NISHIT N TRIVEDI Mobile: 09428XXXX27
Tel: 0X9-27XXX481
E-Mail:
[email protected]
In quest of mid level assignments in Plant Operations & Maintenance / Instrumentation Designing with a reputed organization. PROFESSIONAL PROFILE An Instrumentation & Control Engineer with 2+ yrs of experience in Operations & Maintenance, Troubleshooting
of
equipments
in
well
known
organization.
Currently
associated
with
PirXXXX Glass Ltd (Campus Selection), XXXmba as Executive- Instrumentation Department. Gained experience in handling the complete plant operations entailing planning, resource utilization, maintenance & manpower management. Managed a wide spectrum of machinery, equipment & utilities; while curtailing the operational costs & expenses. Possess exposure to SAP & six-sigma techniques. Adept at installation and commissioning operations with demonstrated abilities in working on initiatives, thereby bringing down plant breakdown & achieving annual costs savings. An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational abilities. EXPERIENCE DETAILS Since Jul’07
PiXXXX Glass Ltd., XXXamba (PiraXXX Group) Executive- Instrumentation Department
Key Deliverables: Operations & Maintenance Planning and effecting preventive/ predictive/ breakdown maintenance schedules of various machineries and equipments in the plant to increase machine up time/ reliability. Experience in Process measurement/control instrumentation, Working on DCS (Yokogawa CS-1000), µXL(Yokogawa), Data-logger(Yokogawa DC-100). Good Exposure of SLCs/PLCs like(Siemens ,Allen-Bradley , LOGO), SCADA (Rs-VIEW/Step-7). Exposure of RTU /HMI OP-7(Siemens), Panel View 550(Allen-Bradley). Exposure of P&I diagrams/Panel Drawings, various type of control schemes, interlocks between the process & functional logic loops. Working on Various Natural gas flow control skids (GGCL/GAIL), Gas flow computer (Delta-Daniel). Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget. Exposure of Turbine Flow meter, Solenoid Valves, Fiber Optic temp.sensor (Land make). Exposure of PID Controllers(Honeywell,UT350,Nippon,West), T/C, RTD, Level / Proximity / Limit / Pressure / Flow Switch, Pressure Gauge, E/P Converter, Paramagnetic O2 Analyzer . Non Contact type ( HORN ) & Contact type ( ZIPPE ) make Level Controlling System. Installation, Calibration & testing of control valves, Pressure/Flow transmitters. Handling Electric Actuators, Control Valves, Positioners, Rotameter, Annuciator Panel, RelayContractors systems. Exposure of operation & configuration of AC DRIVES (ABB, Allen-Bradley, Reliance Electric etc.) Identifying areas of obstruction/ breakdowns and take steps to rectify the equipments through application of troubleshooting tools. Coordinating material/ spare parts planning related activities encompassing identification of vendors, requirement specification & offer evaluation through SAP. Installation & Commissioning Individually Commissioned the Automated Shrink Wrapping Machine from one plant unit to another plant unit on war basis. Individually Convert temperature loop to fiber optic thermometer from thermocouple in µXL DCS panel. Significant Contributions:
Resolved the problem of furnace pressure, by concluding the problem of input card in DCS-µXL(Yokogawa). Developed & implement the effective and efficient alarming loop in lehr control panel in running lehr condition. Design & Implement the logic for prevention of PLC o/p card burnt frequently, after this no o/p card gets burn in Automated shrink wrapping M/c. Solved the problem of frequent inverter (Reliance Electric- SP500) tripping by making necessary modification in control circuitry . Solved the problems related to stacker operation, it was not working perfectly in Euro shorting mode so by necessary modification in circuitry. Installed VFD’s in blowers & which can give a good amount of KWH saving. Reconditioned 2 nos. of Logicon make “Automated shrink Wrapping Machine” for smooth operation. Awarded Above Target (AT) for the financial year 2007-2008. Made 6 kaizens in the plant for minimizing breakdowns & process betterment (3 individual & 3 in groups). Manage efficiently a team of 10 Members. PROJECT UNDERTAKEN Reconditioned 2 no. of automatic shrink wrapping m/c during Shutdown of 75 TPD. Microcontroller (PB89C51) based “Automated Filling Conveyor System” with VB interfacing at Leons Integrations –Baroda. (Final Year major project) INPLANT TRAINING / WORKSHOP
Vocational Training at Indian Farmers Fertilizers Cooperative Ltd (IFFCO), Kalol Unit (4 Months). Attended workshop of PLC Programming & its application for the duration of one day. Attended 2 days SAP–PM (Plant Maintenance) Module training class. Attended ISO awareness training class. Attended workshop of LabVIEW 8.5 Programming & its application by NI (National Instruments) at Vadodara.
Attended National Conference of LabVIEW 8.6 Programming & its application by NI (National Instruments) at Vadodara. TECHNICAL VISITS
Dhuvaran Power Station (TPS). Indian Rayon (Textile Plant). EDUCATION 2007: 2003: 2000: 1998:
B.E. (Instrumentation & Control Engineering) from SVIT, XXAD (XX.Uni.) with 62.14 % marks. Diploma - Instrumentation & Control Engineering from XXXrat (T.E.B) with 63.07 % marks. H.S.C. from XXXchari Higher Secondary School, A’bad (GSEB) with 47.00 % marks. S.S.C. from XXada High School, (GSEB) with 71.29 % marks.
COMPUTER PROFICIENCY PLC ladder logic Programming. Basics of DCS Programming. Windows 98/2000/XP, MS-Office, Visual Basics-6,Lotus Notes. Programming in “C”, Microprocessor 8085, Micro Controller 8051. PERSONAL DETAILS Date of Birth
: 27th May, 1983.
Hobbies Language Reference
: Reading, Playing Volley Ball, Listening music, Making new friends. : Gujarati, Hindi, English. : Available upon Request.