NO
JENIS PEKERJAAN
1 SUMBER AIR A. MATA AIR /BRONCAPTERING
HARGA SATUAN PEKERJAAN PER UNIT (Rp) 18,000,000
2 BAK PENAMPUNG A. RESERVOIR BETON B. RESERVOIR BATU BELAH
81,000,000 63,000,000
3 PERPIPAAN A. PIPA PVC SNI DAN ASESORIS
4 KRAN UMUM
42,000 2,000,000
5 SISTEM POMPA A. SUMERSIBLE + PENYAMBUNGAN LISTRIK B. SENTRIFUGAL + PENYAMBUNGAN LISTRI
35,000,000 28,000,000
DIMENSI (METER)
KETERANGAN
1.5 X 7 X 1.5
Disesuaikan dengan kondisi sumber air
4 X 4 X 1.75 4 X 4 X 1.75
Plat Beton Bertulang Pas. Dinding Batu Belah
1
Kombinasi Pipa Ø 3", Ø 2" dan Ø 1"
2X2
Pas. Batu Batu dan Beton
2 PK 1,5 PK
H = 80 M P= 400 M Kaps. Listrik 3 Phase H = 60 M P= 300 M Kaps. Listrik 3 Phase BOP KKM Pelatihan
PHBS
18,000,000
85,455,000
126,000,000 20,000,000
276,755,000 11,070,200 9,000,000 15,000,000
311,825,200 APBN INCASH INKIND ADD
70% 4% 16% 10%
218,277,640 12,473,008 49,892,032 31,182,520 -
21,000,000
###