PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

DO’S & DON’TS Ir. Muhammad Azman bin Jamrus Jamrus,, CKSAJ, Ibu Pejabat JKR Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’ts

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’ts

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Kompleks Pelancongan, Pulau Banding, Gerik

Project collapse upon completion Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Persimpangan Bertingkat Ke Projek Perumahan SP Setia, NKVE

Bridge collapse during construction Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Kompleks Equestrian, Terengganu

Structures collapse during construction Jabatan Kerja Raya Malaysia

KURSUS PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

SMK Raja Muda, Selangor

Building failed earlier than design life Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

SMK Raja Muda, Selangor

Do have a proper detailing for cantilever concrete gutter ... Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

IKBN Kinarut, Sabah

Do consider differential settlement of earth filling & piled structures Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

MRR2

Do have a proper design for all D&B project Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Hospital Cheras

Don’t cut excessively trees Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembangunan Kampus II INSPEN, Sepang

Don’t let our project cause floods Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembangunan Kampus II INSPEN, Sepang

Don’t have services blocking our road side drains

Don’t let drain be left un-maintained

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembangunan Kampus II INSPEN, Sepang

Don’t let silt traps be left un-maintained

Don’t have large areas without silt traps

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Hospital Cheras

Don’t have silt trap poorly done

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Hospital Cheras

Don’t have temporary earth drain w ith deep & steep slope

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Hospital Cheras

Don’t let the site muddy with no temporary drainage provided

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Status Kualiti Kerja Tanah Ujian Pemadatan (compaction test)

• Kaedah “Sand Replacement Method”telah dijalankan bagi ujian“compaction test”dikawasantambakyang memerlukan “compaction ”. • (90 % of relative maximum density test) Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Kerja--kerja Cerun Kerja

Cerun yang sempurna Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Status Kualiti Kerja -kerja Perparitan Kerja-Kerja Pemasangan U-Drain

Pemasangan “Capping Beam ” tidak sempurna dan“unreinforced ” untuk menahan tekanan dari “strutting” Sekiranya‘horizontal reinforcement ’ tidak mencukupi tekanan mendatar (lateral force) yang dikenakan kepada sisi “capping beam” akan menyebabkan “concrete crushed”

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Status Kualiti Kerja -kerja Perparitan Kerja-Kerja Pemasangan U-Drain

Lukisan bagi ‘Capping Beam ’ Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Tiada ‘berm’ dan ‘toe drain’ walaupun ketinggian melebihi 5 meter. Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’ts Unsuitable material yang telah dikorek dan dikumpulkan sebelum dikeluarkan dari tapak...

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek KK2 Taiping, Perak Rekabentuk Sistem Saliran Permukaan Berpandukan MASMA : Bio-ecological Drainage System(BIOECODS)

Do have proj ect like this ~ Retention pond designed as a recreational area

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek KK2 Taiping, Perak Rekabentuk Sistem Saliran Permukaan Berpandukan MASMA : Bio-ecological Drainage System(BIOECODS)

Perimeter Grass Swale Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

JPJ Langkaw i, Kedah.

Don’t let piles be driven w ithout looking at BQ (pre boring specified) Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

ASWARA, Kuala Lumpur

Don’t simply cut slopes w ithout geotechnical advice

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, Pahang

Do have concrete for bored piles poured at least 1000mm above cut-off level. Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Istana Negara, Jalan Duta, Kuala Lumpur .

Do look at Construction Draw ing Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Istana Negara, Jalan Duta, Kuala Lumpur .

Don’t let contractor do w hatever he likes Jabatan Kerja Raya Malaysia

KURSUS PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Istana Negara, Jalan Duta, Kuala Lumpur .

Do look at Construction notes... Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Istana Negara, Jalan Duta, Kuala Lumpur .

At Construction Site

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Istana Negara, Jalan Duta, Kuala Lumpur .

Don’t let be pad foundation jeopardised Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Jabatan Kecemasan Hospital Tengku Ampuan Rahimah, Klang Selangor Pemasangan Papak Pra-tuang

Don’t cut holes/voids in Precast Slabs at site. It should be specified and done at the factory with QC by manufacture.

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

UiTM Selayang

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Klinik Kesihatan Jenis 2 (KK2) Senaw ang, Negeri Sembilan Pemasangan Dinding Bata

Don’t have masonry walls laid for stiffener without tie rods and exmat at every 4 layers... Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

SMK Teluk Cempedak, Pahang

Don’t have poorly done formwork with less of grout...

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembinaan Pusat Latihan POLIS (PULAPOL), P. Langkaw i, Kedah

Hostel Block ~ Don ’t have brick w alls with no stiffeners Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek UIA(Bangunan Farmasi), Kuantan Don’t let huge trusses be mishandled

Projek Institut Latihan Diplomasi dan Hubungan Luar Nagara, Wisma Putra KL Not handled properly

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Sekolah Kebangsaan Bintong, Pulau Pinang

Don’t have design fault (Local Buckling)

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Pejabat Agama, Dungun, Terengganu.

Don’t install of roof tiles w ithout proper wall plate (wooden peg left in place)

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

ADTECH, Taiping, Perak.

Don’t let beam designed without reference to truss design Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

ADTECH, Taiping, Perak.

Stiffener were not built

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Dewan Makan Universiti Islam Antarabangsa (2004)

• Agihan genting konkrit secara sekata • Pembinaan ‘wall plate’ yang sempurna Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Sekolah Menengah Simpang Ampat, Seberang Perai Selatan Don’t let truss sit directly on slab subjected to overflow ing water

• Improper maintenance • Anti-rust specification • Signs corrosion

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Mahkamah Kuala Lumpur

Don’t sit heavy light fitting directly on ceiling

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Mahkamah Kuala Lumpur

Don’t let ceiling hang by wires

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jalan Masuk Sisa Toksid Bukit Nenas Negeri Sembilan

Don’t backfill earthwork from one side only

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Membina Jalandan Jambatan Kedua Permas Jaya, Johor Bahru

Do read draw ing & specification Joint in adjacent sheaths shall be staggered by at least 300mm Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Membina Jalandan Jambatan Kedua Permas Jaya, Johor Bahru

Do have comman sense. Prestressing tendon not protected/covered from weather with water proofing material to avoid corrosion. Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembinaan Jambatan No. FT005/252/80, Laluan Persekutuan 5, Alor Gajah, Melaka

Don’t certify a project completed. Starter bars there, but intermediate diaphragm not constructed.

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Cadangan Penggunaan Semula‘Tie Frame’ MRRII sebagai jejantas pejalan kaki di Laluan Persekutuan 5, Seksyen 446, Di Hadapan Sek. Keb. Sementa, Klang Water pipe was laid by punching through the w all of roads side drain.

Deviation of anchor bolts deviated from the centreline of pile cap. Don’t have poorly constructed works Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Jambatan Sungai Kemaman Teregganu

Abutment ‘B’ was shifted 150mm towards river due slope failure of approach embankment.

Do be careful w hen you have high embankment on soft soil

Jabatan Kerja Raya Malaysia

Embankment fill has been removed

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Membina Jambatan Baru Bersebelahan Jambatan Merdeka : Pakej C1

Sagging of walk way slab

Tranverse beam not constructed below walk way slab (Not follow ing construction drawing) Do read construction drawing Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Membina Jambatan Baru Bersebelahan Jambatan Merdeka : Pakej C1

Arrangement of reinforcement for tranverse beam not follow ing construction drawing.

Insufficient reinforcement anchorage length provided at arch beam.

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, Pahang

Do use steel formw orks to produce high quality of concrete finishing.

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, Pahang

Piers: Good concrete finishing

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, Pahang

Do have a design for scaffolding certified by PE.

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jln Lingkaran Luar Butterw orth : Pakej1B – Jambatan Sungai Perai (BORR)

QUALITY CONTROL DURING CONSTRUCTION Curing of segment with automatic sprinkling system

The segments were water cured for fourteen (14) day s, followed by the application of a curing compound for a further seven (7) days. In this period of curing, the segments were protected from direct w ind and sun in the curing chamber .

Curing of segment with mist (fogging) Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jln Lingkaran Luar Butterw orth : Pakej1B – Jambatan Sungai Perai (BORR)

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jln Lingkaran Luar Butterw orth : Pakej1B – Jambatan Sungai Perai (BORR)

View of Twin Leaf Pier Ribbed Finishes

General View of The Ramp

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jln Lingkaran Luar Butterw orth : Pakej1B – Jambatan Sungai Perai (BORR)

Final Connection of Main Segments And Site Frames... Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’ts

Do understand our CONTRACT • Obligation of the Government • Obligation of the Contractors

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do & Don’ts

Do look at DRAWINGS • Construction Drawings • Details • Notes

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’ts

Do look at BQ, MOM & SPECIFIC ATIONS • Method of Construction • Quality of finish product

Jabatan Kerja Raya Malaysia

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’ts

THANK YOU