MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO TRAMO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

CÁLCULO DE FLETE A LA CIUDAD DE CUSCO El cálculo del flete se basa en lo establecido en el D.S. N° 033-2006-MTC del 30.09.06 y el D.S. N° 010-2006-MTC del 25.03.06 que establecen costos del servicio de transporte de bienes en el ámbito local y por carretera para diversas rutas y distancias virtuales establecidas previamente.

TIPO TRANSPORTE : NORMAL RUTA : LIMA - CUSCO ORIGEN

DESTINO

Lima

Cusco

D.V. (kmv) 1,566.43 1,566.43

S/. X TM

FRV (*)

258.68 258.68

1.00

S/. X TM 258.68 258.68

REAJUSTE K1 1.225

SUBTOTAL

316.95

TIPO TRANSPORTE : ESPECIAL RUTA : LIMA - CUSCO ORIGEN

DESTINO

Lima

Cusco

D.V. (kmv) 1,566.43 1,566.43

S/. X TM

FRV (*)

258.68 258.68

1.40

S/. X TM 362.15 362.15

REAJUSTE K1 1.225

FACTOR DE REAJUSTE (K1) K actual =

(32) ENERO 2014 (32) DIC. 2005

=

455.19

=

1.225

371.50

Nota: (*) FRV : Factor de Retorno al Vacío igual a 1 para transporte normal y a 1.4 para transporte especial (de acuerdo al D.S. N° 010-2006-MTC del 25.03.06) Transporte Especial : Se denomina al transporte usando contenedores, cargas peligrosas, cargas liquidas (de acuerdo al D.S. N° 010-2006-MTC del 25.03.06) Factor de Reajuste (k) (De acuerdo al D.S. N° 011-79-VC del 02.03.79 y sus modificatorias, ampliatorias y complementarias.)

SUBTOTAL

443.74

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO TRAMO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

CÁLCULO DE FLETE A LA CIUDAD DE CUSCO El cálculo del flete se basa en lo establecido en el D.S. N° 033-2006-MTC del 30.09.06 y el D.S. N° 010-2006-MTC del 25.03.06 que establecen costos del servicio de transporte de bienes en el ámbito local y por carretera para diversas rutas y distancias virtuales establecidas previamente.

TIPO TRANSPORTE : NORMAL RUTA : AREQUIPA - CUSCO ORIGEN

DESTINO

Arequipa

Cusco

D.V. (kmv) 877.02 877.02

S/. X TM

FRV (*)

144.83 144.83

1.00

S/. X TM 144.83 144.83

REAJUSTE K1 1.225

SUBTOTAL

177.46

TIPO TRANSPORTE : ESPECIAL RUTA : AREQUIPA - CUSCO ORIGEN

DESTINO

Arequipa

Cusco

D.V. (kmv) 877.02 877.02

S/. X TM

FRV (*)

144.83 144.83

1.40

S/. X TM 202.76 202.76

REAJUSTE K1 1.225

FACTOR DE REAJUSTE (K1) K actual =

(32) ENERO 2014 (32) DIC. 2005

=

455.19

=

1.225

371.50

Nota: (*) FRV : Factor de Retorno al Vacío igual a 1 para transporte normal y a 1.4 para transporte especial (de acuerdo al D.S. N° 010-2006-MTC del 25.03.06) Transporte Especial : Se denomina al transporte usando contenedores, cargas peligrosas, cargas liquidas (de acuerdo al D.S. N° 010-2006-MTC del 25.03.06) Factor de Reajuste (k) (De acuerdo al D.S. N° 011-79-VC del 02.03.79 y sus modificatorias, ampliatorias y complementarias.)

SUBTOTAL

248.44

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO TRAMO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

CÁLCULO DE FLETE DE CUSCO A OBRA Considerando las limitaciones de aplicación del D.S. N° 033-2066-MTC del 29.09.06, el cálculo del flete a obra se basa en lo establecido en el D.S. N° 049-2002-MTC del 19.12.02 (costo) y en la Tarifas de carga del MTC - 1991 (Distancia Virtual)

CALCULO DE LA DISTANCIA VIRTUAL El cálculo de la distancia virtual se basa en el método de TARIFAS DE CARGA DEL MTC - 1991, publicadas por el MTC.

LUGAR DE ORIGEN : CUSCO VIA : CUSCO-MARANURA

LUGAR DE DESTINO : C.G. OBRA

INICIO

FINAL

REGION

ALTITUD (m.s.n.m.)

Cusco Ollantaytambo Alfamayo Maranura

Ollantaytambo Alfamayo Maranura C.G (OBRA)

Sierra Sierra Sierra Sierra

2500 a mas 2500 a mas 1000-2500 1000-2500

DISTANCIA TIPO CARRETERA (km) Asfaltada Asfaltada Asfaltada Afirmado

F.C.

D.V. (kmv)

74.00 82.50 49.00 6.48

1.40 1.40 1.20 2.10

103.60 115.50 58.80 13.62

D.V. AL C.G.

(kmv)

291.52

CALCULO DE FLETE El cálculo del flete se basa en el anexo III "Costos km/virtual para transporte de carga en camión por Carretera" - Módulo 0 a 500 km virtuales, para la distancia anteriormente determinada, considerando un FRV (Factor de Retorno al vacío) para distancias mayores a 200km.

LUGAR DE ORIGEN : CUSCO TIPO DE CARGA UTIL TRANSPORTE (Ton)

D.V. (kmv)

Normal

30

292.00

Especial

30

292.00

Norm S/.

FRV

1,634.19 2,287.87

S/. X TM

REAJUSTE K2

54.47

1.430

77.92

76.26

1.430

109.08

FACTOR DE REAJUSTE (K2) K actual =

(32) ENERO 2014 (32) NOV. 2002

=

455.19

=

SUBTOTAL

1.430

318.23

Nota: (*) FRV : Factor de Retorno al Vacío igual a 1 para transporte normal y a 1.4 para transporte especial (de acuerdo al D.S. N° 010-2006-MTC del 25.03.06) Transporte Especial : Se denomina al transporte usando contenedores, cargas peligrosas, cargas liquidas (de acuerdo al D.S. N° 010-2006-MTC del 25.03.06) Factor de Reajuste (k) (De acuerdo al D.S. N° 011-79-VC del 02.03.79 y sus modificatorias, ampliatorias y complementarias.)

MUNICIPALIDAD DISTRITAL DE MARANURA "MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

PROYECTO TRAMO

CÁLCULO DE FLETE A OBRA TIPO DE TRANSPORTE :

NORMAL

FLETE A CUSCO

FLETE DE CUSCO A OBRA

TOTAL

ORIGEN

DESTINO

S/. X TM

ORIGEN

DESTINO

S/. X TM

S/. X TM

S/. X KG

Lima

Cusco

316.95

Cusco

Obra

77.92

394.87

0.39

TIPO TRANSPORTE :

ESPECIAL

FLETE A CUSCO

FLETE DE CUSCO A OBRA

TOTAL

ORIGEN

DESTINO

S/. X TM

ORIGEN

DESTINO

S/. X TM

S/. X TM

S/. X KG

Lima

Cusco

443.74

Cusco

Obra

109.08

552.82

0.55

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO TRAMO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

TIPO DE TRANSPORTE :

NORMAL

FLETE A CUSCO

FLETE DE CUSCO A OBRA

TOTAL

ORIGEN

DESTINO

S/. X TM

ORIGEN

DESTINO

S/. X TM

S/. X TM

S/. X KG

Arequipa

Cusco

177.46

Cusco

Obra

77.92

255.38

0.26

TIPO TRANSPORTE :

ESPECIAL

FLETE A CUSCO

FLETE DE CUSCO A OBRA

TOTAL

ORIGEN

DESTINO

S/. X TM

ORIGEN

DESTINO

S/. X TM

S/. X TM

S/. X KG

Arequipa

Cusco

248.44

Cusco

Obra

109.08

357.52

0.36

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

ANÁLISIS DE PRECIOS UNITARIOS PROYECTO

101 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS A.- MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO TRANSPORTADO

EQUIPO CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3 CARGADOR SOBRE LLANTAS 200-250 HP 4-4.1 yd3 CHANCADORA PRIMARIA SECUNDARIA 5 FAJAS 75 HP 46 - 70 ton/h EXCAVADORA SOBRE ORUGAS 115-165 HP 0.75-1.4 YD3 MOTONIVELADORA DE 145-150 HP PAVIMENTADORA SOBRE ORUGAS 105 HP 10-16' PLANTA DE ASFALTO EN CALIENTE 60 - 115 TON/H RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 yd3 RODILLO LISO VIBRATORIO AUTOPROPULSADO 101-135HP 10-12 ton RODILLO LISO VIBRATORIO AUTOPROPULSADO 33 HP 2.5 ton RODILLO LISO VIBRATORIO MANUAL 10.8HP 0.8-1.1 ton RODILLO NEUMATICO AUTOPROPULSADO 135 HP 9-26 ton RODILLO TANDEM VIBRATORIO AUTOPROPULSADO 111-130HP 9-11 ton TRACTOR DE ARADO TRACTOR DE ORUGAS DE 140-160 HP TRACTOR DE ORUGAS DE 190-240 HP ZARANDA VIBRATORIA 4" X 6" X 14" MOTOR ELECTRICO 15 HP

PESO (TON) UND

CANTIDAD

PESO TOTAL

16.59 20.83 39.00 23.40 13.54 12.00 60.00 9.00 11.10 11.10 9.00 11.00 14.90 8.00 14.90 20.52 7.00

1.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 2.00 6.00 1.00

16.59 62.49 39.00 23.40 13.54 12.00 60.00 9.00 22.20 11.10 9.00 11.00 14.90 8.00 29.80 123.12 7.00

Total de viajes Duración del viaje IDA (HM) FRV : Factor de Retorno al Vacío (D.S. N° 010-2006-MTC) Costo de alquiler de Equipo (S/. / HM) MOVILIZACIÓN DE EQUIPO TRANSPORTADO (S/.) DESMOVILIZACIÓN DE EQUIPO TRANSPORTADO (S/.) SEGUROS DE TRANSPORTE MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO TRANSPORTADO (S/.) (*) D.S Nº 010-2006/MTC del 26.03.06 Origen / Destino Lima - Cusco Cusco -Ollantaytambo Ollantaytambo - Alfamayo Alfamayo - Maranura Maranura - CG (Obra) TOTAL

Distancia (Km.) 1,566.43 74.00 82.50 49.00 6.48 1,778.41

Velocidad (Km./h) 60.0 30.0 20.0 30.0 25.0

Tiempo (Horas) 26.10 2.50 4.10 1.60 0.30 34.60

Cama Baja 25 Ton. 1 3 3 1

Nº VIAJES Cama Camion Baja Plataforma 18 Ton. 19 Ton.

SemiTrailer 35 Ton.

1 1 3 1 2 1 1 1 1 1

2

1

12.00 34.60 1.40 271.85 158,018.06 158,018.06 15,801.81

2.00 34.60 1.40 271.85 26,336.34 26,336.34 2,633.63

1.00 34.60 1.40 256.47 12,423.16 12,423.16 1,242.32

2 6 1 18.00 34.60 1.40 256.47 223,616.96 223,616.96 22,361.70

882,828.52

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

ANÁLISIS DE PRECIOS UNITARIOS PROYECTO

101 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS B.- MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO AUTOTRANSPORTADO CANTIDAD

HM (S/.)

Distancia (Km.)

Velocidad (Km./h)

HORAS

PARCIAL (S/.)

CAMION VOLQUETE 15 m3 CAMION IMPRIMADOR 6 X 2 178 - 210 HP 2000 gl

10 1

267.56 143.03

1,778.41 1,778.41

45.0 45.0

40 40

107,024.00 5,721.07

CAMION CISTERNA 4 X 2 (AGUA) 145 - 165 HP 2,000 gl

1

166.06

1,778.41

45.0

40

6,642.40

CAMIONETA PICK-UP 4 X 2 C Simple 1 ton

1

52.19

1,778.41

70.0

25

1,304.83

GRUA HIAB SOBRE CAMION DE 5 ton

1

135.00

1,778.41

45.0

40

5,400.00

EQUIPO AUTOTRANSPORTADO

MOVILIZACIÓN DE EQUIPO AUTOTRANSPORTADO (S/.) DESMOVILIZACIÓN DE EQUIPO AUTOTRANSPORTADO (S/.) SEGUROS DE TRANSPORTE

126,092.30 126,092.30 12,609.23

MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO AUTOTRANSPORTADO (S/.)

264,793.83

NOTA : El resto de Equipos sera transportado en los Volquetes o remolcado por los mismos. Esta relación no es limitativa, debiendo el Contratista compatibilizarla con la de su propuesta, de tal manera de poder terminar la obra en el plazo planteado El Seguro de Transporte cubre la movilizacion y desmovilizacion de los equipos transportados. El Equipo de Topografia sera transportado en las camionetas.

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

ANÁLISIS DE PRECIOS UNITARIOS PROYECTO

101 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS C.- MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO CANTIDAD PRECIO (S/.) HORAS

PARCIAL (S/.)

MANO DE OBRA CAPATAZ OPERARIO

1 2

21.81 16.78

240.00 240.00

OFICIAL

2

14.24

240.00

6,835.20

PEON

4

12.84

240.00

12,326.40

100.00

11.81

SOLDADORA ELECTRICA TRIFASICA 400 A

5% 1 1 1 1

32,450.40 0.00 178.60 154.16 80.00

SUBPARTIDAS CONCRETO CLASE D(F'C=210KG/CM2) ACERO DE REFUERZO ENCOFRADO Y DESENCOFRADO

8 480 33.6

427.68 5.18 55.15

5,234.40 8,054.40

MATERIALES SOLDADURA

1,181.00

EQUIPO HERRAMIENTAS MANUALES GRUA HIDRAULICA AUTOPROPULSADA 127 HP 18 ton 9 m CARGADOR SOBRE LLANTAS 125-155 HP 3.00 yd3 GRUPO ELECTROGENO 116 HP 75 KW

120.00 120.00 120.00 120.00

1,622.52 0.00 21,431.60 18,498.60 9,600.00 3,421.44 2,486.40 1,853.04

MONTAJE Y DESMONTAJE DE (01) PLANTA DE ASFALTO (S/.) NRO. DE UBICACIONES DE LAS PLANTAS DE ASFALTO

92,545.00 1.00

MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO (S/.)

92,545.00

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

ANÁLISIS DE PRECIOS UNITARIOS PROYECTO

101 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS D.- MONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS CANTIDAD PRECIO (S/.) HORAS

PARCIAL (S/.)

MANO DE OBRA CAPATAZ OPERARIO PEON

1 2

21.81 16.78

160.00 160.00

3,489.60 5,369.60

4

12.84

160.00

8,217.60

5%

17,076.80

1

178.60

80.00

14,287.73

4 240 16.8

427.68 5.18 55.15

EQUIPO HERRAMIENTAS MANUALES CARGADOR SOBRE LLANTAS 125-155 HP 3.00 yd3 SUBPARTIDAS CONCRETO CLASE D(F'C=210KG/CM2) ACERO DE REFUERZO ENCOFRADO Y DESENCOFRADO

853.84

1,710.72 1,243.20 926.52

MONTAJE Y DESMONTAJE DE (01) PLANTA CHANCADORA (S/.) NRO. DE UBICACIONES DE LAS PLANTAS CHANCADORAS

36,098.81 1.00

MONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS (S/.)

36,098.81

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

ANÁLISIS DE PRECIOS UNITARIOS PROYECTO

101 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS E.- MONTAJE Y DESMONTAJE DE ZARANDAS VIBRATORIA CANTIDAD PRECIO (S/.) HORAS

PARCIAL (S/.)

MANO DE OBRA CAPATAZ OPERARIO PEON

1 2

21.81 16.78

80.00 80.00

1,744.80 2,684.80

4

12.84

80.00

4,108.80

5%

8,538.40

1

178.60

40.00

7,143.87

4 240 16.8

427.68 5.18 55.15

EQUIPO HERRAMIENTAS MANUALES CARGADOR SOBRE LLANTAS 125-155 HP 3.00 yd3 SUBPARTIDAS CONCRETO CLASE D(F'C=210KG/CM2) ACERO DE REFUERZO ENCOFRADO Y DESENCOFRADO

426.92

1,710.72 1,243.20 926.52

MONTAJE Y DESMONTAJE DE (01) ZARANDAS O LAVADORA DE AGREGADOS (S/.) NRO. DE UBICACIONES DE ZARANDA VIBRATORIA (1)

19,989.63 1.00

MONTAJE Y DESMONTAJE DE ZARANDA VIBRATORIA (S/.)

19,989.63

MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO TRANSPORTADO (S/.)

882,828.52

MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO AUTOTRANSPORTADO (S/.)

264,793.83

MONTAJE Y DESMONTAJE DE PLANTAS DE ASFALTO (S/.)

92,545.00

MONTAJE Y DESMONTAJE DE PLANTAS CHANCADORAS (S/.)

36,098.81

MONTAJE Y DESMONTAJE DE ZARANDA VIBRATORIA (S/.)

19,989.63

TOTAL (S/.)

1,296,255.79

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO TRAMO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

COSTO DE MANO DE OBRA

CUADRO DE JORNALES VIGENTES ENERO 2014 CATEGORIA DESCRIPCION

OPERARIO

REMUNERACIÓN BÁSICA VIGENTE (RB)

OFICIAL

PEON

OPERADOR EQUIPO MEDIANO

OPERADOR EQUIPO PESADO

OPERADOR ELECTROMECANIC O

52.10

44.10

39.40

52.10

52.10

52.10

16.67

13.23

11.82

16.67

16.67

16.67

55.09

46.63

41.66

55.09

55.09

55.09

(vigente del 01.06.13 al 31.05.14) BONIFICACIÓN UNIFICADA DE CONSTRUCCIÓN (BUC) - 32% (vigente del 01.06.13 al 31.05.14) LEYES Y BENEFICIOS SOCIALES SOBRE LA RB

105.73%

BONIF. POR ALTA ESPECIALIZACION OPERADOR EQUIPO LIVIANO

8.00%

-

-

-

OPERADOR EQUIPO PESADO

10.00%

-

-

-

OPERADOR ELECTROMECANICO

15.00%

LEYES Y BENEFICIOS SOCIALES SOBRE EL BUC

11.77%

4.17

-

-

5.21

7.82

1.96

1.56

1.39

1.96

1.96

1.96

-

-

-

-

-

-

SEGURO DE VIDA ESSALUD - VIDA (S/. 5.00 / mes)

0.15

0.15

0.15

0.15

0.15

0.15

BONIFICACIÓN POR MOVILIDAD ACUMULADA

7.68

7.68

7.68

7.68

7.68

7.68

OVEROL (02 unidades anuales)

0.60

0.60

0.60

0.60

0.60

0.60

134.25

113.95

102.70

138.42

139.46

142.07

16.78

14.24

12.84

17.30

17.43

17.76

BONIFICACION POR ALTITUD (*)

Total día de 8 horas Costo Hora Hombre (HH) S/.

Costo Hora Hombre (HH) S/. CAPATAZ = 130% OPERARIO

30.00%

OPERARIO

21.81

TOPOGRAFO = 130% OPERARIO

30.00%

OPERARIO

21.81

NIVELADOR = 100% OPERARIO

0.00%

OPERARIO

16.78

AYUDANTE TOPOGRAFIA = 100% PEON

PEON

12.84

AYUDANTE NIVELADOR = 100% PEON

PEON

12.84

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC FLETES DE: Lima a Obra (carga general) (S/. / kg) : Lima a Obra (carga en especial) (S/. / kg) : Arequipa a Obra (carga en general) (S/. / kg) : Arequipa a Obra (carga en especial) (S/. / kg) :

LIMA LIMA ES Arequip Arequip

0.395

FECHA PRESUPUESTO BASE :

0.550

31 de Enero, 2014

PRECIO DEL DÓLAR

2.810

0.255 0.360

Precios de Materiales e Insumos Enero 2014 - Puestos en Obra ADQUISICIONES N°

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

DESCRIPCIÓN

UND

ACERO CORRUGADO kg ACERO DE CONSTRUCCION LISO kg ACERO ESTRUCTURAL A-36 kg ACETILENO m3 ADITIVO CURADOR gl ADITIVO INCORPORADOR DE AIRE kg ADITIVO MEJORADOR DE ADHERENCIA kg ALAMBRE NEGRO NACIONAL # 8 kg ALAMBRE NEGRO NACIONAL # 16 kg ALCANTARILLA METALICA 0=60" C=10 m ANGULO DE ACERO 3/8" X 1" X 3/16" m ANGULO DE ACERO 4" X 4" X 1/2" m ASFALTO DILUIDO MC-70 O MC-30 lt BARRENO 5' X 1/8" und CABLES, ESTROBOS, ETC est CAPTAFAROS und CEMENTO ASFALTICO PEN 60-70 kg CEMENTO PORTLAND TIPO I (42.5 kg) bol CINTA TEFLON und CLAVOS DIFERENTES MEDIDAS kg CLAVOS PARA CALAMINA kg CLAVOS PARA MADERA CON CABEZA DE 3" kg COMBUSTIBLE gl DESMOLDADOR PARA MADERA gl DINAMITA kg DISCO DE CORTE PARA CONCRETO und DISOLVENTE XILOL gl ELEMENTO TERRAMESH 1.0 x 1.0 x 6.0 M - MALLA 12 x 10 Ø und FIBRA DE VIDRIO DE 4 mm ACABADO m2 FILLER kg FULMINANTE und GEOTEXTIL CLASE 1 m2 GEOTEXTIL NO TEJIDO PARA SUBDRENAJE CLASE 2 m2 GUARDAVIA m IMPRIMANTE ASFALTICO MODIFICADO kg LAMINA REFLECTORIZANTE ALTA INTENSIDAD p2 LIJA und LIJA PARA CONCRETO hja MADERA TORNILLO p2 MASILLA PLASTICA BITUMINOSA kg MATERIAL DE RESPALDO PARA SELLADORES m MECHA NARANJA m MICROESFERAS DE VIDRIO kg NEOPRENE SHORE 60 DE 0.45 X 0.35 X 0.07 m und NEOPRENO EXPANDIBLE - COMPRESIBLE (TIPO PANAL) m OXIGENO m3 PEGAMENTO EPOXICO gl PERNOS 3/8" X 8" + T + A pza PERNOS 5/8" X 14" und PERNOS 5/8" X 14" + T + A pza PINTURA ANTICORROSIVA gl PINTURA DE TRAFICO gl PINTURA ESMALTE gl PINTURA ESMALTE BLANCO gl PINTURA ESMALTE EPOXICA gl PINTURA ESMALTE NEGRO gl PINTURA ESMALTE POLIURETANA gl PINTURA IMPRIMANTE gl PINTURA SCOTHLITEAMARILLO gl PINTURA WASH PRIMER gl PLANCHA ACERO 1.5 mm X 1.22m X 2.40 m pza PLANCHA ACERO 3 mm X 1.22m X 2.40 m pza PLANCHA DE ACERO 16 MM x 1.22 M * 2.40 M und PLANCHA DE ACERO 8 MM x 1.22 M * 2.40 M und PLANCHA DE ACERO 9.5 MM x 1.22 M * 2.40 M und PLANTINA DE ACERO DE 2" X 3/16" m PLATINA DE ACERO LIVIANO DE 3/16" x 3" m PLATINAS DE 2" x 1/8" m POSTE Y PERNOS und PRIMER PARA SELLANTE ELASTICO DE POLIURETANO gl

PESO

1.00 1.00 1.00 4.90 4.90 1.00 1.00 1.00 1.00 129.11 1.75 7.64 3.50 10.00 2.00 0.35 3.85 42.50 0.10 1.00 1.00 1.00 2.78 3.67 1.00 1.00 4.75 36.25 1.00 1.00 0.02 0.20 0.25 10.66 1.00 0.25 0.10 0.10 2.12 1.00 0.08 0.03 1.00 3.00 3.00 1.00 3.57 0.50 0.58 0.58 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 65.06 130.12 367.76 208.36 218.36 1.78 2.87 1.18 19.19 5.07

UND

ADICIONALES O RECARGAS ALMAC. FLETE 2%

PROCEDENCIA PRECIO S/.

kg/kg

LIMA

kg/kg kg/kg kg/m3 kg/gl kg/kg kg/kg kg/kg kg/kg kg/m kg/m kg/m kg/lt kg/und kg/est kg/und kg/kg kg/bol kg/und kg/kg kg/kg kg/kg kg/gl kg/gl kg/kg kg/und kg/gl kg/und kg/m2 kg/kg kg/und kg/m2 kg/m2 kg/m kg/kg kg/p2 kg/und kg/hja kg/p2 kg/kg kg/m kg/m kg/kg kg/und kg/m kg/m3 kg/gl kg/pza kg/und kg/pza kg/gl kg/gl kg/gl kg/gl kg/gl kg/gl kg/gl kg/gl kg/gl kg/gl kg/pza kg/pza kg/und kg/und kg/und kg/m kg/m kg/m kg/und kg/gl

LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA ESP LIMA LIMA LIMA LIMA ESP AREQUIPA LIMA LIMA LIMA LIMA LIMA ESP LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA

2.72 4.07 2.72 21.60 34.70 15.97 16.55 2.74 2.74 786.00 4.76 48.84 3.75 ** 432.78 2.95 24.57 2.27 16.86 1.50 3.58 5.57 3.48 11.91 19.82 6.66 516.80 38.78 570.07 15.80 0.85 0.93 5.99 4.93 60.63 31.54 9.15 2.00 2.07 2.76 6.91 0.59 1.10 3.00 350.41 77.52 8.66 18.87 7.85 11.85 11.85 29.66 36.85 29.51 29.51 223.49 29.51 128.62 13.30 43.67 47.27 99.77 172.02 952.06 439.86 593.07 6.15 8.47 4.51 119.76 262.35

0.39 0.39 0.39 1.93 1.93 0.39 0.39 0.39 0.39 50.98 0.69 3.02 1.93 3.95 0.79 0.14 2.12 10.85 0.04 0.39 0.39 0.39 1.53 1.45 0.39 0.39 1.88 14.31 0.39 0.39 0.01 0.08 0.10 4.21 0.39 0.10 0.04 0.04 0.84 0.39 0.03 0.01 0.39 1.18 1.18 0.39 1.41 0.20 0.23 0.23 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 25.69 51.38 145.22 82.28 86.22 0.70 1.13 0.47 7.58 2.00

0.05 0.08 0.05 0.43 0.69 0.32 0.33 0.05 0.05 15.72 0.10 0.98 0.08 8.66 0.06 0.49 0.05 0.34 0.03 0.07 0.11 0.07 0.24 0.40 0.13 10.34 0.78 11.40 0.32 0.02 0.02 0.12 0.10 1.21 0.63 0.18 0.04 0.04 0.06 0.14 0.01 0.02 0.06 7.01 1.55 0.17 0.38 0.16 0.24 0.24 0.59 0.74 0.59 0.59 4.47 0.59 2.57 0.27 0.87 0.95 2.00 3.44 19.04 8.80 11.86 0.12 0.17 0.09 2.40 5.25

MERMAS 5%

VIÁTICOS 40%

0.14

0.19

0.11 0.84 0.18 0.28 0.17 0.60 2.664 1.94

0.372

1.58 0.10 0.10 0.14

0.44

0.94

1.84 1.48 1.48 11.17 1.48 6.43 0.67 2.18 2.36

13.12

TOTAL S/.

3.30 4.54 3.16 23.96 37.32 16.68 17.27 3.18 3.18 852.70 5.55 52.84 5.95 445.39 3.80 25.20 4.55 28.89 1.57 4.22 6.34 4.11 14.27 21.67 9.84 527.53 43.38 595.78 16.51 1.26 1.33 6.19 5.13 66.05 34.14 9.43 2.18 2.25 3.80 7.44 0.63 1.57 3.45 358.60 80.25 9.22 21.60 8.21 12.32 12.32 32.25 41.43 33.57 33.57 241.13 33.57 139.62 16.24 48.72 52.58 127.46 226.84 1,116.32 530.94 691.15 6.97 9.77 5.07 129.74 282.72

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC FLETES DE: Lima a Obra (carga general) (S/. / kg) : Lima a Obra (carga en especial) (S/. / kg) : Arequipa a Obra (carga en general) (S/. / kg) : Arequipa a Obra (carga en especial) (S/. / kg) :

LIMA LIMA ES Arequip Arequip

0.395

FECHA PRESUPUESTO BASE :

0.550

31 de Enero, 2014

PRECIO DEL DÓLAR

2.810

0.255 0.360

Precios de Materiales e Insumos Enero 2014 - Puestos en Obra ADQUISICIONES N° 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 93 101

DESCRIPCIÓN

UND

PESO

UND

ADICIONALES O RECARGAS ALMAC. FLETE 2%

PROCEDENCIA PRECIO S/.

SELLANTE ELASTICO DE POLIURETANO gl 5.07 kg/gl LIMA SOLDADURA (AWS E6011) kg 1.00 kg/kg LIMA SOLVENTE XILOL gl 4.50 kg/gl LIMA TACHAS DELINEADORAS BIDIRECCIONALES und 0.25 kg/und LIMA TECKNOPORT E= 1/2" m2 0.49 kg/m2 LIMA TECNOPOR DE 3/4" m2 0.51 kg/m2 LIMA TEE DE ACERO 1 1/2" X 1 1/2" X 3/16" X 6 m pza 3.83 kg/pza LIMA TERMINAL T-1 und 8.00 kg/und LIMA TERMINAL T-2 und 15.00 kg/und LIMA THINER gl 5.25 kg/gl LIMA TINTA SERIGRAFICA NEGRA gl 5.07 kg/gl LIMA TRIPLAY DE 19 mm pln 24.36 kg/pln LIMA TUBERIA PVC 4" CLASE 75 m 5.25 kg/m LIMA TUBERIA PVC SAP 6" m 9.25 kg/m LIMA TUBERIA PVC SAP Ø 1" m 1.00 kg/m LIMA TUBO CORRUGADO HDPE 4" m 10.25 kg/m LIMA TUBO DE FIERRO GALVANIZADO 2" m 12.25 kg/m LIMA TUBO DE FIERRO NEGRO DE 2" m 4.56 kg/m LIMA TUBO DE FIERRO NEGRO DE 3" m 7.65 kg/m LIMA TUBO PVC SAP Ø3/8" m 0.75 kg/m LIMA YESO DE 28 Kg bol 28.00 kg/bol LIMA SEMILLAS kg 1.25 kg/kg LIMA PETROLEO GLN 4.00 kg/GLN LIMA ESP Los precios de los materiales corresponde al promedio * Costo de Materiales NO INCLUYE IGV ** Costo de Asfalto Diluido MC-70 o MC-30 corresponde al mayor precio por ser muy suceptible FUENTE: REVISTA COSTOS COSTOS, CONSTRUCTIVO

195.36 11.20 26.59 6.50 2.65 3.83 95.00 106.04 146.14 39.44 1,169.80 80.00 5.79 8.71 2.35 15.88 20.91 20.13 26.89 0.87 9.00 20.00 12.35

2.00 0.39 1.78 0.10 0.19 0.20 1.51 3.16 5.92 2.07 2.00 9.62 2.07 3.65 0.39 4.05 4.84 1.80 3.02 0.30 11.06 0.49 2.20

3.91 0.22 0.53 0.13 0.05 0.08 1.90 2.12 2.92 0.79 23.40 1.60 0.12 0.17 0.05 0.32 0.42 0.40 0.54 0.02 0.18 0.40 0.25

MERMAS 5% 9.77 0.56

0.13 0.19

4.00 0.29 0.44 0.12

0.04

0.62

VIÁTICOS 40%

TOTAL S/. 211.04 12.37 28.90 6.73 3.02 4.30 98.41 111.32 154.98 42.30 1,195.20 95.22 8.27 12.96 2.91 20.25 26.17 22.33 30.45 1.23 20.24 20.89 15.42

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

RENDIMIENTOS DE PLANTAS DE ASFALTO Y AGREGADOS

DESCRIPCION

ZARANDEO MECÁNICO

ZARANDEO MECÁNICO (AGREGADO FINO)

CHANCADO Y ZARANDEADO (BASE GRANULAR)

ZARANDEO Y CHANCADO (ARENA)

ZARANDEO Y CHANCADO (PIEDRA)

MEZCLA ASFÁLTICA EN CALIENTE

CAPACIDAD DEL EQUIPO (t/h)

(1)

100.00

58.00

58.00

58.00

58.00

87.50

EFICIENCIA DEL EQUIPO (%)

(2)

80%

70%

90%

60%

90%

90%

TIEMPO ÚTIL (%)

(3)

80%

90%

90%

60%

90%

90%

(4) = (1)*8h*(3)*(2) / (3)

320.00

182.70

234.90

104.40

234.90

246.52

BASES DE CALCULO

RENDIMIENTO (m3/día)

(5)

950

950

950

950

950

950

(6) = (4) / (5)

0.3368

0.1926

0.2474

0.1095

0.2474

0.2595

RENDIMIENTO DEL CARGADOR FRONTAL (m3/día) INCIDENCIA DEL CARGADOR PESO ESPECÍFICO (t/m3)

(7)

RENDIMIENTO (m3/dia)

2.300

320

183

235

104

235

247

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

RENDIMIENTOS DE TRANSPORTE

BASES DE CALCULO

UND

TRANSPORTE DE MATERIAL GRANULAR

D<=1km

D>1km

TRANSPORTE INTERNO

TRANSPORTE DE ESCOMNBROS

TTRANSPORTE DE DESECHOS Y EXCEDENTES A DME

TRANSPORTE DE MEZCLA ASFÁLTICA

D<=1km

D>1km

D<=1km

D>1km

D<=1km

D>1km

TRANSPORTE DE PIEDRA PEDRAPLEN

TRANSPORTE DE PIEDRA MEDIANA Y GRANDE

TRANSPORTE DE MATERIAL DE CANTERA

AGUA PARA LA OBRA

TRANSPORTE DE AGREGADOS

TRANSPORTE DE PIEDRA PARA ENROCADO

TRANSPORTE DE PIEDRA PARA TERRAMESH

km

1.00

1.00

0.30

1.00

1.00

1.00

1.00

1.00

1.00

1.90

4.60

6.20

1.20

4.60

1.90

4.60

VELOCIDAD CARGADO

km/h

15

20

15

15

20

15

20

15

20

15

15

15

15

15

15

15

VELOCIDAD DESCARGADO

km/h

20

25

20

20

25

20

25

20

25

20

20

20

20

20

20

20

TIEMPO DE CARGA

min

6.10

6.10

6.10

6.10

6.10

6.10

10

6.10

6.10

6.10

DISTANCIA MEDIA PONDERADA

TIEMPO DE DESCARGA

6.10

12

min

2.00

2.00

2.00

6.00

2.00

2.00

20

2.00

2.00

2.00

TIEMPO RECORRIDO CARGADO

fórmula

60 d / 15

60 d / 20

60 d / 15

60 d / 15

60 d / 20

60 d / 15

60 d / 20

60 d / 15

60 d / 20

60 d / 15

60 d / 15

60 d / 15

60 d / 15

60 d / 15

60 d / 15

60 d / 15

TIEMPO RECORRIDO DESCARGADO

fórmula

60 d / 20

60 d / 25

60 d / 20

60 d / 20

60 d / 25

60 d / 20

60 d / 25

60 d / 20

60 d / 25

60 d / 20

60 d / 20

60 d / 20

60 d / 20

60 d / 20

60 d / 20

60 d / 20

min

7.00

5.40

7.00

7.00

5.40

7.00

5.40

7.00

5.40

7.00

7.00

7.00

7.00

7.00

7.00

7.00

8.10 + 7.00d

8.10 + 7.00d

0.00 + 5.40d

12.10 + 7.00d

8.10 + 7.00d

8.10 + 7.00d

30.00 + 7.00d

8.10 + 7.00d

8.10 + 7.00d

8.10 + 7.00d 40.30

TIEMPO RECORRIDO

2.00

6

CICLO

fórmula

CICLO

min

15.10

5.40

10.20

15.10

5.40

15.10

5.40

25.00

5.40

25.40

40.30

51.50

38.40

40.30

21.40

TIEMPO TRABAJADO POR DIA

min

480

480

480

480

480

480

480

480

480

480

480

480

480

480

480

480

EFICIENCIA

%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

90.00%

TIEMPO UTIL TRABAJADO

min

432

432

432

432

432

432

432

432

432

432

432

432

432

432

432

432

VOLUMEN DEL VOLQUETE

m3

15

15

15

15

15

15

15

15

15

15

15

15

15

15

15

VOLUMEN DEL CAMION CISTERNA

gln

RENDIMIENTO DEL CARGADOR INCIDENCIA DEL CARGADOR

8.10 + 7.00d 0.00 + 5.40d

8.10 + 7.00d 0.00 + 5.40d 12.00 + 7.00d 0.00 + 5.40d

2,000.00

m3/día

1180

1180

1180

1180

1180

1180

1180

1180

1180

1180

hm

0.3686

0.5339

0.3686

0.3686

0.2161

0.1398

0.1017

0.1398

0.2542

0.1398

NUMERO DE VIAJES AL DIA

u

29

80

42

29

80

29

80

17

80

17

11

8

11

11

20

11

VOLUMEN TRANSPORTADO POR DIA

m3

435

1200

630

435

1200

435

1200

255

1200

255

165

120

83

165

300

165

1.20

1.20

1.20

1.30

1.30

1.30

1.30

1.30

1.30

1.20

1.20

1.20

1.20

1.50

1.20

363

1,000

525

335

923

335

923

196

923

213

138

100

138

200

138

ESPONJAMIENTO

RENDIMIENTO (m3/dia)

83

MUNICIPALIDAD DISTRITAL DE MARANURA "MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

PROYECTO TRAMO

DISTANCIA MEDIA DE TRANSPORTE

CÁLCULO DE LA DISTANCIA MEDIA DE TRANSPORTE PARA ROCA USO : Pedraplen

CANTERA

1

AREA DE INFLUENCIA

VOLUMEN UTILIZADO (m3)

UBICACIÓN

ACCESO (km)

INICIO

FINAL

4 + 120

0.020

0 + 000.00

4 + 120.00

4,120.00

2.080

8,569.60

4 + 120.00

8 + 110.00

3,990.00

2.015

8,039.85

8 + 110.00

12 + 100.00

3,990.00

2.045

8,159.55

12 + 100.00

12 + 968.29

868.29

0.484

420.25

12 + 100.00

0.05

TOTALES

LONGITUD (m)

DISTANCIA (km)

12,968.29

DISTANCIA MEDIA DE TRANSPORTE (km)

25,189.25

(m-km)

-

1.90

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

DISTANCIA MEDIA DE TRANSPORTE CÁLCULO DE LA DISTANCIA MEDIA DE TRANSPORTE MATERIAL DE FILTRO CANTERA

1

AREA DE INFLUENCIA FINAL

(m-km)

UBICACIÓN

ACCESO (km)

INICIO

9 + 460.00

0.65

0 + 000.00

9 + 460.00

9,460.00

5.375

50,847.50

9 + 460.00

12 + 968.29

3,508.29

2.399

8,416.39

TOTALES

LONGITUD (m)

C.G. (km)

12,968.29

DISTANCIA MEDIA DE TRANSPORTE (km)

59,263.89

4.60

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO TRAMO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENC MARANURA - MANDOR - PAVAYOCC

DISTANCIA MEDIA DE TRANSPORTE CÁLCULO DE LA DISTANCIA MEDIA DE TRANSPORTE DE MATERIAL PARA RELLENO CANTERA

1

AREA DE INFLUENCIA

(m-km)

UBICACIÓN

ACCESO (km)

INICIO

FINAL

1 + 200.00

0.76

0 + 260.00

1 + 200.00

940.00

1.230

1,156.20

1 + 200.00

12 + 968.29

11,768.29

6.644

78,188.52

TOTALES

LONGITUD (m)

C.G. (km)

12,708.29

DISTANCIA MEDIA DE TRANSPORTE (km)

79,344.72

6.20

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO TRAMO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

DISTANCIA MEDIA DE TRANSPORTE CÁLCULO DE LA DISTANCIA MEDIA DE TRANSPORTE DE AGUA PRINCIPAL USO : COMPACTACIÓN DE MATERIALES GRANULARES PREPARACIÓN DE CONCRETOS. FUENTE DE AGUA

AREA DE INFLUENCIA

(m-km)

UBICACIÓN

ACCESO (km)

INICIO

FINAL

0 + 000

0.690

0 + 000.00

0 + 000.00

0 + 000.00

2 + 060.00

2,060.00

1.720

3,543.20

2 + 060.00

4 + 120.00

2,060.00

1.170

2,410.20

4 + 120.00

5 + 555.00

1,435.00

0.858

1,231.23

5 + 555.00

6 + 990.00

1,435.00

0.938

1,346.03

6 + 990.00

8 + 225.00

1,235.00

0.838

1,034.93

8 + 225.00

9 + 460.00

1,235.00

1.263

1,559.81

9 + 460.00

10 + 580.00

1,120.00

1.205

1,349.60

10 + 580.00

11 + 700.00

1,120.00

1.010

1,131.20

11 + 700.00

12 + 968.29

1,268.29

1.084

1,374.83

TOTALES

12,968.29

4 + 120

6 + 990

9 + 460

11 + 700

0.140

0.220

0.645

0.450

LONGITUD (m)

C.G. (km)

-

DISTANCIA MEDIA DE TRANSPORTE (km)

14,981.02

1.20

MUNICIPALIDAD DISTRITAL DE MARANURA "MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

PROYECTO TRAMO

DISTANCIA MEDIA DE TRANSPORTE CÁLCULO DE LA DISTANCIA MEDIA DE TRANSPORTE AGREGADOS CANTERA

1

AREA DE INFLUENCIA

(m-km)

UBICACIÓN

ACCESO (km)

INICIO

FINAL

9 + 460.00

0.65

0 + 000.00

9 + 460.00

9,460.00

5.375

50,847.50

9 + 460.00

12 + 968.29

3,508.29

2.399

8,416.39

TOTALES

LONGITUD (m)

C.G. (km)

12,968.29

DISTANCIA MEDIA DE TRANSPORTE (km)

59,263.89

4.60

MUNICIPALIDAD DISTRITAL DE MARANURA "MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

PROYECTO TRAMO

DISTANCIA MEDIA DE TRANSPORTE CÁLCULO DE LA DISTANCIA MEDIA DE TRANSPORTE PARA ENROCADO CANTERA

1

AREA DE INFLUENCIA

(m-km)

UBICACIÓN

ACCESO (km)

INICIO

FINAL

4 + 120

0.020

0 + 000.00

4 + 120.00

4,120.00

2.080

8,569.60

4 + 120.00

8 + 110.00

3,990.00

2.015

8,039.85

8 + 110.00

12 + 100.00

3,990.00

2.045

8,159.55

12 + 100.00

12 + 968.29

868.29

0.484

420.25

12 + 100.00

0.05

TOTALES

LONGITUD (m)

C.G. (km)

12,968.29

DISTANCIA MEDIA DE TRANSPORTE (km)

25,189.25

1.90

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

DISTANCIA MEDIA DE TRANSPORTE CÁLCULO DE LA DISTANCIA MEDIA DE TRANSPORTE PIEDRA PARA TERRAMESH CANTERA

1

AREA DE INFLUENCIA FINAL

(m-km)

UBICACIÓN

ACCESO (km)

INICIO

9 + 460.00

0.65

0 + 000.00

9 + 460.00

9,460.00

5.375

50,847.50

9 + 460.00

12 + 968.29

3,508.29

2.399

8,416.39

TOTALES

LONGITUD (m)

C.G. (km)

12,968.29

DISTANCIA MEDIA DE TRANSPORTE (km)

59,263.89

4.60

MUNICIPALIDAD DISTRITAL DE MARANURA

PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANURA PROVINCIA DE LA CONVENCION - REGION CUSCO"

TRAMO

MARANURA - MANDOR - PAVAYOCC

TABLA DE ALQUILER DE EQUIPOS PARA LA OBRA (ENERO 2014)

EQUIPO

UNIDAD

Revista Costos

Constructivo

OTROS

(S/.)

(S/.)

(S/.)

CAMION CISTERNA 4 X 2 (AGUA) 145 - 165 HP 2,000 gl CAMION IMPRIMADOR 6 X 2 178 - 210 HP 2000 gl CAMION VOLQUETE DE 15 M3 CAMIONETA PICK UP 4X2 C SIMPLE 1 TON CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3

H.M. H.M. H.M. H.M. H.M.

155.32 134.12 260.56 50.21 178.94

CARGADOR SOBRE LLANTAS 200-250 HP 4-4.1 yd3 CHANCADORA PRIMARIA SECUNDARIA 5 FAJAS 75 HP 46 - 70 ton/h COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP

H.M. H.M. H.M. H.M.

239.60 141.14 23.19 27.84

COMPRESORA NEUMATICA 250-330 PCM 87 HP COMPRESORA NEUMATICA 600-690 PCM, 196 HP CORTADORA DE CONCRETO CORTADORA DE PAVIMENTO CON DISCO EQUIPO DE CORTE Y SOLDEO (OXI-ACET) EQUIPO DE PINTURA EXCAVADORA SOBRE ORUGAS 115-165 HP 0.75-1.4 YD3 FAJA TRANSPORTADORA 18" X 4' MOTOR ELECTRICO 3 KW 150 ton/h GRUA HIAB SOBRE CAMION DE 5 ton GRUPO ELECTROGENO 116 HP 75 KW GRUPO ELECTROGENO 140 HP 90 KW

H.M. H.M. HM H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M.

78.74 172.05

GRUPO ELECTROGENO 230 HP 150 KW

H.M.

170.72

MAQUINA PINTAR PAVIMENTOS MARTILLO NEUMATICO DE 29 kg

H.M. H.M.

4.06

MEZCLADORA DE CONCRETO DE 11p3 18 HP MINICARGADOR 70 HP MOTOBOMBA 34 HP 8" MOTONIVELADORA DE 145-150 HP

H.M. H.M. H.M. H.M.

9.71 66.44 65.40 209.51

MOTOSIERRA PAVIMENTADORA SOBRE ORUGAS 105 HP 10-16' PLANTA DE ASFALTO EN CALIENTE 60 - 115 TON/H RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 yd3 RODILLO LISO VIBRATORIO AUTOPROPULSADO 101-135HP 10-12 ton

H.M. H.M. H.M. H.M. H.M.

RODILLO LISO VIBRATORIO AUTOPROPULSADO 33 HP 2.5 ton RODILLO LISO VIBRATORIO MANUAL 10.8HP 0.8-1.1 ton

H.M. H.M.

RODILLO NEUMATICO AUTOPROPULSADO 135 HP 9-26 ton RODILLO TANDEM VIBRATORIO AUTOPROPULSADO 111-130HP 9-11 ton SOLDADORA ELECTRICA TRIFASICA 400 A TIRFOR DE 5 TN TRACTOR DE ARADO TRACTOR DE ORUGAS DE 140-160 HP TRACTOR DE ORUGAS DE 190-240 HP VIBRADOR DE CONCRETO 4 HP 1.25" ZARANDA ESTATICA 3/8" ZARANDA VIBRATORIA 4" X 6" X 14" MOTOR ELECTRICO 15 HP

112.64 41.74 170.08

49.18

CAPECO

(S/.)

(S/.)

167.42 182.32 274.56 64.63 186.77

166.06 143.03 267.56 52.19 178.60

250.22 136.68 26.24 31.69

244.91 138.91 24.72 29.77

82.62 174.94

139.50 153.98

70.18 173.50 22.85 13.75 5.88 49.18 230.49 6.45 135.00 139.19 154.16

173.73

172.23

7.95

49.18 6.01

11.61 89.48 69.50 213.63

12.12 77.96 67.45 211.57

22.85 13.75 5.88 219.04 6.02

49.18 243.43

229.00 6.88 135.00

138.88 154.33 49.18 15.05

PRESUPUESTO

10.00

105.52 158.30

10.00 136.58 837.80 105.52 152.20

31.56

34.65

137.72 33.11

H.M. H.M. H.M. H.M.

137.72

141.75 208.62

139.74 208.62 11.24 37.50

H.M. H.M. H.M. H.M. H.M. H.M.

80.50 254.07 348.05 5.31

79.50 261.68 359.69 6.89

80.00 252.94 353.87 6.03 10.00 53.86

132.38

140.77 837.80

152.21

146.08 137.72

11.24 37.50 80.00 243.06 5.90 10.00 51.79

NOTA : Los Equipos marcados con (*) no incluyen su fuente de poder ( ** ) La Planta de Asfalto incluye calentador de aceite, secador de áridos, fajas transportadoras y operador. No incluye los combustibles.

55.92

MUNICIPALIDAD DISTRITAL DE MARANURA PROYECTO

"MEJORAMIENTO DE LA CARRETERA MARANURA - MANDOR - PAVAYOCC - DISTRITO DE MARANUR

TRAMO

MARANURA - MANDOR - PAVAYOCC

EQUIPO MÍNIMO REFERENCIAL

RELACIÓN DE EQUIPO MÍNIMO DE EJECUCIÓN EQUIPO CAMION CISTERNA 4 X 2 (AGUA) 145 - 165 HP 2,000 gl CAMION IMPRIMADOR 6 X 2 178 - 210 HP 2000 gl CAMION VOLQUETE DE 15 M3

CANTIDAD 1.00 1.00 10.00

CAMIONETA PICK UP 4X2 C SIMPLE 1 TON

1.00

CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3

1.00

CARGADOR SOBRE LLANTAS 200-250 HP 4-4.1 yd3

3.00

CHANCADORA PRIMARIA SECUNDARIA 5 FAJAS 75 HP 46 - 70 ton/h

1.00

COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP

1.00

COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP

3.00

COMPRESORA NEUMATICA 250-330 PCM 87 HP

1.00

COMPRESORA NEUMATICA 600-690 PCM, 196 HP

3.00

CORTADORA DE CONCRETO

1.00

CORTADORA DE PAVIMENTO CON DISCO

1.00

EQUIPO DE CORTE Y SOLDEO (OXI-ACET)

1.00

EQUIPO DE PINTURA

1.00

EXCAVADORA SOBRE ORUGAS 115-165 HP 0.75-1.4 YD3

1.00

FAJA TRANSPORTADORA 18" X 4' MOTOR ELECTRICO 3 KW 150 ton/h

4.00

GRUA HIAB SOBRE CAMION DE 5 ton

1.00

GRUPO ELECTROGENO 116 HP 75 KW

1.00

GRUPO ELECTROGENO 140 HP 90 KW

1.00

GRUPO ELECTROGENO 230 HP 150 KW

1.00

MAQUINA PINTAR PAVIMENTOS MARTILLO NEUMATICO DE 29 kg MEZCLADORA DE CONCRETO DE 11p3 18 HP MINICARGADOR 70 HP MOTOBOMBA 34 HP 8" MOTONIVELADORA DE 145-150 HP MOTOSIERRA PAVIMENTADORA SOBRE ORUGAS 105 HP 10-16' PLANTA DE ASFALTO EN CALIENTE 60 - 115 TON/H RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 yd3 RODILLO LISO VIBRATORIO AUTOPROPULSADO 101-135HP 10-12 ton RODILLO LISO VIBRATORIO AUTOPROPULSADO 33 HP 2.5 ton RODILLO LISO VIBRATORIO MANUAL 10.8HP 0.8-1.1 ton RODILLO NEUMATICO AUTOPROPULSADO 135 HP 9-26 ton RODILLO TANDEM VIBRATORIO AUTOPROPULSADO 111-130HP 9-11 ton SOLDADORA ELECTRICA TRIFASICA 400 A TIRFOR DE 5 TN TRACTOR DE ARADO TRACTOR DE ORUGAS DE 140-160 HP TRACTOR DE ORUGAS DE 190-240 HP VIBRADOR DE CONCRETO 4 HP 1.25" ZARANDA ESTATICA 3/8" ZARANDA VIBRATORIA 4" X 6" X 14" MOTOR ELECTRICO 15 HP

1.00 12.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 6.00 2.00 1.00 1.00

MUNICIPALIDAD DISTRITAL DE MARANURA "MEJORAMIENTO DE LA CARRETERA MARANURA MANDOR - PAVAYOCC - DISTRITO DE MARANURA PROVINCIA DE LA CONVENCION - REGION CUSCO" MARANURA - MANDOR - PAVAYOCC

PROYECTO TRAMO

ANÁLISIS DE PRECIOS UNITARIOS PROYECTO

103.A MANTENIMIENTO DE TRÁNSITO Y SEGURIDAD VIAL MANTENIMIENTO DE TRÁNSITO TEMPORAL Y SEGURIDAD VIAL

11 meses efectivo

MANTENIMIENTO DE DESVIOS QUE INVOLUCRE LA OBRA EN EJECUCION Para el periodo contractual, 1.0 dias/semana para trabajos livianos, 1.00 dia/semana para trabajos con equipos pesados.

DESCRIPCION

UND

CUADRILLA CANTIDAD

PU (S/.)

PARCIAL (S/.)

MANO DE OBRA CAPATAZ

MES

1.00

2.93

5,234.40

15,354.24

PEON

MES

8.00

2.93

3,081.60

72,314.88

5%

87,669.12

4,383.46

CAMIONETA PICK-UP 4 X 2 90 HP 1 ton

MES

0.50

2.93

12,526.40

18,372.05

CARGADOR S/LLANTAS 125-155 Hp 3.0 Yd3

MES

0.50

2.93

42,863.20

62,866.03

MOTONIVELADORA DE 145-150 HP

MES

0.50

2.93

2,400.00

3,520.00

CAMION VOLQUETE 15 m3

MES

0.50

2.93

64,214.40

94,181.12

CAMION CISTERNA 4X2 (AGUA) 145-165 HP 2000 gl

MES

0.50

2.93

39,854.40

58,453.12

RODILLO LISO VIBRATORIO AUTOP.101-135 Hp, 10-12 Ton

MES

0.50

2.93

7,945.20

11,652.96

MATERIALES PARA SEÑALIZACION Y SEGURIDAD (*)

EST

1.00

51,300.00

51,300.00

LASTRADO MAT. ZARANDEADO (**)

M3

7,150.00

43.93

314,099.50

COSTO TOTAL (S/.)

706,497.36

EQUIPO HERRAMIENTAS MANUALES

Tiempo de Ejecucion (Meses)

11.00

COSTO MENSUAL (S/.)

64,227.03

DESCRIPCIÓN

UND

CANT.

SEÑALES PREVENTIVAS SEÑALES REGLAMENTARIAS SEÑALES INFORMATIVAS BARRERAS / TRANQUERAS CONOS / CILINDROS LAMPARAS DESTALLANTES CHALECOS DE SEGURIDAD, SILBATOS CINTA DE SEGURIDAD MALLA DE SEGURIDAD

U U U U U U U Rollo M

30 20 20 30 50 30 20 30 1500

PRECIO 300.00 300.00 450.00 250.00 60.00 150.00 15.00 150.00 5.00

PARCIAL 9,000.00 6,000.00 9,000.00 7,500.00 3,000.00 4,500.00 300.00 4,500.00 7,500.00 51,300.00

(*) Incluye Señales, Barreras, Conos, Lámparas, Banderines de acuerdo con la Especificación Técnica. (**) Material a usar para el mantenimiento de la via y los desvios. (el P.U del material incluye extraccion, transporte interno, zarandeo estatico y transporte a la zona) Nota: Los implementos de seguridad estan incluidos en G. Generales.