Question 1/65 - 1z0-348.v2018-04-18 In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required. A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting. Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting in frozen type. A. Build cost planning scenario and perform cost roll up. B. Create Accounting Distributions. C. Transfer transactions from production to Costing. D. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition. E. Transfer Transactions from Inventory to Costing. F. Publish cost planning scenario to Accounting. Correct Answer: B,D,E

Question 2/65 - 1z0-348.v2018-04-18 Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of products manufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally. Identify two different ways of achieving this requirement. A. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Item Organization. B. Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and Corporate Engineering organizations as Item Organization. C. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Inventory Organization. D. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Item Organization E. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Inventory Organization. Correct Answer: B,D

Question 3/65 - 1z0-348.v2018-04-18

You are setting up Fusion Manufacturing to support Back-to-Back Fulfillment. Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item components and resources. A. Select the Used in Planning check box in the new Work Definition. Planning check box in the Work Definition Names. the Work Structure. Correct Answer: B

B. Select the Used in

C. Select the Used in Planning check box in

D. Select the Used in Planning check box in the item definition.

Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAIMS/FAIMS1823006.htm#FAIMS1823006

Question 4/65 - 1z0-348.v2018-04-18 A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab. Identify the two reasons that can cause the Reservations tab not to be displayed. A. Work Order (WO-1025) is not a Configured item Work Order. is not a Plan-to-produce Work Order.

B. Work Order (WO-1025)

C. Work Order (WO-1025) is not a Drop-Ship Work Order.

D. Work Order (WO-1025) is not a Back-to-Back Work Order. not a Pick-to-order Work Order. Correct Answer: A,C

E. Work Order (WO-1025) is

Question 5/65 - 1z0-348.v2018-04-18 Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation. Identify the reason. A. An item cannot be assigned on an ad hoc basis. Structure Components in the Work Definition privileges. create item structure. Correct Answer: A

B. The user doesn't have Override Item C. The user doesn't have Data access to

D. The user doesn't have access to the PIM module.

Question 6/65 - 1z0-348.v2018-04-18 Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).

B. Set the global sourcing rule in GOP to determine supply creation option as Make.

C. Set a local sourcing rule in GOP to determine supply creation option as Make.

D. Create

Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item. E. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item. Correct Answer: A,B Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAIMS/FAIMS1922443.htm

Question 7/65 - 1z0-348.v2018-04-18 In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can report the excess production completion? A. Overcompletion Tolerance Type = Percentage, value = 0 Type = Percentage, value = 100

B. Overcompletion Tolerance

C. Overcompletion Tolerance Type = Percentage, value > 0

D. Overcompletion Tolerance Type = Amount, value = 0 Amount, value > 0 Correct Answer: A,C,D

E. Overcompletion Tolerance Type =

Question 8/65 - 1z0-348.v2018-04-18 You have been asked to set up cost estimates for 10 different purchased items. Which two steps could be used to accomplish this task? A. Import spreadsheet. cost estimates directly into UI. Correct Answer: A,C

B. Run the ESS process "Update Item Cost Estimate". D. Call web service.

C. Enter

E. Use the Mass Edit functionality.

Question 9/65 - 1z0-348.v2018-04-18 A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management. Which scheduled process should you run to achieve this requirement? A. Transfer General Ledger Balances to Balance Cubes Management C. Transfer Ledger Balances Correct Answer: B

B. Transfer Cost to Cost

D. Transfer Transactions to Costing

Question 10/65 - 1z0-348.v2018-04-18 A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs. Identify the two recommendations. A. Update Firm flag in the Details region of the Edit Work Order page. Plan Options, Overwrite Firm Planned Orders = None. of the Edit Work Definition page. Definition Names page. Correct Answer: A,B

B. Update Supply

C. Update Firm flag in the Details region

D. Update Firm flag in the Details region of the Edit Work

Question 11/65 - 1z0-348.v2018-04-18 As a production supervisor, you require immediate access to critical shop floor execution systems to take action while on the go. Which four work order related actions can be taken in the Manufacturing Supervisor mobile application? A. Executing standard work order and updating item and resource usage standard or non standard work order mail

B. Creating a new

C. Searching for work orders and sending them through e-

D. Releasing work orders using quick swipe details

E. Reviewing operation, component,

and resource detail F. Reviewing customer information of work orders Correct Answer: C,D,E,F Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2402851.htm#FAUMF2318052 (tracking and managing work orders: examples)

Question 12/65 - 1z0-348.v2018-04-18 A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon. What time will R1 be scheduled to finish, assuming no calendar exceptions have been set? A. 8:00 PM B. 4:00 PM Correct Answer: B

C. 2:00 PM

D. 12:30 PM

E. 1:00 PM

Question 13/65 - 1z0-348.v2018-04-18 Identify three types of Item Quantities displayed in the Work Order History tab. A. Scrapped Quantity

B. In Process Quantity

C. Remaining Quantity

D. Total

Quantity E. Completed Quantity Correct Answer: A,C,E Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092337.htm#FAUMF2014081

Question 14/65 - 1z0-348.v2018-04-18 Identify the two capabilities that the Application Development Framework Desktop Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud. A. You can mass create and update work definitions and their operations, items, and resources. B. You can mass create and update work definitions and their operations, items only and cannot add resources in work definitions.

C. You can mass create and update work definitions and their

operations only and cannot add items and resources in work definitions. definitions form one organization to another organization. Correct Answer: A,D

D. You can copy work

Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092335.htm#FAUMF2092335

Question 15/65 - 1z0-348.v2018-04-18 Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the Morning Shift and the remaining units are available for the Evening Shits. Which two actions must you perform to associate LATHE with W1? A. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 60% against the resource LATHE in the Morning Shift column. B. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.

C. Do not select the Available 24 Hours check box and in the Resource

Availability region, enter 40% against the resource LATHE in the Evening Shift column. D. Select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column. E. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column. F. Select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.

Correct Answer: A,D

Question 16/65 - 1z0-348.v2018-04-18 A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged. Identify the four transactions to correct this situation. A. Reverse resources charged to a work order. C. Reverse from reject to ready.

B. Reverse the product at the last operation.

D. Reverse at an operation.

E. Reverse material issued

to a work order. F. Reverse from scrap to ready. Correct Answer: A,C,E,F

Question 17/65 - 1z0-348.v2018-04-18 In a manufacturing plant, a production operator in a given shift completes a car assembly and reports this using orderless completion by referencing a Work Definition. Identify the two purposes of the referenced Work Definition in Orderless reporting. A. Material usage Return material Correct Answer: A,B

B. Resource usage

C. Processing steps

D. Scrap material

E.

Explanation/Reference: Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2033973

Question 18/65 - 1z0-348.v2018-04-18 Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition. Which two attributes cannot be updated using the Edit Work Definition Details action? A. Production Priority Correct Answer: B,C

B. State Date

C. Version

D. Costing Priority

Question 19/65 - 1z0-348.v2018-04-18 A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work Definition WD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2. Identify the reason.

A. The Production Priority was not populated in the new Work Definition WD2 during creation. B. The Start Data was not populated in the new Work Definition WD2 during creation. C. The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work Definition WD2 as well during creation. D. The Item and Structure Name were changed in the new Work Definition WD2 during creation. Correct Answer: B

Question 20/65 - 1z0-348.v2018-04-18 The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes. Which two reasons could cause this? A. The engineer does not have Data access to Items Attributes. have the Manage Work Definitions function privilege. access to Item Structures.

B. The engineer does not

C. The engineer does not have Data

D. The engineer does not have Data access to Manufacturing plant in

which the Item Structure change was performed. Items. Correct Answer: B,D

E. The engineer does not have Data access to

Question 21/65 - 1z0-348.v2018-04-18 In your customer's manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies form the Warehouse subinventory through automatically created Movement Requests. Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory? A. Batch Wave Movement Requests B. Pick Wave Movement Requests C. Replenishment Requests D. Requisition Movement Requests Correct Answer: D Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAMML/FAMML1153516.htm#FAMML1153492

Question 22/65 - 1z0-348.v2018-04-18

The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift. Identify the correct sequence of steps to achieve this requirement. A. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column B. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column. C. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column. D. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column. Correct Answer: D

Question 23/65 - 1z0-348.v2018-04-18 You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised? A. The Production Operator can report and exception and the application generates a notification that is sent to all users who have access to the manufacturing plant. B. The Production Operator can report an exception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant. C. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification. D. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification. Correct Answer: B Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092338.htm#FAUMF2273578

Question 24/65 - 1z0-348.v2018-04-18 Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the Manufacturing Cloud? A. Use ibots to create the report. B. Use Business Intelligence answers to create the report. C. Use the Manufacturing subject area to select the report columns and create the report. D. Use Business Intelligence publisher to create a template and use that template to create the report. Correct Answer: B,D

Explanation/Reference: Explanation: You can use Oracle Transactional Business Intelligence to create analysis and Oracle Business Intelligence Publisher to create reports. Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092337.htm#FAUMF2402867

Question 25/65 - 1z0-348.v2018-04-18 To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product. Identify the action that meets this requirement. A. Change the Supply Type = Push in Item definition and Work Definition, for subassemblies having high inventory stock. B. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock. C. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock. D. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock. Correct Answer: C

Question 26/65 - 1z0-348.v2018-04-18 Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version. A. Completion Sub inventory B. Add an Operation C. Delete an Operation D. Costing Priority E. Production Priority Correct Answer: A,B,E

Question 27/65 - 1z0-348.v2018-04-18 Your customer has completed the required setup steps for automatic work definition. Identify the option that shows the navigation steps needed to create an automatic work definition. A. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work definition

B. Product Management> Product Information Management> Items> Edit Item > Actions> Create automatic work definition C. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation> Actions> Create automatic work definition D. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition Correct Answer: C Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092336.htm#FAUMF2402871

Question 28/65 - 1z0-348.v2018-04-18 A manufacturing cloud user wants to print information available in the work order in PDF. Identify the three reports that the user can print directly from the work order screen using the Print PDF action. A. Work Order Traveler B. Resource List C. Print Labels D. Print Component List E. Bill of material Correct Answer: A,C,D Explanation/Reference: Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013522.htm#FAUMF2014147

Question 29/65 - 1z0-348.v2018-04-18 The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC. The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines. Identify the correct setup that you will advise to the Plant Manager. A. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC. B. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common. C. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC. D. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common. Correct Answer: D

Question 30/65 - 1z0-348.v2018-04-18 You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required. A. Deselect the Referenced check box while adding the standard operation to the work definition and change the usage manually.

B. Select the Referenced check box while adding the standard

operation to the work definition and change the usage manually. Standard Operation functionality to edit the resource usage. resource and alter its usage. Correct Answer: B

C. Use the Transfer and Edit

D. Use a Resource exception for the

explanation/Reference: Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013518.htm#FAUMF2013518 (using the standard operations, first bullet)

Question 31/65 - 1z0-348.v2018-04-18 Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements. Identify four REST resources and the corresponding HTTP action available with Manufacturing Cloud. A. Work Order Status GET method B. Work Orders GET method C. Work Order Status POST method D. Work Orders PATCH method E. Resource transaction POST method F. Resource transaction GET method Correct Answer: A,B,D,E Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FASRP/Overview_of_REST_API.html

Question 32/65 - 1z0-348.v2018-04-18 While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied. 1. Template: Finished Goods (WIP = No, Customer Ordered = Yes) 2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No) Identify the Item Attribute values in the application. A. WIP = No, Customer Ordered = No No, Customer Ordered = Yes

B. WIP = Yes, Customer Ordered = No

D. WIP = Yes, Customer Ordered = Yes

C. WIP =

Correct Answer: C

Question 33/65 - 1z0-348.v2018-04-18 During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box. Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports. A. Oracle Business Intelligence Standard Edition C. Oracle Business Intelligence Enterprise Edition Correct Answer: D

B. Oracle Business Intelligence Application D. Oracle Business Intelligence Publisher

Question 34/65 - 1z0-348.v2018-04-18 An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product. Which seeded job role must this employee be provided with? A. Manufacturing Engineer B. Production Engineer C. Production Operator D. Manufacturing Supervisor E. Production Supervisor Correct Answer: A Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAMMM/FAMMM.pdf (page 148)

Question 35/65 - 1z0-348.v2018-04-18 An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in- house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order. Identify two options that can cause this situation. A. Sourcing rule for the product item is defined as Buy. item are defined as Make as well as Transfer. as Buy as well as Transfer. Definition is not defined. Correct Answer: B,D

B. Sourcing rules for the product

C. Sourcing rules for the product item are defined

D. Sourcing rule for the product item is defined as Make, but Work

Question 36/65 - 1z0-348.v2018-04-18 In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required. A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario. Identify the reason. A. Create Accounting Distributions was not initiated.

B. Create Accounting was not initiated.

C. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario. accounting. Correct Answer: A

D. Costs for purchase components P1 and P2 are not defined in cost

Question 37/65 - 1z0-348.v2018-04-18 A Work Center created a month ago is no longer in use now. You want to remove the Work Center; however, the system is no allowing you to delete it. Identify three reasons for this. A. The work center is being references in the work definition operation. is being referenced in the Work Area.

B. The work center

C. There are resources associated with the Work Center.

D. The Work Center is being referenced in the Open Work Order. being referenced in the Closed Work Order. Correct Answer: B,C,D

E. The Work Center is

Question 38/65 - 1z0-348.v2018-04-18 Identify two reports that provide work order cost-related information to the costing user. A. Purchase Variance Summary

B. Cost Accounting Dashboard

C. Work order

Operational Analysis D. WIP Balance by Plant Correct Answer: B,C

Question 39/65 - 1z0-348.v2018-04-18 The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing. Identify the reason for work order transactions not getting transferred to Costing.

A. The item was made inactive after the Work Order transaction. setup is not complete.

B. The Manage Item Rules

C. The Costing Interfaced Attribute is not enabled in the resource

definition. D. The Costing Interfaced Attribute is enabled in the resource definition. Correct Answer: C

Question 40/65 - 1z0-348.v2018-04-18 You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation. Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application? A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK

B. Select the infertile Dispatch List> Select a work order operation you want to release>

Swipe left on the work order name> Tap or click the Release action, and click OK C. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK D. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK Correct Answer: B

Question 41/65 - 1z0-348.v2018-04-18 A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts. Determine the available capacity of the resource R1 for that week. A. 78 hours B. 76 hours Correct Answer: A

C. 60 hours

D. 70 hours

Question 42/65 - 1z0-348.v2018-04-18 As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager. What must be set up first in order for you to configure the setup task called Manage Plant Parameters? A. The Manage Items Profile Options tasks

B. The Supply Chain Orchestration Functional

Area C. The Manufacturing Master Data Functional Area Value Sets task

D. The Manage product and Child

Correct Answer: C

Question 43/65 - 1z0-348.v2018-04-18 A Production Operator needs to load Work Order Transactions from an external system into Manufacturing Cloud. Identify the correct sequence of tasks to be performed. A. Load Data to Fusion repository> Export File to UCM server > Process Import Operations Transactions> Load file from UCM to Interface table. B. Export File to UCM server> Load Data to Fusion repository> Process Import Operations Transactions> Load file from UCM to Interface table. C. Load Data to Fusion repository> Export File to UCM server > Load file from UCM to Interface table >Process Import Operations Transactions. D. Load Data to Fusion repository> Load File from UCM to Interface table> Export File to UCM server> Process Import Operations Transactions. Correct Answer: B Explanation/Reference: Reference: https://docs.oracle.com/cd/E60665_01/financialscs_gs/FAFCF/FAFCF1475897.htm

Question 44/65 - 1z0-348.v2018-04-18 Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud. A. The shifts are defined in the plant calendar B. Resource calendars of the work centers involved C. The primary work definition of the item D. The lot size of the item E. Resource calendar exceptions F. Plant calendar exceptions Correct Answer: A,C,D,E

Question 45/65 - 1z0-348.v2018-04-18 Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

A. There are no components attached to it. deselected.

B. The Automatically Transact check box is

C. The Automatically Transact check box is selected.

D. The Count Point check

is selected. E. The Count Point check box is deselected. Correct Answer: B,E Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092335.htm#FAUMF2092335 (see note)

Question 46/65 - 1z0-348.v2018-04-18 You are reviewing the production status of your manufacturing plant shop floor as a production supervisor. Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized. Which option shows the steps to complete the task using the mobile application? A. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send. B. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send. C. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share. D. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e- mail, and click Send. Correct Answer: A Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2402851.htm#FAUMF2318052

Question 47/65 - 1z0-348.v2018-04-18 A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day. Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page. A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column. B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column. C. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click

Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available. D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column. Correct Answer: D Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092337.htm#FAUMF2014030

Question 48/65 - 1z0-348.v2018-04-18 Identify three requirements fulfilled by nonstandard work orders. A. Rescheduling B. Repair C. Rework D. Prototype Correct Answer: B,C,D Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092337.htm#FAUMF2014000

Question 49/65 - 1z0-348.v2018-04-18 You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it. Identify the setup that will fulfill this requirement. A. Select the Automatically Transact check box while defining the Standard Operation. B. Deselect the Count Point check box while defining the Standard Operation. C. Select the Count Point check box while defining the Standard Operation. D. Ensure that the Charge Type of the resource is Automatic. Correct Answer: C Explanation/Reference: Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013518.htm#FAUMF2013518

Question 50/65 - 1z0-348.v2018-04-18 Which entity should you use to configure the manufacturing plant in Functional Manager? A. Business Unit B. Legal Entity C. Plant

D. Organization Correct Answer: C

Question 51/65 - 1z0-348.v2018-04-18 One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you can generate and manage work order exceptions. Which option shows the production exception types that can be reported by the production operator? A. Work Area, Work Center, Resources, Components, and Miscellaneous B. Work Area, Work Center, Resources, and Components C. Work Area, Work Center, and Resources D. Resources and Components E. Work Center and Resources Correct Answer: D

Question 52/65 - 1z0-348.v2018-04-18 During a Manufacturing Cloud implementation, the Production Supervisor wants to close the work orders for last month and wants to make sure that the work orders include the correct cost. Identify the approach to be taken by the Production Supervisor. A. Work order costs can be updated anytime regardless of the status of the work order. B. The Production Supervisor need not include cost variances while costing last month's work orders because those can be applied directly in subledger accounting. C. The Production Supervisor should make sure that all costs are included while closing last month's work orders; however, variances can be included after closing the work orders. D. The Production Supervisor needs to include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected, should not be closed. Correct Answer: D

Question 53/65 - 1z0-348.v2018-04-18 Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days. A plan is run and the Work Order WO-2045 is rescheduled. Identify the duration of the rescheduled Work Order WO- 2045. A. Rescheduled Work Order WO-2045 duration = 2 days B. Rescheduled Work Order WO-2045 duration = 0.75 days

C. Rescheduled Work Order WO-2045 duration = 3.25days D. Rescheduled Work Order WO-2045 duration = 1.25 days Correct Answer: B

Question 54/65 - 1z0-348.v2018-04-18 A Production operator in your company is required to report production activities, such as completing or scrapping production units, by referencing a work definition without creating work orders. Identify the manufacturing transaction that a production operator can perform for reporting such activities. A. Orderless Transactions B. Operation Transactions C. Resource Transactions D. Movement request E. Material Transactions Correct Answer: A Explanation/Reference: Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013702

Question 55/65 - 1z0-348.v2018-04-18 Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions. Which three steps must be completed and verified in the Work Definition area? A. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition. secondary item structure.

B. Ensure the item is a standard item with a

C. Ensure the predefined work definition name ORA_MAIN name is

active. D. Ensure there is only one default standard operation at a given point in time. E. Select a resource that is to be used in automatic work definition by enabling the attribute Default for automatic work definition. Correct Answer: A,B,C

Question 56/65 - 1z0-348.v2018-04-18 In a Manufacturing Cloud post production support environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable

to update any of the orders. Identify two reasons. A. The scheduled resources are not part of the organization selected by the user. work order operations do not have operations start or completion date. include scheduled resources. Correct Answer: C,D

B. The

C. None of the operations

D. The operations are missing sequence.

Question 57/65 - 1z0-348.v2018-04-18 A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW. Identify the two Sourcing Rules that need to be set for order promising to schedule the order. A. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW B. Define Local sourcing rule for organization DW: Source Type Make From, Source MP C. Define Local sourcing rule for organization MP: Source Type Make At, Source MP D. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP Correct Answer: C,D

Question 58/65 - 1z0-348.v2018-04-18 In a manufacturing cloud implementation, production operators want to perform work order updates using Dispatch List. Identify two tasks that the Dispatch List allows the production users to perform. A. Report Component Returns

B. Report Resource Transactions

D. Report Material Transactions by Quantity and Serial Number Correct Answer: B,D

C. Report Receipts

E. Report Cost Transactions

Explanation/Reference: Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013521

Question 59/65 - 1z0-348.v2018-04-18 Identify the three sources from which supply chain orchestration (SCO) can create the work orders. A. Order Management B. Quality C. Inventory Min-Max Planning D. Procurement E. Planning

Correct Answer: A,D,E Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAIMS/FAIMS1922443.htm#FAIMS1922443

Question 60/65 - 1z0-348.v2018-04-18 Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates. A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing. Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting. A. Create accounting B. Transfer Transactions from Production to Costing C. Transfer Costs to Cost Management D. Transfer Transactions from Inventory to Costing Correct Answer: B

Question 61/65 - 1z0-348.v2018-04-18 Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house. A. Resources

B. Manufacturing Lead Time

C. Operation Items

D. Production Line

E. Operations Correct Answer: A,C,E

Question 62/65 - 1z0-348.v2018-04-18 Your customer has the following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component. Identify the way to establish the relationship between Pallet and Engine Work Definitions. A. The Work Definition versions can be used to tie the Work Orders. B. Create a Sub inventory that could be the completion Sub inventory for yielding the pallet and then the same Sub inventory can serve as the supply Sub inventory of the pallet in the Work Definition created for Engine.

C. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet. D. The two Work Definitions can be tied through Project or Seiban numbers. Correct Answer: A

Question 63/65 - 1z0-348.v2018-04-18 The production user wants to report Work Order completion. Identify two ways of reporting the progress of work order at work order operation level. A. Change Move status to Ready. B. Complete using quantity completion C. Complete with Details D. Quick Complete E. Change status of Operation to completed Correct Answer: C,D Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092338.htm#FAUMF2033961

Question 64/65 - 1z0-348.v2018-04-18 A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift. Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution. A. Manage Work Orders Operation Transactions Correct Answer: A

B. Review Dispatch List

C. Report Resource, Material and

D. Review Production Transaction History

Explanation/Reference: Reference: https://docs.oracle.com/cloud/farel11/scmcs_gs/FAUMF/FAUMF2013521.htm#FAUMF2013521

Question 65/65 - 1z0-348.v2018-04-18 Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet. Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)? A. Create Work Definitions

B. Update Work Definitions

(Assemble To Order) model work definitions Correct Answer: C,D

C. Create and update ATO

D. Populate Descriptive flexfields

Explanation/Reference: Reference: https://docs.oracle.com/cloud/latest/scmcs_gs/FAUMF/FAUMF2092336.htm

Related Documents

Fusion > Fusion
November 2019 35
Fusion
October 2019 29
Fusion
November 2019 24
Fusion
May 2020 17
Fusion > Lepton
November 2019 19
Fusion Hack
April 2020 12

More Documents from ""