Hills Plaza-rfp Response

  • Uploaded by: bill stotler
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Hills Plaza-rfp Response as PDF for free.

More details

  • Words: 2,403
  • Pages: 28
CONTENTS PROFILE BASE BUILDING EXPERIENCE BASE BUILDING SERVICES TENANT IMPROVEMENT SERVICES BUILDING MARKETING SERVICES PUBLIC AREA/LOBBY EXPERIENCE REVIT CASE STUDY REVIT RESUMES

PROFILE

FME, Architecture + Design is a San Francisco-based firm specializing in architecture and interior design. Our portfolio includes projects for office, corporate interiors, business and industrial parks, research and development, retail, renovation, churches, schools, childcare and housing. Since starting shop in 1980, we have made it our mission to fulfill our clients’ needs to the utmost. Whether they require new space, are relocating, expanding, or simply reconfiguring their spaces, we provide our clients with innovative high-quality design under strict adherence to scheduling and budgetary demands. FME is a member of the US Green Building Council and has LEED Accredited Professionals on staff. We have incorporated sustainable design solutions into our projects throughout the firm’s history. Our portfolio includes LEED certified projects. For project documentation, FME utilizes Revit – a Building Information Modeling (BIM) software that combines 3D modeling and 2D drawings. This tool is fully compatible with AutoCAD and can produce photo-realistic point of view images, digital walkthroughs and 3D models. Above all, we are passionate about our work and pride ourselves on giving our clients individual, personalized service with hands-on principal participation in all project phases.

THINK PANMURE, REVIT RENDERING

THINK PANMURE, FINAL PROJECT

BASE BUILDING EXPERIENCE

601 MONTGOMERY

600 MONTGOMERY

Embarcadero Center - Retail, San Francisco, CA

450 Sutter Street, San Francisco, CA

2 Bryant Street, San Francisco, CA

475 Sansome Street, San Francisco, CA

170 Maiden Lane, San Francisco, CA

490 Post Street, San Francisco, CA

345 California Street, San Francisco, CA

500 Sutter Street, San Francisco, CA

475 SANSOME

505 Sansome Street, San Francisco, CA

615 Battery Street, San Francisco, CA

545 Sansome Street, San Francisco, CA

640 Sutter Street, CA

600 Montgomery Street, San Francisco, CA 601 Montgomery Street, San Francisco, CA

BASE BUILDING SERVICES

TENANT IMPROVEMENT SERVICES

MACROVISION

Established in 1980, FME has a history working with a variety of architectural and interior design clients throughout San Francisco. This range of clients includes everything from high profile law and investment firms to smaller technology companies with modest budgets to non-profit and educational clients. This range of experience demonstrates our ability to adapt according to the needs of our clients at both ends of the design spectrum.

BAKER & MCKENZIE

BUILDING MARKETING SERVICES

HYPOTHETICAL RESTAURANT

AMENITIES MAP

FME has the ability to assist with building marketing services.

HYPOTHETICAL RETAIL SPACE

PUBLIC AREA/LOBBY EXPERIENCE

120 Howard Street, San Francisco, CA

235 Second Street, San Francisco, CA

170 Maiden Lane, San Francisco, CA

250 Sutter Street, San Francisco, CA

180 Montgomery Street, San Francisco, CA

375 Sutter Street, San Francisco, CA

180 Sansome Street, San Francisco, CA

475 Sansome Street, San Francisco, CA

200 Pine Street, San Francisco, CA

500 Montgomery Street, San Francisco, CA

601 Montgomery Street, San Francisco, CA

Pell Development, San Rafael, CA

568 Howard Street, San Francisco, CA.

PMI, Walnut Creek, CA

Campus Drive, San Mateo, CA Transamerica, San Francisco, CA Transamerica Wintergarden, San Francisco, CA

180 MONTGOMERY SAN FRANCISCO, CALIFORNIA

PROPOSED

PROPOSED

This project intends to update the building’s image and marketplace viability by renovating the existing lobby and adding a new cantilevered entrance canopy. The main focal point is the installation of four color changing, energy efficient LED back lit walls. Nine different lighting selections can be presented, three of which relate to the seasons. Other interior changes include changing the heavy dark marble stone to light Venetian plaster with new fins to add visual interest and protect the Venetian plaster walls. Additional improvements include new tenant signage, as well as replacement of the dark stone on the columns with a light Egyptian Sinaloa limestone.

EXISTING

“Working with FME on the 180 Montgomery lobby and common area reconstruction was a delight from start to finish. They brought creativity, high professionalism, and a keen eye for detailing to this important project. Our objective was to create an identity for the property, but within the constraints of a first class financial district office environment. FME helped us to successfully achieve that goal. A testament to their vision for the project can be seen when comparing the initial design renderings to the result - absolutely spot on.” Ken Perry Chief Investment Officer The Swig Company, LLC

475 SANSOME SAN FRANCISCO, CALIFORNIA

EXISTING

3-D RENDERING

We strived to achieve a “timeless, modern and classic” look by maximizing the frontage along Sansome Street. This was done by capturing the exterior plazas for the interior, and sharing that resultant area with the new lobby and retail spaces. By using a structural glass wall system, we constructed a transparent ground floor lobby in the original arcade space and relocated the flanking retail spaces to the adjacent sides of the building. Warm wood paneling and effective lighting created a much larger, memorable building entrance that was effectively responsible for the rapid re-leasing of the entire office tower.

COMPLETED PROJECT

“Reorienting the retail space to the sides of the building created the opportunity to stretch the lobby across Sansome Street. In doing so, FME created a large and spacious lobby that benefits the marketing of new tenants while creating a new branding statement for the building. FME demonstrated an ability to utilize the capital improvement budget effectively, spending money very strategically to provide maximum visual impact.” Susan Court, RPA Property Manager Cusshman & Wakefield

160-180 SANSOME SAN FRANCISCO, CALIFORNIA

EXISTING

PROPOSED

This multi-phased lobby renovation intends to increase access, visibility and identity by reconstructing portions of the framing mass of the tower’s base outward of its current location and replacing the existing glazing system with frameless, structural glass. This results in a more dynamic massing of the base relative to the main tower and widens the glazed openings by approximately 40%. Additional improvements include expanding and updating the main lobby from its current side core configuration.

601 MONTGOMERY SAN FRANCISCO, CALIFORNIA

Modifications to this existing space included a renovation to the main lobby for this highly visible multi-tenant building in downtown San Francisco. This project also consisted of upgrades to an existing conference center on the 4th floor.

TRANSAMERICA LOBBY SAN FRANCISCO, CALIFORNIA

A variety of existing ceiling heights, stepping down from the main lobby to the elevator lobby, generated a series of floating planes that were enhanced with hidden cove and strip lighting to provide for a dramatic but timeless solution for this landmark building.

WINTERGARDEN SAN FRANCISCO, CALIFORNIA

The remodel and expansion of this 19-story steel frame office building involved the remodel of the existing first floor lobby and the addition of a two-story Wintergarden. Design of the Wintergarden involved the removal of an existing exterior fountain and extension of the first floor lobby to create a two-story open space enclosed by a curved glass curtain wall.

REVIT CASE STUDY

FME has served as the base building architects for the Pyramid Center (600 Montgomery Street) since 1988. In 2007, the management asked us to re-do the building’s BOMA Calculations. At the time, we were already utilizing Autodesk’s 3D BIM program, Revit, for some test-fit plans as part of the leasing effort. The response and tenant understanding of the plans was so positive that we proposed to use Revit to simultaneously do the calculations and model the building.

The complexity of a continuously tapering building with each floor at a different size argued for the 3D approach. The additional benefits for ongoing management of space, as well as the management of the actual facility, infrastructure and equipment, provides an unequaled package. Going forward, all design and cotruction documents will be in Revit. This allows for an improved understanding of the design and an overall lower cost of build-out and 3D as-built drawings.

REVIT

AMENITIES MAP

FME utilizes Revit to assist our clients in the design process. This 3D software program developed by Autodesk is fully compatible with AutoCad and allows for significant benefits in the design, presentation and construction process. Whether it is test-fits for a potential tenant space or a hypothetical plan for the landlord/leasing team, the Revit model allows for large, mid or small scale examination of the proposed solution.

ALL IMAGES: 345 CALIFORNIA, 3RD FLOOR

This provides a whole new level of communication, understanding and, for the non-professional, participation in the decision process. For the first time, the cost vs. value equation can be fully understood with a direct comparison of the proposed end project vs. the proposed budget. Changes are easily accomplished and since they are made in the model, the problems of reconciliation and coordination of documents are greatly reduced.

DA VID PEEBLES PRINCIPAL-IN-CHARGE Environmental Design Art Center College of Design, Pasadena, CA David Peebles has more than 24 years of experience in the design of commercial, corporate, hotel, restaurant and residential projects. Mr. Peebles is effective at managing multiple, high-caliber and technically complex projects, successfully meeting budget and schedule requirements, and coordinating multi-disciplinary teams of consultants. Since joining FME, Architecture + Design in 2000, Mr. Peebles has served as the Principal-inCharge and/or Senior Project Manager for the following projects: Adams Nye Sinunu Bruni Becht LLP – San Francisco, CA Analysis Group – San Francisco, CA Baker & McKenzie LLP – San Francisco and Palo Alto, CA Bar Method – San Francisco, CA Chevron – San Francisco, CA DFS Group Limited Headquarters – San Francisco, CA DFS North America Retail Concessions – San Francisco International Airport Embarcadero Centers (Retail Tenants) – San Francisco, CA Macrovision – San Francisco, CA Metropolitan Club – San Francisco, CA Moderati Corporate Offices – San Francisco, CA Nossaman, Guthner, Knox & Elliot LLP – San Francisco, CA Physic Ventures – San Francisco, CA PMI World Headquarters – Walnut Creek, CA Pillsbury & Levinson LLP – San Francisco, CA San Francisco Business Times – San Francisco, CA Sephora Corporate Offices – San Francisco, CA Skyline Construction – San Francisco, CA Taleo – San Francisco and Dublin, CA Think Panmure (formerly ThinkEquity Partners) – San Francisco, CA Thoma Cressey Equity Partners – San Francisco, CA Transamerica Investment Management – San Francisco, CA Pyramid Center Portfolio – San Francisco, CA (Sr. Manager) 2 Bryant Street – San Francisco, CA 505 Sansome Street – San Francisco, CA 545 Sansome Street – San Francisco, CA 600 Montgomery Street – San Francisco, CA 701 Montgomery Street – San Francisco, CA Prior to joining FME, Mr. Peebles directed the planning and design of the following projects: W New York Court Hotel – New York, NY W New York Tuscany Hotel – New York, NY Fairmont Hotel – Dallas, TX Hotel Sofitel – Redwood City, CA Inn at Breckenridge – Breckenridge, CO Sheraton Long Beach – Long Beach, CA Sheridan Ross Law Offices – Denver, CO Shutters on the Beach – Santa Monica, CA Swiss Grand Hotel – Chicago, IL Westin Hotel, Puerto Vallarta – Puerto Vallarta, Mexico Westin Hotel – Philadelphia, PA

KELLY YOHO PROJECT MANAGER Bachelor of Fine Arts, Interior Architecture California College of Arts and Crafts, Oakland Kelly Yoho has eight years of experience in the design of corporate offices, commercial, retail and residential projects. Since joining FME, Architecture + Design, Mr.Yoho has been involved in the following projects: 345 California Base Building Architectural Services – San Francisco, CA 600 Montgomery Base Building Architectural Services – San Francisco, CA Baker and McKenzie – Palo Alto, CA Barrington / Wells Fargo – San Francisco, CA Chevron – San Francisco, CA CV Partners – San Francisco, CA Delaware Investments – San Francisco, CA Gallup Organization – San Francisco, CA Ironwood Capital Management – San Francisco, CA Moderati – San Francisco, CA Orbis Capital Management – San Francisco, CA PMI World Headquarters – Walnut Creek, CA Sephora Corporate Office – San Francisco, CA Sephora University – San Francisco, CA Sephora Marketing Office – New York, NY Stein & Lubin LLP – San Francisco, CA Think Panmure (formerly ThinkEquity Partners) – San Francisco, CA Transamerica Corporate Offices – San Francisco, CA Wilkes Bashford – Carmel by the Sea, CA Wilkes Bashford, 3rd Floor Renovation – San Francisco, CA Wine Bar – San Francisco, CA 500 Sutter Street – San Francisco, CA Prior to joining FME, he worked on the following projects: San Rafael Corporate Center – San Rafael, CA Menlo Oaks Office Park – Menlo Park, CA Woodside Office Building – Novato, CA Basin St. Landing – Petaluma, CA Larkspur Landing Mixed-Use – Larkspur, CA Work while with Strauss Architects Brightpoint N.A. Call Center – Richmond, CA The Pasini Building – San Francisco, CA InterPacific Group – San Francisco, CA IDG – San Francisco, CA DSI Technology Escrow Services – San Francisco, CA Work while with McCluskey and Associates

JOHN ALFARO PROJECT ARCHITECT Associate of Science City College of San Francisco John Alfaro has eight years of experience in the design of institutional and commercial projects. Since joining FME, Architecture + Design, Mr. Alfaro has been involved in the following projects: Embarcadero Center Retail On Call Architectural Services – San Francisco, CA 345 California Base Building Architectural Services – San Francisco, CA 600 Montgomery Base Building Architectural Services – San Francisco, CA Baker and McKenzie – Palo Alto, CA Barrington / Wells Fargo – San Francisco, CA Chevron – San Francisco, CA Gryphon Investors – San Francisco, CA Fusion Storm – San Francisco, CA Ironwood Capital Management – San Francisco, CA Orbis Capital Management – San Francisco, CA PMI World Headquarters – Walnut Creek, CA Sephora University – San Francisco, CA Stein & Lubin LLP – San Francisco, CA Telephia – San Francisco, CA Think Panmure (formerly ThinkEquity Partners) – San Francisco, CA Wilkes Bashford – Carmel by the Sea, CA Wilkes Bashford, 3rd Floor Renovation – San Francisco, CA 3D International – San Francisco, CA 505 Sansome Street – San Francisco, CA Prior to joining FME, he worked on the following projects: Monterey Library – Monterey, CA West Hotel – San Francisco, CA West Portal Club House & Park Renovation – San Francisco, CA South Beach Park and Harbor Improvement Project – San Francisco, CA War Memorial Community Center – Daly City, CA Belmont Police Dept. – Belmont, CA Valencia Gardens – San Francisco, CA Work while with Bay City Mechanical, INC. Maddock Douglas – Elms Grove, IL Wine.com – San Francisco, CA FirstUp.com – San Francisco, CA Panasonic Semiconductor – Sunnyvale, CA Matson Navigation – San Francisco, CA KKSF – San Francisco, CA Essex Environmental – Half Moon Bay, CA Work while with Irvine Contract, INC.

Related Documents

Hills Plaza-rfp Response
November 2019 8
Abadeih Hills
November 2019 10
Toscana Hills
May 2020 7
Seven Hills
May 2020 10
Harmony Hills
December 2019 13
Pat Hills
December 2019 16

More Documents from "Les"