IRCON INTERNATIONAL LIMITED ( A Govt. Of India Undertaking)

Quazigund-Baramulla New Rail Line Project,Srinagar

SUB CONTRACTR'S RUNNING /FINAL ACCOUNT BILL/C.C.

RA Bill/C.C. No………..15 th Name of Work…………Earth work in embankment zone E-21B between KM 3/000 to KM 10/000 in QZD - BARA new BG rail Name of Contractor.……M/S KASANA BROTHERS, D S PUNNU & Associates Pvt Ltd (JV) KANGAN, Srinagar (J & K). Contract Agreement/Work Order No…….... IRCON/1008/J&K-DLI/EW/E-21B/13346. DT: 09/12/2003. Contract Value……..Rs 4,11,32376.00/Date of Commencement of the work…………09th Dec' 2003. Schedule Date of Completion o Date of Measurement…………28.10.2005 Revised Date of Complition,if a Actual Date of Complition……N.A. Performance Bank Gurantee No…. Quantity Executed BOQ BOQ DESCRIPTION OF WORK UNIT Sl.NO. Since last QUANTITY ITEM Upto this Bill Upto last Bill Bill 1

2

1

1

2

4

3

5

3 Earth work in filling in embankment ………. Slope as directed by engineer - in - charge Mechanical compaction of earth work in layers as directed by engineer - in - charge. Providing blanketing on formation with blended material (Gravel, sand & clay) of approved quality …… as directed by engineer - in- charge

4

5

6

7

8

Cum

453500

346978.860

###

7057.714

Cum

462447

346978.860

###

7057.714

Cum

57525

17121.635 8820.960 8300.675

Grand total for value of work certified = Deduct For Contract Value @ 46.77% (-) = Net Payble Gross amount = Total Carried Forward=

Contractor S.NO.

BOQ ITEM

DESCRIPTION OF WORK

UNIT

BOQ QUANTITY

1

2

3

4

5

Quantity Executed Upto last Since last Upto this Bill Bill Bill

6

7

8

NON SCHEDULE ITEM 1

…… Earth work in excavation… … …. Providing & laying soling

2 ………stone below hume pipe…….

Cum

………

850.600

850.600

0.000

Cum

……….

48.787

48.787

0.000

Pcc 1:4:8 for electrical

3 ………conduits……

Providing & laying NP-4 class hume pipe…….

4 ………

5

…….. Earth work in cutting Earth work in filling with

6

…… GSB material ………….

7

…… GSB material ………….

Mechanical compaction of

……….

Cum

108.817

108.817

0.000

342.190

342.190

0.000

392.500

362.500

30.000

32.500

32.500

0.000

650.275

650.275

0.000

Cum

300 mm dia 600 mm dia 900 mm dia ……..

Cum

……..

1164.013

1164.013

0.000

Cum

……..

1164.013

1164.013

0.000

Mt

Grand Total For Value Of Work Certified = Net Payable amount of this bill =

( Rs. Twenty three lacs fifty four thousand five hundred thirty one and seventy four p

The measurements were made by me (Anil Kumar Verma) on the 28/10/2005 and are recorded at page no 10 no -369. .

Contractor (With official seal) Date

Certified that the forgoing claim is correct that the necessary measurement ware taken by Mr. Anil Kumar Verm 28/10/2005 and are recorded at at page NO.- 10 to 17 measurment book no - 369. And that the work has been

Dated : 28/10/2005

Manager

Certified that,

1. Measurements recorded in MB NO:369 pages 10 to 17, and MB NO.369 are fully accepted by me and I do not have any other claim agai 2. The labours employed by me have been paid minimum wages as fixed in similar type of work in the area.

3. All taxes including Royality charges.cess,etc.due to the Govt.on the materials used for this work have been fully paid and no payment is du 4. All the insurance polices as per previsions of the contract has been taken by me and are valid as on date.

5. I have extended the provident fund benefits to the staff engaged by me and requisites amount of provident fund has been remitted to the p 6.That the statutory formalities and guidelines has been complied with. DATE:___________________ Certified that,

CONTRACTOR.______________________

(M/S KASSANA BROTHERS, D.S PUNNU ASSO. PVT LT

1. The quantity billed is not more than the quantity actually executed at site. 2. No material has been issued to the contractor, for which the cost was to be recovered except such as specifically provided in the agreeme 3. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bi 4. In case of lump sum payment, approximate quantity billed is not more than the quantity actually executed at site.

5. That the certificate for consumption/recovery are recorded. 6. That the value of the bill/Quantity is not executed beyond the permissible limit.

7.That the entry has been made in DMTR/ Stock register/ and has been authenticated by the concerned official. That the above quantity billed to the client. 8. That the above quantity has been approved / certified and billed to the client. 9. That the statutory formalities and guidelines has been checked and complied with.

SE/AEN/AM Certified value of work Rs______________________________________________________________________________ Chargeable to ____________________________________and to be included in the account for the month of _____________ To be paid at ___________________________ in presence of _________________________ by Cheque on or before________

Dated__________________________

AL LIMITED

ing)

Project,Srinagar

ACCOUNT BILL/C.C. Date. 28.10.2005 10/000 in QZD - BARA new BG rail line project .

N, Srinagar (J & K).

6.

DT: 09/12/2003.

Schedule Date of Completion of Work……..8th Feb' 05. Revised Date of Complition,if any:-……………31st OCT .2005 No…. Valid upto…..16.04.2003. Amount Rate Upto this Upto last Bill Since last Bill Bill 9 10 11 12 105.00

8.00

###

35691720.3 3

2775830.88 2719369.17

741059.97

56461.71

425.00 7276694.88 3748908.00 3527786.88

e of work certified =

alue @ 46.77% (-) =

yble Gross amount =

tal Carried Forward=

42159997.5 0 19718230.8 ### 3 ### ### 22441766.6 ### 7 ###

4325308.56 2022946.81 2302361.74 2302361.74

SE/AE/AM Amount Rate

9 BF

Upto this Bill

Upto last Bill

Since last Bill

11 12 10 22441766.6 ### 7 2302361.74

98.00

83358.80

83358.80

0.00

564.00

27515.87

27515.87

0.00

2550.00 277483.35

277483.35

0.00

280937.99

280937.99

0.00

1739.00 682557.50

630387.50

52170.00

821

3393

110272.50

110272.50

0.00

18.41

11971.56

11971.56

0.00

237.11

275999.12

275999.12

0.00

4.46

5191.50

5191.50

0.00

###

2354531.74

Of Work Certified = amount of this bill =

###

2,354,531.74

hirty one and seventy four paise only.)

and are recorded at page no 10 to 17 of measurement book

SE /AEN / AM Date - 28/10/2005

e taken by Mr. Anil Kumar Verma, AM/Const. on the dated 69. And that the work has been satisfactorily performed.

Manager / DGM(Civil) / Mgr (const)

e and I do not have any other claim against this bill.

ve been fully paid and no payment is due to them.

rovident fund has been remitted to the provident fund commissioner.

______________

A BROTHERS, D.S PUNNU ASSO. PVT LTD. J.V)

as specifically provided in the agreement/work order. charges have been recovered in this bill. xecuted at site.

erned official. That the above quantity has been approved/

certified and

Manager / DGM(Civil) / Mgr (const

___________________ month of _____________ heque on or before________

Manager/DGM(civil)

IRCON INTERNATIONAL LIMITED ( A Govt. Of India Undertaking)

Quazigund-Baramulla New Rail Line Project,Srinagar

SUB CONTRACTR'S RUNNING /FINAL ACCOUNT BILL/C.C. RA Bill/C.C. No………..16 th Date. 02.03.2006 Name of Work…………Earth work in embankment zone E-21B between KM 3/000 to KM 10/000 in QZD - BARA new BG rail line project. Name of Contractor.……M/S KASANA BROTHERS, D S PUNNU & Associates Pvt Ltd (JV) KANGAN, Srinagar (J & K). Contract Agreement/Work Order No…….... IRCON/1008/J&K-DLI/EW/E-21B/13346. DT: 09/12/2003. Contract Value……..Rs 4,11,32376.00/Date of Commencement of the work…………09th Dec' 2003. Schedule Date of Completion of Work……..8th Feb' 05. (Extention Approved) Date of Measurement…………02.03.2006 Revised Date of Complition,if any:-…………… .2006 Actual Date of Complition……N.A. Performance Bank Gurantee No…. Valid upto…..16.04.2003. BOQ Sl.NO. ITEM 1

2

1

1

2

2

3

3

4

4

5

5

DESCRIPTION OF WORK

UNIT

Quantity Executed Upto this Bill Upto last Bill

7

Since last Bill

Rate

8

9

Upto this Bill 10

105.00

###

Since last Bill 12

6

453500

###

Cum

8947

1522.500

0.000

1522.500

33.00

50242.50

0.00

50242.50

Cum

8947

1522.500

0.000

1522.500

47.00

71557.50

0.00

71557.50

Cum

462447

###

Cum

57525

22474.835

346978.860 4116.401

346978.860 5638.901

17121.635

5353.200

8.00

425.00

Grand total for value of work certified = Deduct For Contract Value @ 46.77% (-) = Net Payble Gross amount = Total Carried Forward=

Contractor

Amount Upto last Bill 11

5

3 4 Earth work in filling in embankment ………. Slope Cum as directed by engineer in - charge Eaeth Work in cutting in all type of soil ……….. As directed by engineer in charge. loading leading & unloading of earth used in filling the same ……… as directed by engineer - in charege. Mechanical compaction of earth work in layers as directed by engineer - in charge. Providing blanketing on formation with blended material (Gravel, sand & clay) of approved quality …… as directed by engineer - in- charge

BOQ QUANTITY

36432780.3 432222.11 0

2820942.09 2775830.88

45111.21

9551804.88 7276694.88 2275110.00 46485306.0 2874243.31 6 21741177.6 ### 1344283.60 4 ### ### 1529959.72 24744128.4 1 1529959.72 ### ###

SE/AE/AM

S.NO.

BOQ ITEM

DESCRIPTION OF WORK

UNIT

BOQ QUANTITY

1

2

3

4

5

Quantity Executed Upto this Since last Upto last Bill Bill Bill

6

7

8

Amount Rate

9 BF

Upto this Bill Upto last Bill Since last Bill

10 ###

11 12 24744128.4 1 1529959.72

NON SCHEDULE ITEM 1

……… Earth work in excavation……. Cum

2

……… stone below hume pipe…….

3

……… conduits…… Providing & laying NP-4 ……… class hume pipe…….

4

5 6 7

Providing & laying soling Pcc 1:4:8 for electrical

…….. Earth work in cutting Earth work in filling with GSB material Mechanical compaction of …… GSB material ………….

……

………

887.100

850.600

36.500

98.00

86935.80

83358.80

3577.00

Cum

……….

51.037

48.787

2.250

564.00

28784.87

27515.87

1269.00

Cum

……….

110.505

108.817

1.688

2550.00

281787.75

277483.35

4304.40

349.690

342.190

7.500

821

287095.49

280937.99

6157.50

362.500

362.500

0.000

1739.00

630387.50

630387.50

0.00

32.500

32.500

0.000

3393

110272.50

110272.50

0.00

650.275

650.275

0.000

18.41

11971.56

11971.56

0.00

Cum

300 mm dia 600 mm dia 900 mm dia ……..

Cum

……..

1164.013

1164.013

0.000

237.11

275999.12

275999.12

0.00

Cum

……..

1164.013

1164.013

0.000

4.46

5191.50

5191.50

0.00

###

1545267.62

Mt

Grand Total For Value Of Work Certified = Net Payable amount of this bill =

###

1,545,267.62

( Rs. Fiftteen lacs Forty Five thousand Two hundred Sixty Seven and sixty two paisa only.)

The measurements were made by me (Anil Kumar Verma) on the 02/03/2006 and are recorded at page no 19 to 29 of measurement book no -369. .

Contractor

SE /AEN / AM

(With official seal) Date

Date - 02/03/2006

Certified that the forgoing claim is correct that the necessary measurement ware taken by Mr. Anil Kumar Verma, AM/Civil. on the dated 02/03/2006 and are recorded at at page NO.- 19 to 29 measurment book no - 369. And that the work has been satisfactorily performed.

Dated : 02/03/2006

Manager / DGM(Civil) / Mgr (const)

Certified that,

1. Measurements recorded in MB NO:369 pages 19 to 29, and MB NO.369 are fully accepted by me and I do not have any other claim against this bill. 2. The labours employed by me have been paid minimum wages as fixed in similar type of work in the area. 3. All taxes including Royality charges.cess,etc.due to the Govt.on the materials used for this work have been fully paid and no payment is due to them. 4. All the insurance polices as per previsions of the contract has been taken by me and are valid as on date. 5. I have extended the provident fund benefits to the staff engaged by me and requisites amount of provident fund has been remitted to the provident fund commissioner. 6.That the statutory formalities and guidelines has been complied with. DATE:___________________

CONTRACTOR.______________________

Certified that,

(M/S KASSANA BROTHERS, D.S PUNNU ASSO. PVT LTD. J.V)

1. The quantity billed is not more than the quantity actually executed at site. 2. No material has been issued to the contractor, for which the cost was to be recovered except such as specifically provided in the agreement/work order. 3. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill. 4. In case of lump sum payment, approximate quantity billed is not more than the quantity actually executed at site. 5. That the certificate for consumption/recovery are recorded. 6. That the value of the bill/Quantity is not executed beyond the permissible limit. 7.That the entry has been made in DMTR/ Stock register/ and has been authenticated by the concerned official. That the above quantity has been approved/ the client. 8. That the above quantity has been approved / certified and billed to the client. 9. That the statutory formalities and guidelines has been checked and complied with.

SE/AEN/AM

Manager / DGM(Civil) / Mgr (const

Certified value of work Rs______________________________________________________________________________ Chargeable to ____________________________________and to be included in the account for the month of _____________ To be paid at ___________________________ in presence of _________________________ by Cheque on or before________

Dated__________________________

certified and billed to

Manager/DGM(civil)

IRCON INTERNATIONAL LIMITED ( A Govt. Of India Undertaking)

Quazigund-Baramulla New Rail Line Project,Srinagar

SUB CONTRACTR'S RUNNING /FINAL ACCOUNT BILL/C.C. RA Bill/C.C. No………..17 th Date. 30.04.2006 Name of Work…………Earth work in embankment zone E-21B between KM 3/000 to KM 10/000 in QZD - BARA new BG rail line project. Name of Contractor.……M/S KASANA BROTHERS, D S PUNNU & Associates Pvt Ltd (JV) KANGAN, Srinagar (J & K). Contract Agreement/Work Order No…….... IRCON/1008/J&K-DLI/EW/E-21B/13346. DT: 09/12/2003. Contract Value……..Rs 4,11,32376.00/Date of Commencement of the work…………09th Dec' 2003. Schedule Date of Completion of Work……..8th Feb' 05. (Extention Approved) Date of Measurement…………30.04.2006 Revised Date of Complition,if any:-…………… .2006 Actual Date of Complition……N.A. Performance Bank Gurantee No…. Valid upto…..16.04.2003. BOQ Sl.NO. ITE M 1 2 1

1

2

2

3

3

4

4

5

5

DESCRIPTION OF WORK

3 Earth work in filling in embankment ………. Slope as directed by engineer - in - charge Eaeth Work in cutting in all type of soil ……….. As directed by engineer in charge. loading leading &

Amount Upto last Bill 11

BOQ QUANTITY

Upto this Bill

Upto last Bill

Since last Bill

Rate

4

5

6

7

8

9

Cum

453500

351095.261

###

0.000

105.00

Cum

8947

1522.500

1522.500

0.000

33.00

50242.50

50242.50

0.00

8947

1522.500

1522.500

0.000

35.00

53287.50

53287.50

0.00

462447

352617.761

###

0.000

8.00

2820942.09

2820942.09

0.00

unloading of earth used in filling the same ……… as Cum directed by engineer - in charege. Mechanical compaction of earth work in layers as Cum directed by engineer - in Providing blanketing on charge. formation with blended material (Gravel, sand & Cum clay) of approved quality …… as directed by engineer - in- charge

Contractor

Quantity Executed

UNIT

57525

25731.187 22474.835 3256.352

425.00

Upto this Bill 10

36865002.41 36865002.41

10935754.48 9551804.88

Since last Bill 12 0.00

1383949.60

Grand total for value of work certified = 50725228.97 49341279.37 1383949.60 Deduct For Contract Value @ 46.77% (-) = 23724189.59 23076916.36

647273.23

Net Payble Gross amount = 27001039.38 26264363.01

736676.37

736676.37 Total Carried Forward= 27001039.38 26264363.01 SE/AE/AM

S.NO.

BOQ ITEM

DESCRIPTION OF WORK

UNIT

BOQ QUANTITY

1

2

3

4

5

Quantity Executed Upto this Upto last Since Bill Bill last Bill

6

7

8

Amount Rate

9 BF

1 2 3 4

5 6 7

…… Earth work in excavation… … …. Providing & laying soling ……… stone below hume pipe……. Pcc 1:4:8 for electrical ……… conduits……

Providing & laying NP-4 ……… class hume pipe…….

…….. Earth work in cutting

Upto last Bill

Since last Bill

10

11

12

27001039.38 26264363.01

736676.37

NON SCHEDULE ITEM Cum

………

919.100

887.100

32.000

98.00

90071.80

86935.80

3136.00

Cum

……….

51.037

51.037

0.000

564.00

28784.87

28784.87

0.00

……….

118.257

110.505

7.752

2550.00

301555.35

281787.75

19767.60

392.190

349.690

42.500

821.00

321987.99

287095.49

34892.50

5.000

0.000

5.000

1339.00

6695.00

0.00

6695.00

370.000

362.500

7.500

1739.00

643430.00

630387.50

13042.50

32.500 667.400

32.500 650.275

0.000 17.125

3393.00 18.41

110272.50 12286.83

110272.50 11971.56

0.00 315.27

……..

1167.438

1164.013

3.425

237.11

276811.22

275999.12

812.10

……..

1167.438

1164.013

3.425

4.46

5206.77

5191.50

15.28

Cum Mt

Cum

Earth work in filling with GSB Cum material Mechanical compaction of Cum …… GSB material ………….

……

Upto this Bill

300 mm dia 450 mm dia 600 mm dia 900 mm dia ……..

Grand Total For Value Of Work Certified = 28798141.72 27982789.10 815352.62 815,352.62 Net Payable amount of this bill =

( Rs. Eight lacs Fifteen thousand Three hundred Fifty two and Sixty two only.) The measurements were made by me (Anil Kumar Verma) on the 30/04/2006 and are recorded at page no 56 to 64 of measurement book no -369. .

The measurements were made by me (Anil Kumar Verma) on the 30/04/2006 and are recorded at page no 56 to 64 of measurement book no -369. .

Contractor

SE /AEN / AM

(With official seal) Date

Date -30/04/2006

Certified that the forgoing claim is correct that the necessary measurement ware taken by Mr. Anil Kumar Verma, AM/Civil. on the dated 30/04/2006 and are recorded at at page NO.- 50 to 64 measurment book no - 369. And that the work has been satisfactorily performed.

Dated : 30/04/2006

Manager / DGM(Civil) / Mgr (const)

Certified that,

1. Measurements recorded in MB NO:369 pages 50 to 64, and MB NO.369 are fully accepted by me and I do not have any other claim against this bill. 2. The labours employed by me have been paid minimum wages as fixed in similar type of work in the area. 3. All taxes including Royality charges.cess,etc.due to the Govt.on the materials used for this work have been fully paid and no payment is due to them. 4. All the insurance polices as per previsions of the contract has been taken by me and are valid as on date. 5. I have extended the provident fund benefits to the staff engaged by me and requisites amount of provident fund has been remitted to the provident fund commissioner. 6.That the statutory formalities and guidelines has been complied with. DATE:___________________

CONTRACTOR.______________________

Certified that,

(M/S KASSANA BROTHERS, D.S PUNNU ASSO. PVT LTD. J.V)

1. The quantity billed is not more than the quantity actually executed at site. 2. No material has been issued to the contractor, for which the cost was to be recovered except such as specifically provided in the agreement/work order. 3. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill. 4. In case of lump sum payment, approximate quantity billed is not more than the quantity actually executed at site. 5. That the certificate for consumption/recovery are recorded. 6. That the value of the bill/Quantity is not executed beyond the permissible limit. 7.That the entry has been made in DMTR/ Stock register/ and has been authenticated by the concerned official. That the above quantity has been approved/ the client. 8. That the above quantity has been approved / certified and billed to the client. 9. That the statutory formalities and guidelines has been checked and complied with.

SE/AEN/AM

Manager / DGM(Civil) / Mgr (const

Certified value of work Rs______________________________________________________________________________ Chargeable to ____________________________________and to be included in the account for the month of _____________ To be paid at ___________________________ in presence of _________________________ by Cheque on or before________

Dated__________________________

certified and billed to

Manager/DGM(civil)

IRCON INTERNATIONAL LIMITED ( A Govt. Of India Undertaking)

Quazigund-Baramulla New Rail Line Project,Srinagar

SUB CONTRACTR'S RUNNING /FINAL ACCOUNT BILL/C.C. RA Bill/C.C. No………..18 th Date. 30.06.2006 Name of Work…………Earth work in embankment zone E-21B between KM 3/000 to KM 10/000 in QZD - BARA new BG rail line project. Name of Contractor.……M/S KASANA BROTHERS, D S PUNNU & Associates Pvt Ltd (JV) KANGAN, Srinagar (J & K). Contract Agreement/Work Order No…….... IRCON/1008/J&K-DLI/EW/E-21B/13346. DT: 09/12/2003. Contract Value……..Rs 4,11,32376.00/Date of Commencement of the work…………09th Dec' 2003. Schedule Date of Completion of Work……..8th Feb' 05. (Extention Approved) Date of Measurement…………30.06.2006 Revised Date of Complition,if any:-…………… .2006 Actual Date of Complition……N.A. Performance Bank Gurantee No…. Valid upto…..16.04.2003.

Sl.NO.

BOQ ITEM

1

2

1

1

2

2

DESCRIPTION OF WORK

3 Earth work in filling in embankment ………. Slope as directed by engineer - in charge Eaeth Work in cutting in all type of soil ……….. As directed by engineer in charge.

UNIT

BOQ QUANTITY

4

Rate

Amount Upto last Bill 11

Upto last Bill

Since last Bill

5

6

7

8

9

Upto this Bill 10

Cum

453500

###

###

0.000

105.00

###

36865002.4 1

0.00

Cum

8947

1522.500

1522.500

0.000

33.00

50242.50

50242.50

0.00

8947

1522.500

1522.500

0.000

35.00

53287.50

53287.50

0.00

462447

###

###

0.000

8.00

2311.452

425.00

3

3

loading leading & unloading of earth used in filling the same … Cum …… as directed by engineer in - charege.

4

4

Mechanical compaction of earth work in layers as directed Cum by engineer - in - charge.

5

Providing blanketing on formation with blended material (Gravel, sand & clay) of approved quality …… as directed by engineer - incharge

5

Quantity Executed Upto this Bill

Cum

57525

28042.639 25731.187

Grand total for value of work certified = Deduct For Contract Value @ 46.77% (-) = Net Payble Gross amount = Total Carried Forward=

2820942.09 2820942.09

###

0.00

10935754.4 982367.10 8

50725228.9 7 23724189.5 ### 9 ### ### 27001039.3 8 ### ###

Since last Bill 12

982367.10 459453.09 522914.01 522914.01

Contractor

SE/AE/AM

SL.NO.

BOQ ITEM

DESCRIPTION OF WORK

UNIT

BOQ QUANTITY

1

2

3

4

5

Quantity Executed Upto this Upto last Since last Bill Bill Bill

6

7

8

Amount Rate

9 BF

Upto this Bill Upto last Bill

10

Since last Bill

11

12

27001039.3 8 522914.01 ###

NON SCHEDULE ITEM 1

……… Earth work in excavation…….

Cum

………

1250.000

919.100

330.900

98.00

122500.00

90071.80

32428.20

2

Providing & laying soling stone ……… below hume pipe…….

Cum

……….

55.962

51.037

4.925

564.00

31562.57

28784.87

2777.70

3

………

Cum

……….

118.257

118.257

0.000

301555.35

0.00

Mt

300 mm dia

392.190

392.190

0.000

321987.99

321987.99

0.00

450 mm dia 600 mm dia 900 mm dia

5.000 370.000 32.500

5.000 370.000 32.500

0.000 0.000 0.000

1339.00 6695.00 1739.00 643430.00 3393.00 110272.50

6695.00 643430.00 110272.50

0.00 0.00 0.00

4

Pcc 1:4:8 for electrical conduits…… Providing & laying NP-4 class ……… hume pipe…….

2550.00 301555.35 821.00

EXTRA WORK ITEM 1 2 3 4

…….. Earth work in cutting Earth work in filling with GSB …… material Mechanical compaction of GSB …… material …………. Providing Sand bags at the …… minor bridges approaches

Cum

……..

633.150

650.275

-17.125

18.41

11656.29

11971.56

-315.27

Cum

……..

1164.013

1167.438

-3.425

237.11

275999.12

276811.22

-812.10

Cum

……..

1164.013

1167.438

-3.425

4.46

5191.50

5206.77

-15.28

Nos.

……..

23495.000

0.000

23495.000

13.29

312248.55

0.00

312248.55

###

###

869225.81

Net Payable amount of this bill =

869,225.81

( Rs. Seven lacs Ninty six thousand Three hundred Eighty two and Twenty sixty only.)

Contractor

SE /AEN / AM

(With official seal) Date

Date -30/06/2006

Certified that the forgoing claim is correct that the necessary measurement ware taken by Mr. Anil Kumar Verma, AM/Civil. on the dated 30/06/2006 and are recorded at at page NO.- 66 to 72 measurment book no - 369. And that the work has been satisfactorily performed.

Dated : 30/06/2006

Manager / DGM(Civil) / Mgr (const)

Certified that,

1. Measurements recorded in MB NO:369 pages 66 to 72, and are fully accepted by me and I do not have any other claim against this bill. 2. The labours employed by me have been paid minimum wages as fixed in similar type of work in the area. 3. All taxes including Royality charges.cess,etc.due to the Govt.on the materials used for this work have been fully paid and no payment is due to them. 4. All the insurance polices as per previsions of the contract has been taken by me and are valid as on date. 5. I have extended the provident fund benefits to the staff engaged by me and requisites amount of provident fund has been remitted to the provident fund commissioner. 6.That the statutory formalities and guidelines has been complied with. DATE:___________________

CONTRACTOR.______________________

Certified that,

(M/S KASSANA BROTHERS, D.S PUNNU ASSO. PVT LTD. J.V)

1. The quantity billed is not more than the quantity actually executed at site. 2. No material has been issued to the contractor, for which the cost was to be recovered except such as specifically provided in the agreement/work order. 3. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill. 4. In case of lump sum payment, approximate quantity billed is not more than the quantity actually executed at site. 5. That the certificate for consumption/recovery are recorded. 6. That the value of the bill/Quantity is not executed beyond the permissible limit. 7.That the entry has been made in DMTR/ Stock register/ and has been authenticated by the concerned official. That the above quantity has been approved/ 8. That the above quantity has been approved / certified and billed to the client. 9. That the statutory formalities and guidelines has been checked and complied with.

SE/AEN/AM

Manager / DGM(Civil) / Mgr (const

Certified value of work Rs______________________________________________________________________________ Chargeable to ____________________________________and to be included in the account for the month of _____________ To be paid at ___________________________ in presence of _________________________ by Cheque on or before________

Dated__________________________

certified and billed to the client.

Manager/DGM(civil)

Schedule Date of Completion of Work……..8th Feb' 05. (Extention Approved)

IRCON INTERNATIONAL LIMITED ( A Govt. Of India Undertaking)

Quazigund-Baramulla New Rail Line Project,Srinagar

SUB CONTRACTR'S RUNNING /FINAL ACCOUNT BILL/C.C.

RA Bill/C.C. No………..19 th Name of Work…………Earth work in embankment zone E-21B between KM 3/000 to KM 10/000 in QZD - BARA new BG rail Name of Contractor.……M/S KASANA BROTHERS, D S PUNNU & Associates Pvt Ltd (JV) KANGAN, Srinagar (J & K). Contract Agreement/Work Order No…….... IRCON/1008/J&K-DLI/EW/E-21B/13346. DT: 09/12/2003. Contract Value……..Rs 4,11,32376.00/Date of Commencement of the work…………09th Dec' 2003. Schedule Date of Completion of W Date of Measurement…………30.08.2006 Actual Date of Complition……N.A. Performance Bank Gurantee No….

Sl.NO.

BOQ ITEM

1

2

1

1

2

2

3

3

4

4

5

5

DESCRIPTION OF WORK

UNIT

BOQ QUANTITY

3 Earth work in filling in embankment ………. Slope as directed by engineer - in charge Eaeth Work in cutting in all type of soil ……….. As directed by engineer in charge. loading leading & unloading of earth used in filling the same … …… as directed by engineer - in - charege. Mechanical compaction of earth work in layers as directed by engineer in - charge. Providing -blanketing on formation with blended material (Gravel, sand & clay) of approved quality …… as directed by engineer - incharge

4

Quantity Executed Upto this Bill

Upto last Bill

5

6

7

Cum

453500

###

###

Cum

8947

1522.500

1522.500

Cum

8947

1522.500

1522.500

Cum

462447

###

###

Cum

57525

29368.614 28042.639

Grand total for value of work certified = Deduct For Contract Value @ 46.77% (-) = Net Payble Gross amount = Total Carried Forward=

Contractor

SL.NO.

BOQ ITEM

DESCRIPTION OF WORK

UNIT

1

2

3

4

Quantity Executed BOQ Upto this Upto last QUANTITY Bill Bill

5

6

7

NON SCHEDULE ITEM 1

…… Earth work in excavation…….

2

……… below hume pipe……. Pcc 1:4:8 for electrical ……… conduits…… Providing & laying NP-4 class ……… hume pipe…….

3 4

Providing & laying soling stone

Cum

………

1250.000

1250.000

Cum

……….

55.962

55.962

Cum

……….

118.257

118.257

Mt

300 mm dia

392.190

392.190

450 mm dia 600 mm dia 900 mm dia

5.000

5.000

370.000

370.000

32.500

32.500

EXTRA WORK ITEM 1 2 3 4

…….. Earth work in cutting Earth work in filling with GSB …… material Mechanical compaction of GSB …… material …………. Providing Sand bags at the …… minor bridges approaches

Cum

……..

650.275

650.275

Cum

……..

1164.013

1164.013

Cum

……..

1164.013

1164.013

Nos.

……..

28803.000 23495.000 Net Payable amount of this bill =

( Rs. Three lacs Seventy thousand Five hundred Fifteen and Thirty three Pais

Contractor (With official seal) Date

Certified that the forgoing claim is correct that the necessary measurement ware taken by Mr. Arivazhagan G, A and are recorded at at page NO.- 75 to 81 measurment book no - 369. And that the work has been satisfactoril

Dated : 30/08/2006

Mana

Certified that,

1. Measurements recorded in MB NO:369 pages 75 to 81, and are fully accepted by me and I do not have any other claim against this bill. 2. The labours employed by me have been paid minimum wages as fixed in similar type of work in the area. 3. All taxes including Royality charges.cess,etc.due to the Govt.on the materials used for this work have been fully paid and no payment is du 4. All the insurance polices as per previsions of the contract has been taken by me and are valid as on date. 5. I have extended the provident fund benefits to the staff engaged by me and requisites amount of provident fund has been remitted to the p 6.That the statutory formalities and guidelines has been complied with.

DATE:___________________

CONTRACTOR.______________________

Certified that,

(M/S KASSANA BROTHERS, D.S PUNNU ASS

1. The quantity billed is not more than the quantity actually executed at site. 2. No material has been issued to the contractor, for which the cost was to be recovered except such as specifically provided in the agreeme 3. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bi 4. In case of lump sum payment, approximate quantity billed is not more than the quantity actually executed at site. 5. That the certificate for consumption/recovery are recorded. 6. That the value of the bill/Quantity is not executed beyond the permissible limit. 7.That the entry has been made in DMTR/ Stock register/ and has been authenticated by the concerned official. That the above quantity h client. 8. That the above quantity has been approved / certified and billed to the client. 9. That the statutory formalities and guidelines has been checked and complied with.

SE/AEN/AM Certified value of work Rs______________________________________________________________________________ Chargeable to ____________________________________and to be included in the account for the month of _____________ To be paid at ___________________________ in presence of _________________________ by Cheque on or before________

Dated__________________________

ONAL LIMITED

ndertaking)

il Line Project,Srinagar

INAL ACCOUNT BILL/C.C.

Date. 30.08.2006 M 10/000 in QZD - BARA new BG rail line project .

AN, Srinagar (J & K).

46.

DT: 09/12/2003.

Schedule Date of Completion of Work……..8th Feb' 05. (Extention Approved) Revised Date of Complition,if any:- 30th September 2006 e No…. Valid upto…..16.04.2003.

tity Executed

Amount Upto last Bill 11

Since last Bill

Rate

8

9

Upto this Bill 10

0.000

105.00

###

36865002.4 1

0.00

0.000

33.00

50242.50

50242.50

0.00

0.000

35.00

53287.50

53287.50

0.00

0.000

8.00

1325.975

425.00

tal for value of work certified = Contract Value @ 46.77% (-) = Net Payble Gross amount = Total Carried Forward=

2820942.09 2820942.09

###

Since last Bill 12

0.00

11918121.5 563539.38 8

51707596.0 7 24183642.6 ### 8 ### ### 27523953.3 ### 9 ###

563539.38 263567.37 299972.01 299972.01

SE/AE/AM

tity Executed Since last Bill

8

Amount Rate

9

Upto this Bill

Upto last Bill

Since last Bill

10

11

12

BF

###

27523953.3 9 299972.01

0.000

98.00

122500.00

122500.00

0.00

0.000

564.00

31562.57

31562.57

0.00

0.000

2550.00

301555.35

301555.35

0.00

0.000

821.00

321987.99

321987.99

0.00

0.000

1339.00

6695.00

6695.00

0.00

0.000

1739.00

643430.00

643430.00

0.00

0.000

3393.00

110272.50

110272.50

0.00

0.000

18.41

11971.56

11971.56

0.00

0.000

237.11

275999.12

275999.12

0.00

0.000

4.46

5191.50

5191.50

0.00

5308.000

13.29

382791.87

312248.55

70543.32

###

###

370515.33

et Payable amount of this bill =

370,515.33

ed Fifteen and Thirty three Paise only.)

SE /AEN / AM Date -30/08/2006

are taken by Mr. Arivazhagan G, AM/Const. on the dated 30/08/2006 at the work has been satisfactorily performed.

Manager / DGM(Civil) / Mgr (const)

not have any other claim against this bill.

have been fully paid and no payment is due to them. provident fund has been remitted to the provident fund commissioner.

________________

M/S KASSANA BROTHERS, D.S PUNNU ASSO. PVT LTD. J.V)

ch as specifically provided in the agreement/work order. re charges have been recovered in this bill. executed at site.

cerned official. That the above quantity has been approved/

certified and billed to the

Manager / DGM(Civil) / Mgr (const

____________________ e month of _____________ Cheque on or before________

Manager/DGM(civil)

IRCON INTERNATIONAL LIMITED ( A Govt. Of India Undertaking)

Quazigund-Baramulla New Rail Line Project,Srinagar

SUB CONTRACTR'S RUNNING /FINAL ACCOUNT BILL/C.C.

RA Bill/C.C. No………..20 th Name of Work…………Earth work in embankment zone E-21B between KM 3/000 to KM 10/000 in QZD - BARA new BG rail Name of Contractor.……M/S KASANA BROTHERS, D S PUNNU & Associates Pvt Ltd (JV) KANGAN, Srinagar (J & K). Contract Agreement/Work Order No…….... IRCON/1008/J&K-DLI/EW/E-21B/13346. DT: 09/12/2003. Contract Value……..Rs 4,11,32376.00/Date of Commencement of the work…………09th Dec' 2003. Schedule Date of Completion of Date of Measurement…………27.09.2006 Actual Date of Complition……N.A. Performance Bank Gurantee No….

Sl.NO.

BOQ ITEM

1

2

1

1

2

2

3

3

4

4

5

5

DESCRIPTION OF WORK

UNIT

BOQ QUANTITY

3 in Earth work in filling embankment ………. Slope as directed by engineer - in charge Eaeth Work in cutting in all type of soil ……….. As directed by engineer in charge. loading leading & unloading of earth used in filling the same … …… as directed by engineer - in - charege. Mechanical compaction of earth work in layers as directed by engineer - in - charge. Providing blanketing on formation with blended material (Gravel, sand & clay) of approved quality …… as directed by engineer - in- charge

4

Quantity Executed Upto this Bill

Upto last Bill

5

6

7

Cum

453500

###

###

Cum

8947

1522.500

1522.500

Cum

8947

1522.500

1522.500

Cum

462447

###

###

Cum

57525

30164.777 29368.614

Grand total for value of work certified = Deduct For Contract Value @ 46.77% (-) = Net Payble Gross amount = Total Carried Forward=

Contractor

SL.NO.

BOQ ITEM

DESCRIPTION OF WORK

UNIT

1

2

3

4

Quantity Executed BOQ QUANTITY Upto this Upto last Bill Bill

5

6

7

NON SCHEDULE ITEM 1 2 3 4

……

Earth work in excavation……. Providing & laying soling stone

……… below hume pipe……. Pcc 1:4:8 for electrical ……… conduits…… Providing & laying NP-4 class ……… hume pipe…….

Cum

………

1250.000

1250.000

Cum

……….

55.962

55.962

Cum

……….

118.257

118.257

Mt

300 mm dia

392.190

392.190

450 mm dia 600 mm dia 900 mm dia

5.000

5.000

370.000

370.000

32.500

32.500

EXTRA WORK ITEM 1 2 3 4

…….. Earth work in cutting Earth work in filling with GSB …… material Mechanical compaction of GSB …… material …………. Providing Sand bags at the …… minor bridges approaches

Cum

……..

650.275

650.275

Cum

……..

1164.013

1164.013

Cum

……..

1164.013

1164.013

Nos.

……..

28803.000 28803.000 Net Payable amount of this bill =

( Rs. Four lacs One thousand Two hundred Twenty One and Twenty Seven Pa

Contractor (With official seal) Date

Certified that the forgoing claim is correct that the necessary measurement ware taken by Mr. Arivazhagan G, A and are recorded at at page NO.- 83 to 91 measurment book no - 369. And that the work has been satisfactoril

Dated : 27/09/2006

Mana

Certified that,

1. Measurements recorded in MB NO:369 pages 83 to 91, and are fully accepted by me and I do not have any other claim against this bill. 2. The labours employed by me have been paid minimum wages as fixed in similar type of work in the area. 3. All taxes including Royality charges.cess,etc.due to the Govt.on the materials used for this work have been fully paid and no payment is du 4. All the insurance polices as per previsions of the contract has been taken by me and are valid as on date. 5. I have extended the provident fund benefits to the staff engaged by me and requisites amount of provident fund has been remitted to the p 6.That the statutory formalities and guidelines has been complied with. DATE:___________________ Certified that,

CONTRACTOR.______________________

(M/S KASSANA BROTHERS, D.S PUNNU A

1. The quantity billed is not more than the quantity actually executed at site. 2. No material has been issued to the contractor, for which the cost was to be recovered except such as specifically provided in the agreeme 3. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bi 4. In case of lump sum payment, approximate quantity billed is not more than the quantity actually executed at site. 5. That the certificate for consumption/recovery are recorded. 6. That the value of the bill/Quantity is not executed beyond the permissible limit. 7.That the entry has been made in DMTR/ Stock register/ and has been authenticated by the concerned official. That the above quantity client. 8. That the above quantity has been approved / certified and billed to the client. 9. That the statutory formalities and guidelines has been checked and complied with.

SE/AEN/AM Certified value of work Rs______________________________________________________________________________ Chargeable to ____________________________________and to be included in the account for the month of _____________ To be paid at ___________________________ in presence of _________________________ by Cheque on or before________

Dated__________________________

ONAL LIMITED

dertaking)

Line Project,Srinagar

NAL ACCOUNT BILL/C.C.

Date. 27.09.2006 10/000 in QZD - BARA new BG rail line project.

N, Srinagar (J & K).

.

DT: 09/12/2003.

Schedule Date of Completion of Work……..8th Feb' 05. (Extention Approved) Revised Date of Complition,if any:- 30th September 2006 No…. Valid upto…..16.04.2003.

tity Executed

Amount Upto last Bill 11

Since last Bill

Rate

8

9

Upto this Bill 10

3675.938

105.00

###

0.000

33.00

50242.50

50242.50

0.00

0.000

35.00

53287.50

53287.50

0.00

3675.938

8.00

796.163

425.00

al for value of work certified =

Contract Value @ 46.77% (-) = Net Payble Gross amount = Total Carried Forward=

36865002.4 385973.49 1

2850349.59 2820942.09

###

Since last Bill 12

29407.50

12481660.9 338369.28 5

52271135.4 4 24447210.0 ### 5 ### ### 27823925.4 ### 0 ###

753750.27 352529.00 401221.27 401221.27

SE/AE/AM

tity Executed Since last Bill

8

Amount Rate

9 BF

Upto this Bill

10

Upto last Bill Since last Bill 11

12

27823925.4 ### 0 401221.27

0.000

98.00

122500.00

122500.00

0.00

0.000

564.00

31562.57

31562.57

0.00

0.000

2550.00

301555.35

301555.35

0.00

0.000

821.00

321987.99

321987.99

0.00

0.000

1339.00

6695.00

6695.00

0.00

0.000

1739.00

643430.00

643430.00

0.00

0.000

3393.00

110272.50

110272.50

0.00

0.000

18.41

11971.56

11971.56

0.00

0.000

237.11

275999.12

275999.12

0.00

0.000

4.46

5191.50

5191.50

0.00

0.000

13.29

382791.87

382791.87

0.00

###

###

401221.27

t Payable amount of this bill =

401,221.27

ty One and Twenty Seven Paise only.)

SE /AEN / AM Date -27/09/2006

e taken by Mr. Arivazhagan G, AM/Const. on the dated 27/09/2006 the work has been satisfactorily performed.

Manager / DGM(Civil) / Mgr (const) have any other claim against this bill.

ve been fully paid and no payment is due to them.

ovident fund has been remitted to the provident fund commissioner.

_____________

M/S KASSANA BROTHERS, D.S PUNNU ASSO. PVT LTD. J.V)

as specifically provided in the agreement/work order. charges have been recovered in this bill. ecuted at site.

erned official. That the above quantity has been approved/

certified and billed to the

Manager / DGM(Civil) / Mgr (const

__________________ month of _____________ eque on or before________

Manager/DGM(civil)

IRCON INTERNATIONAL LIMITED ( A Govt. Of India Undertaking)

Quazigund-Baramulla New Rail Line Project,Srinagar

SUB CONTRACTR'S RUNNING /FINAL ACCOUNT BILL/C.C. RA Bill/C.C. No………..21st Date. 31.03.2007 Name of Work…………Earth work in embankment zone E-21B between KM 3/000 to KM 10/000 in QZD - BARA new BG rail line project. Name of Contractor.……M/S KASANA BROTHERS, D S PUNNU & Associates Pvt Ltd (JV) KANGAN, Srinagar (J & K). Contract Agreement/Work Order No…….... IRCON/1008/J&K-DLI/EW/E-21B/13346. DT: 09/12/2003. Contract Value……..Rs 4,11,32376.00/Date of Commencement of the work…………09th Dec' 2003. Schedule Date of Completion of Work……..8th Feb' 05. (Extention Approved) Date of Measurement…………31.03.2007 Revised Date of Complition,if any:- -------------------------- 2007 Actual Date of Complition……N.A. Performance Bank Gurantee No…. Valid upto…..16.04.2003.

Sl.NO.

BOQ ITEM

1

2

1

1

2

2

3

3

4

4

5

5

Quantity Executed

BOQ QUANTITY Upto this Bill Upto last Bill

Since last Bill

Rate

8

9

Upto this Bill 10

Amount Upto last Bill 11

Since last Bill 12

DESCRIPTION OF WORK

UNIT

3 Earth work in filling in embankment ………. Slope as directed by engineer - in charge Eaeth Work in cutting in all type of soil ……….. As directed by engineer in charge. loading leading & unloading of earth used in filling the same ……… as directed by engineer - in - charege. Mechanical compaction of earth work in layers as directed by engineer - in charge. Providing blanketing on formation with blended material (Gravel, sand & clay) of approved quality …… as directed by engineer - incharge

4

5

6

Cum

453500

###

Cum

8947

1522.500

1522.500

0.000

33.00

50242.50

50242.50

0.00

Cum

8947

1522.500

1522.500

0.000

35.00

53287.50

53287.50

0.00

Cum

462447

###

8.00

2873312.82

2850349.59

22963.22

Cum

57525

30899.808

7

354771.199 2870.403

356293.699 2870.403

30164.777

735.031

105.00 37552368.21 37250975.90 301392.32

425.00 13132418.40 12820030.23 312388.18

Grand total for value of work certified = Deduct For Contract Value @ 46.77% (-) = Net Payble Gross amount = Total Carried Forward=

53661629.43 25097544.08 28564085.34 28564085.34

53024885.71 24799739.05 28225146.66 28225146.66

636743.71 297805.04 338938.68 338938.68

Contractor

SE/AE/AM

Amount

Quantity Executed BOQ SL.NO. ITEM

1

DESCRIPTION OF WORK

UNIT

BOQ QUANTITY

3

4

5

2

Upto this Since last Upto last Bill Bill Bill

6

7

8

Rate

9 BF

Upto this Bill

Upto last Bill

Since last Bill

11 12 10 28564085.34 28225146.66 338938.68

NON SCHEDULE ITEM 1

……

Earth work in excavation……. Providing & laying soling stone

2

……… below hume pipe…….

3

………

4

Pcc 1:4:8 for electrical conduits…… Providing & laying NP-4 class ……… hume pipe…….

Cum

………

1250.000

1250.000

0.000

98.00

122500.00

122500.00

0.00

Cum

……….

55.962

55.962

0.000

564.00

31562.57

31562.57

0.00

Cum

……….

118.257

118.257

0.000

2550.0 0

301555.35

301555.35

0.00

Mt

300 mm dia

392.190

392.190

0.000

821.00

321987.99

321987.99

0.00

450 mm dia

5.000

5.000

0.000

6695.00

6695.00

0.00

600 mm dia

370.000

370.000

0.000

1339.0 0 1739.0

643430.00

0.00

32.500

32.500

0.000

0 3393.0 0

643430.00

900 mm dia

110272.50

110272.50

0.00

EXTRA WORK ITEM 1

…….. Earth work in cutting

2

……

3

……

4

……

Earth work in filling with GSB material Mechanical compaction of GSB material …………. Providing Sand bags at the minor bridges approaches

Cum

……..

650.275

650.275

0.000

18.41

11971.56

11971.56

0.00

Cum

……..

1164.013

1164.013

0.000

237.11

275999.12

275999.12

0.00

Cum

……..

1164.013

1164.013

0.000

4.46

5191.50

5191.50

0.00

Nos.

……..

28803.000

28803.000

0.000

13.29

382791.87

382791.87

0.00

30778042.80 30439104.13 338938.68 Net Payable amount of this bill =

338,938.68

( Rs. Three lacs Thirty Eight thousand Nine hundred Thirty Eight and Sixty Eight Paise only.)

Contractor

SE /AEN / AM

(With official seal) Date

Date -31/03/2007

Certified that the forgoing claim is correct that the necessary measurement ware taken by Mr. Anil Kumar Verma, AM/Civil. on the dated 31/03/2007 and are recorded at at page NO.- 01 to 07 measurment book no - 833. And that the work has been satisfactorily performed.

Dated : 31/03/2007

Manager / JGM(Civil) / Mgr (Civil)

Certified that,

1. Measurements recorded in MB NO:833 pages 01 to 07, and are fully accepted by me and I do not have any other claim against this bill. 2. The labours employed by me have been paid minimum wages as fixed in similar type of work in the area. 3. All taxes including Royality charges.cess,etc.due to the Govt.on the materials used for this work have been fully paid and no payment is due to them. 4. All the insurance polices as per previsions of the contract has been taken by me and are valid as on date. 5. I have extended the provident fund benefits to the staff engaged by me and requisites amount of provident fund has been remitted to the provident fund commissioner. 6.That the statutory formalities and guidelines has been complied with. DATE:___________________

CONTRACTOR.______________________

Certified that,

(M/S KASSANA BROTHERS, D.S PUNNU ASSO. PVT LTD. J.V)

1. The quantity billed is not more than the quantity actually executed at site. 2. No material has been issued to the contractor, for which the cost was to be recovered except such as specifically provided in the agreement/work order. 3. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill. 4. In case of lump sum payment, approximate quantity billed is not more than the quantity actually executed at site. 5. That the certificate for consumption/recovery are recorded. 6. That the value of the bill/Quantity is not executed beyond the permissible limit. 7.That the entry has been made in DMTR/ Stock register/ and has been authenticated by the concerned official. That the above quantity has been approved/ 8. That the above quantity has been approved / certified and billed to the client. 9. That the statutory formalities and guidelines has been checked and complied with.

SE/AEN/AM

Manager / JGM(Civil) / Mgr (Civil)

Certified value of work Rs______________________________________________________________________________ Chargeable to ____________________________________and to be included in the account for the month of _____________ To be paid at ___________________________ in presence of _________________________ by Cheque on or before________

Dated__________________________

certified and billed to the client.

Manager/JGM(civil)

Schedule Date of Completion of Work……..8th Feb' 05. (Extention Approved)

IRCON INTERNATIONAL LIMITED ( A Govt. Of India Undertaking)

Quazigund-Baramulla New Rail Line Project,Srinagar

SUB CONTRACTR'S RUNNING /FINAL ACCOUNT BILL/C.C. RA Bill/C.C. No………Final Bill Date. 30-10-2007 Name of Work…………Earth work in embankment zoneE25 between KM 20.055to KM 23/795 in QZD - BARA new BG rail line project. Name of Contractor.……M/S KASANA BROTHERS, KANGAN, Srinagar (J & K). Contract Agreement/Work Order No…….... IRCON/1008/J&K-DLI/EW/E-25 DT: 21/07/2003. Contract Value……. Date of Commencement of the work…………01/08/2003. Schedule Date of Completion of Work……..30.11.2004 Date of Measurement…………30-10-2007 Revised Date of Complition,if any:- 10-10-2007 Actual date of completion: 30-10-2007 Further extension on process BOQ Sl.NO. ITEM 1

2

1

1

2

2

3

3

4

4

5

5

6

6

DESCRIPTION OF WORK

3 Earth work in filling in embankment Mechanical compaction of earth Providing blanketing on formation Stone pitching RRM in toe wall in 1:6 cement morter Turfing

Quantity Executed

BOQ QUANTITY

4

5

6

7

8

9

10

Cum

195660

###

339731.059

801.195

124.00

###

Cum

195660

###

339731.059

801.195

9.60

Cum

36410

33,519.292

###

0.000

500.00

Cum

8280

0.000

0.000

590.00

Cum

2050

4,667.040

4539.600

127.440

1219.00

5,689,121.76

5,533,772.40

M2

41920

24,867.010

###

0.000

11.50

285,970.62

285,970.62

Upto this Bill

-

Since last Upto last Bill Bill

(in Rs)

Upto this Bill Upto last Bill 11

42,126,651.32 3,269,109.64 3,261,418.17 ### -

Grand total for value of work certified =

###

Deduct For Contract Value @ 26.51 (-) =

###

Since last Bill 12 99,348.18 7,691.47 -

16,759,646.00 -

67,967,458.50

155,349.36 262,389.01 69,559.33

283,189.05

18,018,173.25 280,824.56

for item (2)

21,924.31

21,741.26

183.06

for item (5)

61,057.34

57,360.02

3,697.31

###

###

186,584.83

Less 2.38% rebate Qty beyond BOQ + 25% for item (1)

Net Payble Gross amount =

Contractor

Amount

Rate

UNIT

2,364.49

JE/AE/AM

SL.NO.

1

BOQ ITEM

DESCRIPTION OF WORK

2

3

Quantity Executed BOQ Rate UNIT QUANTIT (in Upto last Since last Y Rs) Upto this Bill Bill Bill

Amount Upto this Bill

Upto last Bill

Since last Bill

6

7

8

9

10

11

12

5,444.88

5,296.20

148.680

98.00

533,598.24

519,027.60

14570.64

777.84

750.00

27.840

2,550.77

1,984,090.94

1,913,077.50

71013.44

600 dia

487.50

487.50

0.000

1,739.00

847,762.50

847,762.50

0.00

450 dia

77.50

77.50

0.000

1,339.00

103,772.50

103,772.50

0.00

4

5

NON SCHEDULE ITEM 1 2 3

Earth work in excavation… …. Pcc 1:4:8 for electrical Ns-2 conduits…… Providing & laying NP-4 Ns-3 hume pipe Ns-1

Cum Cum

6,084.25 750.00

Mt

4

Ns4 RRM in 1:6 morter

Cum

8.50

8.50

0.000

894.75

7,605.38

7,605.38

0.00

5

Ns-5 S/P local wood..

Cum

7.43

7.43

0.000

8,800.00

65,384.00

65,384.00

0.00

6

Ns-6 S/P second class wood..

Cum

7.02

7.02

0.000

231,660.00

231,660.00

0.00

7

Ns-7 Earth work in filling…….

Cum

720.00

720.00

0.000

98.00

70,560.00

70,560.00

0.00

8

Ns-8 GSB Filling

Cum

131.36

131.36

0.000

484.5648

63,654.37

3,758,849.48

0.00

7517698.96

85,584.08

57107058.37

272,168.90

say Two Lakhs Seventy Two Thousand One Hundrred and Sixty Nine Only.

272,169.00

131.36

33,000.00

Ns Total= 3908087.92 Grand Total= 53684032.16

Contractor

AM/Civil

Certified that the forgoing claim is correct that the necessary measurement ware taken by Mr. Y.K Yadav, JE/Civil. on the dated 24/05/2007 and are recorded at at page NO.- 33 to 38 measurment book no -606. And that the work has been satisfactorily performed.

Dated : 24/05/2007

Manager / JGM(Civil) / Mgr (Civil)

Certified that,

1. Measurements recorded in MB NO:606 pages 33 to 38, and are fully accepted by me and I do not have any other claim against this bill. 2. The labours employed by me have been paid minimum wages as fixed in similar type of work in the area. 3. All taxes including Royality charges.cess,etc.due to the Govt.on the materials used for this work have been fully paid and no payment is due to them. 4. All the insurance polices as per previsions of the contract has been taken by me and are valid as on date. 5. I have extended the provident fund benefits to the staff engaged by me and requisites amount of provident fund has been remitted to the provident fund commissioner. 6.That the statutory formalities and guidelines has been complied with. DATE:___________________

CONTRACTOR.______________________

Certified that,

(M/S KASSANA BROTHERS

1. The quantity billed is not more than the quantity actually executed at site. 2. No material has been issued to the contractor, for which the cost was to be recovered except such as specifically provided in the agreement/work order. 3. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill. 4. In case of lump sum payment, approximate quantity billed is not more than the quantity actually executed at site. 5. That the certificate for consumption/recovery are recorded. 6. That the value of the bill/Quantity is not executed beyond the permissible limit. 7.That the entry has been made in DMTR/ Stock register/ and has been authenticated by the concerned official. That the above quantity has been approved/ client. 8. That the above quantity has been approved / certified and billed to the client. 9. That the statutory formalities and guidelines has been checked and complied with.

JE/AEN/AM

Manager / JGM(Civil) / Mgr (Civil)

Certified value of work Rs______________________________________________________________________________ Chargeable to ____________________________________and to be included in the account for the month of _____________ To be paid at ___________________________ in presence of _________________________ by Cheque on or before________

Dated__________________________

certified and billed to the

Manager/JGM(civil)