IRCON International Limited (A Govt. Of India Undertaking) Qazigund-Baramulla New Rail Line Project, Srinagar SUB CONTRACTORS RUNNING ACCOUNT BILL/CC RA Bill/CC No.6Th/ Final,

Date:15-05-2009

Name of Work: Construction of of FOB at Anantnag Station Yard (FOB-1RA) on Qazigund Baramulla New BG Rail Line Project, J&K. Name of Contractor: M/S Royal Steel (JV), Industrial Estate, Baghi Ali Mardan Khan, Srinagar 190 011, J&K Contract agreement / work Order No.IRCON/ J&K-SGR/1008/Foot Over Bridge/ FOB-1RA/ LT/423/18867; Dated: 29-03-2008 Contract Value: Rs. 75,81,983.70 Date of commencement of Work: 29-03-2008 Date of completion of work:Scheduled: 28-05-2008; Time extension: on process Actual Date of completion of work: 15-05-2009 Ref & Date of Measurement: MB-1239, Dated: 15-05-2009 Sl no./ MB no.

BOQ Item

Description of Item

Unit

BOQ Qty.

Qty upto this Qty executed Qty executed Rate bill upto last bill since last bill (in Rs.)

Amount upto this bill

Amount upto last bill

Amount since last bill

SCHEDULE: A DSR 2002 Items, Quoted rate 85.00% Above. 1

A.1.1

Earthwork excavation

in

2

A.1.2

Excavation trenches

in

3

A.3

cum

322.00

481.268

481.268

-

91.5

44,036.02

44,036.02

-

cum

286.00

-

-

-

93.50

-

-

-

Filling with cum available soil

486.50

-

-

-

30.25

-

-

-

4

Centering and A.4.1 shuttering of foundation

sqm

108.75

84.840

84.840

-

61.10

5,183.72

5,183.72

-

5

Centering and A.4.2 shuttering of suspended floor

sqm

157.50

148.180

148.180

-

112.20

16,625.80

16,625.80

-

6

Centering and A.4.3 shuttering of beams.

sqm

98.00

-

-

-

87.95

-

-

-

7

A.4.4 C&S of columns

sqm

191.00

-

-

-

135.80

-

-

-

8

A.4.5 C&S of Stairs.

sqm

177.75

114.840

114.840

-

106.40

12,218.98

12,218.98

-

metre

90.00

468.288

468.288

-

29.90

14,001.81

14,001.81

-

sqm

380.25

-

-

-

45.90

-

-

-

9

A.4.6.1

10

A.5.1

25865618.xls

C&S of slab edges. Extra for C&S of suspended floor.

Page 1 of 8

Sl no./ MB no.

BOQ Item

Description of Item

Unit

BOQ Qty.

Qty upto this Qty executed Qty executed Rate bill upto last bill since last bill (in Rs.)

Amount upto this bill

Amount upto last bill

Amount since last bill

11

A.6.1 PCC 1:4:8

cum

13.00

18.512

18.512

-

1404.70

26,003.81

26,003.81

-

12

M-20 concrete A.7.1 upto platform level.

cum

107.75

84.700

84.700

-

2284.05

193,459.04

193,459.04

-

M-20 concrete for suspended floor.

cum

43.75

38.773

38.773

-

2518.25

97,640.11

97,640.11

-

Providing M-35 A.8.1 concrete in stead of M-20 concrete.

cum

151.30

123.473

123.473

-

140.00

17,286.22

17,286.22

-

426,455.50

426,455.50

-

Add 85.00% above

362,487.17

362,487.17

-

Total amount of Schedule A

788,942.67

788,942.67

-

13

A.7.2.1

14

TOTAL OF SCHEDULE A :

(185.00% of Schedule A) SCHEDULE: B STEEL Items, Quoted rate 53.50% Above. 15

B.1

Providing Cutting TMT steel bar

kg

17,246.25

16,143.939

16,143.939

-

40.60

655,443.92

655,443.92

-

16

B.2

Structural steel in stair case.

kg

22,822.00

23,644.806

23,644.806

-

50.00

1,182,240.30

1,182,240.30

-

17

B.3

Structural steel in main FOB.

kg

19,477.00

23,022.841

21,522.841

1,500.000

56.80

1,307,697.37

1,222,497.37

85,200.00

18

B.4

Structural steel in truss.

kg

8,091.00

13,424.070

12,424.070

1,000.000

47.70

640,328.14

592,628.14

47,700.00

19

B.5

Providing and fixing MS round holding down bolts.

kg

368.000

158.400

-

158.400

52.40

8,300.16

-

8,300.16

20

B.6.1

Structural steel in railing.

kg

2,510.500

1,298.109

-

1,298.109

54.70

71,006.56

-

71,006.56

21

B.7

Stair steps nosing angle.

kg

4,296.000

2,383.920

-

2,383.920

53.40

127,301.33

-

127,301.33

22

B.8

Steel wire mesh 75x25

sqm

175.500

-

-

-

465.30

-

-

-

3,992,317.78

3,652,809.73

339,508.05

Add 53.50% above

2,135,890.01

1,954,253.21

181,636.81

Total amount of Schedule B

6,128,207.79

5,607,062.94

521,144.86

TOTAL OF SCHEDULE B :

(153.50% of Schedule B) 25865618.xls

Page 2 of 8

Sl no./ MB no.

BOQ Item

Description of Item

Unit

BOQ Qty.

Qty upto this Qty executed Qty executed Rate bill upto last bill since last bill (in Rs.)

Amount upto this bill

Amount upto last bill

Amount since last bill

SCHEDULE: C Quoted rate 25.00% Above. 23

C.1

Providing and fixing rib profile sheeting.

24

C.2

P&F ridges.

25

C.3

26

sqm

432.00

452.502

-

452.502

649.00

293,673.80

-

293,673.80

metre

67.75

92.660

-

92.660

385.00

35,674.10

-

35,674.10

Non shrink grout.

sqm

12.00

6.400

-

6.400

1450.00

9,280.00

-

9,280.00

C.4

S&F 25mm chequred precast cement concrete tiles.

sqm

228.75

263.067

-

263.067

848.60

223,238.66

-

223,238.66

27

C.5

S&F 22mm chequred precast cement concrete tiles.

sqm

41.00

-

-

-

848.60

-

-

-

28

C.6

P&F PVC moulding on railing.

metre

124.50

111.860

-

111.860

74.80

8,367.13

-

8,367.13

570,233.68

-

570,233.68

142,558.42

-

142,558.42

712,792.10

-

712,792.10

TOTAL OF SCHEDULE C : Add 25.00% above (125.00% of Schedule C)

Total amount of Schedule C GRAND TOTAL

Contractor

25865618.xls

AM/ Civil

7,629,942.57

6,396,005.61

1,233,936.96

Say:

1,233,937.00

Amount heldup for incomplete riveting, finishing of hand rail, Ridge replacement.

400,000.00

Total Amount payable in this 6th RA / Final bill is Rupees

Page 3 of 8

833,937.00

Certified that the forgoing claim is correct. The necessary measurement were taken and recorded by Sh Surajit Ghosh on 15-05-2009

Date:

DGM/ Civil

Certified that, Measurements Recorded in MB as above and 1239 are fully accepted by me and I do not have any other claim against this 1 bill. 2

The labour employed by me have been paid minimum wages as fixed in similar type of work in the area.

3

All taxes including Royalty charges. Cess, etc. due to the govt. on the materials used for this work have been fully paid and no payment is due to them.

4

All the insurance polices as per previous of the contract has been taken by me and are valid as on date.

5

I have extended the provident fund benefits to the staff engaged by me and requisites amount of providend fund has been remitted to the providend fund commissioner.

6

The statury formalities and guidelines has been complied with. Date:

Contractor

Certified that, 1

The quantity billed is not more than the quantity actually executed at site.

2

No material has been issued to the contractor, for which the cost was to be recovered except such as specially provided in the agreement/ work order.

3

No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill.

4

In case of lump sum payment, approximate quantity billed is not more than the quantity actually at site.

5

The work has been executed as per approved drawing and specifications and the method of measurement is correct.

6

That the statury formalities and guidelines has been complied with.

DM / Civil DGM / Civil Chargeble to ........................................................................ and to be included in the account for the month of ................... To be paid at …………................... in presence of ............................................................. by Cheque on or before................ Date:

Manager/ Finance

Variation Statement Sl no

BOQ Item

Description of Item

Unit

Rate (in Rs.)

BOQ Qty.

BOQ Amount

Qty executed

Amount upto Variarion Variarion in Final bill in Quantity Amount

% variation

SCHEDULE: A DSR 2002 Items, Quoted rate 85.00% Above. 1

A.1.1

2

A.1.2

3

A.3

4

A.4.1

5

Earthwork in excavation Excavation in trenches Filling with available soil

cum

91.50

322.00

29,463.00

cum

93.50

286.00

26,741.00

-

cum

30.25

486.50

14,716.63

-

Centering and shuttering of foundation

sqm

61.10

108.75

6,644.63

84.840

A.4.2

Centering and shuttering of suspended floor

sqm

112.20

157.50

17,671.50

148.180

6

A.4.3

Centering and shuttering of beams.

sqm

87.95

98.00

8,619.10

-

7

A.4.4

C&S of columns

sqm

135.80

191.00

25,937.80

-

8

A.4.5

C&S of Stairs.

sqm

106.40

177.75

18,912.60

114.840

9

A.4.6.1

metre

29.90

90.00

2,691.00

468.288

10

A.5.1

Extra for C&S of suspended floor.

sqm

45.90

380.25

17,453.48

11

A.6.1

PCC 1:4:8

cum

1404.70

13.00

18,261.10

25865618.xls

C&S of slab edges.

481.268

18.512

44,036.02

159.27

14,573.02

49.46

-

(286.00)

(26,741.00)

(100.00)

-

(486.50)

(14,716.63)

(100.00)

5,183.72

(23.91)

(1,460.90)

(21.99)

16,625.80

(9.32)

(1,045.70)

(5.92)

-

(98.00)

(8,619.10)

(100.00)

-

(191.00)

(25,937.80)

(100.00)

12,218.98

(62.91)

(6,693.62)

(35.39)

14,001.81

378.29

11,310.81

420.32

(380.25)

(17,453.48)

(100.00)

5.51

7,742.71

42.40

26,003.81

Sl no

BOQ Item

Description of Item

Unit

Rate (in Rs.)

BOQ Qty.

12

A.7.1

M-20 concrete upto platform level.

cum

2284.05

107.75

246,106.39

84.700

193,459.04

(23.05)

(52,647.35)

(21.39)

13

A.7.2.1

M-20 concrete for suspended floor.

cum

2518.25

43.75

110,173.44

38.773

97,640.11

(4.98)

(12,533.33)

(11.38)

A.8.1

Providing M35 concrete in stead of M-20 concrete.

cum

140.00

151.30

21,182.00

123.473

17,286.22

(27.83)

(3,895.78)

(18.39)

14

TOTAL OF SCHEDULE A :

(185.00% of Schedule A)

BOQ Amount

Qty executed

Amount upto Variarion Variarion in Final bill in Quantity Amount

% variation

564,573.65

426,455.50

(138,118.15)

Add 85.00% above

479,887.60

362,487.17

(117,400.43)

Total amount of Schedule A

1,044,461.25

788,942.67

(255,518.58)

(24.46)

SCHEDULE: B STEEL Items, Quoted rate 53.50% Above. 15

B.1

Providing Cutting TMT steel bar

kg

40.60

17,246.25

700,197.75

16,143.939

655,443.92

(1,102.31)

(44,753.83)

(6.39)

16

B.2

Structural steel in stair case.

kg

50.00

22,822.00

1,141,100.00

23,644.806

1,182,240.30

822.81

41,140.30

3.61

17

B.3

Structural steel in main FOB.

kg

56.80

19,477.00

1,106,293.60

23,022.841

1,307,697.37

3,545.84

201,403.77

18.21

18

B.4

Structural steel in truss.

kg

47.70

8,091.00

385,940.70

13,424.070

640,328.14

5,333.07

254,387.44

65.91

25865618.xls

BOQ Item

Description of Item

Unit

Rate (in Rs.)

BOQ Qty.

19

B.5

Providing and fixing MS round holding down bolts.

kg

52.40

368.00

19,283.20

158.400

8,300.16

(209.60)

(10,983.04)

(56.96)

20

B.6.1

Structural steel in railing.

kg

54.70

2,510.50

137,324.35

1,298.109

71,006.56

(1,212.39)

(66,317.79)

(48.29)

21

B.7

kg

53.40

4,296.00

229,406.40

2,383.920

127,301.33

(1,912.08)

(102,105.07)

(44.51)

22

B.8

sqm

465.30

175.50

81,660.15

(175.50)

(81,660.15)

(100.00)

Sl no

Stair steps nosing angle. Steel wire mesh 75x25

TOTAL OF SCHEDULE B :

(153.50% of Schedule B)

BOQ Amount

Qty executed

-

Amount upto Variarion Variarion in Final bill in Quantity Amount

-

% variation

3,801,206.15

3,992,317.78

191,111.63

Add 53.50% above

2,033,645.29

2,135,890.01

102,244.72

Total amount of Schedule B

5,834,851.44

6,128,207.79

293,356.35

5.03

SCHEDULE: C Quoted rate 25.00% Above. 23

C.1

Providing and fixing rib profile sheeting.

24

C.2

25

26

25865618.xls

sqm

649.00

432.00

280,368.00

452.502

293,673.80

20.50

13,305.80

4.75

P&F ridges.

metre

385.00

67.75

26,083.75

92.660

35,674.10

24.91

9,590.35

36.77

C.3

Non shrink grout.

sqm

1450.00

12.00

17,400.00

6.400

9,280.00

(5.60)

(8,120.00)

(46.67)

C.4

S&F 25mm chequred precast cement concrete tiles.

sqm

848.60

228.75

194,117.25

263.067

223,238.66

34.32

29,121.41

15.00

BOQ Item

Description of Item

Unit

Rate (in Rs.)

BOQ Qty.

27

C.5

S&F 22mm chequred precast cement concrete tiles.

sqm

848.60

41.00

34,792.60

28

C.6

P&F PVC moulding on railing.

metre

74.80

124.50

9,312.60

Sl no

TOTAL OF SCHEDULE C :

(125.00% of Schedule C)

Note:

(

BOQ Amount

Qty executed

Amount upto Variarion Variarion in Final bill in Quantity Amount

-

-

111.860

8,367.13

(41.00)

(34,792.60)

(100.00)

(12.64)

(945.47)

(10.15)

562,074.20

570,233.68

8,159.48

Add 25.00% above

140,518.55

142,558.42

2,039.87

Total amount of Schedule C

702,592.75

712,792.10

10,199.35

1.45

GRAND TOTAL

7,581,905.44

7,629,942.57

48,037.13

0.63

) Denotes -ve Figure

Total variation is +ve 0.63% of the contract value

25865618.xls

% variation

Related Documents

Fob Final Bill
June 2020 5
Bill Fob-1ra May 2008
November 2019 6
Fob Setup.docx
June 2020 4
Fob Explain
April 2020 8
Disaster Bill Final V2
June 2020 11
E-25 Final Bill
November 2019 12