Tin A

  • Uploaded by: Nishit Trivedi
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Tin A as PDF for free.

More details

  • Words: 486
  • Pages: 3
xxank Negi B.Tech(App. Electronics & Instrumentation.) Dehradun Institute Of Technology Mussorie Diversion Road, Dehradun-248001 (UTTARAKHAND) Email: [email protected]

307 Vraj Complex, Near Parivar Society Waghodia Road Baroda(Gujarat) -390019

[email protected]

Ph No-0265-2xx1579

Mob No: +91-999xxx6202 9411xxx710

CAREER OBJECTIVE Advance my career in the present competitive environment by joining the professionally and technologically driven organization that encourages a proactive approach and provides necessary exposure for professional and personal development WORK PROFILE Presently working with ABB SYSTEM HOUSE, xxxSE PROCESS CONTROL, VADODARA as a Trainee Instrumentation engineer from 23 july 2008 till date. Work Profile includes PLC programming, Preparing SCADA Screens, Panel Testing and Plant Commissioning. •

Calculation of Energy consumption by the machine using 50 Energy Meters(Modbus) and presented the data in SCADA Software at Deepak Plastic Industries, Chalisgaon.



Plc programming of a spiral cutting machine.



Power saving project using ABB PLC PM 500 SERIES & SCADA COMPACT HMI



Plant Commissioning at ABB Baroda.



PLC Programming using ABB PLC , Developing SCADA Screens using ABB Compact HMI and Plant Commissioning of a Rotary Vacuum Dryer Plant at DRDO Nashik.



PLC Programming, HMI Programming and panel testing of a zone having 6 rooms which has to be protected from High Voltage Area using ABB 500 Series PLC and 500 Series HMI..



Plant commissioning ( Material Handling) at ATUL Ltd Valsad, Gujrat.



Programming of a Robotic Hand using ABB PLC.

EDUCATION

Academic Qualification B.TECH ( Applied Electronics & Istrumentation Engg )

Year of Institute Passing xxradun Institute of (200xTechnology, xxadun 200x) 2002

XII X

2000

Govt. Inter College Pauri, Uttarakhand Govt. Inter College Pauri, Uttarakhand

Board/University U.P. Technical University, Lucknow Uttaranchal Board. Uttar Pradesh Board

CPI/ Percentage

66.22%

62% 59%

INDUSTRIAL INTERNSHIPS •

One week PLC Introduction (G.E. Fanuc) at Advance Training Institute under Ministry Of Labour And Empolyment, Dehradun from 14-1-2008 to 18-1-2008.



One week PLC Programming & Installation (G.E. Fanuc) at Advance Training Institute under Ministry Of Labour And Empolyment, Dehradun from 21-1-2008 to 25-1-2008



Six weeks summer training at ABB System House (Precise Process Control) Vadodara, Gujrat from 10th June to 20th July 2007.



Two month summer training at RANBAXY Ind. (PONTA SAHIB, H.P) from July 01, 2006 to August 31, 2006.

PROJECT



Bottle Axis Plant: This project is based on the process of filling liquids in the bottles with a desired quantity in a given time. The number of bottles can be varied according to the requirement.

AREA OF INTERST •

Transducer



Operational Amplifier



Process Automation

COMPUTER SKILLS • Operating Systems Platforms: Windows 9X/Me, XP. • Basic knowledge of PLC programming. STRENGTH

• •

Positive thinking Patience

PERSONAL INFORMATION



Father’s name

:

Mr xxxS Negi

• • • •

Date of Birth Languages Marital Status Permanent Address

: : : :



Phone No

:

09/04/ 1985 English, Hindi. Single H. No 2, xxx Quaters, I.T.I Niranjanpur xxradun xx8306202

Date: Place:

(xxxank Negi)

Related Documents

Tin A
June 2020 7
Tin
October 2019 27
Tin
May 2020 17
Tin A 1
June 2020 2
Tin
May 2020 14
Sunset Tin A
November 2019 4

More Documents from ""