KAJIAN TEKNIS RENCANA KONVERSI BBM (IDO) KE BBP

Produksi 2010 dalam RKAP 2.416.000 •

Analisa menggunakan BBM (100%) Ratio BBM 0.3 Harga BBM per liter

= Rp 5890

2.416.000 x 0.3 = 724.800

= 724.800 liter/tahun

724.800 x Rp 5890

= Rp 4.269.072.000/tahun

Total biaya panggunaan bahan bakar = Rp 4.269.072.000/tahun



Analisa menggunakan BBP (100%) Ratio BBP 1.3 Harga BBP per Kg

= Rp 400

2.416.000 x 1.3 = 3.140.800

=3.140.800 Kg/tahun

3.140.800 x Rp 400

= Rp 1.256.320.000/tahun

Efisiensi yang didapat = Rp 4.269.072.000 - Rp 1.256.320.000/tahun = Rp 3.012.752.000/tahun

KAJIAN TEKNIS RENCANA KONVERSI BBM (IDO) KE BBP

(2 Dryer)

Produksi 2010 terhadap RKAP 2.416.000 •

Analisa menggunakan BBM (100%) Ratio BBM 0.3 Harga BBM per liter

= Rp 5890

2.416.000 x 0.3 = 724.800

= 724.800 liter/tahun

724.800 x Rp 5890

=

Rp

4.269.072.000/tahun Total biaya panggunaan bahan bakar •

= Rp 4.269.072.000/tahun

Analisa menggunakan BBM (20%) Ratio BBM 0.3



Harga BBM per liter

= Rp 5890

2.416.000 x 0.3 = 724.800 x 20%

= 144.960 liter/tahun

144.960 x Rp 5890

= Rp 853.814.400/tahun

Analisa menggunakan BBP (80%) Ratio BBP 1.3 Harga BBP per Kg

= Rp 400

2.416.000 x 1.3 = 3.140.800 x 80 %

= 2.512.640 Kg/tahun

2.512.640 x Rp 400

= Rp 1.005.056.000

Total biaya panggunaan bahan bakar Rp 853.814.400 + Rp 1.005.056.000 = Rp 1.858.870.400 /tahun Efisiensi yang didapat = Rp 4.269.072.000 - Rp1.858.870.400 = Rp 2.410.201.600

KAJIAN TEKNIS RENCANA KONVERSI BBM (IDO) KE DRYER TENAGA LISTRIK

Produksi 2010 dalam RKAP 2.416.000 •

Analisa menggunakan BBM (100%) Ratio BBM 0.3 Harga BBM per liter

= Rp 5890

2.416.000 x 0.3 = 724.800

= 724.800 liter/tahun

724.800 x Rp 5890

= Rp 4.269.072.000/tahun

Total biaya panggunaan bahan bakar = Rp 4.269.072.000/tahun



Analisa menggunakanTenaga Listrik (100%) Ratio Tenaga Listrik 0.5 Harga Listrik per KWH

= Rp 439

2.416.000 x 0.5 = 1.208.000

=1.208.000 Kg/tahun

1.208.000 x Rp 439

= Rp 530.312.000/tahun

Efisiensi yang didapat = Rp 4.269.072.000 - 530.312.000 Rp /tahun = Rp 3.738.760.000/tahun

KAJIAN TEKNIS RENCANA KONVERSI BBM (IDO) KE TENAGA LISTRIK ( 2 Dryer)

Produksi 2010 terhadap RKAP 2.416.000 •

Analisa menggunakan BBM (100%) Ratio BBM 0.3 Harga BBM per liter

= Rp 5890

2.416.000 x 0.3 = 724.800

= 724.800 liter/tahun

724.800 x Rp 5890

=

Rp

4.269.072.000/tahun Total biaya panggunaan bahan bakar •

= Rp 4.269.072.000/tahun

Analisa menggunakan BBM (20%) Ratio BBM 0.3



Harga BBM per liter

= Rp 5890

2.416.000 x 0.3 = 724.800 x 20%

= 144.960 liter/tahun

144.960 x Rp 5890

= Rp 853.814.400/tahun

Analisa menggunakan Tenaga Listrik (80%) Ratio 0.5 Harga Listril per KWH

= Rp 439

2.416.000 x 0.5 = 1.208.000 x 80 %

= 966.400 Kg/tahun

966.400 x Rp 439

= Rp 424.249.600

Total biaya panggunaan bahan bakar Rp 853.814.400 + Rp 424.249.600 = Rp 1.278.064.000/tahun Efisiensi yang didapat = Rp 4.269.072.000 - Rp 1.278.064.000

= Rp 2.991.008.000

KEBUTUHAN BARANG BAHAN ELECTRIC CONTROL/PANEL CONTROL - Box Panel - Contactor 60 Kw - Thermo Control 600o Digital 2 Buah - Push Button - NFB - Kabel Kontrol DAPUR PEMANAS/RUANG BAKAR - Plat Steinless 304 2mm - Papper Glass 5 cm - Heater 1000 watt (125 buah) - Tubing - Thermo Couple DUCTING - Plat - Aluminium Foil - Glass woll/Rock woll BLOWER (Untuk menghasilkan 18000 Cfm) JASA PENGERJAAN Rp 30.000.000 WAKTU PENGERJAAN 45 HARI

FBD I

32 M

FBD II

VFBD II

8 M

VFBD I

PINTU 4,7 Perhitungan Biaya 5M

-

Pemakaian BBM (Ratio 0,3) 23,75 M

Kapasitas Dryer VFBD Pemakaian BBM dengan nozzle burner 8 dan 4 Harga BBM

60 liter BBM = 200 Kg teh kering 0.3 liter BBM = 1 Kg teh kering Sehingga 0.3 x Rp 5890

= 200 Kg/jam = 60 liter/jam = Rp 5890/liter

= Rp 1767/Kg

Perhitungan Biaya Pemakaian BBP ( Ratio 1.5 ) -

Kapasitas Dryer VFBD Pemakaian BBP Harga BBP

300 Kg BBP = 200 Kg teh kering 1.5 Kg BBP = 1 Kg teh kering Sehingga 1.5 x Rp 400

= 200 Kg/jam = 300 Kg/jam = Rp 400/Kg

= Rp 600/Kg

Perhitungan Biaya Pemakaian Tenaga Listrik ( Ratio 0.5 ) -

Kapasitas Dryer VFBD Pemakaian Tenaga Listrik Harga KWH Listrik

100 KW listrik = 200 Kg teh kering 0.5 KW listrik = 1 Kg teh kering Sehingga 0.5 x Rp 753

= 200 Kg/jam = 100 KW/jam = Rp 753/KWH

= Rp 376,5/Kg

Perhitungan Kalori Kalori

Related Documents

Dryer Jadi
June 2020 16
2007 Edv606e Dryer Original
November 2019 21
Flatbed Dryer Design2
June 2020 7
Jadi Blackbook.pdf
November 2019 32
Tti Jadi
June 2020 23
Jadi Dong.docx
June 2020 23