ENGINEER'S ESTIMATE CONSTRUCTION OF TECHNICAL BUILDING FOR NATIONAL REFINERY - KARACHI GROUND FLOOR Sr. No. 1

2

Description

Quantity

Unit

Excavation in Foundation (as per D.I - 1) a) 0 to 5 feet depth. b) Below 5 to 10 feet depth. c) Below 10 to 15 feet depth

20,500.00 20,500.00 6,250.00

Cft. Cft. Cft.

Filling earth under floor (as per D.I - 2) a) From outside sources

25,000.00

Cft.

3

Providing and laying Termite Treatment (as per D.I - 3)

7,500.00

Sft.

4

Providing and laying soling stone under floors (as per D.I - 4)

3,650.00

Cft.

5

Providing and laying DPC 1:2:4 (as per D.I - 5)

580.00

Sft.

6

Providing & laying C.C. 1:4:8 (Class-E) concrete (as per D.I - 6) a. In foundation

2,200.00

Cft.

Providing & laying C.C. 1:3:6 (Class-D) concrete (as per D.I - 7) a. Under Floor b. In Step

2,400.00 24.00

Cft. Cft.

Providing & laying C.C. 1:1½:3 (Class-B) concrete using SR Cement (as per D.I - 8) a. Column and Wall Footing b. Column upto Plinth c. Walls upto Plinth d. Plinth Beams

5,750.00 975.00 1,150.00 2,300.00

Cft. Cft. Cft. Cft.

Providing and laying Class "B" 1:1½:3 Concrete using O.P. Cement (as per D.I - 9) a) Column Superstructure b) Wall Superstructure c) Beams / Lintels d) Slab 6" thick

700.00 1,050.00 1,550.00 3,800.00

Cft. Cft. Cft. Cft.

7

8

9

Sr. No.

Description e) Staircase

Quantity

Unit

400.00

Cft.

Sr. No.

Quantity

Unit

3.00 40.00

Tonne Tonne

4,500.00 20.00

Cft. Cft.

Providing and laying ½" thick plain cement plaster in 1:4 cement mortar (as per D.I - 12) a. Ceiling b. Internal walls

1,500.00 13,500.00

Sft. Sft.

Providing and laying 3/4" thick plain cement plaster on external walls (as per D.I - 13)

9,000.00

Sft.

14

Providing and laying C.C. 1:2:4 floor (as per D.I - 14)

630.00

Sft.

15

Providing and laying China Verona Marble Tiles floor (as per D.I - 15)

6,600.00

Sft.

Providing and laying China Verona Marble Tiles skirting (as per D.I - 16)

760.00

Sft.

Providing and laying China Verona Marble Tiles on steps (as per D.I - 17) a) Treads b) Risers

400.00 250.00

Sft. Sft.

Providing and laying non-skid Ceramic Tile Floor in Bath (as per D.I. - 18)

350.00

Sft.

Providing and laying Glazed Tiles in Dado (as per D.I - 19)

1,000.00

Sft.

Providing and applying oil bound distemper on ceiling (as per D.I - 20)

1,500.00

Sft.

13,500.00

Sft.

10

11

12

13

16

17

18

19

20

21

Description Providing & laying Steel Reinforcement (as per D.I - 10) a. Mild Steel Bars b. TOR Steel Bars Providing & laying Solid Block Masonry walls in superstructure (as per D.I - 11) a. 6" thick walls b. 4" thick walls

Providing and applying Plastic Emulsion Paint on internal walls (as per D.I - 21)

Sr. No. 22

23

24

25

Description

Quantity

Unit

Providing and fixing commercial ply flush door shutter with frame (as per D.I - 22)

600.00

Sft.

Providing and fixing aluminum fully glazed door (as per D.I - 23) a) With side panels b) Without side panels

110.00 175.00

Sft. Sft.

Providing and fixing aluminum fully double glazed sliding or fixed windows / ventilators (as per D.I.-24)

3,050.00

Sft.

Providing and fixing Acoustic Tiles false ceiling (as per D.I. - 26)

7,000.00

Sft.

350.00

Sft.

2.00

Each

400.00

Sft.

Providing and fixing Weather Shield Paint on external surface (as per D.I. - 30)

9,000.00

Sft.

Providing and fixing M.S. Grills (as per D.I. - 31)

3,000.00

Sft.

26

P/F Staircase Railing (as per D.I. - 27)

27

Making flower beds (as per D.I. - 28)

28

Providing and fixing Wooden Partitions (as per D.I. - 29)

29

30

31

Kitchen Cabinet (low level) (as per D.I. 32)

60.00

Sft.

32

Kitchen Cabinet (high level) (as per D.I. 33)

40.00

Sft.

33

Providing and fixing marble portition in urinals (as per D.I. 35) a) 2½" x 1½' size a) 2½" x 1' size Total ======>

1.00 1.00

No. No.

ENGINEER'S ESTIMATE UCTION OF TECHNICAL BUILDING NATIONAL REFINERY - KARACHI GROUND FLOOR Rate (Rs.)

Amount (Rs.)

3.00 5.00 8.00

61,500.00 102,500.00 50,000.00

5.00

125,000.00

3.00

22,500.00

12.00

43,800.00

14.00

8,120.00

42.00

92,400.00

50.00 50.00

120,000.00 1,200.00

70.00 80.00 80.00 80.00

402,500.00 78,000.00 92,000.00 184,000.00

82.00 82.00 82.00 82.00

57,400.00 86,100.00 127,100.00 311,600.00

Rate (Rs.)

Amount (Rs.)

85.00

34,000.00

Rate (Rs.)

Amount (Rs.)

27,000.00 28,000.00

81,000.00 1,120,000.00

50.00 52.00

225,000.00 1,040.00

8.00 8.00

12,000.00 108,000.00

10.00

90,000.00

15.00

9,450.00

60.00

396,000.00

35.00

26,600.00

65.00 40.00

26,000.00 10,000.00

70.00

24,500.00

70.00

70,000.00

4.00

6,000.00

10.00

135,000.00

Rate (Rs.)

Amount (Rs.)

200.00

120,000.00

350.00 350.00

38,500.00 61,250.00

300.00

915,000.00

50.00

350,000.00

100.00

35,000.00

1,000.00

2,000.00

200.00

80,000.00

10.00

90,000.00

130.00

390,000.00

350.00

21,000.00

250.00

10,000.00

1,000.00 1,000.00 Total ======>

1,000.00 1,000.00 6,455,060.00

ENGINEER'S ESTIMATE CONSTRUCTION OF TECHNICAL BUILDING FOR NATIONAL REFINERY - KARACHI FIRST FLOOR Sr. No. 1

2

3

4

5

6

7

8

Description

Quantity

Unit

1,300.00 850.00 3,950.00 1,100.00 400.00 860.00

Cft. Cft. Cft. Cft. Cft. Cft.

2.00 24.00

Tonne Tonne

4,300.00 20.00

Cft. Cft.

Providing and laying ½" thick plain cement plaster in 1:4 cement mortar (as per D.I - 12) a. Ceiling b. Internal walls

1,500.00 16,000.00

Sft. Sft.

Providing and laying 3/4" thick plain cement plaster on external walls (as per D.I - 13)

14,500.00

Sft.

Providing and laying China Verona Marble Tiles floor (as per D.I - 15)

6,800.00

Sft.

Providing and laying China Verona Marble Tiles skirting (as per D.I - 16)

875.00

Sft.

Providing and laying non-skid Ceramic Tile Floor in Bath (as per D.I. - 18)

350.00

Sft.

Providing & laying RCC Class-B (1:1½:3) concrete (as per D.I - 8) a. Beams / Lintels b. Column in super structure c. Roof Slab d. Wall e. Staircase f. Projection / Pardi Providing & laying Steel Reinforcement (as per D.I - 10) a. M.S. Bars b. TOR Steel Bars Providing & laying Solid Block Masonry wall in superstructure (as per D.I - 11) a. 6" thick walls b. 4" thick walls

Sr. No. 9 10

11

12

13

14

15

Description

Quantity

Unit

1,200.00

Sft.

1,500.00

Sft.

16,000.00

Sft.

650.00

Sft.

Providing and fixing aluminum fully glazed sliding or fixed windows / ventilators (as per D.I. - 24)

3,100.00

Sft.

Providing and laying 2½" thick (average) C.C. 1:6 screed over roof (as per D.I. - 25)

6,500.00

Sft.

Providing and fixing Acoustic Tiles false ceiling (as per D.I. - 26)

6,000.00

Sft.

Providing and laying Glazed Tiles in Dado (as per D.I - 19) Providing and applying oil bound distemper on ceiling (as per D.I - 20) Providing and applying Plastic Emulsion Paint on internal walls (as per D.I - 21) Providing and fixing commercial ply flush door shutter with frame (as per D.I - 22)

16

P/F Staircase Railing (as per D.I. - 27)

350.00

Sft.

17

P/F Wooden Partitions (as per D.I. 29)

400.00

Sft.

18

P/A Weather Shield Paint on external surface (as per D.I. 30)

14,500.00

Sft.

19

Providing and laying China Verona Marble Tiles on steps (as per D.I - 17) a) Treads b) Risers

450.00 200.00

Sft. Sft.

3,100.00

Sft.

20

Providing and fixing M.S. Grills (as per D.I. - 31)

21

Kitchen Cabinet (low level) (as per D.I. 32)

60.00

Sft.

22

Kitchen Cabinet (high level) (as per D.I. 33)

40.00

Sft.

33

Providing and fixing marble partition in urinals (as per D.I. 35) a) 2½" x 1½' size a) 2½" x 1' size

1.00 1.00

No. No.

Sr. No.

34

Description

Supply and fixing sand in sunk slab (as per D.I. 34) Total ======>

Quantity

Unit

400.00

Cft.

ENGINEER'S ESTIMATE RUCTION OF TECHNICAL BUILDING NATIONAL REFINERY - KARACHI FIRST FLOOR Rate (Rs.)

Amount (Rs.)

82.00 82.00 82.00 82.00 85.00 85.00

106,600.00 69,700.00 323,900.00 90,200.00 34,000.00 73,100.00

27,000.00 28,000.00

54,000.00 672,000.00

50.00 52.00

215,000.00 1,040.00

8.00 8.00

12,000.00 128,000.00

10.00

145,000.00

60.00

408,000.00

35.00

30,625.00

70.00

24,500.00

Rate (Rs.)

Amount (Rs.)

70.00

84,000.00

4.00

6,000.00

10.00

160,000.00

200.00

130,000.00

300.00

930,000.00

12.00

78,000.00

50.00

300,000.00

100.00

35,000.00

200.00

80,000.00

10.00

145,000.00

65.00 40.00

29,250.00 8,000.00

130.00

403,000.00

350.00

21,000.00

250.00

10,000.00

1,000.00 1,000.00

1,000.00 1,000.00

Rate (Rs.)

10.00 Total ======>

Amount (Rs.)

4,000.00 4,812,915.00

ENGINEER'S ESTIMATE CONSTRUCTION OF TECHNICAL BUILDING FOR NATIONAL REFINERY - KARACHI SUMMARY OF COST FOR CIVIL WORKS 1

Ground Floor

Rs.

2

First Floor

Rs. Total Bid

Rebate (if any)

Rs. Rs.

Net Bid Amount

Rs.

Rupees in Word One Crore Twelve Lacs Sixty Seven Thousands Nine Hundred and Seventy Five Only

ENGINEER'S ESTIMATE STRUCTION OF TECHNICAL BUILDING OR NATIONAL REFINERY - KARACHI SUMMARY OF COST FOR CIVIL WORKS 6,455,060 4,812,915 11,267,975

11,267,975

One Crore Twelve Lacs Sixty Seven Thousands Nine Hundred and Seventy Five Only