Costos

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Costos as PDF for free.

More details

  • Words: 138
  • Pages: 1
ITEM A

B

C

DESCRIPCION

Unid

Metrado

Cant

Precio S/.

P.Total S/.

|. Excavación de zanja terreno (manual)

M2

15.00

1

1.00

15.00

2. Trazado y replanteo de la obra 3.Eliminacion de material (manual usando carretilla)

M

2

15.00

1

1.20

18.00

M3

15.00

1.60

24.00

TOTAL

57.00

25.00 50.00 50.00 10.00 10.00

200.00 200.00 50.00 50.00 10.00

TOTAL

510.00

MANO DE OBRA (Obras preliminares)

HERRAMIENTAS MANUALES Y EQUIPOS 1.Pala 2.Carretillas 3.Wincha 4.Machete 5Clavos

UND. UND. UND. UND. Kg

X X X X

8 4 1 5 1

MATERIALES INSUMOS 1.Alambre Nº 16 2.fierro de 3/8 7.Cemento

Kg UND. BOLSAS

X X 1.56

120 864 8

4.00 16.00 19.50

480.00 13 824.00 253.50

8.Hormigon

M3

X

4

5.00

20.00

9.Arena Gruesa

M

X

4

5.00

20.00

TOTAL

14597.5

Sub total

21545.5

Imprevst.5%

30978.25

Gran Total

36710

3

D

Related Documents

Costos
August 2019 78
Costos
June 2020 53
Costos
May 2020 41
Costos
May 2020 43
Resumen Costos
November 2019 29
Costos Paola
June 2020 16