S10

321

Página

Presupuesto

Cliente Lugar

"MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS EN LA I.E. SAN AGUSTIN EN LA LOCALIDAD DE LA MATANZA, DISTRITO DE LA MATANZA, PROVINCIA DE MORROPON . DEPARTAMENTO DE PIURA ESTRUCTURAS 001 Costo al MUNICIPALIDAD DISTRITAL DE LA MATANZA 30/11/2012 PIURA - MORROPON - LA MATANZA

Item

Descripción

Und.

01 03.00 05.09.03

ESTRUCTURAS MOVIMIENTO ENCOFRADO DEY TIERRAS DESENCOFRADO DE LOSA MACIZA

m2

5.20

58.73

1,988,191.52 225,553.59 305.40

m2

2,075.90

42.31

13,618.52 32,284.53 87,831.33 27,077.72 33,553.61 4,830.12

Presupuesto Subpresupuesto

01.00 03.02 05.09.04

0303001

OBRAS EXCAVACIONES ENCOFRADO PROVISIONALES Y DESENCOFRADO DE LOSA ALIGERADA

Metrado

Precio S/.

Parcial S/.

01.01 03.02.01 05.09.05

CASETA ACERO EXCAVACION PARA fy=4200 LA DEkg/cm2, OBRA ZANJAS (OFIC. LOSA PARA RESIDENTE, ALIGERADA ZAPATAS YSUPERVISOR CIMENTACION Y ALMACEN)

m2 m3 kg

7,557.12 896.02 36.00

134.17 30.22 4.44

01.02 03.02.02 05.09.06

CARTEL EXCAVACION LADRILLO PARA DELA PARA TECHO OBRA CISTERNA, 15x30x30 (3.60 m x h7.20m) > 1.50m PROFUNDIDAD

u m3 pza

17,198.89 58.60 1.00

3,018.92 39.25 2.49

42,825.24 3,018.92 2,300.05

01.03 03.02.03 05.10

INSTALACION ESCALERAS EXCAVACIONPROVISIONAL PARA ZANJASDE PARA DEPOSITO SARDINELES DE AGUA DE BLOQUETAS, VEREDAS

u m3

107.30 2.00

884.74 27.09

13,708.48 1,769.48 2,906.76

01.04 03.03 05.10.01

AGUA CORTES CONCRETO PARA LAf 'c=210 CONSTRUCCION kg/cm2, ESCALERA

glb m3

13.12 1.00

1,500.00 439.47

6,384.24 1,500.00 5,765.85

01.05 03.03.01 05.10.02

MOVILIZACION CORTE DE TERRENO ENCOFRADO Y DESMOVILIZACION DESENCOFRADO NATURAL HASTA DE DEESCALERA HERRAMIENTAS NIVEL DE EXPLANACION Y EQUIPOS MENORES

glb m3 m2

650.11 87.84 1.00

2,500.00 72.71 4.31

2,500.00 2,801.97 6,386.85

m3 kg

165.31 350.40

21.67 4.44

55,751.56 3,582.27 1,555.78

02.00 03.03.02 05.10.03 02.02 03.04 05.11

OBRAS ACERO CORTE PRELIMINARES DE fy=4200 TERRENO kg/cm2,EXPLANADO ESCALERA ELIMINACION DE OBSTRUCCIONES RELLENOS CISTERNA

142,208.47 14,371.46 1,977.68

02.02.01 03.04.01 05.11.01

TALA RELLENOS CONCRETO DE ARBOLES CON f 'c=210 MATERIAL GRANDES kg/cm2,DE CISTERNA PRESTAMO HASTA NIVEL EXPLAN.C/MAQ.

u m3

1,899.60 12.00 14.00

441.51 54.18 27.92

53,036.83 6,181.14 650.16

02.02.02 03.04.02 05.11.02

TALA ENCOFRADO RELLENO DE ARBOLES COMPACTADO Y DESENCOFRADO MEDIANOS C/EQUIPO DECON CISTERNA MATERIAL PROPIO

u m3 m2

509.70 12.00 71.00

33.86 21.44 59.20

10,927.97 4,203.20 406.32

02.02.03 03.04.03 05.11.03

ACERO TALA RELLENO DEfy=4200 ARBOLES COMPACTADO kg/cm2, PEQUEÑOS CISTERNA C/EQUIPO CON MATERIAL DE PRESTAMO AFIRMADO

u m3 kg

703.10 898.00 20.00

105.44 16.25 4.44

74,134.86 3,987.12 325.00

05.12 02.02.04 03.04.04 02.03 05.12.01 03.05 02.03.01 05.12.02 03.05.01 02.03.02 05.12.03 03.05.02 02.03.03 07.00 04.00 02.03.04 07.01 04.01.01 02.03.05 07.02 04.01.02 02.03.06 07.03 04.02.01 02.03.07 07.04 04.05.01 02.03.08 07.05 04.05.02 02.03.09 07.05.01 04.08.01 02.03.10 07.05.02 05.00 02.03.11 07.05.03 05.01 02.03.12 07.05.04 05.01.01 02.03.13 07.05.05 05.01.02 02.03.14 09.00 05.02 02.03.15 09.01 05.02.01 02.04 09.02 05.02.02 02.04.01 09.03 05.02.03 02.04.02 09.04 05.05 02.04.03 05.05.01 02.04.04 05.05.02 02.04.05 05.05.03 02.04.06 05.06 02.04.07 05.06.01 02.04.08 05.06.02 02.04.09 05.06.03 02.04.10 05.07 02.04.11 05.07.01 02.04.12 05.07.02 02.04.13 05.07.03 02.04.14 05.07.04 02.04.15 05.07.05 02.04.16 05.07.06 02.04.17 05.08 02.04.18 05.08.01 02.04.19 05.08.02 02.04.20 05.08.03 02.04.21 05.08.04 02.04.22 05.08.05 02.04.23 05.08.06 02.04.24 05.09 02.04.25 05.09.01 02.07 05.09.02

TANQUE REMOCION ELEVADO DE RAICES u 44.00 ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA m3 2,520.74 REMOCIONES CONCRETO f 'c=210 kg/cm2, TANQUE ELEVADO. m3 6.00 ELIMINACION DE MATERIAL EXCEDENTE REMOCION DEY PANELES ENCOFRADO DESENCOFRADO DE MADERA DE TANQUE ELEVADO m2 26.04 44.00 ACARREO INTERNO DE MATERIAL PROCEDENTE DE EXCAVACION m3 961.83 ACERO REMOCION fy=4200 DE COBERTURA kg/cm2, TANQUE CONELEVADO PLANCHAS DE CALAMINA m2 kg 549.45 366.00 ELIMINACION DE MATERIAL EXCEDENTE D=5kg m3 2,782.73 ESTRUCTURAS REMOCION DEMETALICAS COBERTURAYCON COBERTURAS PLANCHAS DE ASBESTO CEMENTO m2 991.45 OBRAS DE CONCRETO SIMPLE TIJERAL REMOCION PRINCIPAL DE VIGAS TM 1DE MADERA um 186.50 8.00 SUBCIMIENTOS, CONCRETO MEZCLA C:H 1:12 + 30% PG m3 64.02 TIJERAL REMOCION METALICO DE VIGUETAS TM 2 DE MADERA m 814.60 23.00 142.75 CIMIENTOS CORRIDOS 1:10 + 30% PG m3 VIGUETA REMOCION DE FIERRO DE VIGUETAS LISO 1/2" DEYFIERRO 3/82" CORRUGADO m 1,299.90 164.85 SOLADOS PARA ZAPATAS 1:10 e=10cm m2 64.87 TIJERAL REMOCION PRINCIPAL DE VIGAS TM 3Y VIGUETAS DE CAÑA DE GUAYAQUIL m 472.25 86.40 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 34.80 ESTRUCTURAS REMOCION DE APARATOS METALICAS SANITARIOS TECHO LIVIANO DE PATIO DE HONOR u 16.00 SOBRECIMIENTO, CONCRETO MEZCLA 1:8 + 25% PG m3 360.20 TIJERAL REMOCION - ARCO DE PORTON TIPICO METALICO m2 m 136.00 28.00 FALSO PISO DE 4" MEZCLA 1:8 m2 1,781.20 REMOCION VIGUETA V -DE 1 PUERTA METALICA m2 m 526.30 55.01 OBRAS DE CONCRETO ARMADO REMOCION VIGUETA V -DE 2 PUERTA DE MADERA m2 m 110.80 9.60 ZAPATAS REMOCION VARILLA TENSORA DE VENTANA DIAMETRO METALICA 1" m2 m 278.58 130.00 CONCRETO f 'c=210 kg/cm2, ZAPATA m3 152.60 ARRIOSTRES REMOCION DEDE VENTANA VIGUETAS DE MADERA m2 m 190.50 14.18 ACERO fy=4200 kg/cm2, ZAPATA kg 3,631.00 MUROS REMOCION Y TABIQUES DE POSTES DE MADERA u 2.00 VIGAS DE CIMENTACION MURO REMOCION DE LADRILLO DE TACHOS KK TIPO DE BASURA IV CABEZA C:A:C 1:1:4 e=1.5cm u m2 905.39 2.00 CONCRETO f 'c=210 kg/cm2, VIGAS DE CIMENTACION m3 102.20 MURO DEMOLICIONES DE LADRILLO KK TIPO IV SOGA C:A:C 1:1:4 e=1.5cm m2 992.54 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 761.80 MURO DEMOLICION DE LADRILLO DE CONCRETO KK TIPO IVSIMPLE CANTOEN C:A:C CIMENTACION 1:1:4 e=1.5cm (INC.EXC.LATER) m3 m2 106.51 25.02 ACERO fy=4200 kg/cm2, VIGA DE CIMENTACION kg 11,896.00 ALAMBRE DEMOLICION # 08 REFUERZO DE CONCRETO HORIZONTAL SIMPLE SUPERFICIAL EN MUROS m3 kg 524.92 49.29 SOBRECIMIENTO REFORZADOS COSTO DEMOLICION DIRECTO DE LOSA DE CONCRETO SIMPLE EN PATIO m2 461.43 CONCRETO f 'c=175 kg/cm2, SOBRECIMIENTO REFORZADO m3 51.22 GASTOS DEMOLICION GENERALES DE VEREDA (10%) DE CONCRETO SIMPLE m2 150.37 ENCOFRADO Y DESENCOFRADO, SOBRECIMIENTO REFORZADO m2 495.58 UTILIDAD DEMOLICION (10%) DE VEREDA DE CONCRETO SIMPLE MASIVO (C/EQUIPO) m2 224.47 ACERO fy=4200 kg/cm2, SOBRECIMIENTO REFORZADO kg 2,081.86 DEMOLICION DE PISO DE CEMENTO MANUAL (INC. FALSO PISO) m2 399.66 MUROS REFORZADOS SUB DEMOLICION TOTAL DE PISO DE CEMENTO PULIDO (INC. FALSO PISO C/EQUI) m2 931.64 CONCRETO f 'c=210 kg/cm2, PLACAS m3 9.30 IGV (18%) DEMOLICION DE PISO Y CONTRAPISO m2 231.59 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 73.99 DEMOLICION DE TECHO ALIGERADO (SEGUNDO PISO PAB 1) m2 252.26 ACERO fy=4200 kg/cm2, PLACAS kg 752.97 TOTAL DEMOLICION PRESUPUESTO MASIVA DE MURO DE QUINCHA (C/EQUIPO) m2 50.98 COLUMNAS DEMOLICION DE MURO DE ADOBE (C/EQUIPO) m2 94.11 SON CONCRETO : DOS MILLONES OCHOCIENTOS QUINCE MIL DOSCIENTOS SETENTINUEVEm3Y 19/100 NUEVOS SOLES f 'c=175 kg/cm2, COLUMNETAS 17.04 DEMOLICION MANUAL DE MURO DE ALBAÑILERIA DE CABEZA m2 32.73 CONCRETO f 'c=210 kg/cm2, COLUMNAS m3 13.80 DEMOLICION MASIVA DE MURO DE ALBAÑILERIA CONF. CABEZA (C/EQUIPO) m2 471.21 CONCRETO f 'c=210 kg/cm2, COLUMNAS CONCRETO EXPUESTO m3 140.16 DEMOLICION DE MURO DE ALBAÑILERIA DE CABEZA (MANUAL) m2 155.07 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 502.76 DEMOLICION MASIVA DE MURO DE ALBAÑILERIA CONF. SOGA (C/EQUIPO) m2 272.57 ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVOS m2 1,403.14 DEMOLICION DE CONCRETO ARMADO EN VIGAS Y COLUMNAS m2 17.20 ACERO fy=4200 kg/cm2, COLUMNAS kg 28,710.31 PICADO DE CIELO RASO ENLUCIDO CON YESO m2 284.84 VIGAS PICADO DE ENLUCIDOS DE MUROS, VIGAS Y COLUMNAS INT. C/MEZCL. m2 820.17 CONCRETO f 'c=175 kg/cm2, VIGAS SOLERAS m3 6.60 PICADO DE ENLUCIDOS DE MUROS, VIGAS Y COLUMNAS INT. C/EXT. m2 100.00 CONCRETO f 'c=210 kg/cm2, VIGAS m3 21.56 PICADO DE CERAMICA EN ZOCALOS INTERIORES Y EXTERIORES m2 93.96 CONCRETO f 'c=210 kg/cm2, VIGAS CONCRETO EXPUESTO m3 227.53 DEMOLICION DE COBERTURA DE ESCALERA (PAB. 1) m2 39.60 ENCOFRADO Y DESENCOFRADO DE VIGAS SOLERA m2 290.51 DEMOLICION DE GRUTA m2 1.00 ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVOS VIGAS m2 1,860.24 DEMOLICION DE BANCOS DE CONCRETO m2 48.00 ACERO fy=4200 kg/cm2, VIGAS kg 27,604.32 DEMOLICION DE MESAS DE CONCRETO m2 11.00 LOSAS ALIGERADA H=0.20 m EN UNA DIRECCION DEMOLICION DE MASTIL PARA EL ASTA DE BANDERA m2 1.00 LOSA MACIZA CONCRETO f 'c=210 kg/cm2 m3 1.00 TRAZO, NIVEL Y REPLANTEO m2 9,063.68 CONCRETO f 'c=210 kg/cm2, LOSA ALIGERADA m3 181.64 Fecha :

13.55 1.63 461.91

7,875.58 596.20 4,108.81 9,581.01 2,771.46 44,676.35 79.07 2.16 3,479.08 56.25 19.08 18,351.72 1.63 4.44 1,625.04 895.60 9.46 26,324.63 2.16 148,843.62 2,141.53 198,916.76 836.32 3.87 6,690.56 721.76 166.60 10,665.73 328.15 2.16 1,759.54 7,547.45 191.05 27,272.39 43.04 4.51 55,947.70 743.47 73.19 4,747.84 72.76 1.08 6,286.46 510.03 40.48 1,408.70 16.57 72,371.45 265.12 309.51 111,485.50 212.02 10.84 28,834.72 303.52 24.33 43,336.60 51.84 6.77 27,283.39 372.42 1,184,607.81 82.39 4.51 9,128.81 43.30 64,645.39 28.94 5.42 1,509.90 3,762.20 317.98 48,523.75 17.65 4.51 3,362.33 63.95 4.44 16,121.64 61.19 160,899.66 122.38 117,659.60 105.41 36.12 95,437.16 72.24 331.45 33,874.19 62.43 33,044.54 61,964.27 40.65 30,967.17 80.36 52.96 8,559.14 1,325.06 4.44 52,818.24 33.73 4.14 1,662.55 2,173.17 45,799.43 1,988,191.52 3.38 1,559.63 322.04 16,494.89 198,819.15 2.71 407.50 40.48 20,061.08 198,819.15 1.46 327.73 4.44 9,243.46 2.71================= 1,083.08 10,495.94 2,385,829.82 1.46 1,360.19 425.89 3,960.78 429,449.37 5.42 1,255.22 44.26 3,274.80 16.46================= 4,152.20 4.33 3,260.36 2,815,279.19 0.91 46.39 321,705.44 1.23 115.76 369.40 6,294.58 9.03 295.55 398.57 5,500.27 1.83 862.31 406.79 57,015.69 6.77 1,049.82 46.15 23,202.37 1.47 400.68 72.85 102,218.75 108.36 1,863.79 4.44 127,473.78 4.07 1,159.30 359,540.83 5.42 4,445.32 324.87 2,144.14 6.78 678.00 364.65 7,861.85 6.78 637.05 371.94 84,627.51 16.46 651.82 47.38 13,764.36 10.84 10.84 69.12 128,579.79 5.42 260.16 4.44 122,563.18 10.84 119.24 228,805.66 81.27 81.27 365.51 365.51 1.23 11,148.33 351.93 63,924.57 .

Related Documents

Expediente
April 2020 18
Expediente
November 2019 28
Expediente 4087
December 2019 21
Expediente Tecnico.docx
December 2019 24

More Documents from ""

Karaoke Evento.docx
April 2020 6
Asia Revolution.docx
April 2020 5
May 2020 4
Meu Perfil Profissional
November 2019 16