ADANI POWER LTD 7TH Floor,Sambhav Building judges Bungalow road Bodakdev, Ahmedabad380015
STANDARD FILELD QUALITY PLAN ITEM: CIVIL WORK SYSTEM:__________________
SL.NO
ACTIVITY AND OPERATION
CHARACTERISTICS
1
2
3
SUB-
CLASS OF CHECK # 4
QP NO : APL/SFQP/001 REV.NO.: 0 DATE:10.03.08 13 OF 37
TO BE USED FOR: PROJECT : 5 x660MW MUNDRA PACKAGE : PAGE CONTRACTNO.: EPC-CONTRACTOR:SEPCOIII
TYPE OF CHECK
QUANTUM OF CHECK
REFERENCE DOCUMENT
ACCEPTANCE NORMS
FORMAT OF RECORD
5
6
7
8
9
D*
same as Columnn 7
SR
√
REMARKS 10
1.00 EXCAVATION
1.10
Naturre of Soil/Rock
B
Visual+TC review
Random
As per contractor's scheme for excavaton/appd. drg.
1.20
Initial Ground Level & Foundation Layout
C
Measuremen t
100%
_do_
_do_
SR
√
1.30
Final Pit / bed Level
C/B
_do_
100% for C & Random for B
_do_
_do_
SR
√
Random by AG
2.00 FILL MATERIALS ( For borrowed fill materials as per site requirement
2.10
Grain Size Analysis
B
Physical
Note 1
IS 2720(PT IV)
IS 2720(PT IV)
SR/TR
√
2.20
Liquid and Plastic Limit
B
_do_
Note 1
IS 2720(PT V)
IS 2720(PT V)
SR/TR
√
2.30
Shrinkage Limit
B
_do_
Note 2
IS 2720(PT VI)
IS 2720(PT VI)
SR/TR
√
2.40
Free Swell Index
B
_do_
Note 2
IS 2720(PT XI)
IS 2720(PT XI)
SR/TR
√
2.50
Chemical Analysis
2.60 2.70
Degree of Compaction fill
Note 1 :- Minimum 2 samples in every 2000 cum of each type and source of fill materials
Note 2 : Min. 2 samples in every 5000 cum of each type and source of fill material.
√
a) Organic Matter
B
_do_
Note 3
IS 2720(PT XXII) IS 2720(PT XXII)
b)Calcium Corbonate
B
_do_
Note 3
IS 2720(PT XXIII)
c) PH Value d) Total Soluble Sulphate Moisture Content of fill before compaction
B
_do_
Note 3
B
_do_
Note 3
IS 2720(PT XXVI) IS 2720(PT XXVII)
IS 2720(PT XXIII) IS 2720(PT XXVI) IS 2720(PT XXVII)
B
_do_
Note 1
IS 2720(PT II)
IS 2720(PT II)
SR/TR
√
SR/TR
√
SR/TR
√
SR/TR
√
SR/TR
√
Note 3 :- One in every 5000 cum for each type and source of fill materials.
a) Dry density by Core Cutter method or Dry density by sand displacement method or Relative Density Index
2.80 3.00
CAST-IN -SITU CONCRETE
3.10
Materials
3.1.1
A/B
SR/TR
Note 4 :i) For Foundation backfilling one for every 10 founations for each √ compacted layer. Ii) For area filling one in every 1000 sqm. Area for each compacted layer.
ASTM-D1588
SR/TR
√
IS 2720 ( Pt IS 2720 ( Pt XXIX) OR IS XXIX) OR IS 2720 (Pt XXVIII) 2720 (Pt XXVIII) OR IS 2720 (Pt OR IS 2720 (Pt XIV) XIV)
_do_
Note 4
ASTM-D1588
b) Dry Density by proctor needle penetraction
B
_do_
Random for each compactor layer
Sand
B
_do_
Random
IS 2720 & IS 383
IS 2720 & IS 383
SR/TR
√
a) Manufacture's TC as per I.S -8112 & I.S - 1489(PART- I)
A
Review
100%
IS 8112 Grade 43 IS-1489 (Part-I)
IS 8112 Grade 43 IS-1489 (Part-I)
TC
√
b) Storage of Cement
B
Visual
100%
IS - 4082
IS - 4082
SR
Cement to be stored on √ raised platfarm in a weather tight covered store.
c) Resting of Cement for compressive strenth & setting time, if stored more than 90 days in Contractor godown
A
Testing
One Sample per batch
TC
√
Cement
As per relevant As per relevant IS code IS code
3.1.2 a) Moisture Content
B
Physical
b) Praticle Size & Shape ( sieve Analysis, determination of material finer than 75 Micron, flakines index, elongation index, angularty number
B
_do_
Note - 5
IS - 2386(PartIII) IS-456 & IS -383
IS - 2386(PartIII) IS-456 & IS -383
SR / TR
Manufacturers's TC for each batch to be reviewed
Note 5 :- Once for each coarse aggregate stock √ when there is rain has to be done everyday before start of concreting.
While These test will be carried establishing SR / out while establishing design mix & IS - 2386(Part- I) IS - 2386(PartLab.repor √ design mix and results shall once per 100 & IS -383 I) & IS -383 t be intimated to site for Cum or part review and approved there of sourse
c) Deleterious material & Organic impurities ( determination of clay lumps, fine silt, fine dust, lightweight pieces, soft praticle & estimation organic impurities)
d)Specific gravity, bulk density, voids, water absorption
B
B
_do_
Physical
f) Alkali aggregate reactivity test
g) Petrographic examination of aggregate
h) Crushing value, abrasion value, impact value
i) Repeated Temp. Cycle Test of aggregate
3.1.3
a) Bulkage, Moisture Content, & Motar making properties Fine Aggregate
B
B
A
B
B
B
While establishing design mix & once for each source & for every change of source
IS - 2386(Part- SR / TR & II) IS-456 Lab.repor √ & IS -383 t
These test will be carried IS - 2386(Part- IS - 2386(Part- SR / TR & out while establishing III) IS-456 III) IS-456 Lab.repor √ design mix and results shall & IS -383 & IS -383 t be intimated to site for review and approved
_do_
Once per IS - 2386(Part- IS - 2386(Part- SR / TR & source & every IV) IS-456 IV) IS-456 Lab.repor √ change of & IS -383 & IS -383 t source
Expeert opinion regarding suitability of aggreagates shall be obtained by contractor from the specialist agency like NCBM,CSMRS etc.
_do_
IS - 2386(Part- IS - 2386(PartSR / TR & VI) ASTM- VI) ASTMLab.repor √ C1260 & IS C1260 & IS t -383 -383
The result should be supported by petrographic examination
Coarse Aggregate e) Soundness
Once per IS - 2386(Partsource & every II) IS-456 change of & IS -383 source
_do_
_do_
_do_
_do_
_do_
_do_
Petrographic report shall be IS - 2386(Part- IS - 2386 SR / TR & supported by the analysis & VIII) & IS (Part- VIII) & Lab.repor √ recommendation of -383 IS -383 t specialist such as NCBM & CSMRS etc.
IS - 2386 & IS -383
The report shall be SR / TR & supported by the analysis & Lab.repor √ recommendation of t specialist such as NCBM & CSMRS etc.
No residual expansion
√
Applicable for aggregate used in TG,BFP,FAN & Mill foundations, Contrator shall be obtain opinion of specialist agency for suitability of aggregate
IS - 2386(Part- IS - 2386(PartEveryday III), IS- III), IS- SR / TR & before start of 2386(Part-VI) Lab.repor √ 2386(Part-VI) work & IS & IS t -383 -383
Volume of sand & weight of water shall be adjusted as per moisture content
Once per source & every IS - 2386 & IS change of -383 source
_do_
-
TR
Fine Aggregate
b)All other tests similar to coarse aggregate mentioned at sl.no.3.1.2 ( c ), (d) to (g)
B
_do_
Once per source & every change of source
-
-
SR / TR & Lab.repor √ t
3.1.4
Water
3.1.5
a) Test for acidity and alkalinity by neutralization of water using indicator and chloride content
B
Testing
Quaterly for each source
IS-3025 (Part-22 & 23), IS - 456
IS - 456
TR
100 ml of water should not require more than 5ml 0.02 N NaOH ( using √ phenolphathalinc Indicator ) and 25ml of 0.02 N sulphuric acid.
b) Test for as certaining limit of solid
B
_do_
_do_
IS-3025 (Part18), IS - 456
IS-3025 (Part18), IS - 456
TR
√
c) Test for PH Value
B
_do_
_do_
IS-3025 (Part-II), IS-3025 (PartIS - 456 II), IS - 456
TR
√
d) Check for initial set time used water & distilled water
B
_do_
_do_
IS - 456
IS - 456
TR
√
e) Check for concrete compressive strenth with used water and water and distilled water
A
_do_
Refer remark
IS - 456
IS - 456
TR
Physical
One Sample every 2(two)hrs. for every mixing plant
IS - 456 ,IS1199
IS - 456, IS1199
a) Workablity ( slump)
CONCRETE
B
b) Trial Mix (Cubes compressive strength) Mix design
A
Physical
c ) Crushing strngth( work test cube)
A
_do_
d) Water cement ratio
B
Physical
Initial Set time for used water should not be less than with distilled water. These checks are to be carried out only if the result of test mentioned at √ 3.1.4a,b,c are not acceptable.
SR / TR & Lab.repor √ t
Slump test for medium high workability & compaction factor test for medium and low workability
For trial mix min 6 cubes for Min. 4 trial Mix each mix out of which 3 with & without cubes shall be tested at 7 IS- 456, IS- 516, IS- 456, IS- 516, admixture with days and remaining 3 cubes ISISSR/TR √ fly ash for each shall be tested for 28 days 10262 10262 grade of comp. strength.Mix design concrete test shall be carried out at One set of 6 NCBM or CSMRS etc. cubes per 100 3 m or part 3 cubes shall be tested at 7 there of for days & remaining 3 cubes IS- 456, IS- 516 IS- 456, IS- 516 SR/TR √ each grade of shall be tested for 28 days concrete per comp. strenght. shift whichever is earlier At random at SR / TR & As per printed report from IS 1199 & appd IS 1199 & appd the time of Lab.repor √ computerised Batching design mix design mix batching t plant for each of concrete.
4.00
e) Cement content
B
_do_
_do_
f) Admixture for concrete
B
Testing review TC
100%
g) Dimension and visual examination of finished structure
B
Visual & Measurment
100%
a) Mix of concrete ( Calibration of concrete mixer)
b) Calibration of Batching Plant
c) Handling and tramportation
_do_
_do_
IS - 9103, ASTM IS - 9103, ASTM - C- 494 & appd - C- 494 & appd design mix design mix
IS- 456 & drg.
IS- 456 & drg.
A
_do_
100%
IS - 457
IS - 459
A
Measuremen t
100%
-
-
C
Physical
100%
As per construction / erection methodology
As per construction / erection methodology
SR / TR & Lab.repor √ t TR
√
SR
√
_do_ Admixture Brand shall be approved by site.
Concrete mixture shall be Calibratio calibrated at time of n of √ starting & sequently once in mixer three months
_do_
√
To be calibrated at the time of starting & subsequently once in 3 months
SR
Free fall or drop shall be limited to 150 cm unless permitted. Concrete sholud be placed within 30 minutes of its removal from mixture. Construction methodology to be approved one weak prior to start of work
No concrete shall be placed until the place of deposit has been inspected & approved. The concrete shall be deposited in such a manner to maintain ,until completion of unit, a plastic horizantal surface throughout.
d) Placement of concrete
B
_do_
100%
_do_
_do_
SR
e) Temp. control of concrete for top deck of TG foundation
B
Physical
100%
-
Temp. 250 c Max.
SR
Concrete Conveying,Placing & Compaction √
Appropriate shall be taken to controll the concrete temp.
f) Check for placement
B
_do_
100%
-
As per appd.constructi on methodology
SR
g) Compaction
B
_do_
Random
-
Check for segregation as per IS- 456
SR
SR
h) Curing
B
_do_
_do_
-
Check period of curing as per IS 456
I) Cleanliness, provision of chute & arrangement for transprotation of concrente
C
Visual
100%
-
Before clearance for concreting
SR
j) Check for segregation
B
Physical
Random
-
Check period of curing as per IS 456
SR
a) Ultrasonic Test on top deck of TG foundation
A
UT
100%
IS- 13311
IS- 13311
If water accumulates at surface due to bleeding or other causes, concreting shall be stopped as far as of mix design.Accumulated water shall be removed by sponge. √
Exposed Concrete surface shall be protected against heating & drying atleast 72 hrs after placement. Curing compound may be used.
5.00
Test / Check on RCC Structure in Hardened condition
b) Core Test
A
c) Rebound Hammar Test
A
d) Dimensional check of finished structure
B
e) Water tightness Test of liquid retaining structure
A
Physical
As per site Engineer
IS - 456, IS- 516 IS - 456, IS- 516
UT report √
The grid shall be 300 mm c/c or as required by site engineer
TR
Accetably only if average equivalent cube strength of the core equal to 85%of cube strength of the grade √ of concrete specified for the corresponding age and no individual core has result less than 75% of cube strength.
_do_
-
-
SR
√
Measuremen t
100%
As per drg.
IS-456
SR/Insp Report
√
Test
100%
IS - 3370
IS - 3370
SR/Insp Report
√
6.0
Reinforcement steel
a) Mechanical and Chemical Properties
A
TC Review
100%
IS-1786, IS-432, IS-1786, IS-432, ISIS1566 1566
b) Cutting tolerance
B
Measuremen t
Random
IS-1852, IS-432, IS-1852, IS-432, ISIS1786 1786
c) Freedom from crack from crack & surface flow, lamination
B
Visual
Random
_do_
_do_
SR
B
Review
100%
Drawing
Drawing
SR
B
Review & Measuremen t
100%
_do_
Drawing
SR
B
Visual & Measurment
100%
_do_
Drawing
SR
B
_do_
100%
_do_
_do_
SR
√
e) Lapping of bars
B
Measuremen t
100%
√
B
Visual
Random
IS - 456 Bar bending schedule Drawing & bar bending schedule
SR
f) Check all joint crossing
IS - 456 Bar bending schedule Drawing & bar bending schedule
SR
√
a)Material and accessories
B
Visual
Once
As per relevant As per relevant IS code IS code
SR
i) Soundness of staging, shuttering & scaffolding
B
Visual
Once
IS-3696, ISIS-3696, IS4014, IS-4990 4014, IS-4990
SR
ii) Plywood for concrete shuttering work
B
Visual
Once
IS-4990,ISIS-4990,IS1734(Part-I to 1734(Part-I to II) II)
SR
iii) Hoisting of personal & material
B
Visual
Once
Asper supplier / Asper supplier / manufacturer manufacturer recommendatio recommendatio n n
SR
Fortnightly
IS-14687,ISIS-14687,IS3696 & As per 3696 & As per National safety National safety council council
SR
√
SR/TR
√
a) Check for bar bending schedule with necessary laps, specer & chairs b) Check for cover specing bars
6.1
c) Check for bending of bars
Placement of Reinforcement Steel d) Check for space & chair after reinforcement cage is put inside the formwork
7.0
Staging & Forms
b) Connection between indivisual scaffolding unit & safe slendreness ratio two indipendent safety measure against collapse c) Concrete Strength during climbing process
B
Visual
B
Testing
For each lift of As per provision As per provision shuttering & tolerances & tolerances
√
TC for each batch shall be reviewed. Report test may be carried out as per requirement of site engineer.
TC
SR/LB
Tolerance as per specification To be checked at site. Steel materials to be stored properly to prevent rusting.
Crossing of the bars are to be tied up properly with right gauge annealed wire
Manufactures will supply technical data ( Type of adhesive used, type of preservative used density of plywood etc.
8.0
d) Alignment / shape
B
_do_
As per drg.
As per drg.
SR/TR
√
e) Check form's seam mark & water tightness
Measuremen t
B
Physical
Random
As per drg.& specn
As per drg.& specn
SR/TR
√
a) Position and level of embeded parts
B
Dimn.
100%
As per drg.& specn
As per drg.& specn
SR
√
B
_do_
100%
_do_
_do_
SR
√
B
_do_
100%
_do_
_do_
SR
√
d)Welding/ tieing of embeddment to reinforcement
B
_do_
100%
_do_
_do_
SR
√
a) Crushing Strength
A
Physical
IS- 516, IS-456
SR/TR
√
b)Position, depth, & size Embedded Part of bolt hole ( including laying of c) Location, verticality rails & anchor of pipe sleeve/ opening fasteners) of bolt hole
9.0
One sample of six cube per 50 IS- 516, IS-456 m3 or part thereof
b) Workmanship free from visual defects
B
_do_
100%
Specn
Specn
SR
c) Dimension of finish structure
B
Measuremen t
100%
IS-456, Specn
IS-456, Specn
SR
A
5%or as IS-456, as IS-456, as Measuremen decided by APL decided by APL decided by APL t site I/C site I/C site I/C
Pre - Cast concrete d) Load Test
e) Workability
B
Physical
One Sample every 2(two)hrs. from mixing plant
f) Water cement ratio
B
Physical
Random
A minimum of three cubes shall be tested for 28 days compressive strength The precast units shall be free from defects like honeycombing, reinforcement exposure and should have good finish. All releavant test like workability , cube tests shall be carried out as per IS 456 , same as applicable to cast-in-situ concrete. Grade of concrete shall be as per speci/drg
√
SR/TR
These test shall also be carried out in case of doubt √ regarding grade and quality of concrete.
IS- 1199 & IS456
IS- 1199 & IS456
SR/TR
√
According to mix design
IS- 1199
IS- 1199
SR/TR
√
According to mix design
g) Cement content 10.0
B
Physical
At random at the time of batching
IS- 1199
IS- 1199
a) Test on Bricks i) Dimn. & colour ii) Compressive Strength,water absorption, warpage, efflorescence b)Test on Concrete Bricks Brick Masonary
A A
Visual & Measurment
As per IS standard
Physical
As per IS standard
IS- 1077 IS- 1077 Specn. & Is std. Specn. & Is std. IS-1077, ISIS-1077, IS3495(part- I to 3495(part- I to IV) IV)
SR/TR
√
SR/TR
√
SR/TR
√
SR/TR
Efflorescence shall be checked at each source. Pre √ conditional of bricks shall be as per IS Std. Cement used in mortar shall confim to either IS 269 or IS 455. Sand shall confirm to IS 2116-1980
b) Test on Mortar i)Compressive Strength Consistency and water retentivity for each portion of wall plaster & ceiling
According to mix design
C
Test
Random
IS- 2250
IS- 2250
SR/TR
√
B
Visual & Measurment
100%
Is-2212,IS- 1905 Tech.Specn.
IS-2212,IS1905 Tech.Specn.
SR/Insp Report
√
c) Masonry Construction i) Workmanship,verticality , and alignment 11.0
i) Material
Sheeting Work
A
Review
100%
Asper applicable IS std.& Tech,Specn.
Asper applicable IS std.& Tech,Specn.
i) where a materials is manufacured or fabricated as per spec & drg , separate QP will be application and contrator should submit to APL for approval. ii ) For TR?TC for aluminum door and window, test as √ check for anodisation as per per IS applicable speci. iii) For aluminium cladding, grade of aluminimum to be checked iv) All test shall be carried out at manufactures work before desptch.
Storage should be on raised plaform, profile sheet, if used, will be kept covered in wheather proof storage to avoid any exposur to water. Principele of first in and first out shall be applied for erection the sheet. The sheet packet shall be stacked neatly clear off the ground at an angle to the ground to drain moisture.
Sheeting Work ii) Storage at site
ii) Installation, alignment & workmenship iii) Check for level & slope iv)Proper installation of flashing v) Fixing including opening location vi) Fastener for sheeting work 22
Finishing Items
22.1
Plastering Raw Material a)Fine Sand
b) Glavanised hexagonal wire netting for plastering
Visual
100%
B
Visual & Measurment
100%
As per Specn
As per Specn
SR
B
_do_
Visual & Measurment
_do_
_do_
SR
B
_do_
_do_
_do_
_do_
SR
B
_do_
_do_
_do_
_do_
SR
B
_do_
_do_
_do_
_do_
SR
SR
√
219.65
Once per 100 m3 or part thereof or Tech Specn. IS - Tech Specn. IS change of 1905 SL 1905 SL source no.6,3.4 no.6,3.4 whichever is earlier
i) General Quality
B
Visual
SR
√
ii) Deleterious materials
B
Physical
_do_
IS- 2366,Is2116
IS- 2366,Is2116
SR
√
iii) Grading of Sand
B
_do_
_do_
IS- 1542
IS- 1542
SR
√
Testing for all characterics asper code
B
Review
100%
IS- 3150
IS- 3150
TC
√
_do_
B
Test
One sample per 50 m3 or part thereof
IS-2547, IS 1542,IS- 2333
IS-2547, IS 1542,IS- 2333
TR
√
i) Check finish surfece for defect like blistering, cracking & irregularity of surface texture
B
Visual
Random
IS-1661
IS-1661
SR
√
c) Plaster of Paris
Final inspection
Manufacturer's Manufacturer's recommendatio recommendatio n n
B
1254
ii) Truness of finish plaster surface
iii) Check thickness of plaster over brick
ii) Final inspection
iii) M.S. Gate
24
Specn.
See remark
SR
Min. 18 mm thick for out side & 12 mm thick for inside surface of Min.thick
SR
√
motar should be 6 mm. Min.7 days curing time
SR
√
SR
√ √
_do_
_do_
B
_do_
_do_
_do_
B
_do_
_do_
_do_
B
Measuremen t
100%
Drg.
Drg.
SR
ii) Chipping of floor prior to commencement of actual finishing work
C
Visual
100%
_do_
_do_
SR
iii) Curing of cement concrete floor
B
Measuremen t
100%
_do_
Min.7 days curing time
SR
√
iv) Tiles for finish floors
B
Review
100%
_do_
_do_
TC
√
v) Polishing of tiled finish floor
B
Visual
100%
_do_
_do_
SR
√
a) PVC coated chain link mesh
B
Visual & Physical
Random per lot
Drg.
Drg.
TC
√
b) Welded wiremess
B
_do_
_do_
_do_
_do_
TC
√
c) Barbed wire
B
_do_
_do_
_do_
_do_
TC
√
i)Verticality & aligment
B
_do_
100%
_do_
_do_
SR
√
ii) Fixing of fencing
B
_do_
100%
_do_
_do_
SR
√
100%
Drg.
Drg.
SR
Random
Relevant IS
Relevant IS
TC
No ponding of water on finished surface to be ensured
Fencing & Gates i)Materials
23
Random
_do_
22.2 Flooring & Finishing work i)Check for slope / levels
22.4
Measuremen t
B
iv) Chck thickness of plaster over concrete ceiling v) Curing of plaster surface
22.3
B
Finish plaster surface shall not show any deviation √ more than 4mm when checked with straingth edge of 2 m length
False Ceiling
Fabrication & workmanship
B
i) Material
B
ii) Fixing & erection
B
Visual
_do_
_do_
_do_
SR
B
Visual
100%
As per drg. & specn.
As per drg. & specn.
SR
Painting of Concrete i)Check painting of Surface underground & super surface Special item
Visual & Physical Review of TC
√
√
All supports, hangers, accossories shall be as per speci / approved manufactures's recommendation
24 i)Bitumastic flooring ii) Earthing Materials
iii) Composite Aluminium Panel
a) Check bitumen grade
B
Visual + TC
100%
As per drg. & specn.
As per drg. & specn.
SR
√
a) Check weld size & length
B
Measuremen t
100%
Specn.
Specn.
SR
√
b)Dyc. Penetrant Test
A
NDT
100%
_do_
_do_
TC
√
c) Earth Test
A
Testing
Weld 100%
_do_
_do_
SR
√
a) Material
A
TC
Random per lot
Applicable IS
Applicable IS
SR
√
A
Visual + Measurment
Random
_do_
_do_
SR
√
A
Correlated TC for each Random per lot batch
b) Installation 25
Painting of Structural Steel
a) Painting Material
27
28
Rolling Shutter
Door, Windows, Ventilators & Grill
TC
SR
√
B
Visual + Physical
Random
Specn.
B
Measuremen t
100%
Drg. + Specn.
Specn.
SR
√
B
_do_
100%
_do_
Paint should not peel off
SR
√
a) Grouting pressure
B
Physical
Random
Drg.
Drg.
SR
√
b) Composion of grout
B
_do_
Each lot / batch
Manufacturer's specn.
Manufacturer's specn.
SR
√
c) Compressive Strength
B
Test
_do_
specn.
specn.
SR
√
B
Review TC
One / lot
Drg. + Specn.
Drg. + Specn.
TC
Random
_do_
_do_
SR
100%
_do_
_do_
SR
_do_
_do_
SR
c) Check thickness of paint after each coating d) Check adhesion of paint Grouting of foundation
_do_ Surface shall be cleaned to near white metal surface (sa 2 1/2)
b) Surface preparation
26
_do_
Correlated manufactures test certificate for each √ batch shall be submitted for review.
a) Material & accessories b) Dimensoin & workmanship c) Verticality & Allignment d) Performance of rolling shutter ( smooth operration) i) Materials & accessories
B B
Visual + Measurment Measuremen t
B
Visual
100%
B
Review TC
One per lot
ii) Check for dimn.
B
Physical
Random
Specn.
iii) Thickness of paint / anodized coating
B
_do_
_do_
iv) Workmanship
B
Visual
B B
v) Verticality & alignment vi) Check smooth operation of door & shutter
IS- 2202(part-II), IS- 2202(partIS-1038 II), IS-1038
SR/TC
√
Specn.
SR
√
Specn.
Specn.
SR
100%
_do_
_do_
SR
Measuremen t
100%
Drg.
Drg.
SR
Visual
100%
Drg.
Drg.
SR
DFT shall be as per specification
Adherim test should not be carried not for high thickness of coating
28.1
29
Fire Proof Door
Glass & Glazing work
30
i) Check material ( steel, insulation & fire retardent painting etc.) ii) Check for provision of latches, horizontal full width level & openable on pressing door stopper a) Materials & accessories b) Fixing of glasses and glazing a) Material & accessories i) High solid cement liquid elastomeric water proofing membrane
A
Review TC
One per lot
Drg. + Specn.
Drg. + Specn.
TC
√
B
Physical
100%
_do_
_do_
SR
√
B
Review TC
One per lot
IS- 14900, IS1081, IS-5437
IS- 14900, IS1081, IS-5437
TC
√
B
Visual
Random
Specn
Specn
SR
√
B
Review TC
One per lot
Specn
Specn
TC
√
B
Review TC
One per lot
Specn.
Specn.
TC
√
B
Physical
Random
_do_
_do_
SR
c) Workmanship
B
_do_
100%
_do_
_do_
SR
d) Thickness of elastomeric membrane
B
Measuremen t
Random
_do_
_do_
SR
Fire Proof door to be inspected and tested at manufactures's work before despatch.
ii) Bitumen membrane iii) Polymerised mastic iv) Sealing compound v) Galv. Chicken wire mesh vi) Chequered cement tiles Roof water proofing b) Surface preparation
31
Water supply, drainage and sanitation
31.1
Vitreous China sanitary items
e) Testing for dampness below elastomeric membrance
B
Physical
Random
_do_
_do_
SR
f) Sealing of Joints of panels of wearing course
All elastomeric membrane shall be fully dreid to perform testing with water ponds created on min 5% of area of √ nominal size 6 m x 6 m for a height of 25 to 30 mm at critical location fo r a period of 48 hours.
B
_do_
_do_
_do_
_do_
SR
√
B
Review TC
One per lot
TC
√
B
Visual
100%
a) Materials & accessories b) Surface finish, freedom from crack and other defects
Is-2566 & Tech Is-2566 & Tech specn. specn. _do_
_do_
SR
Manufactures's TC shall be correlated with cousignment received
c) Dimension and construction 31.2
Flushing System
a) Materials / component including valve b) Surface finish, freedom from crack and other defects c) Dimn. & construction
a) Materials & accessories b) Surface finish, freedom from crack and other defect c) Dimn. & construction a) Materials / 31.4 G.I.,C.I., P.V.C Pipes component including and fitting valve 31.3
31.5
31.6
MISC. Sanitary & bathroom fittings
B
Measuremen t
10% subject to min.of 3 nos.for each type of items
B
Review TC
100%
B
Visual
100%
Relevant IS
Relevant IS
SR
B
Physical
10% subject to min.of 3 nos.for each type of items
Relevant IS
Relevant IS
SR
B
Review TC
100%
_do_
_do_
TC
B
Visual
B
Physical
B
Review TC
B
Visual
10% subject to min.of 3 nos.for each type
c) Dimn. & construction
B
Measuremen t
_do_
B
Review TC
100%
Visual
Random
B B
_do_
IS- 2326, IS_ 174 IS- 2326, IS_ & specn. 174 & specn.
100% _do_ _do_ 10% subject to min.of 3 _do_ _do_ nos.for each type of items Relevant IS Drg. Relevant IS Drg. 100% Specn. Specn.
b) Surface finish, freedom from crack and other defect
Concrete and stone a) Materials & ware pipes accessories b) Surface finish, freedom from crack and other defect c) Dimn. & construction
_do_
_do_
_do_
Toleranceas per IS- 1729, IS1536, IS1230 IS- 458, IS- 651, IS- 458, IS- 651, Tech specn Tech specn _do_
Relevant IS
Relevant IS
Measuremen IS- 458, IS- 651, IS- 458, IS- 651, 5% of each lot t Tech specn Tech specn
Tolerance limit as per relevant part of IS 2566
SR
TC
√
Manufactures's TC shall be correlated with the consigniment received
√
Correlated manufactures's TC shall be reviewed
√
Manufactures's test certificate with the cousignment shall be reviewed .
SR SR TC
SR
SR TC
Correlated manufactures's test
√ certificate with the consigment shall be reviewed
SR SR
After installation of pipes a) Water pipe & fittings
A
Physical
100%
IS- 2065
IS- 2065
SR/log book
√
b) Drain & sewer pipes above ground i)Smoke test level
A
_do_
100%
Relevant IS
Relevant IS
_do_
√
ii) Water test
A
_do_
100%
_do_
_do_
SR
√
iii) Straightness test
B
_do_
100%
_do_
_do_
SR
√
A
_do_
100%
_do_
_do_
SR
√
i)Hydraulic pressure test
c) Drain & sewer i) Water test pipe below ground level
Tolerance limit as per cl. 14.3 id IS 2065
c) Drain & sewer pipe below ground level
d) Overhead Tank
32.0
Joint of Concrete
32.1
Materials
ii)Smoke test
A
_do_
100%
_do_
_do_
SR
√
iii) Straightness test
B
_do_
100%
_do_
_do_
SR
√
i)Surface finish
B
Visual
100%
IS & drg.
IS & drg.
SR
ii) Dimn. & construction
B
Physical
100%
_do_
_do_
SR
iii) Water tightness
A
Physical
100%
_do_
_do_
TR
√
a) Bitumen impregnated board
A
Review TC
One per lot
IS - 1838
IS - 1838
TC
√
b) PVC water stop
A
_do_
One per lot
IS - 12200
IS - 12200
TC
√
A
_do_
One per lot
IS - 1834
IS - 1834
TC
√
A
_do_
One per lot
IS - 1835
IS - 1835
TC
√
A
_do_
One per lot
IS - 4671
IS - 4671
TC
√
B
Visual
Random
Specn.
Specn.
SR
a) Mineral wool
B
Review TC
100%
IS- 8183
IS- 8183
TC
√
b) Polysocyanurate / rigid phenolic foam slab
B
_do_
One per lot
IS- 12436 , IS 13204
IS- 12436 , IS 13204
TC
√
a) Mineral wool
B
Random
Drg. & Specn.
Drg. & Specn.
SR
√
b) Polysocyanurate / rigid phenolic foam slab
B
Random
_do_
_do_
SR
√
c) Bitumen sealing compound d)Two part poly sulphite sealant e) Expanded polystyrene board 32.2
Installation & fixing
33.0
Insulation
33.1
i) Materials
33.2
Installation & fixing
-
Visual & Physical Visual & Physical
LEGEND :
Name of Contractor :SIMPLEX INFRASTRUCTURES LIMITED, Kolkata
1). D* : RECORDS INDENTIFIED WITH ' TICK ' (√ ) SHALL ESSENTIALLY BE INCLUDED BY SUPPLIER IN QA DOCUMENTATION. 2) LEGEND TO BE USED FOR CLASS OF CHECK # : A, B & C · · ·
Smoke test and straightness tests are to be carried out on the pipe before burial.
Name of Client : Shandong TIEJUN Electric Power Engineering Co. Ltd.
A' shall be witnessed by AG's FQA and Executing Dept., surveillance by Head AG's (FQA) Name of Owner : M/s. Adani Power Limited B' shall be witnessed by AG's Executing Dept and Surveillance by AG's FQA C' shall be witnessed by Contractor's FQA and AG's Executing Dept and Survelliance by AG's Authorized Engineer For Simplex :
A' , 'B ' & C shall be AG's CHP stage . CHP : " Customer Hold Point" to be witnessed and work shall not proceeded till it is witnessed and cleared. AG : ADANI GROUP, FQA : FIELD QUALITY ASSURANCE , TC : Manufactureer's Test Cetificate, SR : Site Register TR : Test Report. LB : Log Book
For Shandong : For Adani Power :
STANDARD FILELD QUALITY PLAN
ADANI POWER LTD 7TH Floor,Sambhav Building ITEM: CIVIL WORK judges Bungalow road Bodakdev, Ahmedabad-380015 SYSTEM:__________________
SL.NO
ACTIVITY AND OPERATION
CHARACTERISTICS
1
2
3
SUB-
CLASS OF CHECK # 4
QP NO : APL/SFQP/001 REV.NO.: 0 DATE:10.03.08 13 OF 37
TO BE USED FOR: PROJECT : 5 x660MW MUNDRA PACKAGE : PAGE CONTRACTNO.: EPC-CONTRACTOR:SEPCOIII
TYPE OF CHECK
QUANTUM OF CHECK
REFERENCE DOCUMENT
ACCEPTANCE NORMS
FORMAT OF RECORD
5
6
7
8
9
D*
Random
As per contractor's scheme for excavaton/appd. drg.
same as Columnn 7
SR
√
REMARKS 10
1.00 EXCAVATION
1.10
Naturre of Soil/Rock
B
Visual+TC review
1.20
Initial Ground Level & Foundation Layout
C
Measuremen t
100%
_do_
_do_
SR
√
1.30
Final Pit / bed Level
C/B
_do_
100% for C & Random for B
_do_
_do_
SR
√
Random by AG
IS 2720(PT IV)
IS 2720(PT IV)
SR/TR
√
Note 1 :- Minimum 2 samples in every 2000 cum of each type and source of fill materials
SR/TR
Note 4 :i) For Foundation backfilling one for every 10 founations for each √ compacted layer. Ii) For area filling one in every 1000 sqm. Area for each compacted layer.
2.00 FILL MATERIALS ( For borrowed fill materials as per site requirement
2.10
2.70
Grain Size Analysis
B
Physical
Note 1
Degree of Compaction fill
3.00
CAST-IN -SITU CONCRETE
3.10
Materials
3.1.1
a) Dry density by Core Cutter method or Dry density by sand displacement method or Relative Density Index
A/B
_do_
Note 4
a) Manufacture's TC as per I.S -8112 & I.S - 1489(PART- I)
A
Review
100%
IS 8112 Grade 43 IS-1489 (Part-I)
IS 8112 Grade 43 IS-1489 (Part-I)
TC
√
b) Storage of Cement
B
Visual
100%
IS - 4082
IS - 4082
SR
Cement to be stored on √ raised platfarm in a weather tight covered store.
c) Resting of Cement for compressive strenth & setting time, if stored more than 90 days in Contractor godown
A
Testing
One Sample per batch
TC
√
IS 2720 ( Pt IS 2720 ( Pt XXIX) OR IS XXIX) OR IS 2720 (Pt XXVIII) 2720 (Pt XXVIII) OR IS 2720 (Pt OR IS 2720 (Pt XIV) XIV)
Cement
As per relevant As per relevant IS code IS code
Manufacturers's TC for each batch to be reviewed
3.1.2 a) Moisture Content
B
Physical
b) Praticle Size & Shape ( sieve Analysis, determination of material finer than 75 Micron, c) Deleterious material & Organic impurities ( determination of clay lumps, fine silt, fine dust,
Note - 5
IS - 2386(PartIII) IS-456 & IS -383
IS - 2386(PartIII) IS-456 & IS -383
SR / TR
Note 5 :- Once for each coarse aggregate stock √ when there is rain has to be done everyday before start of concreting.
B
_do_
While establishing SR / design mix & IS - 2386(Part- I) IS - 2386(PartLab.repor √ once per 100 & IS -383 I) & IS -383 t Cum or part there of sourse
B
_do_
Once per IS - 2386(Partsource & every II) IS-456 change of & IS -383 source
These test will be carried out while establishing design mix and results shall be intimated to site for review and approved
IS - 2386(Part- SR / TR & II) IS-456 Lab.repor √ & IS -383 t
Coarse Aggregate
d)Specific gravity, bulk density, voids, water absorption
e) Soundness
3.1.5
B
Physical
IS - 2386(Part- IS - 2386(Part- SR / TR & III) IS-456 III) IS-456 Lab.repor √ & IS -383 & IS -383 t
_do_
Expeert opinion regarding suitability of aggreagates shall be obtained by contractor from the specialist agency like NCBM,CSMRS etc.
IS - 2386(Part- IS - 2386(PartSR / TR & VI) ASTM- VI) ASTMLab.repor √ C1260 & IS C1260 & IS t -383 -383
The result should be supported by petrographic examination
B
_do_
_do_
b)All other tests similar to coarse aggregate mentioned at sl.no.3.1.2 ( c ), (d)
B
_do_
Once per source & every change of source
-
-
SR / TR & Lab.repor √ t
Physical
One Sample every 2(two)hrs. for every mixing plant
IS - 456 ,IS1199
IS - 456, IS1199
SR / TR & Lab.repor √ t
b) Trial Mix (Cubes compressive strength) Mix design
B
A
These test will be carried out while establishing design mix and results shall be intimated to site for review and approved
Once per IS - 2386(Part- IS - 2386(Part- SR / TR & source & every IV) IS-456 IV) IS-456 Lab.repor √ change of & IS -383 & IS -383 t source
f) Alkali aggregate reactivity test
a) Workablity ( slump)
CONCRETE
B
While establishing design mix & once for each source & for every change of source
Physical
Min. 4 trial Mix with & without IS- 456, IS- 516, IS- 456, IS- 516, admixture with ISISSR/TR fly ash for each 10262 10262 grade of concrete
Slump test for medium high workability & compaction factor test for medium and low workability
For trial mix min 6 cubes for each mix out of which 3 cubes shall be tested at 7 days and remaining 3 cubes √ shall be tested for 28 days comp. strength.Mix design test shall be carried out at NCBM or CSMRS etc.
cubes per 100 m3 or part 3 cubes shall be tested at 7 there of for days & remaining 3 cubes IS- 456, IS- 516 IS- 456, IS- 516 SR/TR √ each grade of shall be tested for 28 days concrete per comp. strenght. shift whichever is earlier At random at SR / TR & As per printed report from IS 1199 & appd IS 1199 & appd the time of Lab.repor √ computerised Batching design mix design mix batching t plant for each of concrete.
c ) Crushing strngth( work test cube)
A
_do_
d) Water cement ratio
B
Physical
e) Cement content
B
_do_
_do_
f) Admixture for concrete
B
Testing review TC
100%
g) Dimension and visual examination of finished structure
B
Visual & Measurment
100%
IS- 456 & drg.
b) Calibration of Batching Plant
A
Measuremen t
100%
-
c) Handling and tramportation
C
Physical
100%
_do_
_do_
IS - 9103, ASTM IS - 9103, ASTM - C- 494 & appd - C- 494 & appd design mix design mix
As per construction / erection methodology
SR / TR & Lab.repor √ t TR
√
IS- 456 & drg.
SR
√
-
_do_
√
As per construction / erection methodology
_do_ Admixture Brand shall be approved by site.
To be calibrated at the time of starting & subsequently once in 3 months
SR
Free fall or drop shall be limited to 150 cm unless permitted. Concrete sholud be placed within 30 minutes of its removal from mixture. Construction methodology to be approved one weak prior to start of work
No concrete shall be placed until the place of deposit has been inspected & approved. The concrete shall be deposited in such a manner to maintain ,until completion of unit, a plastic horizantal surface throughout.
d) Placement of concrete
B
_do_
100%
_do_
_do_
SR
e) Temp. control of concrete for top deck of TG foundation
B
Physical
100%
-
Temp. 250 c Max.
SR
√
Appropriate shall be taken to controll the concrete temp.
f) Check for placement
B
_do_
100%
-
As per appd.constructi on methodology
SR
g) Compaction
B
_do_
Random
-
Check for segregation as per IS- 456
SR
SR
h) Curing
B
_do_
_do_
-
Check period of curing as per IS 456
I) Cleanliness, provision of chute & arrangement for transprotation of concrente
C
Visual
100%
-
Before clearance for concreting
SR
j) Check for segregation
B
Physical
Random
-
Check period of curing as per IS 456
SR
d) Dimensional check of finished structure
B
Measuremen t
100%
As per drg.
IS-456
SR/Insp Report
If water accumulates at surface due to bleeding or other causes, concreting shall be stopped as far as of mix design.Accumulated water shall be removed by sponge. √
Exposed Concrete surface shall be protected against heating & drying atleast 72 hrs after placement. Curing compound may be used.
√
6.0 Reinforcement steel
6.1
a) Mechanical and Chemical Properties
A
TC Review
100%
B
Review
100%
Drawing
Drawing
SR
B
Review & Measuremen t
100%
_do_
Drawing
SR
B
Visual & Measurment
100%
_do_
Drawing
SR
B
_do_
100%
_do_
_do_
SR
√
e) Lapping of bars
B
Measuremen t
100%
√
B
Visual
Random
IS - 456 Bar bending schedule Drawing & bar bending schedule
SR
f) Check all joint crossing
IS - 456 Bar bending schedule Drawing & bar bending schedule
SR
√
a)Material and accessories
B
Visual
Once
a) Check for bar bending schedule with necessary laps, specer & chairs b) Check for cover specing bars c) Check for bending of bars
Placement of Reinforcement Steel d) Check for space & chair after reinforcement cage is put inside the formwork
7.0
IS-1786, IS-432, IS-1786, IS-432, ISIS1566 1566
As per relevant As per relevant IS code IS code
TC
SR
√
TC for each batch shall be reviewed. Report test may be carried out as per requirement of site engineer.
Crossing of the bars are to be tied up properly with right gauge annealed wire
Staging & Forms
i) Soundness of staging, shuttering & scaffolding
B
Visual
Once
IS-3696, ISIS-3696, IS4014, IS-4990 4014, IS-4990
SR
ii) Plywood for concrete shuttering work
B
Visual
Once
IS-4990,ISIS-4990,IS1734(Part-I to 1734(Part-I to II) II)
SR
iii) Hoisting of personal & material
B
Visual
Once
Asper supplier / Asper supplier / manufacturer manufacturer recommendatio recommendatio n n
SR
B
Visual
Fortnightly
IS-14687,ISIS-14687,IS3696 & As per 3696 & As per National safety National safety council council
SR
√
B
Testing
SR/TR
√
B
Measuremen t
_do_
As per drg.
As per drg.
SR/TR
√
As per drg.& specn
SR/TR
√
b) Connection between indivisual scaffolding unit & safe slendreness ratio two indipendent safety measure against collapse c) Concrete Strength during climbing process d) Alignment / shape
8.0
e) Check form's seam mark & water tightness
B
Physical
Random
As per drg.& specn
a) Position and level of embeded parts
B
Dimn.
100%
As per drg.& specn
As per drg.& specn
SR
√
B
_do_
100%
_do_
_do_
SR
√
B
_do_
100%
_do_
_do_
SR
√
B
_do_
100%
_do_
_do_
SR
√
IS- 516, IS-456
SR/TR
√
b)Position, depth, & size Embedded Part of bolt hole ( including laying of c) Location, verticality rails & anchor of pipe sleeve/ opening fasteners) of bolt hole d)Welding/ tieing of embeddment to reinforcement 9.0 a) Crushing Strength
Pre - Cast concrete
For each lift of As per provision As per provision shuttering & tolerances & tolerances
Manufactures will supply technical data ( Type of adhesive used, type of preservative used density of plywood etc.
A
Physical
One sample of six cube per 50 IS- 516, IS-456 m3 or part thereof
A minimum of three cubes shall be tested for 28 days compressive strength The precast units shall be free from defects like honeycombing, reinforcement exposure and should have good finish. All releavant test like workability , cube tests shall be carried out as per IS 456 , same as applicable to cast-in-situ concrete. Grade of
b) Workmanship free from visual defects
B
_do_
100%
Specn
Specn
SR
c) Dimension of finish structure
B
Measuremen t
100%
IS-456, Specn
IS-456, Specn
SR
√
e) Workability
B
Physical
One Sample every 2(two)hrs. from mixing plant
IS- 1199 & IS456
IS- 1199 & IS456
SR/TR
√
According to mix design
f) Water cement ratio
B
Physical
Random
IS- 1199
IS- 1199
SR/TR
√
According to mix design
g) Cement content
B
Physical
At random at the time of batching
IS- 1199
IS- 1199
SR/TR
√
According to mix design
11.0
i) Material
A
Review
100%
Asper applicable IS std.& Tech,Specn.
Asper applicable IS std.& Tech,Specn.
i) where a materials is manufacured or fabricated as per spec & drg , separate TR?TC for QP will be application and test as √ contrator should submit to per IS APL for approval. ii ) For aluminum door and window, check for anodisation as per applicable speci.
Storage should be on raised plaform, profile sheet, if used, will be kept covered in wheather proof storage to avoid any exposur to water. Principele of first in and first out shall be applied for erection the sheet. The sheet packet shall be stacked nea
Sheeting Work ii) Storage at site
ii) Installation, alignment & workmenship iii) Check for level & slope iv)Proper installation of flashing v) Fixing including opening location vi) Fastener for sheeting work 22
Finishing Items
22.1
Plastering Raw Material
Manufacturer's Manufacturer's recommendatio recommendatio n n
B
Visual
100%
SR
B
Visual & Measurment
100%
As per Specn
As per Specn
SR
B
_do_
Visual & Measurment
_do_
_do_
SR
B
_do_
_do_
_do_
_do_
SR
B
_do_
_do_
_do_
_do_
SR
B
_do_
_do_
_do_
_do_
SR
√
219.65
i) General Quality
B
Visual
ii) Deleterious materials
B
Physical
a)Fine Sand
Once per 100 m3 or part thereof or Tech Specn. IS - Tech Specn. IS change of 1905 SL 1905 SL source no.6,3.4 no.6,3.4 whichever is earlier _do_
IS- 2366,Is2116
IS- 2366,Is2116
SR
√
SR
√
1254
iii) Grading of Sand
B
_do_
_do_
IS- 1542
IS- 1542
SR
√
i) Check finish surfece for defect like blistering, cracking & irregularity of surface texture
B
Visual
Random
IS-1661
IS-1661
SR
√
B
Measuremen t
ii) Truness of finish plaster surface
Random
Specn.
See remark
SR
Finish plaster surface shall not show any deviation √ more than 4mm when checked with straingth edge of 2 m length
Min. 18 mm thick for out side & 12 mm thick for inside surface of Min.thick
SR
√
motar should be 6 mm. Min.7 days curing time
SR
√
SR
√ √
Final inspection iii) Check thickness of plaster over brick
B
_do_
_do_
_do_
B
_do_
_do_
_do_
B
_do_
_do_
_do_
B
Measuremen t
100%
Drg.
Drg.
SR
C
Visual
100%
_do_
_do_
SR
B
Measuremen t
100%
_do_
Min.7 days curing time
SR
√
iv) Tiles for finish floors
B
Review
100%
_do_
_do_
TC
√
v) Polishing of tiled finish floor
B
Visual
100%
_do_
_do_
SR
√
a) PVC coated chain link mesh
B
Visual & Physical
Random per lot
Drg.
Drg.
TC
√
b) Welded wiremess
B
_do_
_do_
_do_
_do_
TC
√
c) Barbed wire
B
_do_
_do_
_do_
_do_
TC
√
i)Verticality & aligment
B
_do_
100%
_do_
_do_
SR
√
ii) Fixing of fencing
B
_do_
100%
_do_
_do_
SR
√
Fabrication & workmanship
B
Visual & Physical
100%
Drg.
Drg.
SR
i) Material
B
Review of TC
Random
Relevant IS
Relevant IS
TC
ii) Fixing & erection
B
Visual
_do_
_do_
_do_
SR
B
Visual
100%
As per drg. & specn.
As per drg. & specn.
SR
iv) Chck thickness of plaster over concrete ceiling v) Curing of plaster surface 22.2 i)Check for slope / levels ii) Chipping of floor prior to commencement of Flooring & Finishing actual finishing work work iii) Curing of cement concrete floor
22.3
No ponding of water on finished surface to be ensured
Fencing & Gates
i)Materials
ii) Final inspection iii) M.S. Gate 22.4 False Ceiling
23
24
i)Check painting of Painting of Concrete underground & super Surface surface Special item
√
√
All supports, hangers, accossories shall be as per speci / approved manufactures's recommendation
i)Bitumastic flooring a) Check bitumen grade
B
Visual + TC
A
Correlated TC for each Random per lot batch
25 a) Painting Material
27
Rolling Shutter
28
Door, Windows, Ventilators & Grill
As per drg. & specn.
SR
√
_do_
_do_
TC
√
SR
√
B
Visual + Physical
Random
Specn.
B
Measuremen t
100%
Drg. + Specn.
Specn.
SR
√
B
_do_
100%
_do_
Paint should not peel off
SR
√
a) Grouting pressure
B
Physical
Random
Drg.
Drg.
SR
√
b) Composion of grout
B
_do_
Each lot / batch
Manufacturer's specn.
Manufacturer's specn.
SR
√
B
Review TC
One / lot
Drg. + Specn.
Drg. + Specn.
TC
Random
_do_
_do_
SR
100%
_do_
_do_
SR
_do_
_do_
SR
c) Check thickness of paint after each coating d) Check adhesion of paint Grouting of foundation
As per drg. & specn.
Surface shall be cleaned to near white metal surface (sa 2 1/2)
Painting of Structural b) Surface preparation Steel
26
100%
a) Material & accessories b) Dimensoin & workmanship c) Verticality & Allignment d) Performance of rolling shutter ( smooth operration) i) Materials & accessories
B B
Visual + Measurment Measuremen t
B
Visual
100%
B
Review TC
One per lot
ii) Check for dimn.
B
Physical
Random
Specn.
iii) Thickness of paint / anodized coating
B
_do_
_do_
iv) Workmanship
B
Visual
B
Measuremen t
B
v) Verticality & alignment vi) Check smooth operation of door & shutter 28.1 i) Check material ( steel, insulation & fire retardent painting etc.) ii) Check for provision of Fire Proof Door latches, horizontal full width level & openable on pressing door stopper a) Materials & 29 accessories Glass & Glazing work b) Fixing of glasses and glazing a) Material & 30 accessories i) High solid cement liquid elastomeric water proofing membrane ii) Bitumen membrane iii) Polymerised mastic
IS- 2202(part-II), IS- 2202(partIS-1038 II), IS-1038
SR/TC
√
Specn.
SR
√
Specn.
Specn.
SR
100%
_do_
_do_
SR
100%
Drg.
Drg.
SR
Visual
100%
Drg.
Drg.
SR
A
Review TC
One per lot
Drg. + Specn.
Drg. + Specn.
TC
√
B
Physical
100%
_do_
_do_
SR
√
B
Review TC
One per lot
IS- 14900, IS1081, IS-5437
IS- 14900, IS1081, IS-5437
TC
√
B
Visual
Random
Specn
Specn
SR
√
B
Review TC
One per lot
Specn
Specn
TC
√
Correlated manufactures test certificate for each batch shall be submitted for review.
DFT shall be as per specification
Adherim test should not be carried not for high thickness of coating
Fire Proof door to be inspected and tested at manufactures's work before despatch.
iv) Sealing compound v) Galv. Chicken wire mesh vi) Chequered cement tiles
B
Review TC
One per lot
Specn.
Specn.
TC
B
Physical
Random
_do_
_do_
SR
c) Workmanship
B
_do_
100%
_do_
_do_
SR
d) Thickness of elastomeric membrane
B
Measuremen t
Random
_do_
_do_
SR
Roof water proofing b) Surface preparation
B
Physical
Random
_do_
_do_
SR
All elastomeric membrane shall be fully dreid to perform testing with water ponds created on min 5% of area of √ nominal size 6 m x 6 m for a height of 25 to 30 mm at critical location fo r a period of 48 hours.
B
_do_
_do_
_do_
_do_
SR
√
B
Review TC
One per lot
TC
√
B
Visual
100%
_do_
_do_
SR
c) Dimension and construction
B
Measuremen t
10% subject to min.of 3 nos.for each type of items
_do_
_do_
SR
a) Materials / component including valve
B
Review TC
100%
b) Surface finish, G.I.,C.I., P.V.C Pipes freedom from crack and and fitting other defect
B
Visual
10% subject to min.of 3 nos.for each type
c) Dimn. & construction
B
Measuremen t
_do_
B
Review TC
100%
B
Visual
Random
e) Testing for dampness below elastomeric membrance
31.1
Vitreous China sanitary items
31.4
31.5
31.6
√
f) Sealing of Joints of panels of wearing course a) Materials & accessories b) Surface finish, freedom from crack and other defects
a) Materials & accessories Concrete and stone b) Surface finish, freedom from crack and ware pipes other defect c) Dimn. & construction
B
Is-2566 & Tech Is-2566 & Tech specn. specn.
Relevant IS Drg. Relevant IS Drg. Specn. Specn. _do_
_do_
Toleranceas per IS- 1729, IS1536, IS1230 IS- 458, IS- 651, IS- 458, IS- 651, Tech specn Tech specn _do_
Relevant IS
Relevant IS
Measuremen IS- 458, IS- 651, IS- 458, IS- 651, 5% of each lot t Tech specn Tech specn
TC
Manufactures's TC shall be correlated with cousignment received
Tolerance limit as per relevant part of IS 2566
√
Manufactures's test certificate with the cousignment shall be reviewed .
SR
SR TC
Correlated manufactures's test
√ certificate with the consigment shall be reviewed
SR SR
After installation of pipes a) Water pipe & fittings
i)Hydraulic pressure test
i)Smoke test b) Drain & sewer pipes above ground ii) Water test level
A
Physical
100%
IS- 2065
IS- 2065
SR/log book
√
A
_do_
100%
Relevant IS
Relevant IS
_do_
√
A
_do_
100%
_do_
_do_
SR
√
Tolerance limit as per cl. 14.3 id IS 2065
iii) Straightness test
B
_do_
100%
_do_
_do_
SR
√
i) Water test
A
_do_
100%
_do_
_do_
SR
√
A
_do_
100%
_do_
_do_
SR
√
iii) Straightness test
B
_do_
100%
_do_
_do_
SR
√
a) Bitumen impregnated board
A
Review TC
One per lot
IS - 1838
IS - 1838
TC
√
b) PVC water stop
A
_do_
One per lot
IS - 12200
IS - 12200
TC
√
A
_do_
One per lot
IS - 1834
IS - 1834
TC
√
A
_do_
One per lot
IS - 1835
IS - 1835
TC
√
A
_do_
One per lot
IS - 4671
IS - 4671
TC
√
B
Visual
Random
Specn.
Specn.
SR
a) Mineral wool
B
Review TC
100%
IS- 8183
IS- 8183
TC
√
b) Polysocyanurate / rigid phenolic foam slab
B
_do_
One per lot
IS- 12436 , IS 13204
IS- 12436 , IS 13204
TC
√
a) Mineral wool
B
Random
Drg. & Specn.
Drg. & Specn.
SR
√
b) Polysocyanurate / rigid phenolic foam slab
B
Random
_do_
_do_
SR
√
c) Drain & sewer pipe ii)Smoke test below ground level
32.0
Joint of Concrete
32.1
Materials
32.2
Installation & fixing
33.0
c) Bitumen sealing compound d)Two part poly sulphite sealant e) Expanded polystyrene board -
Insulation
33.1 i) Materials 33.2 Installation & fixing
Visual & Physical Visual & Physical
LEGEND : 1). D* : RECORDS INDENTIFIED WITH ' TICK ' (√ ) SHALL ESSENTIALLY BE INCLUDED BY SUPPLIER IN QA DOCUMENTATION. 2) LEGEND TO BE USED FOR CLASS OF CHECK # : A, B & C · · ·
Smoke test and straightness tests are to be carried out on the pipe before burial.
A' shall be witnessed by AG's FQA and Executing Dept., surveillance by Head AG's (FQA) B' shall be witnessed by AG's Executing Dept and Surveillance by AG's FQA C' shall be witnessed by Contractor's FQA and AG's Executing Dept and Survelliance by AG's Authorized Engineer
A' , 'B ' & C shall be AG's CHP stage . CHP : " Customer Hold Point" to be witnessed and work shall not proceeded till it is witnessed and cleared. AG : ADANI GROUP, FQA : FIELD QUALITY ASSURANCE , TC : Manufactureer's Test Cetificate, SR : Site Register TR : Test Report. LB : Log Book
Name of Contractor :SIMPLEX INFRASTRUCTURES LIMITED, Kolkata Name of Client : Shandong TIEJUN Electric Power Engineering Co. Ltd.
Name of Owner : M/s. Adani Power Limited
For Simplex : For Shandong : For Adani Power :