ARYADUTA HOTEL - MEDAN February 2017

Prepared By Bagus Perkoso SELECTION UNIT

Project Date

: ARYADUTA HOTEL - MEDAN : 4th February 2017

Report By No Doc

1 Description Quantity Room

: : 376

room

2 Standard Hot Water Shower + Bathtube Kitchen Westafel

: 148 :5 :3

liter / person / peak liter / person liter / person

3 Assumption Consumption Standard per room Peak per Period Temp. Hot Water Temp. Cold Water Temp. Mixing Water ΔT Occupancy Percentage

:2 :2 : 60 : 28 : 40 : 32 : 100

person hour °C °C °C °C %

: Bagus Perkoso : 001/DOC/AD/IV/2017

4 Calcullation Hot Water for Hotel a Shower + Bathtube

Total Peak per days

b Kitchen

= =

376 44,518

room liter / peak

x

148

liter

= =

44,518 89,037

liter / peak liter

x

2

times/peak

room liter / peak

x

5

liter

3,760

= =

376

Peak Period / 3 hour

= =

3,760 1,253

liter / peak liter / peak

:

3

hour

Total Peak per days

= =

1,253 11,280

liter / peak liter

x

9

times/peak

room liter / peak

x

3

liter

2,256 2,256 2,256

liter / peak liter

x

1

times/peak

c Westafel

= =

Total Peak per days

= =

Total Consumption per days

= =

376

Shower + Bathtube liter 102,573

+

Kitchen

x

x

x

+

Return Of Investment Cooled And Hot Water System

ARYADUTA HOTEL - MEDAN February 2017

Prepared By Bagus Perkoso SELECTION UNIT

Project Date

: ARYADUTA HOTEL - MEDAN : 4th February 2017

Report By No Doc

: Bagus Perkoso : 001/DOC/AD/IV/2017

5 Energy Hot Water per days Total Consumption per days Delta Temp.

= = =

102,573 0.028 32

liter/hour m³/s °C

Energy Hot Water per days

=

3,829

kW

Heatloss per hour Heatloss per days

= =

38 919

kW kW

Total Energy Hot Water per days include Heat Loss

=

4,748

kW

Total Energy Hot Water per days include Heat Loss

=

4,748

kW/days

Total Energy Hot Water @ 2 hour per peak Total Hot Water Consumption Demand 70%

= = =

1,187.11 kW/hour 31,798 liter / hour 22,258 liter / hour

Hot Water Storage Quantity Total Hot Water Storage Water Back Up HW Storage

= = = =

10,000 liter 2 unit 20,000 liter 1.11 cycle/hour

Heat Pump Trane (Heating Mode) Heat Capacity Delta Temp. Quantity Hot Production

= = = =

205.98

Total Heat Capacity

6 Selection Heat Pump Alternatif 1

=

35.3 35,311 206.0

kW/h °C unit m³/h liter / hour kW

Heatloss per hour

=

38.29

kW

Total Heat Capacity include Heat Loss

=

168

kW

5 1

Return Of Investment Cooled And Hot Water System

ARYADUTA HOTEL - MEDAN February 2017

Prepared By Bagus Perkoso SELECTION UNIT

Project Date

: ARYADUTA HOTEL - MEDAN : 4th February 2017

Report By No Doc

Total Hot Water Production

=

28,746

liter/hour

Conclusion Total Hot Water Storage Total Hot Water Production

= =

20,000 28,746

liter/hour liter/hour

= =

0.70 42

Shower + Bathtube Kitchen

= =

44,518 3,760

liter / peak liter / peak

Total Hot Water / peak Demand

= =

48,278 38,623

liter / peak liter / peak

= = =

12,874 3 38,623

liter unit liter

Back Up Period

: Bagus Perkoso : 001/DOC/AD/IV/2017

hour minute

7 Selection Heat Pump Alternatif 2

80%

Hot Water Storage Quantity Total Hot Water Storage Heat Pump Air To Water Capacity Delta Temp. Quantity Hot Production Total Heat Capacity

= = = = = =

Heatloss per hour

=

38.29

kW

Total Heat Capacity include Heatloss Total Hot Water Production

= =

276.71 7,412

kW liter/hour

Conclusion Total Hot Water Storage Total Hot Water Production

= =

38,623 7,412

liter/hour liter/hour

= =

5.21 313

Back Up Period

105 32 3 2.8 2,813 315

kW °C unit m³/h liter/hour kW

hour minute

Return Of Investment Cooled And Hot Water System

ARYADUTA HOTEL - MEDAN February 2017

Prepared By Bagus Perkoso SELECTION UNIT

Project Date

: ARYADUTA HOTEL - MEDAN : 4th February 2017

Report By No Doc

: Bagus Perkoso : 001/DOC/AD/IV/2017

Return Of Investment Cooled And Hot Water System

ARYADUTA HOTEL - MEDAN February 2017

Prepared By Bagus Perkoso

/2017

1

2

3

80

%

2

person

2

person

Westafel

Return Of Investment Cooled And Hot Water System

ARYADUTA HOTEL - MEDAN February 2017

Prepared By Bagus Perkoso

/2017

4

5

Return Of Investment Cooled And Hot Water System

ARYADUTA HOTEL - MEDAN February 2017

Prepared By Bagus Perkoso

/2017

6

Return Of Investment Cooled And Hot Water System

ARYADUTA HOTEL - MEDAN February 2017

Prepared By Bagus Perkoso

/2017

7

Return Of Investment Cooled And Hot Water System