STANDARD FIELD QUALITY PLAN ( GANNON DUNKERLEY & CO. LTD.) TO BE USED FOR:
ADANI POWER LTD 7TH Floor,Sambhav Building judges Bungalow ITEM: CIVIL WORK road Bodakdev, SYSTEM:__________________ Ahmedabad-380015
SL.N O
ACTIVITY AND OPERATION
CHARACTERISTICS
1
2
3
1
SUB-
CLASS OF CHECK # 4
PROJECT : 5 x660MW MUNDRA Name of Client : SEPCO III Name of Owner: M/s Adani Power Ltd. Contract No. :
QP NO : GDC/SFQP/001 REV.NO.: 0 DATE:
TYPE OF CHECK
QUANTUM OF CHECK
REFERENCE DOCUMENT
ACCEPTANCE NORMS
FORMAT OF RECORD
5
6
7
8
9
D*
same as Columnn 7
SR
√
1.10
Naturre of Soil/Rock
B
Visual+TC review
Random
1.20
Initial Ground Level & Foundation Layout
C
Measureme nt
100%
_do_
_do_
SR
√
1.30
Final Pit / bed Level
C/B
_do_
100% for C & Random for B
_do_
_do_
SR
√
Random by AG
FILL MATERIALS ( For borrowed fill materials as per site requirement
2.10
Grain Size Analysis
B
Physical
Note 1
IS 2720(PT IV)
IS 2720(PT IV)
SR/TR
√
2.20
Liquid and Plastic Limit
B
_do_
Note 1
IS 2720(PT V)
IS 2720(PT V)
SR/TR
√
2.30
Shrinkage Limit
B
_do_
Note 2
IS 2720(PT VI)
IS 2720(PT VI)
SR/TR
√
2.40
Free Swell Index
B
_do_
Note 2
IS 2720(PT XI)
IS 2720(PT XI)
SR/TR
√
2.50
Chemical Analysis
2.60
10
EXCAVATION As per contractor's scheme for excavaton/appd .drg.
2
REMARKS
Note 1 :- Minimum 2 samples in every 2000 cum of each type and source of fill materials Note 2 : Min. 2 samples in every 5000 cum of each type and source of fill material.
√
a) Organic Matter
B
_do_
Note 3
b)Calcium Corbonate
B
_do_
Note 3
c) PH Value
B
_do_
Note 3
d) Total Soluble Sulphate
B
_do_
Note 3
Moisture Content of fill before compaction
B
_do_
Note 1
Page 1 of 21
IS 2720(PT XXII) IS 2720(PT XXII) IS 2720(PT XXIII) IS 2720(PT XXVI) IS 2720(PT XXVII) IS 2720(PT II)
IS 2720(PT XXIII) IS 2720(PT XXVI) IS 2720(PT XXVII) IS 2720(PT II)
SR/TR
√
SR/TR
√
SR/TR
√
SR/TR
√
SR/TR
√
Note 3 :- One in every 5000 cum for each type and source of fill materials.
2.70
Degree of Compaction fill a) Dry density by Core Cutter method or Dry density by sand displacement method or Relative Density Index
2.80 3 3.10
A/B
_do_
Note 4
b) Dry Density by proctor needle penetraction
B
_do_
Random for each compactor layer
Sand
B
_do_
a) Manufacture's TC as per I.S -8112 & I.S - 1489(PART- I)
A
b) Storage of Cement
c) Retesting of Cement for compressive strenth & setting time, if stored more than 90 days in Contractor godown
IS 2720 ( Pt IS 2720 ( Pt XXIX) OR IS XXIX) OR IS 2720 (Pt XXVIII) 2720 (Pt XXVIII) OR IS 2720 (Pt OR IS 2720 (Pt XIV) XIV)
SR/TR
Note 4 :- i) For Foundation backfilling one for every 10 founations for each √ compacted layer. Ii) For area filling one in every 1000 sqm. Area for each compacted layer.
ASTM-D1588
ASTM-D1588
SR/TR
√
Random
IS 2720 & IS 383
IS 2720 & IS 383
SR/TR
√
Review
100%
IS 8112 Grade 43 IS-1489 (Part-I)
IS 8112 Grade 43 IS-1489 (Part-I)
TC
√
Manufacturers's TC for each batch to be reviewed
B
Visual
100%
IS - 4082
IS - 4082
SR
√
Cement to be stored on raised platfarm in a weather tight covered store.
A
Testing
One Sample per batch
TC
√
CAST-IN -SITU CONCRETE Materials
3.1.1
Cement
Page 2 of 21
As per relevant As per relevant IS code IS code
3.1.2
Coarse Aggregate
a) Moisture Content
B
d)Specific gravity, bulk density, voids, water absorption
B
_do_
While establishing design mix & once per 500 Cum or part there of sourse
B
_do_
Once per IS - 2386(Partsource & II) IS-456 every change & IS -383 of source
B
SR / TR IS - 2386(Part& II) IS-456 √ Lab.repo & IS -383 rt
Physical
Once per SR / TR IS - 2386(Part- IS - 2386(Partsource & & IV) IS-456 IV) IS-456 √ every change Lab.repo & IS -383 & IS -383 of source rt
Expeert opinion regarding suitability of aggreagates shall be obtained by contractor from the specialist agency like NCBM,CSMRS etc.
f) Alkali aggregate reactivity test
B
_do_
B
SR / TR
These test will be carried out while establishing design mix and results shall be intimated to site for review and approval.
_do_
A
IS - 2386(PartIII) IS-456 & IS -383
While establishing SR / TR design mix & IS - 2386(Part- IS - 2386(Part& once for each III) IS-456 III) IS-456 √ Lab.repo source & for & IS -383 & IS -383 rt every change of source
B
h) Crushing value, abrasion value, impact value
These test will be carried out while establishing design mix and results shall be intimated to site for review and approval.
Note - 5
e) Soundness
g) Petrographic examination of aggregate
SR / IS - 2386(Part- IS - 2386(Part- I) Lab.repo √ I) & IS -383 & IS -383 rt
Physical
b) Praticle Size & Shape ( sieve Analysis, determination of material finer than 75 Micron, flakines index, elongation index, angularty number c) Deleterious material & Organic impurities ( determination of clay lumps, fine silt, fine dust, lightweight pieces, soft praticle & estimation organic impurities)
√
Note 5 :- Once for each coarse aggregate stock.When there is rain test to be done everyday before start of concreting.
IS - 2386(PartIII) IS-456 & IS -383
_do_
_do_
_do_
_do_
Once per source & every change of source
Page 3 of 21
IS - 2386(PartSR / TR IS - 2386(PartThe result should be VII) ASTM& VII) ASTM√ supported by petrographic C1260 & Lab.repo C1260 & IS -383 examination IS -383 rt Petrographic report shall SR / TR be supported by the IS - 2386(Part- IS - 2386 & analysis & VIII) & IS (Part- VIII) & IS √ Lab.repo recommendation of -383 -383 rt specialist such as NCBM & CSMRS etc. The report shall be SR / TR supported by the analysis IS - 2386 & IS IS - 2386 & & √ & recommendation of -383 IS -383 Lab.repo specialist such as NCBM & rt CSMRS etc.
i) Repeated Temp. Cycle Test of aggregate
3.1.3
Fine Aggregate
B
_do_
_do_
-
No residual expansion
TR
√
Applicable for aggregate used in TG,BFP,FAN & Mill foundations, Contrator shall be obtain opinion of specialist agency for suitability of aggregate Volume of sand & weight of water shall be adjusted as per moisture content
a) Bulkage, Moisture Content, & Mortar making properties
B
_do_
IS - 2386(Part- IS - 2386(PartSR / TR Everyday III), IS- III), IS& before start of 386(Part-VI) 386(Part-VI) √ Lab.repo work & IS & IS rt -383 -383
b)All other tests similar to coarse aggregate mentioned at sl.no.3.1.2 ( c ), (d) to (g) Sieve analyses.
B
_do_
Once per source & every change of source
Page 4 of 21
-
-
SR / TR & √ Lab.repo rt
3.1.4 a) Test for acidity and alkalinity by neutralization of water using indicator and chloride content
Water
3.1.5 CONCRETE
Quaterly for IS-3025 (Part-22 each source & 23), IS - 456
IS - 456
TR
100 ml of water should not require more than 5ml 0.02 N NaOH ( using √ phenolphathalinc Indicator ) and 25ml of 0.02 N sulphuric acid.
IS-3025 (Part18), IS - 456
TR
√
TR
√
IS - 456
TR
√
IS - 456
TR
B
Testing
b) Test for as certaining limit of solid
B
_do_
_do_
IS-3025 (Part18), IS - 456
c) Test for PH Value
B
_do_
_do_
IS-3025 (Part- IS-3025 (Part-II), II), IS - 456 IS - 456
d) Check for initial set time used water & distilled water
B
_do_
_do_
IS - 456
e) Check for concrete compressive strenth with used water and water and distilled water
A
_do_
Refer remark
IS - 456
Physical
One Sample every 2(two)hrs. for every mixing plant
a) Workablity ( slump) test
B
b) Trial Mix (Cubes compressive strength) Mix design
A
Physical
c ) Crushing strngth( work test cube)
A
_do_
d) Water cement ratio
B
Physical
e) Cement content
B
_do_
IS - 456 ,IS1199
IS - 456, IS1199
Initial Set time for used water should not be less than with distilled water. These checks are to be carried out only if the result of test mentioned at √ 3.1.4a,b,c are not acceptable.
SR / TR & √ Lab.repo rt
Slump test for medium and high workability & compaction factor test for medium and low workability For trial mix min 6 cubes for each mix out of which 3 cubes shall be tested at 7 days and remaining 3 cubes shall be tested for 28 days comp. strength.Mix design test shall be carried out at NCBM or CSMRS etc.
Min. 4 trial Mix with & without IS- 456, IS- 516, IS- 456, IS- 516, admixture ISISSR/TR √ with fly ash for 10262 10262 each grade of concrete One set of 6 cubes per 100 m3 or part 3 cubes shall be tested at there of for 7 days & remaining 3 each grade of IS- 456, IS- 516 IS- 456, IS- 516 SR/TR √ cubes shall be tested for concrete per 28 days comp. strenght. shift whichever is earlier SR / TR At random at As per printed report from IS 1199 & appd IS 1199 & appd & the time of √ computerised Batching design mix design mix Lab.repo batching plant for each of concrete. rt _do_
Page 5 of 21
_do_
_do_
SR / TR & √ Lab.repo rt
_do_
4
IS - 9103, ASTM IS - 9103, ASTM - C- 494 & appd - C- 494 & appd design mix design mix
f) Admixture for concrete
B
Testing review TC
100%
g) Dimension and visual examination of finished structure
B
Visual & Measurmen t
100%
IS- 456 & drg.
A
_do_
100%
A
Measureme nt
100%
Admixture Brand shall be approved by site.
TR
√
IS- 456 & drg.
SR
√
IS - 457
IS - 459
Calibrati on of mixer
√
Concrete mixture shall be calibrated at time of starting & subsequently once in three months
-
-
_do_
√
To be calibrated at the time of starting & subsequently once in 3 months
Concrete Conveying,Placing & Compaction a) Mix of concrete ( Calibration of concrete mixer)
b) Calibration of Batching Plant
c) Handling and tramportation
C
Physical
100%
As per construction / erection methodology
As per construction / erection methodology
SR
Free fall or drop shall be limited to 150 cm unless permitted. Concrete sholud be placed within 30 minutes of its removal from mixture. Construction methodology to be approved one weak prior to start of work No concrete shall be placed until the place of deposit has been inspected & approved. The concrete shall be deposited in such a manner to maintain ,until completion of unit, a plastic horizantal surface throughout.
d) Placement of concrete
B
_do_
100%
_do_
_do_
SR
e) Temp. control of concrete for top deck of TG foundation
B
Physical
100%
-
Temp. 250 c Max.
SR
f) Check for placement
B
_do_
100%
-
As per appd.constructio n methodology
SR
Page 6 of 21
√
Appropriate shall be taken to controll the concrete temp. If water accumulates at surface due to bleeding or other causes, concreting shall be stopped as far as poible for reconsideration of mix design.Accumulated water shall be removed by sponge.
g) Compaction
B
_do_
Random
-
Check for segregation as per IS- 456
SR
h) Curing
B
_do_
_do_
-
Check period of curing as per IS 456
SR
I) Cleanliness, provision of chute & arrangement for transprotation of concrente
C
Visual
100%
-
Before clearance for concreting
SR
j) Check for segregation
B
Physical
Random
-
Check period of curing as per IS 456
SR
Page 7 of 21
√ Exposed Concrete surface shall be protected against heating & drying atleast 72 hrs after placement. Curing compound may be used if needed.
5
Test / Check on RCC Structure in Hardened condition
a) Ultrasonic Test on top deck of TG foundation
A
b) Core Test
A
c) Rebound Hammar Test
A
d) Dimensional check of finished structure
B
e) Water tightness Test of liquid retaining structure
A
UT
Physical
100%
As per site Engineer
IS- 13311
IS- 13311
IS - 456, IS- 516 IS - 456, IS- 516
UT report
√
TR
Acceptabily only if average equivalent cube strength of the core equal to 85%of cube strength of the grade of concrete √ specified for the corresponding age and no individual core has result less than 75% of cube strength.
_do_
-
-
SR
√
Measureme nt
100%
As per drg.
IS-456
SR/Insp Report
√
Test
100%
IS - 3370
IS - 3370
SR/Insp Report
√
Page 8 of 21
The grid shall be 300 mm c/c or as required by site engineer
6
6.1
Reinforcement steel
a) Mechanical and Chemical Properties
A
TC Review
100%
IS-1786, IS-432, IS-1786, IS-432, ISIS1566 1566
b) Cutting tolerance
B
Measureme nt
Random
IS-1852, IS-432, IS-1852, IS-432, ISIS1786 1786
TC for each batch shall be reviewed. Report test may √ be carried out as per requirement of site engineer.
TC
SR/LB
Tolerance as per specification To be checked at site. Steel materials to be stored properly to prevent rusting.
c) Freedom from crack from crack & surface flow, lamination
B
Visual
Random
_do_
_do_
SR
a) Check for bar bending schedule with necessary laps, specer & chairs
B
Review
100%
Drawing
Drawing
SR
b) Check for cover specing bars
B
100%
_do_
Drawing
SR
c) Check for bending of bars
B
100%
_do_
Drawing
SR
_do_
_do_
SR
√
IS - 456 Bar bending schedule Drawing & bar bending schedule
IS - 456 Bar bending schedule Drawing & bar bending schedule
SR
√
SR
√
Placement of Reinforcement Steel d) Check for space & chair after reinforcement cage is put inside the formwork
Review & Measureme nt Visual & Measurmen t
B
_do_
100%
e) Lapping of bars
B
Measureme nt
100%
f) Check all joint crossing
B
Visual
Random
Page 9 of 21
Crossing of the bars are to be tied up properly with right gauge annealed wire
7
Staging & Forms a)Material and accessories
B
Visual
Once
As per relevant As per relevant IS code IS code
SR
i) Soundness of staging, shuttering & scaffolding
B
Visual
Once
IS-3696, ISIS-3696, IS4014, IS-4990 4014, IS-4990
SR
ii) Plywood for concrete shuttering work
B
Visual
Once
IS-4990,ISIS-4990,IS1734(Part-I to 1734(Part-I to II) II)
SR
Once
Asper supplier / Asper supplier / manufacturer manufacturer recommendatio recommendatio n n
SR
Fortnightly
IS-14687,ISIS-14687,IS3696 & As per 3696 & As per National safety National safety council council
SR
√
SR/TR
√
iii) Hoisting of personal & material b) Connection between indivisual scaffolding unit & safe slendreness ratio two indipendent safety measure against collapse c) Concrete Strength during climbing process
8
Embedded Part
B
Visual
Manufactures will supply technical data ( Type of adhesive used, type of preservative used density of plywood etc.
B
Visual
B
Testing
d) Alignment / shape
B
Measureme nt
_do_
As per drg.
As per drg.
SR/TR
√
e) Check form's seam mark & water tightness
B
Physical
Random
As per drg.& specn
As per drg.& specn
SR/TR
√
For each lift of As per provision As per provision shuttering & tolerances & tolerances
( including laying of rails & anchor fasteners) a) Position and level of embeded parts b)Position, depth, & size of bolt hole c) Location, verticality of pipe sleeve/ opening of bolt hole d)Welding/ tieing of embeddment to reinforcement
B
Dimn.
100%
As per drg.& specn
As per drg.& specn
SR
√
B
_do_
100%
_do_
_do_
SR
√
B
_do_
100%
_do_
_do_
SR
√
B
_do_
100%
_do_
_do_
SR
√
Page 10 of 21
9
Pre - Cast concrete One sample of six cube per IS- 516, IS-456 50 m3 or part thereof
a) Crushing Strength
A
Physical
IS- 516, IS-456
SR/TR
b) Workmanship free from visual defects
B
_do_
100%
Specn
Specn
SR
c) Dimension of finish structure
B
Measureme nt
100%
IS-456, Specn
IS-456, Specn
SR
d) Load Test
A
Measureme nt
5%or as decided by APL site I/C
IS- 1199 & IS456
A minimum of three cubes √ shall be tested for 28 days compressive strength The precast units shall be free from defects like honeycombing, reinforcement exposure and should have good finish. All releavant test like workability , cube tests shall be carried out as per IS 456 , same as applicable to cast-in-situ concrete. Grade of concrete shall be as per speci/drg √
SR/TR
√
These test shall also be carried out in case of doubt regarding grade and quality of concrete.
IS- 1199 & IS456
SR/TR
√
According to mix design
IS-456, as IS-456, as decided by APL decided by APL site I/C site I/C
e) Workability
B
Physical
One Sample every 2(two)hrs. from mixing plant
f) Water cement ratio
B
Physical
Random
IS- 1199
IS- 1199
SR/TR
√
According to mix design
g) Cement content
B
Physical
At random at the time of batching
IS- 1199
IS- 1199
SR/TR
√
According to mix design
Page 11 of 21
10 Brick Masonary a) Test on Bricks i) Dimn. & colour ii) Compressive Strength,water absorption, warpage, efflorescence b)Test on Concrete Bricks
A
Visual & Measurmen t
As per IS standard
A
Physical
As per IS standard
IS- 1077
IS- 1077
Specn. & Is std. Specn. & Is std. IS-1077, ISIS-1077, IS3495(part- I to 3495(part- I to IV) IV)
SR/TR
√
SR/TR
√
SR/TR
√
Cement used in mortar shall confim to either IS 269 or IS 455. Sand shall confirm to IS 2116-1980
b) Test on Mortar i)Compressive Strength Consistency and water retentivity for each portion of wall plaster & ceiling
C
Test
Random
IS- 2250
B
Visual & Measurmen t
100%
Is-2212,IS1905 Tech.Specn.
IS- 2250
SR/TR
√
c) Masonry Construction i) Workmanship,verticality, and alignment
Efflorescence shall be checked at each source. Pre conditional of bricks shall be as per IS Std.
Page 12 of 21
IS-2212,IS- 1905 SR/Insp Tech.Specn. Report
√
11 Sheeting Work
i) Material
A
Review
100%
ii) Storage at site
B
Visual
100%
ii) Installation, alignment & workmenship iii) Check for level & slope iv)Proper installation of flashing v) Fixing including opening location vi) Fastener for sheeting work
i) where a materials is manufacured or fabricated as per spec & drg , separate QP will be application and contrator should submit to APL for approval. ii ) For Asper aluminum door and Asper applicable TR?TC applicable IS window, check for IS std.& for test √ std.& anodisation as per Tech,Specn. as per IS Tech,Specn. applicable speci. iii) For aluminium cladding, grade of aluminimum to be checked iv) All test shall be carried out at manufactures work before Storage should be on desptch. raised plaform, profile sheet, if used, will be kept covered in wheather proof storage to avoid any exposur to water. Manufacturer's Manufacturer's Principele of first in and recommendatio recommendatio SR first out shall be applied n n for erection the sheet. The sheet packet shall be stacked neatly clear off the ground at an angle to the ground to drain moisture. As per Specn As per Specn SR √
B
Visual & Measurmen t _do_
B
_do_
_do_
_do_
_do_
SR
B
_do_
_do_
_do_
_do_
SR
B
_do_
_do_
_do_
_do_
SR
B
100% Visual & Measurment
_do_
_do_
SR
Page 13 of 21
12 12.1
Finishing Items Plastering Raw Material a)Fine Sand
i) General Quality
B
Visual
ii) Deleterious materials
B
Physical
_do_
IS- 2366,Is2116
iii) Grading of Sand
B
_do_
_do_
B
Review
_do_
B
i) Check finish surfece for defect like blistering, cracking & irregularity of surface texture
B
ii) Truness of finish plaster surface
B
b) Glavanised hexagonal wire Testing for all netting for plastering characterics asper code c) Plaster of Paris Final inspection
iii) Check thickness of plaster over brick
SR
√
IS- 2366,Is2116
SR
√
IS- 1542
IS- 1542
SR
√
100%
IS- 3150
IS- 3150
TC
√
Test
One sample per 50 m3 or part thereof
IS-2547, IS 1542,IS- 2333
IS-2547, IS 1542,IS- 2333
TR
√
Visual
Random
IS-1661
IS-1661
SR
√
Measureme nt
Random
Specn.
See remark
SR
Min. 18 mm thick for out side & 12 mm thick for inside surface of Min.thick
Finish plaster surface shall not show any deviation √ more than 4mm when checked with straingth edge of 2 m length
SR
√
motar should be 6 mm. Min.7 days curing time
SR
√
SR
√ √
B
_do_
_do_
_do_
B
_do_
_do_
_do_
B
_do_
_do_
_do_
i)Check for slope / levels
B
Measureme nt
100%
Drg.
Drg.
SR
ii) Chipping of floor prior to commencement of actual finishing work
C
Visual
100%
_do_
_do_
SR
iii) Curing of cement concrete floor
B
Measureme nt
100%
_do_
Min.7 days curing time
SR
√
iv) Tiles for finish floors
B
Review
100%
_do_
_do_
TC
√
iv) Chck thickness of plaster over concrete ceiling v) Curing of plaster surface 12.2 Flooring & Finishing work
Once per 100 m3 or part thereof or Tech Specn. IS - Tech Specn. IS change of 1905 SL 1905 SL source no.6,3.4 no.6,3.4 whichever is earlier
Page 14 of 21
No ponding of water on finished surface to be ensured
v) Polishing of tiled finish floor
B
Visual
100%
_do_
_do_
SR
√
a) PVC coated chain link mesh
B
Visual & Physical
Random per lot
Drg.
Drg.
TC
√
b) Welded wiremess
B
_do_
_do_
_do_
_do_
TC
√
c) Barbed wire
B
_do_
_do_
_do_
_do_
TC
√
i)Verticality & aligment
B
_do_
100%
_do_
_do_
SR
√
ii) Fixing of fencing
B
_do_
100%
_do_
_do_
SR
√
Fabrication & workmanship
B
100%
Drg.
Drg.
SR
i) Material
B
Random
Relevant IS
Relevant IS
TC
ii) Fixing & erection
B
Visual
_do_
_do_
_do_
SR
B
Visual
100%
As per drg. & specn.
As per drg. & specn.
SR
12.3 Fencing & Gates i)Materials
ii) Final inspection
iii) M.S. Gate 12.4 False Ceiling
13
Painting of i)Check painting of Concrete Surface underground & super surface
Visual & Physical Review of TC
Page 15 of 21
√
√
All supports, hangers, accossories shall be as per speci / approved manufactures's recommendation
14
Special item i)Bitumastic flooring ii) Earthing Materials
B
Visual + TC
100%
As per drg. & specn.
As per drg. & specn.
SR
√
a) Check weld size & length
B
Measureme nt
100%
Specn.
Specn.
SR
√
b)Dyc. Penetrant Test
A
NDT
100%
_do_
_do_
TC
√
c) Earth Test
A
Testing
Weld 100%
_do_
_do_
SR
√
A
TC
Random per lot
Applicable IS
Applicable IS
SR
√
Random
_do_
_do_
SR
√
a) Check bitumen grade
iii) Composite Aluminium Panel a) Material b) Installation 15
16
17
Painting of Structural Steel
Grouting of foundation
Rolling Shutter
a) Painting Material
A
A
Visual + Measurmen t Correlated TC for each batch
Random per lot
_do_
_do_
TC
√
SR
√
Random
Specn.
Surface shall be cleaned to near white metal surface (sa 2 1/2)
Correlated manufactures test certificate for each batch shall be submitted for review.
b) Surface preparation
B
Visual + Physical
c) Check thickness of paint after each coating
B
Measureme nt
100%
Drg. + Specn.
Specn.
SR
√
d) Check adhesion of paint
B
_do_
100%
_do_
Paint should not peel off
SR
√ carried not for high thickness
a) Grouting pressure
B
Physical
Random
Drg.
Drg.
SR
√
Manufacturer's specn.
Manufacturer's specn.
SR
√ √
b) Composion of grout
B
_do_
Each lot / batch
c) Compressive Strength
B
Test
_do_
specn.
specn.
SR
a) Material & accessories
B
Review TC Visual + Measurmen t Measureme nt
One / lot
Drg. + Specn.
Drg. + Specn.
TC
Random
_do_
_do_
SR
100%
_do_
_do_
SR
Visual
100%
_do_
_do_
SR
b) Dimensoin & workmanship c) Verticality & Allignment d) Performance of rolling shutter ( smooth operration)
B B B
Page 16 of 21
DFT shall be as per specification Adherim test should not be of coating
18
18.1
19
20
Door, Windows, i) Materials & Ventilators & Grill accessories
Fire Proof Door
IS- 2202(part- IS- 2202(part-II), II), IS-1038 IS-1038
B
Review TC
One per lot
SR/TC
√
ii) Check for dimn.
B
Physical
Random
Specn.
Specn.
SR
√
iii) Thickness of paint / anodized coating
B
_do_
_do_
Specn.
Specn.
SR
iv) Workmanship
B
Visual
B
Measureme nt
100%
_do_
_do_
SR
100%
Drg.
Drg.
SR
B
Visual
100%
Drg.
Drg.
SR
A
Review TC
One per lot
Drg. + Specn.
Drg. + Specn.
TC
√
B
Physical
100%
_do_
_do_
SR
√
B
Review TC
One per lot
IS- 14900, IS1081, IS-5437
IS- 14900, IS1081, IS-5437
TC
√
B
Visual
Random
Specn
Specn
SR
√
B
Review TC
One per lot
Specn
Specn
TC
√
B
Review TC
One per lot
Specn.
Specn.
TC
√
b) Surface preparation
B
Physical
Random
_do_
_do_
SR
c) Workmanship
B
_do_
100%
_do_
_do_
SR
d) Thickness of elastomeric membrane
B
Measureme nt
Random
_do_
_do_
SR
v) Verticality & alignment vi) Check smooth operation of door & shutter i) Check material ( steel, insulation & fire retardent painting etc.)
ii) Check for provision of latches, horizontal full width level & openable on pressing door stopper a) Materials & Glass & Glazing accessories work b) Fixing of glasses and glazing Roof water proofing a) Material & accessories i) High solid cement liquid elastomeric water proofing membrane ii) Bitumen membrane iii) Polymerised mastic iv) Sealing compound v) Galv. Chicken wire mesh vi) Chequered cement tiles
Page 17 of 21
Fire Proof door to be inspected and tested at manufactures's work before despatch.
21
e) Testing for dampness below elastomeric membrance
B
Physical
Random
_do_
_do_
SR
All elastomeric membrane shall be fully dreid to perform testing with water ponds created on min 5% of area of √ nominal size 6 m x 6 m for a height of 25 to 30 mm at critical location fo r a period of 48 hours.
f) Sealing of Joints of panels of wearing course
B
_do_
_do_
_do_
_do_
SR
√
a) Materials & accessories
B
Review TC
One per lot
TC
√
b) Surface finish, freedom from crack and other defects
B
Visual
100%
_do_
_do_
SR
c) Dimension and construction
B
Measureme nt
10% subject to min.of 3 nos.for each type of items
_do_
_do_
SR
Water supply, drainage and sanitation
21.1 Vitreous China sanitary items
Page 18 of 21
Is-2566 & Tech Is-2566 & Tech specn. specn.
Manufactures's TC shall be correlated with cousignment received
Tolerance limit as per relevant part of IS 2566
21.2 Flushing System
21.3 MISC. Sanitary & bathroom fittings
21.4 G.I.,C.I., P.V.C Pipes and fitting
21.5 Concrete and stone ware pipes
a) Materials / component including valve
B
Review TC
100%
IS- 2326, IS_ 174 & specn.
IS- 2326, IS_ 174 & specn.
TC
b) Surface finish, freedom from crack and other defects
B
Visual
100%
Relevant IS
Relevant IS
SR
c) Dimn. & construction
B
Physical
10% subject to min.of 3 nos.for each type of items
Relevant IS
Relevant IS
SR
B
Review TC
100%
_do_
_do_
TC
B
Visual
a) Materials & accessories b) Surface finish, freedom from crack and other defect c) Dimn. & construction
B
100% _do_ _do_ 10% subject to min.of 3 Physical _do_ _do_ nos.for each type of items Relevant IS Drg. Relevant IS Drg. Review TC 100% Specn. Specn.
a) Materials / component including valve
B
b) Surface finish, freedom from crack and other defect
B
Visual
10% subject to min.of 3 nos.for each type
c) Dimn. & construction
B
Measureme nt
_do_
B
Review TC
100%
B
Visual
Random
a) Materials & accessories b) Surface finish, freedom from crack and other defect
_do_
_do_
Toleranceas per IS- 1729, IS1536, IS1230 IS- 458, IS- 651, IS- 458, IS- 651, Tech specn Tech specn _do_
Relevant IS
Relevant IS
Measureme IS- 458, IS- 651, IS- 458, IS- 651, 5% of each lot nt Tech specn Tech specn
√
Manufactures's TC shall be correlated with the consigniment received
√
Correlated manufactures's TC shall be reviewed
√
Manufactures's test certificate with the cousignment shall be reviewed .
√
Correlated manufactures's test certificate with the consigment shall be reviewed
Tolerance limit as per cl. 14.3 id IS 2065
SR SR TC
SR
SR TC SR
c) Dimn. & construction
B
SR
a) Water pipe & fittings
i)Hydraulic pressure test
A
Physical
100%
IS- 2065
IS- 2065
SR/log book
√
b) Drain & sewer pipes above ground level
i)Smoke test
A
_do_
100%
Relevant IS
Relevant IS
_do_
√
ii) Water test
A
_do_
100%
_do_
_do_
SR
√
iii) Straightness test
B
_do_
100%
_do_
_do_
SR
√
i) Water test
A
_do_
100%
_do_
_do_
SR
√
ii)Smoke test
A
_do_
100%
_do_
_do_
SR
√
21.6 After installation of pipes
c) Drain & sewer pipe below ground level
Page 19 of 21
Smoke test and straightness tests are to be carried out on the pipe before burial.
pipe below ground level
d) Overhead Tank
iii) Straightness test
B
_do_
100%
_do_
_do_
SR
√
i)Surface finish
B
Visual
100%
IS & drg.
IS & drg.
SR
ii) Dimn. & construction
B
Physical
100%
_do_
_do_
SR
iii) Water tightness
A
Physical
100%
_do_
_do_
TR
√
a) Bitumen impregnated board
A
Review TC
One per lot
IS - 1838
IS - 1838
TC
√
b) PVC water stop
A
_do_
One per lot
IS - 12200
IS - 12200
TC
√
A
_do_
One per lot
IS - 1834
IS - 1834
TC
√
A
_do_
One per lot
IS - 1835
IS - 1835
TC
√
A
_do_
One per lot
IS - 4671
IS - 4671
TC
√
B
Visual
Random
Specn.
Specn.
SR
22.0 Joint of Concrete 22.1 Materials
c) Bitumen sealing compound d)Two part poly sulphite sealant e) Expanded polystyrene board 22.2 Installation & fixing
-
Page 20 of 21
23.0 Insulation 23.1 i) Materials
23.2 Installation & fixing
a) Mineral wool
B
b) Polysocyanurate / rigid phenolic foam slab
B
a) Mineral wool
B
b) Polysocyanurate / rigid phenolic foam slab
B
Review TC _do_ Visual & Physical Visual & Physical
100%
IS- 8183
IS- 8183
TC
√
One per lot
IS- 12436 , IS 13204
IS- 12436 , IS 13204
TC
√
Random
Drg. & Specn.
Drg. & Specn.
SR
√
Random
_do_
_do_
SR
√
Name of Contractor : GANNON DUNKERLEY & CO.LTD.
LEGEND : 1). D* :RECORDS IDENTIFIED WITH ' TICK '(√ ) SHALL ESSENTIALLY BE INCLUDED BY SUPPLIER IN QA DOCUMENTATION. 2) LEGEND TO BE USED FOR CLASS OF CHECK # : A, B & C · · ·
Name of Client : Shandong TIEJUN Electric Power Engineering Co. Ltd.
A' shall be witnessed by AG's FQA and Executing Dept., surveillance by Head AG's (FQA) Name of Owner : M/s. Adani Power Limited B' shall be witnessed by AG's Executing Dept and Surveillance by AG's FQA C' shall be witnessed by Contractor's FQA and AG's Executing Dept and Surveillance by AG's Authorized Engineer For GDC :
A' , 'B ' & C shall be AG's CHP stage . CHP : " Customer Hold Point" to be witnessed and work shall not proceeded till it is witnessed and cleared. AG : ADANI GROUP, FQA : FIELD QUALITY ASSURANCE , TC : Manufacturer's Test Certificate, SR : Site Register TR : Test Report. LB : Log Book
Page 21 of 21