ADANI POWER LTD CHP CLEARANCE REPORT Project Name : Contract Name: Contractor : Date of Inspection:-
Unit No : Contract No : Sub- Contractor : To
From
CHP NO. Sl.No.
Area: - Receipt Inspection / Storage/ Fabrication / Assembly / Erection Equipment / System : Manufacturer : Location
:
Date FQP Refrence No. Classification Specn/Drg Ref No. Description of Item / of Checks Component
Brief Description of Check and Test
Acceptable Value/ Acceptance Std.
Actual Results Obtained
If space is not sufficient, enclose report as Annexure.
Sign
Sign
Sign
Name
Name
Name
For Contractor
Copies to :
For Manufacturer
For Executive Department
Sign Name
For FQA
Remarks
1). Contractor / Sub-Contractor
2)Executing Dept/Site
3)FQA Site
4)CQA & IG