IRCON International Limited (A Govt. Of India Undertaking) Qazigund-Baramulla New Rail Line Project, Srinagar SUB CONTRACTORS RUNNING ACCOUNT BILL/CC RA Bill/CC No.11th; FINAL BILL 30.09.2007

Date:

Name of work: Construction of RCC Over Head Tank at Qazigund, Anantnag and Baramulla (Package OHT-2) on Qazigund - Baramulla section of new BG Rail Line Project (J&K) Name of Contractor: M/S Md. Maqbool Reshi, R/o Watlab, Sopore, state J&K Contract agreement / work Order No.IRCON/ 1008/ J&K -DLI/ Over Head Tank/ OHT-2/8555 Date: 17/04/2006 Contract Value: Rs 1,15,020,63.90 Date of commencement of Work: 17/04/2006 Date of completion of work: Scheduled:16-02-2007, Further extension Granted Upto : 30-09-2007 Ref & Date of Measurement: Qazigund MB no 592&610, Anantanag MB no 544 & 545, Baramulla MB no. 533 Measurement 30-03-2008

Sl no./ MB no.

1

BOQ Description of Item Item

1.1

P/F GI pipe 40mm …

Unit

BOQ Qty.

Qty executed upto this bill

Qty executed upto last bill

Rate

Qty executed since last bill

Rs.)

Qazigund

138

155

-17

544,545

Anantanag

138

120

18

533

Baramulla

135.65

135.65

0.00

411.65

410.65

1.00

Total: 4.1

P/F CI sluice valve150mm …

240

Qazigund

2

2

0

544,545

Anantanag

2

2

0

533

Baramulla

2

2

0

6.00

6.00

0.00

Total: 5.1

Painting GI pipe 40mm …

9

Amount since last bill

37.30

15,354.55

15317.25

3211.2

19,267.20

19267.20

6.9

2,840.39

1763.99

37.30

-

m

592/610

Qazigund

138

0

138

544,545

Anantanag

138

120

18

533

Baramulla

135.65

135.65

0

411.65

255.65

156.00

Total:

Amount upto last bill

each

592/610

3

Amount upto this bill

m

592/610

2

(in

240

Page 1 of 6

1,076.40

4

6.1

P/L 150mm CI double flanged.

m

592/610

Qazigund

110.34

110

0.34

544,545

Anantanag

104.8

90

14.8

533

Baramulla

117.2

117.2

0.00

332.336

317.200

15.136

Total: 5

7.1

P/L S &S CI 300mm…

360

1429.95

475,223.86

453580.14

21,643.72

3033.05

10,630.84

2805.57

7,825.27

523,316.83

492,734.14

30,582.69

130,829.21

123,183.54

7,645.67

654,146.04

615,917.68

38,228.37

33,083.85

33083.85

-

Quintal

592/610

Qazigund

1.72

0

1.72

544,545

Anantanag

0.86

0

0.86

533

Baramulla

0.93

0.93

0

3.5050

0.9250

2.58

Total:

7.50

Total of schedule "A"

(+) 25% above ( Quoted Rate) for Schedule "A"

6

Sch E/W in "B" Excavation … m3 1 ……..

592/610

Qazigund

544,545 533

103.335

103.335

0.000

130.65

Anantanag

68.89

68.89

0.000

130.65

Baramulla

81.00

81.00

0.000

130.65

253.225

253.225

0.00

130.65

Total: 7

2

P/L PCC 1:4:8……

459.00 m3

592/610

Qazigund

6.889

6.889

0.000

2,279.75

544,545

Anantanag

6.889

6.889

0.000

2,279.75

533

Baramulla

6.890

6.890

0.000

2,279.75

24.00

20.668

20.668

0.00

2,279.75

47,117.87

47117.87

-

189.00

55.112 55.112 55.110 165.334

55.112 55.112 55.110 165.334

0.000 0.000 0.000 0.000

4,038.20 4,038.20 4,038.20 4,038.20

667,651.76

667651.76

-

Total: 8 592/610 544,545 533

3

P/L Design mix M25… in pile cap

Qazigund Anantanag Baramulla Total:

m3

Page 2 of 6

9

4

592/610 544,545 533

10

5

6

592/610 544,545 533 13

9

592/610 544,545 533

Cast in situ 500 mm dia pile

0.000 0.000 0.000 0.000

5,806.85 5,806.85 5,806.85 5,806.85

694,696.69

694696.69

-

60.00

11.312 17.8433 19.785 48.9403

11.312 17.8433 19.785 48.9403

0.000 0.000 0.000 0.000

5,390.20

263,798.01

263798.01

-

93.00

32.116 32.185 38.364 102.665

32.116 32.185 38.364 102.665

0.000 0.000 0.000 0.000

9,048.20 9,048.20 9,048.20 9,048.20

928,933.45

928933.45

-

1,538.00

377.40 555.00 555.00 1487.40

377.40 555.00 555.00 1487.40

0.000 0.000 0.000 0.000

1,300.63 1,300.63 1,300.63 1,300.63

1,934,557.06

1934557.06

-

3.00

1 1 1 3

1 1 1 3

0 0 0 0

32,096.80 32,096.80 32,096.80 32,096.80

96,290.40

96290.40

-

3.00

1 1 1 3

1 1 1 3

0 0 0 0

20,209.00 20,209.00 20,209.00 20,209.00

60,627.00

60627.00

0.00

Rm

Carrying out Vt PLT….

no

Qazigund Anantanag Baramulla Total: 10

45.043 39.505 35.086 119.634

m3

Qazigund Anantanag Baramulla Total:

592/610 544,545 533

14

P/L Design mix M25… in dome wall etc.

Qazigund Anantanag Baramulla Total: 8

93.00

45.043 39.505 35.086 119.634

P/L Design mix M25… in staircase etc.

Qazigund Anantanag Baramulla Total:

592/610 544,545 533 12

m3

Qazigund Anantanag Baramulla Total:

592/610 544,545 533

11

P/L Design mix M25… in Column, Beam.

Carrying out routine Vt load no Test…. Qazigund Anantanag Baramulla Total:

Page 3 of 6

15

Sch "B" 11

592/610 544,545 533

Carrying out Lateral load no Test…. Qazigund Anantanag Baramulla Total:

3.00

1 1 1 3

1 1 1 3

0 20,209.00 0 20,209.00 0 20,209.00 0 20,209.00 Total of schedule "B"

(-) 5% below ( Quoted Rate) for Schedule "B"

16

Sch "C" 1

592/610 544,545 533

17 592/610 544,545 533

592/610 544,545 533

0.00

239,369.15

239,369.15

0.00

4,548,013.94

4,548,013.94

3,462,311.05

3430861.06

-

113,250.00

25,413.113 29,183.760 30,681.724 85,278.60

25,413.113 28,409.130 30,681.724 84,503.97

0.000 774.630 0.000 774.630

40.60 40.60 40.60 40.60

3,030.00

2,507.283 2,512.356 3,302.252 8,321.891

2,529.670 2,433.060 3,302.252 8,264.982

(22.387) 79.296 0.000 56.909

40.60 40.60 40.60 49.15

409,020.94

406223.87

2,797.08

Total of schedule "C"

3,871,332.00

3,837,084.93

34,247.07

6.00% above (quoted rate) for Schedule "C"

232,279.92

230225.10

2,054.82

4,103,611.92

4,067,310.02

36,301.90

31,449.99

Steel builtup Kg sections. Qazigund Anantanag Baramulla Total:

(+)

18

60627.00 4,787,383.09

P/L …. reinforcement Kg of TMT steel bar Qazigund Anantanag Baramulla Total:

Sch "C" 2

60,627.00 4,787,383.09

Sch Earthing job "D" 1 arrangement. Qazigund Anantanag Baramulla Total:

3.00

1.000 1.000 1.000 3.000

(-)

0.000 1.000 0.000 1.000

40.60 40.60 40.60 26,048.00

78,144.00

26048.00

52,096.00

Total of schedule "D"

78,144.00

26,048.00

52,096.00

45.00% below (quoted rate) for Schedule "D"

35,164.80

11,721.60

23,443.20

42,979.20

14,326.40

28,652.80

Page 4 of 6

1.000 0.000 1.000 2.000

19

7.1

Snowcem cement paint 2 or more coat.

Sqm

592/610

Qazigund

615.29

0

615.29

544,545

Anantanag

615.27

0

615.27

533

Baramulla

656.52

0

656.52

1887.0787

0.0000

1887.08

Total:

28.88

Grand total (Sch A+B+C+D+ NS Item)=

54,498.83

0.00

54,498.83

9,403,249.93

9,245,568.03

157,681.89

Net payable amount in words :- Rs. One Lakhs Fifty Seven Thousand Six Hundred And Eighty Two Only.

Contractor

Asst. Mgr/ Civil

Page 5 of 6

157,682.00

Certified that the foregoing claim is correct, for which necessary measurement were taken and recorded at the Abstract MB-533 & Reference MB No 592/610,544/545 &533 .and that the work has been satisfactorily as per drawing and specification.

Date: JGM/DGM/ Civil Certified that, Measurements Recorded in MB No. (592,610), (544, 545) & 533 are fully accepted by me and I do not have any other claim 1 against this bill. 2

The labour employed by me have been paid minimum wages as fixed in similar type of work in the area.

3

All taxes including Royalty charges. Cess, etc. due to the govt. on the materials used for this work have been fully paid and no payment is due to them.

4

All the insurance polices as per previous of the contract has been taken by me and are valid as on date.

5

I have extended the provident fund benefits to the staff engaged by me and requisites amount of providend fund has been remitted to the providend fund commissioner.

6

The statury formalities and guidelines has been complied with.

Date:

Contractor

Certified that, 1

The quantity billed is not more than the quantity actually executed at site.

2

No material has been issued to the contractor, for which the cost was to be recovered except such as specially provided in the agreement/ work order.

3

No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill.

4

In case of lump sum payment, approximate quantity billed is not more than the quantity actually at site.

5

The work has been executed as per approved drawing and specifications and the method of measurement is correct.

6

That the statury formalities and guidelines has been complied with.

AM/C

Mgr/ Civil

Chargeble to ........................................................................ and to be included in the account for the month of ................... To be paid at …………................... in presence of ............................................................. by Cheque on or before................