epro • System III AB • Air Barrier / Above Cavity Walls Excellent Strength & Flexibility • Seamless • Exceptional Adhesion • Extremely Durable • Redundant Protection

System Description System III CWB are highly modified fluid applied air barrier products designed for use in above grade cavity wall assemblies. The materials offer application flexibility, high production volumes, exceptional value and performance. System Components

Ecoflex-PS is an acrylic based highly flexible single component emulsions designed to provide a vapor permeable air barrier membrane in a cavity wall application Ecoflex-F is a self-adhering detail and transition sheet designed to be used in conjunction with the Ecoflex fluid applied membranes to provide a continuous air barrier in the wall assembly. Additional Information: Specification Reference - Air Barrier Specification Detail Drawings - Reference all AB labeled details Installation Guidelines - Reference 1. Waterproofing Membrane Installation (Vertical). 2. Ecoflex-F Installation.

Excellent Air Vapor and Moisture Control - Utilising a high performance monolithic membrane. System Versatility – Ecoflex can be applied to a wide range of substrates (concrete, CMU, block, ICF, wood, dense glass, etc.) on the positive or negative side. Cost Effective – The material costs and installation speed make this a high value, quality and performance solution. No Seam Failures – The highly flexible spray applied or fluid applied monolithic membrane bonds tenaciously to almost any substrate and in almost any condition including green concrete and damp block. Problem Prevention – Along with its excellent elongation and recovery properties, Ecoflex is self sealing thus, preventing any air leakage due to minor penetrations and cracking caused by building movement and shrinkage.

OR

LD

OF DIFFE RE N

A

W

CE

Product Information - Reference: Ecoflex, EcoflexPS, or Ecoflex-F product brochures.

800-882-1896 •

TI

EA

R

rev. sys3ab_031011

R

W a te r p r oo f i n g Sys tems

ON

FO

S

Ecoflex-S (R) are polymer modified asphalt emulsions, designed to provide an air/moisture vapor barrier in a cavity wall application.

LW ND ORLD CO

I

www.eproserv.com

SYSTEM III-AB Air Barrier The Components:

The Installation Steps:

Step 1

Step 1-Detailing

DETAIL MEMBRANE ECOFLEX-F 2 3

• Treat all cold joints, substrate changes, penetrations, door and window openings with self adhering Ecoflex-F or Ecoflex-R and polyester mesh.

A self adhering 40-mil sheet membrane used to detail around openings, plane changes, penetrations and cracks. 1

3

For best results use Epro Primer to prepare substrate prior to installation.

Step 2-Air Barrier Membrane

• Begin the application of ECOFLEX-S from the bottom to the top. Always applying to the footer first.

Step 1.1

FIELD MEMBRANE ECOFLEX-S or R

*Spray application should be done in 4 ft. x 4 ft. passes to a 20-mil build on each pass.

A spray or fluid applied, exceptionally flexible, monolithic membrane. Step 2 – OPTIONAL Air Barrier Membrane

• ECOFLEX-R may be applied by roller, brush or sprayer to a 40-mil build. Apply two 30-mil coats to achieve a 40-mil finish coat.

OPTIONAL DETAIL MEMBRANE ECOLINE-R With polyester reinforcement fabric may also be used to detail around openings, plane changes, penetrations and cracks.

Step 1.2

Step 2 & 2.11

OR

LD

OF DIFFE RE N

R

EA

TI

R

Wa te r p r oo f i n g Sys tems

ON

FO

S

A

CE

W

LW ND ORLD CO

I

SYSTEM III-AB A System Designed for cost effective protection

Rev. SYSTEM III-AB.01.09.08

Related Documents

Epro / System Iii Ab
December 2019 26
Epro - System Iii Mb
December 2019 66
Ab
June 2020 28
Ab
June 2020 19
Ab
June 2020 22
Ab
November 2019 38

More Documents from ""

Epro - System Iii Mb
December 2019 66
Ecoshield-p
December 2019 72
Sys3pw
December 2019 76
Es
December 2019 86
Sys3lw
December 2019 63
As9100b
April 2020 44