Code No: H1011 OR II B.Tech.(CCC) Supplimentary Examinations, June 2009 ECONOMICS ACCOUNTANCY AND MANAGEMENT SCIENCE (Computer Science & Engineering) Time: 3 hours MAnswer any FIVE Questions All Questions carry equal marks . . . . . ax Marks: 100 1. Discuss the nature and scope of Managerial economics [10+10] 2.

How do you determine BEP in terms of physical units and sales value? Explain the concepts of margin of safety and the angle of incidence use diagrams. [10+10] 3. What is NPV? What is IRR? Compare and contrast the two methods of evaluating capital proposals. [5+5+10] 4. From the following trial balance taken from the books of Akbar.

Prepare Trading and Profit and Loss A/c. for the year ending 31st March, 2005 and the Balance Sheet as on that date: [20] Debit balances Rs. Credit balances Rs. Opening Stock 45,000 Sales 3,00,000 Purchases 2,50,000 Capital 1,65,000 Wages 25,000 Creditors 33,000 Salaries 20,000 Discounts received 7,000 Postage 2,000 Drawings 28,000 Debtors 40,000 Furniture 20,000 Buildings 75,000 5,05,000

5,05,000 (a) Closing strock was valued at Rs.80,000 (b) Depreciate Buildings @ 5%. (c) Provide a Reserve for bad and doubtful debts @ 5%. 5. Compare between monopoly and perfect competition. [10+5+5] 6. Describe the different functions of the management. Discuss the expected tasks to be performed by managers to effectively deal with the various challenges.

[10 � 2 = 20] 7. What are the different methods of training to be followed at different levels of management. [6+7+7] 1 of 2

Code No: H1011 OR 8. List of activities for erecting a canteen in the factory is given below with other relevant details. Job A must precede all others while job E must follow all others a part from this, jobs can run concurrently. Code Job Description Normal Crash Duration (Days) Cost (Rs) Duration

Days Cost (Rs) A Lay foundations and build walls 5 3000 4 4000 B Tile roofing 6 1200 2 2000 C Instal electricity 4 1000 3 1800 D Instal plumbing 5 1200 3 2000 E Connect services to finish 3 1600 3 1600 (a) Draw the network and identify critical path. (b) Crash the network fully

to find out minimum duration. (c) If indirect costs are Rs.300/day, determine the time-cost trade-off for the project. [20] ????. 2 of 2