Chapter V Camilo

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Chapter V Camilo as PDF for free.

More details

  • Words: 291
  • Pages: 2
34 Chapter V SUMMARY, CONCLUSION AND RECOMMENDATION This chapter consists of the summary, conclusion and recommendation of the study. Summary This technical feasibility study sought to design, construct, test and revise the functionality of the Multi-Powered Working Table in giving advantage in power supply for electronic appliances circuits and systems. It can be used in troubleshooting and servicing electronic appliances and laboratory experiments. This device can be the source power supply for appliances having 220 volts AC or that electronic device that uses direct current voltage. It can also be use as a working place for technicians. Input voltage is 12 volts DC having continued output of 300 watts and 220 volts AC. The Multi-Powered Working Table is technically feasible due to the fact that its design and construction are simple, since all supplies and materials needed are available in the local market. The features of the device are that it is battery and electrically, economical, locally produced, functional and multi-powered source. The major parts of the device are the inverter circuit, variable power supply circuit, battery and the working table. The device economically in terms of

35 labor and manpower, replaceable parts, made from low cost materials that can be found locally. Conclusion The findings of this project show that it is technically feasible to design a Multi-Powered Working Table, because supplies and materials needed in the construction of the project can be found locally with affordable prices. Recommendation The following recommendations are offered for considerations: 1. Skilled electrician should be encouraged to construct the device to increase productivity. 2. A further study should be conducted to improve and design and construction of the project. 3. A study must be undertaken to determine the feasibility study must producing the device.

Related Documents

Chapter V Camilo
November 2019 18
Chapter 2 Camilo
November 2019 10
Chapter Iv Camilo
November 2019 14
Chapter Iii Camilo Alcantara
November 2019 15
Chapter 1 Camilo
November 2019 13
Camilo
April 2020 16