CALCULO DEL FLETE DE MATERIALES PARA SISTEMA DE RIEGO PAMPAHUASI

PROYECTO

: INSTALACION DEL SISTEMA DE RIEGO POR ASPERSION EN LA LOCALIDAD DE PAMPAHUASI - S. A. ANTAPARCO - ANGARAES - HUANCAVELICA

1- DATOS GENERALES A- POR PESO MATERIALES CEMENTO FIERRO, CLAV. ETC MADERA YESO CALAMINAS TAPAS, COMPUERTAS METALICAS VALVULAS, SUMIDEROS OTROS (ACCESORIOS) PESO TOTAL

UNIDAD BL. KG P2 BL PL UND UND KG

AFECTO IGV 415.54 2,356.91 1,471.94 12.82 32.62 81.00 74.00 1,500.00

UNIDAD M3 M3 M3

AFECTO IGV

PESO.UNIT. 42.50 1.00 0.95 25.00 1.85 5.00 1.00 1.00

PESO.TOTAL 17,660.45 2,356.91 1,398.34 320.50 60.35 405.00 74.00 1,500.00 23,775.55

B- POR VOLUMEN EN AGREGADOS Y MADERA DESCRIPC. ARENA FINA ARENA GRUESA PIEDRA CHANCADA DE 1/2"

SIN IGV FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO FLETE INC. EN COSTO

VOLUMEN TOTAL CAPACIDAD DEL CAMION (M3) NUMERO DE VIAJES REDONDEO

DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL DE MATERIAL

0.00

EN TUBERIA UNIDAD DE (2.60 M. x 6.5.00 M.) DE CARROCERIA, CON H= 2.30 M. CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJES Tub, 1/2" 4,500.00 U Tub,3/4" 4,000.00 U 20.00 4.00 Tub, 1" 3,830.00 U 142.71 28.54 Tub,2" PVC 470.00 U 1,376.32 275.26 Tub 1.5:" PVC 994.00 U 456.44 91.29 Tub 2 1/2": PVC 420.00 U 275.78 45.96 Tub 3" U-PVC 360.00 U 33.53 5.59 Tub 4:" U-PVC 325.00 U 771.12 128.52 Tub 6:" U-PVC 135.00 U 462.00 77.00 Tub 8:" U-PVC 92.00 U 659.20 131.84 NUMERO TOTAL DE VIAJES REDONDEO TUBERIA EN VOLUMEN

0.00 0.01 0.59 0.09 0.11 0.02 0.40 0.57 1.43 3.22 1.00 42

2- FLETE TERRESTRE UNIDAD QUE DA COMPROBANTE CAPACIDAD DEL CAMION ( M3 ) COSTO POR VIAJE S/. CAPACIDAD DEL CAMION (KG) FLETE POR KG

UNIDAD DE TRANSPORTE UNIDAD QUE NO DA COMPROBANTE 40.00 CAPACIDAD DEL CAMION ( M3 ) 1,071.00 COSTO POR VIAJE S/. 8,000.00 CAPACIDAD DEL CAMION (KG) 0.13

AFECTO IGV 3,090.82

FLETE POR PESO FLETE POR VOLUMEN AGREGADOS TUBERIA COSTO FLETE TERRESTRE

2,260.97 5,351.79

SIN IGV

FLETE POR PESO =Peso Total * Flete por peso FLETE POR VOLUMEN=No viajes*costo por viaje

0.00

EXP.TECNICO: Construcción De Sistema De Riego Por Aspersión En La Localidad De Ccollpa

CALCULO DEL FLETE DE MATERIALES PARA SISTEMA DE RIEGO PAMPAHUASI

PROYECTO

: INSTALACION DEL SISTEMA DE RIEGO POR ASPERSION EN LA LOCALIDAD DE PAMPAHUASI - S. A. ANTAPARCO - ANGARAES - HUANCAVELICA

3- FLETE FLUVIAL UNIDAD DE TRANSPORTE QUE DA COMPROBANTE UNIDAD DE TRANSPORTE QUE NO DA COMPROB. CAPACIDAD DEL BOTE EN PESO (KG) CAPACIDAD DEL BOTE EN VOLUMEN (M3) COSTO POR VIAJE COSTO POR PESO AFECTO IGV

SIN IGV

FLETE POR PESO =Peso Total * Flete por peso FLETE POR VOLUMEN=No viajes*costo por viaje

FLETE POR PESO FLETE POR VOLUMEN AGREGADOS TUBERIA COSTO FLETE FLUVIAL

4- FLETE EN ACEMILA La tubería será transportada por peones Costos de transporte por viaje Acemila S/. 2.00 MATERIALES Peon S/. 5.00 Cantidad Peso total tubería de agua Peso total de Acero Numero bolsas de cemento Numero bolsas de Yeso Peso resto de materiales Agregados Total en Kilos Madera Total en pies cuadrados COSTO TOTAL DEL FLETE EN ACEMILA S/.

2.50 AGREGADO

Unidades de Carga

12,500 1,520 287.00 7.00 4,500.00 114,975.00 1,563

Capacidad de Carga 2 2 1 1 1 1 2

60 60 1 2 60 60 60

Número de Viajes 208.33 25.33 287.00 3.50 75.00 1,916.25 26.05

FLETE TOTAL

11,267.47

RESUMEN DE FLETE TOTAL FLETE TERRESTRE FLETE FLUVIAL FLETE EN ACEMILA FLETES TOTALES S/.

AFECTO IGV 5,351.79

SIN IGV

5,915.68

5,351.79

5,915.68

EXP.TECNICO: Construcción De Sistema De Riego Por Aspersión En La Localidad De Ccollpa

Flete no Afecto a IGV 833.32 253.30 574.00 17.50 150.00 4,790.63 130.25 5,915.68

Related Documents


More Documents from "Manuel Contreras"

Flete Ccollpa.xls
May 2020 11
Ficha Tecnica.docx
May 2020 3
Cash_memo
May 2020 7
Pasos De Tesis
November 2019 18
April 2020 21