASKET FURNISHED WITH CURB AROUND ENTIRE PERIMETER.

TYPICAL STRUCTURAL STEEL

GALVANIZED SHEET

MEMBER FOR EQUIPMENT

STRUCTURAL

5/8" ALL THREADED ROD,

ROOF STRUCTURE

FLASHING. FACTORY SEISMIC ROOF C L

NAILING STRIP DUCTWORK

ENTIRE PERIMETER OF

SPRING

UNIT.

VIBRATION

REFER TO STRUCTURAL

ISOLATION,

DRAWINGS FOR

TYP.

SPREADER MEMBER

REFER

LOCATION AND UPPER

4" RIGID ACOUSTICAL INSULATION WITHIN ENTIRE CURB FRAME ROOFING

M SHOTO AF R T T N EN E V M I P R D UI Q E

ATTACHMENT DETAILS

TO

1/8" SLACK AIRCRAFT CABLE, TYP. H A F

C L

M

Descri pti on

CURB EXTENDED AROUND

(TYP)

B-LINE STRUT CHANNEL, B-12, TYP.

OSA

0.5 CLEARANCE

TYP.

SPREADER LOCATION.

METAL COUNTER

FLEX. DUCT CONNECTOR

STEEL TRUSS,

MEMBERS FOR

Date

-

Appr.

EC

SIDE PANEL (UNIT)

C

S

C L

SPECS

THREADED ROD, TYP.

PARALLEL

OF 4 SIZED FOR LOAD

BLADE/

REFER TO STRUCTURAL AND

1/8" SLACK AIRCRAFT

ARCHITECTURAL DRAWING

CABLE, TYP.

ALL-DIRECTIONAL SEISMIC

LOW LEAK

SNUBBERS (TYP)

MOTORIZED DAMPER

NUMBER OF ISOLATION UNITS AS REQUIRED

FOR EQUIPMENT SUPPORT

AIR

FLEX.

FLOW

CONN

FILTER

MONITORING

(TYP)

RACK

DUCT

AIR UNIT

STATION FOR HEATING

TYPE "B" WELDED STEEL BASE SIMILAR TO MASON KSL/Z-1225

FRAMING MEMBERS

B-LINE STRUT CHANNEL B12, TYP. A3

COIL DETAILS SEE M-5000

PLAN

ELEVATION FLEX CONNECTION, TYP.

ROOF TOP UNIT CURB DETAIL

C2

N.T.S.

IN-LINE FAN SUSPENSION DETAIL

C3

N.T.S.

VIBRATION ISOLATION BASES

C4

N.T.S.

HEAT AND VENT UNIT SUSPENSION DETAIL N.T.S.

GRADE

FOR BACKFILL 40"

SEE

TROUGH

C1 M-5020

M-5000

U.S.ARMY

FACTORY SEISMIC CURB

A1

GREASE

SPECIFICATION SECTION 31 00 00 EARTHWORK

7/22/2011

Pl ot scal e:AS SHOW N

Pl ot date:

F-171-40-160

Project Code:

6,800 GAL., POTABLE HOT WATER UNDERGROUND

EXHAUST DUCT ENCLOSURE SHAFT

STORAGE TANK

* MAINTAIN A MIN. CLEARANCE OF 2FT. *

AND MASONRY ANCHOR

SIDES OF EXCAVATION

(TYP.)

CEILING

PEA GRAVEL 8’X 22’X 18" THK. REINFORCED CONCRETE PAD 6 AT 1 FT. EACH WAY

UL LISTED VAPOR PROOF FLOURESCENT LIGHT

MI N.

STRUCTURAL CHANNEL REINFORCEMENT

MI N.

THREADED ROD COUPLING WITH

A

12"

EXHAUST DUCT

18"

16 GA. WELDED GREASE

DETAI LS

(ABOVE CEILING ONLY)

BETWEEN TANK AND MEXI CO

TANK HOLD DOWN STRAP

LAS CRUCES,NEW

GENERAL CONTRACTOR

RESERVE CENTER

1-HOUR FIRE RATED CHASE BY

U.S.ARMY

WITH MIN. 3" AIR SPACE AROUND EXHAUST DUCT

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-5020.dgn

REFER TO

DUCT THRU ROOF

FAX (714) 327-1601

TO HX-1

TEL (714) 327-1600

1-1/2" HWR

FROM HX-1

HUTTON CENTRE DRI VE,SUI TE 800

1-1/2" HWS

BIRD SCREEN

CLEANOUTS PER IMC

SANTA ANA, CALI FORNI A 92707

2" DHWS

4

2" DHWR

MI N

2" TANK VENT

3"

M-5020

LOUI SVI LLE DI STRI CT

CORPS OF ENGI NEERS

C3

SNUBBER. FOR DETAIL SEE

MIN

M .BETZ

VIBRATION ISOLATION STEEL BASE FRAME WITH SEISMIC

GAGE HATCH

DIRECT EVAPORATIVE COOLER

Subm i tted by:

ELECTRIC HEAT

Revi ewed by:

EXTENSION (TYP.)

Desi gned by:

MAKE-UP AIR UNIT

A.REED

FIBERGLASS MANWAY

SLAB

A.REED

PROTECTIVE CONCRETE

C.KORPASH

8’ X 23’ X 6" THK.

Ckd by:

TO ACCESS LADDER

Dwn by:

Date:

24" ACCESS MANHOLE

072811

B

I .FRANCO

Sol i ci tati on No.

Rev.

M-5010

W 912QR-11-R-0071

D2

LOUI SVI LLE,KENTUCKY

DUCT THRU WALL

Fi l e nam e:LCARC_M 5020. dgn

Mark

C1

U.L. CLASSIFIED GREASE FILTERS NOTES:

FOR HOOD DETAILS

1.CONTROL PANEL FOR LIGHTS AND FANS SHALL BE REMOTE MOUNTED.

SEE KITCHEN DRAWINGS SHEET REFERENCE NUMBER:

9:04:46 AM

m oraja

A1

KITCHEN HOOD AND SUPPLY/EXHAUST DUCT

A4

N.T.S.

1

2

*** Support Value Engineering - It Pays ***

M-5020

SECTION THRU 6800 GAL. TANK

Sheet 137

of 222

N.T.S.

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

EVAPORATIVE COOLER UNITS SCHEDULE (INDIRECT/DIRECT)

STATIC

MIN

SERVES

MODEL NO

CFM

OSA CFM

EC 1-1

ARC BUILDING

EC 1-2

ARC BUILDING

EC 1-3

ARC BUILDING

EC 1-4

ARC BUILDING

EC 1-5

ARC BUILDING

EC 1-6

ARC BUILDING

EC 1-7

ARC BUILDING

EC 2-1

OMS BUILDING

ENERGY LABS

ASSEMBLY

PRESS

MOTOR

IN WG

HP

OA DB ^F

TOTAL EXT

1500

7500

3.6

0.5

RA

7.5

WB ^F

99

DB ^F

64

WINTER HEAT RECOVERY

IDEC WB ^F

78

DB ^F

65

WB ^F

74.6

OA

HX

DB ^F

WBDE % 70

WB ^F

18

DB ^F

LAT

72

45

DB

50

WB

74.6

ESP

CFM

DB

56.5

ELECTRICAL

LOUISVILLE DISTRICT

EAT EFF %

HOT WATER COIL WITH 30% PROPYLENE GLYCOL

FAN RPM

WB

58.0

APPROX

MAX IN WG

MIN

56.5

RA

EXHAUST FAN

(DEC)

OPERATING HP

PREFILTER/ FILTER

HEATING

EAT

CFM

LAT

EWT

LWT

^F

^F

^F

GPM

ROWS

FPI

DROP

TOTAL EXT 7500

56.5

1.2

MAX

PRESS

APD

REMARKS

WEIGHT MCA

FLA

VOLTS

PHASE

HZ

27.6

24.1

460

3

60

LB Appr.

MANUFACTURER

LOCATION

NO

INDIRECT EVAPORATIVE COOLER (IDEC)

(IN WG)

(FT)

0.3

1740

MERV 8/

3

3600

58

77

180

160

8.1

1

13

2.0

.2

2 3 4 5 6 7 8 9 10

9000

12 13 14 15

MERV 13 7000 ENERGY LABS

OFFICES

700

3.92

(5000 DX MODE)

7.5

0.5

99

64

78

65

74.2

56.4

70

18

72

1

50

45

1

1

1

7000

1.1

0.3

1740

MERV 8/

3

MERV 13 MERV 8/

ENERGY LABS

CLASSROOM

1400

7270

0.5

3.6

7.5

99

64

78

65

74.5

56.5

18

70

72

50

45

74.5

56.5

58.0

7270

56.5

1.1

0.3

1740

3

MERV 13

3000

63

82

180

160

7.0

1

13

2.0

1 61.3

.2

1 58.2

460

3

60

10000

59

80

180

160

8.9

1

13

2.0

.2

13

2.0

.2

23.2

13

2.0

.2

23.2

13

2.0

.2

22.3

27.6

24.1

460

3

60

PHYSICAL READINESS

650

ENERGY LABS

TOILETS

1800

ENERGY LABS

KITCHEN

ENERGY LABS

WEAPONS

ENERGY LABS

OFFICES

3350

3250

64

99

65

78

64

99

3

78

64

99

3

0.5

3.6

99

5

0.5

3.6

2600

825

5

0.5

3.6

2250

1000

0.5

3.6

65

78

64

72.7

71.4

65

78

55.8

55.4

72.3

65

18

70

55.7

73.5

18

70

18

70

56.2

18

70

72

45

50

72

45

50

72

45

50

72

45

50

72

45

50

72.7

55.8

71.4

57.4

55.4

72.3

56.8

0.9

3250

55.4

1.0

1740

0.3

0.3

1740

MERV 8/

2

MERV 13 MERV 8/

2

57.0

2250

55.7

0.8

0.3

1740

1-1/2

MERV 13 MERV 8/

56.2

57.7

2600

56.2

0.8

0.3

1740

1-1/2

MERV 13 MERV 8/

250

2200

3.6

3

0.5

99

64

78

65

72.6

56

70

18

72.6

56

57.2

2200

56

0.8

1740

0.3

1800

3250

MERV 13 MERV 8/

55.7

73.5

3350

55.8

3

MERV 13

2250

1900

1700

60

82

180

160

4.8

1

21.3

12 13 14 15

460

3

60

58

58

63

77

73

74

76

180

160

180

160

180

160

180

160

8.6

4.1

3.6

2.0

1

1

13

1

13

1

2.0

2.0

21.3

460

3

60

8000

12 13 14 15 16 18 19

21

21

2 3 4 5 6 7 8 9 10 21.1

460

3

60

5800

12 13 14 15 16 18 19

21

2 3 4 5 6 7 8 9 10

.2

22.3

.2

22.3

21.1

21.1

460

3

460

60

3

60

7250

12 13 14 15 16 18 19

21

2 3 4 5 6 7 8 9 10

7250

12 13 14

16 PROVIDE FACTORY MOUNTED SUMP PUMP INTEGRAL WITH UNIT FOR DEC SECTION. SIZED PER MANUFACTURER.

21 PROVIDE AIRFLOW VOLUME AND TRANSMITTER ON INLET TO SUPPLY FAN.

4 PROVIDE 2"(MERV 8 PRE-FILTERS) AND 4"(MERV 13 EFFICIENCY FINAL FILTER) 5 PROVIDE WITH STRUCTURAL STEEL BASE FRAME

9 PROVIDE 30% GLYCOL AT HEATING HOT WATER COIL 14 PROVIDE INTERNAL PIPE CHASE FOR ALL PIPING TO COILS, IDEC,AND DEC

19 PROVIDE INTERNAL 2" SPRING ISOLATORS FOR SUPPLY FAN

3 DOUBLE WALL CONSTRUCTION, OUTDOOR UNIT WITH PERFORATED LINER AT THE FAN SECTION

21

2 3 4 5 6 7 8 9 10 55

7 SINGLE POINT POWER CONNECTION WITH 480V/120V 11 PROVIDE WITH STAINLESS STEEL DRAIN PAN TRANSFORMER FOR CONV. OUTLETS, LIGHTS, HEAT 12 TEFC PREMIUM EFFICIENCY MOTORS TRACE, UPSTREAM OF DISCONNECT 8 PROVIDE WITH ROOF CURB 13 PROVIDE OUTSIDE AIR HOOD WITH 2" MERV 8 PRE- FILTER AND LOW LEAKAGE DAMPER

2 FURNISH WITH VFD AND INVERTER DUTY MOTOR ON SUPPLY & EXHAUST FAN

10 PROVIDE 120V HEATTRACE SYSTEM FOR ICW MAKE-UP WATER

18 19

12 13 14 15 16 18 19

20 PROVIDE SIDE DISCHARGE SUPPLY AIR OPENING WITH PLUG FAN

6 DUCT SMOKE DETECTOR IN SUPPLY DUCT

21

2 3 4 5 6 7 8 9 10

8000

15 PROVIDE FACTORY MOUNTED SUMP PUMP INTEGRAL WITH UNIT FOR IDEC, SIZED PER MANUFACTURER.

1 FOR CONDENSING UNIT (CU-1) INFORMATION SEE SCHEDULE BELOW

18 19

2 3 4 5 6 7 8 9 10

8000

D ENERGY LABS

18 19 20 21

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

3500

Date

MARK

SUPPLY FAN

US Army Corps of Engineers

Descri pti on

OUTDOOR AIR

DIRECT EVAPORATIVE COOLER

16 17 18 19 21

17 PROVIDE WITH CLEARWATER SYSTEMS DOLPHIN NON-CHEMICAL WATER TREATMENT PACKAGE OR EQUAL WITH MICROTRAC CONTROLLER. 18 PROVIDE MINIMUM OUTDOOR AIR AIRFLOW MONITORING STATIONS

HEAT AND VENTILATING UNIT SCHEDULE

LOCATION

MIN

SERVES

NO

ESP

CFM

CFM

HOT WATER COIL WITH 30% PROPYLENE GLYCOL FILTER

MOTOR

RPM

IN WG

EAT

HP

LAT

EWT

LWT

^F

^F

^F

ELECTRICAL

BASIS OF DESIGN APPROX

PRESS GPM

ROWS

FPI

DROP (FT)

APD

VOLTS

PHASE

HZ

IN WG

WEIGHT

MANUFACTURER

REMARKS Mark

MARK

SUPPLY FAN

MODEL NO

LB Appr.

OUTDOOR AIR

INDOOR UNIT SINGLE POINT POWER WITH VFD AND FACTORY MOUNTED CONTROL CENTER TO INCLUDE CONTROL CIRCUIT FUSING, CONTROL TRANSFORMER &

ARC

UNIT STORAGE

2000

2000

0.4

1050

3/4

2" MERV 13

18

68

180

160

12.0

2

13

7

0.12

120

1

60

250

ENERGY LABS

HVU 2-1

OMS ROOF

OMS WORK BAYS

4040

6060/4040

0.5

1800

5.0

2" MERV 13

18

60

180

160

19.4

2

13

3.5

0.25

460

3

60

2700

ENERGY LABS

INTEGRAL DISCONNECT SWITCH. Date

HVU 1-1

OUTDOOR UNIT NEMA 3R RATED VFD. SINGLE POINT POWER AND FACTORY MOUNTED CONTROL CENTER TO INCLUDE CONTROL CIRCUIT FUSING, CONTROL TRANSFORMER & INTEGRAL DISCONNECT SWITCH,OSA AIRFLOW MONITORING STATION, INTERNAL SPRING ISOLATORS.

C

SUPPLY DIFFUSER, REGISTER, AND GRILLE SCHEDULE CFM (BASED ON NC 30)

VEHICLE EXHAUST SCHEDULE (OMS BUILDING)

MARK

TYPE

FACE SIZE

NECK SIZE

NO

(FACE)

(INxIN OR DIA.)

(INxIN OR DIA.)

1 &2-WAY THROW

AREA SERVED

NO

MANUFACTURER

MODEL

HOSE

HOSE

REEL/

DIA.

LENGTH

FAN

IN.

FT.

TSP

CFM

IN.W.G.

REEL

FAN

DRIVE

MOTOR

HP

HP

REEL

FAN

V/PH/HZ

V/PH/HZ

THROW

PERFORATED SQUARE CEILING

24x24

6

-

0-125

TITUS PAS

PERFORATED SQUARE CEILING

24x24

8

-

126-200

TITUS PAS

PERFORATED SQUARE CEILING

24x24

10

-

201-300

TITUS PAS

PERFORATED SQUARE CEILING

24x24

14

-

401-500

TITUS PAS

SUPPLY GRILLE

8x8

6x6

0-100

-

TITUS 300RL

SUPPLY GRILLE

20x14

18x12

400-700

-

TITUS 300RL

SUPPLY GRILLE

32x22

30x20

850

-

TITUS 300RL

SUPPLY GRILLE

10x10

10x10

150-450

-

TITUS 300RL

LINEAR DIFFUSER

-

-

640

-

REMARKS Descri pti on

MARK

REMARKS

4-WAY

A

INTERNAL WIRING. FURNISH WITH FOUR FUNCTION (ON/OFF/UP/DOWN). SPECIAL REEL TO ACCOMODATE 40 FT HOSE

CONDENSING UNIT AND DX COIL SCHEDULE

MIN.

410A

4

4

(DB)

^F

^F

^F

^F

77.4

64.5

55

54

1 CONDENSING UNIT SHALL BE FACTORY TESTED AS PART OF THE EC UNIT.

VOLT

HZ

FUSE

2

SCROLL

7.5

480

3

60

15

33.4

5 WEIGHT INCLUDED IN EC 1-2

2000 5

1

2

3 4 5 6 7 8 9

9 MANUFACTURER’S GUARANTTED RATE OF 0.5% ANNUAL REFRIGERANT LEAKAGE.

6 PROVIDE MINIMUM 4 STEPS OF CAPACITY CONTROL UNLOADING

3

7 WITH HOT GAS BYPASS

E

F

DRUM LOUVER

-

J

SQUARE PLATE

24X24

B

20X10

600-700

-

6"

-

0-150

8"

-

151-250

COOLING

10"

-

251-400 Date:

RETURN, TRANSFER AND EXHAUST REGISTER AND GRILLE SCHEDULE

HEATING

FC 1

MITSUBISHI

FC 2

MITSUBISHI

FC 3

MITSUBISHI

FC 4

MITSUBISHI

FC 5

MITSUBISHI

80F/67F

MODEL

SIPRNET

PCA-A24

CAPACITY

CAPACITY

MBH (TOT)

MBH

24

26

HEAT PUMP

REFRIG.

RL

RS

SUPPLY

TYPE

SIZE

SIZE

CFM

410A

3/8"

5/8"

REMARKS

WEIGHT

600

71

1

2

3

4

MARK

TYPE

FACE SIZE

NECK SIZE

NO

(FACE)

(INxIN OR DIA.)

(INxIN OR DIA.)

PERFORATED SQUARE CEILING

24x24

6x6

0-200

20

TITUS PAR

TER

HEAT PUMP

24

26

410A

3/8"

5/8"

600

71

1

2

3

4

MAX

PERFORATED SQUARE CEILING

24x24

8x8

201-300

20

TITUS PAR

PERFORATED SQUARE CEILING

24x24

10x10

301-400

20

TITUS PAR

PERFORATED SQUARE CEILING

24x24

22x22

980-1300

20

TITUS PAR

PERFORATED SQUARE CEILING

24x48

22x46

1301-2800

20

TITUS PAR

EXHAUST GRILLE

8X8

6X6

0-100

22

TITUS 350FL

EXHAUST GRILLE

10X10

8x8

101-250

22

TITUS 350FL

EXHAUST GRILLE

12x12

10X10

251-350

22

TITUS 350FL

EXHAUST GRILLE

16x16

12X12

351-750

22

TITUS 350FL

EXHAUST GRILLE

26x16

24X14

751-1100

22

TITUS 350FL

EXHAUST GRILLE

38x20

36X18

1101-2000

22

TITUS 350FL

SECURITY EXHAUST GRILLE

16x16

16x16

615-750

22

H

SIDEWALL RETURN

38x24

36x20

1875

22

TITUS 350FL

I

EXHAUST GRILLE

10X10

8x8

101-250

22

TITUS 350FL

EXHAUST GRILLE

12x12

10X10

251-400

22

TITUS 350FL

REMARKS

NC

5

CAFE PCA-A24

CFM

5

C

ARMORER

PCA-A24

SUPPLY PCA-A24

OFFICE KITCHEN

PCA-A24

OFFICE

HEAT PUMP

HEAT PUMP

HEAT PUMP

24

410A

26

24

26

24

410A

410A

26

3/8"

3/8"

3/8"

5/8"

5/8"

5/8"

600

600

600

71

71

71

1

1

1

2

2

2

3

3

3

4

4

4

5

5

5

1 SINGLE POINT POWER. CONTROL PANEL TO INCLUDE MOTOR STARTER, CONTROL TRANSFORMER, AND INTEGRAL DISCONNECT

4 CEILING MOUNTED

2 CONDENSATE PUMP.

5 WALL MOUNTED REMOTE CONTROLLER

LOUI SVI LLE DI STRI CT

MANUFACT.

DUTY

Desi gned by:

AREA SERVED

NO

3 POWERED FROM HP UNIT

REFRIG

NO

TYPE MANUFACT.

MODEL

SEER

HSPF

VOLT

PH

HZ

MCA

WEIGHT

REMARKS G

HP 1 HP 2 HP 3 HP 4

MITSUBISHI

MITSUBISHI

MITSUBISHI

MITSUBISHI

PUZ-A24

PUZ-A24

PUZ-A24

PUZ-A24

410A

410A

410A

410A

208/ 16.8

16.8

10.9

10.9

230

208/ 230

16.8

10.9

10.9

1

60

60

208/ 230

16.8

1

1

60

208/ 230

1

60

19

19

19

19

165

MITSUBISHI

PUZ-A24

410A

16.8

10.9

208/ 230

1

60

19

165

9:05:21 AM

SHEET REFERENCE NUMBER:

165 14X14

12x12

401-650

22

TITUS 350FL

M-6000

165 EXHAUST GRILLE

1

MEXI CO

165

EXHAUST GRILLE HP 5

TITUS SG-3300RL

U.S.ARMY

MARK

A

SCHEDULES

ELECTRICAL BASIS OF DESIGN

LAS CRUCES,NEW

HEAT PUMP UNIT SCHEDULE (TRAINING BUILDING)

RESERVE CENTER

D

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-6000.dgn

TITUS DL

ARI 95F/75F

MARK

m oraja

(1) 1-1/2" SLOT -

THERMA-FUSER TF-HC, DIGITAL WALL ADJUSTER

SPLIT SYSTEM FAN COIL UNIT SCHEDULE (TRAINING BUILDING)

BASIS OF DESIGN

TITUS FL-15-JT

120 CFM/FT. WITH BOOT.

8 CU-1 IS POWERED AND CONTROLLED FROM A SINGLE POINT POWER CONNECTION PROVIDED WITH EC 1-2. (STARTER, DISCONNECT SWITCH, AND CONTROLS ALL FACTORY PROVIDED)

REFRIGERANT PIPING SHALL BE FACTORY INSTALLED AND TESTED

B

UNIT FLA

2 UNIT SHALL BE MOUNTED ON STRUCTURAL BASE (SLEEPER SYSTEM) INDEPENDENT OF EC UNIT ROOF CURB

4

PH

(EA)

5000

REMARKS

WEIGHT

HP

Mark

208.2

(DB)

TYPE

7/22/2011

11.8

(WB)

QTY

Pl ot scal e:NONE

COOLING

(DB)

CFM

Pl ot date:

OFFICES

LABS

LAT

FAX (714) 327-1601

ENERGY

LAT

TEL (714) 327-1600

SIZE

EAT

Fi l e nam e:LCARC_M 6000. dgn

SIZE

EAT

M .BETZ

TYPE

RS

Subm i tted by:

CAPACITY

RL

HUTTON CENTRE DRI VE,SUI TE 800

REFRIG.

SANTA ANA, CALI FORNI A 92707

TOTAL

EER

4

DUTY

F-171-40-160

AREA SERVED

Project Code:

MANUFACT.

MBH 1 CU 1

ELECTRICAL 8

A.REED

NO

COMPRESSOR

CORPS OF ENGI NEERS

MARK

DX COIL(EC 1-2)

Revi ewed by:

COOLING

A.REED

460/3/60

W 912QR-11-R-0071

120/1/60

Sol i ci tati on No.

1.5

C.KORPASH

1/6

Ckd by:

3.0

Dwn by:

1400

I .FRANCO

40

8

CMW13

LOUI SVI LLE,KENTUCKY

CARMON

HUNG FROM STRUCTURE, DISCHARGE THRU ROOF. UNIT MOUNTED CONTROL PACKAGE INCLUDING STARTER, TRANSFORMER AND

Rev.

VEHICLE WORKBAYS

TSR

072811

TO

VX 2-2

U.S.ARMY

VX 2-1

2

*** Support Value Engineering - It Pays ***

4

18x18

16X16

651-1000

22

Sheet 138

TITUS 350FL

5

of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

PUMP SCHEDULE

5

DOOR AIR CURTAIN SCHEDULE (TRAINING BUILDING) US Army Corps of Engineers

BASIS OF DESIGN

MOTOR

MOTOR

BASIS OF DESIGN

LOUISVILLE DISTRICT

APPROX SERVES

MFR

MODEL

GPM

TYPE

TOTAL

NO.

EFFICIENCY

RPM

OPERATING HP

HEAD

V

PH

HZ

ARC HEATING

ARC

HOT WATER

HWP 1B

ARC HEATING

ARC

HOT WATER

MARK

LOCATION

SERVES

MAX

NO

WEIGHT

(FT) HWP 1A

REMARKS

MANUFACTURER

MODEL

MARS

48C

MAX

CFM

FPM

1700

1700

REMARKS

WEIGHT HP

V

.5

120

PH

HZ

FLA

LBS

60

9.8

-

Appr.

LOCATION

NO

(LBS)

SERIES B&G

90

48

INLINE

30

1750

45%

1

480

3

25

60

DAC 1

2

TRAINING BUILDING

1-1/2A SERIES B&G

90

INLINE

48

30

45%

1750

1

480

3

60

25

2

INLINE

74

70

55%

1750

5

480

3

60

75

2

3

INLINE

74

70

55%

1750

5

480

3

60

75

1

2

KITCHEN

1

FURNISH WITH WALL MOUNTED CONTROL

KITCHEN

Date

MARK

PANEL WITH MICROSWITCH.

1-1/2A ARC HEATING ARC

HOT WATER

D HWP 2B

ARC HEATING ARC

HOT WATER

SERIES B&G

80 SC

EXPANSION TANK SCHEDULE

2X2X9-1/2 SERIES B&G

80 SC

3

2X2X9-1/2 ARC HEATING

ARC

HWP 3

HOT WATER ARC HEATING

HWP 4

ARC

HOT WATER ARC HEATING

HWP 5

ARC

HOT WATER

BASIS OF DESIGN

SERIES

B&G

1535-356

18

INLINE

PL-55 SERIES

B&G

100

3500

45%

2

480

3

60

50

MARK

2

18

INLINE

PL-55

30

3250

40%

30

0.4

3250

40%

120

0.4

1

120

60

1

25

MECH RM

B&G

OMS

22

INLINE

80

OMS

25

60

1

50%

30

1750

1

3

480

60

50

HWP 7A HWP 7B

B&G

OMS

50%

30

1750

1

3

480

60

50

1

OMS

SERIES90

B&G

OMS

35

INLINE

45%

70

3450

3

3

480

60

50

1-1/2 AA

MECH RM

OMS

SERIES90

B&G

OMS

35

INLINE

45%

70

3450

3

3

480

60

50

TYPE

VOLUME -

ACCEPTANCE

(GAL)

VOLUME (GAL)

NO.

OPERATING

OPERATING

PRESSURE

TEMPERATURE

(PSIG)

^F

OPERATING HEIGHT

DIAMETER

WEIGHT

(IN)

(IN)

(LBS)

REMARKS

ET 1

MECHANICAL

ET 2

MECHANICAL

ET 3

MECHANICAL

ET 4

MECHANICAL

ET 5

MECHANICAL

ARC

ROOM

VERTICAL

B&G

D-260V

B&G

D-40V

B&G

PTA-455

B&G

D-40V

B&G

D-20V

B-1,2

2000

159

56

125

200

58

30

21.7

11.3

125

200

30

17

370

240.5

125

200

82

48

21.7

8

125

200

30

17

10.9

2.4

125

200

26

12

BLADDER

1 2 3 4 5 6 7 8 9 10 11

ARC

ROOM

B-1,2

VERTICAL BLADDER

300

1 2 3 4 5 6 7 8 9 10 11

2

1

ARC B-1,2

ROOM

VERTICAL BLADDER

5000

- 7 8 9 1 2 3 4 5 6 10 11

300

- 7 8 9 1 2 3 4 5 6 10 11

200

- 7 8 9 1 2 3 4 5 6 10 11

2

1-1/2X1-1/2X7B

MECH RM

1 STAND BY

22

INLINE

80

OMS

MODEL

2

1-1/2X1-1/2X7B

MECH RM

MFR.

2

SERIES HWP 6B

SERVICE

MAX

2

SERIES HWP 6A

LOCATION

NO.

SERIES

B&G

30

INLINE

DIMENSION

MAX

Descri pti on

HWP 2A

OMS

ROOM

B-3,4

VERTICAL BLADDER

3

2

OMS

ROOM

B-3,4

VERTICAL BLADDER

3

1-1/2 AA

2 MOTOR STARTER, CONTROLS, HOA, INDICATOR LIGHTS AND SELECTOR SWITCHES FURNISHED AS PART OF FACTORY PUMP CONTROL PANEL WITH DISCONNECT AND INSTALLED BY ELECTRICAL

3 PROVIDE VFD

1 30% PROPYLENE GLYCOL

4 PROVIDE SIGHT GLASS

7

PROVIDE WITH AUTOMATIC AIR VENT

10

PROVIDE WITH SEISMIC RESTRAINTS

2 PER ASME SECTION VIII DIVISION 1 STANDARDS

5 FURNISH WITH AIR RELEASE FITTING AND LEVEL GAGE

8

PROVIDE WITH AIR PURGER

11

PROVIDE 18" CLEARANCE FOR SYSTEM PIPING

3 PEPLACEABLE BLADDER DESIGN

6

9

PROVIDE WITH LIFTING RING

FACTORY PRE-CHARGED TO 12 PSIG

CAPACITY

LOCATION

MFR

MODEL

NO

TYPE

NO.

EFF.

PRESSURE

(MBH) 1

GPM

(AFUE)

RATING

POWER

TEMPERATURE

INPUT

(PSIG)

OUTPUT (GROSS)

EWT

LWT

^F

^F

OPERATING

PD

WEIGHT

(FT)

(LBS) V

Appr.

ASME MARK

CHEMICAL POT FEEDER

OPERATING

PH

REMARKS BASIS OF DESIGN

HZ MARK

ARC

B 1,2

BURNHAM

ALP 500

CONDENSING

125

95%

500

399

160 ^F

180 ^F

48

5

120

1

60

700

1 2 3 4 5 6 7

BURNHAM

ALP 285

CONDENSING

125

95%

285

220

160 ^F

180 ^F

22

5

120

1

60

400

1 2 3 4 5 6 7

MECH. RM

LOCATION

SERVICE

MFR.

FILL

OPERATING

MODEL

CAPACITY

CAPACITY

PRESS

NO.

(GAL)

(GAL)

(PSIG)

HP-5-ASME

5.0

6.3

200

NO.

MAX

Date

MIN.

BASIS OF DESIGN

Mark

HEATING HOT WATER BOILER SCHEDULE

OPERATING

NOZZLE SIZE

TEMPERATURE

REMARKS

(IN)

^F

C OMS MECH RM

1 RATINGS AT 4000 FEET ASL

2 PROVIDE MANUFACTURERS SEALED STAINLESS STEEL FLUE/COMBUSTION AIR KIT

5 BOILER CONTROL PANEL

6 STAINLESS STEEL HEAT EXCHANGER

7

3

4

STACKABLE UNITS WITH MOUNTING FRAME

CPF 1

MECHANICAL

HEATING HOT

ROOM

WATER

J.L.WINGERT

200

3/4

1 2 3 4 5 6 7

FULLY MODULATING 5:1 TURN DOWN

PROVIDE NEOPRENE RUBBER ISOLATION PAD

AIR / DIRT SEPARATOR TANK SCHEDULE

1 30% PROPYLENE GLYCOL

5

PROVIDE WITH 1/4" NPT AIR RELEASE VALVE

2 ASME CODE RATED

6

PROVIDE WITH 1/4" NPT PRESSURE GAUGE

3 DOME BOTTOM WITH SUPPORT LEGS

7

PROVIDE WITH SIGHT LEVEL AND SIGHT FLOW INDICATOR

Descri pti on

B 3,4

4 STEEL CONSTRUCTION WITH INTERNAL/EXTERNAL EPOXY COATING

AS 2

MECHANICAL

AS 3

MECHANICAL

ROOM

RL-3F

B&G

ARC

EAS-2"

B&G

125

270

GLYCOL MAKE-UP UNIT 160

1 2 3

125

270

MARK

1 2 3

100

LOCATION

SERVICE

MFR.

40

125

270

1 2 3

100

OMS

EAS-1"

B&G

3

125

270

ARC

MODEL

2

PROVIDE WITH STRAINER, HIGH CAPACITY AIR VENT FITTING AND MANUAL BLOWDOWN VALVE.

CAPACITY

GMU-30

B&G

WATER

OMS

CUT-IN

CUT-OUT

(PSIG)

(PSIG)

10-45

20-50

1 2 3 4 5 6

10-45

20-50

1 2 3 4 5 6

55 GAL

HEATING HOT

MECHANICAL

3 ASME 125 PSIG RATED

GMU-30

B&G

WATER

5 GPM/10GPM 55 GAL

ROOM

HOT WATER UNIT HEATER SCHEDULE

REMARKS

5 GPM/10GPM

ROOM

GFA 2

30% PROPYLENE GLYCOL

HEATING HOT

MECHANICAL

1 2 3

50

PRESSURE

NO.

GFA 1

B-3,4

ROOM

^F

NO.

B-3,4

MECHANICAL

30

EAS-2"

B&G

OMS

ROOM

96

(PSIG)

BASIS OF DESIGN

B-1,2

ROOM

AS 4 1

ARC B-1,2

(LBS)

1 PROVIDE WITH (1) 1/2 HP MOTOR PUMP, 115V/1PH/60HZ, NEMA 4X CONTROL PANEL

4 PRV, SHUT-OFF VALVES, PRESSURE SWITCHES AND GAUGES

2 LOW LEVEL FLOAT SWITCH

5 DISCONNECT BY ELECTRICAL. REFER TO ELECTRICAL DWGS

6

FOR PROPYLENE GLYCOL Mark

MECHANICAL

WEIGHT

TEMPERATURE

HC-18

0.5

1/60

120

1

60

20

1 2 3

PROPELLER MOUNT

60

340

180

160

1.3

0.5

1/60

120

1

60

20

UH 6

SEE

WALL

ARCH 60

340

180

160

1.3

0.5

1/60

120

1

60

20

1 2 3

SEE

ARC

WALL

ARCH

UNIT STORAGE

MOUNT

60

180

160

1.3

0.5

1/60

120

1

60

20

A

1

MODEL

MODERN FAN

CIRRUS HUGGER

VOLT

PH

HZ

WATTS

36"

115

1

60

85

52"

115

1

60

85

1 2

3

OFFICE / CLASSROOMS

50

1

2

3

5

1

2

3

4

6

7

/ MODERN FAN

CIRRUS HUGGER

ASSEMBLY

50

RCP 1 BRUSHED ALUMINUM BODY AND BLADES

MODINE

340

60

180

160

1.3

0.5

1/60

120

1

60

20

1 2

340

60

180

160

1.3

0.5

1/60

120

1

60

20

1 2 3

UNIT STORAGE

2 FAN SPEED CONTROLLER, WALL MOUNTED

3 CEILING MOUNTED BRACKET, HUGGER STYLE FAN

4

(1) ONE CEILING FAN LOCATED IN THE CENTER OF ASSEMBLY ROOM A102

V-42

950

60

180

160

3.1

0.6

1/30

120

1

60

50

1 2 3

UH 9

MODINE

HC-18

UNIT STORAGE

UNIT STORAGE

MECHANICAL RM

ELECTRICAL RM

MOUNT

MECHANICAL RM

VERTICAL

HC-18

PROVIDE MOUNTING BRACKET

ELECTRICAL RM

2

ELECTRICAL

BASIS OF DESIGN WATER

VERTICAL

60

950

180

160

3.1

0.6

1/30

120

1

60

50

1 2 3

MARK

REMOVAL

NO

PINTS/DAY

MANUFACT.

MODEL

THERMA-STOR

HI-E DRY 195

CFM

WEIGHT VOLT

PH

HZ

KW

115

1

60

1.25

REMARKS

MOUNT

60

340

180

160

1.3

0.5

1/60

120

1

60

20

1 2

3

PROPELLER

DH 1

190

540

110

1

2

3

MOUNT

340

60

180

160

1.3

0.5

1/60

120

1

60

20

1 2

3

340

60

180

160

1.3

0.5

1/60

120

1

60

20

1 2

3

1 6FT POWER CORD

2

3

INTERNAL CONDENSATE PUMP

PROPELLER MOUNT

KITCHEN SUPPLY FAN MAKE-UP AIR UNIT SCHEDULE

PROPELLER WALL

OMS MODINE

DEHUMIDIFIER SCHEDULE

WALL

OMS HC-18

(2) TWO CEILING FANS LOCATED IN THE PHYSICAL READINESS ROOM A126

WALL

ARC

MODINE

7

WALL

ARC

HC-18

6 (2) TWO CEILING FANS LOCATED IN EACH CLASSROOM A134 & A131

PROPELLER

ARC

MODINE

5 (3) THREE CEILING FANS LOCATED IN THE LOWER CEILING OF ASSEMBLY ROOM A102

PROPELLER

ARC MODINE

3

30% PROPYLENE GLYCOL

MOUNT

60

340

180

160

1.3

0.5

1/60

120

1

60

20

1 2

3

PROPELLER 3

ELECTRIC HEATER

BASIS OF DESIGN EXTERNAL

RATINGS AT 4000 FEET ASL

MARK NO

LOCATION MANUFACTURER

SERVES

CFM

MODEL

SP

DRIVE

MAX FAN RPM

(IN.

EVAPORATIVE COOLING

FAN MOTOR

ELECTRICAL DATA APPROX

EAT

LAT

KW

^F

^F

(#STAGES)

18

55

LAT

TYPE

GPM

WEIGHT HP

RPM

3/4

1750

V

PH

HZ

LBS

3

60

1000

REMARKS

WG)

GAS DETECTOR SCHEDULE KSF 1-1

GREENHECK

MSX109H12

TRAINING BUILDING

12 GREASE HOOD

1600

0.4

BELT

905

KITCHEN

(3)

73^F

DIRECT CELDEK

4

480

1 2 3 4 5 6

BASIS OF DESIGN ALARMS MARK

GD 1

POWER

DETECTED LOCATION

MFR

MODEL

OMS WORKBAY

BRASCH

GSE-NCM-1

REMARKS

GASES

NO.

LOW LEVEL

CO/NO2

CO = 35PPM

HIGH LEVEL

CO = 100PPM

V

120

NO2 = 1.0PPM NO2 = 5.0PPM

PH

1

HZ

60

1

SINGLE POINT OF POWER CONNECTION. MOTOR STARTER, CONTROL PANEL, CONTROLS, HOA FACTORY INSTALLED

5

PUMP FOR EVAPORATIVE COOLER

2

UNIT MOUNTED DISCONNECT SWITCH, NEMA 3R.

6

PROVIDE LOW LEAKAGE MOTORIZED DAMPER ON OUTSIDE AIR INTAKE

3

PRE-FAB FACTORY ROOF CURB.

4

MERV 13 FILTER.

1 2 3 4 5

1 HIGH LEVEL ALARM STARTS HIGH SPEED OF FANS

3 MICROPROCESSOR CONTROLLED AND FACTORY CALIBRATED UP TO 9000 SQUARE FEET OF COVERAGE

2 OUTPUT ALARMS AT BAS

4 POWER LOSS FAIL-SAFE MODE

SHEET REFERENCE NUMBER:

M-6010 Sheet 139

of 222

5 DIGITAL DISPLAY LOACL READOUT

AM 9:05:55

REMARKS

WALL

ARC

HC-18

NO

m oraja

MOUNT

UNIT STORAGE

MODINE

UH 12

ARC

HC-18

MODINE

V-42

UH 11

MANUFACT.

RCP

PROPELLER 340

WEIGHT

SIZE

WALL

UH 8

UH 10

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-6010.dgn

UH 7

BLADE

1 2 3

PROPELLER MOUNT

SERVES

NO

PROPELLER UH 5

MARK

HUTTON CENTRE DRI VE,SUI TE 800

ARC UNIT STORAGE

MODINE

1.3

SCHEDULES

MODINE

160

4

UNIT STORAGE

HC-18

180

Desi gned by:

HC-18

60

340

WALL

ARC

MODINE

MOUNT

MEXI CO

UH 4

UNIT STORAGE

U.S.ARMY

UH 3

HC-18

RESERVE CENTER

UH 2

MODINE

ELECTRICAL

BASIS OF DESIGN

WALL

ARC

U.S.ARMY

UH 1

Date:

(FT)

F-171-40-160

(LB)

Project Code:

HZ

Revi ewed by:

PH

A.REED

V

W 912QR-11-R-0071

HP

Sol i ci tati on No.

DROP

CEILING FAN SCHEDULE

REMARKS

C.KORPASH

^F

WEIGHT

PRESS

Ckd by:

^F

GPM

Dwn by:

LWT

I .FRANCO

MODEL

EWT

LOUI SVI LLE DI STRI CT

EAT

LAS CRUCES,NEW

MANUFACT.

CFM

LOUI SVI LLE,KENTUCKY

TYPE

072811

LOCATION

NO

A.REED

MARK

B

ELECTRICAL

CORPS OF ENGI NEERS

HOT WATER COIL

BASIS OF DESIGN

Rev.

3 POLYETHYLENE TANK WITH CARBON STEEL STAND

7/22/2011

AS 1

OPERATING

PRESSURE

Pl ot scal e:NONE

NO.

OPERATING

Pl ot date:

NO

GPM

FAX (714) 327-1601

MODEL

TEL (714) 327-1600

MFR.

REMARKS

Fi l e nam e:LCARC_M 6010. dgn

SERVES

OPERATING

M .BETZ

LOCATION

MAX

Subm i tted by:

MARK

MAX

SANTA ANA, CALI FORNI A 92707

BASIS OF DESIGN

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

EXHAUST FAN SCHEDULE

5

TANK SCHEDULE

US Army Corps of Engineers LOUISVILLE DISTRICT

MOTOR MARK

LOCATION

SERVES

CFM

MAX FAN

DRIVE

SP

NO

BASIS OF DESIGN

RPM

IN WG

BASIS OF DESIGN

APPROX

OPER REMARKS

WEIGHT HP

V

PH

HZ

RPM

MARK

LBS

MANUFACTURER

LOCATION

TYPE

SIZE

NO

MODEL

MANUFACTURER

MODEL

STORAGE

PRESS

(GALLONS)

RATING

LINING

Appr.

EXTERNAL

REMARKS

WT LBS

ROOM MECHANICAL

EF 1-3 EF 1-4 EF 1-5 EF 1-6

EF 1-7 EF 1-8 EF 1-9 EF 1-10

EF 1-11

BUILDING

ROOM

ARC

BREAK

BUILDING

ROOM

ARC

MAIL

BUILDING

ROOM

ARC

ARMS

BUILDING

VAULT

ARC

UNIT

BUILDING

STORAGE

ARC

UNIT

BUILDING

STORAGE

ARC

KITCHEN

BUILDING

HOOD

ARC

KITCHEN

BUILDING

HOOD

ARC

COPY

BUILDING

ROOM

ARC

TOILET

BUILDING

ROOM

1300

0.4

1400

0.4

700

1100

BELT

0.35

510

1100

BELT

1100

BELT

0.35

1300

BELT

1/3

1/3

1/6

1/6

120

1

120

1

120

1

120

1

60

1725

60

1725

60

100

1725

135SDB

COOK

200

1725

60

135SDB

COOK

200

120C2B

COOK

100

COOK

100C2B

1

1

1

1

2

2

2

3

3

3

2 3

4

HST 1

4

5

5

690

0.4

BELT

1000

1/6

120

1

60

1725

150

COOK

120SDB

1

2

3

4

2000

0.5

BELT

600

1/3

120

1

60

1725

700

COOK

210SDB

1

2

3

4

2000

0.5

BELT

600

1/3

120

1

60

1725

700

COOK

210SDB

1

2

3

4

HST 2

6

6

KENNEDY

SILICON

0.4

DIRECT

1650

1/8

120

1

60

1550

ACRUD

100

COOK

MECH RM

HELIODYNE

2150

1.75

BELT

1490

1 1/2

480

3

60

1725

500

COOK

350

0.4

BELT

1637

1/6

120

1

60

1725

100

COOK

2

3

5

ARC

JAN A103C

130

0.3

1200

DIRECT

ACEB

1

2

3

1

2

3 5

1

2

3 4

EF 2-2

EF 2-3

EF 2-4

EF 2-5

81W

120

1

-

60

20

COOK

650

0.35

1500

BELT

1/6

120

1

60

COOK

100

1725

80,000

1

2

3

4

1500

-

-

119

-

GLASS

-

GLASS

-

5

TANK SOLAR HOT WATER TANK

24" MANWAY WITH INTERNAL LADDER

3

INTERIOR SAND BLAST AND POTA-POX 20 LINING

5

2

42" COLLAR RING

4

EXTERIOR SANDBLAST AND 100 MIL FIBERGLASS COAT

INTEGRAL HEAT TRANSFER COIL, 30 gpm, 200MBH

COLD SIDE

BASIS OF DESIGN

HX 1

6 10

OPER

TOTAL SERVICE MANUFACTURER

6

HOT SIDE

GPM

MODEL

EWT

LWT

^F

^F

PD

B&G

BP400-30

DOMESTIC

18

180

GPM

PSI

160

10

18

EWT

LWT

^F

^F

120

PD

140

HEAT

TRANSFER

WT

EXCHANGED

AREA

LBS

PSI

(MBH)

(SQ FT)

10

178

3.53

REMARKS

POTABLE WATER RATED

20

HOT WATER

6

70C2B

GN-162

ELECTRICAL

100 C2B

1

2

3 5

6

MARK

AMB

200

0.4

1500

BELT

1/6

120

1

1725

60

100

COOK

70 C2B

75

0.3

BELT

1200

1/6

120

1

60

1725

75

COOK

60 C2B

3030/2020

0.75

BELT

1500

3/4

480

3

60

1725

350

COOK

150QMX

1

2

3 5

MODEL

6

1

2

3 5

6

1

2

3 4

7 8

GPM

PD

TEMP

MBH

(FT HD)

EWT

LWT

^F

^F NO. OF

(^F DB)

HD 1

HEAT CRAFT

WGS049

95

30

15.5

282

180

OPER

FAN MOTOR

160

1

WT VOLTAGE

(LBS)

208/3/60

400

HP

1/3

REMARKS

-

Date

OMS

WORK

BUILDING

BAY

OMS

WORK

BUILDING

BAY

ROOM

BUILDING OMS

MECHANICAL

BUILDING

ROOM

OMS

MEN’S

BUILDING

9 11

TWO SPEED FAN 3030/2020

0.75

1500

BELT

3/4

480

3

60

COOK

350

1725

150QMX

1

2

3 4

7 8

SOLAR HEATING COLLECTOR SCHEDULE 9 11

TWO SPEED FAN

BASIS OF DESIGN OPER

ELECTRICAL

OMS

1000

0.4

876

BELT

1/6

120

1

60

COOK

150

1725

135 SDB

1

2

3 4

MARK

SERVES

TYPE

GPM

NO 500

0.4

130

0.3

937

BELT

DIRECT

1200

1/6

81W

120

1

120

1

60

60

COOK

175

1725

COOK

20

-

150 SQN-HP

GN-162

1

1

2

2

SLOPE

PD

SIZE

(FT HD)

(FT2)

(LBS)

WT

REMARKS

MANUFACTURER

MODEL

HELIODYNE

GOBI

ARC

GLAZED PLATE

1

20

32

200

-

HELIODYNE

GOBI

OMS

GLAZED PLATE

0.8

20

32

200

-

3 4

3 4

SC 1 THRU SC 30

WOMEN’S

BUILDING

130

0.3

DIRECT

0.4

BELT

1200

81W

120

1

60

-

20

COOK

150

COOK

OMS

EF 2-7

96"W X 60"H

1

NO

OMS

EF 2-6

WATER

BASIS OF DESIGN

BUILDING

EF 2-1

HOT WATER

100R15DM

165CPS

125

HEAT DUMP FLUID COOLER SCHEDULE

BUILDING

EF 1-14

SOLAR

MECH RM

MANUFACTURER JAN A121

OMS

HSTG 119

NO 1

6800

PLATE FRAME HEAT EXCHANGERS

A144

ARC

ARC

SOLAR

MARK 360

90"X226"

STORAGE

BUILDING

850

1000

1

MOTOR STARTER FURNISHED AND INSTALLED BY ELECTRICAL.

4

2

BACKDRAFT DAMPER.

3

FURNISH WITH CONTACTOR FOR BAS CONTROL WIRED BY ELECTRICAL.

1/6

120

1

60

1725

GN-162

135SDB

7 INLET SAFETY GUARD.

10

UL762.

5 ROOF CURB.

8

MOUNTING RAIL.

11

SPARK RESISTANT CONSTRUCTION.

6 UNIT MOUNTED DISCONNECT SWITCH, NEMA 3R.

9

MOTOR COVER.

UNIT MOUNTED DISCONNECT SWITCH, NEMA 1.

1

1

2

2

3 4

SC 31 THRU

3 4

SC 34

Descri pti on

EF 1-13

C

ROOM

BUILDING

TANK

STEEL

LINING

ELECTRICAL ARC

EF 1-12

UNDERGROUND

Descri pti on

BUILDING

POTABLE HWT 1

Mark

ELECTRICAL

ARC

EF 1-2

D

ARC

Appr.

EF 1-1

Date

(PSIG)

INTAKE AND RELIEF SCHEDULE BASIS OF DESIGN

STATIC CFM

SERVES

TYPE

DROP

NO

FURNISH WITH ROOF CURB

MECH RM

COOK

GI

INTAKE

1300

0.017

24"X24"

12"X12"

INTAKE

500

0.017

12"X12"

31"X27"X12"

100

FURNISH WITH ROOF CURB

COOK

16"X16"

INTAKE

1000

0.017

16"X16"

31"X39"X12"

150

FURNISH WITH ROOF CURB

INTAKE

850

0.017

16"X16"

31"X39"X12"

150

FURNISH WITH ROOF CURB

INTAKE

2800

0.017

36"X36"

63"X68"X23"

300

FURNISH WITH ROOF CURB

RELIEF

2000

0.011

24"X24"

37"X39"X12"

175

FURNISH WITH ROOF CURB

RELIEF

2000

0.011

24"X24"

37"X39"X12"

175

FURNISH WITH ROOF CURB

RELIEF

300

0.011

12"X12"

125

250

FURNISH WITH ROOF CURB

51"X39"X15"

51"X39"X15"

175

FURNISH WITH ROOF CURB

STORAGE

COOK

16"X16" GI

WORK BAYS

COOK

36"X36" GI

EF 1-6

COOK

BLDG

24"X24" GR

EF 1-7

COOK

BLDG

24"X24" GR

7/22/2011

175

24"X24"

Pl ot scal e:NONE

0.017

Pl ot date:

1600

FAX (714) 327-1601

INTAKE

Fi l e nam e:LCARC_M 6020. dgn

24"X24"

M .BETZ

FURNISH WITH ROOF CURB

Subm i tted by:

100

31"X27"X12"

F-171-40-160

12"X12"

Project Code:

0.017

W 912QR-11-R-0071

300

Sol i ci tati on No.

INTAKE

TEL (714) 327-1600

TRAINING

12"X12"

HUTTON CENTRE DRI VE,SUI TE 800

RV 3

FURNISH WITH ROOF CURB

24"X24" COOK

BLDG

TRAINING

175

GI

OMS

RV 2

51"X39"X15"

SANTA ANA, CALI FORNI A 92707

COOK

ELECT RM

ELECT RM

OMS

TRAINING

24"X24"

GI

OMS

RV 1

0.017

4

BLDG

2000

Revi ewed by:

IV 8

INTAKE

GI

GI

OMS

BLDG

24"X24"

A.REED

MECH RM

BLDG

IV 7

FURNISH WITH ROOF CURB

GI

BLDG

BLDG

175

C.KORPASH

BLDG

IV 6

IV 9

COOK

51"X39"X15"

Ckd by:

TRAINING

EF ROOM

24"X24"

Dwn by:

IV 5

BLDG

0.017

I .FRANCO

TRAINING

COOK

2000

LOUI SVI LLE DI STRI CT

IV 4

UNIT STORAGE

INTAKE

GI

LOUI SVI LLE,KENTUCKY

TRAINING

BLDG

24"X24"

Rev.

IV 3

COOK

Date:

TRAINING

LBS

(IN)

072811

IV 2

UNIT STORAGE HVU-1

(IN)

Desi gned by:

TRAINING

(IN WC)

HOOD

A.REED

B

IV 1

MODEL

REMARKS

WEIGHT THROAT

Mark

MANUFACTURER

PRESSURE

CORPS OF ENGI NEERS

LOCATION

OMS VENTILATION SCHEDULE

APPROX

U.S.ARMY

MARK

ARC VENTILATION SCHEDULE

DIMENSIONS

RV 7

BAYS

OMS

WORK

BLDG

BAYS

OMS

WORK

BLDG

BAYS

OMS

WORK

BLDG

BAYS

COOK

30PR

RELIEF

3030

0.1

30.75

250

250

FURNISH WITH ROOF CURB

COOK

30PR

RELIEF

3030

0.1

30.75

250

250

FURNISH WITH ROOF CURB

COOK

20PR

RELIEF

1400

0.09

20.5

100

250

FURNISH WITH ROOF CURB

COOK

20PR

RELIEF

1400

0.09

20.5

100

250

FURNISH WITH ROOF CURB

MEXI CO

BLDG

U.S.ARMY

A

WORK

SCHEDULES

RV 6

GR

EF 1-5

OMS

12"X12"

LAS CRUCES,NEW

RV 5

COOK

RESERVE CENTER

RV 4

STORAGE

BLDG

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-6020.dgn

UNIT

SOLAR HEAT EXCHANGER AND CONTROL SCHEDULE BASIS OF DESIGN MARK

TYPE

GPM

NO MANUFACTURER

HELIODYNE

REMARKS

SHEET REFERENCE NUMBER:

(FT HD)

MODEL

HPAK-24

MBH

HEAT TRANSFER

4

5

M-6020 24

-

Sheet 140

APPLIANCE

of 222

9:06:33

m oraja

AM

HPAK 1

PD

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

US Army Corps of Engineers

Date

Appr.

LOUISVILLE DISTRICT

1-1/2" HWS/R

3/4" HWS/R

UH-9 (1.3 GPM)

H/C

D

3/4" HWS/R

1-1/4" HWS/R

3/4" HWS/R

UH-10 (1.3 GPM)

H/C

3/4" HWS/R

1-1/2" HWS/R

3/4" HWS/R (TYP) Descri pti on

H/C

EC 1-5 (8.6 GPM)

H/C

H/C

H/C

UH-4 (1.3 GPM)

H/C

A1

UH-6 (1.3 GPM)

HVU-1 (12.0 GPM)

UH-5 (1.3 GPM)

FOR CONT SEE M-7010

3/4" HWS/R

3" 3/4" HWS/R 1-1/2" HWS/R

DPT 2-1/2"HWS/R

Mark

1 1/4" HWS/R

Appr.

H/C

1" HWS/R

1-1/2" HWS/R

Date

UH-3 (1.3 GPM)

3/4" HWS/R

1-1/4" HWS/R

C 1" HWS/R

2" HWS/R H/C

H/C

HVU 2-1 (19.4 GPM)

3/4"HWS/R

Descri pti on

EC 2-1 (2.0 GPM)

2-1/2"HWS/R H/C

H/C

UH-7 (3.1 GPM)

UH-8 (3.1 GPM)

A1 FOR CONT SEE

3/4" HWS/R

3/4" HWS/R

M-7020 2"HWS/R

3/4" HWS/R 1-1/2" HWS/R

3/4"HWS/R H/C UH-11 (1.3 GPM)

H/C EC 1-7 (3.6 GPM)

UH-12 (1.3 GPM)

Mark

H/C

2

OMS-HOT WATER HEATING DIAGRAM SCALE :NONE

1

7/22/2011

Pl ot scal e:NONE

Pl ot date:

Fi l e nam e:LCARC_M 7000. dgn

TEL (714) 327-1600

FAX (714) 327-1601

M .BETZ

Subm i tted by: HUTTON CENTRE DRI VE,SUI TE 800

SANTA ANA, CALI FORNI A 92707

F-171-40-160

Project Code:

Revi ewed by:

A.REED

C.KORPASH

EC 1-4 (4.8 GPM)

ARC-HEATING HOT WATER DIAGRAM SCALE :NONE

U.S.ARMY

A

EC 1-3 (8.9 GPM)

H/C

RESERVE CENTER

EC 1-2 (7.0 GPM)

H/C

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-7000.dgn

H/C

4

EC 1-1 (8.1 GPM)

DI AGRAMS

EC 1-6 (4.1 GPM)

LOUI SVI LLE DI STRI CT

H/C

U.S.ARMY

H/C

1"HWS/R

1-1/4" HWS/R

1-1/4" HWS/R

MEXI CO

MANIFOLD MOUNTED ON WALL OF OMS MECHANICAL ROOM

1-1/2" HWS/R

LAS CRUCES,NEW

2" HWS/R

Ckd by:

DPT

Dwn by:

1-1/2" HWS/R

Desi gned by:

1-1/4" HWS/R (12 LOOPS 10 GPM)

LOUI SVI LLE,KENTUCKY

Date:

1" HWS/R

072811

1"HWS/R

I .FRANCO

Sol i ci tati on No.

Rev.

UH-1 1.3 GPM)

CORPS OF ENGI NEERS

UNDERSLAB RADIANT HEATING VALVE MANIFOLD ASSEMBLY

102F

3-WAY MIXING VALVE

UH-2 (1.3 GPM)

CONTRACTOR TO VERIFY EXACT ROUTING AND LOCATION OF PIPING AND LOOPS

82F

CIRCULATING PUMP, 10 GPM, 15 FEET HEAD

H/C

A.REED

(12) 5/8" TUBING LOOPS UNDER SLAB 9" OC

B

H/C

W 912QR-11-R-0071

2 1/2"HWS/R

1-1/4" HWR

SHEET REFERENCE NUMBER:

M-7000 9:07:56 AM

m oraja

Sheet 141

1

2

*** Support Value Engineering - It Pays ***

4

5

of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

US Army Corps of Engineers

Date

Appr.

LOUISVILLE DISTRICT

PSV SET TO 125 PSIG DISCHARGE ON ROOF (TYP.5) SC-1

SC-2

SC-3

SC-4

SC-5

SC-6

SC-25

SC-26

SC-27

SC-28

SC-29

SC-30

D

GLAZED PLATE SOLAR COLLECTORS

SC-8

SC-9

SC-10

SC-11

SC-12

SC-13

SC-14

SC-15

SC-16

SC-17

SC-18

SC-19

SC-20

SC-21

SC-22

SC-23

SC-24 Descri pti on

SC-7

1" SHWR (TYP.) 1" SHWR

1-1/4" SHWR

1-1/2" SHWR

1" SHWS (TYP.)

1-1/4" SHWR 1-1/4" SHWS

1-1/2" SHWS

1" SHWR

1-1/2" SHWS

EQUIPMENT LOCATED ON ROOF

1" SHWS

AUTOMATIC AIR VENT

PSV SET TO 125 PSIG TO DISCHARGE TO FD

3" HWS TO HEATING SYSTEM ZONES FOR CONTINUATION

2" DHW

1" DOMESTIC HOT WATER RETURN

2" DHWR

1-1/2" HWS 3" HWR FROM HEATING SYSTEM ZONES FOR CONTINUATION

1-1/2" DHWR

2" SHWS

SEE SHEET M-7000

SEE SHEET M-7000

BALANCING VALVE

M

2" DOMESTIC COLD WATER SUPPLY

HD-1

2" SHWS

1-1/2" HWR

C1

HEAT DUMP

CIRCUIT SETTER

Mark

1-1/2" DHWS

Appr.

2" DOMESTIC HOT WATER SUPPLY

FOR CONTINUATION SEE PLUMBING DRAWINGS Date

P-411A 3/4" DRAIN

HEAT EXCHANGER [HX-1]

3-WAY CONTROL VALVE

VLV-S1-01

DOMESTIC HOT WATER TANK

HWP-5

ET-3

HWT-1

DIAPHRAGM EXPANSION TANK SEE DETAIL

HWP-2A

2" SHW S

3" HW R

UNDERGROUND

C

HWP-2B

D2

M-5020 3" HWR

2" SHW R

FLEXIBLE COUPLING, TYP

PRESSURE RELIEF VALVE, DISCHARGE TO FD (TYP.)

MULTI PURPOSE VALVE

TO DRAIN

(GATE, BALANCING, CHECK

PRESSURE REDUCING VALVE SET AT 15 PSIG

Descri pti on

AUTOMATIC AIR VENT

AND METERING), TYP

ICW MAKE-UP, THERMOMETER

1" ICW

HWP-1A

3" HW R

3" HWR

3" HWS GATE VALVE (TYP.)

2" SHWS

AUTOMATIC AIR VENT

HWS

3" HWS

AS-2 LSL

LSLL

M-5000

D5

HWP-3

GFA-1

3/4" HB

GLYCOL FILL ASSEMBLY COMBINATION PRESSURE AND

ET-2

DIAPHRAGM EXPANSION TANK

TEMPERATURE GAGE (TYP.)

7/22/2011

Pl ot scal e:NONE

Pl ot date:

Fi l e nam e:LCARC_M 7010. dgn

F-171-40-160

Project Code:

FAX (714) 327-1601

HUTTON CENTRE DRI VE,SUI TE 800

D1

M-5020

N.T.S.

RESERVE CENTER

1

ARC- HOT WATER SYSTEM PIPING SCHEMATIC

U.S.ARMY

A

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-7010.dgn

SEE DETAIL

TEL (714) 327-1600

AQUASTAT (TYP.)

PI PI NG SCHEMATI C

3"

U.S.ARMY

PIPE CAP

SANTA ANA, CALI FORNI A 92707

DIRT LEG

ARC HOT W ATER SYSTEM

B-2

4

PS BOILER

MEXI CO

M

LOUI SVI LLE DI STRI CT

SHUT OFF COCK

LOUI SVI LLE,KENTUCKY

CORPS OF ENGI NEERS

M-5020

GAS SUPPLY

LAS CRUCES,NEW

3" HW R

HEAT STORAGE TANK 3/4" HB

M .BETZ

SEE DETAIL

3"

A2

Revi ewed by:

SEE DETAIL

EXPANSION TANK

Desi gned by:

DIAPHRAGM 3/4" HB

Dwn by:

CHEMICAL POT FEEDER

D.O’ CALLAGHAN

2" SHWR

ET-1

3"

Ckd by:

B-1

A.REED

W 912QR-11-R-0071

Sol i ci tati on No.

Rev. Date:

BOILER

R.SALLW ASSER C.KORPASH

3/4"

HST-1 072811

3" HW S

AQUASTAT,

B

M

TO DRAIN

AS-1

Subm i tted by:

HWP-1B

3"

Mark

3" HWS

2" SHW R

VENT UP THRU ROOF (TYP.)

FE

FE

3/4"

COMBUSTION AIR INTAKE PIPED TO EXTERIOR (TYP.)

3" HW S

HWP-4

SHEET REFERENCE NUMBER:

M-7010 of 222

9:10:03

m oraja

AM

Sheet 142

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

US Army Corps of Engineers

Appr.

LOUISVILLE DISTRICT

AUTOMATIC AIR VENT

Date

PRESSURE RELIEF VALVE, DISCHARGE TO FD (TYP.)

TO DRAIN

AIR SEPARATOR

PRESSURE REDUCING GATE VALVE, TYP

VALVE SET AT 30 PSIG THERMOMETER

FLEXIBLE TYPE MECHANICAL COUPLINGS TYP.

CW MAKE-UP,

D PRESSURE GAGE, TYP 1" CW 2" HWR

2" HWR

2" HWR

MULTI PURPOSE VALVE (GATE, BALANCING, CHECK

COMBUSTION AIR INTAKE PIPED TO EXTERIOR (TYP.)

AND METERING), TYP

FE

2" HWS

2" HWS

2" HWS

VENT UP THRU ROOF (TYP.)

1"

AS-3

HWP-6A 2" HW S

2" HW S

FROM HEATING SYSTEM ZONES FOR CONTINUATION SEE SHEET M-7000

Descri pti on

TO HEATING SYSTEM ZONES FOR CONTINUATION SEE SHEET M-7000

GAS SUPPLY

SHUT OFF COCK

BOILER SYSTEM CONTROL PANEL

3/4"

HWP-7B

DIRT LEG

BOILER

BOILER

B-3

B-4

PIPE CAP

ET-4

DIAPHRAGM

SEE DETAIL

Mark

3/4" HB

EXPANSION TANK

D1 Appr.

2" HW R

3/4"

HWP-6B

M-5020

POT FEEDER

HWP-7A

A2

Date

AQUASTAT

CHEMICAL

COMBINATION PRESSURE AND

SEE DETAIL M-5000

TEMPERATURE GAGE

C

PSV SET TO 125 PSIG DISCHARGE ON ROOF

SC-31

SC-32

SC-33

SC-34

1" SHWS

Descri pti on

GLAZED PLATE SOLAR COLLECTORS AQUASTAT,

2" HWR

HST-2

2" HWS

1" SHW R

1" HWR

1" HWS

H0T WATER STORAGE TANK

1" HWR

Mark

3/4" HB 1" HWS

SOLAR HOT WATER

SOLAR HOT WATER SYSTEM HEAT EXCHANGER AND CONTROL PACKAGE HPAK-1

U.S.ARMY

A

OMS- HOT WATER SYSTEM PIPING SCHEMATIC

7/22/2011

N.T.S.

7/22/2011

Pl ot scal e:NONE

Pl ot date:

4

FAX (714) 327-1601

HUTTON CENTRE DRI VE,SUI TE 800

G.HADDAD

Subm i tted by:

F-171-40-160

Project Code:

Revi ewed by:

OMS HOT W ATER SYSTEM

M-5020

MEXI CO

D5

SEE DETAIL

LAS CRUCES,NEW

EXPANSION TANK

RESERVE CENTER

DIAPHRAGM

PANEL

PI PI NG DI AGRAM

ET-5

SYSTEM CONTROL

1

TEL (714) 327-1600

GFA-2

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-7020.dgn

Dwn by:

U.S.ARMY

FILL ASSEMBLY

LOUI SVI LLE DI STRI CT

FM GLYCOL

LOUI SVI LLE,KENTUCKY

Desi gned by:

3/4"

PS

D.O’ CALLAGHAN

LSLL

CORPS OF ENGI NEERS

LSL

Ckd by:

1" SHWS

A.REED

Date:

121710

B

W 912QR-11-R-0071

Sol i ci tati on No.

1"

R.SALLW ASSER C.KORPASH

Rev.

AS-4

Fi l e nam e:LCARC_M 7020. dgn

AUTOMATIC AIR VENT

SANTA ANA, CALI FORNI A 92707

TO DRAIN

SHEET REFERENCE NUMBER:

M-7020 of 222

9:12:44

m oraja

AM

Sheet 143

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES A. FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO LL

LOW LIMIT (FREEZE STAT)

N.O.

NORMALLY OPEN

LOUISVILLE DISTRICT

DRAWING M-8000. B. DUCT SMOKE DETECTORS AND ADDRESSABLE

MEASURED VARIABLE OR CONTROL DEVICE

Appr.

CONTROLS & INSTRUMENTATION

US Army Corps of Engineers

CONTROL DEVICES PROVIDED AND CONNECTED TO

TS 1

NO2

FIRE ALARM SYSTEM BY DIVISION 28. SEE DIVISION

NITROGEN DIOXIDE SENSOR

INSTRUMENT OR DEVICE NOT LOCATED IN AN ENCLOSURE

OA

OUTDOOR AIR

PD

PRESSURE DIFFERENTIAL SENSOR

PDI

PRESSURE DIFFERENTIAL INDICATOR

Date

28 FOR ADDITIONAL INFORMATION.

INSTRUMENT OR DEVICE IDENTIFICATION NUMBER

KEY NOTES

MEASURED VARIABLE OR CONTROL DEVICE AX

1

D

BUILDING NETWORK BACKBONE POINTS FOR USE OF BAS SYSTEM BY DIVISION 27. NECESSARY

INSTRUMENT OR DEVICE LOCATED IN AN ENCLOSURE

PI

PRESSURE INDICATOR

PT

PROGRAMMABLE THERMOSTAT

CABLE AND NETWORK HARDWARE BY BAS SYSTEM CONTRACTORS. 2

BAS SHALL BE PROVIDED WITH WEB-ENABLED INTERFACE AND SHALL BE REMOTELY ACCESSIBLE

AF

AFS

BACNET IP ON BUILDING ETHERNET BACKBONE (LAN)

HEAT AND VENT UNIT HVU 2-1

BAS SUB-NETWORK BACNET MS/TP 2

EXHAUST FANS

FLOOR RADIANT HEATING

EC 2-1

3

AFMS

DESCRIPTION

R

REFRIGERANT SENSOR

S

TEMPERATURE, RELATIVE HUMIDITY AND CO2 SPACE SENSOR

SD

SMOKE DETECTOR

AX

COORDINATE NETWORK CHARACTERISTICS AND REQUIREMENTS WITH BASE IT DEPARTMENT FOR

AIR FLOW

AIR FLOW SWITCH

AIR FLOW METERING STATION SP

3

VIA INTERNET USING STANDARD WEB BROWSER.

DUCT STATIC PRESSURE

WEB SERVER. 3

FACTORY MOUNTED UNIT CONTROL PANEL

4

PROVIDE AN ENERGY MONITORING/SUSTAINABLE

Descri pti on

ABBREV

STRATEGIES "DASHBOARD" SCREEN FOR PUBLIC ACCESS IN LOBBY A101. SEE ARCHITECTURAL

AUXILIARY CONTACT

DRAWINGS FOR LOCATION AND SPECIFICATION. SS CO

START/STOP CONTROL

CARBON MONOXIDE DETECTOR MONITOR/SCREEN SHALL BE BUILT FOR OUTDOOR

BACNET WEB SERVER

1

1

BACNET ROUTER/BUILDING CONTROLLER (BC)

C

T

THERMOSTAT

TI

TEMPERATURE INDICATOR

APPLICATIONS.

COMMON CONTROLS CONTRACTOR SHALL PROVIDE

INTERVAL DATA RECORDER FC-MON IDR-8-B

120V/24V TRANSFORMER AS REQUIRED

CD

CONTROL DAMPER

CI

CURRENT INPUT

GRAPHICAL INTERFACE TO MONITOR THE FOLLOWING ENERGY USAGE AND DISPLAY A REAL-TIME SNAPSHOT OF THE ARC BUILDING AND

COMM. CABLE

TS

TEMPERATURE SENSOR

OMS BUILDING SEPARATELY. -DELIVERED ELECTRICAL ENERGY

CR

CURRENT RELAY

VFD

VARIABLE FREQUENCY DRIVE

120V

PULSE OUTPUT

VLV

C

FLOW METER

FM

Mark

-WATTS/SQ.FT -YEARLY GAS CONSUMPTION ELECTRONIC INTERLOCK WIRING

(TOTAL CFH) -YEARLY=WATER CONSUMPTION

DI

DAMPER POSITION INDICATOR CONTROL SYSTEM/THERMOSTAT WIRING

FM

-POWER FACTOR (%) -CURRENT LOAD (AMPS)

DIRECT EVAPORATIVE COOLER

E-MON D-MON SERIES 3000

PULSE OUTPUT

VALVE

Appr.

CONDENSING UNIT

Date

CU

DEC

INTERNET

-REAL POWER (KW) -APPEARENT POWER (KVA)

ELECTRIC METER SERIAL GATEWAY

(KWH)

(GAL/YEAR) -AVERAGE MONTHLY WATER

FLOW METER

DP

CONSUMPTION (GAL/MONTH)

DIFF. PRESSURE SWITCH CM

NATURAL GAS FLOW METER

DOMESTIC WATER FLOW METER

ROOTS METER SOLID STATE PULSER

TURBINE FLOW METER ONICON 1130

DSD

CONTROL MODULE

IN ADDITION THE SYSTEM SHALL DISPLAY THE ENERGY SAVING FEATURES OF THE BUILDING

DUCT SMOKE DETECTOR

INCLUDING: DX

DIRECT EXPANSION

EPO

EMERGENCY POWER OFF

DI

DIGITAL INPUT TO UNIT CONTROLLER

-RAMMED EARTH CONSTRUCTION -PHOTO VOLTAICS -2-STAGE EVAPORATIVE

DO

DIGITAL OUTPUT FROM UNIT CONTROLLER

COOLING -RAINWATER HARVESTING

AI

ENTHALPY SENSOR

ANALOG INPUT TO UNIT CONTROLLER CONTROLS CONTRACTOR SHALL SUBMIT COMPLETE

N.T.S.

Descri pti on

A2

ES

OMS-DDC OVERVIEW

CONTROL SYSTEM WITH PROPOSED DASHBOARD F

FILTER

AO

ANALOG OUTPUT FROM UNIT CONTROLLER

GRAPHICAL IMAGES, CHARTS AND GRAPHS AS PART OF A COMPLETE CONTROL SYSTEM PACKAGE

H

HUMIDITY SENSOR (WET BULB TEMPERATURE)

(SIMILAR TO PROPHET, PERISCOPE, D-MON D-MON, SIEMENS SIMATIC, OR EQUIVALEST). THE CONTROL SYSTEM SHALL GENERATE ALL NECESSARY

HS

HUMIDITY SENSOR (RELATIVE HUMIDITY)

IDEC

INDIRECT EVAPORATIVE COOLER

M

MOTOR/ACTUATOR

MD

MOTORIZED DAMPER

N.C.

NORMALLY CLOSED

REPORTS REQUIRED TO MEET THE LEED MEASUREMENT AND VERIFICATION REQUIREMENTS.

HEAT AND VENT UNIT HVU 1-1

UNIT HEATERS

SPLIT HEAT PUMP UNITS

KITCHEN SUPPLY FANS KSF1-1

KITCHEN EXHAUST FANS

Mark

EXHAUST FANS

GATEWAY

FM

ELECTRIC METER

FLOW METER

NATURAL GAS FLOW METER

DOMESTIC WATER FLOW METER

ROOTS METER SOLID STATE PULSER

TURBINE FLOW METER ONICON 1130

U.S.ARMY

A

A1

7/22/2011

Pl ot scal e:NONE

Pl ot date:

Fi l e nam e:LCARC_M 8000. dgn

FAX (714) 327-1601

M .BETZ

Subm i tted by:

F-171-40-160

Project Code:

E-MON D-MON SERIES 3000

DDC SYSTEM ARCHITECTURE N.T.S.

MEXI CO

LOCATE MONITOR IN LOBBY A101

FLOW METER

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8000.dgn

FM

PULSE OUTPUT

RESERVE CENTER

PULSE OUTPUT

U.S.ARMY

COMM. CABLE (8) #26 AWG STRANDED SILVERSTRAIN

4

TEL (714) 327-1600

INTERVAL DATA RECORDER FC-MON IDR-8-B

LAS CRUCES,NEW

BAS OPERATOR’S WORKSTATION IN FACILITY MAINTENANCE OFFICE RM A116

HUTTON CENTRE DRI VE,SUI TE 800

BAS SUB-NETWORK BACNET MS/TP

LOUI SVI LLE DI STRI CT

CORPS OF ENGI NEERS

1

SANTA ANA, CALI FORNI A 92707

120V

4

ARC-DDC OVERVIEW

CONTROLS

BACNET IP ON BUILDING ETHERNET BACKBONE (LAN)

Revi ewed by:

120V/24V TRANSFORMER AS REQUIRED

1

A.REED

3

W 912QR-11-R-0071

3

Sol i ci tati on No.

3

C.KORPASH

3

Ckd by:

3

Dwn by:

3

EC 1-7

I .FRANCO

3

EC 1-6

Date:

1

EC 1-5

Desi gned by:

BACNET WEB SERVER

EC 1-4

A.REED

B

EC 1-3

EC 1-2

LOUI SVI LLE,KENTUCKY

EC 1-1 BACNET ROUTER/BUILDING CONTROLLER (BC)

072811

2

Rev.

BAS SUB-NETWORK BACNET MS/TP

SHEET REFERENCE NUMBER:

M-8000 of 222

9:14:38

m oraja

AM

Sheet 144

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

*** Safety Pays ***

2

5

SEQUENCE OF OPERATION LOW LEAKAGE

EXHAUST FAN

GENERAL NOTES

HEATING AND VENTILATING UNIT (HVU 1-1) A. FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-0010. FOR CONTROL

F. HEATING CONTROL: WHEN THERE IS A DEMAND FOR EF 1-7

N.C.

EXHAUST

A. SUPPLY FAN HAND-OFF-AUTO OPERATION:

AIR

HAND-OFF-AUTO SETTINGS SHALL BE PROVIDED AS PART OF THE VARIABLE FREQUENCY DRIVE (VFD) THROUGH THE

CD

DI

M

4

DRIVE’S KEYPAD. IN THE OFF MODE, THE FAN SHALL BE

6

2

N.C.

AX

4

SS

CD

DI

1

1

HVU 1-1 FREEZE

COIL

STAT

CONTINUOUSLY. IN THE AUTO MODE, THE BAS SHALL START/STOP THE UNIT THROUGH THE UNIT CONTROLLER

LOW LEAKAGE

AS DESCRIBED BELOW. PROGRAM A TIME DELAY INTO THE

EF 1-6

SUPPLY

N.C.

EXHAUST

THE RESTART OF EACH UNIT AFTER A POWER FAILURE TO

AIR

PREVENT CREATING A SPIKE IN THE FACILITY ELECTRICAL

INTAKE

AIR

DEMAND. UPON ACTIVATION, SAFETIES SHALL BE HARD

AIR

M

6

WIRED TO THE RESPECTIVE VFD TO STOP THE UNIT

1 LL

1 CD

DI

1

1

TS

SS

CI

SUPPLY FAN IN THE HAND AND AUTO MODES.

DSD

TO FACP

1 AX

AX

4

SS

CD

DI

1

1

1

FIRE ALARM SYSTEM BY DIVISION 28. SEE DIVISION

FAN IS STARTED OUTDOOR AIR DAMPER, CD-1, SHALL OPEN.

28 FOR ADDITIONAL INFORMATION.

WHEN THE UNIT IS OFF CD-1, SHALL BE CLOSED. H. FIRE ALARM SHUTDOWN: WHEN PARTICLES OF COMBUSTION ARE SENSED BY THE SUPPLY AIR DUCT

KEY NOTES

SMOKE DETECTOR DSD-1, A DUCT SMOKE ALARM SIGNAL SHALL BE SENT TO THE UNIT CONTROLLER AND FIRE

LOCAL-REMOTE SETTINGS SHALL BE PROVIDED AS PART

DP CM

OF THE VFD THROUGH THE DRIVE’S KEYPAD. IN THE

4

LOCAL MODE, THE FAN SPEED SHALL BE CONTROLLED

1

VARIABLE FREQUENCY DRIVE

2

PROVIDE INTERLOCK WIRING BETWEEN FAN AND FIRE

ALARM SYSTEM. UPON RECEIVING AN ALARM SIGNAL FROM SUPPLY AIR DUCT SMOKE DETECTOR DSD-1, THE FIRE

B. SUPPLY FAN LOCAL-REMOTE SPEED CONTROL:

2

2

1

CONTROL DEVICES PROVIDED AND CONNECTED TO

G. OUTDOOR AIR DAMPER CONTROL: WHEN THE SUPPLY

ALARM SYSTEM SHALL ACTIVATE A CONTROL MODULE (CM)

ALARM SYSTEM THROUGH CONTROL MODULE (CM).

TO STOP THE FAN. WHEN THE FIRE ALARM CONDITION HAS

WHEN A DUCT SMOKE DETECTOR ASSOCIATED WITH

BEEN CLEARED, AND THE FIRE ALARM SYSTEM HAS BEEN

AHU SENSES PARTICLES OF COMBUSTION, FAN

RESET, THE UNIT SHALL BE RETURNED TO OPERATION.

SHALL STOP. THIS INTERLOCK SHALL BE HARD

THROUGH A MANUAL SPEED CONTROL LOCATED AT THE TS

FROM

XXX

FACP

RESPECTIVE DRIVE CONTROL PANEL. IN THE REMOTE MODE, THE FAN SPEED SHALL BE CONTROLLED BY THE BAS

7

THROUGH THE UNIT CONTROLLER.

WIRED AND NOT PERFORMED THROUGH THE DDCS. I. DIRTY FILTER ALARM: DIFFERENTIAL PRESSURE SWITCH

SHALL START AND STOP THE UNIT. TO START THE UNIT, THE BAS SHALL SEND A START SIGNAL TO THE UNIT DI DI

DI

DI

AO

DO AO

AI

DI

DO

CONTROLLER, WHICH WILL START THE SUPPLY FAN. IF THE

DO

THE START COMMAND SHALL BE CANCELED. TO STOP THE CONTROLLER

UNIT, THE BAS SHALL SEND A STOP COMMAND TO UNIT

CONTROLLER

X

X

X

CONTROLLER, WHICH WILL DE-ENERGIZE THE SUPPLY FAN. THE UNIT SHALL BE PLACED ON A TIME SCHEDULE.

FROM PREVIOUS CONTROLLER

FROM PREVIOUS CONTROLLER

TO NEXT CONTROLLER

CONTROL: THE EXHAUST FAN MOTOR STARTERS SHALL BE SOFTWARE INTERLOCKED WITH THE SUPPLY FAN MOTOR STARTER TO START WHEN THE SUPPLY FAN IS ON AND

HEATING AND VENTILATING UNIT (ARC UNIT STORAGE) - CONTROL DIAGRAM

TO STOP WHEN THE SUPPLY FAN IS OFF. THE EXHAUST

N.T.S.

FAN (EF 1-7), IS ASSOCIATED WITH HVU 1-1. WHENEVER HVU 1-1 IS ON EF 1-7 SHALL BE ON.

INDICATOR (PDI-1) LOCATED AT THE FILTERS SHALL

TEMPERATURE HEATING SET POINT SHALL BE INITIALLY SET AT 68F (ADJUSTABLE). WHEN THE ROOM TEMPERATURE IS ABOVE 75F, THE HEATING SYSTEM SHALL BE OFF AND EF 1-6 SHALL START AND ITS ASSOCIATED

C

OPEN. IV-2 AND EF-1-6 SHALL REMAIN IN THE VENTILATING MODE UNTIL THE SPACE TEMPERATURE

EF 2-1

N.C. 4

HVU 2-1

OUTDOOR

N.C.

AIR

AX

SS

SHALL OPEN. ONCE DAMPER IS PROVEN OPEN BY

CD

DI

1

1

STATUS INDICATED DOES NOT MATCH THE COMMANDED

1

1

1

6

MOTOR STARTER

7

TYPICAL SPACE TEMPERATURE AND HUMIDITY

OUTPUT FOR THE FAN AN ALARM SHALL BE GENERATED AT THE UNIT CONTROLLER AND THE BAS. K. FAILURE MODE: UPON LOSS OF CONTROL SIGNAL OR

SENSORS. XXX REPRESENTS ASSOCIATED ROOM

ELECTRICAL POWER THE CONTROL DEVICES SHALL FAIL IN

NUMBER.

THE MANNER INDICATED IN THE "BAS POINT FUNCTION SCHEDULE" ON THE MECHANICAL SHEETS.

8

ADDITIONAL MONITORING: IN ADDITION TO THE POINTS

TYPICAL CARBON MONOXIDE AND NITROGEN DIOXIDE SENSORS. SEE M-110B FOR LOCATIONS OF SENSORS.

MENTIONED IN THESE SEQUENCES PROVIDE THE ADDITIONAL MONITORING POINTS LISTED IN THE "BAS POINT FUNCTION 9

PROVIDE ALARM HORN WHERE INDICATED ON M-110B. ALARM HORN SHALL SOUND WHEN LEVEL OF EITHER

L. EMERGENCY STOP: WHEN THE EMERGENCY VENMTILATION

CARBON MONOXIDE OR NITROGEN DIOXIDE EXCEEDS

STOP BUTTON IS ACTIVATED, THE SUPPLY AND EXHAST

HIGH LEVEL LIMIT. SEE SEQUENCE OF OPERATION

FANS SHALL STOP AND THE MOTORIZED DAMPERS SHALL

FOR DETAIL.

CLOSE. 10 M. PROVIDE LOW LIMIT SUPPLY TEMPERATURE ALARM TO

INTERLOCK WIRING BETWEEN HOOD SWITCH AND HOOD EXHAUST FANS

SHUTDOWN SUPPLY FAN AND ALARM BAS.

EF 1-7 SHALL RUN DURING ALL OCCUPIED TIMES. UNIT

"HEAT/VENT/COOL/OFF". INTERLOCK KSF 1-1, HOOD,

HEATERS SHALL MAINTAIN SPACE AT 40F DURING

EF 1-9.

11

HOOD VENTILATOR SELECTOR SWITCH

OCCUPIED TIMES TO KEEP SPACE AT 68F.

SEQUENCE OF OPERATION

EXHAUST N.C.

AIR

HEATING AND VENTILATING UNIT (HVU 2-1)

AIR

C

M 6 LL

1 PD

FAN DISCONNECT

FALLS TO 70F AND THEN SHALL TURN OFF. HVU 1-1 AND

EF 2-2

SUPPLY

PDI DI

5

LOW LEAKAGE

1

CD

START. DAMPER SHALL CLOSE WHEN FAN STOPS.

MONITOR THE STATUS OF THE UNIT SUPPLY FAN. IF THE

UNOCCUPIED TIMES AND SUPPLEMENT HVU 1-1 DURING

FREEZE STAT

COIL

ASSOCIATED DAMPER POSITION SWITCH, FAN SHALL

J. FAN STATUS: A CURRENT RELAY SHALL BE USED TO

AIR

M

HEATING

H

M

START IN EITHER HAND OR AUTO MODE. DAMPER

FILTERS.

EXHAUST

6

F

ASSOCIATED DAMPER. WHEN FAN IS COMMANDED TO

INTAKE VENTILATOR (IV-2) MOTORIZED DAMPER SHALL

LOW EXHAUST FAN LEAKAGE

A F M S

PROVIDE INTERLOCK WIRING BETWEEN FAN AND

INDICATE THE DIFFERENTIAL PRESSURE ACROSS THE

SCHEDULE."

SUPPLY FAN

4

CONTROLLER AND THE BAS. PRESSURE DIFFERENCE

E. SUPPLY AIR TEMPERATURE SET POINT: THE SUPPLY AIR

LOW LEAKAGE

MANUAL HOOD SWITCH

TO NEXT CONTROLLER D. EXHAUST FANS AUTOMATIC MODE START/STOP

D1

3

FAN DOES NOT START AFTER A 60 SECOND (ADJUSTABLE) TIME DELAY, A UNIT FAILURE ALARM SHALL BE ISSUED AND

X

INSTALLED UNDER DIVISION 28.

FILTERS. WHEN THE PRESSURE EXCEEDS AN ADJUSTABLE LIMIT, AN ALARM SIGNAL WILL BE SENT TO THE UNIT

C. AUTOMATIC MODE START/STOP CONTROL: THE BAS

CM AND SMOKE DETECTOR FURNISHED AND

DP-1 SHALL MONITOR THE PRESSURE DROP AT THE

Descri pti on

H

PDI

DUCT SMOKE DETECTORS AND ADDRESSABLE

VFD, IN BOTH THE HAND AND AUTO MODES, TO STAGGER

C

D

HEATING SHALL BE OFF.

Mark

F

B.

LOUISVILLE DISTRICT

Appr.

SUPPLY FAN

HEATING

TEMPERATURE. WHEN THE SUPPLY FAN IS OFF, THE

DRAWING M-8000.

Date

AIR

ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO

Descri pti on

OUTDOOR

LOW LEAKAGE

CONTROL VALVE TO MAINTAIN A 68F SUPPLY AIR

STOPPED. IN THE HAND MODE, THE FAN SHALL RUN

M M

HEATING, THE BAS SHALL MODULATE THE HEATING

US Army Corps of Engineers

Appr.

IV 2

IV 1

4

Date

1

TS

TO

1 AX

SS

CI

FACP

2

DSD AX

1

SS

4

2

CD

DI

1

1

DP CM

1 4

8

TS

FROM

CO

NO2

XXX

FACP

XXX

XXX

A. SUPPLY FAN HAND-OFF-AUTO OPERATION: HAND-OFF-AUTO SETTINGS SHALL BE PROVIDED AS

H. FIRE ALARM SHUTDOWN: WHEN PARTICLES OF COMBUSTION ARE SENSED

PART OF THE VARIABLE FREQUENCY DRIVE (VFD) THROUGH THE DRIVE’S KEYPAD. IN THE OFF

BY THE SUPPLY AIR DUCT SMOKE DETECTOR DSS-1, A DUCT SMOKE ALARM

MODE, THE FAN SHALL BE STOPPED. IN THE HAND MODE, THE FAN SHALL RUN CONTINUOUSLY. IN

SIGNAL SHALL BE SENT TO THE UNIT CONTROLLER AND FIRE ALARM

THE AUTO MODE, THE BAS SHALL START/STOP THE UNIT THROUGH THE UNIT CONTROLLER AS

SYSTEM. UPON RECEIVING AN ALARM SIGNAL FROM SUPPLY AIR DUCT

DESCRIBED BELOW. PROGRAM A TIME DELAY INTO THE VFD, IN BOTH THE HAND AND AUTO

SMOKE DETECTOR DSD-1, THE FIRE ALARM SYSTEM SHALL ACTIVATE A

MODES, TO STAGGER THE RESTART OF EACH UNIT AFTER A POWER FAILURE TO PREVENT

CONTROL MODULE (CM) TO STOP THE FAN. WHEN THE FIRE ALARM

CREATING A SPIKE IN THE FACILITY ELECTRICAL DEMAND. UPON ACTIVATION, SAFETIES SHALL BE

CONDITION HAS BEEN CLEARED, AND THE FIRE ALARM SYSTEM HAS BEEN

HARD WIRED TO THE RESPECTIVE VFD TO STOP THE UNIT SUPPLY FAN IN THE HAND AND

RESET, THE UNIT SHALL BE RETURNED TO OPERATION.

AUTO MODES.

7

I. DIRTY FILTER ALARM: DIFFERENTIAL PRESSURE SWITCH DP-1 SHALL

DI

DI

AI

AI

DI

AO

DO AO

AI

DI

DO

DI

AI

DO

AI

CONTROLLER

CONTROLLER

X

X

MONITOR THE PRESSURE DROP AT THE FILTERS. WHEN THE PRESSURE

AS PART OF THE VFD THROUGH THE DRIVE’S KEYPAD. IN THE LOCAL MODE, THE FAN SPEED

EXCEEDS AN ADJUSTABLE LIMIT, AN ALARM SIGNAL WILL BE SENT TO THE

SHALL BE CONTROLLED THROUGH A MANUAL SPEED CONTROL LOCATED AT THE RESPECTIVE

UNIT CONTROLLER AND THE BAS. PRESSURE DIFFERENCE INDICATOR (PDI-1)

DRIVE CONTROL PANEL. IN THE REMOTE MODE, THE FAN SPEED SHALL BE CONTROLLED BY THE

LOCATED AT THE FILTERS SHALL INDICATE THE DIFFERENTIAL PRESSURE

BAS THROUGH THE UNIT CONTROLLER.

ACROSS THE FILTERS.

C. AUTOMATIC MODE START/STOP CONTROL: THE BAS SHALL START AND STOP THE UNIT. TO

J. FAN STATUS: A CURRENT RELAY SHALL BE USED TO MONITOR THE

START THE UNIT, THE BAS SHALL SEND A START SIGNAL TO THE UNIT CONTROLLER, WHICH WILL

STATUS OF THE UNIT SUPPLY FAN. IF THE STATUS INDICATED DOES NOT

START THE SUPPLY FAN. IF THE FAN DOES NOT START AFTER A 60 SECOND (ADJUSTABLE)

MATCH THE COMMANDED OUTPUT FOR THE FAN AN ALARM SHALL BE

TIME DELAY, A UNIT FAILURE ALARM SHALL BE ISSUED AND THE START COMMAND SHALL BE

GENERATED AT THE UNIT CONTROLLER AND THE BAS.

AI

DO X

B. SUPPLY FAN LOCAL-REMOTE SPEED CONTROL: LOCAL-REMOTE SETTINGS SHALL BE PROVIDED

X

WHICH WILL DE-ENERGIZE THE SUPPLY FAN. THE UNIT SHALL BE PLACED ON A TIME SCHEDULE. 9

THE FLOOR RADIANT HEATING SYSTEM (SEE M-8070 AND M-7000 FOR DETAIL).

M. PROVIDE LOW LIMIT SUPPLY TEMPERATURE ALARM TO SHUTDOWN SUPPLY

10

FAN AND ALARM BAS

CR

CD

SS

GREASE

1

STARTER TO START WHEN THE SUPPLY FAN IS ON AND TO STOP WHEN THE SUPPLY FAN IS A. SUPPLY FAN HAND-OFF-AUTO OPERATION: HAND-OFF-AUTO

OFF.

OPERATION SWITCH ON MOTOR STARTER SHALL CONTROL THE FAN. IN

1 B.D.D

SUPPLY AIR

EXHAUST

EXHAUST

AIR

AIR

SW

KITCHEN HOOD

A

F. FIRE ALARM SHUTDOWN: WHEN PARTICLES OF COMBUSTION ARE SENSED BY THE SUPPLY

FAN SHALL BE ENERGIZED. IN THE AUTO POSITION THE BAS SHALL

AIR DUCT SMOKE DETECTOR DSD-1, A DUCT SMOKE ALARM SIGNAL SHALL BE SENT TO THE

START/STOP THE UNIT THROUGH THE UNIT CONTROLLER AS DESCRIBED

UNIT CONTROLLER AND FIRE ALARM SYSTEM. UPON RECEIVING AN ALARM SIGNAL FROM

BELOW. PROVIDE AN ADJUSTABLE DELAY-ON-MAKE RELAY, WIRED IN

SUPPLY AIR DUCT SMOKE DETECTOR DSD-1, THE FIRE ALARM SYSTEM SHALL ACTIVATE A

BOTH THE HAND AND AUTO MODES, TO STAGGER THE RESTART OF

CONTROL MODULE (CM) TO STOP THE FAN. WHEN THE FIRE ALARM CONDITION HAS BEEN

UNIT, AFTER A POWER FAILURE, TO PREVENT CREATING A SPIKE IN THE

CLEARED, AND THE FIRE ALARM SYSTEM HAS BEEN RESET, THE UNIT SHALL BE RETURNED TO

FACILITY ELECTRICAL DEMAND. SAFETIES SHALL BE HARD WIRED TO

OPERATION. THIS SHALL BE PROVIDED BY FLS SEPARATE FROM BAS.

B. AUTOMATIC MODE START/STOP CONTROL: THE UNIT SHALL BE

DROP AT THE FILTERS. WHEN THE PRESSURE EXCEEDS AN ADJUSTABLE LIMIT, AN ALARM

CONTROLLED BY A "HEAT/VENT/COOL/OFF" KITCHEN HOOD SWITCH.

SIGNAL WILL BE SENT TO THE UNIT CONTROLLER AND THE BAS.PRESSURE DIFFERENCE

WHEN THE HOOD SWITCH IS INDEXED TO "VENT", THE BAS SHALL SEND

INDICATOR (PDI-1) LOCATED AT THE FILTERS SHALL INDICATE THE DIFFERENTIAL PRESSURE

A START SIGNAL TO SUPPLY FAN STARTER, WHICH WILL START THE

ACROSS THE FILTERS.

(ADJUSTABLE) TIME DELAY, A UNIT FAILURE ALARM SHALL BE ISSUED

H. FAN STATUS: A CURRENT RELAY SHALL BE USED TO MONITOR THE STATUS OF THE UNIT

AND THE START COMMAND SHALL BE CANCELED. TO STOP THE UNIT,

SUPPLY FAN. IF THE STATUS INDICATED DOES NOT MATCH THE COMMANDED OUTPUT FOR THE

TURN THE HOOD SWITCH TO OFF AND THE BAS SHALL SEND A STOP

FAN AN ALARM SHALL BE GENERATED AT THE UNIT CONTROLLER AND THE BAS.

COMMAND TO STARTER, WHICH WILL STOP THE SUPPLY FAN. I. FAILURE MODE: UPON LOSS OF CONTROL SIGNAL OR ELECTRICAL POWER THE CONTROL

AO

DI

DI

AI

DI

DI

C. TEMPERATURE CONTROL: KSF 1-1 SHALL HAVE A MANUAL

DEVICES SHALL FAIL IN THE MANNER INDICATED IN THE "BAS POINT FUNCTION SCHEDULE" ON

"HEAT/VENT/COOL/OFF" WALL SWITCH. WHEN PLACED IN "HEAT"

THE MECHANICAL SHEETS.

POSITION, THE ELECTRIC HEATER SHALL STAGE ON TO TEMPER THE

CONTROLLER FOR SF/EF

X

X

SUPPLY AIR TO MAINTAIN 55F SUPPLY AIR. HEATER SHALL TURN ON

J. ADDITIONAL MONITORING: IN ADDITION TO THE POINTS MENTIONED IN THESE SEQUENCES

ONLY AFTER FAN IS PROVEN "ON". UNIT SHALL ALARM AT THE BAS

PROVIDE THE ADDITIONAL MONITORING POINTS LISTED IN THE "BAS POINT FUNCTION

WHEN SUPPLY AIR TEMPERATURE IS ABOVE 75F OR BELOW 45F. UNIT

SCHEDULE."

TO NEXT CONTROLLER

35F. WHEN THE SWITCH IS MOVED TO "COOL", THE EVAPORATIVE

K. EMERGENCY STOP: WHEN THE EMERGENCY VENTILATION STOP BUTTON IS ACTIVATED, THE

COOLING PUMP SHALL START AND TEMPER THE SUPPLY AIR.

SUPPLY AND EXHAUST FANS SHALL STOP AND THE MOTORIZED DAMPERS SHALL CLOSE.

7/22/2011

Pl ot scal e:NONE

Pl ot date:

SHEET REFERENCE NUMBER:

D. GREASE HOOD EXHAUST FAN AUTOMATIC START/STOP CONTROL: THE

A1

KITCHEN HOOD SUPPLY AND EXHAUST FANS - CONTROL DIAGRAM N.T.S.

GREASE HOOD EXHAUST FAN, EF 1-9 MOTOR STARTER SHALL BE INTERLOCKED WITH THE KSF 1-1 SUPPLY FAN MOTOR STARTER TO

M-8010

START WHEN THE SUPPLY FAN IS ON AND TO STOP WHEN THE

Sheet 145

SUPPLY FAN IS OFF. 9:15:29 AM

Fi l e nam e:LCARC_M 8010. dgn

SHALL SHUTDOWN WHEN TEMPERATURE RISES ABOVE 80F OR BELOW FROM PREVIOUS CONTROLLER

m oraja

Desi gned by:

STOP THE SUPPLY FAN.

SUPPLY FAN. IF THE FAN DOES NOT START AFTER A 60 SECOND

3 KITCHEN HOOD

THE OFF MODE, THE FAN SHALL BE STOPPED. IN THE HAND MODE, THE

G. DIRTY FILTER ALARM: DIFFERENTIAL PRESSURE SWITCH DP-1 SHALL MONITOR THE PRESSURE

SW

11

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8010.dgn

FAN, EF 1-8 MOTOR STARTER SHALL BE INTERLOCKED WITH THE EC1-6 SUPPLY FAN MOTOR

M

DUCT

CM

DP

E. CONDENSATE HOOD EXHAUST FAN AUTOMATIC START/STOP CONTROL: THE HOOD EXHAUST

EF 1-9)

FAX (714) 327-1601

1

KITCHEN MAKE-UP AIR UNIT (KSF 1-1) AND EXHAUST FANS (EF 1-8 &

TEL (714) 327-1600

1

5

CONTROLS

TS

MEXI CO

1 PDI

LAS CRUCES,NEW

M

HUTTON CENTRE DRI VE,SUI TE 800

EVAP COOLER

SANTA ANA, CALI FORNI A 92707

SEQUENCE OF OPERATION

4

EF 1-8

H

LOUI SVI LLE DI STRI CT

M CR

CORPS OF ENGI NEERS

CLOSED.

U.S.ARMY

6 SUPPLY FAN

E DIRECT

100% OUTSIDE AIR (4040CFM).

DAMPER, CD-1, SHALL OPEN. WHEN THE UNIT IS OFF, OUTDOOR AIR DAMPER, CD-1, SHALL BE

RESERVE CENTER

F OUTDOOR AIR

(10CFM/PERSON x15 = 150CFM). HVU 2-1 OPERATES AT A MINIMUM OF G. OUTDOOR AIR DAMPER CONTROL: WHEN THE SUPPLY FAN IS STARTED THE OUTDOOR AIR

HEATING COIL

BE WITHIN 15% PLUS OR MINUS OF DESIGN MINIMUM REQUIRED

U.S.ARMY

LOW LEAKAGE

N. AIRFLOW MONITORING STATION: MEASURE OUTSIDE AIR (OSA) VOLUME TO

FAN IS OFF, THE HEATING SHALL BE OFF. EF 1-9

KSF 1-1

ELECTRIC

HEATING CONTROL VALVE TO MAINTAIN A 60F SUPPLY AIR TEMPERATURE. WHEN THE SUPPLY

A.REED

F. HEATING CONTROL: WHEN THERE IS A DEMAND FOR HEATING, THE BAS SHALL MODULATE THE

M .BETZ

MOTORIZED DAMPERS SHALL CLOSE.

SHALL BE INITIALLY SET AT 60F(ADJUSTABLE). SPACE TEMPERATURE SENSOR SHALL OPERATE

Subm i tted by:

E. SUPPLY AIR TEMPERATURE SET POINT: THE SUPPLY AIR TEMPERATURE HEATING SET POINT

F-171-40-160

ACTIVATED, THE SUPPLY AND EXHAST FANS SHALL STOP AND THE

Date:

L. EMERGENCY STOP: WHEN THE EMERGENCY VENMTILATION STOP BUTTON IS

Project Code:

ADDITIONAL VENTILATION.

072811

B

Revi ewed by:

"BAS POINT FUNCTION SCHEDULE."

OF CO OR N02, THE EXHAUST FANS AND HVU 2-1 SHALL STAGE TO A HIGHER CFM FOR

A.REED

EXHAUST FANS, EF 2-1 AND EF 2-2, ARE ASSOCIATED WITH HVU 2-1. UPON AN ALARM CONDITION

W 912QR-11-R-0071

SEQUENCES PROVIDE THE ADDITIONAL MONITORING POINTS LISTED IN THE

Sol i ci tati on No.

START WHEN THE SUPPLY FAN IS ON AND TO STOP WHEN THE SUPPLY FAN IS OFF. THE

C.KORPASH

N.T.S.

ADDITIONAL MONITORING: IN ADDITION TO THE POINTS MENTIONED IN THESE

Ckd by:

HEATING AND VENTILATING UNIT (OMS WORK BAYS) - CONTROL DIAGRAM

POINT FUNCTION SCHEDULE" ON THE MECHANICAL SHEETS.

STARTERS SHALL BE SOFTWARE INTERLOCKED WITH THE SUPPLY FAN MOTOR STARTER TO

LOUI SVI LLE,KENTUCKY

B1

ED

THE CONTROL DEVICES SHALL FAIL IN THE MANNER INDICATED IN THE "BAS D. EXHAUST FANS AUTOMATIC MODE START/STOP CONTROL: THE EXHAUST FAN MOTOR

Dwn by:

HORN

K. FAILURE MODE: UPON LOSS OF CONTROL SIGNAL OR ELECTRICAL POWER

I .FRANCO

FROM PREVIOUS CONTROLLER TO NEXT CONTROLLER

TO NEXT CONTROLLER

Rev.

FROM PREVIOUS CONTROLLER

Mark

CANCELED. TO STOP THE UNIT, THE BAS SHALL SEND A STOP COMMAND TO UNIT CONTROLLER,

1

2

*** Support Value Engineering - It Pays ***

4

5

of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES SEQUENCE OF OPERATION

A.

FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS,

SPLIT SYSTEM HEAT PUMP UNIT

AND NOTES REFER TO DRAWING M-8000. OUTDOOR

HP-1, 2, 3, 4, 5 B.

SIGNAL TO THE UNIT CONTROLLER, WHICH WILL START THE FAN COIL AND OUTDOOR HEATPUMP UNIT.

PROVIDED AND CONNECTED TO FIRE ALARM SYSTEM BY

IF THE UNIT DOES NOT START AFTER A 60 SECOND (ADJUSTABLE) TIME DELAY, A UNIT FAILURE

DIVISION 28. SEE DIVISION 28 FOR ADDITIONAL INFORMATION.

ALARM SHALL BE ISSUED AND THE START COMMAND SHALL BE CANCELED. TO STOP THE UNIT, THE

Date

BAS SHALL SEND A STOP COMMAND TO UNIT CONTROLLER, WHICH WILL DE-ENERGIZE THE FAN

INDOOR

COIL/HEAT PUMP. THE UNIT SHALL BE PLACED ON A TIME SCHEDULE.

FAN COIL SUPPLY FAN

1. OPTIMAL START: THE BAS SHALL START THE UNIT ACCORDING TO AN OPTIMAL START ROUTINE.

D

KEY NOTES

COOL DOWN MODE SHALL BE USED IF THE SPACE TEMPERATURE, AS SENSED BY THE SPACE OUTDOOR X

AIR

SUPPLY

TEMPERATURE SENSOR, IS ABOVE THE OCCUPIED SET POINT. AT THE SCHEDULED OCCUPANCY TIME,

AIR

THE UNIT SHALL START IF NOT ALREADY STARTED BY THE OPTIMAL START ROUTINE, AND THE UNIT SHALL BE SWITCHED TO THE OCCUPIED MODE.

FC-1, 2, 3, 4, 5

D

D

DUCT SMOKE DETECTORS AND ADDRESSABLE CONTROL DEVICES Appr.

1

SS

LOUISVILLE DISTRICT

A. AUTOMATIC MODE START/STOP CONTROL: TO START THE UNIT, THE BAS SHALL SEND A START

HEAT PUMP

CR

US Army Corps of Engineers

TS XXX

X

1

MOTOR STARTER

2

ELECTRIC METER SHALL BE CONNECTED TO BAS SUB-NETWORK USING BACNET. SEE "BAS POINT FUNCTION SCHEDULE" ON

2. OPTIMAL STOP: THE BAS SHALL STOP THE UNIT ACCORDING TO AN OPTIMAL STOP ROUTINE. THE

M-8080 FOR LIST OF NETWORK POINTS.

ROUTINE SHALL MONITOR THE ROOM TEMPERATURE AS SENSED BY THE SPACE TEMPERATURE 6

SENSOR, AND STOP THE UNIT UP TO 30 MINUTES EARLY IF THE TEMPERATURES ARE WITHIN

3

ACCEPTABLE LIMITS.

MECHANICAL FLOOR PLANS.

3. UNOCCUPIED START/STOP: IN THE UNOCCUPIED MODE, THE BAS SHALL START THE UNIT AND

4

FAN DISCONNECT

5

PROVIDE INTERLOCK WIRING BETWEEN FAN AND ASSOCIATED

OPERATE THE SYSTEM IN THE UNOCCUPIED COOLING MODE IF ANY SPACE TEMPERATURE, AS SENSED

AI

DI

PROVIDE EMERGENCY SHUTDOWN SIWTCHES WHERE INDICATED IN

BY THE SPACE TEMPERATURE SENSORS, RISES ABOVE 85F (ADJUSTABLE). THE UNIT SHALL OPERATE

DAMPER. WHEN FAN IS COMMANDED TO START IN EITHER HAND

UNTIL SPACE TEMPERATURE IS AT LEAST 78F (ADJUSTABLE).

X

OPEN BY ASSOCIATED DAMPER POSITION SWITCH, FAN SHALL

B. COOLING/HEATING CONTROL: WHEN THERE IS A DEMAND FOR COOLING, THE BAS SHALL CYCLE ON

CONTROLLER

X

START. DAMPER SHALL CLOSE WHEN FAN STOPS.

AND OFF THE HEAT PUMP COMPRESSOR TO MAINTAIN THE SPACE TEMPERATURE AS SENSED BY THE TEMPERATURE SENSOR AT THE SPACE TEMPERATURE COOLING SET POINT, INITIALLY SET AT 74

TO NEXT CONTROLLER

FROM PREVIOUS CONTROLLER

6

DEGREES F (ADJUSTABLE). WHEN THE FAN COIL IS OFF, THE HEAT PUMP SHALL BE OFF. AS ROOM

LOCATIONS OF SPACE TEMPERATURE SENSORS.

TEMPERATURE AT 68F. UPON A RISE OF TEMPERATURE TO 72F, THE HEATING MODE OF THE HEAT

D1

PUMP SHALL TURN OFF.

N.T.S.

TYPICAL SPACE TEMPERATURE SENSORS. XXX REPRESENTS ASSOCIATED ROOM NUMBER. SEE MECHANICAL SHEETS FOR

TEMPERATURE FALLS TO 62F, THE UNIT SHALL SWITCH TO HEATING MODE TO MAINTAIN ROOM

SPLIT HEAT PUMP FAN COIL UNIT - CONTROL DIAGRAM

Descri pti on

OR AUTO MODE, DAMPER SHALL OPEN. ONCE DAMPER IS PROVEN

7

BOILER ROOM EPO SWITCH AND ALARM INDICATION.

C. FAILURE MODE: UPON LOSS OF CONTROL SIGNAL OR ELECTRICAL POWER THE CONTROL DEVICES SHALL FAIL IN THE MANNER INDICATED IN THE "BAS POINT FUNCTION SCHEDULE" ON THE MECHANICAL SHEETS. D. ADDITIONAL MONITORING: IN ADDITION TO THE POINTS MENTIONED IN THESE SEQUENCES PROVIDE THE ADDITIONAL MONITORING POINTS LISTED IN THE "BAS POINT FUNCTION SCHEDULE."

M

AIR 1 4

C

EF 1-2

EF 1-5

EF 1-6

EF 1-7

EF 2-3

EF 2-4

EF 2-7

SS

M

CR SS

EF 1-1

CR

5

CD

DI

1

1

CD 1

EF 1-4

EF 1-10

EF 1-12

EF 1-13

SEQUENCE OF OPERATION

EF 1-14

EXHAUST FANS (TYPICAL)

M

A. EXHAUST FAN HAND-OFF-AUTO OPERATION: PROVIDE A HAND-OFF-AUTO

EMERGENCY SHUTDOWN LOW LEAKAGE DAMPER

DI 1

TS XXX

EF 1-3

Date

1 4

EXHAUST

M

Appr.

Mark

EMERGENCY SHUTDOWN LOW LEAKAGE DAMPER

OPERATION SWITCH AT THE FAN DISCONNECT. IN THE OFF MODE, THE EXHAUST FAN SHALL BE STOPPED. IN THE HAND MODE, THE EXHAUST FAN SHALL RUN CONTINUOUSLY. IN THE AUTO MODE, THE EXHAUST FAN SHALL

5

EXHAUST

BE CONTROLLED BY THE BAS AS DESCRIBED BELOW.

AIR B. AUTOMATIC MODE START/STOP CONTROL: THE BAS SHALL START AND STOP THE FAN BASED ON A PROGRAMMED START/STOP SCHEDULE. TO START THE FAN, THE BAS SHALL SEND A START SIGNAL TO THE FAN. TO STOP A FAN, THE BAS SHALL SEND A STOP COMMAND TO THE FAN WHICH DI

DI

DO

WILL DE-ENERGIZES THE FAN.

DO

Descri pti on

C. FAN STATUS: A CURRENT RELAY SHALL BE USED TO MONITOR THE STATUS OF THE FAN. IF THE STATUS INDICATED DOES NOT MATCH THE CONTROLLER

X

X

X

CONTROLLER

COMMANDED OUTPUT FOR THE FAN AN ALARM SHALL BE GENERATED AND

X

SENT TO THE BAS AND THE FAN START COMMAND SHALL BE CANCELED. FROM PREVIOUS CONTROLLER

N.T.S.

EMERGENCY SHUTDOWN LOW LEAKAGE DAMPER

SEQUENCE OF OPERATION

EXHAUST

M

AIR

A. VEHICALE EXHAUST FAN AND REEL

Mark

USER DEFINED PERIOD FROM 1 TO 30

M

X FROM PREVIOUS CONTROLLER

VX 2-1

REEL

TO NEXT CONTROLLER

1V-9 INTAKE VENTILATOR MOTORIZED DAMPER

VX 2-2

B2 VEHICLE EXHAUST FAN - WIRING DIAGRAM

EXHAUST FAN - WIRING DIAGRAM N.T.S.

N.T.S.

UNIT MOUNTED TSTAT

U.S.ARMY

B1

X

CORPS OF ENGI NEERS

FAN

CONTROLLER

M

UNIT MOUNTED

7/22/2011

Pl ot scal e:NONE

Pl ot date:

Fi l e nam e:LCARC_M 8020. dgn

2 DH-1 DEHUMIDIFIER H

TS H CR

SS

C

EMERGENCY AIR DISTRIBUTION SHUT DOWN 7 EPO

UH -

3 TS OA

CO2 OA

A. PROVIDE EMERGENCY AIR DISTRIBUTION SW

DROPS TO 65F (ADJUSTABLE), THE FAN SHALL START AND

A. WHEN THE HUMIDITY RISES ABOVE THE

THE HEATING VALVE SHALL MODULATE TO MAINTAIN 68F.

SET POINT, INITIALLY SET AT 65% RH

(TYP)

SHUTDOWN SWITCH WHERE INDICATED IN THE

A

DEHUMIDIFIER (TYPICAL)

A. DURING OCCUPIED HOURS, WHEN THE TEMPERATURE

MECHANICAL FLOOR PLANS. WHEN THE SWITCH IS

B. DURING UNOCCUPIED HOURS AND NIGHT SETBACK, THE

ACTIVATED, ALL MECHANICAL EQUIPMENT

UNIT HEATER SHALL MAINTAIN A TEMPERATURE OF 40F

CONTROLLED BY THE BAS WITHIN THE BUILDING

(ADJUSTABLE).

(ADJUSTABLE), THE DEHUMIDIFIER SHALL BE ENABLED. WHEN THE HUMIDITY FALLS BELOW 50% RH, THE DEHUMIDIFIER SHALL BE DISABLED. THE DEHUMIDIFIER SHALL BE

SHALL BE SHUT DOWN INCLUDING CONTROL

CONTROLLED BY A UNIT MOUNTED

DAMPERS, AND MOTORIZEDDAMPERS. WHEN THE

HUMIDISTAT PROVIDED BY THE UNIT

EMERGENCY CONDITION HAS BEEN CLEARED, THE DI

DI

DI

AI

AI

DI

MANUFACTURER AS SPECIFIED IN DIVISION

MECHANICAL EQUIPMENT SHALL BE RETURNED TO

AI

HUMIDITY LEVEL

NORMAL OPERATION. DI

X

CONTROLLER

DO

HUMIDITY BY BAS ONLY.

AI

AO

X X

FROM PREVIOUS CONTROLLER

TO NEXT CONTROLLER

X

CONTROLLER

CONTROLLER

FROM PREVIOUS CONTROLLER

MISCELLANEOUS & OA MONITROING

A2

X

X FROM PREVIOUS CONTROLLER

TO NEXT CONTROLLER SHEET REFERENCE NUMBER:

TO NEXT CONTROLLER

UNIT HEATER - CONTROL DIAGRAM A4

N.T.S.

N.T.S.

M-8020

DEHUMIDIFIER

Sheet 146

N.T.S.

of 222

TYPICAL

9:16:17

m oraja

AM

A1

23, MONITORING OF TEMPERATURE AND

CONTROLS

METER

MEXI CO

WATER

METER

LAS CRUCES,NEW

GAS

METER

U.S.ARMY

ELEC.

SEQUENCE OF OPERATION

SEQUENCE OF OPERATION

M

SEQUENCE OF OPERATION

RESERVE CENTER

1 4

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8020.dgn

HUMIDISTAT

FAX (714) 327-1601

M M

TEL (714) 327-1600

EF 2-6

M .BETZ

EF 2-5

Subm i tted by:

EF 1-11

DISCONNECT SWITCH

LOUI SVI LLE DI STRI CT

DISCONNECT SWITCH

Desi gned by:

DISCONNECT SWITCH

DI

A.REED

CLOSE.

HUTTON CENTRE DRI VE,SUI TE 800

30 MINUTE TIMER

MOTORIZED INTAKE DAMPER SHALL WALL SWITCH (ON-OFF-UP-DOWN)

Date:

STOP AND THE INTERLOCKED

072811

THE "OFF" POSITION THE FAN SHALL

SANTA ANA, CALI FORNI A 92707

RELAY

4

B. WHEN THE SWITCH IS PLACED IN

B

F-171-40-160

5

Project Code:

1

Revi ewed by:

DISCONNECT SWITCH

MINUTES.

CD

EF 2-6

A.REED

INTAKE VENTEILATOR (IV-9) MOTORIZED

EF 2-5

W 912QR-11-R-0071

EF 1-11

THE FAN SHALL START AND THE DAMPER SHALL OPEN.

SHALL START AND OPERATE FOR A

M

Sol i ci tati on No.

SWITCH IS PLACED IN "ON" POSITION,

MAGNETIC MOTOR STARTER

CONTROLLED BY A 30 MINUTE WALL

Rev.

CIRCUIT BREAKER

1 4

CIRCUIT BREAKER

4-POSITION WALL SWITCH. WHEN THE CIRCUIT BREAKER

A. EXHAUST FANS SHALL BE MOUNTED TIMER SWITCH. THE FAN

SHALL BE OPERATED FROM THE LOCAL CIRCUIT BREAKERS

SEQUENCE OF OPERATION

C.KORPASH

N.T.S.

EXHAUST FAN - CONTROL DIAGRAM

Ckd by:

C2

Dwn by:

EXHAUST FAN - CONTROL DIAGRAM

TO NEXT CONTROLLER

I .FRANCO

C1

TO NEXT CONTROLLER

LOUI SVI LLE,KENTUCKY

FROM PREVIOUS CONTROLLER

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES A.

FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS,

LOUISVILLE DISTRICT

Appr.

AND NOTES REFER TO DRAWING M-8000.

US Army Corps of Engineers

Date

KEY NOTES 1 AI

H

CONTROLS AND POINTS SHOWN ARE PART OF THE UNIT’S FACTORY CONTROL PANEL.

2

VFD

POINTS ARE PART OF THE OVERALL DDC SYSTEM, BUT NOT SPECIFICALLY INCLUDED IN THE UNIT’S PANEL. SHOWN FOR

TS

AI

D

EXHAUST

DP

PDI

OUTSIDE

OUTSIDE

AIR

AIR

CLARITY, AS AFFECTED BY THE SEQUENCE OF OPERATION OF DP

PDI

EACH SYSTEM.

FAN

OA TEMPERATURE AND HUMIDITY SENSORS (GLOBAL POINTS) LOCATED ON ROOF IN WEATHER SHEILD. ONLY

H

PRE-FILTER PRE-FILTER

OUTSIDE

ARC EC UNITS SHALL BE TREATED FROM ONE CENTRAL WT-1 MD 3B

M

SYSTEM LOCATED IN THE MECHANICAL ROOM. SYSTEM SHALL BE

EMERGENCY SHUTOFF LOW LEAK DAMPER

ENABLED BASED ON AVEAGE SUMP WATER CONDUCTIVITY.

MINIMUM OSA AIR FLOW MEASURING STATION

EMERGENCY SHUTOFF LOW LEAK DAMPER

INSIDE

FT DP

INDIVIDUAL WATER TREATMENT SYSTEM FOR EC 2-1 ONLY. ALL

M MD 3A

BDD

4

L

L

DPT

CO2 SENSOR ONLY FOR EC 1-1, 1-3, 1-4, AND 1-7

Descri pti on

ONE IS REQ’D FOR THE FACILITY

3 H

DI DO

DP

EMERGENCY SHUTOFF LOW LEAK DAMPER

M

MD

M

1A

PDI

PDI MINIMUM OSA AIR FLOW MEASURING STATION

L

H

H

INDIRECT

L

COOLER OUTSIDE

FAN

EVAP

C

AIR

TO FACP

DSD

DIRECT

H

HEAT EXCHANGER

EMERGENCY SHUTOFF LOW LEAK DAMPER

SUPPLY

SA AIR FLOW MEASURING

TS

COOLER PRE-FILTER

FT TS

FINAL FILTER

FT

LL

MS

TS

VFD

EMERGENCY SHUTOFF LOW LEAK DAMPER MD 2A

IEC

NO

Mark

RETURN DI VLV

MS

DO

M

Appr.

M SUPPLY

DSD

TO FACP

Date

EMERGENCY SHUTOFF LOW LEAK DAMPER

RETURN

S

AIR

Descri pti on

CO2

SPACE

TEM PERATURE

SPACE

HUM I DI TY

RELATI VE

SPACE

SUPPLY FAN

N.T.S.

120 V

2

2

POWER

THE CONTROLLER SHALL MODULATE THE DAMPERS AS THE FIRST STAGE OF COOLING TO MAINTAIN THE SUPPLY AIR

OUTDOOR AIR (AFTER BEING INDIRECT EVAPORATIVELY COOLED) IS LESS THAN THE

SYSTEM IS BACNET COMPATIBLE. ALL POINTS DESCRIBED AS ADJUSTABLE CAN BE ACCESSED BY KEYPAD OR BUILDING

TEMPERATURE SETPOINT. ECONOMIZER DAMPER (HEAT EXCHANGER BYPASS) SHALL MODULATE OPEN FOR FREE COOLING WHEN

ENTHALPY OF THE RETURN AIR. WHEN THE OUTDOOR AIR (AFTER BEING INDIRECT

AUTOMATION SYSTEM (BAS).

THE UNIT IS IN THE COOLING MODE AND THE O/A DRY BULB TEMP IS LESS THAN 55F (ADJUSTABLE). INDIRECT EVAP

EVAP COOLED) IS CALCULATED TO HAVE AN ENTHALPY GREATER THAN THE RETURN

COOLING SHALL BE OFF. HEAT EXCHANGER FACE DAMPER SHALL MODULATE CLOSED WHILE HEAT EXCHANGER BYPASS DAMPER

AIR, UNIT SHALL OPERATE AT MINIMUM OUTSIDE AIR AND EXHAUST FAN SHALL RUN IN

MODULATES OPEN AS REQUIRED TO ACHIEVE THE DESIRED SUPPLY AIR TEMPERATURE FOR COOLING. RECIRCULATION DAMPER

LOW SPEED.

CO2 SENSORS SHALL COMPARE CO2 LEVELS BETWEEN OUTSIDE AIR (OSA) ROOM AIR. OUTSIDE AIR AND EXHAUST AIR DAMPERS ON THE RESPECTIVE UNIT SHALL MODULATE TO MAINTAIN A CO2 LEVEL BELOW 700PPM(ADJUSTABLE). UNDER NORMAL OPERATING MODE, IF

HARD-WIRED FAN SHUT-DOWN (SMOKE DETECTOR, WIRING, CONDUIT, AND RELAYS) SHALL BE

BE CLOSED AND THE DRAIN VALVE SHALL BE OPEN WHENEVER THE DRAIN CYCLE IS

THE ECONOMIZERS SHALL CLOSE FOR FREEZE PROTECTION, WHENEVER:

- EMERGENCY SHUTDOWN SIGNAL

AFTER IT IS INITIATED (UNLESS FILL IS PROHIBITED BY OUTSIDE AIR TEMPERATURE).

- SMOKE DETECTION

COIL) FALLS BELOW SETPOINT (35F, ADJUSTABLE) AND THE OUTSIDE AIR TEMPERATURE IS BELOW 35F (WITH A 5F DEADBAND, RETURNING TO NORMAL OPERATION AT 40F OUTSIDE

- THE MIXED AIR TEMPERATURE DROPS FROM 40F TO 35F MORNING WARM-UP CONTROL UNIT WILL ENTER MORNING WARM-UP UPON UNIT START UP. THE FAN WILL BE STARTED, THE HEATING COIL WILL BE ENABLED AND THE ECONOMIZER DAMPERS ARE HELD SHUT. THE UNIT WILL REMAIN IN WARM-UP UNTIL EITHER THE RETURN AIR

COOLING CONTROL

TEMPERATURE EQUALS 68F (ADJUSTABLE) OR THE DURATION OF MORNING WARM-UP EXCEEDS THE MAXIMUM MORNING WARM-UP

COOLING SHALL BE STAGED IN ORDER TO MAINTAIN THE SUPPLY AIR TEMPERATURE SETPOINT WHEN IN COOLING MODE. THE

TIME LIMIT (ADJUSTABLE), WHICHEVER HAPPENS FIRST.

SUPPLY FAN VFD

AIR) THE OUTSIDE AIR DAMPER SHALL CLOSE, THE RETURN AIR DAMPER SHALL OPEN, THE

SUPPLY FAN VFD SHALL HAVE A SOFT START CAPABILITY AND SHALL RAMP UP SPEED

EXHAUST AIR DAMPER SHALL CLOSE, AND AN ALARM CONDITION SHALL BE INDICATED. ONCE

AS FINAL FILTER PRESSURE DROP INCREASES TO MAINTAIN PROPER SUPPLY AIR

THE OUTSIDE AIR TEMPERATURE RISES ABOVE 40F THE DAMPERS SHALL BE RELEASED TO

VOLUME.

OPERATE IN THE NORMAL MODE.

SYSTEM WILL STAGE UP WHEN THE SUPPLY AIR TEMPERATURE IS ABOVE SETPOINT PLUS 1.5F. THE SYSTEM WILL STAGE

WHENEVER THE TEMPERATURE AT THE AVERAGING SENSOR LOCATED DOWNSTREAM OF THE

DOWN WHEN THE SUPPLY AIR TEMPERATURE IS BELOW SETPOINT MINUS 1.5F. INTERSTAGE DELAYS OF 120 SECONDS

HEATING COIL FALLS BELOW SETPOINT (40F, ADJUSTABLE) THE FANS SHALL BE DISABLED,

(ADJUSTABLE) WILL BE USED. INDIRECT COOLING IS ACTIVE WHENEVER THE O/A DRY BULB IS MORE THAN 5F ABOVE THE

THE OUTSIDE AIR DAMPER SHALL CLOSE, THE RETURN AIR DAMPER SHALL OPEN, THE

FAN CONTROL

RETURN AIR WET BULB TEMP. RETURN AIR WET BULB TEMP IS CALCULATED BY UNIT CONTROLLER FROM THE RETURN AIR DRY

EXHAUST AIR DAMPER SHALL CLOSE, AND AN ALARM CONDITION SHALL BE INDICATED. ONCE

WHEN THE UNIT IS COMMANDED TO RUN, THE SUPPLY FAN STARTS AND RUNS CONTINUOUSLY.

BULB TEMP AND RH. INDIRECT EVAP COOLING SUMP SHALL BE AUTOMATICALLY DRAINED AND FLUSHED ONCE DAILY, BETWEEN

THE OUTSIDE AIR TEMPERATURE RISES ABOVE 40F THE FANS AND DAMPERS SHALL BE

3AM AND 4AM. SUMP SHALL HAVE AUTO FREEZE PROTECTION, AND WILL DRAIN WHENEVER AMBIENT DRY-BULB IS LESS THAN

RELEASED TO OPERATE IN THE NORMAL MODEL.

WHENEVER THE CURRENT RELAY INDICATES THE SUPPLY FAN STATUS IS ON, THE EXHAUST FAN WILL START AND RUN

7/22/2011

Pl ot scal e:NONE

Pl ot date:

WHENEVER THE MIXED AIR TEMPERATURE (TEMPERATURE ENTERING THE HEATING WATER

FAX (714) 327-1601

INITIATED (WEEKLY, ADJUSTABLE). THE DRAIN CYCLE SHALL TERMINATE 10 MINUTES

TEL (714) 327-1600

- OUTSIDE AIR ENTHALPY IS LESS THEN RETURN AIR ENTHALPY

FURNISHED AND INSTALLED BY DIVISION 28.

HUTTON CENTRE DRI VE,SUI TE 800

ADJUSTABLE WITH A 25 DEADBAND, DRAINED AT 38F). THE SUMP FILL VALVE SHALL

SANTA ANA, CALI FORNI A 92707

THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING ANY OF THE FOLLOWING:

WHENEVER THE OUTSIDE AIR TEMPERATURE IS ABOVE SETPOINT (INITIALLY 60F,

4

OR

EMERGENCY SHUTDOWN

EXTRA SET OF DRY CONTACTS FURNISHED WITH DUCT-MOUNTED SMOKE DETECTOR).

LOUI SVI LLE DI STRI CT

- OUTSIDE AIR WET BULB IS LESS THAN 58F (ADJUSTABLE)

THE SUMP FILL VALVE SHALL BE OPEN AND THE DRAIN VALVE SHALL BE CLOSED

LOUI SVI LLE,KENTUCKY

HOURS BACK TO 0.

Desi gned by:

SUMP FULL & DRAIN, FLUSH

A.REED

AND

CORPS OF ENGI NEERS

EXCEEDS 1000 HOURS (ADJUSTABLE). ONCE MAINTENANCE IS DONE, THE KEYPAD PROVIDES THE ABILITY TO RESET THE RUN

MONITORED AND DISPLAYED VIA THE DIRECT DIGITAL CONTROL SYSTEM AS DETERMINED VIA

M .BETZ

WHENEVER SMOKE IS DETECTED (DUCT-MOUNTED SMOKE DETECTOR STATUS TO BE

FOR EQUIPMENT MAINTENANCE PURPOSES, RUN HOURS ARE ACCUMULATED AND WILL GENERATE AN ALARM WHEN THE TOTAL

Subm i tted by:

THE DUCT-MOUNTED SMOKE DETECTOR SHALL DISABLE THE AIR HANDLING UNIT FANS

F-171-40-160

AIR TEMP OR B) THE RETURN AIR TEMP AT SETPOINT.

Project Code:

- AND OUTSIDE AIR TEMPERATURE IS BELOW THE OUTSIDE AIR LOCKOUT SETTING 55F(ADJUSTABLE)

SAFETIES

Revi ewed by:

CONTROL. HW VALVE SHALL MODULATE AS REQUIRED FOR CONTROLLING A) SUPPLY

A.REED

- AND THE HEATING MODE HAS BEEN OFF FOR A MINIMUM OF 4 MINUTES

W 912QR-11-R-0071

EXHAUST FAN WILL OPERATE AT LOWER SPEED TO MAINTAIN BUILDING PRESSURE

U.S.ARMY

RUN HOUR TRACKING

- PROOF OF AIR FLOW IS ON

Date:

AND AT THE REDUCED HEATING SUPPLY AIR VOLUME SHOWN IN SCHEDULES.

- REMOTE START/STOP: THE UNIT IS COMMANDED TO RUN BASED UPON A FIELD SUPPLIED SIGNAL.

Sol i ci tati on No.

10% INCREASE OR DECREASE (ADJUSTABLE).

C.KORPASH

WHEN IN THE HEATING MODE THE UNIT SHALL OPERATE WITH MINIMUM OUTDOOR AIR

Ckd by:

ALLOWED TO CONTINUE NORMAL OPERATION. THE OSA DAMPER SHALL BE LIMITED TO A

Dwn by:

AT OR BELOW THE LOW SETPOINT FOR AT LEAST 15 MINUTES, THE ECONOMIZER SHALL BE

I .FRANCO

LEVEL IS AT OR BELOW THE LOW SETPOINT OF 600 PPM (ADJUSTABLE). WHEN THE CO2 IS

Fi l e nam e:LCARC_M 8030. dgn

700PPM, THE ECONOMIZER WILL BE IN OVERRIDE AND THE DAMPERS WILL BE MODULATED TO BRING IN OUTSIDE AIR (UNLESS OSA CO2 LEVEL IS ABOVE 700PPM) UNTIL THE CO2

HEATING MODE FREE COOLING MODE SHALL BE ENABLED WHENEVER:

3

THE CO2 SENSOR IN THE ROOM SENSES A CO2 LEVEL ABOVE THE HIGH SETPOINT OF

TO CONTROL THE BUILDING STATIC PRESSURE SLIGHTLY POSITIVE.

- TIME OF DAY SCHEDULE: THE UNIT WILL BE COMMANDED TO RUN BASED UPON AN INTERNAL TIME OF DAY SCHEDULE.

CO2 LEVEL CONTROL

Mark

UNIT SHALL USE THE FOLLOWING CONTROL STRATEGY DURING SUMMER COOLING MODE

COMMUNICATION TRUNK

Rev.

SEQUENCE OF OPERATION

- 24 HOURS

38F.

CONTINUOUSLY.

ALARMS COOLING MODE SHALL BE ENABLED WHEN:

ALARMS SHALL BE PROVIDED AS FOLLOWS:

SUPPLY AIR TEMPERATURE CONTROL - FIXED OR RESET SCHEDULE OPTION

- LOW/HIGH OUTSIDE AIR TEMPERATURE COOLING STAGING WILL BE AS FOLLOWS:

- LOW/HIGH MIXED AIR TEMPERATURE

THE METHOD OF CONTROLLING TEMPERATURE IS SELECTABLE. THE OPERATOR WILL HAVE THE OPTION OF CHOOSING BETWEEN A FIXED SUPPLY AIR SETPOINT (ADJUSTABLE), OR A RESET SCHEDULE BASED UPON THE RETURN AIR TEMPERATURE.

- LOW/HIGH SUPPLY AIR TEMPERATURE

- ECONOMIZERS ARE OPEN AND AT MAXIMUM POSITION OR FREE COOLING IS OFF

- LOW/HIGH RETURN AIR TEMPERATURE

- INDIRECT EVAPORATIVE COOLING

A

WHEN THE RESET SCHEDULE IS SELECTED, THE CONTROLLER SHALL ADJUST THE SUPPLY AIR TEMPERATURE SETPOINT AS

- LOW/HIGH OUTSIDE HUMIDITY

- DIRECT EVAPORATIVE PUMP

- LOW/HIGH RETURN HUMIDITY

REQUIRED TO MAINTAIN THE RETURN AIR AT SETPOINT 78F (ADJUSTABLE).

- FAN FAILURES: COMMANDED ON AND AFTER A 2 MINUTE DELAY, THE RUN STATUS OF A FAN IS OFF

THE DIRECT EVAPORATIVE PUMP SHALL BE ENABLED WHENEVER:

- DIRECT PUMP FAILURE: COMMANDED ON AND AFTER A 2 MINUTE DELAY, THE PUMP

NIGHT SETBACK OPERATION DURING UNOCCUPIED HOURS OR NIGHT SETBACK PERIODS, THE UNITS SHALL MAINTAIN A MINIMUM OF 40F (ADJUSTABLE) DURING WINTER MODE. BOILERS AND PUMPS SHALL BE AVAILABLE TO PROVIDE HEAT AND OUTSIDE AIR DAMPERS SHALL BE CLOSED. DURING SUMMER MONTHS, THE UNITS SHALL BE ENABLED AND OPERATIONG TO KEEP THE SPACE AT A MAXIMUM OF 85F

RUN STATUS IS OFF

- PROOF OF AIR FLOW IS ON - UNIT SHALL OPERATE WITH 100% OSA

CONTROLS

- DIRTY FILTERS

MEXI CO

- SMOKE DETECTION

- AND OUTSIDE AIR TEMPERATURE IS ABOVE THE OUTSIDE AIR LOCKOUT SETTING 55F(ADJUSTABLE)

LAS CRUCES,NEW

- EMERGENCY SHUTDOWN SIGNAL

- AND THE HEATING MODE HAS BEEN OFF FOR A MINIMUM OF 4 MINUTES

U.S.ARMY

TO PREVENT SHORT CYCLING, MINIMUM ON/OFF TIMES OF 2 MINUTES WILL BE USED.

- PROOF OF AIR FLOW IS ON

RESERVE CENTER

THE SUPPLY FAN SHALL HAVE A 10 MINUTE DELAY ON STOP IN ORDER TO DRY OUT THE DIRECT EVAPORATIVE MEDIA.

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8030.dgn

3

TO NEXT DEVICE

GENERAL

HOLIDAYS CAN BE ENTERED TO OVERRIDE THE NORMAL SCHEDULE.

AI

BY

EVAPORATIVE COOLING UNIT CONTROL SYSTEM DIAGRAM (EC 1-1,3,4,5,6,7, AND 2-1)

SHALL BE CLOSED DURING ECONOMIZER MODE. EXHAUST FAN VFD SHALL MODULATE THE EXHAUST FAN SPEED AS REQUIRED

B

2

AI

DIV. 26

SUCH THAT IT USES 100% O/A WHENEVER THE CALCULATED ENTHALPY OF THE

- OFF MODE

AI

1

FREE COOLING

RUN CONDITIONS (KEYPAD SELECTABLE)

TEM PERATURE

SUPPLY FAN

2

SEQUENCE OF OPERATION AIR HANDLING UNITS (WITH INDIRECT AND DIRECT EVAPORATIVE COOLING)

AI

SUPPLY AI R

DO

START/STOP

DI

STATUS

VFD FAULT

DI

CONTROL

SA FLOW

VOLUM E

VALVES LI NE DRAI N

DEC SUM P

AO

AI

VFD SPEED

DI

START/STOP

DEC PUM P

TEM PERATURE

DO

FI LL AND

DI

HEATI NG COI L

FREEZE STAT

CONTROL

VALVE (HW )

FI NAL FI LTER

FI LTER STATUS

OA FI LTER

DI

AO

AI

STATUS

OA FI LTER

DI

STATUS

VOLUM E

OSA FLOW

DAM PER CONTROL

ECONOM I ZER

PACKAGED FACTORY DIRECT DIGITAL CONTROLLER

1

DI

AI

072811

4

AO

DAM PER CONTROL

2

AO

RECI RCULATI ON

AI

HEAT EXCHANGER

2

AI R

AI R

AI

DRY BULB

RETURN

W ATER BLEED

M OTORI ZED SUM P

SUM P W ATER

CONDUCTI VI TY

AI

W ET BULB

DO

AI

ENABLE/DI SABLE

VALVES LI NE DRAI N

W ATER TREATM ENT

DO

DO

I DEC SUM P FI LL AND

CONTROLLER

BUI LDI NG PRESSURE

STATUS FAN

I DEC PUM P

DO

AI

START/STOP

DI

EXHAUST

VFD FAULT

VFD SPEED

DI

CONTROL

EXHAUST FAN

OSA FLOW

VOLUM E

AO

START/STOP

DO

AI

CONTROL

OA

BLOCK

DAM PER

OA FI LTER

TERMINATION

AO

STATUS

DI

RETURN AIR WET BULB

H

TEM PERATURE

RETURN AIR TS DRY BULB

RETURN

C

- AND THE RETURN AIR HUMIDITY IS BELOW 60% RH (ADJUSTABLE) - AND THE SUPPLY AIR TEMPERATURE IS ABOVE SETPOINT 55F (ADJUSTABLE)

(ADJUSTABLE).

MIXED AIR DAMPERS

SHEET REFERENCE NUMBER:

IF THE SUPPLY FAN IS OFF OR THE SYSTEM IS IN MORNING WARM-UP MODE, THE EXHAUST AIR DAMPERS WILL CLOSE FULLY AND THE RETURN AIR DAMPERS WILL OPEN FULLY.

M-8030 of 222

9:17:13

m oraja

AM

Sheet 147

1

2

1 *** Support Value Engineering - It Pays ***

42

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES A.

FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-8000.

US Army Corps of Engineers LOUISVILLE DISTRICT

M

CONDENSER

KEY NOTES

CU 1

1

Appr.

RL

Date

RL

CONTROLS AND POINTS SHOWN ARE PART OF THE UNIT’S FACTORY CONTROL PANEL.

COMPRESSORS VFD

POINTS ARE PART OF THE OVERALL DDC SYSTEM, BUT NOT

2

HOT GAS BYPASS

SPECIFICALLY INCLUDED IN THE UNIT’S PANEL. SHOWN FOR EXHAUST

DP

PDI

OUTSIDE

OUTSIDE

AIR

AIR

CLARITY, AS AFFECTED BY THE SEQUENCE OF OPERATION OF

DP

PDI

EACH SYSTEM.

RS

FAN

D

H

H

PRE-FILTER PRE-FILTER

L

L

DPT

M MD 3A

BDD

M EMERGENCY SHUTOFF LOW LEAK DAMPER

MD 3B

EMERGENCY SHUTOFF LOW LEAK DAMPER OUTSIDE

MIN OSA AIR FLOW MEASURING STATION

INSIDE

FT

DI

DP DO

EMERGENCY SHUTOFF LOW LEAK DAMPER

SUPPLY FAN

MD

M

M

Descri pti on

DP

1A TS

EMERGENCY SHUTOFF LOW LEAK DAMPER

PDI

PDI MIN OSA AIR FLOW MEASURING STATION

L

H

H

INDIRECT

DSD TO FACP

SA AIR FLOW MEASURING

L

COOLER OUTSIDE

D

HEAT EXCHANGER

H X

AIR

C

PRE-FILTER

FT FINAL FILTER

FT

TS

EMERGENCY SHUTOFF LOW LEAK DAMPER

LOCAL EMERG. SHUTOFF SWITCH

VFD

TS

M EMERGENCY SHUTOFF LOW LEAK DAMPER

MD

NO

IDEC

LL

DO

NO

2A RETURN DI

SORTING / DISTRIBUTION Mark

VLV

DO

M

SUPPLY

M EMERGENCY SHUTOFF LOW LEAK DAMPER

Appr.

MS

DSD

Date

TO FACP

RETURN

S

AIR

C

2

SPACE

2

Descri pti on

TEM PERATURE

AI

HUM I DI TY

RELATI VE

SPACE

SUPPLY FAN

TEM PERATURE

SUPPLY FAN

AI

AI

SUPPLY AI R

DO

START/STOP

DI

STATUS

VFD FAULT

DI

CONTROL

SA FLOW

VFD SPEED

AO

AI

VOLUM E

TEM PERATURE

FREEZE STAT

CONTROL

VALVE (HW )

DI

HEATI NG COI L

DI

AO

DI

CU- 1

COOLI NG STAGE 3

DI

CU- 1

CU- 1

CU- 1

1

DI

COOLI NG STAGE2

DI

COOLI NG STAGE 1

CU- 1

DI

STATUS

CU- 1

START/STOP

FI NAL

DO

FI LTER STATUS

OA FI LTER

STATUS

OA FI LTER

OSA FLOW

AI

COOLI NG STAGE 4

PACKAGED FACTORY DIRECT DIGITAL CONTROLLER

DI

STATUS

DI

AI

DAM PER CONTROL

ECONOM I ZER

DAM PER CONTROL

AO

VOLUM E

AO

RECI RCULATI ON

2

TEM PERATURE

AI R

HEAT EXCHANGER

2

AI

W ET BULB

AI R

AI

DRY BULB

RETURN

M OTORI ZED SUM P

AI

W ATER BLEED

SUM P W ATER

CONDUCTI VI TY

W ATER TREATM ENT

DO

AI

ENABLE/DI SABLE

DO

VALVES

I DEC SUM P FI LL AND

DO

LI NE DRAI N

I DEC PUM P

DO

START/STOP

CONTROLLER

STATUS

AI

FAN

EXHAUST

DI

VFD FAULT

VFD SPEED

DI

CONTROL

EXHAUST FAN

OSA FLOW

AO

BUI LDI NG PRESSURE

OA

OA FI LTER

STATUS

BLOCK

VOLUM E

TERMINATION

DO

AI

START/STOP

AO

DAM PER CONTROL

DI

RETURN AIR WET BULB

H TS

RETURN

RETURN AIR DRY BULB

2

POWER BY DIV. 26

TO NEXT DEVICE

COMMUNICATION TRUNK

EVAPORATIVE COOLING UNIT CONTROL SYSTEM DIAGRAM (EC 1-2, CU-1) N.T.S.

Mark

1

120 V

- AND OUTSIDE AIR TEMPERATURE IS BELOW THE OUTSIDE AIR LOCKOUT SETTING 55F(ADJUSTABLE) RUN HOUR TRACKING FOR EQUIPMENT MAINTENANCE PURPOSES, RUN HOURS ARE ACCUMULATED AND WILL GENERATE AN ALARM WHEN THE TOTAL

AND

EXCEEDS 1000 HOURS (ADJUSTABLE). ONCE MAINTENANCE IS DONE, THE KEYPAD PROVIDES THE ABILITY TO RESET THE RUN HOURS BACK TO 0.

AIR) THE OUTSIDE AIR DAMPER SHALL CLOSE, THE RETURN AIR DAMPER SHALL OPEN, THE A) IDEC SHALL OPERATE TO PRECOOL MINIMUM OSA. OSA DAMPERS

EXHAUST AIR DAMPER SHALL CLOSE, AND AN ALARM CONDITION SHALL BE INDICATED. ONCE

SHALL MODULATE TO MINIMUM POSITIONS AND RETURN AIR DAMPERS

THE OUTSIDE AIR TEMPERATURE RISES ABOVE 40F THE DAMPERS SHALL BE RELEASED TO

SHALL OPEN.

OPERATE IN THE NORMAL MODE.

B) SUPPLY AIR FAN SHALL RAMP DOWN TO 5000 CFM (DURING DX

WHENEVER THE TEMPERATURE AT THE AVERAGING SENSOR LOCATED DOWNSTREAM OF THE

COOLING) AND THE EXHAUST FAN SHALL TRACK WITH THE BUILDING

HEATING COIL FALLS BELOW SETPOINT (40F, ADJUSTABLE) THE FANS SHALL BE DISABLED,

PRESSURE SETPOINT 0.05" WG (ADJ)

THE OUTSIDE AIR DAMPER SHALL CLOSE, THE RETURN AIR DAMPER SHALL OPEN, THE

- OUTSIDE AIR WET BULB IS LESS THAN 58F (ADJUSTABLE) - OUTSIDE AIR ENTHALPY IS LESS THEN RETURN AIR ENTHALPY

THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING ANY OF THE FOLLOWING: THE ECONOMIZERS SHALL CLOSE FOR FREEZE PROTECTION, WHENEVER:

EXHAUST AIR DAMPER SHALL CLOSE, AND AN ALARM CONDITION SHALL BE INDICATED. ONCE

- EMERGENCY SHUTDOWN SIGNAL B) CONDENSING UNIT SHALL STAGE "ON" COOLING STAGES TO MAINTAIN 45-55% RH

- THE MIXED AIR TEMPERATURE DROPS FROM 40F TO 35F

WITHIN SPACE.

C) SUPPLY AIR DISCHARGE TEMPERATURE SHALL BE MAINTAINED BETWEEN 53F AND

UNIT WILL ENTER MORNING WARM-UP UPON UNIT START UP. THE FAN WILL BE STARTED, THE HEATING COIL WILL BE ENABLED

COOLING CONTROL

AND THE ECONOMIZER DAMPERS ARE HELD SHUT. THE UNIT WILL REMAIN IN WARM-UP UNTIL EITHER THE RETURN AIR

COOLING SHALL BE STAGED IN ORDER TO MAINTAIN THE SUPPLY AIR TEMPERATURE SETPOINT WHEN IN COOLING MODE. THE

TEMPERATURE EQUALS 68F (ADJUSTABLE) OR THE DURATION OF MORNING WARM-UP EXCEEDS THE MAXIMUM MORNING WARM-UP

SYSTEM WILL STAGE UP WHEN THE SUPPLY AIR TEMPERATURE IS ABOVE SETPOINT PLUS 1.5F. THE SYSTEM WILL STAGE

TIME LIMIT (ADJUSTABLE), WHICHEVER HAPPENS FIRST.

DOWN WHEN THE SUPPLY AIR TEMPERATURE IS BELOW SETPOINT MINUS 1.5F. INTERSTAGE DELAYS OF 120 SECONDS

UNIT SHALL USE THE FOLLOWING CONTROL STRATEGY DURING SUMMER COOLING MODE

(ADJUSTABLE) WILL BE USED. INDIRECT COOLING IS ACTIVE WHENEVER THE O/A DRY BULB IS MORE THAN 5F ABOVE THE

SUCH THAT IT USES 100% O/A WHENEVER THE CALCULATED ENTHALPY OF THE

RETURN AIR WET BULB TEMP. RETURN AIR WET BULB TEMP IS CALCULATED BY UNIT CONTROLLER FROM THE RETURN AIR DRY

OUTDOOR AIR (AFTER BEING INDIRECT EVAPORATIVELY COOLED) IS LESS THAN THE

FAN CONTROL

BULB TEMP AND RH. INDIRECT EVAP COOLING SUMP SHALL BE AUTOMATICALLY DRAINED AND FLUSHED ONCE DAILY, BETWEEN

ENTHALPY OF THE RETURN AIR. WHEN THE OUTDOOR AIR (AFTER BEING INDIRECT

WHEN THE UNIT IS COMMANDED TO RUN, THE SUPPLY FAN STARTS AND RUNS CONTINUOUSLY.

3AM AND 4AM. SUMP SHALL HAVE AUTO FREEZE PROTECTION, AND WILL DRAIN WHENEVER AMBIENT DRY-BULB IS LESS THAN

EVAP COOLED) IS CALCULATED TO HAVE AN ENTHALPY GREATER THAN THE RETURN

38F.

AIR, UNIT SHALL OPERATE AT MINIMUM OUTSIDE AIR AND EXHAUST FAN SHALL RUN IN

55F WHILE CONDENSING UNIT IS "ON". - EMERGENCY SHUTDOWN SIGNAL

WHEN IN THE HEATING MODE THE UNIT SHALL OPERATE WITH MINIMUM OUTDOOR AIR

- AND THE HEATING MODE HAS BEEN OFF FOR A MINIMUM OF 4 MINUTES

AND AT THE REDUCED HEATING SUPPLY AIR VOLUME SHOWN IN SCHEDULES.

- AND OUTSIDE AIR TEMPERATURE IS ABOVE THE OUTSIDE AIR LOCKOUT SETTING 55F(ADJUSTABLE)

EXHAUST FAN WILL OPERATE AT LOW SPEED TO MAINTAIN BUILDING PRESSURE SETPOINT. HW VALVE SHALL MODULATE AS REQUIRED FOR CONTROLLING A) SUPPLY AIR TEMP OR B) THE RETURN AIR TEMP AT SETPOINT.

- ECONOMIZERS ARE OPEN AND AT MAXIMUM POSITION OR FREE COOLING IS OFF

SUMP FULL & DRAIN, FLUSH

FIXED SUPPLY AIR SETPOINT (ADJUSTABLE), OR A RESET SCHEDULE BASED UPON THE RETURN AIR TEMPERATURE.

- INDIRECT EVAPORATIVE COOLING

THE SUMP FILL VALVE SHALL BE OPEN AND THE DRAIN VALVE SHALL BE CLOSED

- DX COOLING WHEN THE RESET SCHEDULE IS SELECTED, THE CONTROLLER SHALL ADJUST THE SUPPLY AIR TEMPERATURE SETPOINT AS

- LOW/HIGH RETURN AIR TEMPERATURE

- FAN FAILURES: COMMANDED ON AND AFTER A 2 MINUTE DELAY, THE RUN STATUS OF A FAN IS OFF - COOLING CIRCUIT FAILURES: COMMANDED ON AND AFTER A 2 MINUTE DELAY, THE RUN STATUS OF A COMPRESSOR IS OFF

WHENEVER THE OUTSIDE AIR TEMPERATURE IS ABOVE SETPOINT (INITIALLY 60F, ADJUSTABLE WITH A 25 DEADBAND, DRAINED AT 38F). THE SUMP FILL VALVE SHALL

REQUIRED TO MAINTAIN THE RETURN AIR AT SETPOINT 78F (ADJUSTABLE).

7/22/2011

Pl ot scal e:NONE

- LOW/HIGH SUPPLY AIR TEMPERATURE

RUN STATUS IS OFF

THE METHOD OF CONTROLLING TEMPERATURE IS SELECTABLE. THE OPERATOR WILL HAVE THE OPTION OF CHOOSING BETWEEN A

Pl ot date:

- LOW/HIGH MIXED AIR TEMPERATURE

- DIRECT PUMP FAILURE: COMMANDED ON AND AFTER A 2 MINUTE DELAY, THE PUMP

COOLING STAGING WILL BE AS FOLLOWS:

F-171-40-160

- LOW/HIGH OUTSIDE AIR TEMPERATURE

- LOW/HIGH RETURN HUMIDITY

- PROOF OF AIR FLOW IS ON

A SUPPLY AIR TEMPERATURE CONTROL - FIXED OR RESET SCHEDULE OPTION

- DIRTY FILTERS

- LOW/HIGH OUTSIDE HUMIDITY HEATING MODE

TO PREVENT SHORT CYCLING, MINIMUM ON/OFF TIMES OF 2 MINUTES WILL BE USED.

- SMOKE DETECTION

LOW SPEED. COOLING MODE SHALL BE ENABLED WHEN:

THE SUPPLY FAN SHALL HAVE A 10 MINUTE DELAY ON STOP IN ORDER TO DRY OUT THE DIRECT EVAPORATIVE MEDIA.

ALARMS ALARMS SHALL BE PROVIDED AS FOLLOWS:

WHENEVER THE CURRENT RELAY INDICATES THE SUPPLY FAN STATUS IS ON, THE EXHAUST FAN WILL START AND RUN

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8040.dgn

MORNING WARM-UP CONTROL

CONTINUOUSLY.

THE OUTSIDE AIR TEMPERATURE RISES ABOVE 40F THE FANS AND DAMPERS SHALL BE RELEASED TO OPERATE IN THE NORMAL MODEL.

U.S.ARMY

- SMOKE DETECTION

U.S.ARMY

OR EMERGENCY SHUTDOWN

FAX (714) 327-1601

BELOW 35F (WITH A 5F DEADBAND, RETURNING TO NORMAL OPERATION AT 40F OUTSIDE

TEL (714) 327-1600

SHORT CYCLING AND ALLOW PROPER TEMPERATURE RESPONSE TIME.

M .BETZ

- AND THE HEATING MODE HAS BEEN OFF FOR A MINIMUM OF 4 MINUTES

Subm i tted by:

COIL) FALLS BELOW SETPOINT (35F, ADJUSTABLE) AND THE OUTSIDE AIR TEMPERATURE IS

HUTTON CENTRE DRI VE,SUI TE 800

INTER-STAGE DELAYS AND MINIMUM ON/OFF TIME DELAYS ARE USED TO PREVENT

SANTA ANA, CALI FORNI A 92707

- PROOF OF AIR FLOW IS ON

LOUI SVI LLE DI STRI CT

WHENEVER THE MIXED AIR TEMPERATURE (TEMPERATURE ENTERING THE HEATING WATER

MEXI CO

- REMOTE START/STOP: THE UNIT IS COMMANDED TO RUN BASED UPON A FIELD SUPPLIED SIGNAL.

BELOW SETPOINT AND IT HAS BEEN RUNNING FOR A MINIMUM TIME DELAY.

LAS CRUCES,NEW

- 24 HOURS

4

THAT EACH STAGE WILL BE COMMANDED OFF WHEN THE SUPPLY AIR TEMPERATURE IS

CONTROLS

FREE COOLING MODE SHALL BE ENABLED WHENEVER:

HOLIDAYS CAN BE ENTERED TO OVERRIDE THE NORMAL SCHEDULE.

Project Code:

FURNISHED AND INSTALLED BY DIVISION 28.

Revi ewed by:

STAGE WILL START. THE COMPRESSORS WILL STAGE DOWN IN THE SAME MANNER, IN

A.REED

HARD-WIRED FAN SHUT-DOWN (SMOKE DETECTOR, WIRING, CONDUIT, AND RELAYS) SHALL BE

W 912QR-11-R-0071

SUPPLY AIR TEMPERATURE IS STILL ABOVE SETPOINT PLUS 2F THEN THE SECOND

C.KORPASH

TO CONTROL THE BUILDING STATIC PRESSURE SLIGHTLY POSITIVE.

EXTRA SET OF DRY CONTACTS FURNISHED WITH DUCT-MOUNTED SMOKE DETECTOR).

Ckd by:

SETPOINT PLUS A DEADBAND OF 2F (ADJUSTABLE). IF AFTER A TIME DELAY, THE

Dwn by:

SHALL BE CLOSED DURING ECONOMIZER MODE. EXHAUST FAN VFD SHALL MODULATE THE EXHAUST FAN SPEED AS REQUIRED

Date:

THE FIRST DX STAGE WILL START WHEN THE SUPPLY AIR TEMPERATURE IS ABOVE

- OFF MODE - TIME OF DAY SCHEDULE: THE UNIT WILL BE COMMANDED TO RUN BASED UPON AN INTERNAL TIME OF DAY SCHEDULE.

MONITORED AND DISPLAYED VIA THE DIRECT DIGITAL CONTROL SYSTEM AS DETERMINED VIA

MODULATES OPEN AS REQUIRED TO ACHIEVE THE DESIRED SUPPLY AIR TEMPERATURE FOR COOLING. RECIRCULATION DAMPER

072811

WHENEVER SMOKE IS DETECTED (DUCT-MOUNTED SMOKE DETECTOR STATUS TO BE

COOLING SHALL BE OFF. HEAT EXCHANGER FACE DAMPER SHALL MODULATE CLOSED WHILE HEAT EXCHANGER BYPASS DAMPER

RUN CONDITIONS (KEYPAD SELECTABLE)

Sol i ci tati on No.

THE DUCT-MOUNTED SMOKE DETECTOR SHALL DISABLE THE AIR HANDLING UNIT FANS

I .FRANCO

(ADJUSTABLE).

SAFETIES

LOUI SVI LLE,KENTUCKY

THE UNIT IS IN THE COOLING MODE AND THE O/A DRY BULB TEMP IS LESS THAN 55F (ADJUSTABLE). INDIRECT EVAP

Rev.

TEMPERATURE SETPOINT. ECONOMIZER DAMPER (HEAT EXCHANGER BYPASS) SHALL MODULATE OPEN FOR FREE COOLING WHEN

Desi gned by:

AUTOMATION SYSTEM (BAS).

WHEN THE SYSTEM IS IN COOLING MODE, THE COMPRESSORS WILL BE STAGED UP OR DOWN IN ORDER TO MAINTAIN THE SUPPLY AIR TEMPERATURE SETPOINT 55F

A.REED

SYSTEM IS BACNET COMPATIBLE. ALL POINTS DESCRIBED AS ADJUSTABLE CAN BE ACCESSED BY KEYPAD OR BUILDING

B

COMPRESSORS DX COOLING:

THE CONTROLLER SHALL MODULATE THE DAMPERS AS THE FIRST STAGE OF COOLING TO MAINTAIN THE SUPPLY AIR

CORPS OF ENGI NEERS

GENERAL

FREE COOLING

RESERVE CENTER

AIR HANDLING UNITS (WITH INDIRECT AND DIRECT EVAPORATIVE COOLING)

Fi l e nam e:LCARC_M 8040. dgn

SEQUENCE OF OPERATION

BE CLOSED AND THE DRAIN VALVE SHALL BE OPEN WHENEVER THE DRAIN CYCLE IS INITIATED (WEEKLY, ADJUSTABLE). THE DRAIN CYCLE SHALL TERMINATE 10 MINUTES

NIGHT SETBACK OPERATION

AFTER IT IS INITIATED (UNLESS FILL IS PROHIBITED BY OUTSIDE AIR TEMPERATURE).

DURING UNOCCUPIED HOURS OR NIGHT SETBACK PERIODS, THE UNITS SHALL MAINTAIN A MINIMUM OF 40F (ADJUSTABLE) DURING WINTER MODE. BOILERS AND PUMPS SHALL BE AVAILABLE TO PROVIDE HEAT

SUPPLY FAN VFD

AND OUTSIDE AIR DAMPERS SHALL BE CLOSED. DURING SUMMER MONTHS, THE UNITS SHALL BE

SHEET REFERENCE NUMBER:

SUPPLY FAN VFD SHALL HAVE A SOFT START CAPABILITY AND SHALL RAMP UP SPEED

ENABLED AND OPERATING TO KEEP THE SPACE AT A MAXIMUM OF 85F (ADJUSTABLE).

AS FINAL FILTER PRESSURE DROP INCREASES TO MAINTAIN PROPER SUPPLY AIR VOLUME.

MIXED AIR DAMPERS

M-8040

IF THE SUPPLY FAN IS OFF OR THE SYSTEM IS IN MORNING WARM-UP MODE, THE EXHAUST AIR DAMPERS WILL CLOSE FULLY Sheet 148

of 222

9:18:03

m oraja

AM

AND THE RETURN AIR DAMPERS WILL OPEN FULLY.

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES

OVERVIEW

A.

THE HEATING HOT WATER SYSTEM IS COMPRISED OF TWO BOILERS: (B-1, B-2). THE PREFERRED SEQUENCE OF HEATING HOT WATER STAGING MAY VARY BY SEASON. THE PRIMARY PUMPS AND RUN AT CONSTANT FLOW. THERE IS A SECONDARY HEATING HOT WATER SUPPLY LOOP WITH

FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS,

US Army Corps of Engineers

AND NOTES REFER TO DRAWING M-8000.

LOUISVILLE DISTRICT

PI

VARIABLE SPEED DRIVES ON THE PUMPS CONTROLLED FROM DIFFERENTIAL PRESSURE, WHICH IS RESET LOAD.

HWP

Appr.

INCREMENTALLY TO OPERATE AT THE LOWEST SPPED AND PRESSURE POSSIBLE TO SATISTY THE CURRENT PT

1A

THE SYSTEM STATUS WILL BE DETERMINED FROM THE HEATING HOT WATER SUPPLY TEMPERATURE COMPARED WITH THE

HOT WATER RETURN FROM HEATING ZONES

Date

PI W/ CURRENT

SETPOINT AND THE OUTSIDE ARE TEMPERATURE IS LESS THAN [55F] (ADJUSTABLE).

SENSOR RELAY

CT

R

TI

TT

TI

TI

PT

TT

TT

TO PREVENT SHORT CYCLING, THE BOILER SYSTEM SHALL RUN FOR AND BE "OFF" FOR THE MINIMUM ADJUSTABLE TIMES UNLESS SHUTDIOWN ON SAFETIES OR OUTSIDE AIR CONDITIONS. PI

THE BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.

SOLAR COLLECTOR ARRAYS

1

D

HWP

BOILER SEQUENCING

PT

1B HOT WATER STORAGE TANK

SOFTWARE [BAS] LEAD LAG SELECTOR SHALL BE PROVIDED TO ALLOW ANY OF THE BOILERS TO ACT AS THE LEAD MACHINE.

W/ CURRENT

1

CT

R

SENSOR RELAY

HEAT DUMP

HD

HST 1

THE BOILER WILL ONLY BE ENABLED TO OPERATE IN AUTO UPON THE FOLLOWING CONDIITONS: 1. BOILER SCHEDULE ON [BY BAS] 2. THERE ARE NOT ACTIVE ALARMS THAT INITIATE A SHUTDOWN (REPORTED TO BAS AND BOILER PANEL) 3. THERE IS A CALL FOR HEATING [BAS] 4. THE HEATING HOT WATER FLOWS ARE VERIFIED [BAS AND BOILER PANEL]

Descri pti on

5. THE SOLAR HOT WATER SYSTEM IS UNABLE TO MAINTAIN THE DESIRED HHWS TEMPERATURE PI FS

BOILER

UPON A CALL FOR HEATING:

FS

BOILER

B-1

TI

TT

B-2

HWP

OPEN THE CONTROL VALVE

PT

3

THE LEAD PRIMARY (HWP-1A) PUMP STARTS, THE PUMP STATUS IS CONFIRMED VIA A CURRENT SENSOR IN THE BAS AND THE FLOW IS CONFRIMED THROUGH A FLOW SWITCH.

W/ CURRENT

PI

TI

CT

R

SENSOR RELAY

TT

THEN THE ASSIGNED LEAD BOILER PUMP STARTS, THE PUMP STATUS IS CONFIRMED ON VIA A CURRENT SENSOR IN THE BAS AND THE FLOW IS CONFIRMED THROUGH A FLOW SWITCH.

GFA

PT

1

THERE SHALL BE [30-60] SECOND DELAYS BETWEEN THESE PUMPS, PER THE BOILER INTEGRAL PROGRAMMED SETTINGS (ADJUSTABLE) HOT WATER RETURN FROM HEATING ZONES

THE LEAD SECONDARY PUMP HWP THEN STARTS, RAMPING UP FROM THE MINIMUM SPEED OF 20 Hz VIA THE VARIABLE FREQUENCY DRIVE. THE BOILER MAINTAINS THE HHW SUPPLY TEMPERATURE AT THE SETPOINT[BAS] WHICH RANGES FROM 175F TO 180F, BASED ON A RESET SCHEDULE, BY MODULATING THE BOILER CAPACITY.

Appr.

Mark

BOIILER-HOT WATER SUPPLY TEMPERATURE SETPOINT

Date

ALARMS SHALL BE PROVIDED AS FOLLOWS:

DO

AI

DI

AI

HW P- 3

DI

Descri pti on

DI FF PRESS.

HW P- 3

HW P- 3

START/STOP

TEM PERATURE

SOLAR

COLLECTOR

TANK LVL LOW

GLYCOL FI LL

ASSEM BLY

TANK LVL LOW

GLYCOL FI LL

ASSEM BLY

LOW

DI

STATUS ON/OFF

GLYCOL FI LL

ASSEM BLY

M ODULATI NG

DI

HEAT DUM P VALVE

VLV- S1- 01

AO

START/STOP

STATUS

VLV- S1- 01

PRESSURE

HEAT DUM P VALVE

HD- 1

DO

DI

SYSTEM

SOLAR W ATER

AI

TEM PERATURE

SUPPLY

SOLAR W ATER

AI

TEM PERATURE

SOLAR W ATER

RETURN HW

RETURN

AI

AI

TEM PERATURE

HOT W ATER

SUPPLY

TEM PERATURE

HOT W ATER

AI

PRESSURE

AI

RETURN

HW P- 1B

AI

DI FF PRESS.

HW P- 1B

DI

PUM P STATUS

HW P- 1B

DO

START/STOP

HW P- 1A

AI

DI FF PRESS.

HW P- 1A

PUM P STATUS

HW P- 1A

DI

START/STOP

SW I TCH FLOW

BOI LER (B- 2)

OPEN- CLOSED

BOI LER (B- 2)

DO

DI

SHUT OFF VALVE

DO

STATUS

BOI LER (B- 2)

SHUT- OFF VALVE

DI

PERM I SSI ON

BOI LER(B- 2)

ON- OFF

DO

ALARM /STATUS

SUM M ARY

DI

SETPOI NT

BOI LER (B- 2)

AO

HOT W ATER SUPPLY

SW I TCH

BOI LER (B- 1)

FLOW

OPEN- CLOSED

BOI LER (B- 1)

DI

SHUT OFF VALVE

STATUS

BOI LER (B- 1)

DO

SHUT- OFF VALVE

DI

PERM I SSI ON

BOI LER(B- 1)

ON- OFF

ALL BOILERS AND PUMPS SHALL TURN OFF WHEN THE HWS TEMPERATURE IS >180F FOR [30] MINUTES [BAS] AND THE BOILER IS STAGED DOWN TO MINIMUM CAPACITY OR WHEN FAILURE ALARMS ARE REGISTERED (BAS AND BOILER CONTROLS)

DO

ALARM /STATUS

THE LAG BOILER AND ASSOCIATED PUMPS SHALL STAGE OFF WHENEVER THE BOILERS ARE LOADED LESS THAN 40% FOR LONGER THAN 20 MINUTES (ADJUSTABLE).

SUM M ARY

BOI LER (B- 1)

AFTER A CALL HAS BEEN MAINTAINED FOR [20] MINUTES, THE LAG BOILER AND PUMP SEQUENCE START AS DESCRIBED ABOVE FOR THE LEAD BOILER THE SECOND LAG BOILER WILL START UNDER THE SAME CONDITIONS AND SEQUENCES. WHENEVER A LAG BOILER STARTS, ALL RUNNING BOILERS LOAD AND UNLOAD AS NECESSARY TO BE RUNNING WITH 5% OF THE SAME % LOAD.

DI

SETPOI NT

AO

THERE IS NOT AUTOMATIC BOILER STAGING/SELECTION OPTIMIZATION CONTROLS. THE FIRST LAG BOILER WILL BE CALLED FOR WHENEVER THE HOT WATER STORAGE TANK HST-2 TEMPERATURE FALLS 5 DEG F BELOW THE HWS TEMPERATURE SETPOINT FOR MORE THAN 10 MINUTES (ADJUSTABLE).

HOT W ATER SUPPLY

C

PUM P STATUS

BOILER STAGING [ALL IN BAS]

BOILERS WILL NOT CYCLE ON AND OFF MORE THAN THREE TIMES IN A ONE HOUR PERIOD IF ANY SPACE TEMPERATURE SENSOR INDICATES A TEMPERATURE BELOW 50 DEG F DURING AN UNOCCUPIED SCHEDULE. THE HEATING WATER SYSTEM SHALL BE ALLOWED TO OPERATE NORMALLY TO MAINTAIN THE MINIMUM UNOCCUPIED TEMPERATURE SETPOINT. DIRECT DIGITAL CONTROLLER

ALARM ON BOILER FAILURE FAILURE ALARMS MUST BE MANUALLY RESET. SEE OTHER ALARM MODES IN BOILER OPERATOR’S MANUAL [ALARMS CREATED BY BOILER CONTROLS, SHUTDOWN BY BOILER CONTROLS, MESSAGE SENT TO BAS]

COMMUNICATION TRUNK

1

BOILERS LEAD/LAG OPERATION:

ARC- HEATING HOT WATER CONTROL SYSTEM DIAGRAM

TO NEXT DEVICE

N.T.S. 120 V POWER BY DIV. 26

EPO STATION

CONNECT TO

EPO SPECIFICATIONS

ON BREAKER SERVING B-1

EPO SHUTDOWN

TB

R

HEAVY DUTY 2-POSITION SELECTOR SWITCH

CONTROL WIRING SHALL BE #14

SQUARE D TYPE 9001K11J38LRH7

IN 3/4"C

EPO

N

1

TEMPERATURE BELOW 150F (ADJUSTABLE), THE LAG BOILER’S ISOLATION VALVE SHALL OPEN, THE LAG PUMP SHALL START, THE FLOW SHALL BE PROVEN, AND THE

ENABLE SWITCH

R

(OR APPROVED EQUIVALENT) Mark

ON FAILURE OF THE LEAD BOILER, THE LAG BOILER SHALL RUN AND THE LEAD BOILER SHALL TURN OFF. ON DECREASING HEATING HOT WATER SUPPLY

-MAINTAINED -ILLUMINATED (RED) -TWO (2) N.0. CONTACTS

EPO RELAY

-10 POLE (CONVERTIBLE CONTACTS) -120 VAC COIL -10A CONTACTS

IN THE EVENT THAT ADDITIONAL HEATING IS REQUIRED, THE LAG HEATING HOT WATER PRIMARY PUMP

-CLAMP TYPE TERMINALS R

SHALL BE COMMANDED TO START AND THE OPERATE IN SEQUENCE WITH THE LEAD AND LAG BOILER AND THE SECONDARY PUMP(S) 3

TO MAINTAIN THE BUILDING HEATING HOT WATER SETPOINT HHWST.

EPO ACTIVATION

4

4

EPO HORN/STROBE

ALARM

THE PRIMARY HHW PUMPS SHALL OPERATE CONTINUOUSLY WHEN THEIR ASSOCIATED BOILER IS RUNNING. PRIMARY HHW PUMPS SHALL

KELE #868STR, SURFACE MOUNT, OUTDOOR

PROVIDE CONSTANT FLOW THROUGH THE BOILER ACCORDING TO THE MANUFACTURER’S RECOMMENDATIONS. R DI

5

EPO

GAS SOLENOID

DDC/BAS

ASCO#8042, 2", GAS SOLENOID VALVE, NORMALLY CLOSED, 120V

ACTIVATION ALARM

PUMP OFF TIME DELAY

HUTTON CENTRE DRI VE,SUI TE 800

3

LOUI SVI LLE DI STRI CT

(OR APPROVED EQUIVALENT)

Desi gned by:

CUTLER HAMMER CAT. NO. AR10100A

THE LEAD PRIMARY PUMP HHWP STARTS UPON A CALL FOR HEATING. THE LEAD PRIMARY PUMP hHWP SHALL OPERATE IN SEQUENCE WITH THE LEAD BOILER AND SECONDARY PUMP(S) TO MAINTAIN THE BUILDING HEATING HOT WATER SETPOINT HHWST.

CORPS OF ENGI NEERS

INDUSTRIAL CONTROL RELAY R

EACH PRIMARY HEATING HOT WATER HHW PUMP IS ASSIGNED TO ONE BOILER [BAS].

U.S.ARMY

PRIMARY HEATING HOT WATER PUMPS HWP-1A AND 1B

A.REED

-120 VAC

C.KORPASH

-ONE (1) N.O. CONTACT TB

Ckd by:

-RED

MONTHLY

Dwn by:

-EXTENDED GUARD

ON BREAKER SERVING B-2

4

-MOMENTARY

I .FRANCO

5

WEEKLY

PUSHBUTTON

(OR APPROVED EQUIVALENT)

LOUI SVI LLE,KENTUCKY

SHUT TRIP CONNECTION POINTS

2

F-171-40-160

EPO

DAILY

Project Code:

R

Date:

SQUARE D CAT. NO. 9001KR2RH5

IF BOILER RUNTIME (ADJ) IS EXCEEDED

Revi ewed by:

HEAVY DUTY PUSHBUTTON OPERATOR

MANUALLY THROUGH A SOFTWARE SWITCH

A.REED

THE DESIGNATED LEAD BOILER SHALL ROTATE UPON ONE OF THE FOLLOWING CONDITIONS (USER SELECTABLE): 072811

B

W 912QR-11-R-0071

LAG BOILER SHALL STAGE ON AND RUN IN CONJUNCTION WITH THE LEAD BOILER TO MAINTAIN THE HEATING HOT WATER SETPOINT.

Sol i ci tati on No.

Rev.

-120 VAC

7/22/2011

R

Pl ot scal e:NONE

ENABLE

Pl ot date:

DISABLE

FAX (714) 327-1601

20A

3/4"C.

SHUT TRIP CONNECTION POINTS

2

EPO

TEL (714) 327-1600

WATER TEMPERATURE OF 180F. WHEN THE RETURN WATER TEMPERATURE DROPS TO [150F] (ADJUSTABLE), HEATING HOT WATER PUMP HWP-1B WILL START AND AFTER BEING PROVEN, WILL INITIATE THE STATUS OF BOILER B-2.

1

1 #12 GND,

Fi l e nam e:LCARC_M 8050. dgn

PANEL ________

2 #12,

M .BETZ

CIRCUIT IN

WHEN THE HOT WATER PUMP (HWP-1A) STATUS IS PROVEN, THE HOT WATER BOILER B-1 WILL BE PERMITTED TO START TO MAINTAIN THE SUPPLY

RELAY ENCLOSURE

Subm i tted by:

SPARE

SANTA ANA, CALI FORNI A 92707

THE TWO BOILERS SHALL OPERATE IN A LEAD/LAG FASHION WHEN CALLED TO RUN AND FLOW IS PROVEN. THE LEAD BOILERS SHALL RUN FIRST.

RESIDUAL HEAT AND PREVENT HIGH LIMIT ALARM.

2

ALARM ON PUMP FAILURE

EMERGENCY POWER OFF (EPO) WIRING DIAGRAM N.T.S.

SOLAR HEATING HOT WATER SYSTEM A DIFFERENTIAL TEMPERATURE CONTROLLER SHALL CALCULATE THE TEMPERATURE DIFFERENCE BETWEEN THE SOLAR COLLECTOR

A

TYPICAL FOR:

TEMPERATURE SENSOR AND THE STORAGE TANK WATER TEMPERATURE. THE CONTROLLER SHALL START THE SOLAR COLLECTOR LOOP AND

PLASTIC COVER

DISABLE

ENABLE

OMS MECHANICAL ROOM #B103

U.S.ARMY

(HINGED)

ARC MECHANICAL ROOM #A117

PUSH TO SHUTDOWN

HEAT DUMP, HD-1

CONTROLS

EPO STATION

MEXI CO

UPON FAILURE OF THE LEAD PUMP, THE LEAD BOILER SHALL SHUT DOWN, THE LAG PUMP SHALL BE INITIATED TO START, AND THE LAG BOILER SHALL START AUTOMATICALLY TO MEET THE LOAD. AN ALARM SHALL BE GENERATED BY THE BAS.

LAS CRUCES,NEW

RESERVE CENTER

HWP 1A AND 1B; ALARM ON PUMP FAILURE DETECTED VIA A MOTOR CURRENT SWITCH AND FLOW SWITCH.

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8050.dgn

WHENEVER THE BOILER IS DIABLED, THE CORRESPONDING PUMP SHALL CONINUE TO OPERATE FOR [5] MINUTES ADJ. TO DISAPATE

CIRCULATING PUMPS SHALL BE STARTED, IF AFTER 5 MINUTES THE TEMPERATURE IN THE SUPPLY WATER LINE IS STILL GREATER THAN

BE CYCLED ON. THE POSITION OF DIVERTING VALVE VLV-S01-1 SHALL BE MODULATED WITH A PID LOOP TO MAINTAIN A SUPPLY WATER EPO OPERATION

SHALL BE DISABLED. NAMEPLATE

TO DE-ENERGIZE NATURAL GAS BOILERS, PLACE SWITCH IN THE ENABLE POSITION AND THEN DEPRESS PUSHBUTTON.

SHEET REFERENCE NUMBER:

THE DIVERTING VALVE SHALL BE MODULATED TO DIVERT 100% OF THE FLOW THROUGH THE HEAT DUMP FLUID COOLER.

3

EMERGENCY POWER OFF (EPO) STATION

M-8050

N.T.S.

of 222

9:18:37

m oraja

AM

Sheet 149

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES A.

PI

FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS,

US Army Corps of Engineers

AND NOTES REFER TO DRAWING M-8000.

LOUISVILLE DISTRICT

Appr.

PI TI CW MAKE-UP AND DHWR HWP

PT

HWP

Date

PT

4 2A DHWS TO DISTRIBUTION VFD

W/ CURRENT

PI

W/ CURRENT

SENSOR RELAY

R

TT

CT

SENSOR RELAY

PI PI

D

FI

PT

FT

HWP 2B

DOMESTIC HOT WATER STORAGE TANK

5

ZONES OR

FM

AIR-HANDLING UNIT COILS

HOT WATER HEAT EXCHANGER

HWS FROM HST-1 VFD

W/ CURRENT

HWP

PT HW SUPPLY TO HEATING

PT

SENSOR RELAY

CT

R

HWT

W/ CURRENT SENSOR RELAY

1

HX 1 FOR TRANSMITTER AND VALVE LOCATION SEE M-7000

DPT

Descri pti on

1

PI

PT

Mark

HWR TO HST-1

AI

DI

DO

AI

TEM PERATURE

W ATER TANK

DOM ESTI C HOT

HW P- 5

START/STOP

PUM P STATUS

HW P- 5

DI FF PRESS.

HW P- 5

HW P- 4

Date

AI

DI FF PRESS.

HW P- 4

PUM P STATUS

START/STOP

HW P- 4

CONTROL

DI FFERENTI AL VALVE

DI

Appr.

DO

AO

BLDG

DI FF PRESS

AI

PRESSURE

HW

SUPPLY

AI

(GPM )

HW S SECONDARY

AO

FLOW

HW P- 2B

AI

AO

DI FF PRESS.

DI

SPEED

DO

HW P- 2B

AO

HW P- 2B

DI

PUM P STATUS

DO

START/STOP

AI

HW P- 2B

HW P- 2A

AO

SPEED

HW P- 2A

PUM P STATUS

DI

START/STOP

HW P- 2A

DO

DI FF PRESS.

RETURN HW

PRESSURE

C

HW P- 2A

AI

AI

Descri pti on

DIRECT DIGITAL CONTROLLER

COMMUNICATION TRUNK

1

ARC- SECONDARY HEATING HOT WATER CONTROL SYSTEM DIAGRAM N.T.S. TO NEXT DEVICE

120 V POWER BY DIV. 26

SECONDARY HEATING HOT WATER PUMPS HWP-2A AND 2B

DOMESTIC HOT WATER HEAT EXCHANGER AND PUMPS HWP-4 AND 5

SOFTWARE LEAD/LAG FUNCTION SHALL BE PROVIDED TO ALLOW ANY OF THE SECONDARY PUMPS TO ACT AS THE LEAD PUMP [BAS] THE LEAD SECONDARY HW PUMP SHALL START BASED UPON A CALL FOR HEATING AS INDICATED UNDER THE BOILER CONTROL SEQUENCES. THE LEAD SECONDARY PUMP HWP SHALL OPERATE IN SEQUENCE WITH THE LEAD BOILER AND PRIMARY PUMP(S) TO MAINTAIN THE BUILDING HEATING WATER SETPOINT HW SUPPLY TEMPERATURE. IN THE EVENT THAT ADDITIONAL HEATING IS REQUIRED, THE LAG HEATING WATER SECONDARY PUMP SHALL BE COMMANDED TO START AND SHALL OPERATE IN SEQUENCE WITH THE LEAD AND LAG BOILER AND THE PRIMARY PUMP(S)

Mark

TO MAINTAIN THE BUILDING HEATING WATER SETPOINT HHWST.

7/22/2011

Pl ot scal e:NONE

F-171-40-160

Pl ot date:

M .BETZ

Subm i tted by:

LOW DIFFERENTIAL PRESSURE - THE MINIMUM PRESSURE LIMIT IS LESS THAN 10 PSI (ADJUSTABLE).

C.KORPASH

HIGH DIFFERENTIAL PRESSURE - THE MAXIMUM PRESSURE LIMIT IS GREATER THAN [18] PSI (ADJUSTABLE).

Ckd by:

ALARMS SHALL BE PROVIDED AS FOLLOWS:

Dwn by:

Desi gned by:

REQUIRED TO PROVIDE FULL FLOW TO ALL HEATING HOT WATER CONTROL VALVES. THE MINIMUM PRESSURE LIMIT IS THE PRESSURE CORRELATING TO THE LOWEST SPEED THE PUMP MOTOR IS ALLOWED TO BE OPERATED AT.

A.REED

THE REMOTE DP SETPOINT WILL BE MAINTAINED BETWEEN THE MAXIMUM AND MINIMUM PRESSURES. THE MAXIMUM PRESSURE LIMIT IS THE PRESSURE

I .FRANCO

THE RAISED PUMP DIFFERENTIAL (DISCHARGE) PRESSURE SETPOINT.

Project Code:

IS NOT BEING MET, A PID SIGNAL SHALL BE CALCULATED AND SENT TO THE PUMP DISCHARGE PRESSURE SETPOINT, AND IT SHALL BE RAISED ACCORDINGLY. THROUGH ANOTHER PI LOOP, THE VARIABLE SPEED (FREQUENCY) DRIVE (VFD) SHALL INCREASE THE PUMP MOTOR SPEED TO MEET

Revi ewed by:

Date:

A PID LOOP SHALL CHANGE THE SECONDARY PUMP DISCHARGE DIFFERENTIAL PRESSURE SETPOINT TO MAINTAIN THE REMOTE DP SETPOINT 072811

B

Sol i ci tati on No.

RISES BACK ABOE 16 PSI (ADJ), THE LAG PUMP SHALL TURN "OFF" AND THE LEAD PUMP SHALL MODULATE TO CONTROL THE DIFFERENTIAL PRESSURE CONTROL SETPOINT.

A.REED

Rev.

THE LEAD PUMP SHALL RUN FIRST TO MAINTAIN ITS DIFFERENTIAL PRESSURE SETPOINT (ADJUSTABLE). IF THE WATER DIFFERENTIAL PRESSURE DROPS BELOW 12 PSI (ADJUSTABLE, THE LAG PUMP SHALL START, THE LEAD PUMP SHALL RAMP DOWN WHILE THE LAG PUMP RAMPS UP AND THE PUMPS SHALL RUN IN UNISON. IF THE WATER DIFFERENTIAL PRESSURE

W 912QR-11-R-0071

THE HEATING WATER CONTROL VALVES SHALL BE POLLED EVERY [5] MINUTES (ADJUSTABLE).

Fi l e nam e:LCARC_M 8060. dgn

DIFFERENTIAL PRESSURE CONTROL [ALL BAS]

DURING REDUCING LOAD AS THE DP INCREASES: WHEN THE TOTAL SECONDARY HHW GPM HAS REDUCED TO BE EQUAL TO OR LESS THAN ONE PUMPS GPM FOR [10] MINUTES

FAX (714) 327-1601 TEL (714) 327-1600

HUTTON CENTRE DRI VE,SUI TE 800

U.S.ARMY

AS DIFFERENTIAL PRESSURE FALLS BELOW LOW LEVEL SETPOINT, AND THE LAG PUMP STARTS BOTH PUMPS SHALL CONVERGE AND RUN AT SIMILAR SPEEDS AND GPM TO MAINTAIN THE COMMON SUPPLY DISCHARGE PRESSURE DIFFERENTIAL SETPOINT AN REMOTE DP SETPOINTS.

SANTA ANA, CALI FORNI A 92707

PUMP STAGING [BAS]

4

THE DP RESET AND HHWST RESET COMPETE WITH EACH OTHER FOR CONTROL OF THE BUILDING. THE HHWST RESET SHALL NOT OCCUR UNLESS ALL THE

LOUI SVI LLE DI STRI CT

DIFFERENTIAL CONTROL AND HHWST RESET.

LOUI SVI LLE,KENTUCKY

CORPS OF ENGI NEERS

THE VFD INTERNAL SETTINGS WILL ALLOW THE VFD TO RUN THE PUMPS TO THEIR MINIMUM.

MONITORING THE CONTROLLER SHALL MONITOR RPM AND GPM OF THE PUMPS AND SHALL NOT ALL THE OPERATION OF THE PUMPS AT OR BEYOND THEIR PUBLISHED

UPON FAILURE OF THE LEAD SECONDARY PUMP VFD AND LEAD SECONDARY PUMP, THE LAG SECONDARY PUMP VFD SHALL INITIATE THE SECONDARY LAG PUMP TO START AUTOMATICALLY, AND AN ALARM SHALL BE GENERATED BY THE [BAS AND BOILER CONTROLLER]

A

ALARM FOR VFD FAILURE

U.S.ARMY

UPON FAILURE OF THE LEAD OR LAG VFD INITIATION, AN ALARM SHALL BE GENERATED BY THE BAS.

CONTROLS

HWP 2A AND 2B: ALARM ON PUMP FAILURE SHALL BE DETECTED VIA A CURRENT SENSING SWITCH AND FLOW SWITCH.

MEXI CO

ALARM FOR PUMP FAILURE

LAS CRUCES,NEW

RESERVE CENTER

"END OF CURVE" LIMIT [BAS]. UPON SENSING AN END OF CURVE CONDITION, VIA A PUMP CURVE EQUATION, THE NEXT PUMP SHALL BE STAGED ON.

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8060.dgn

(ADJUSTABLE), THE LAG HHW PUMP SHALL BE COMMANDED OFF.

SHEET REFERENCE NUMBER:

M-8060 of 222

9:19:07

m oraja

AM

Sheet 150

1

2

*** Support Value Engineering - It Pays ***

4

5

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

1

*** Safety Pays ***

2

4

5

GENERAL NOTES PI TI

A.

TT

FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS, AND

PT

W/ CURRENT SENSOR RELAY

3-WAY VALVE

PI

CT

R

LOUISVILLE DISTRICT

NOTES REFER TO DRAWING M-8000.

6A

TI

TT

CIRCULATING PUMP

RADIANT HEAT, VALVE MANIFOLD

Appr.

HWP

US Army Corps of Engineers

TI

TT

Date

PT HWP PI

7A

WORKBAY TEMP

SLAB SENSOR

TS HWP

VFD

HST

PT

6B

SENSOR RELAY

D

PI

W/ CURRENT SENSOR RELAY

2 HOT WATER STORAGE TANK

W/ CURRENT

SOLAR COLLECTOR ARRAY

TT

PI

FI

PT

CT

R

SOLAR HOT WATER SYSTEM

FT

HWP

HEAT EXCHANGER AND

PT

7B

CONTROL PACKAGE

FM

VFD

W/ CURRENT SENSOR RELAY

PI HPAK DPT 1

PI

FOR LOCATION OF TRANSMITTER AND VALVE SEE M-7000

FS

BOILER

GFA

PANEL

B-4

TT

FM

TI

DO

DI

AO

DO

DI

AO

AI

AO

AI

AI

AO

AO

DO

AI

DI

AI

AI

1

SOLAR W ATER

TEM PERATURE

SOLAR W ATER

AI

DI

DI

DI

AI

RETURN

SLAB TEM PERATURE

ALARM

SLAB TEM PERATURE

W ORKBAY SPACE TEM P

PUM P START/STOP

DIRECT DIGITAL CONTROLLER

3- W AY RADI ANT VALVE

CONTROL

DI FFERENTI AL VALVE

BLDG

DI FF PRESS

PRESSURE

SUPPLY HW

(GPM )

HW S SECONDARY

FLOW

HW P- 7B DI FF PRESS.

HW P- 7B SPEED

HW P- 7B

PUM P STATUS

START/STOP

HW P- 7B

HW P- 7A

SPEED

HW P- 7A

PUM P STATUS

START/STOP

HW P- 7A

DI FF PRESS.

HW P- 7A

RETURN HW

PRESSURE

TEM PERATURE

HOT W ATER

SUPPLY

HW P- 6B

DI FF PRESS.

HW P- 6B

PUM P STATUS

START/STOP

HW P- 6B

HW P- 6A

DI FF PRESS.

HW P- 6A

PUM P STATUS

HW P- 6A

START/STOP

TEM PERATURE

RETURN

HOT W ATER

SW I TCH

BOI LER (B- 4)

FLOW

OPEN- CLOSED

BOI LER (B- 4)

SHUT OFF VALVE

STATUS

BOI LER (B- 4)

SHUT- OFF VALVE

PERM I SSI ON

BOI LER(B- 4)

ON- OFF

ALARM /STATUS

SUM M ARY

SETPOI NT

BOI LER (B- 4)

HOT W ATER SUPPLY

SW I TCH

BOI LER (B- 3)

FLOW

OPEN- CLOSED

BOI LER (B- 3)

SHUT OFF VALVE

STATUS

BOI LER (B- 3)

SHUT- OFF VALVE

PERM I SSI ON

BOI LER(B- 3)

ON- OFF

ALARM /STATUS

SUM M ARY

SETPOI NT

HOT W ATER SUPPLY

BOI LER (B- 3)

AI

COMMUNICATION TRUNK

Mark

AI

Appr.

AI

TO NEXT DEVICE 120 V POWER BY DIV. 26

Date

AI

AI

LOW

DI

TANK LVL LOW

DO

GLYCOL FI LL

AI

ASSEM BLY

DI

TANK LVL LOW

DO

GLYCOL FI LL

AI

ASSEM BLY

DI

STATUS ON/OFF

DO

ASSEM BLY

DI

GLYCOL FI LL

DO

SOLAR

DI

COLLECTOR

AO

TEM PERATURE

DI

PRESSURE

DO

SOLAR W ATER

DI

SYSTEM

DO

TT

TEM PERATURE

DI

2

SYSTEM CONTROL

TI

AO

PT

SOLAR HOT WATER

SUPPLY

B-3

TI

TI

Descri pti on

PT

FS

BOILER

1

OMS- HEATING HOT WATER CONTROL SYSTEM DIAGRAM N.T.S.

C

OVERVIEW

THE PREFERRED SEQUENCE OF HEATING HOT WATER STAGING MAY VARY BY SEASON. THE PRIMARY PUMPS AND RUN AT CONSTANT FLOW. THERE IS A SECONDARY HEATING HOT WATER SUPPLY LOOP WITH ALARM ON BOILER FAILURE

VARIABLE SPEED DRIVES ON THE PUMPS CONTROLLED FROM DIFFERENTIAL PRESSURE, WHICH IS RESET INCREMENTALLY TO OPERATE AT THE LOWEST SPPED AND PRESSURE POSSIBLE TO SATISTY THE CURRENT

FAILURE ALARMS MUST BE MANUALLY RESET. SEE OTHER ALARM MODES IN BOILER OPERATOR’S MANUAL [ALARMS CREATED BY BOILER CONTROLS, SHUTDOWN BY BOILER CONTROLS, MESSAGE SENT TO BAS]

LOAD.

A PID LOOP SHALL CHANGE THE SECONDARY PUMP DISCHARGE DIFFERENTIAL PRESSURE SETPOINT TO MAINTAIN THE REMOTE DP SETPOINT TO MAINTAIN THE MOST OPEN HEATING HOT WATER CONTROL VALVE AT 90% OPEN WITH A DEADBAND OF +/- 2%. WHEN THE LOCAL DP SETPOINT IS NOT BEING MET, A PID SIGNAL SHALL BE CALCULATED AND SENT TO THE PUMP DISCHARGE PRESSURE SETPOINT, AND IT SHALL BE RAISED ACCORDINGLY. THROUGH ANOTHER PI LOOP, THE VARIABLE SPEED (FREQUENCY) DRIVE (VFD) SHALL INCREASE THE PUMP MOTOR SPEED TO MEET THE RAISED PUMP DIFFERENTIAL (DISCHARGE) PRESSURE SETPOINT. Descri pti on

THE HEATING HOT WATER SYSTEM IS COMPRISED OF TWO BOILERS: (B-3, B-4).

THE REMOTE DP SETPOINT WILL BE MAINTAINED BETWEEN THE MAXIMUM AND MINIMUM PRESSURES. THE MAXIMUM PRESSURE LIMIT IS THE PRESSURE

THE SYSTEM STATUS WILL BE DETERMINED FROM THE HEATING HOT WATER SUPPLY TEMPERATURE COMPARED WITH THE SETPOINT AND THE OUTSIDE ARE TEMPERATURE IS LESS THAN [55F] (ADJUSTABLE).

BOILERS LEAD/LAG OPERATION:

TO PREVENT SHORT CYCLING, THE BOILER SYSTEM SHALL RUN FOR AND BE "OFF" FOR THE MINIMUM ADJUSTABLE TIMES

REQUIRED TO PROVIDE FULL FLOW TO ALL HEATING HOT WATER CONTROL VALVES. THE MINIMUM PRESSURE LIMIT IS THE PRESSURE CORRELATING TO THE LOWEST SPEED THE PUMP MOTOR IS ALLOWED TO BE OPERATED AT.

UNLESS SHUTDIWN ON SAFETIS OR OUTSDIE AIR CONDITIONS. THE TWO BOILERS SHALL OPERATE IN A LEAD/LAG FASHION WHEN CALLED TO RUN AND FLOW IS PROVEN. THE LEAD BOILERS SHALL RUN FIRST. WHEN THE HOT WATER PUMP (HWP-6A) STATUS IS PROVEN, THE HOT WATER BOILER B-3 WILL BE PERMITTED TO START TO MAINTAIN THE SUPPLY

THE BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.

WATER TEMPERATURE OF 180 DEG F. WHEN THE RETURN WATER TEMPERATURE DROPS TO [150 DEG F] (ADJUSTABLE), HEATING HOT WATER PUMP HWP-6B WILL START AND AFTER

ALARMS SHALL BE PROVIDED AS FOLLOWS:

BEING PROVEN, WILL INITIATE THE STAUTS OF BOILER B-4. BOILER SEQUENCING

HIGH DIFFERENTIAL PRESSURE - THE MAXIMUM PRESSURE LIMIT IS GREATER THAN [18] PSI (ADJUSTABLE). ON FAILURE OF THE LEAD BOILER, THE LAG BOILER SHALL RUN AND THE LEAD BOILER SHALL TURN OFF. ON DECREASING HEATING HOT WATER SUPPLY TEMPERATURE BELOW 150 DEG F

SOFTWARE [BAS] LEAD LAG SELECTOR SHALL BE PROVIDED TO ALLOW ANY OF THE BOILERS TO ACT AS THE LEAD MACHINE.

(ADJUSTABLE), THE LAG BOILER’S ISOLATION VALVE SHALL OPEN. THE LAG PUMP SHALL START. THE FLOW SHALL BE PROVEN, AND THE LAG BOILER SHALL STAGE ON AND RUN IN

LOW DIFFERENTIAL PRESSURE - THE MINIMUM PRESSURE LIMIT IS LESS THAN 10 PSI (ADJUSTABLE). THE VFD INTERNAL SETTINGS WILL ALLOW THE VFD TO RUN THE PUMPS TO THEIR MINIMUM.

CONJUNCTION WITH THE LEAD BOILER TO MAINTAIN THE HEATING HOT WATER SETPOINT. THE BOILER WILL ONLY BE ENABLED TO OPERATE IN AUTO UPON THE FOLLOWING CONDIITONS: 1. BOILER SCHEDULE ON [BY BAS]

DIFFERENTIAL CONTROL AND HHWST RESET. THE DESIGNATED LEAD BOILER SHALL ROTATE UPON ONE OF THE FOLLOWING CONDITIONS (USER SELECTABLE):

WEEKLY

Mark

UNTIL THE PRESSURE RESET IS AT ITS MINIMUM).

THE PRIMARY HHW PUMPS SHALL OPERATE CONTINUOUSLY WHEN THEIR ASSOCIATED BOILER IS RUNNING. PRIMARY HHW PUMPS SHALL

"END OF CURVE" LIMIT [BAS]. UPON SENSING AN END OF CURVE CONDITION, VIA A PUMP CURVE EQUATION, THE NEXT PUMP SHALL BE STAGED ON.

PROVIDE CONSTANT FLOW THROUGH THE BOILER ACCORDING TO THE MANUFACTURER’S RECOMMENDATIONS. BOILER-HOT WATER SUPPLY TEMPERATURE SETPOINT RESET THE HOT WATER SUPPLY (HWS) TEMPERATURE SHALL BE RESET BASED ON OUTSIDE AIR TEMPERATURE.

ALARM FOR PUMP FAILURE HWP 7A AND 7B: ALARM ON PUMP FAILURE SHALL BE DETECTED VIA A CURRENT SENSING SWITCH AND FLOW SWITCH.

PUMP OFF TIME DELAY

ALARMS SHALL BE PROVIDED AS FOLLOWS:

WHENEVER THE BOILER IS DIABLED, THE CORRESPONDING PUMP SHALL CONINUE TO OPERATE FOR [5] MINUTES ADJ. TO DISAPATE

UPON FAILURE OF THE LEAD SECONDARY PUMP VFD AND LEAD SECONDARY PUMP, THE LAG SECONDARY PUMP VFD SHALL INITIATE THE SECONDARY LAG PUMP TO START AUTOMATICALLY, AND AN ALARM SHALL BE GENERATED BY THE [BAS AND BOILER CONTROLLER]

RESIDUAL HEAT AND PREVENT HIGH LIMIT ALARM.

SOFTWARE LEAD/LAG FUNCTION SHALL BE PROVIDED TO ALLOW ANY OF THE SECONDARY PUMPS TO ACT AS THE LEAD PUMP [BAS]

A DIFFERENTIAL TEMPERATURE CONTROLLER SHALL CALCULATE THE TEMPERATURE DIFFERENCE BETWEEN THE SOLAR COLLECTOR TEMPERATURE SENSOR AND THE STORAGE TANK WATER TEMPERATURE. THE CONTROLLER SHALL START THE SOLAR COLLECTOR LOOP AND STORAGE LOOP

THE LEAD SECONDARY HW PUMP SHALL START BASED UPON A CALL FOR HEATING AS INDICATED UNDER THE BOILER CONTROL SEQUENCES. THE LEAD SECONDARY PUMP HWP SHALL OPERATE IN SEQUENCE WITH THE LEAD BOILER AND PRIMARY PUMP(S)

ADJUSTABLE.

TO MAINTAIN THE BUILDING HEATING WATER SETPOINT HW SUPPLY TEMPERATURE.

ALL BOILERS AND PUMPS SHALL TURN OFF WHEN THE OSAT IS >75F FOR [30] MINUTES [BAS] OR WHEN ALL

IN THE EVENT THAT ADDITIONAL HEATING IS REQUIRED, THE LAG HEATING WATER SECONDARY PUMP

UNDERSAB RADIANT HEATING HOT WATER SYSTEM

THE OSAT IS >75F FOR [30] MINUTES [BAS] SHALL BE COMMANDED TO START AND SHALL OPERATE IN SEQUENCE WITH THE LEAD AND LAG BOILER AND THE PRIMARY PUMP(S)

CIRCULATING PUMP SHALL BE ENABLED AND ACTIVE WITH SPACE TEMPERATURE BETWEEN 67F AND 75F. SPACE TEMPERATURE SENSOR SHALL MODULATE THE 3-WAY VALVE TO MAINTAIN 68FTO 72F(ADJUSTABLE) WITHIN THE WORK BAYS. SUPPLY WATER TEMPERATURE SHALL BE 101F TO 102F TO THE MANIFOLD, RETURN WATER TEMPERATURE SHALL BE 81F T0 82F. IF SLAB TEMPERATURE RISES TO 84F AN ALARM WILL APPEAR AT THE BAS. IF SLAB TEMPERATURE RISES TO 86F, THEN PUMP WILL STOP AND VALVE SHALL RECIRCULATE THE RETURN WATER.

TO MAINTAIN THE BUILDING HEATING WATER SETPOINT HHWST. OR WHEN AN UNOCCUPIED SCHEDULE OCCURS. IF ANY SPACE TEMPERATURE SENSOR INDICATES A TEMPERATURE BELOW 50 DEG F DURING AN UNOCCUPIED SCHEDULE. THE HEATING WATER SYSTEM SHALL BE ALLOWED TO OPERATE NORMALLY TO MAINTAIN THE MINIMUM UNOCCUPIED TEMPERATURE SETPOINT. OR

DIFFERENTIAL PRESSURE CONTROL [ALL BAS]

7/22/2011

Pl ot scal e:NONE

Pl ot date:

MEXI CO

SOLAR HEATING HOT WATER SYSTEM

SECONDARY HEATING HOT WATER PUMPS HWP-7A AND 7B

CONTROLS

A

UPON FAILURE OF THE LEAD OR LAG VFD INITIATION, AN ALARM SHALL BE GENERATED BY THE BAS.

BOILER SHALL START AUTOMATICALLY TO MEET THE LOAD. AN ALARM SHALL BE GENERATED BY THE BAS.

LAS CRUCES,NEW

THE LAG BOILER AND ASSOCIATED PUMPS SHALL STAGE OFF WHENEVER THE BOILERS ARE LOADED LESS THAN 40% FOR LONGER THAN 20 MINUTES (ADJUSTABLE).

UPON FAILURE OF THE LEAD PUMP, THE LEAD BOILER SHALL SHUT DOWN, THE LAG PUMP SHALL BE INITIATED TO START, AND THE LAG

RESERVE CENTER

AFTER A CALL HAS BEEN MAINTAINED FOR [20] MINUTES, THE LAG BOILER AND PUMP SEQUENCE START AS DESCRIBED ABOVE FOR THE LEAD BOILER THE SECOND LAG BOILER WILL START UNDER THE SAME CONDITIONS AND SEQUENCES. WHENEVER A LAG BOILER STARTS, ALL RUNNING BOILERS LOAD AND UNLOAD AS NECESSARY TO BE RUNNING WITH 5% OF THE SAME % LOAD.

ALARM FOR VFD FAILURE

U.S.ARMY

THERE IS NOT AUTOMATIC BOILER STAGING/SELECTION OPTIMIZATION CONTROLS. THE FIRST BOILER WILL BE CALLED FOR WHENEVER THE HOT WATER STORAGE TANK HST-2 TEMPERATURE FALLS 5 DEG F BELOW THE HWS TEMPERATURE SETPOINT FOR MORE THAN 10 MINUTES (ADJUSTABLE).

OR

Fi l e nam e:LCARC_M 8080. dgn

ALARM ON PUMP FAILURE HWP-6A AND 6B; ALARM ON PUMP FAILURE DETECTED VIA A MOTOR CURRENT SWITCH AND FLOW SWITCH.

7/22/2011

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8070.dgn

BOILER STAGING [ALL IN BAS]

FAX (714) 327-1601

THE CONTROLLER SHALL MONITOR RPM AND GPM OF THE PUMPS AND SHALL NOT ALL THE OPERATION OF THE PUMPS AT OR BEYOND THEIR PUBLISHED

SCHEDULE, BY MODULATING THE BOILER CAPACITY.

TEL (714) 327-1600

MONITORING

THE BOILER MAINTAINS THE HHW SUPPLY TEMPERATURE AT THE SETPOINT[BAS] WHICH RANGES FROM 175F TO 180F, BASED ON A RESET

LOUI SVI LLE DI STRI CT

TO MAINTAIN THE BUILDING HEATING HOT WATER SETPOINT HHWST.

Desi gned by:

SHALL BE COMMANDED TO START AND THE OPERATE IN SEQUENCE WITH THE LEAD AND LAG BOILER AND THE SECONDARY PUMP(S)

A.REED

IN THE EVENT THAT ADDITIONAL HEATING IS REQUIRED, THE LAG HEATING HOT WATER PRIMARY PUMP

CORPS OF ENGI NEERS

THE LEAD SECONDARY PUMP HWP THEN STARTS, RAMPING UP FROM THE MINIMUM SPEED OF 20 Hz VIA THE VARIABLE FREQUENCY DRIVE.

WHEN THE TOTAL SECONDARY HHW GPM HAS REDUCED TO BE EQUAL TO OR LESS THAN ONE PUMPS GPM FOR [10] MINUTES (ADJUSTABLE), THE LAG HHW PUMP SHALL BE COMMANDED OFF.

M .BETZ

DURING REDUCING LOAD AS THE DP INCREASES:

THERE SHALL BE [30-60] SECOND DELAYS BETWEEN THESE PUMPS, PER THE BOILER INTEGRAL PROGRAMMED SETTINGS (ADJUSTABLE)

Subm i tted by:

TO MAINTAIN THE BUILDING HEATING HOT WATER SETPOINT HHWST.

HUTTON CENTRE DRI VE,SUI TE 800

THE LEAD PRIMARY PUMP hHWP SHALL OPERATE IN SEQUENCE WITH THE LEAD BOILER AND SECONDARY PUMP(S)

SANTA ANA, CALI FORNI A 92707

Date:

THE LEAD PRIMARY PUMP HHWP STARTS UPON A CALL FOR HEATING.

CONFIRMED ON VIA A CURRENT SENSOR IN THE BAS AND THE FLOW IS CONFIRMED THROUGH A FLOW SWITCH.

U.S.ARMY

THEN THE ASSIGNED LEAD BOILER PUMP STARTS, THE PUMP STATUS IS

072811

EACH PRIMARY HEATING HOT WATER HHW PUMP IS ASSIGNED TO ONE BOILER [BAS].

4

IS CONFRIMED THROUGH A FLOW SWITCH.

B

F-171-40-160

THE LEAD PRIMARY (HWP-6A) PUMP STARTS, THE PUMP STATUS IS CONFIRMED VIA A CURRENT SENSOR IN THE BAS AND THE FLOW

Project Code:

PRIMARY HEATING HOT WATER PUMPS HWP-6A AND 6B

Revi ewed by:

AS DIFFERENTIAL PRESSURE FALLS BELOW LOW LEVEL SETPOINT, AND THE LAG PUMP STARTS BOTH PUMPS SHALL CONVERGE AND RUN AT SIMILAR SPEEDS AND GPM TO MAINTAIN THE COMMON SUPPLY DISCHARGE PRESSURE DIFFERENTIAL SETPOINT AN REMOTE DP SETPOINTS.

OPEN THE CONTROL VALVE

A.REED

MONTHLY

W 912QR-11-R-0071

PUMP STAGING [BAS]

UPON A CALL FOR HEATING:

Sol i ci tati on No.

DAILY

C.KORPASH

5. THE HEATING HOT WATER FLOWS ARE VERIFIED [BAS AND BOILER PANEL]

Ckd by:

IF BOILER RUNTIME (ADJ) IS EXCEEDED

Dwn by:

4. THERE IS A CALL FOR HEATING [BAS]

THE DP RESET AND HWST RESET COMPETE WITH EACH OTHER FOR CONTROL OF THE BUILDING. THE HHWST RESET SHALL NOT OCCUR UNLESS ALL THE

I .FRANCO

MANUALLY THROUGH A SOFTWARE SWITCH

LOUI SVI LLE,KENTUCKY

3. THERE ARE NOT ACTIVE ALARMS THAT INITIATE A SHUTDOWN (REPORTED TO BAS AND BOILER PANEL)

Rev.

2. OSAT<56F[BAS] (SHUT BACK OFF AT OSAT>54F

THE HEATING WATER CONTROL VALVES SHALL BE POLLED EVERY [5] MINUTES (ADJUSTABLE). WHEN FAILURE ALARMS ARE REGISTERED (BAS AND BOILER CONTROLS)

OR

WHEN THE SOLAR COLLECTORS ARE ABLE TO MAINTAIN THE DESIRED HWS TEMPERATURE AS INDICATED BY THE BOILER OPERATING AT MINIMUM LOAD AND THE HWS TEMPERATURE 5 DEG F GREATER THAN THE HWS TEMPERATURE SETPOINT FOR LONGER THAN 20 MINUTES (ADJUSTABLE).

SHEET REFERENCE NUMBER:

THE LEAD PUMP SHALL RUN FIRST TO MAINTAIN ITS DIFFERENTIAL PRESSURE SETPOINT (ADJUSTABLE). IF THE WATER DIFFERENTIAL PRESSURE DROPS BELOW 12 PSI (ADJUSTABLE, THE LAG PUMP SHALL START, THE LEAD PUMP SHALL RAMP DOWN WHILE THE LAG PUMP RAMPS UP AND THE PUMPS SHALL RUN IN UNISON. IF THE WATER DIFFERENTIAL PRESSURE RISES BACK ABOE 16 PSI (ADJ), THE LAG PUMP SHALL TURN "OFF" AND THE LEAD PUMP SHALL MODULATE TO CONTROL THE DIFFERENTIAL PRESSURE CONTROL SETPOINT.

M-8070

BOILERS WILL NOT CYCLE ON AND OFF MORE THAN THREE TIMES IN A ONE HOUR PERIOD

9:19:36 AM

m oraja

Sheet 151

1

2

*** Support Value Engineering - It Pays ***

4

5

of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

9:20:10 AM

m oraja

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8080.dgn

1

A

2

*** Support Value Engineering - It Pays *** 4 5 Sheet 152

HUTTON CENTRE DRI VE,SUI TE 800

FAX (714) 327-1601

SANTA ANA, CALI FORNI A 92707 TEL (714) 327-1600

4

C.KORPASH

M .BETZ

Subm i tted by:

A.REED

Revi ewed by:

Ckd by:

Dwn by:

Rev.

7/22/2011 Pl ot scal e:NONE

Pl ot date:

Fi l e nam e:LCARC_M 8080. dgn

F-171-40-160

Project Code:

W 912QR-11-R-0071

Sol i ci tati on No.

B

I .FRANCO

Date: 072811

Mark

Descri pti on

Date

Appr.

Mark

Descri pti on

1

LOUI SVI LLE,KENTUCKY

Desi gned by:

D Date

Appr.

FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER

A.REED

A.

CONTROLS

CORPS OF ENGI NEERS

4

LOUI SVI LLE DI STRI CT

U.S.ARMY

*** Safety Pays ***

MEXI CO

RESERVE CENTER

2

LAS CRUCES,NEW

U.S.ARMY

7/22/2011

1 5

GENERAL NOTES TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS,

US Army Corps of Engineers

AND NOTES REFER TO DRAWING M-8000. LOUISVILLE DISTRICT

KEY NOTES LISTED ALARM LIMITS ARE INITIAL SETTINGS ONLY AND

SHALL BE USER ADJUSTABLE. ACTUAL ALARM LIMITS MAY

DIFFER DEPENDING ON ACTUAL OPERATING CONDITIONS.

C

SHEET REFERENCE NUMBER:

M-8080 of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

9:20:35

m oraja AM

c:\pwworki ng\gbna\m oraja\dm s97636\LCARC_M-8090.dgn

1

A

2

*** Support Value Engineering - It Pays *** 4 5 Sheet 153

HUTTON CENTRE DRI VE,SUI TE 800

FAX (714) 327-1601

SANTA ANA, CALI FORNI A 92707 TEL (714) 327-1600

4

C.KORPASH

M .BETZ

Subm i tted by:

A.REED

Revi ewed by:

Ckd by:

Dwn by:

Rev.

7/22/2011 Pl ot scal e:NONE

Pl ot date:

Fi l e nam e:LCARC_M 8090. dgn

F-171-40-160

Project Code:

W 912QR-11-R-0071

Sol i ci tati on No.

B

I .FRANCO

Date:

Mark

Descri pti on

Date

Appr.

Mark

Descri pti on

2

072811

1

LOUI SVI LLE,KENTUCKY

Desi gned by:

D Date

Appr.

FOR MECHANICAL ABBREVIATIONS, SYMBOLS, AND NOTES REFER

A.REED

A.

CONTROLS

CORPS OF ENGI NEERS

4

LOUI SVI LLE DI STRI CT

U.S.ARMY

*** Safety Pays ***

MEXI CO

RESERVE CENTER

2

LAS CRUCES,NEW

U.S.ARMY

7/22/2011

1 5

GENERAL NOTES TO DRAWING M-0010. FOR CONTROL ABBREVIATIONS, SYMBOLS,

US Army Corps of Engineers

AND NOTES REFER TO DRAWING M-8000. LOUISVILLE DISTRICT

KEY NOTES LISTED ALARM LIMITS ARE INITIAL SETTINGS ONLY AND

SHALL BE USER ADJUSTABLE. ACTUAL ALARM LIMITS MAY

DIFFER DEPENDING ON ACTUAL OPERATING CONDITIONS.

PART OF UNIT FACTORY CONTROL PANEL.

C

SHEET REFERENCE NUMBER:

M-8090 of 222

CERTIFIED FINAL SUBMITTAL (RTA) - 07-28-11

6

5

4

3

2

1

Dewberry Architects Inc.

SYMBOL

DESCRIPTION

-CEILING DIFFUSER, ROUND NECK (CEILING DIFFUSERS ARE 4-WAY THROW UNO)

F

SYMBOL

DESCRIPTION -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME WITH ELECTRIC HEAT

-FIRE DAMPER (WITH ACCESS PANEL)

-TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME WITH ELECTRIC HEAT

-FIRE & SMOKE DAMPER (WITH ACCESS PANEL)

-ROUND DIFFUSER -CEILING RETURN

-EXISTING FIRE DAMPER TO REMAIN

-CEILING EXHAUST

-TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME, FAN POWERED

-EXISTING FIRE & SMOKE DAMPER TO REMAIN -CEILING DIFFUSER, RECTANGULAR OR SQUARE NECK (CEILING DIFFUSERS ARE 4-WAY THROW UNO)

SA-1

-SOUND ATTENUATOR

-SUPPLY REGISTER OR GRILLE (VERTICAL MOUNT, SIDEWALL)

-TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME, FAN POWERED, WITH ELECTRIC HEAT

-MOTOR OPERATED CONTROL DAMPER (MOD) M

-RETURN/EXHAUST REGISTER OR GRILLE (VERTICAL MOUNT, SIDEWALL)

-ELECTRIC DUCT HEATER (W/ PANEL CLEARANCE) -AIR FLOW MEASURING STATION

FM

-REVISION REFERENCE

1

-MANUAL BALANCING DAMPER

-DETAIL REFERENCE: TOP-DETAIL#, BOTTOM-DRAWING# SHOWN ON

T

-THERMOSTAT/TEMPERATURE SENSOR

H

-HUMIDISTAT/HUMIDITY SENSOR -DUCT SMOKE DETECTOR

E

-HYDRONIC REHEAT COIL

-DOOR GRILLE

UC

1 M-1

-INLINE CENTRIFUGAL FAN

-UNDERCUT DOOR

-CONNECT TO EXISTING -PACKAGED TERMINAL AIR CONDITIONER (PTAC)

-ACCESS DOORS, VERTICAL OR HORIZONTAL -DEMOLISH TO POINT INDICATED -MOTORIZED CONTROL DAMPER

M TS

-TEMPERATURE SENSOR

P

-PRESSURE SENSOR

-STAINLESS STEEL DUCTWORK

UP

DN -CHANGE OF ELEVATION

-FLEXIBLE CONNECTION -FLEXIBLE DUCT 12x8

-BACKDRAFT DAMPER

BD

-FLAT OVAL DUCT -TRANSITION, CONCENTRIC

-NEUTRAL RELATIVE PRESSURE

0

24x12

-NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN

-POSITIVE RELATIVE PRESSURE

+ _

-NEGATIVE RELATIVE PRESSURE

24x12

-EXISTING DUCTWORK TO REMAIN

1

-SHEET NOTE CALLOUT

24x12

-EXISTING DUCTWORK TO BE REMOVED

-SHEET NOTE CALLOUT

SYMBOL

DESCRIPTION 1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

AFD

-ADJUSTABLE FREQUENCY DRIVE

LD

-LINEAR DIFFUSER

AFF

-ABOVE FINISHED FLOOR

MBH

-THOUSAND BTUs PER HOUR

AFR

-ABOVE FINISHED ROOF

MCA

-MINIMUM CIRCUIT AMPS

AHU

-AIR HANDLING UNIT

MOCP

-MAXIMUM OVER CURRENT PROTECTION

AP

-ACCESS PANEL

MOD

-MOTOR OPERATED CONTROL DAMPER (MOD)

BOP

-BOTTOM OF PIPE

NC

-NORMALLY CLOSED

BHP

-BRAKE HORSEPOWER

NO

-NORMALLY OPEN

BTU

-BRITISH THERMAL UNIT

NTS

-NOT TO SCALE

h

-CENTER LINE

OA

-OUTSIDE AIR

c

-CFM (CUBIC FEET PER MINUTE)

OAL

-OUTSIDE AIR LOUVER

CD

-CEILING DIFFUSER

PRV

-PRESSURE REDUCING VALVE

CT

-COOLING TOWER

PRS

-PRESSURE REDUCING STATION

CV

-CONSTANT AIR VOLUME

PSI

-POUNDS PER SQUARE INCH

P

-CHANGE IN PRESSURE

PSIG

-PSI GAUGE

T

-CHANGE IN TEMPERATURE

PTAC

-PACKAGED TERMINAL AIR CONDITIONER

CFM

-CUBIC FEET PER MINUTE

PVC

-POLYVINYL CHLORIDE PIPE

CU

-CONDENSING UNIT

RA

-RETURN AIR

DDC

-DIRECT DIGITAL CONTROLS

RHC

-REHEAT COIL

DN

-DOWN

RHP

-ROOFTOP HEAT PUMP

EAT

-ENTERING AIR TEMPERATURE

RPM

-REVOLUTIONS PER MINUTE

ESP

-EXTERNAL STATIC PRESSURE

RS/L

-REFRIGERANT SUCTION & LIQUID LINES

EWT

-ENTERING WATER TEMPERATURE

RTU

-ROOFTOP AIR HANDLING UNIT

FCU

-FAN COIL UNIT

SA

-SUPPLY AIR

FD

-FIRE DAMPER

SP

-STATIC PRESSURE

FF

-FINAL FILTERS

TSP

-TOTAL STATIC PRESSURE

FLA

-FULL LOAD AMPS

UNO

-UNLESS NOTED OTHERWISE

FPM

-FEET PER MINUTE

V/PH

-VOLTS/PHASE

GPM

-GALLONS PER MINUTE

VAV

-VARIABLE AIR VOLUME

KW

-KILOWATT

VFD

-VARIABLE FREQUENCY DRIVE

LAT

-LEAVING AIR TEMPERATURE

LWT

-LEAVING WATER TEMPERATURE

2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT. 3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARD. 4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK. 5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS. 6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED. 7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND EQUIPMENT OF ALL TRADES. 8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS. 9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION. 10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. 11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT BLACK. 12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT. 13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED. 14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT. 15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT. 16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS. 17. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND OTHER AIR DISTRIBUTION DEVICES. 18. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR HANDLING UNITS, AND FAN COIL UNITS.

-TRANSITION, SQUARE TO ROUND

10x8

-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST

1

DESCRIPTION

24x12

-SHEET NOTE CALLOUT

1

-TRANSITION, ECCENTRIC

SYMBOL

UP W/IN FLOOR

DOWN

-CEILING MOUNTED ACCESS DOOR

19. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.

-SQUARE THROAT TEE

DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING

20. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.

-DUCT ELBOW, EXHAUST -DUCT ELBOW, NEGATIVE PRESSURE, RETURN

-RADIUS TEE

12x8

21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY OWNER.

-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE

D

401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

-RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE, SUPPLY OR OUTSIDE AIR

22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.

-RECTANGLE-TO-ROUND TAKE-OFF

23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10' CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE LOCATIONS.

-RECTANGULAR DUCT SECTION UP, NEGATIVE PRESSURE, RETURN -STANDARD BRANCH TAKE-OFF

-RECTANGULAR DUCT SECTION UP, EXHAUST -ROUND DUCT SECTION UP

24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK. 25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI.

-SPIN-IN TAKE-OFF

114400 North 49th Street Clearwater, FL.

DESCRIPTION

HVAC GENERAL NOTES

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

SYMBOL

HVAC ABBREVIATIONS

Pinellas County

HVAC SYMBOL LEGEND

26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN.

-FLAT OVAL DUCT SECTION UP -SQUARE THROAT ELBOW W/TURNING VANES

27. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING. 28. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26.

-RADIUS ELBOW

SEAL

-RECTANGULAR/ROUND BRANCH TAKE-OFF OR ROUND/ROUND BRANCH TAKE-OFF

PRELIMINARY DOCUMENTS -EXHAUST DUCT UP THROUGH SLAB W/ FAN ON ROOF ABOVE

NOT FOR CONSTRUCTION

-EXHAUST FAN ON ROOF W/ DUCT DOWN THROUGH ROOF

KEY PLAN

C

HVAC PIPING SYMBOL LEGEND SYMBOL

DESCRIPTION

SYMBOL

DESCRIPTION

HVAC EQUIPMENT TAGS SYMBOL EQUIP.

CWS

-CONDENSER WATER SUPPLY

-FLOW DIRECTION

CWR

-CONDENSER WATER RETURN

-GATE VALVE

-CHILLED WATER SUPPLY

-BALL VALVE

CHWS CHWR

DESCRIPTION

TAG A

- P-TRAP

-AIR DISTRIBUTION DEVICE

200 CFM

-TWO-WAY CHECK VALVE

SCALE

MV

AHU NUMBER -MANUAL VENT

-CHILLED WATER RETURN

-CALIBRATING BALANCING VALVE

CD

-CONDENSATE

-BUTTERFLY VALVE

CR

-CONDENSATE RETURN

-GAS COCK

-PRESSURE GAUGE

PC

-PUMPED CONDENSATE

-UNION

-RELIEF VALVE

AHU-1

HWR HWS

-HOT WATER SUPPLY

HPS

-HIGH PRESSURE STEAM SUPPLY

MPS

-MEDIUM PRESSURE STEAM SUPPLY -LOW PRESSURE STEAM SUPPLY

S

-STRAINER

FM

-FLOW METER

-CONTROL VALVE

M

-WATER METER

-SOLENOID VALVE -PSI REG. -CHECK VALVE

HPR

-HIGH PRESSURE STEAM RETURN

MPR

-MEDIUM PRESSURE STEAM RETURN

-FLOW SWITCH

LPR

-LOW PRESSURE STEAM RETURN

-SLOPE DIRECTION (DOWN)

-REFRIGERANT LIQUID

-FLEX CONNECTION

RL RS

-REFRIGERANT SUCTION

D

D

-VALVE ON RISER -CAP -CONNECTION, BOTTOM

VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS

VTU - VARIABLE TERMINAL UNIT CTU - CONSTANT TERMINAL UNIT PTU - PARALLEL TERMINAL UNIT STU - SERIES TERMINAL UNIT

AHU NUMBER TERMINAL NUMBER VTU-1-1

No.

Description

Date

-COUPLING -O.S.&Y. GATE VALVE

-ELBOW, 90°

-STEAM TRAP

-ELBOW, 45°

-THREE-WAY CONTROL VALVE

-ELBOW, TURNED DOWN

-45° PIPE RISE (R) / DROP (D) -ELBOW, TURNED UP -PIPE ANCHORS

-REHEAT COIL

RHC-1-1

TERMINAL UNIT TYPE -INLINE PUMP

-CONNECTION, TOP

-TEE, OUTLET DOWN -TEE, OUTLET UP

-INLINE PUMP

12" = 1'-0"

COIL NUMBER

-HOT WATER RETURN

LPS

B

AHU NUMBER

-AIR HANDLING UNIT

-THERMOMETER

REVISIONS DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

-CONCENTRIC REDUCER -ECCENTRIC REDUCER

03/19/2014

TITLE

MECHANICAL LEGEND A NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT PROJECT NO.

M-000 SHEET NO.

50057109

6

5

4

3

2

1

Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

F

SAFE HARBOR GENERAL NOTES:

(N)CHWS/R BRANCH TO NEW BUILDING

1.

ALL EXISTING, PLASTIC CHILLED WATER PIPING SHALL BE DEMOLISHED/ABANDONED. ANY METALLIC BRANCH PIPING THAT IS CONNECTED TO PLASTIC MAIN PIPE SHALL BE DISCONNECTED FROM THE PLASTIC PIPE. METAL ENDS SHALL BE CAPPED AND LEFT IN SUITABLE CONDITION FOR CONNECTION TO NEW, METALLIC UNDERGROUND CHILLED WATER LINES. CONTRACTOR TO VERIFY WHERE PLASTIC PIPE ENDS AND METAL PIPE BEGINS.

2.

FINAL PIPE SIZE TO BE DETERMINED BY FINAL DESIGN BUILD CONTRACTOR.

(N)CHWS/R DISTRIBUTION

(E)4" CHWS/R (E)4" CHWS/R

"M1"

(E)6" CHWS/R

(E)6" CHWS/R (E)1" BALL VALVES

(N) CHWS/R DISTRIBUTION (E)8" CHWS/R

"B"

145TH AVE N

HEALTH CARE FACILITY

(E)4" CHWS/R

(E) CHWS/R VALVE BOX

"A"

SHERIFF ADMIN. 2' V ALLEY GU TTER

(E)4" CHWS/R (E)4" CHWS/R

"C" D

"M2"

49TH ST N

(E)3" CHWS/R

(E)3" CHWS/R

(E)8" CHWS/R

142ND AVE N (N) 20" CHWS/R DISTRIBUTION RUN PARALLEL TO EXISTING PIPING SERVING CENTRAL/INTAKE AND HOUSING A-G

(E) CHWS/R

CENTRAL DIVISION

POND POND

114400 North 49th Street Clearwater, FL.

(N)CHWS/R DISTRIBUTION

Pinellas County

E

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

CR OS SB AYO U

(N)CHWS/R BRANCH TO NEW BUILDING

SEAL

PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION

C

PINELLAS COUNTY CRIMINAL COURT COMPLEX

SOUTH DIVISION (E) CHWS/R

(N)CHWS/R PIPING BRIDGED OVER TO STATE ATTORNEY/ CJC CENTER

"G" MAINTENANCE

KEY PLAN

POND

"F"

"E"

"D"

"C"

POND

SCALE

1" = 100'-0"

SIR LB021 (FI R 1/2" LB1344 0.30' S., 0.50' W.)

OHE

OHE

OHE

LAND LINE JURISDICT IONAL WET

B

No.

Description

Date

REVISIONS DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

JUVENILE DETENTION CENTER

03/19/2014

TITLE

MECHANICAL SITE PLAN EDGE OF W ATER

ASPHALT WALK

A

1

MECHANICAL SITE PLAN

140TH AVE N

FIR 1/2" LB1344

PROJECT NO. EDGE OF W ATER

M-001

Scale: 1" = 100'-0" SHEET NO.

50057109

6

5

4

3

2

1

1 2 3 4 5 6 7

F

1

1.1

3

5

USED OIL TANK

6.9

Keynotes AREA TO BE PROVIDED WITH DEDICATED CHILLED WATER FAN COIL UNIT. AREA TO BE EXHAUSTED. FAN TO BE CHEMICAL RATED. AREA TO BE EXHAUSTED. VAV BOX WITH ELECTRIC HEAT. PROVIDE ACCESS PANEL AS REQUIRED. PROVIDE LINT TRAP. DRYER EXHAUST FAN. ROUTE TO EXTERIOR WALL. COMBUSTION AIR MAKE UP FAN. ROUTE TO EXTERIOR WALL.

Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

7

NEW OIL TANK

A

A S

WORKER STAGING 122

LOADING DOCK 105 PROGRAM MEETING ROOM 111

4 STORAGE

B

D

4

SALLYPORT SERVICE DRIVE 103

DOCK STORAGE 102

BULK REFIG STORAGE 109

JANITOR 142

3 INMATE TOILET 119

4 INMATE TOILET 113

3

T

S

STORAGE 112

B

JANITOR 114

3

T

T

T

T

1

SEARCH 123

Pinellas County

3 INMATE TOILET 121

DOCK STAGING 107

SECURITY ELECTRONICS 101

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

E

PROGRAM MEETING ROOM 116

PROGRAM MEETING ROOM 110

BULK DRY STORAGE 108

STAFF

4 3

3

4

118

T

S

STAIR A SA1

MEDIUM PRESSURE SUPPLY DUCT ESTIMATED 80x30

FEC

FEC C

CO AND NO2 SENSORS LINKED TO ALARM

ELEVATOR A EA

1 ELECTRICAL 140

CART WASH 139

OFFICE/ 137

WATER HEATER 124 ELEVATOR B EB

114400 North 49th Street Clearwater, FL.

A.1

A.1

STAIR B SB1

ELEVATOR C EC

C

C

SEAL

3 STAFF TOILET 125

NOT FOR CONSTRUCTION

AIR 1 COMPRESSOR 126

GARBAGE/ RECYCLE DOCK 106

C

PRELIMINARY DOCUMENTS

KEY PLAN

3 UTILITY WASH 136

TRASH COMPACTOR

CLEAN LAUNDRY STORAGE 135 CENTRAL LAUNDRY 138

T

SCALE

D

D 1/8" = 1'-0"

4 T S PARKING AREA

WATER TANK STORAGE 104

B

DRYERS 127

STORAGE 134

MAINTENANCE SUPPLY 133

T 7

S 4

T

T RISER ROOM 132

UNIFORM STORAGE 131

INMATE TOILET 129

BREAK ROOM 130

CHEMICAL STORAGE 128 2

3

5

No.

E.9

H

E.9

6

2448

2448

Description

Date

REVISIONS

C

F

F

DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

03/19/2014

TITLE

1

A

1

1.1

FIRST FLOOR MECHANICAL PLAN

3

5

6.9

7

FIRST FLOOR MECHANICAL PLAN

Scale: 1/8" = 1'-0" PROJECT NO.

M-110 SHEET NO.

50057109

4

3

2

1

1 2 3 4 5 6

F

7

1.1

3

5

6.9

A

C

H

5 SECURED STORAGE 209

E

401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

7

A

C

A.1 DRY FOOD STORAGE 204

Dewberry Architects Inc.

H

1

Keynotes ROUTE EXHAUST DUCTWORK, APPROXIMATELY 60x20, TO KITCHEN HOODS. COORDINATE WITH KITCHEN DESIGNER. ROUTE MAKE UP DUCTWORK, APPROXIMATELY 50x20, TO KITCHEN EQUIPMENT. COORDINATE WITH KITCHEN DESIGNER. ROUTE SUPPLY AND DUCTING TO MECHANICAL CHASE. AREA TO BE EXHAUSTED. AREA TO BE EXHAUSTED. FAN TO BE CHEMICAL RATED. AREA TO BE PROVIDED WITH DEDICATED CHILLED WATER FAN COIL UNIT. REFRIGERATER/ FREEZER AREA. SEE KITCHEN EQUIPMENT PLANS.

BREAK ROOM 211

A.1

CHEMICAL STORAGE (SECURE) 216

WARE WASH AREA 215

4

EQUIPMENT STORAGE 203

UNIFORM 205

TRAY MAKE-UP 220

OFFICE 213

INMATE TOILET 207

B

H C

JAN/EQUIP SUPPLIES 202

6

C

KITCHEN/LAUNDRY STORAGE 201

H

CORRIDOR 210

4 INMATE TOILET 208

B

FOOD SERVICE MGMT OFFICE 214

4

STORAGE 218

C

CART STORAGE AND WASHING 219

STAFF TOILET 206

Pinellas County

STORAGE/ FUTURE LINK 217

CORRIDOR 212

4 4

D

STAIR A SA2

CORRIDOR 221

CORRIDOR 250 FEC

FEC

6 4

4 TRASH HOLDING 246

ICE/BEV. 234

ELEVATOR A EA

ELEVATOR B EB

ELEC 233

D

DAIRY COLDROOM 247

JAN 249

114400 North 49th Street Clearwater, FL.

5

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

6

STAIR B SB2

ELEVATOR C EC

D

C

D2

C

D2 C1

C1

SEAL E1 E2 G

3

E1 E2 G D1

STAFF DINING MULTI-PURPOSE 232

NOT FOR CONSTRUCTION

12"X12" 1075 CFM .27" S.P.

G G FIRE CABINET

G G G

STEAM CO N DEN SATE TRAP AN D ST RAI N ER

12"X10" 1456 CFM .39" S.P.

9"X8" 538 CFM .07" S.P.

G G

12"X12" 937 CFM .27" S.P.

SAFET Y VA LVE

VALVE

1/ 2" N PT

SATE 12"X9"CO N DEN RETU RN 1217 CFM STEAM .37" S.P. CO N TRO L

SAFET Y VA LVE

STEAM CO N DEN SATE TRAP AN D ST RAI N ER

STEAM CO N TRO L VALVE 1/ 2" N PT

12"X12" 937 CFM .27" S.P.

1 C

C

STEAM CO N DEN SATE TRAP AN D ST RAI N ER

H

D

APPROXIMATE RETURN DUCT SIZE 70x24

SAFET Y VA LVE

G

12"X10" 1353 CFM .43" S.P.

1/ 2" N PT CO N DEN SATE RETU RN

11"X8" 1012 CFM .29" S.P.

SCALE

D

12"X12" 937 CFM .27" S.P.

JAN 228

STEAM CO N TRO L VALVE

SAFET Y VA LVE

#321.2L

C

STEAM CO N DEN SATE TRAP AN D ST RAI N ER

1/ 2" N PT CO N DEN SATE RETU RN STEAM CO N TRO L VALVE

#321.1L

SAFET Y VA LVE

CO N DEN SATE 12" X9" RETU RN 1216 CFM .37" S.P.

12"X12" 937 CFM .27" S.P.

12"X10" 1379 CFM .42" S.P.

R

12"X10" 809 CFM .20" S.P.

D

R

C D

G

D

KEY PLAN

R

#321.2R

R

FINISHED BULK COLDROOM 243

3

SERVING 231

#321.6L

STEAM CO N TRO L VALVE

BULK MEAT COLDROOM 242

2

FOOD PREP SERVICE AREA 230 D

C

PRELIMINARY DOCUMENTS

CORRIDOR 222

G

FINISH PRODUCE COLDROOM 245

G

HOT FOOD PRODUCTION 235

12"X11" 1648 CFM .47" S.P.

CORRIDOR 251

D1

#321.6R

BULK PRODUCE COLDROOM 248

STEAM CO N DEN SATE TRAP AN D ST RAI N ER

1/8" = 1'-0"

12"X12" 937 CFM .27" S.P.

4 FAUCET, TANGENT DRAW-OFF ARE OPTIONAL

H C

DEN SATE 12"X10"CO N RETU RN 1352 CFM .43" S.P.

1/ 2" N PT

G

12"X10" 809 CFM .20" S.P.

G

#321.1R

G G

THAW/PULL 241

11"X8" 1011 CFM .29" S.P.

C

BULK COLDROOM 242

4

FIRE CABINET

D

C D

MULTI-PURPOSE 223

STAFF TOILET 227 CORRIDOR 229

STAFF 4 TOILET 226

H

APPROXIMATE SUPPLY DUCT SIZE 96x24

A/V CLOSET 224

REF

DAILY DRY STORAGE 236

FINISH VEG PREP 237

REF

FINISH MEAT PREP 238

-10 FREEZER 239

C

-20 FREEZER 240

MIC MIC

H

C

B

6

E.9

E.9 C

H

H

C

F

F 7 CONNECTOR TO CENTRAL TOWER CN

No.

Description

Date

REVISIONS DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

03/19/2014

TITLE

1

A

1

1.1

SECOND FLOOR MECHANICAL PLAN Scale: 1/8" = 1'-0"

3

5

6.9

7

SECOND FLOOR MECHANICAL PLAN PROJECT NO.

M-120 SHEET NO.

50057109

6

5

4

3

2

1 1 2 3 4 5 6 7

F

8 9 10 11

1

1.1

3

5

6.9

7

12 13 14

Keynotes GENERATOR RADIATOR. PIPE TO AND FROM GENERATOR. THREE- WAY CATALYST INSTALLED ON EXHAUST GAS PIPE. ROUTE EXHAUST GAS PIPE SHORTEST DISTANCE TO ABSORPTION CHILLER. NEW CHILLED WATER FAN COIL UNIT. ROUTE OUTSIDE AIR THROUGH ROOF. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL. AREA TO BE PROVIDED WITH DEDICATED CHILLED WATER FAN COIL UNIT. AREA TO BE EXHAUSTED. ROOFTOP CHILLED WATER AIR HANDLER. PROVIDE MANUFACTURER'S CLEARANCES. SUPPLY AND RETURN DUCTING PENETRATIONS TO BE COORDINATED WITH STRUCTURE. ROOFTOP MAKE UP FAN FOR KITCHEN EQUIPMENT. COORDINATE WITH KITCHEN DESIGNER. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL. ROOFTOP EXHAUST FAN FOR KITCHEN EQUIPMENT. COORDINATE WITH KITCHEN DESIGNER. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL. ROUTE ABSORPTION CHILLER EXHAUST THROUGH ROOF TO MUFFLER. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL. PROVIDE DEDICATED DX/ CHILLED WATER UNIT FOR ELEVATOR MACHINE ROOM. ACOUSTICAL TREATED WALL. PROVIDE ACOUSTICAL WRAP FOR PIPING PENETRATIONS. REFRIGERANT PURGE SYSTEM FAN. PROVIDE OUTSIDE AIR DROP FOR PURGE SYSTEM.

Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

13 14

A

E FUTURE ELECTRIC CHILLER

ELECTRIC CHILLER

CHWPFUTURE ABS

CWP-2 ABS

CHWP-2 ABS

CWP-1 ABS

A.1

CHWP-1 ABS

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

CWPFUTURE ABS

CONTROL CONFERENCE RM 313

ELECTRIC CHILLER

FUTURE ABSORPTION CHILLER

ABSORPTION CHILLER

10

CONTROL ROOM 302

FUTURE SYS PUMP

SYS PUMP

CHW FAN COIL REF

Pinellas County

A.1

OFFICE 4301

10

4

REF

B

B CHW FAN COIL 5

STAIR A SA3

STAFF TOILET 305

CWP- FUTURE

D

VESTIBULE

303

6

CHWP-FUTURE CHW FAN COIL ELEVATOR LOBBY CWP-3

CHWP-3

CWP- 2

CHWP-2

CWP-1

CHWP-1

CHW/ DX FAN COIL

CHW FAN COIL ELEVATOR A EA

5

310

WATER TREATMENT AND HYDRONIC SPECIALTIES AREA

CHW FAN COIL GENERATOR CONTROL 309

11

CHEMICAL STORAGE

4

4

COUPON RACK AND CHEMICALS

ELEVATOR C EC

STAIR B SB3

CHW FAN COIL

I.T. ROOM 5 306

SEAL

SHOT FEEDER & PUMPS

ELECTRICAL

C

114400 North 49th Street Clearwater, FL.

A

C

312

PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION

LAUNDRY CHW AHU

KEY PLAN

C 8 1

7

2

GAS ENGINE SCALE 9

3

1/8" = 1'-0" D

GENERATOR ROOM 311

EXTERIOR ROOF ER1

1

EXTERIOR ROOF ER2

D

KITCHEN CHW AHU

2

7

B FUTURE GAS ENGINE KITCHEN EQUIPMENT CONDENSING UNIT

No.

3

Description

Date

REVISIONS

E.9

E.9

12

F

F

DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

03/19/2014

20" CHWS/R PIPING TO SOUTH CAMPUS. SEE STRUCTURAL AND ARCHITECTURAL FOR ROUTING.

TITLE

1

1.1

3

5

6.9

7

THIRD FLOOR MECHANICAL PLAN

A

1

THIRD FLOOR PIPING PLAN

PROJECT NO.

Scale: 1/8" = 1'-0"

M-130 SHEET NO.

50057109

6

5

4

3

2

1

1

2

F

3

4

1

1.1

3

5

6.9

Dewberry Architects Inc.

Keynotes ROUTE CONDENSER PIPING FROM TOWER THROUGH ROOF SLAB TO PUMP LOCATED IN MECHANICAL ROOM. COORDINATE ROOF PENETRATION WITH STRUCTURAL. GENERATOR ROOM INTAKE FAN. COORDINATE FAN WITH STRUCTURE. PROVIDE PENTHOUSE. PROVIDE SILENCERS AS REQUIRED. GENERATOR ROOM EXHAUST FAN. COORDINATE FAN WITH STRUCTURE. PROVIDE PENTHOUSE. PROVIDE SILENCERS AS REQUIRED. ABSORPTION CHILLER MUFFLER AND SILENCER. PROVIDE HEAT RECOVERY SYSTEM.

401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

7

A

A A.1

FUTURE MUFFLER

E

1

B

FUTURE 2-CELL COOLING TOWER (ELECTRIC CHILLER)

1

1

2-CELL COOLING TOWER (ELECTRIC CHILLER)

2-CELL COOLING TOWER (ELECTRIC CHILLER)

(2) SINGLE-CELL COOLING TOWERS (ABSORPTION CHILLERS) (1) FUTURE

Pinellas County

4

4

1

B

STAIR A SA4

D

114400 North 49th Street Clearwater, FL.

MUFFLER

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

A.1

SEAL

C

C 1

PRELIMINARY DOCUMENTS

STAIR B SB4

NOT FOR CONSTRUCTION

KEY PLAN

C 2

3

SCALE

1/8" = 1'-0"

D

D

2

B

3

No.

FUTURE SUPPLY FAN

Description

Date

FUTURE EXHAUST FAN REVISIONS

E.9

E.9

F

F

DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

03/19/2014

TITLE

1

A

1

1.1

ROOF PIPING PLAN

3

5

6.9

7

ROOF MECHANICAL PLAN

Scale: 1/8" = 1'-0" PROJECT NO.

M-140 SHEET NO.

50057109

6

5

4

3

2

1

Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

F

PIPING SYMBOL LEGEND -FLOW DIRECTION -GATE VALVE -BALL VALVE -CALIBRATING BALANCING VALVE -BUTTERFLY VALVE -GAS COCK

E

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

-STRAINER -CONTROL VALVE

-CHECK VALVE -FLOW SWITCH -FLEX CONNECTION -O.S.&Y. GATE VALVE

Pinellas County

-THREE-WAY CONTROL VALVE

-THERMOMETER -TWO-WAY CHECK VALVE

MV

-MANUAL VENT

CHWP-1

-PRESSURE GAUGE CHWP-2

FUTURE CHWP

ABSORPTION CHWP

EXPANSION TANK

FUTURE ABSORPTION CHWP

BYPASS

-RELIEF VALVE

FM

-FLOW METER

M

-WATER METER -INLINE PUMP -INLINE PUMP

D

FUTURE CHILLER

FROM BLDG AIR SEPARATOR

114400 North 49th Street Clearwater, FL.

-UNION

TO BLDG. FUTURE SYSTEM PUMP

SEAL CH-2

PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION

SYSTEM PUMP

KEY PLAN

C

CH-1

SCALE

NOT TO SCALE ABSORPTION CHILLER

B

FUTURE ABSORPTION CHILLER

No.

Description

Date

REVISIONS

CHILLED WATER PIPING DIAGRAM No Scale

1

DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

03/19/2014

TITLE

MECHANICAL DIAGRAMS A PROJECT NO.

M-200 SHEET NO.

50057109

6

5

4

3

2

1

Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

F

PIPING SYMBOL LEGEND -FLOW DIRECTION -GATE VALVE -BALL VALVE -CALIBRATING BALANCING VALVE -BUTTERFLY VALVE -GAS COCK

-STRAINER -CONTROL VALVE

-CHECK VALVE -FLOW SWITCH -FLEX CONNECTION

Pinellas County

-O.S.&Y. GATE VALVE -THREE-WAY CONTROL VALVE

-THERMOMETER CT-ABSORPTION FUTURE

CT-ABSORPTION

CT-1

CT-2

CT-FUTURE -TWO-WAY CHECK VALVE -RELIEF VALVE MV

-MANUAL VENT -PRESSURE GAUGE FM

-FLOW METER

M

-WATER METER -INLINE PUMP

D

-INLINE PUMP

FUTURE CWP-ABSORPTION

CWP-ABSORPTION CWP-1

FUTURE CHILLER

CH-2

CWP-2

CWP- FUTURE

114400 North 49th Street Clearwater, FL.

E

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

-UNION

SEAL

CH-1

PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION

KEY PLAN

C

ABSORPTION CHILLER

SCALE FUTURE ABSORPTION CHILLER

NOT TO SCALE

B

No.

Description

Date

REVISIONS

CONDENSER WATER PIPING DIAGRAM No Scale

1

DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

03/19/2014

TITLE

MECHANICAL DIAGRAMS A PROJECT NO.

M-201 SHEET NO.

50057109

6

5

4

3

2

1

Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax

F

REFER TO P201, DETAIL 9 FOR FURTHER DETAIL PLUMBING SYSTEM TO

HEAT RECOVERY RECIRC PUMP

E HOT EXHAUST GAS

HEAT RECOVERY HEAT EXCHANGER, SHELL IN TUBE EXHAUST BYPASS VALVE NO NC

NO ENGINE HIGH TEMP RADIATOR

Pinellas County

FLEX CONNECTION (TYP) NATURAL GAS GENSET

ABSORPTION CHILLER

3-WAY CATALYTIC

HIGH TEMP PUMP

RETURN TEMPERAURE REGULATING 3-WAY VALVE EXPANSION TANK

D

COGENERATOR DIAGRAM

114400 North 49th Street Clearwater, FL.

SILENCER

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

FROM

1

No Scale

SEAL

PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION

KEY PLAN

C

FUTURE EXPANSION TANK ON TOP OF RADIATOR

12" MAX.

EXPANSION TANK ON TOP OF RADIATOR

FLOW LIMITING VALVES

SCALE

MOUNT HEAT EXCHANGER AS CLOSE AS POSSIBLE TO RADIATOR.

NOT TO SCALE

TYPICAL FLEXIBLE CONNECTIONS HOT WATER PIPING (200 F.) OFF THE DUAL ENGINES

PIPING TO PLUMBING SYSTEM SEE PLUMBING FOR CONTINUATION

REFER TO P201, DETAIL 9 FOR FURTHER DETAIL

TYPICAL SHUT-OFF VALVE 12" MAX.

RADIATOR

HEAT EXCHANGER

B

No.

Description

Date

REVISIONS

COGENERATOR DIAGRAM No Scale

2

DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE

03/19/2014

TITLE

MECHANICAL DIAGRAMS A PROJECT NO.

M-202 SHEET NO.

50057109

6

5

4

3

2

1

Dewberry Architects Inc. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax AUTOMATIC FLOW CONTROL DEVICE PRESET BY MANUF. W/ P & T TEST PORTS, STRAINER, AND DRAIN. (PRE-MANUF. SINGLE ASSEMBLY ACCEPTABLE)

THREE WAY CONTROL VALVE

EXTENDED OPERATOR ON BALANCE DAMPER

SPIN-IN FITTING W/VOLUME CONTROL DAMPER (INSUL. PER SPEC.)

MANUAL AIR VENT W/AUTO SHUT-OFF COCK

DRAW BAND

(PRE-MANUF. SINGLE ASSEMBLY ACCEPTABLE)

STEEL RODS W/THREADED ENDS (TYP. 4 PLACES) SUPPORT FROM STRUCTURE ABOVE AS REQUIRED

THREADED CAP, HAND TIGHTENED

COIL

RETURN

SPRING VIB. ISOLATORS

THREADED CAP WITH 1/4" DIA. HOLE DRILLED IN TOP, HAND TIGHTENED.

UNION

PROVIDE WITH FILTER OVER OPENING

FLEXIBLE DUCT MAX. 8'-0" IN LENGTH FULLY EXTENDED.

COOLING COIL

FLEX CONN. (TYP.)

SA SUPPLY

FAN

RA

B

PLUG COCK

SHUT-OFF VALVE (TYP.)

DRAW BAND

A

DRAIN PAN

SLOPE TO DRAIN

BLANK-OFF PLATES WHERE REQUIRED

C

P/T TEST PORTS

CASING SLEEVE

FLOAT SWITCH

UNION (TYP.)

DIFFUSER CONE (INSUL. PER SPEC.)

SNUBBER

CONDENSATE DRAIN PIPING DIMENSIONS:

THERMOMETER W/SEPARABLE WELL (TYP.)

CEILING TEE

ROUTE MAIN CONDENSATE LINE TO FLOOR DRAIN

A = FULL SIZE OF UNIT DRAIN CONNECTION B > 1-1/2" TIMES FAN SUCTION STATIC PRESSURE C > FAN DISCHARGE STATIC PRESSURE PLUS 1/2" INCH

BALL VALVE

CEILING

GALVANIZED SHEET METAL SECONDARY DRAIN PAN TO EXTEND 3" BEYOND UNIT ON ALL SIDES BY 1-1/2" DEEP

COORDINATE MOUNTING/CURB HEIGHT AS REQUIRED TO PROVIDE PROPER CONDENSATE DRAINAGE.

FLEX. CONNECTION (TYP.) NOTES: 1. PROVIDE (4 x DIA.) OF STRAIGHT PIPE ON BOTH SIDES OF BALANCING VALVE 2. ALL COMPONENTS FULL LINE SIZE UNLESS NOTED OTHERWISE 3. LOCATE UNIONS TO ALLOW FOR COIL PULL

LIGHT

3-WAY COIL PIPING DIAGRAM (FCU-4)

1

NOT TO SCALE

AHU CONDENSATE DRAIN TRAP

2

NOT TO SCALE

D

DIFFUSER MOUNTING

3

NOT TO SCALE

FAN COIL UNIT

4

NOT TO SCALE

GEAR W/HAND WHEEL 5" AND LARGER LEVER LATH HANDLE W/MEMORY STOP 4" AND SMALLER

THREE LAYERS OF 5/8" GYPBOARD, REFER TO SPECIFICATION SECTION 15910

DAMPER, TYPICAL MANUAL BALANCING

PRESSURE GAUGE

BUTTERFLY VALVE (TYP.)

TOP OF DUCT TO BE AS HIGH AS POSSIBLE

TAP, TYPICAL 45 DEGREE BOOT

114400 North 49th Street Clearwater, FL.

PRESSURE GAUGE & COCK (TYP.)

E

Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings

DIFFUSER NECK (INSUL. PER SPEC.)

AIR FLOW

STRAINER W / BLOWDOWN

Pinellas County

F

SNUBBER BALL VALVE

EXTEND TREATMENT ACROSS OPEN CEILING SEE PLAN DRWGS.

DIFFERENTIAL PRESSURE TRANSMITTER

P/T PORT W/BLOWDOWN VALVE (TYP.)

DRAW BAND

NON-SLAM CHECK VALVE

SEAL

FLEXIBLE CONNECTER SILENCER

SUPPLY DUCT

FLEXIBLE CONNECTOR

DIAMETER TO MATCH SYSTEM PIPING DIAMETER

PRELIMINARY DOCUMENTS NOT FOR CONSTRUCTION

s" PUMP DRAIN, EXTEND TO FLOOR NEAREST DRAIN

SUCTION DIFFUSER W/INTEGRAL STRAINER & 3/4" BLOW DOWN VALVE. EXTEND TO NEAREST FLOOR DRAIN

C

FLEXIBLE DUCT

SPIN-IN FITTING W/VOLUME CONTROL DAMPER (INSUL. PER SPEC. REQ'D.)

PIPE SUPPORT

RADIUS ELBOWS MAY BE USED IN LIEU OF SQUARE ELBOWS

KEY PLAN

WALL DIAMETER TO MATCH PUMP INLET DIAMETER

NOISE CONTROL TREATMENT AT DUCT SILENCER

5

NOT TO SCALE

CONCRETE HOUSEKEEPING PAD

PIPE SUPPORT

SPLIT-CASE DOUBLE SUCTION PUMP

6

NOT TO SCALE

TYPICAL FLEX DUCT CONNECTION

7

NOT TO SCALE

TYPICAL PRESSURE DUCTWORK

SCALE

8

NOT TO SCALE

NOT TO SCALE VALVES ABOVE TUBE PULL (TYP.) ACTUATOR & VALVE BY CONTROLS CONTRACTOR (TYP.)

LUG TYPE BUTTERFLY VALVE W/GEAR OPERATOR (TYP.) 120 VAC BEACON

ALARM WIRING PER ASHRAE 15 TO EMS

TEMP. SENSOR (TYP.)

A DIFFERENTIAL PRESSURE SENSOR/TRANSMITTER (TYP.)

CWS

ANALOG OUTPUT WIRING

PROVIDE NEW REMOTE ALARM BEACON OUTSIDE ALL CHILLER ROOM ENTRY DOORS

B

A

REFRIGERANT MONITOR PANEL

ROCK FREE BACKFILL

1'-0" MIN.

PITTWRAP JACKETING

FLEXIBLE CONNECTOR FLEX CONNECTION

RESETTING RELIEF ASSEMBLY BY EQUIPMENT MANUFACTURER

FOAMGLASS INSULATION SAMPLE TUBE

FLANGED JOINT

6".

SAND BACKFILL

6".

6" MIN.

COMPRESSION COUPLING

FILTER

FULL SIZE OF VENT OPENING (MIN.) OR AS CODE REQUIRES

CHILLER

12" TO 18"

GRAVEL

No.

Description

Date

RELIEF VENT

TO CHILLER

PIPE

CHWR

SAMPLE LINES

SUPPORT TO COLUMN OR WALL

NOTES: 1. PROVIDE REFRIGERANT MONITOR CAPABLE OF SENSING R-123 REFRIGERANT. 2. NEW EXHAUST FAN. 3. PROVIDE TWO REFRIGERANT SAMPLE LINES I LOCATIONS AS SHOWN ON PLANS.

CHILLER DIFFERENTIAL PRESSURE SWITCH TO CHILLER CONTROL PANEL

PRESSURE GAUGE W/ SNUBBER & BALL VALVES (TYP.) CONNECT NEW RELIEF PIPING TO EXISTING RELIEF PIPING HEADER.

6" MIN.

THERMOMETER (TYP.)

CHWS

CWR

R OOF

COMPRESSOR SUCTION CONNECTION

RELIEF PIPING SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH ASHRAE STANDARD 15. MINIMUM RELIEF PIPING SIZE INDICATED ON FLOOR PLAN. DEVIATION FROM SIZE INDICATED IS ACCEPTABLE ONLY AFTER RECOMMENDATION FROM CHILLER MANUFACTURER AND APPROVAL OF THE ENGINEER. COORDINATE RELIEF PIPING REQUIREMENTS WITH CHILLER MANUFACTURER.

REVISIONS CONTROL PANEL CONDENSER TO CONTROL PANEL

DRAWN BY

HAT

APPROVED BY

LTE

CHECKED BY

LTE

DATE VIBRATION ISOLATION SPRINGS (TYP.)

EVAPORATOR

03/19/2014

TITLE

HOUSEKEEPING PAD

MECHANICAL DETAILS

FLANGED ELBOW W/ LIFT PLATE (TYP.) FLOOR SLAB

FLOOR

A

6" MINIMUM

MECHANICAL JOINT (SIMILIAR TO A VICTAULIC COUPLING)

r" FL x r" NPT DRAIN VALVE (5'-0" ABOVE FLR.)

PETE'S PLUG (TYP.)

PROJECT NO.

UNDERGROUND PIPING INSTALLATION

NOT TO SCALE

9

REFRIGERANT MONITORING

NOT TO SCALE

10 RELIEF PIPING NOT TO SCALE

11 WATER COOLED CHILLER NOT TO SCALE

12

M-300 SHEET NO.

50057109

ARCHITECTURAL

HVAC ABBREVIATIONS AFU F

DUCTWORK

HVAC DUCTWORK SYMBOLS

ANNUAL FUEL UTILIZATION EFFICIENCY DESCRIPTION

SYMBOL DO NOT SCALE DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS AND REFLECTED CEILING PLANS FOR EXACT LOCATION OF DOORS, WINDOWS, CEILING DIFFUSERS,

1.

ETC. 2.

ALL DUCTWORK INSTALLATION SHALL RUN CONTINUOUSLY THROUGH PARTITIONS.

EAT EER

ENTERING AIR TEMPERATURE ENERGY EFFICIENCY RATIO

LOCATE ALL DUCT BALANCING DAMPERS, CONTROL DAMPERS AND FIRE DAMPERS

E/F EWH

EXHAUST FAN

NO FIRE DAMPERS SHOWN ON THE PLANS (DUCTWORK SIZE IS LESS THAN 100

FCU

FAN COIL UNIT

CONDITIONS.

SQUARE INCHES), PROVIDE THE FOLLOWING, MINIMUM:

PIPING AND DUCTWORK ROUTING SHOWN IS SCHEMATIC. HVAC CONTRACTOR SHALL PROVIDE ANY ADDITIONAL OFFSETS AND FITTINGS, INCLUDING DIVIDED DUCTS, REQUIRED FOR PROPER INSTALLATION AND TO MAINTAIN CLEARANCES AS

1). A MINIMUM OF 12-INCH LONG BY 0.060-INCH THICK STEEL SLEEVE SHALL BE CENTERED IN EACH DUCT OPENING.

HP HVAC

HORSEPOWER HEATING, VENTILATING, AIR CONDITIONING

ENCOUNTERED IN THE FIELD.

2). THE SLEEVE SHALL BE SECURED TO BOTH SIDES OF THE WALL AND ALL FOUR SIDES OF THE SLEEVE WITH A MINIMUM OF 1-1/2" x 1-1/2" X 0.060" STEEL RETAINING ANGLES.

PRIOR TO INSTALLATION OF ASSOCIATED WORK; INSTALLER SHALL MEET AT PROJECT SITE WITH GENERAL CONTRACTOR, INSTALLER OF EACH COMPONENT OF ASSOCIATED

4).

WORK, INSPECTION AND TESTING AGENCY REPRESENTATIVES (IF ANY), INSTALLERS OF

OTHER WORK REQUIRING COORDINATION WITH WORK OF THIS SECTION AND ARCHITECT / OWNER FOR PURPOSE OF COORDINATING LOCATIONS OF PROPOSED SYSTEMS, REVIEWING MATERIAL SELECTIONS, AND PROCEDURES TO BE FOLLOWED IN PERFORMING THE WORK IN COMPLIANCE WITH REQUIREMENTS

6.

SPECIFIED.

THE ANNULAR SPACE BETWEEN THE STEEL SLEEVE AND WALL SHALL BE FILLED WITH SILICONE ELASTOMER TO PROVIDE A MINIMUM 2-HOUR RATED FIRESTOP.

BUILDING STRUCTURE, PLUMBING PIPING, ELECTRICAL CONDUIT, LIGHTING, ETC.

7.

PRIOR TO PURCHASING OR INSTALLING EQUIPMENT AND MATERIALS.

6. 7.

IN

INCHES

KW

KILOWATT

LAT LBS

LEAVING AIR TEMPERATURE POUNDS

MBH MCA

1,000 BRITISH THERMAL UNITS MINIMUM CIRCUIT AMPACITY

200-2 8"0

RTU

ROOFTOP UNIT

DUCTWORK SIZES INDICATED ON DRAWINGS ARE INSIDE, FREE AND CLEAR

SEER SP

SEASONAL ENERGY EFFICIENCY RATIO STATIC PRESSURE

DIMENSIONS. INCREASE DUCT OUTSIDE DIMENSION SIZE BY TWO (2) TIMES THE THICKNESS OF THE INSULATION.

TU

TERMINAL UNIT

VAV

VARIABLE AIR VOLUME

W/

WITH WET BULB

BE FLASHED AND COUNTERFLASHED IN A WATERPROOF MANNER.

8.

ALL DUCTWORK SHALL BE CONSTRUCTED SMACNA STANDARDS.

AND INSTALLED IN ACCORDANCE WITH

MAINTAIN MINIMUM OF TEN (10) FEET BETWEEN OUTDOOR AIR INTAKES AND EXHAUST FAN DISCHARGE, PLUMBING VENTS, ETC.

9.

ALL DUCTWORK SHALL BE GALVANIZED SHEET METAL IN AREAS WITH FINISHED

www.cjsarchitects.com

EBS ENGINEERING, PC ENGINEERED BUILDING SYSTEMS

WB

HVAC DRAWING LIST M-1

HVAC SCHEDULES, LEGENDS AND ABBREVIATIONS

M-2

HVAC SCHEDULES

M-3

FLOOR PLAN - HVAC DUCTWORK AND PIPING

M-4

ROOF PLAN - HVAC DUCTWORK AND PIPING

M-5

HVAC DETAILS

4050 RIDGE LEA ROAD BUFFALO NEW YORK 14228 PHONE: (716) 836-9600 FAX: (716) 836-9636 E-MAIL: [email protected] WEBSITE:

MANUAL VOLUME DAMPERS

ROUND SUPPLY AIR DEVICE FIRST NO. CFM, SECOND NO. TYPE THIRD NO. NECK SIZE (REFER TO SCHEDULE FOR SIZE) RETURN / EXHAUST AIR DEVICE

200-1

REVOLUTIONS PER MINUTE

ALL PIPING, DUCTS, VENTS, ETC. EXTENDING THROUGH WALLS AND ROOF SHALL

40

RPM

COORDINATE INSTALLATION AND LOCATIONS OF DUCTWORK AND PIPING WITH

CONTROL WIRING (PLENUM RATED)

DIRECTION OF SLOPE (DOWN IN DIRECTION OF ARROW)

OPEN END DUCT

DUCT WIDTHS FROM BRANCH TAKEOFF.

PROGRAMMABLE, 7-DAY, 24-HOUR THERMOSTAT

INTERNALLY LINED DUCTWORK

OED

PROVIDE VOLUME CONTROL DAMPERS WITH QUADRANT AND LOCK AND STANDOFF COLLAR AT ALL BRANCH DUCTS TO DIFFUSERS. INSTALL AT A MINIMUM OF TWO

T

266 Alexander Street Rochester, N.Y. 14607 585.244.3780 tel 585.244.1294 fax

MECHANICAL / ELECTRICAL ENGINEERS

NO ALLOWANCES WILL BE MADE FOR CONTRACTOR'S UNFAMILIARITY WITH PROJECT

THE RETAINING ANGLES SHALL BE SECURED TO THE SLEEVES AND THE WALL WITH NO. 10 (M5) SCREWS.

RETURN DUCT RISER

FLEXIBLE DUCT

FAHRENHEIT

3).

TEMPERATURE SENSOR

DUCT RISE OR DROP

ELECTRIC WALL HEATER

F

FURNISH ALL LABOR, MATERIAL AND EQUIPMENT REQUIRED FOR THE COMPLETE INSTALLATION AND OPERATION OF ALL SYSTEMS IN THIS SECTION OF WORK IN

S

AIRFOIL TURNING VANES

WHERE DUCTWORK PASSES THROUGH A FIRE-RATED ASSEMBLY, AND THERE ARE

A.

SUPPLY DUCT RISER

EXHAUST DUCT RISER

THE HVAC CONTRACTOR SHALL VISIT THE JOB SITE AND BE FAMILIAR WITH ALL

ACCORDANCE WITH ALL APPLICABLE CODES, ASHRAE, SMACNA, NFPA, EPA, ETC.

5.

DRY BULB DIRECT DIGITAL CONTROL

4.

PROJECT CONDITIONS PRIOR TO FABRICATING DUCTWORK, EQUIPMENT, ETC.

4.

DB DDC

ASPECT RATIO SHALL NOT EXCEED 3:1.

ABOVE ACCESSIBLE CEILINGS OR PROVIDE CEILING ACCESS DOORS.

3.

CUBIC FEET PER MINUTE CONDENSING UNIT

3.

5.

GENERAL

2.

CFM CU

REFER TO ARCHITECTURAL FLOOR PLANS FOR LOCATION AND RATING OF ALL FIRE WALLS.

1.

BRAKE HORSEPOWER

*1

3.

LIGHT FIXTURE LOCATIONS TAKE PRECEDENCE OVER DIFFUSER AND GRILLE LOCATIONS. LOCATE DIFFUSERS AND GRILLES TO ACCOMMODATE LIGHTING LAYOUT.

DUCTWORK SHALL NOT BE SUPPORTED FROM BRIDGING, CONDUIT, PIPING, ETC. OF ANY KIND. DO NOT USE FASTENERS THAT PENETRATE ROOF DECKS.

BHP

STARK

WWW.EBSPE.COM

COPYRIGHT C 2016 ENGINEERED BUILDING SYSTEMS

D. 8o

j

o

(p s

-

2.

RUN ALL DUCTWORK AND PIPING AS TIGHT TO BOTTOM OF STEEL AS POSSIBLE OR RUN THRU OPEN JOIST WEBBING.

JENSEN

303 South Park Avenue Buffalo, N.Y. 14204 716.856.6448 tel 716.852.1722 fax

DESCRIPTION

SYMBOL

-

1.

CHAINTREUIL

HVAC CONTROL SYMBOLS

ARCHITECTS, LLP

HVAC GENERAL NOTES

FIRST NO. CFM, SECOND NO. TYPE

G

0 47

THIRD NO. NECK SIZE (IF REQUIRED)

(REFER TO SCHEDULE FOR SIZE) o S

CEILINGS.

8.

9.

REFER TO PLUMBING DRAWINGS FOR LOCATION AND ROUTING OF ALL CONDENSATE DRAIN LINE CONNECTION POINTS, GAS PIPING, AND WATER HEATER COMBUSTION / EXHAUST AIR DUCTWORK.

10. WHERE RECTANGULAR DUCTWORK IS INDICATED, AND AT INSTALLERS OPTION, PROVIDED THEY ARE EQUIVALENT TO THE RECTANGULAR DIMENSIONS INDICATED ON THE DRAWINGS (i.e.: 8x4 = 8"0, 10x6 = 10"0).

DIVISION 23 SHALL BE LICENSED TO PERFORM MECHANICAL WORK IN THE

AIR DISTRIBUTION DEVICE SCHEDULE

MUNICIPALITY IN WHICH THE PROJECT IS LOCATED.

11. PROVIDE INTERNALLY LINED SUPPLY AIR DUCTWORK FROM ROOFTOP UNITS TO A UNDER THIS CONTRACT AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF THE OWNER'S FINAL ACCEPTANCE OF THE WORK. ANY DEFECTS SHALL BE RECTIFIED BY DIVISION 15 WITHOUT ANY

PROTECTION AND CONSTRUCTION CODE, NEW YORK STATE ENERGY CONSERVATION CODE, AND ANY STATE AND LOCAL CODES OR REGULATIONS THAT APPLY.

A.

ALL HVAC EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S REQUIREMENTS

ALL EQUIPMENT SHALL HAVE A ONE (1) YEAR WARRANTY; COMPRESSORS SHALL HAVE AN ADDITIONAL FIVE (5) YEAR EXTENDED WARRANTY, ROOFTOP UNIT HEAT

STORE ALL EQUIPMENT

IN A DRY PLACE, PROTECTING ALL EQUIPMENT FROM THE WEATHER,

15. MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 5'-0".

ROOF CURBS SHALL HAVE A BASE THAT FITS SLOPE OF ROOF AS REQUIRED.

FLEXIBLE CONNECTORS SHALL BE INSTALLED ON SUPPLY, RETURN, AND EXHAUST

1.

MODIFICATION, OR SUBSTITUTION TO THESE DRAWINGS AND SPECIFICATIONS FOR EVALUATION NO LATER THAN TEN (10) DAYS PRIOR TO THE BID DATE.

EXCEED

SPECIFIED

B. C.

NO MATERIALS SHALL BE DEEMED ACCEPTABLE IF NOT IN STRICT AND FULL

3.

CONDENSATE DRAIN PIPES SHALL HAVE CLEANOUTS AT EVERY CHANGE IN DIRECTION,

MATERIALS

PERFORATED FACE, STEEL CONSTRUCTION, OPPOSED BLADE VOLUME DAMPERS, PROVIDE 22"x22" BACKPAN FOR FULL

TITUS

(DIA.)

CFM

MINIMUM OUTSIDE AIR

8"0

200

75

SIZE

TOTAL

CFM

TITUS

(BYPASS)

TU-04

MIT OFFICE 43

TITUS

4.

TU-05

LAY-IN

PERFORATED FACE, STEEL CONSTRUCTION, OPPOSED BLADE VOLUME DAMPERS, PROVIDE 22"x22" BACKPAN FOR FULL

TITUS

(BYPASS)

8"0

300

100

10"o

500

125

ALL DEVICES SHALL HAVE MATCHING MATTE, WHITE FINISH (UNLESS OTHERWISE NOTED IN DESCRIPTION ABOVE).

4.

ESMB-12 (BYPASS)

12"0

850

200

MIT OFFICE 40

TITUS

ESMB-08 (BYPASS)

8"0

300

100

HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR THE SIZING OF REFRIGERANT

3.

MAXIMUM NC OF 20.

4.

ACCESSORIES:

TU-06

MULTIPURPOSE ROOM 41

TITUS

(BYPASS)

10"o

500

125

TU-07

OFFICE 12, OFFICE 13, OFFICE 15, OFFICE 16, OFFICE 18, OFFICE 20

TITUS

ESMB-12 (BYPASS)

12"0

1,000

200

TU-08

OFFICE 6, OFFICE 7, OFFICE 9, OFFICE 11

A.

(BYPASS)

700

OPERATING KEYS: TOOLS DESIGNED TO FIT THROUGH DIFFUSER FACE AND OPERATE VOLUME CONTROL DEVICE AND / OR PATTERN ADJUSTMENT

VARIABLE AIR VOLUME TERMINAL UNIT NOTES:

2.

LOW LEAKAGE BYPASS DIVERTING CONTROL DAMPER WITH EDGE SEALS.

ALL CONTROL WIRING AND POWER CONDUCTOR INSULATION SHALL BE PLENUM

3.

MINIMUM 1/2" THICK (CLOSED-CELL) FIBRE-FREE INTERNALLY LINED.

4.

FACTORY INSTALLED MODULATING ACTUATOR (0-10V DC, CONTROLLED BY THERMOSTAT).

5.

MAXIMUM AIR PRESSURE DROP OF 0.40 INCHES WG.

6.

ACCESSORIES:

ACCEPTABLE MANUFACTURER'S - TITUS, PRICE.

ALL EXPOSED CONTROL WIRING SHALL BE INSTALLED IN 3/4" EMT CONDUIT. PROVIDE ALL RELAY, CONTACTORS, ETC. REQUIRED TO ACHIEVE INTERLOCK OPERATION

ELECTRIC WALL HEATER SCHEDULE

OF EQUIPMENT.

MARK

AREA SERVED

MANUFACTURER

MODEL NO.

SERIES

TYPE

3450 SERIES

SEMI-

(HEAW DUTY

RECESSED MOUNTING

MBH

WATTS

AMPS

VOLTS / PH

COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB); UPON COMPLETION OF THE PROJECT, SHALL PERFORM A COMPLETE TESTING AND BALANCING

OF ALL EQUIPMENT.

BALANCE SYSTEM TO WITHIN ±5% OF AIR QUANTITIES INDICATED

ON PLANS AND SCHEDULES AND PROVIDE THE OWNER WITH A COMPLETE, SIGNED AND SEALED BALANCE REPORT.

EWH-1

49 S. WATER STREET

175

DRAWING TITLE

CODE (NEC) AND NFPA 70.

MECHANICAL CONTRACTOR, WHO IS CERTIFIED BY EITHER THE ASSOCIATED AIR BALANCE

FLEX BUILDINNG OFFICE/EDICALREIAIL

NEW YORK 14070 10"o

MINIMUM 20-GAUGE GALVANIZED STEEL HOUSING WITH INTEGRAL SOUND ATTENUATOR.

5.

500 SENECA ST - SUITE 508 BUFFALO, NY 14204 (71 6) 332-5959 tel. (716) 332-5968 fax.

ESMB-10 TITUS

1.

ALL CONTROL WIRING AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC

49 S. WATER STREET, LLC

VILLAGE OF GOWANDA

HVAC EQUIPMENT

RATED.

3.

TITUS

PAR

AIR DISTRIBUTION DEVICE NOTES:

CONTROLS

2.

VESTIBULE 1, WAITING 2, TOILET 3,

ESMB-10

2.

SUPPLIER SHALL VERIFY REFRIGERANT PIPE LINE SIZES AND CONFIGURATIONS BASED ON CONTRACTOR'S PROPOSED PIPE ROUTING.

1.

(BYPASS)

I development

OWNER:

ESMB-10 TITUS

PANEL LAY-IN APPLICATION, WHITE FINISH

TYPE 3

DISTANCES GREATER THAN 3 FEET, AND AT THE BEGINNING OF LONG STRAIGHT RUNS. LINES (LONG LINE APPLICATION) GREATER THAN 50'-0".

CONFERENCE ROOM 14

EXHAUST EXHAUST 24x24

40wVIILiTM1$ cOmpanies construction

PAR

PANEL LAY-IN APPLICATION, WHITE FINISH

ALL DEVICES SHALL BE FROM A SINGLE MANUFACTURER.

1.

/

MIT OFFICE 39

MULTIPURPOSE

1.

ALL BIDDERS MUST BID SOLELY ON THE SPECIFIED MATERIALS UNLESS

FAILURE TO SUBMIT PROPOSED SUBSTITUTED EQUIPMENT

DUCT

RECEPTION DESK 4

Q

CONDENSATE PIPING FROM AIR CONDITIONING EQUIPMENT SHALL BE PITCHED A MINIMUM OF 1/4" PER FOOT, IN THE DIRECTION OF FLOW.

BALANCING

1).

LAY-IN

24x24

TYPE 2

ALL PIPING LINES, INCLUDING CONDENSATE DRAINS, SHALL BE FULLY INSULATED

COMPLIANCE WITH THESE DRAWINGS AND SPECIFICATIONS.

ACCEPTANCE BY THE ENGINEER OF A DEVIATION, OMISSION, MODIFICATION, OR SUBSTITUTION IS GRANTED IN WRITING THROUGH THE ARCHITECT / OWNER TO ALL BIDDERS PRIOR TO THE BID DATE.

ALL FLEXIBLE DUCT SHALL

2.

MATERIALS AND IN COMPLIANCE WITH THESE DRAWINGS AND SPECIFICATIONS. REQUESTS FOR SUBSTITUTION SHALL BE MADE ONLY BY THE BIDDER; REQUESTS FOR SUBSTITUTION FROM SALES REPRESENTATIVES, VENDORS, OR SUPPLIERS ARE NOT ACCEPTABLE.

MODEL NO.

ESMB-08

AND VAPOR BARRIER, FLAME SPREAD RATING OF 25 OR LESS, AND SMOKE-DEVELOPED RATING OF 50 OR LESS.

A REQUEST FOR ANY SUBSTITUTION SHALL BE ACCOMPANIED BY TECHNICAL

DATA, DRAWINGS, PRODUCT SAMPLES, AND COMPLETE DATA SUBSTANTIATING

MANUFACTURER

DAT TU-02

RETURN

0

WITH MINIMUM 1-1/2" THICK, 0.75 LB DENSITY, INSULATION WITH ALL SERVICE JACKET

THE BIDDER MUST SUBMIT IN WRITING TO THE ARCHITECT / OWNER, WHO WILL

1).

TITUS

RETURN

PIPING

AIR DUCTS AT ALL EQUIPMENT CONNECTIONS. FORWARD TO THE ENGINEER, ANY REQUEST FOR A PROPOSED DEVIATION,

AREA SERVED



ESMB-08

ARCHITECTURAL PLAQUE FACE, STEEL CONSTRUCTION, 3 SLOTS (SLOT WIDTH IS 1-1/2"), OPPOSED BLADE

KINKING AND SAGGING. (FLEXIBLE DUCT IS NOT PERMITTED IN EXPOSED AREAS, RETURN AIR GRILLE AND EXHAUST AIR GRILLE CONNECTIONS).

TOP OF ROOF CURB SHALL BE LEVEL.

/

MARK

VOLUME DAMPER, 4-WAY THROW, WHITE FINISH

TYPE 1

CONFORM TO THE REQUIREMENTS OF U.L. 181 FOR CLASS 1 FLEXIBLE AIR DUCTS, WITH A MINIMUM R-VALUE OF R-6. SUPPORT FLEXIBLE DUCT TO ELIMINATE

CONSTRUCTION TRAFFIC AND THEFT.

COMPLIANCE OF PROPOSED SUBSTITUTION THAT MEET

LAY-IN

24x24

REGISTERS AND GRILLES.

GENERAL CONTRACTOR SHALL STORE ALL HVAC EQUIPMENT (ROOFTOP UNITS,

A.

[O]

SUPPLY

LINER SHALL BE BLACK IN COLOR SO IT IS NOT NOTICEABLE FROM THE INSIDE OF

PROVIDE WRITTEN GUARANTEE.

6.

MODEL NO.

TU-03

EXCHANGERS SHALL HAVE AN ADDITIONAL TEN (10) YEAR EXTENDED WARRANTY;

5.

MANUFACTURER

KEY PLAN

AIR QUANTITY

EDITION), AND ENVIRONMENTALLY FRIENDLY WITH A MINIMUM R-VALUE OF R-6.

INSTALLED.

4.

DESCRIPTION

TU-01

14. ALL SQUARE ELBOWS SHALL HAVE AIRFOIL TYPE TURNING VANES.

DUCTWORK, ETC.) THAT ARRIVES AT THE PROJECT SITE.

MOUNTING

FROM ENTERING THE AIRSTREAM (COATING SHALL MEET ASHRAE 62 - LATEST

AS SHOWN. UTILIZE FACTORY FILTERS DURING CONSTRUCTION AND REPLACE (IN KIND) JUST PRIOR TO TESTING AND BALANCING. ALL FILTERS SHALL BE 2-INCHES THICK. PROVIDE ONE (1) SET OF EXTRA FILTERS FOR EACH UNIT

3.

STYLE DEVICE SIZE

SUPPLY

13. ALL DUCT LINERS SHALL BE MINIMUM 1-1/2" THICK, COATED TO PREVENT ELEMENTS

IN CASE OF CONFLICTS BETWEEN DRAWINGS, SPECIFICATIONS, AND INTERPRETATION

EQUIPMENT

2.

SYMBOL

12. ALL RETURN AIR DUCTWORK SHALL BE INTERNALLY LINED.

OF CODES BY LOCAL AUTHORITY, LATER SHALL GOVERN.

1.

INLET

FLAME SPREAD RATING OF 25 OR LESS, AND SMOKE-DEVELOPED RATING OF 50 OR LESS.

ADDITIONAL COST TO THE OWNER.

VARIABLE AIR VOLUME TERMINAL UNIT SCHEDULE

&

MINIMUM OF 10-FEET AWAY FROM THE UNIT. REMAINING SUPPLY AIR DUCTWORK SHALL BE EXTERNALLY INSULATED WITH MINIMUM 1-1/2" THICK, 0.75 LB DENSITY, FOIL-BACK INSULATION WITH VAPOR BARRIER AND A MINIMUM R-VALUE OF R-6,

10. DIVISION 23 SHALL GUARANTEE ALL WORK PERFORMED AND MATERIALS FURNISHED

11. WORK SHALL COMPLY WITH THE LATEST REVISIONS OF NEW YORK STATE BUILDING CODE, NEW YORK STATE MECHANICAL CODE, NEW YORK STATE UNIFORM FIRE

I

SPIRAL AND ROUND DUCTWORK MAY BE SUBSTITUTED FOR RECTANGULAR DUCTWORK

VESTIBULE 1

MARKEL

F3453T

FAN FORCED)

6.8

2,000

9.6

PRIOR TO THE BID EVALUATION DATE, AND IS INCLUDED IN THE BIDDERS PRICE / SUBMITTAL REVIEW DRAWINGS (AFTER THE PROJECT IS AWARDED);

208/1/60

HVAC SCHEDULES, LEGENDS AND ABBREVIATIONS JOB NO.

1210

SCALE

NONE

4.15.2016

A.

DISCHARGE AIR SENSOR.

DATE

B.

WALL MOUNTED THERMOSTAT (MODULATING (0-10V DC OUTPUT).

DRAWN BY

C.

FACTORY INSTALLED ACCESS DOOR.

CHECKED BY

7.

MAXIMUM RADIATED NC OF 25 AND DISCHARGE NC OF 22.

8.

ACCEPTABLE MANUFACTURERS: CARRIER, TITUS, PRICE.

REVISIONS

WILL RESULT IN A "REJECTED" SUBMITTAL PACKAGE. ELECTRIC WALL HEATER NOTES: 1.

ELECTRIC WALL HEATERS SHALL CONTAIN AN INTEGRAL, TAMPERPROOF THERMOSTAT.

3.

ELECTRIC WALL HEATERS SHALL BE EQUIPPED WITH BUILT-IN THERMAL OVERLOAD PROTECTION.

4.

FURNISHED AND INSTALLED BY DIVISION 23.

A.

THIS IS A SINGLE SHEET OF A COHESIVE

SET OF CONSTRUCTION DOCUMENTS (INCLUDING DRAWINGS AND SPECIFICATIONS).

WIRING BY DIVISION 26.

INTERPRETATION OF THE INFORMATION

5.

FURNISH 2" SEMI-RECESSED

MOUNTING FRAME #3450EX16 FOR EACH SEMI-RECESSED

6.

COLOR, INCLUDING CUSTOM COLOR, AS SELECTED BY ARCHITECT.

7.

ACCEPTABLE MANUFACTURERS - MARKEL, Q'MARK, INDEECO.

MOUNTED ELECTRIC WALL HEATER.

AS PRESENTED SHOULD BE BASED ON

THE ENTIRE SET OF DOCUMENTS.

DRAWING NO.

M-1 100% DESIGN SUBMISSION

CHAINTREUIL

RTU-1

AREA SERVED

TONS

ENTRY 36, STORAGE 37, KITCHEN 38, MIT OFFICE 39, COMMUNITY ROOM 42, MIT OFFICE 43

8.5

3,625

2,875

STATIC PRESS.

IN. WG EXT.

DX COOLING COIL MANUFACTURER

0.60

750

MODEL NO.

CARRIER

MBH

EAT 'F

97.0

48HCF-09

GAS HEATING SECTION MIN. ROWS

LAT 'F

80

4

67

MBH

MBH

AFUE

INPUT

OUTPUT

180.0

147.0

(1ST STAGE) |(1ST STAGE) 224.0

EAT 'F

LAT 'F

RPM

82%

58

95

80%

58

81%

58

SUPPLY AIR FAN MOTOR

184.0

EER

MCA

OPERATING WEIGHT

(LBS.)

VOLTS / PH

855

1.86

3

460/3/60

12.0

25.0

1,450

FAMILY CARE OFFICE 21, SUPERVISOR 22, ENTRY 23. OFFICE 24, MECHANICAL 25, STORAGE 32, JANITOR 34

3.0

1,225

975

250

0.60

CARRIER

48HCE-04

36.0

80

67

3

95

935

0.55

1

460/3/60

12.5

14.0

1,400

RTU-3

VESTIBULE 1, WAITING 2, TOILET 3, RECEPTION DESK 4, CORRIDOR 5, DATA 5A, TOILET 8, TOILET 10, MULTIPURPOSE CONFERENCE ROOM 14, STORAGE 17, TREATMENT ROOM 19, STORAGE 26, BREAKROOM 27,

12.5

5,500

4,375

1,1.25

0.80

CARRIER

48HCF-14

146.0

80

67

4

95

760

2.99

5

460/3/60

12.2

34.0

2,400

(1ST STAGE) 1 (1ST STAGE) 240.0

ENGINEERED BUILDING SYSTEMS MECHANICAL / ELECTRICAL ENGINEERS

195.0

(2ND STAGE) 1(2ND STAGE) 1,400

4050 RIDGE LEA ROAD BUFFALONEWYORK 14228 PHONE: (716) 836-9600 FAX (716) 836-9636 EAIL: [email protected]

OFFICE 6, OFFICE 7, OFFICE 9, OFFICE 11, OFFICE 12, OFFICE 13, OFFICE 15, OFFICE 16, OFFICE 18, OFFICE 20

82.0 66.0 (1ST STAGE) 1 (1ST STAGE) 115.0 90.0 (2ND STAGE) 1(2ND STAGE)

www.cjsarchitects.com

EBS ENGINEERING, PC

,

OFFICE 28, OFFICE 29, RECORDS 30, WOMENS TOILET 33, MENS TOILET 35, MIT OFFICE 40, MULTIPURPOSE ROOM 41

266 Alexander Street Rochester, N.Y. 14607 585.244.3780 tel 585.244.1294 fax

*

RTU-2

303 South Park Avenue Buffalo, N.Y. 14204 716.856.6448 tel 716.852.1722 fax

HP

(2ND STAGE) 1(2ND STAGE) 82.0 66.0 (1ST STAGE) 1 (1ST STAGE) 115.0 89.0 (2ND STAGE) 1(2ND STAGE) 192.0 156.0

STARK

BHP

%

MARK

SUPPLY I RETURN I OUTSIDE AIR AIR AIR CFM CFM CFM

JENSEN

ARCHITECTS, LLP

ROOFTOP UNIT SCHEDULE

RTU-4

5.0

1,700

1,325

375

0.60

CARRIER

57.5

48HCE-06

80

4

67

81%

57

1196

95

1.05

460/3/60

2

12.45

17.0

WEBSITE:

ROOFTOP UNIT NOTES:

4OF

7.

1.

UNITS SHALL BE LISTED AND LABELED WITH THE ENERGY STAR LOGO.

2.

FACTORY ASSEMBLED, PACKAGED UNIT WITH ROOF CURB AND ALL STANDARD ACCESSORIES.

8.

UNIT SHALL HAVE: A.

A.

R41OA REFRIGERANT.

9.

ACCESSORIES: 2'-0" HIGH, SOLID BOTTOM THERMAL

/

A.

/

B.

ALL SECTIONS SHALL HAVE HINGED ACCESS DOORS.

B.

OUTSIDE AIR INTAKE HOOD AND RELIEF

4.

UNIT SHALL BE U.L. OR AGA APPROVED.

C.

MOTORS SHALL HAVE BUILT-IN OVERLOAD PROTECTION.

C.

MODULATING, LOW-LEAKAGE, OPPOSED BLADE OUTSIDE AIR DAMPERS.

5.

CO 0

Uj

o

EXHAUST HOOD. 1.

L

I-VU CONTROL SYSTEM (COORDINATE EXACT LOCATION IN FIELD WITH OWNER PRIOR TO INSTALLATION).

2. TOUCH PILOT (LCD DISPLAY CONTROLLER WITH TOUCH SCREEN).

COORDINATE EXACT LOCATION IN

47t,

FIELD WITH OWNER PRIOR TO INSTALLATION.

UNIT SHALL BE OF DOWNFLOW DESIGN AND SHALL HAVE 100% ECONOMIZER FUNCTION.

D.

UNITS SHALL HAVE ADJUSTABLE PITCH MOTOR SHEAVES AND MOTOR PULLEYS.

D.

POWER EXHAUST.

A.

E.

2-STAGE GAS HEATING AND SINGLE-STAGE COOLING (RTU-2, RTU-4).

E.

CARBON DIOXIDE (C0 2 ) SENSOR FOR OUTSIDE AIR CONTROL OVERRIDE, MOUNTED IN RETURN AIR DUCTWORK.

F.

2-STAGE GAS HEATING AND 2-STAGE COOLING (RTU-1, RTU-3).

UNIT SHALL HAVE 100% ECONOMIZER FUNCTION WITH DIFFERENTIAL ENTHALPY CONTROL

AND MINIMUM OUTSIDE AIR SETTING, AND BAROMETRIC RELIEF. 6.

COMFORTLINK CONTROLS: SYSTEM CONTROLLER WITH VISUAL SCROLLING MARQUEE DISPLAY (LCD DISPLAY CONTROLLER). COORDINATE EXACT LOCATION IN FIELD WITH OWNER PRIOR TO INSTALLATION.

UNIT SHALL BE SINGLE-WALL CONSTRUCTION.

G.

30% PLEATED FILTERS.

H.

ALUMINIZED STEEL HEAT EXCHANGER.

1.

J. K.

F.

DISCHARGE AIR SENSOR MOUNTED IN SUPPLY AIR DUCTWORK.

G.

HUMIDI-MIZER DEHUMIDIFICATION CONTROL.

H.

STAINLESS STEEL, DOUBLE-SLOPE DRAIN PAN WITH P-TRAP ASSEMBLY.

I.

FACTORY INSTALLED AND WIRED NON-FUSED DISCONNECT SWITCH.

J.

FACTORY INSTALLED AND WIRED 120 VOLT GFI DUPLEX RECEPTACLE.

k9o4ss\

31. SPACE TEMPERATURE SENSORS WITH OVERRIDE. 4 .PRIMARY AIR SENSORS.

WITH 4-2OmA OUTPUT.

5 .ACTUATOR

FOR OTHER EQUIPMENT.

6 .INTERLOCKS

COMPRESSORS SHALL BE HIGH EFFICIENCY DESIGN.

NEw0

CONTROLS ACCESSORIES:

ACCOUSTICAL ROOF CURB.

3.

WWW.EBSPE.COM

COPYRIGHT C 2016 ENGINEERED BUILDING SYSTEMS

10. INSTALLATION: UNITS SHALL BE ON MANUFACTURER PROVIDED, FULL PERIMETER, INSULATED ROOF CURB

A.

SUITABLE FOR THE ROOF DECK, INSULATION AND MEMBRANE (REFER TO ARCHITECTURAL DRAWINGS FOR ROOF CONSTRUCTION).

FACTORY INSTALLED REMOTE SHUTDOWN TERMINALS. B.

DOUBLE-SLOPE DRAIN PAN WITH P-TRAP ASSEMBLY.

ALL SERVICES TO THE UNIT SHALL ENTER WITHIN THE ROOF CURB.

NO SEPARATE ROOF

PENETRATIONS ARE ALLOWED.

UNIT MOUNTED CONTROLS WITH FACTORY MOUNTED CONTROL BOARD.

I

11. ACCEPTABLE MANUFACTURER'S - CARRIER, MON, McQUAY.

KEY PLAN

FAN

STATIC

MARK

E/F-1

E/F-2

AREA SERVED

JANITOR 34

TOILET 3, WOMENS TOILET 33,

CFM

125

PRESS. IN. WG EXT. 0.125

FAN COIL UNIT SCHEDULE

MANUFACTURER

GREENHECK

MODEL NO.

LD-80-VG

FAN TYPE

CENTRIFUGAL

DRIVE TYPE

DIRECT

MOTOR RPM

858

SONES

1.4

HP

1/10

VOLTS / PH 120/1/60

ROOF CURB SIZE

GPI-19-A12

OPERATING WEIGHT (LBS.) 75

MARK

SUPPLY AIR

AREA SERVED

CFM

FCU-1

TOILET 8, TOILET 10

450

0.25

GREENHECK

200

0.25

GREENHECK

LD-95-VG

CENTRIFUGAL

DIRECT

1162

4.6

1/6

120/1/60

GPI-19-A12

75

FCU-2

LD-90-VG

CENTRIFUGAL

DIRECT

1046

2.7

1/10

120/1/60

FAN -

3.

BUILT-IN POWER DISCONNECT.

4.

MOTORS SHALL HAVE BUILT-IN THERMAL OVERLOAD PROTECTION.

6.

75

MULTIPURPOSE ROOM 41

MULTIPURPOSE CONFERENCE ROOM 14

MOTORIZED, OPPOSED BLADE, LOW LEAKAGE ALUMINUM CONTROL DAMPERS (120V ACTUATOR).

B.

1" THICK FAN HOUSING INSULATION.

C.

VARI-GREEN EC MOTOR WITH MOUNTED POTENTIOMETER DIAL.

MBH

EAT 'F

LAT *F

MIN.

MBH

ROWS

SUPPLY FAN FLA

KW

WATTS

RPM

VOLTS / PH

MCA

SEER

OPERATING WEIGHT (LBS.)

do4Tlt1$W1

companies

RAV-SP18OUTUL CARRIER

(IN-CEILING)

19.0

80

20.5

208/1/60

18.8

67

construction Idevelopment

50

OWNER: RAV-SP180UTUL CARRI ER

(IN-CEILING)

19.0

80

20.5

208/1/60

18.8

67

50

4.

49 S. WATER STREET, LLC 500 SENECA ST - SUITE 508 BUFFALO, NY 14204 (71 6) 332-5959 tel. (716) 332-5968 fax.

ACCESSORIES:

1.

UNITS SHALL BE LISTED AND LABELED WITH THE ENERGY STAR LOGO.

2.

HEAT PUMP UNIT.

A.

LOW AMBIENT CONTROLS.

3.

UNIT SHALL HAVE:

B.

SERVICE VALVES WITH SCHRADER PORTS.

A.

R41OA REFRIGERANT.

C.

VIBRATION ISOLATION HANGERS.

B.

MINIMUM 20-GAUGE, FACTORY FINISHED, BONDERIZED STEEL CABINET.

5.

C.

3-SPEED CENTRIFUGAL MOTOR.

*NOTE: FAN COIL UNITS ARE POWERED BY IT'S ASSOCIATED CONDENSING UNIT POWER.

D.

FAN MOTOR THERMAL OVERLOAD PROTECTOR.

E.

MICROPROCESSOR CONTROLS.

F.

SELF-DIAGNOSTICS.

G.

CONDENSATE DRAIN PAN WITH CONDENSATE PUMP.

H.

INTERNAL TRANSFORMER FOR WALL MOUNTED 24V THERMOSTAT CONTROL.

I.

FREEZESTAT.

J.

FILTER TRACK WITH CLEANABLE FILTERS.

K.

ALL NECESSARY CEILING BRACKETS AS REQUIRED FOR A COMPLETE INSTALLATION.

ACCESSORIES: A.

(LOW) 600 (HIGH)

MODEL NO.

ELECTRIC HEAT

FAN COIL UNIT NOTES:

BACKWARD INCLINED ANODIZED ALUMINUM.

FLEX BUILDINNG OFFICE/MEDICAL/RETAIL

ACCEPTABLE MANUFACTURERS - CARRIER, LG, McQUAY.

49 S. WATER STREET

VILLAGE OF GOWANDA NEW YORK 14070

DRAWING TITLE

ROOF CURBS: A.

EACH EXHAUST FAN SHALL BE EQUIPPED WITH AN INSULATED, ANODIZED ALUMINUM ROOF CURB (0.080" MINIMUM THICKNESS), ALL WELDED JOINT CONSTRUCTION.

B.

ALL CURBS SHALL BE MINIMUM 1'-0" HIGH.

7.

INTERLOCK EXHAUST FAN (E/F-1) WITH ASSOCIATED ROOFOTP UNIT (RTU-2) OPERATION.

8.

INTERLOCK EXHAUST FANS (E/F-2 AND E/F-3) WITH ASSOCIATED ROOFOTP UNIT (RTU-3) OPERATION.

9.

GPI-19-A12

HOUSING - "LOW PROFILE" ANODIZED ALUMINUM WITH HINGED HOOD AND ALUMINUM BIRDSCREEN.

2.

5.

MANUFACTURER

(HIGH) 450

ROOF EXHAUST FAN NOTES:

1.

IN. WG EXT.

DX COOLING COIL

450 (LOW) 600

MENS TOILET 35

E/F-3

STATIC

PRESS.

-

ROOF EXHAUST FAN SCHEDULE

N0

HVAC SCHEDULES

CONDENSING UNIT SCHEDULE

MAXIMUM SONES TO BE 5.1 OR LESS, UNLESS OTHERWISE INDICATED.

REFRIGERANT CONNECTIONS

10. ACCEPTABLE MANUFACTURER'S - GREENHECK, COOK. MARK

AREA SERVED

MANUFACTURER

MODEL NO.

MBH

SUCTION

LIQUID

MOTOR RPM

HP

JOB NO.

1210

SCALE

NONE

DATE

4.15.2016

OPERATING VOLTS / PH

MCA

SEER

WEIGHT

(LBS.)

DRAWN BY CU-i

FCU-1

CU-2

FCU-2

CARRIER

CARRIER

RAV-SP180AT2-UL

RAV-SP1 80AT2-UL

19.0

19.0

1/2"

1/2"

1/4"

1/4"

208/1/60

VARIABLE

208/1/60

VARIABLE

17.0

17.0

20.5

100

20.5

100

CHECKED BY REVISIONS

CONDENSING UNIT NOTES: 1.

UNITS SHALL BE LISTED AND LABELED WITH THE ENERGY STAR LOGO.

2.

UNIT CABINET SHALL BE CONSTRUCTED OF HEAVY-GAUGE, CORROSION RESISTANT STEEL, WITH

9.

UNIT SHALL HAVE: A.

R41OA REFRIGERANT.

A.

LOW AMBIENT CONTROLS.

B.

LIQUID LINE SOLENOID VALVE.

B.

WINTER START CONTROL.

C.

LINE SET.

C.

CRANKCASE HEATER.

D.

FILTER DRIER.

D.

PE MOUNTING BASE (INSULATED PIPE RISER CURB).

E.

THERMOSTATIC EXPANSION VALVES.

E.

EQUIPMENT RAIL (MINIMUM

FACTORY POWDER COAT PAINT. 3.

UNIT CABINET SHALL BE EQUIPPED WITH COATED STEEL SAFETY WIRE GUARDS TO PROTECT CONDENSER FAN OPENING.

4.

UNIT ENCLOSURE SHALL CONTAIN FACTORY WIRING, PIPING, CONTROLS, COMPRESSOR, REFRIGERANT CHARGE, AND SPECIAL FEATURES.

5.

CONDENSER COIL SHALL BE CONSTRUCTED OF ALUMINUM FINS MECHANICALLY BONDED TO COPPER TUBES.

6.

CONDENSER FAN SHALL BE DIRECT DRIVE DIRECT DRIVE, PROPELLER TYPE, MULTIPLE SPEED OPERATION.

7.

COMPRESSORS SHALL BE VARIABLE SPEED (INVERTER) TYPE.

8.

MOTORS SHALL HAVE BUILT-IN THERMAL OVERLOAD PROTECTION.

10. ACCESSORIES: THIS IS A SINGLE SHEET OF A COHESIVE

SET OF CONSTRUCTION DOCUMENTS (INCLUDING DRAWINGS AND SPECIFICATIONS).

INTERPRETATION OF THE INFORMATION AS PRESENTED SHOULD BE BASED ON

1'-0" HIGH).

THE ENTIRE SET OF DOCUMENTS.

DRAWING NO.

11. ACCEPTABLE MANUFACTURERS - CARRIER, LG, McQUAY.

m.2 100% DESIGN SUBMISSION

CHAINTREUIL

150-1 8"0

125-2 10"o

8x6

STORAGE MECHANICAL

24

- -JAN STORAGE 37

348x6

200-2

---- 10Ox8

10x4 1-

150-1 8"0

1

125-2 10"0

148

8x6

S100-112x8 8-0

16x8

.

12x8

10x6

8x6 _ MEN TOILET II

39

1

,,150-1

14x8 1-1 1,

WOMENS TOILET 33

CA)

.

o

L

650-2 18x10

T

12x6

8x4MULTIPURPOSE ROOM 41 10x6 -FCU-1

r==

.

----

12"o

12"0

'

TO TU-05

-

S

12x6

F,

14-0

250-2

12x6

III

I

'~

j~

300-1 12"0

I

MIT OFFICE

12"o

T

12x6

F

/~

I

I

Il l

,I

el /A

r-l

H'

12x6

-8x6

10x6 I 'IlI

8x6-

300-1 12"0

I1

EK

A

WAITING

250-2 12"o

175-2 10-0

<

10x6 10-0

150-1 8"0

Q

-

TOILET 10

75-1 8"0

-_

I

1

1

'

16x10

z lII I

125-2

IIT -

OFFICE 7

OFFICE

I

8x6

8x6-

M-3

LLP

NEW YORK 14070 DRAWING TITLE

125-2 10"o

FLOOR PLAN HVAC DUCTWORK AND PIPING

TU-08 16x10

r-7

OFFICE

wA

150-1

8"0

12 THS

OFFICE

TO

TO

TU-08

RTU-4

--

JOB NO.

1210

SCALE

3/16" = 1'-0"

DATE

4.15.2016

11

I

I1

12x8

S10x6 DRAWN BY

150-1

125-2

150-1

150-1

8"O0

10 0r-

8"O0

8"0

FLOOR PLAN - HVAC DUCTWORK AND PIPING SCALE: 3/16" =

49 S. WATER STREET VILLAGE OF GOWANDA

13

EWH-1

1

FLEX BUILDINNG OFFICE/MEDICAL/RETAIL

OFFICE

1-

9

500 SENECA ST - SUITE 508 BUFFALO, NY 14204 (716) 332-5959 tel. (71 6) 332-5968 fax.

150-1

---

II

49 S. WATER STREET, LLC

8"0

OFFICE 6

16x12 FROM RTU-4 ON ROOF (1700 CFM)

150-1

80

4

10"0

-

I II100-2 10O0

m III II I 7*

OWNER:

88x6

125-1

I I

1

1325 CFM 24x12 OED W/ BIRDSCREEN -- 1x8

I

1 00

1. 1

1325

I

I

,] 8x6

150-1

-8x6

5

1'11 1111

8x6125-1 8"0

75-1 8..o

250-2 12"0

8x6

14x6

I I

2

15

8x6

-rTtt

lxe8

~~2221

8x6

1I

8x4

L 8x4

1 x

I

II__ 8x4-

8x6

OFFICE

li

TOILET

8

(1325 CFM)

12"0

L

O 8x4-

VEST

200-1 150-1 8"0

I

CORR

00I10x6 -2 I1EEI

Il

I

12x8-

IT-

10"0

F

I

--

ON ROOF

M

I I I 1 1I

II

71

1 0x8

1

75-1

125-1 8"O

MIT


E

100-2 1O0 24x10 TO RTU-4

>Iilk

8-0

8x4-\

construction I development

10 0 TU-07

I

100-3

175-2

I

I III

T

OFFICE 43

1

C

10"0 TO TU-02

17-

-4L

U

10x6

225-1

10x8

10x8

18x6-

III

DATA 5o

425-2 14"0

14x8

(200 CFM)

200-1 10"1

IIIII~

8."07

300-1 12"o

p

2. ON ROOF

-

I J II

150-1 8-0 10x6

10x10 TO E/F-3

[|1

V 12x6

225-1 10"0

8x6 II

00-3

'j47'I

II

14"o

12x6

IlI

I 8x4

21K

S.

TO

COmparies

150-2 10"-0

RECEPTION TU-04 DESK

'----L TU-05

40

12x6

8x6

AL

a~z~iis

16x12

19 ,

T

75-1 8"0

150-1 8"10

16x12

8X4 STORAGE

II----

III

1 10x6 650-2

-

TOILET 3

TU-02

18x10

hi

7

300-1

20x 10

42

300-1

I

F]

N0

12x8

1J4>

*

COMMUNITY ROOM

ZL

L 14x8

16

KEY PLAN

14x8

8x6 . MULTIPURPOSE CONFIRM

TREATMENT ROOM

-

2

4

675-2

175-1 8"0

8"-0

RTU-3

12x6

8"0

75-1

TO

1

8x6

F-lI-L|_JO

.- iiiiI

36x14 OED W/ BIRDSCREEN TO RTU-1

150-1 8"0

COORDINATE EXACT LOCATIONS OF TEMPERATURE SENSORS AND ITEMS.

8x6

125-1 8-0

2

14"o

2.

2

300-2

8x6

100-3

1 1I

125-1

~%

2875 CFM

ON ROOF (3625 CFM)

IU1II thlill IIn

PROVIDE VOLUME DAMPERS AT ALL BRANCH DUCTWORK TAPS.

INSTALLATION TO AVOID CONFLICTS WITH WALL MOUNTED ARCHITECTURAL OFFICE

--

1.

THERMOSTATS IN FIELD WITH ARCHITECT AND OWNER PRIOR TO

1Ox6450-2 14"0

GENERAL NOTES:

8x6 F-1

E

30

1

T

~'

--1

28x14 FROM RTU-1

II I

3 M-3

300-2 12"0

/

AV.

125-1

II

FCU-2

08 4 7 A PESs0

10x6

150-1 8"0

E

550-2 14"0

250-1

(2875 CFM)

2.2

TO FCU-2

-

14x8

8'

(450 CFM)

200-2 12"0

125-2 10O0

1

TU-03

o

34x26 FROM RTU-3 ON ROOF (5500 CFM)

18

150-1 8-0

8x6

I

N

OFFICE F

,

--

A

8"O

T

10x0 TO E/F-2 ON ROOF

8x6

300-1 12"0

8x6

"D

250-1 10O

14x8

DNFt

TO

2

E

36x12 TO RTU-1 ON ROOF

-E

16x10

RECORDS COPY / MAIL

150-1 8"0

E

I

I-

300-1 12"o

.,

EIIwTh lill

16x8-

150-1| 8-0

----- (

16x8

U11

125-1

4OF

(4375 CFM)

20

TU-03

&

24x10

wI

--- 7

F

8x6 lox~2

10-.0

TU-06 450-2 14"0

r--

250-1

TO

11 IN

10x8

TO FCU-1

s

12x6- 1

IIII

46x12 TO RTU-3

,

-

8x6 OFFICE 28 150-2 10-"0

-14x8

200-2 12"o

8x6

I r

OFFICE

8x6

175-1 8"0 OFFICE 29

150-2 10O0

150-1 8"0

K K

H 150-1 8-0

~1I

8x6

18x10 16x10

I

__

LI 14x8

[email protected]

WWWEBPE.COM

-7- -1

I

Ix

8xE

-

I1

14"o

L 28x16

8x6

WEBSITE:

ON ROOF

__

716) 836-9636

FAX: EMAIL:

TO TU-07 I-

175-1

luxo 10x6 225-1

8x4

ENGINEERED BUILDING SYSTEMS MECHANICAL / ELECTRICAL ENGINEERS

COPYRIGHT ( 2016 ENGINEERED BUILDING SYSTEMS

8x6

+- TU-04

-

'

300-1 12-0

14x8

8x6

no -

-

15-3

12x6

12x6-

x10

F-

EBS ENGINEERING, PC BUFFALO, NEW YORK 14228 PHONE: (716) 836-9600

7

-

175-3

TU-01

II11

ID

I

34x18

1 0"o

--

)

LI~

8"0

300-1 12-'0

L

-

10x6

14

5-1

TU-06-

I

Li

E

16x8

80

80-

| |

175-1

75-2

14x8-

r8

8"Olo

10x6

2

-

L

S

d

I,

-

39

35

ROOF, 5/8" REFRIGERANT SUCTION (RS) TO CONDENSING UNIT

46x18 OED W/ BIRDSCREEN

'

---

3/8" REFRIGERANT LIQUID (RL) FROM CONDENSING UNIT ON

www.cjsarchitects.com

4375 CFM

r A" TO RTU-2 I'

II

80

_

150-1 80

2.

REFER

-4050 RIDGE LEA ROAD

|

425-2

I

.

10"O

1" CONDENSATE DRAIN TO NEAREST SANITARY DRAIN. TO PLUMBING DRAWINGS FOR DRAIN LOCATION.

,

100----i~: 175-2

100

BREAKROOM 27

86

'

TU-01

21

10x6

|j_

If4f

fw1x12 x I 1 I

v

r

I

150-2

TO

xo86 -- 18X10 .

26

8x4

-8x6

175-1 8"0

U1111

STORAGE

8"O

CORR 31

E

266 Alexander Street Rochester, N.Y. 14607 585.244.3780 tel 585.244.1294 fax

1. FAMILY CARE

,

125~-1

L -- -- -- ---

M1T OFFICE

DDC PANEL

10-0

v

/

11 8x6

200-1

IN

1004

E-

-

11111

10"o

II

~

-

150-2

II II

I

Lii

-

225-1

I

I'll

F

9--

10x6

16x8

325-2

I

I I

KITCHEN 38

125-2~jj

-

10-.0

-J

NOTES: O

ON ROOF.

.

,

150-2

225-1

10-'0

8x4-

I I

36

225-1

OFFICE

/

ENTRY

25

2 M-3

/

II

716.852.1722 fax

8x6

OFFICE

ARCHITECTS,

75-1

'7

716.856.6448 tel

24x12 OED W/ BIRDSCREEN

-

100"

150-1 8"0

91

150-1 8"0

-

125-3

303 South Park Avenue Buffalo, N.Y. 14204

975 CFM

,

150-1

24x10 TO RTU-2 ON ROOF (975 CFM)

-

(125 CFM)

22

-

ON ROOF

STARK

D

SUPERVISOR

16x12 FROM RTU-2 ON ROOF (1225 CFM) ENTRY 150-1 23

)

C

10xlO TO E/F-1

-

B

A

JENSEN

125-2 -10O---

200-2 12"0

250-1 10-0

CHECKED BY REVISIONS

THIS IS A SINGLE SHEET OF A COHESIVE

SET OF CONSTRUCTION DOCUMENTS (INCLUDING DRAWINGS AND SPECIFICATIONS). INTERPRETATION OF THE INFORMATION

AS PRESENTED SHOULD BE BASED ON THE ENTIRE SET OF DOCUMENTS.

DRAWING NO.

M-3 100% DESIGN SUBMISSION

JENSEN

STARK ARCHITECTS, LLP

CHAINTREUIL 303 South Park Avenue Buffalo, N.Y. 14204 716.856.6448 tel 716.852.1722 fax

2

ROOF PLAN GENERAL NOTES:

M-4 1.

DIVISION 7 AND DIVISION 23 TO COORDINATE ALL ROOF OPENING, ROOF

PENETRATIONS, AND EQUIPMENT PAD INSTALLATIONS.

266 Alexander Street Rochester, N.Y. 14607 585.244.3780 tel 585.244.1294 fax

www.cjsarchitects.com

2.

DIVISION 7 TO CUT ALL ROOF OPENINGS.

3.

DIVISION 23 TO PROVIDE AND INSTALL ALL EQUIPMENT PADS AND CURBS.

ENGINEERED BUILDING SYSTEMS MECHANICAL I ELECTRIC ENGINEERS

4.

DIVISION 7 TO PROVIDE ROOF FLASHING AND SEALING OF ALL ROOF OPENINGS.

5.

COORDINATE LOCATION AND SPACING OF ROOF TRUSSES WITH DIVISION 6 FOR DUCTWORK PENETRATIONS PRIOR TO INSTALLING ROOF TRUSSES. DIVISION 6 SHALL ADJUST TRUSS SPACING TO ALLOW FOR A MINIMUM OF 2" CLEAR (ALL SIDES) AROUND OPENING AND PROVIDE ANY ADDITIONAL SUPPORTS REQUIRED TO SUPPORT DIVISION 15 EQUIPMENT.

BUFFALO, NEW YORK 14228 PHONE: (716) 836-9600 FAX: (716) 836-9636 E-MAIL: [email protected]

a

EBS ENGINEERING, PC

10x10 FROM

BELOW (125 CFM)

RTU-2 (1400 LBS)

WWW.EBSPE.COM

WEBSITE:

COPYRIGHT C 2016 ENGINEERED BUILDING SYSTEMS

-

LN

0

,

4050 RIDGE LEA ROAD

E/F-1 (75 LBS)

I

l_-

IIl

0

L, F-7

16x12 TO BELOW (1225 CFM)

, '

0

x

0

I/- 1

N

'-+-46x12 FROM BELOW

(4375 CFM)

0

34x26 TO BELOW

Lu

(5500 CFM)

24x10 FROM BELOW (975 CFM)

10x10 FROM BELOW (450 CFM)

4OF

(oo

RTU-3

SS0

(2400 LBS)

K -I

I KEY PLAN

N0

E/F-2 (75 LBS)

VeiLiYijT*]

E 0 RTU-1 (1450 LBS)

construction Idevelopment

CU-2 (100 LBS)

CU-1 (100 LBS)

OWNER:

F1/4" REFRIGERANT LIQUID (RL) TO BELOW, 1/2" REFRIGERANT SUCTION (RS) FROM BELOW

I ,'II

companies

49 S. WATER STREET, LLC

1/4" REFRIGERANT LIQUID (RL) TO BELOW, 1/2" REFRIGERANT SUCTION (RS) FROM BELOW 0

28x14 TO BELOW

-

RTU-4 (1400 LBS)

(3625 CFM)

F7

500 SENECA ST - SUITE 508 BUFFALO, NY 14204 (71 6) 332-5959 tel. (716) 332-5968 fax.

36x12 FROM BELOW

(2875 CFM)

/

16x12 TO BELOW (1700 CFM)

-

R

FLEX BUILDINNG OFFICE/MEDICAL/RETAIL

24x10 FROM BELOW (1325 CFM)

49 S. WATER STREET

10x10 FROM BELOW (200 CFM)

VILLAGE OF GOWANDA NEW YORK 14070

E/F-3 (75 LBS)

,

DRAWING TITLE

-

ROOF PLAN HVAC DUCTWORK AND PIPING

I I I

I I

I I

I I I I I

I

I

I I I I I I I

JOB NO.

1210

SCALE

3/16" = 1'-i

DATE

4.15.2016

DRAWN BY

CHECKED BY REVISIONS

1

M-4

ROOF PLAN - HVAC DUCTWORK AND PIPING SCALE: 3/16"

=

THIS IS A SINGLE SHEET OF A COHESIVE

SET OF CONSTRUCTION DOCUMENTS (INCLUDING DRAWINGS AND SPECIFICATIONS).

INTERPRETATION OF THE INFORMATION AS PRESENTED SHOULD BE BASED ON

THE ENTIRE SET OF DOCUMENTS.

DRAWING NO.

M-4 100% DESIGN SUBMISSION

METAL SPIN-IN FITTING WITH VOLUME DAMPER

INSULATED DUCTWORK

DRAW BAND

NUMBER OF HANGERS

10'-O

1-1/2" x 1-1/2" x 1/8"

10'-O"

FASTEN TO ROOF TRUSSES) 60" MAXIMUM_

-

L1=1

EXTENSION DUCT COLLAR

--_ _

DUCT RING

(MINIMUM)

(REMOVABLE)

NECK SIZE

OF DUCT

ROUND

STRAP HANGERS

HANGERS

MAXIMUM SPACING

1/4" ROD

1" x 16 GAUGE

10'-0"

OUTER CONE

OUTER CONE

19" THRU 30"

1/4" ROD

1" x 16 GAUGE

10'-0"

DUCT HANGER DETAIL

"

'-U

www.cjsarchitects.com

OPPOSED BLADE

EBS ENGINEERING, PC

MANUAL VOLUME DAMPER

ENGINEERED BUILDING SYSTEMS MECHANICAL / ELECTRICAL ENGINEERS

4050 RIDGE LEA ROAD BUFFALO, NEW YORK 14228 PHONE: (716) 836-9600 FAX 716) 836-9636 E-MAIL: '[email protected]

TAKE-OFF FITTING

LAST TAKEOFF FACE SIZE

3'-0" MINIMUM, STRAIGHT, HARD METAL DUCT

CEILING

WWW.EBSPE.COM

COPYRIGHT C 2016 ENGINEERED BUILDING SYSTEMS

------

INSTALL AFTER

TRANSITION

AIR FLOW

' I I

TEE

d-^

OF N 8

r0S D D.

AIR FLOW

o0O

~

TRUNK DUCT 6"

(1" MINIMUM ON TOP AND BOTTOM, SEAL ALL AROUND)

VOLUME DAMPER

PROVIDE ADJUSTABLE ELBOW RINGS FOR RECTANGULAR TO ROUND DUCT CONNECTION

FASTEN DUCT RING TO EXTENSION DUCT COLLAR WITH SHEET

WITH QUADRANT AND LOCK AND

o4719

Css\

STANDOFF COLLAR (TYPICAL)

0 -j

"TAP-OUT" EITHER SIDE OR BOTTOM OF DUCT; TOP "TAP-OUT" IS NOT ACCEPTABLE.

CEILING DIFFUSER CONNECTION DETAIL

RETURN GRILLE CONNECTION DETAIL

ROOFTOP UNIT

GASKET MATERIAL PRESSURE TREATED WOODEN NAILER

RIGID / THERMAL INSULATION

1~

CONDUIT CHASE

-11

I

EXHAUST FAN

4'

14 GAUGE GALVANIZED CAP

'ml

CLEANOUT PLUG SLOPE AT MINIMUM

1/4" PER FOOT

ACOUSTICAL LINING

AWAY FROM UNIT

I-

BIRDSCREEN

COUNTERFLASHING

EXHAUST FAN METAL CURB CAP

BONDING ADHESIVE

INSULATED ROOF CURB

-

"B"

TYPE "L" COPPER OR

SPLICING CEMENT

SCHEDULE 40 PVC PIPE

SPLASH

(TYPICAL)

3" MINIMUM

4'- 1'-C

ROOF-

LAP SEALANT

PAN HEAD WOOD SCREW

U

V

1

BLOCK

END CAPS & SEAMS TO BE CONTINUOUS

BONDING

WELDED

ADHESIVE

49 S. WATER STREET, LLC

DIMENSION

"A"

DIMENSION "B"

INSULATION

MATERIAL]

/z z/

1

FAN DISCHARGE STATIC PRESSURE PLUS 1"

FAN SUCTION STATIC

2-1/2"

/

,

'

BLOW-TH RU

ROOF DECK

ROOFCURB

PRESSURE TREATED WOOD BLOCKING

DRAW-THRU

TWO-POSITION MOTORIZED LOW

ROOF

STEEL ANGLE FRAMING

LEAKAGE BACKDRAFT DAMPER

PRESSURE PLUS 1"

EXHAUST DUCTWORK

SECURE CURB TO ROOF WITH

DAMPER ACTUATOR

SHEETMETAL SCREWS, LAG BOLTS, WITH ROOF CONSTRUCTION

1.

MINIMUM "A" OR "B" DIMENSION SHALL NOT BE LESS THAN 1".

2.

COPPER CONDENSATE DRAIN LINES SHALL BE INSULATED WITH MINIMUM 1-1/2" THICK ARMAFLEX II SLIP-ON TYPE INSULATION.

NOTES:

ROOFING SHALL EXTEND UP AND

1.

OVER TOP OF CURB

2.

THERMAL / ACOUSTICAL ROOF CURB DETAIL

3.

SECURE UNIT CURB CAP TO ROOF CURB WITH WITH SHEET METAL SCREWS 1'-0" ON CENTER ALL AROUND.

DISCHARGE CONDENSATE PIPING A MINIMUM OF 3'-0" AWAY FROM UNIT TO RSPLASH BLOCK ON ROOF (UNLESS PROHIBITED BY LOCAL CODE).

500 SENECA ST - SUITE 508 BUFFALO, NY 14204 (71 6) 332-5959 tel. (716) 332-5968 fax.

ROOF DECK

FLEX BUILDINNG OFFICE/MEDICAL/RETAIL

NOTES:

2"x6" PRESSURE TREATED WOOD BLOCKING BY DIVISION 7

construction I development

OWNER:

/

INSULATION

COmpanies

0

3"

ROOFING

rfZ~Iw

LVIILViIiI.]

FLASHING MEMBRANE

LAP SEALANT

1" MINIMUM-{

COIL CONFIGURATION

Vj_,

N0

KEY PLAN

COUNTERSUNK SHEETMETAL SCREW

COUNTER FLASH 14 GAUGE GALVANIZED BASE & BASE PLATE.

"A"

MEMBRANE FLASHING

ROOF MEMBRANE

2" x 6" PRESSURE TREATED NAILER

UNION

/

MOTOR

VAV BOX DETAIL

SUPPLY BRANCH TAKEOFF FITTING DETAIL

DISCONNECT SWITCH

L

STARK

266 Alexander Street Rochester, N.Y. 14607 585.244.3780 tel 585.244.1294 fax

WEBSITE:

I

INSTALLATION NOTES:

2.

SUPPLY AIR

FLEXIBLE CONNECTION

METAL SCREWS. UP THRU 18"

RECTANGULAR DUCT TRANSITION TO VAV AIR CONNECTION (SEE PLANS FOR SIZES)

EXHAUST BRANCH TAKEOFF FITTING DETAIL

45' ANGLE TAP COLLAR

1.

(SEE PLANS FOR SIZE)

,,

DUCT RING

I

HANGER SIZES FOR RECTANGULAR DUCT LONGEST DIMENSION

ROUND OR

DAMPER OPERATOR (REMOVABLE)

^'

FACE SIZE

~-1

TRANSITION TO DUCT

<

CEILING

GASKET

VOLUME BOX

JENSEN

-J_

2'-0"

DAMPER OPERATOR

VARIABLE AIR

(TYPICAL)

AND LOCK AND STANDOFF COLLAR (TYPICAL)

0

TO BE TIGHT AGAINST DUCT

L~J

-~

OPPOSED BLADE

VOLUME DAMPER WITH QUADRANT

OPEN END OPPOSED BLADE VOLUME DAMPER

VOLUME DAMPER

45' ANGLE TAP COLLAR (1" MINIMUM ON TOP AND BOTTOM, SEAL ALL AROUND) PROVIDE ADJUSTABLE ELBOW RINGS FOR RECTANGULAR TO ROUND DUCT CONNECTION

SUPPORT FROM STRUCTURE ABOVE

NECK SIZE

SELF TAPPING CADMIUM PLATED HEX

HEAD SHEET METAL SCREW, STRAPS

I

INTERNALLY LINED-

DUCTWORK

(5'-0" MAXIMUM LENGTH)

1

(DO NOT MOUNT TO ROOF DECK,

II I I I I

--1

INSULATED FLEXIBLE DUCT

1

HANGER STRAPS

I I I

r I

STEEL SUPPORT ROD

/

3/8" ROD

31" THRU 60"

303 South Park Avenue Buffalo, N.Y. 14204 716.856.6448 tel 716.852.1722 fax

6

'

1" x 16 GAUGE

AIR FLOW

-

1/4" ROD

UP THRU 30"

MAXIMUM SPACING

STRAP HANGERS

lIII I

(TYPICAL)

HANGER SIZES FOR ROUND DUCT ROUND HANGERS

rIIIIIII

AIR FLOW

CHAINTREUIL

'

LOAD RATED FASTENER WITH WASHERS

LAST TAKEOFF

'

INSULATED DUCTWORK

DUCT BAND (SAME SIZE AS HANGER STRAP)

DUCT DIAMETER

INSTALL AFTER

TRANSITION

(DO NOT MOUNT TO ROOF DECK, FASTEN TO ROOF TRUSSES)

ARCHITECTS, LLP

HANGER STRAP

-

I

14 GAUGE GALVANIZED BASE-

LEAD SHIELD ANCHOR

& BASE PLATE.

OR ANCHORS AS PER ROOF CONSTRUCTION

END

CAPS & SEAMS TO BE CONTINUOUS WELDED

49 S. WATER STREET

VILLAGE OF GOWANDA NEW YORK 14070

JOIST

SECURE ROOF CURB TO ROOF WITH SHEET METAL SCREWS, LAG BOLTS OR OTHER METHOD CONSISTENT WITH ROOF CONSTRUCTION AT 1'-0" ON CENTER ALL AROUND.

ROOFTOP UNIT CONDENSATE TRAP DETAIL

ROOF MOUNTED EXHAUST FAN DETAIL

ROOF MOUNTED EQUIPMENT RAIL DETAIL

DRAWING TITLE

HVAC DETAILS JOIST OR BEAM

LOCKNUTS STRAPS

THREADED HANGER ROD

LOW VOLTAGE WIRE

PIPE INSULATION

ADJUSTABLE CLEVIS HANGER

DUCT-SEAL ALL SERVICE PVC JACKET

T

I

I

[--2" OVERLAP

PIPE THERMISTOR CRIMP OR SOLDER LEADS

METAL PIPE SADDLE

END STAGGERED SEAM (SEAL WITH ADHESIVE) =

SCALE

NONE

DATE

4.15.2016

DRAWN BY

INSULATION PIPE

1210

TOR,

COVER -]

JOB NO.

CHECKED BY REVISIONS

JUNCTION BOX-I-

THREADED ROD PROVIDE 2 LOCKNUTS -

ADJUSTABLE CLEVIS HANGER PIPE INSULATION

, ~

METAL PIPE SADDLE

WALL THIS IS A SINGLE SHEET OF A COHESIVE

NOTE:

1.

MOUNT 4'-6" (MINIMUM) ABOVE FINISHED FLOOR, AND 4'-0" (MINIMUM) ABOVE FINISHED FLOOR FOR ADA APPLICATIONS

INTERPRETATION OF THE INFORMATION AS PRESENTED SHOULD BE BASED ON

THE ENTIRE SET OF DOCUMENTS.

ALL PIPING EXPOSED IN OCCUPIED AREAS SHALL BE JACKETED WITH MATERIALS SUITABLE FOR PAINTING.

DRAWING NO.

INSULATION SHIELD

SINGLE PIPE HANGER DETAIL

SET OF CONSTRUCTION DOCUMENTS (INCLUDING DRAWINGS AND SPECIFICATIONS).

PIPING INSULATION JACKET DETAIL

THERMOSTAT / TEMPERATURE SENSOR MOUNTING DETAIL

M-5 100% DESIGN SUBMISSION

12431

PLUMBING DRAWING NOTES:

HVAC DRAWING NOTES:

HVAC LEGEND AND NOTES

Related Documents

Hvac
May 2020 24
Hvac
November 2019 30
Hvac
July 2020 21
Hvac Rafli.docx
April 2020 7
Hvac Ventilation
April 2020 18
Hvac Constants
April 2020 16

More Documents from "William Greco"

Hvac Legends.pdf
November 2019 37
Ergo Checklist Office
December 2019 23
Qra - Food
June 2020 10
Basic Electrical Safety
December 2019 39
H2s Manual
December 2019 27