Ded Mep Poliklinik Rsj Sambang Lihum Ok.pdf

  • Uploaded by: Herliansyah Herry
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Ded Mep Poliklinik Rsj Sambang Lihum Ok.pdf as PDF for free.

More details

  • Words: 6,491
  • Pages: 33
PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GUBERNUR H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PEKERJAAN PERENCANAAN GEDUNG POLIKLINIK

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN DED MEP KONSULTAN PERENCANA

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM

PEMERINTAH PROVINSI KALIMANTAN SELATAN BLUD RUMAH SAKIT JIWA SAMBANG LIHUM DAFTAR ISI GAMBAR MEP

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

300.00

300.00

150.00

150.00

TOILET -0.05

300.00

300.00

300.00

TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

300.00

300.00

R. PENCAMPURAN OBAT ±0.00

LAVATORY ±0.00

300.00

TOILET -0.05 LAVATORY ±0.00 TOILET -0.05

R. KLINIK SARAF ±0.00 GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) ±0.00

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

NURSE STATION ±0.00

NURSERY ±0.00

GUDANG FARMASI ±0.00

DEPO FARMASI ±0.00 R. PERACIKAN OBAT ±0.00

TOILET LAVATORY -0.05 ±0.00

300.00

TOILET -0.05

80.00

80.00

300.00

300.00

PANTRY ±0.00

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

PANTRY ±0.00 TAMAN ORGANIK

TAMAN ORGANIK R. PANEL ±0.00

200.00

PPTK

NAIK R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

R. KLINIK PSIKOGERIATRI ±0.00

R. ADMINISTRASI &INFORMASI ±0.00

RUANG TUNGGU UTAMA ±0.00

RUANG SECURITY ±0.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

R. KLINIK NAPZA ±0.00 200.00

400.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011 SELASAR ±0.00

RAMP

SELASAR ±0.00

200.00

TEAM LEADER

BORDES -0.77 200.00

RAMP

BORDES -1.87

MAIN ENTERANCE ±0.00

250.00

JOKO SUNDORO

CATATAN : RAMP

365.00

315.00

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI PENERANGAN SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

600.00

300.00

300.00

300.00

300.00

900.00

300.00

DAK BETON +4.00

300.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

300.00

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

300.00

TOILET LAVATORY +3.95 +4.00

AREA WUDHU +3.95

LAVATORY TOILET +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

GUDANG & RUANG ARSIP +4.00

TOILET +3.95

300.00

TOILET +3.95

80.00

80.00

KORIDOR +4.00

300.00

PANTRY +4.00

PSIKOLOG +4.00

KORIDOR +4.00

RUANG IT/ SERVER +4.00

TURUN 2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

DIREKTUR RSJ SAMBANG LIHUM

R. PANEL ±0.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016 200.00

PPTK

300.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

R. TAMU KEPALA POLIKLINIK +4.00

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

TANDA TANGAN

PANTRY +4.00

PRIVATE TALK +4.00

KORIDOR +4.00

200.00

300.00

DIKETAHUI/ DISETUJUI

AUDITORIUM +4.00

TOILET +3.95

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

PENGELOLA TEKNIS

200.00

TOILET +3.95

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER

DAK BETON DAK BETON +3.00

DAK BETON +2.23

DAK BETON +3.00

DAK BETON

DAK BETON +1.12

JOKO SUNDORO

DAK BETON +1.92

200.00

DAK BETON +1.92

400.00

CATATAN : 269.26

DAK BETON

365.00

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI PENERANGAN SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

RD 175 PAR E27 D H 200 195

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

H H D1 D

D1 D

DIMENSION (mm)

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

D

DL 150 D=175, D1=140, H=195 DL 175 D=200, D1=170, H=204

PERENCANA : TYPE 160 203

D 190 235

TYPE

D1 H 160 103 203 135

W

W1

2X28 1195 1175 295

L

L1

275

H 60

W1

DIKETAHUI/ DISETUJUI

W

H

L1

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

L D1 D

H

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK TYPE L L1 W 1X28 1195 1175 200

D 195

D1 170

H 195

W1 180

H 130

H

W1

W

L1 L

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS H

D1 D

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

RM 300 ACR D D1 H 110 70 110

TYPE

W

W1

H

2X28 1195 1175 295

L

L1

275

95

JOKO SUNDORO

H W1

D1 D

W

CATATAN :

L1 L

H

D D1 H 110 65 45

TYPE L 1X14 598 1X21 868 1X28 1165

W 38

H 36

38

36

38

36

H

L

W D1 D

H

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

D 550

DIMENSION (mm) TYPE

L

W

H

1X28

1222

80

92

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM

H 755

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

W

H

W

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

H

D

L W H 487 100 85

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

L

W

H

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

TYPE L W H 1X28 1276 100 108

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016 H

L

PPTK

W

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

1260

TEAM LEADER 90

JOKO SUNDORO

TYPE 1X28

L

H1

H

1222 57 180 43

75

W1

W

CATATAN : W

L W1

H1 H

W L

W

H

150

150

800

L

H

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

300.00

300.00

150.00

150.00

TOILET -0.05

300.00

300.00

300.00

TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

300.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 300.00

R. PENCAMPURAN OBAT ±0.00

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

LAVATORY ±0.00

300.00

TOILET -0.05 LAVATORY ±0.00 TOILET -0.05

R. KLINIK SARAF ±0.00 GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) ±0.00

NURSE STATION ±0.00

NURSERY ±0.00

GUDANG FARMASI ±0.00

DEPO FARMASI ±0.00 R. PERACIKAN OBAT ±0.00

TOILET LAVATORY -0.05 ±0.00

PERENCANA :

300.00

TOILET -0.05

80.00

80.00

DIKETAHUI/ DISETUJUI 300.00

TANDA TANGAN

300.00

PANTRY ±0.00

PANTRY ±0.00 TAMAN ORGANIK

DIREKTUR RSJ SAMBANG LIHUM

TAMAN ORGANIK R. PANEL ±0.00

200.00 dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

NAIK R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00

PPTK

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

R. KLINIK PSIKOGERIATRI ±0.00

R. ADMINISTRASI &INFORMASI ±0.00

RUANG TUNGGU UTAMA ±0.00

RUANG SECURITY ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

R. KLINIK NAPZA ±0.00

PENGELOLA TEKNIS 200.00

400.00

SELASAR ±0.00

RAMP

SELASAR ±0.00

200.00

TEAM LEADER

BORDES -0.77 200.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

RAMP

BORDES -1.87

MAIN ENTERANCE ±0.00

250.00

JOKO SUNDORO

CATATAN : RAMP

365.00

315.00

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI STOP KONTAK & RAK KABEL SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

600.00

300.00

300.00

300.00

900.00

TOILET LAVATORY +3.95 +4.00

AREA WUDHU +3.95

300.00

LAVATORY TOILET +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

300.00

DAK BETON +4.00

300.00

300.00

300.00

GUDANG & RUANG ARSIP +4.00

TOILET +3.95

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

300.00

TOILET +3.95

80.00

80.00

DIKETAHUI/ DISETUJUI KORIDOR +4.00

300.00

PANTRY +4.00

PSIKOLOG +4.00

KORIDOR +4.00

RUANG IT/ SERVER +4.00

KORIDOR +4.00

200.00

TURUN

300.00

DIREKTUR RSJ SAMBANG LIHUM

200.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PANTRY +4.00

PRIVATE TALK +4.00

R. PANEL ±0.00

TANDA TANGAN

PPTK

2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

R. TAMU KEPALA POLIKLINIK +4.00 300.00

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

AUDITORIUM +4.00

TOILET +3.95

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS 200.00

TOILET +3.95 400.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

DAK BETON DAK BETON +3.00

DAK BETON +2.23

TEAM LEADER

DAK BETON +3.00

DAK BETON

DAK BETON +1.12

DAK BETON +1.92

200.00

DAK BETON +1.92

400.00

JOKO SUNDORO

CATATAN : 269.26

DAK BETON

365.00

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI STOP KONTAK & RAK KABEL SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

300.00

300.00

150.00

150.00

TOILET -0.05

300.00

300.00

300.00

TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

300.00

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.00

R. PENCAMPURAN OBAT ±0.00

LAVATORY ±0.00

300.00

TOILET -0.05 LAVATORY ±0.00 TOILET -0.05

R. KLINIK SARAF ±0.00 GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) ±0.00

NURSE STATION ±0.00

NURSERY ±0.00

GUDANG FARMASI ±0.00

DEPO FARMASI ±0.00 R. PERACIKAN OBAT ±0.00

TOILET LAVATORY -0.05 ±0.00

PERENCANA : 300.00

TOILET -0.05

80.00

80.00

DIKETAHUI/ DISETUJUI 300.00

DIREKTUR RSJ SAMBANG LIHUM

300.00

PANTRY ±0.00

PANTRY ±0.00 TAMAN ORGANIK

TANDA TANGAN

TAMAN ORGANIK R. PANEL ±0.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

200.00

NAIK

PPTK R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

R. KLINIK PSIKOGERIATRI ±0.00

RUANG TUNGGU UTAMA ±0.00

R. ADMINISTRASI &INFORMASI ±0.00

RUANG SECURITY ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

PENGELOLA TEKNIS

R. KLINIK NAPZA ±0.00 200.00

400.00

F SELASAR ±0.00

RAMP

SELASAR ±0.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

200.00

BORDES -0.77 200.00

RAMP

BORDES -1.87

MAIN ENTERANCE ±0.00

250.00

F

JOKO SUNDORO

CATATAN :

RAMP

365.00

315.00 A

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI FIRE ALARM SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

600.00

300.00

300.00

300.00

900.00

TOILET LAVATORY +3.95 +4.00

AREA WUDHU +3.95

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.00

LAVATORY TOILET +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

300.00

DAK BETON +4.00

300.00

300.00

300.00

GUDANG & RUANG ARSIP +4.00

TOILET +3.95

PERENCANA : 300.00

TOILET +3.95

80.00

80.00

KORIDOR +4.00

300.00

PANTRY +4.00

PSIKOLOG +4.00

KORIDOR +4.00

RUANG IT/ SERVER +4.00

TURUN 2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

200.00

PPTK

R. TAMU KEPALA POLIKLINIK +4.00 300.00

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

R. PANEL ±0.00

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

300.00

PANTRY +4.00

PRIVATE TALK +4.00

KORIDOR +4.00

200.00

DIKETAHUI/ DISETUJUI

AUDITORIUM +4.00

TOILET +3.95

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

PENGELOLA TEKNIS

200.00

TOILET +3.95

F LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER DAK BETON DAK BETON +3.00

DAK BETON +2.23

DAK BETON +3.00 400.00

F DAK BETON +1.12

JOKO SUNDORO

DAK BETON +1.92

DAK BETON

DAK BETON +1.92

200.00

CATATAN :

269.26

DAK BETON

365.00

A

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI FIRE ALARM SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

300.00

300.00

150.00

150.00

TOILET -0.05

300.00

300.00

300.00

TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

300.00

300.00

R. PENCAMPURAN OBAT ±0.00

LAVATORY ±0.00

300.00

TOILET -0.05 LAVATORY ±0.00 TOILET -0.05

R. KLINIK SARAF ±0.00 GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) ±0.00

PERENCANA :

NURSE STATION ±0.00

NURSERY ±0.00

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

GUDANG FARMASI ±0.00

DEPO FARMASI ±0.00 R. PERACIKAN OBAT ±0.00

TOILET LAVATORY -0.05 ±0.00

300.00

TOILET -0.05

80.00

80.00

300.00

300.00

PANTRY ±0.00

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

PANTRY ±0.00 TAMAN ORGANIK

TAMAN ORGANIK R. PANEL ±0.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

200.00

PPTK

NAIK R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00 RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

R. KLINIK PSIKOGERIATRI ±0.00

R. ADMINISTRASI &INFORMASI ±0.00

RUANG TUNGGU UTAMA ±0.00

RUANG SECURITY ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

PENGELOLA TEKNIS

R. KLINIK NAPZA ±0.00 200.00 LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER SELASAR ±0.00

RAMP

SELASAR ±0.00

200.00

BORDES -0.77 200.00

RAMP

BORDES -1.87

JOKO SUNDORO

MAIN ENTERANCE ±0.00

250.00

CATATAN :

RAMP

365.00

315.00

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI CCTV NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

600.00

300.00

300.00

300.00

900.00

300.00

DAK BETON +4.00

300.00

300.00

300.00

TOILET LAVATORY +3.95 +4.00

AREA WUDHU +3.95

300.00

LAVATORY TOILET +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

GUDANG & RUANG ARSIP +4.00

TOILET +3.95

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

300.00

TOILET +3.95

80.00

80.00

DIKETAHUI/ DISETUJUI KORIDOR +4.00

300.00

PANTRY +4.00

PSIKOLOG +4.00

KORIDOR +4.00

RUANG IT/ SERVER +4.00

KORIDOR +4.00

200.00

300.00

PANTRY +4.00

PRIVATE TALK +4.00

TURUN

R. PANEL ±0.00

200.00

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK 2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

R. TAMU KEPALA POLIKLINIK +4.00 300.00

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

AUDITORIUM +4.00

TOILET +3.95

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS 200.00

TOILET +3.95 400.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

DAK BETON DAK BETON +3.00

DAK BETON +2.23

TEAM LEADER

DAK BETON +3.00

DAK BETON

DAK BETON +1.12

JOKO SUNDORO

DAK BETON +1.92

200.00

DAK BETON +1.92

400.00

CATATAN : 269.26

DAK BETON

365.00

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI CCTV SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM 600.00

300.00

300.00

150.00

150.00

TOILET -0.05

300.00

300.00

300.00

TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

300.00

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

300.00

R. PENCAMPURAN OBAT ±0.00

LAVATORY ±0.00

300.00

TOILET -0.05 LAVATORY ±0.00 TOILET -0.05

R. KLINIK SARAF ±0.00 GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) ±0.00

NURSE STATION ±0.00

NURSERY ±0.00

DEPO FARMASI ±0.00 R. PERACIKAN OBAT ±0.00

GUDANG FARMASI ±0.00

TOILET LAVATORY -0.05 ±0.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.00

PERENCANA : TOILET -0.05

80.00

80.00

DIKETAHUI/ DISETUJUI 300.00

TANDA TANGAN

300.00

PANTRY ±0.00

DIREKTUR RSJ SAMBANG LIHUM

PANTRY ±0.00 TAMAN ORGANIK

TAMAN ORGANIK R. PANEL ±0.00

200.00

NAIK

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

R. KLINIK PSIKOGERIATRI ±0.00

R. ADMINISTRASI &INFORMASI ±0.00

RUANG TUNGGU UTAMA ±0.00

RUANG SECURITY ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

R. KLINIK NAPZA ±0.00 200.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

SELASAR ±0.00

RAMP

TEAM LEADER

SELASAR ±0.00

200.00

BORDES -0.77 200.00

RAMP

BORDES -1.87

JOKO SUNDORO

MAIN ENTERANCE ±0.00

250.00

CATATAN :

RAMP

365.00

315.00

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI SOUND SYSTEM SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

600.00

300.00

300.00

300.00

300.00

900.00

300.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

DAK BETON +4.00

300.00

300.00

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR 300.00

TOILET LAVATORY +3.95 +4.00

AREA WUDHU +3.95

LAVATORY TOILET +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

GUDANG & RUANG ARSIP +4.00

TOILET +3.95

300.00

PERENCANA :

TOILET +3.95

80.00

80.00

DIKETAHUI/ DISETUJUI KORIDOR +4.00

300.00

PANTRY +4.00

PSIKOLOG +4.00

KORIDOR +4.00

RUANG IT/ SERVER +4.00

KORIDOR +4.00

200.00

TURUN 2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

R. PANEL ±0.00

200.00

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

R. TAMU KEPALA POLIKLINIK +4.00 300.00

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

300.00

PANTRY +4.00

PRIVATE TALK +4.00

TANDA TANGAN

AUDITORIUM +4.00

TOILET +3.95

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

200.00

TOILET +3.95

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER DAK BETON DAK BETON +3.00

DAK BETON +2.23

DAK BETON +3.00 400.00

DAK BETON +1.12

CATATAN :

DAK BETON +1.92

DAK BETON

DAK BETON +1.92

JOKO SUNDORO

200.00

269.26

DAK BETON

365.00

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI SOUND SYSTEM SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM 600.00

300.00

300.00

150.00

150.00

TOILET -0.05

300.00

300.00

300.00

TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

300.00

300.00

R. PENCAMPURAN OBAT ±0.00

LAVATORY ±0.00

300.00

TOILET -0.05 LAVATORY ±0.00 TOILET -0.05

R. KLINIK SARAF ±0.00 GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) ±0.00

NURSE STATION ±0.00

NURSERY ±0.00

GUDANG FARMASI ±0.00

DEPO FARMASI ±0.00 R. PERACIKAN OBAT ±0.00

TOILET LAVATORY -0.05 ±0.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.00

PERENCANA :

TOILET -0.05

80.00

80.00

DIKETAHUI/ DISETUJUI 300.00

TANDA TANGAN

300.00

PANTRY ±0.00

DIREKTUR RSJ SAMBANG LIHUM

PANTRY ±0.00 TAMAN ORGANIK

TAMAN ORGANIK R. PANEL ±0.00

200.00

NAIK

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

R. KLINIK PSIKOGERIATRI ±0.00

R. ADMINISTRASI &INFORMASI ±0.00

RUANG TUNGGU UTAMA ±0.00

RUANG SECURITY ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

R. KLINIK NAPZA ±0.00 200.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER SELASAR ±0.00

RAMP

SELASAR ±0.00

200.00

BORDES -0.77 200.00

RAMP

BORDES -1.87

JOKO SUNDORO

MAIN ENTERANCE ±0.00

250.00

CATATAN :

RAMP

365.00

315.00

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI TELEPON & MATV SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

600.00

600.00

300.00

300.00

300.00

300.00

900.00

300.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 DAK BETON +4.00

300.00

300.00

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR 300.00

TOILET LAVATORY +3.95 +4.00

AREA WUDHU +3.95

LAVATORY TOILET +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

GUDANG & RUANG ARSIP +4.00

TOILET +3.95

PERENCANA :

300.00

TOILET +3.95

80.00

80.00

DIKETAHUI/ DISETUJUI KORIDOR +4.00

300.00

PANTRY +4.00

PSIKOLOG +4.00

KORIDOR +4.00

RUANG IT/ SERVER +4.00

KORIDOR +4.00

200.00

TURUN 2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

R. PANEL ±0.00

200.00

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

R. TAMU KEPALA POLIKLINIK +4.00 300.00

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

300.00

PANTRY +4.00

PRIVATE TALK +4.00

TANDA TANGAN

AUDITORIUM +4.00

TOILET +3.95

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

200.00

TOILET +3.95

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER DAK BETON DAK BETON +3.00

DAK BETON +2.23

DAK BETON +3.00 400.00

DAK BETON +1.12

CATATAN :

DAK BETON +1.92

DAK BETON

DAK BETON +1.92

JOKO SUNDORO

200.00

269.26

DAK BETON

365.00

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI TELEPON & MATV

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM 600.00

300.00

300.00

150.00

150.00

TOILET -0.05

300.00

300.00

300.00

TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

300.00

300.00

R. PENCAMPURAN OBAT ±0.00

LAVATORY ±0.00

300.00

TOILET -0.05 LAVATORY ±0.00 TOILET -0.05

R. KLINIK SARAF ±0.00 GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) ±0.00

NURSE STATION ±0.00

NURSERY ±0.00

GUDANG FARMASI ±0.00

DEPO FARMASI ±0.00 R. PERACIKAN OBAT ±0.00

TOILET LAVATORY -0.05 ±0.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.00

PERENCANA :

TOILET -0.05

80.00

80.00

DIKETAHUI/ DISETUJUI 300.00

TANDA TANGAN

300.00

PANTRY ±0.00

DIREKTUR RSJ SAMBANG LIHUM

PANTRY ±0.00 TAMAN ORGANIK

TAMAN ORGANIK R. PANEL ±0.00

200.00

NAIK

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

R. KLINIK PSIKOGERIATRI ±0.00

R. ADMINISTRASI &INFORMASI ±0.00

RUANG TUNGGU UTAMA ±0.00

RUANG SECURITY ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

R. KLINIK NAPZA ±0.00 200.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER SELASAR ±0.00

RAMP

SELASAR ±0.00

200.00

BORDES -0.77 200.00

RAMP

BORDES -1.87

JOKO SUNDORO

MAIN ENTERANCE ±0.00

250.00

CATATAN :

RAMP

365.00

315.00

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI AIR BERSIH SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM 600.00

600.00

300.00

300.00

300.00

900.00

TOILET LAVATORY +3.95 +4.00

AREA WUDHU +3.95

300.00

LAVATORY TOILET +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

300.00

DAK BETON +4.00

300.00

300.00

300.00

GUDANG & RUANG ARSIP +4.00

TOILET +3.95

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.00

PERENCANA : TOILET +3.95

80.00

80.00

DIKETAHUI/ DISETUJUI

KORIDOR +4.00

300.00

PANTRY +4.00

PSIKOLOG +4.00

KORIDOR +4.00

300.00

PANTRY +4.00

PRIVATE TALK +4.00

RUANG IT/ SERVER +4.00

KORIDOR +4.00

200.00

TURUN

TANDA TANGAN

R. PANEL ±0.00

DIREKTUR RSJ SAMBANG LIHUM

200.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK 2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

R. TAMU KEPALA POLIKLINIK +4.00 300.00

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

AUDITORIUM +4.00

TOILET +3.95

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

200.00

TOILET +3.95

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER DAK BETON DAK BETON +3.00

DAK BETON +2.23

DAK BETON +3.00 400.00

DAK BETON +1.12

DAK BETON +1.92

JOKO SUNDORO

DAK BETON

DAK BETON +1.92

200.00

CATATAN :

269.26

DAK BETON

365.00

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI AIR BERSIH SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM 600.00

300.00

300.00

150.00

150.00

TOILET -0.05

300.00

300.00

300.00

TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

300.00

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

300.00

R. PENCAMPURAN OBAT ±0.00

LAVATORY ±0.00

300.00

TOILET -0.05 LAVATORY ±0.00 TOILET -0.05

R. KLINIK SARAF ±0.00 GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) ±0.00

NURSE STATION ±0.00

NURSERY ±0.00

GUDANG FARMASI ±0.00

DEPO FARMASI ±0.00 R. PERACIKAN OBAT ±0.00

TOILET LAVATORY -0.05 ±0.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.00

PERENCANA :

TOILET -0.05

80.00

80.00

DIKETAHUI/ DISETUJUI 300.00

TANDA TANGAN

300.00

PANTRY ±0.00

DIREKTUR RSJ SAMBANG LIHUM

PANTRY ±0.00 TAMAN ORGANIK

TAMAN ORGANIK R. PANEL ±0.00

200.00

NAIK

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

R. KLINIK PSIKOGERIATRI ±0.00

R. ADMINISTRASI &INFORMASI ±0.00

RUANG TUNGGU UTAMA ±0.00

RUANG SECURITY ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

R. KLINIK NAPZA ±0.00 200.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

SELASAR ±0.00

RAMP

TEAM LEADER

SELASAR ±0.00

200.00

BORDES -0.77 200.00

RAMP

BORDES -1.87

JOKO SUNDORO

MAIN ENTERANCE ±0.00

250.00

CATATAN :

RAMP

365.00

315.00

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI AIR KOTOR & BEKAS SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

600.00

600.00

300.00

300.00

300.00

300.00

900.00

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM

300.00

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

DAK BETON +4.00

300.00

300.00

TOILET LAVATORY +3.95 +4.00

AREA WUDHU +3.95

300.00

LAVATORY TOILET +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

GUDANG & RUANG ARSIP +4.00

TOILET +3.95

300.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

TOILET +3.95

80.00

80.00

KORIDOR +4.00

300.00

PANTRY +4.00

PSIKOLOG +4.00

KORIDOR +4.00

RUANG IT/ SERVER +4.00

TURUN 2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

R. PANEL ±0.00

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM 200.00 dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

R. TAMU KEPALA POLIKLINIK +4.00 300.00

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

PANTRY +4.00

PRIVATE TALK +4.00

KORIDOR +4.00

200.00

300.00

AUDITORIUM +4.00

TOILET +3.95

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS 200.00

TOILET +3.95 400.00

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

DAK BETON DAK BETON +3.00

DAK BETON +2.23

TEAM LEADER

DAK BETON +3.00

DAK BETON

DAK BETON +1.12

JOKO SUNDORO

DAK BETON +1.92

200.00

DAK BETON +1.92

400.00

CATATAN : 269.26

DAK BETON

365.00

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI AIR KOTOR & BEKAS SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

600.0000

600.0000

300.0000

300.0000

300.0000

300.0000

900.0000

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM

300.0000

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

DAK BETON +4.00

300.0000

300.0000

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.0000

300.0000

PERENCANA :

DAK BETON +7.50

80.0000

80.0000

DIKETAHUI/ DISETUJUI 300.0000

TANDA TANGAN

300.0000

DIREKTUR RSJ SAMBANG LIHUM

200.0000

200.0000

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

2445.0000

300.0000

300.0000

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

DAK BETON +7.50

DAK BETON +7.50

200.0000

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER 400.0000

DAK BETON DAK BETON +3.00

DAK BETON +2.23

DAK BETON +3.00 400.0000

DAK BETON +1.92

DAK BETON +1.12

DAK BETON +1.92

CATATAN :

DAK BETON

200.0000

JOKO SUNDORO

269.2600

DAK BETON

365.0000

95.7400

DAK BETON +1.92

300.0000

300.0000

300.0000

300.0000

300.0000

300.0000

300.0000

300.0000

300.0000

300.0000

300.0000

300.0000

3600.0000

PERENCANAAN INST. AIR HUJAN SKALA 1 : 200

KETERANGAN: = EXISTING

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 PENUTUP ATAP METAL

RANGKA ATAP EXISTING

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

BALOK EXISTING PLAFOND

ELV. +6.75

ELV. +6.75

PLAFOND GYIPSUM 9 MM

GYIPSUM 9 MM

BALOK EXISTING

BALOK EXISTING

ELV. +6.75

PLAFOND GYIPSUM 9 MM

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM PERMUKAAN LANTAI 2 ELV. +4.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

BALOK EXISTING ELV. +3.00

PPTK

BALOK EXISTING

BALOK EXISTING ELV. +3.00

PLAFOND GYIPSUM 9 MM

PLAFOND GYIPSUM 9 MM

BORDES ELV. +2.04

EXISTING BALOK 20/30

ELV. +1.73

PLAFOND GYIPSUM 9 MM

BALOK 15/20

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

PERMUKAAN LANTAI 1 ELV. ±0.00

BORDES ELV. -0.77

BALOK EXISTING

BALOK EXISTING

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

BALOK EXISTING

TEAM LEADER

BALOK B2 20/30

1200.0000

3000.0000

3000.0000

4500.0000

4500.0000

TB1 PILE 20/30 CAP MINI PILE 1800.0000

CATATAN :

3000.0000

35700.0000

1200.0000

4500.0000

4500.0000

4500.0000

JOKO SUNDORO

EXISTING

TB1 PILE 20/30 CAP MINI PILE

PERENCANAAN INST. AIR HUJAN SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

600.00

300.00

300.00

150.00

150.00

EF-1.4 TOILET -0.05

300.00

300.00

300.00

EF-1.6 TOILET -0.05

600.00

300.00

FISIOTERAPI/ REHAB MEDIK ±0.00

300.00

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM

300.00

IU-1.12 R. PENCAMPURAN OBAT ±0.00

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

300.00

LAVATORY ±0.00

300.00

EF-1.1 TOILET -0.05 LAVATORY ±0.00 EF-1.2 TOILET -0.05

R. KLINIK SARAF ±0.00 IU-1.5

GUDANG UMUM ±0.00

R. KLINIK GIGI SPESIALIS (ORTODONTI) IU-1.6 ±0.00

NURSE STATION ±0.00

NURSERY ±0.00

GUDANG FARMASI ±0.00

DEPO FARMASI ±0.00

EF-1.6 TOILET LAVATORY -0.05 ±0.00

LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR 300.00

PERENCANA :

EF-1.7 TOILET -0.05

R. PERACIKAN OBAT ±0.00 EF-2.9

80.00

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018

80.00

DIKETAHUI/ DISETUJUI 300.00

TANDA TANGAN

300.00

PANTRY ±0.00

EF-1.3

EF-2.8

TAMAN ORGANIK

DIREKTUR RSJ SAMBANG LIHUM

PANTRY ±0.00

TAMAN ORGANIK R. PANEL ±0.00

NAIK

200.00

IU-1.4

PPTK

R. REKAM MEDIK ±0.00

2445.00 500.00

R. DOKTER & PERAWAT ±0.00

100.00

200.00

R. KLINIK GIZI ±0.00

R. KLINIK UMUM (MCU) ±0.00

IU-1.2

IU-1.1

R. KLINIK PSIKOGERIATRI ±0.00

IU-1.7

R. ADMINISTRASI &INFORMASI ±0.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

RUANG TUNGGU UTAMA ±0.00

RUANG SECURITY ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

R. KLINIK JIWA ±0.00

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

R. KLINIK NAPZA ±0.00 200.00

IU-1.9

IU-1.8

IU-1.3

IU-1.10

IU-1.11 LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

400.00

TEAM LEADER SELASAR ±0.00

RAMP

SELASAR ±0.00

200.00

BORDES -0.77 200.00

RAMP

BORDES -1.87

JOKO SUNDORO

MAIN ENTERANCE ±0.00

250.00

CATATAN :

RAMP

365.00

315.00

300.00

900.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 1 PERENCANAAN INSTALASI AC DAN EXHAUSE FAN SKALA 1 : 200

NO. LBR

JML. LBR

PEMERINTAH PROVINSI KALIMANTAN SELATAN

600.00

600.00

300.00

300.00

300.00

300.00

900.00

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM

300.00

JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

DAK BETON +4.00

300.00

OU-1.5

300.00

EF-2.1 LAVATORY TOILET +3.95 +4.00

OU-1.6

AREA WUDHU +3.95

OU-2.5

OU-1.12

OU2.8

OU-2.6

TOILET LAVATORY EF-2.8 +3.95 +4.00

KORIDOR +4.00

MUSHOLA +4.20

EF-2.2 TOILET +3.95

300.00

GUDANG & RUANG ARSIP +4.00

IU-2.6

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

300.00

PERENCANA : EF-2.7 TOILET +3.95

80.00

80.00

DIKETAHUI/ DISETUJUI

IU-2.5

KORIDOR +4.00

300.00

PANTRY +4.00

IU-2.8

EF-2.6

RUANG IT/ SERVER +4.00

KORIDOR +4.00

200.00

TURUN

TANDA TANGAN

300.00

PRIVATE TALK +4.00

PSIKOLOG +4.00

EF-2.3

KORIDOR +4.00

DIREKTUR RSJ SAMBANG LIHUM

PANTRY +4.00

R. PANEL ±0.00

200.00

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

2445.00

RUANG KEPALA POLIKLINIK +4.00

300.00

R. TAMU KEPALA POLIKLINIK +4.00

IU-2.2

IU-2.1

IU-2.3

AUDITORIUM +4.00

TOILET +3.95

RUANG STAFF & ADMINISTRASI +4.00

GUDANG PERLENGKAPAN AUDITORIUM +4.00

IU-2.4

EF-2.4

300.00

IU-2.9

IU-2.7

RUANG RAPAT +4.00

PERPUSTAKAAN +4.00

IU-2.10

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

200.00

TOILET +3.95

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

EF-2.5

400.00

TEAM LEADER DAK BETON DAK BETON +2.23

OU-2.1

OU-1.2

OU-1.4

OU-2.2

DAK BETON OU-1.3 OU1.1 +3.00

OU-2.1

OU-2.7

OU-2.9

OU-1.8

OU-1.7

OU-1.11

OU-1.10

OU-1.9

OU-2.10

DAK BETON +3.00

OU-2.4

400.00 JOKO SUNDORO

DAK BETON +1.12

CATATAN : DAK BETON +1.92

DAK BETON

DAK BETON +1.92

200.00

269.26

DAK BETON

365.00

95.74

DAK BETON +1.92

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

300.00

3600.00

LANTAI 2 PERENCANAAN INSTALASI AC DAN EXHAUSE FUN SKALA 1 : 200

NO. LBR

JML. LBR

OU

PEMERINTAH PROVINSI KALIMANTAN SELATAN

BLUD RUMAH SAKIT JIWA SAMBANG LIHUM JL. GBR. H. SYARKAWI KM 3,9 GAMBUT KAB. BANJAR

PERENCANAAN PEMBANGUNAN LANJUTAN INSTALASI RAWAT JALAN TAHUN ANGGARAN 2018 LOKASI JALAN GUBERNUR SYARKAWI KM. 3.9. LINGKAR UTARALANDASAN ULIN KAB. BANJAR

IU

PERENCANA :

DIKETAHUI/ DISETUJUI

TANDA TANGAN

DIREKTUR RSJ SAMBANG LIHUM

dr. IBG. DHARMA PUTRA, MKM NIP. 19610301 198703 1 016

PPTK

RIZALI HADI ALVIAN NOOR. ST NIP. 19861008 200903 1 002

PENGELOLA TEKNIS

LUSVIAN TEJA INDALA, ST NIP. 19640922 198703 1 011

TEAM LEADER

JOKO SUNDORO

CATATAN :

NO. LBR

JML. LBR

Related Documents

Ded
May 2020 15
Ded Ipa.pdf
December 2019 13
Serv-ded
October 2019 46
Mep Cad.pdf
June 2020 4
Mep Engineer
June 2020 11

More Documents from ""