Desert Claim Wind Farm Map - Re Configured - Feb 2009

  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Desert Claim Wind Farm Map - Re Configured - Feb 2009 as PDF for free.

More details

  • Words: 99
  • Pages: 1
RECONFIGURED PROJECT (2009) AND NEARBY RESIDENCES

KITTITAS COUNTY, WA

Reconfigured: 95 turbines, 190 megawatts

Roc

ky R

each

Habb erma n

BPA

PROPOSED TURBINE LOCATION (Turbines are not to scale)

- Ma

ple V

alley

PARTICIPATING RESIDENCES RESIDENCE WITHIN 2,500 FT. HIGH VOLTAGE TRANSMISSION LINE

345

REVISED PROJECT AREA

kv

rG pe Up en re Ca

- Cascade 230 kv

230

kv

7 y9 Hw Old

Happy Canyon

BPA

Pleasant Ln.

Reach

Reecer Creek

on ny

Rocky

Bra

nch C anal

0

.125 .25

.5

.75

1 MILES SCALE 1:48,000

Robbins

Reecer Creek

Howard

97

Lower Green Canyon

Smithson

Related Documents