Desert Claim Farm Map - Original - Map 2006

  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Desert Claim Farm Map - Original - Map 2006 as PDF for free.

More details

  • Words: 99
  • Pages: 1
PROPOSED PROJECT (2006) AND NEARBY RESIDENCES

KITTITAS COUNTY, WA

Proposed: 90 turbines, 180 megawatts

Roc

ky R

each

Habb erma n

BPA

PROPOSED TURBINE LOCATION (Turbines are not to scale)

- Ma

ple V

alley

PARTICIPATING RESIDENCES RESIDENCE WITHIN 2,500 FT. HIGH VOLTAGE TRANSMISSION LINE

345

REVISED PROJECT AREA

kv

rG pe Up en re Ca

BPA

230

kv

Happy Canyon

- Cascade 230 kv

Pleasant Ln.

Reach

Reecer Creek

on ny

Rocky

7 y9 Hw Old Bra

nch C anal

0

.125 .25

.5

.75

1 MILES SCALE 1:48,000

Robbins

Reecer Creek

Howard

97

Lower Green Canyon

Smithson

Related Documents