CALCULO DE FLETE CONSTRUCCION DEL PUENTE CARAHUANGA SOBRE RIO CHONTA MATERIAL FIERRO CORRUGADO CEMENTO MADERA
CANTIDAD 19.595 4343 6309
U.M. T.M. BOLSAS P2
PESO 1.0000 0.0425 0.0042 TOTAL
PRECIO FLETE X TONELADA (SIN IGV) CAJAMARCA - PUENTE CARAHUANGA TOTAL FLETE (SIN IGV) NOTA: PARA LOS MATERIALES DE MENOR INCIDENCIA SE HA CONSIDERADO CON PRECIOS PUESTOS EN OBRA.
TOTAL T.M. 19.5950 184.5775 26.5023 230.6748 17.34