Document (5).docx

  • Uploaded by: mansi jagtap
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Document (5).docx as PDF for free.

More details

  • Words: 188
  • Pages: 1
400kV Kharghar Grid Substation Substation Commissioned Number One Best Substation :- - :- : of MSETCL Total Area of Substation Grid Substation 05 Aug 1998 Year 2010-11 16 Hectares Bay Provision 400kV 11 Bays 220kV 22 Bays 33kV 09 Bays Commissioned Capacity 400/220kV 630 MVA (2 Nos. ICTs) 220/33kV 100 MVA (2 Nos. T/Fs) 33/0.44 kV - 1.2 MVA (3 Nos. Stn TF 0.5 0.5 0.2 MVA) Bus arrangement Two main + One Aux. Bus (For 400 kV and 220 kV) One main Bus with Bus-section (For 33kv as Bus section I & II) Direct Connected Generation GTPS, Uran Connected Source :- 400kV Padgha (HVDC and Grid Substation) 400kV Kalwa (Grid Substation) 220kV Topworth (South-Western Maharashtra Power Feeds to > Working scheme :Generation, Koyana Hydro) 220kV Uran (Double ckt - Direct Source) Navi Mumbai 220kV - Panvel, Nerul, Kalwa 33KV- Kharghar, CBD, Kamothe 1)SMS (Seimens make Only all line Distance protection incorporated except 400kV Kalwa line Main-I & II & 400kV Padgha line Main-1I. 2) ABT metering (Secure make) 3) Islanding - Tripping to 220kv Uran I & II, Kalwa, Nerul, 400kv ICT 18I 4) RTU (Siemens make

Related Documents

Document
October 2019 16
Document
December 2019 16
Document
November 2019 14
Document
May 2020 7
Document
October 2019 19
Document
December 2019 23

More Documents from ""

Document (5).docx
November 2019 16
Bol Fd.docx
August 2019 28
Sec 138 Him & Kays.docx
November 2019 27
Ent Law.docx
November 2019 26
Corp 2
October 2019 19