DATA FOR DRAIN SL NO
QTY
DESCRIPTION OF WORK
RATE
PER
AMOUNT
1. Cement Mortar 1 :2 0.72 mt
Cost of Cement
4515.00
1mt
3250.80
1 m3
Sand for Mortar
334.10
1m3
334.10
Total for 1 m3
3584.90
2. Cement Mortar 1 :1.5 0.960 mt
Cost of Cement
4515.00
1mt
4334.40
1 m3
Sand for Mortar
334.10
1m3
334.10
Total for 1 m3
4668.50
2. Cement Mortar 1 :3 0.480 mt
Cost of Cement
4515.00
1mt
2167.20
1 m3
Sand for Mortar
334.10
1m3
334.10
Total for 1 m3
2501.30
MAIN DATA
1
Vibrated Reinforced Cement concrete 1:2:4 for walls 6.30 m3
20mm ISS HBG metal
787.50
1m3
4961.25
2.70 m3
20mm ISS HBG metal
732.50
1m3
1977.75
4.50 m3
Sand for mortar
334.10
1m3
1503.45
3.24 mt
Cement
4515.00
1mt
14628.60
3.50 Nos
Mason II class
200.00
Each
700.00
21.20 Nos
Mazdoor I class
150.00
Each
3180.00
35.30 Nos
Mazdoor II class
100.00
Each
3530.00
LS
Add 10 % extra on labour charges for work in city
7410.00
10%
741.00
10.00 m3
Vibrating charges
16.50
1m3
165.00
10.00 m3
Add extra for workinfg in height
55.00
1m3
550.00
LS
Sundries
2
2.95 Rate for 10 m3
31940.00
Rate for 1 m3
3194.00
Centering for soffits and sides of R.C.C slabs or plane surfaces 0.40 m3
Silver oak boarding 40mm thick
11250.00
1m3
4500.00
0.12 m3
C.W. Joists (silver oak)
11250.00
1m3
1350.00
15.50
1Rm
1526.75
98.50 Rm
Casurina props 10 – 13Cm dia at 75 Cm c/c
7376.75 Cost of materials for one operation = ( 7376.75/ 5 )
LS
3.80 Nos
Carpenter I class
160.00
Each
608.00
5.40 Nos
Mazdoor I class
150.00
Each
810.00
wedges
LS
Add 10% extra on labour charges for work in city LS
1475.35
Sundries nails , coir etc. Rate per 10 m2 Rate per 1m2 for plane surfaces Rate per 1m2 for side walls = 2770 x 110%/100)
1418.00 LS
25.00 10%
141.80 6.85 3067.00 306.70 337.37
3
Supply and fabrication of steel reinforcement 1.00 mt
Cost of steel
32550.0
1mt
32550.00
0.01 mt
Cost of binding wire
35000.00
1mt
350.00
35.00 Nos
Fitter I class
180.00
Each
6300.00
L.S
Add 10% extra on labour charges for work in city
6300.00
10%
630.00
Anti corrosive treatment
2000.00
1mt
2000.00
LS
10.00
1.00 mt L.S
Sundries Rate per 100 Kg
41840.00 Rate per 1KG
4
or
41.84
Plastering with cm 1:2 – 12 mm thick 0.14 m3
Cost of Cement mortar 1:2
3584.90
1 m3
501.89
0.14 m3
Mixing Charges
27.00
1 m3
3.78
1.10 Nos
Mason I class
200.00
Each
220.00
0.50 Nos
Mazdoor I class
150.00
Each
75.00
1.10 Nos
Mazdoor II class
100.00
Each
110.00
LS
Add 10 % extra on labour charges for work in city
408.78
10%
40.88
LS
Sundries
Ls
2.46
Rate for 10 M2
954.00
Rate for 1m2
95.40
DATA
for 12"(300mm) wall thickness SL NO 1
QTY
DESCRIPTION OF WORK
RATE
PER AMOUNT
40.55
1Kg
2021.01
337.37
1m2
674.74
Vibrated R.C.C M15(1:2:4) using 20mm and 3194.00 12 mm ISS HBG Graded metal
1m3
958.20
Plastering with cm 1:2 – 12 mm thick
1m2
190.80
1 m2
49.84 Kg 2.00 m2 0.300 m3 2.00 m2 L.S
Construction of strong room of wall with RCC 1:2:4 of 12"(300mm)thickness and the walls wshould be reinforced with 2 row tor steel of 12mm #, the grill to be placed @ 6"(150mm) centre to centre and the wall and the cover should be of 3"(75mm) centre to centre from the surface of the RCC wall and alignment of the rods should be show the size of 3"x3" grills, and finished with plastering with cement mortar 1:3 of 12mm thick and curing etc, complete. Steel fabrication & placing grills including cost of steel. Form work for centering and shuttering etc.
Sundries for curing, and other incidental charges etc
95.40 L.S
5.25
Rate per 1 m2
3850.00
Rate per 1 Sq. ft
357.67 (or)
358.00
Certified that the rates adopted are as per the current schedule of rates for the year of 2007 08.
DATA
for 6" (150mm) wall thickness SL NO 1
QTY
DESCRIPTION OF WORK
RATE
PER AMOUNT
40.55
1Kg
2021.01
337.37
1m2
674.74
Vibrated R.C.C M15(1:2:4) using 20mm and 3194.00 12 mm ISS HBG Graded metal
1m3
479.10
Plastering with cm 1:2 – 12 mm thick
1m2
190.80
1 m2
49.84 Kg 2.00 m2 0.150 m3 2.00 m2 L.S
Construction of strong room of wall with RCC 1:2:4 of 6"(150mm)thickness and the walls wshould be reinforced with 2 row tor steel of 12mm #, the grill to be placed @ 6"(150mm) centre to centre and the wall and the cover should be of 3"(75mm) centre to centre from the surface of the RCC wall and alignment of the rods should be show the size of 3"x3" grills, and finished with plastering with cement mortar 1:3 of 12mm thick and curing etc, complete. Steel fabrication & placing grills including cost of steel. Form work for centering and shuttering etc.
Sundries for curing, and other incidental charges etc
95.40 L.S
4.35
Rate per 1 m2
3370.00
Rate per 1 Sq. ft
313.07 (or)
313.00
Certified that the rates adopted are as per the current schedule of rates for the year of 2007 08.