Construction Cost Estimate

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Construction Cost Estimate as PDF for free.

More details

  • Words: 158
  • Pages: 1
4 STAR CITY FORD HOTEL VUNG TAU PRE - CONSTRUCTION COST ESTIMATED

1 BASEMENT 2 GROUND FLOOR

1,656 M2

x

250 USD/M2

=

414,000

USD

819 M

x

400 USD/M

=

327,600

USD

=

15,000

USD

2

2

_ LANDSCAPING, FOUNTAIN, FENCE 3 FIRST FLOOR

669 M2

x

360 USD/M2

=

240,840

USD

4 SECOND FLOOR

903 M2

x

420 USD/M2

=

379,260

USD

7,224 M2

x

300 USD/M2

=

2,167,200

USD

=

348,000

USD

5 3,4,5,6,7,8,9,10TH FLOOR HOTEL ROOM FURNITURE

116 RM

x

6 11th FLOOR

903 M2

x

420 USD/M2

=

379,260

USD

7 12th FLOOR

446 M

x

420 USD/M

=

187,320

USD

SWIMMING POOL

=

30,000

USD

FITNESS MASSAGE

=

25,000

USD

=

29,760

USD

4,543,240

USD

454,324

USD

4,997,564

USD

79,961,024,000 (80 ty)

VND

TERRACE GARDEN

2

248 M2

x

3,000 USD/RM 2

120 USD/M2

SUB TOTAL = CONTENGENCY 10% TOTAL CONSTRUCTION COST

=

COST AVERAGE PER ROOM: 43.000 USD/RM Ti gia 16000

Related Documents