DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATE

Project Client Location

Item Code

WBS / BoQ Code

Definition

10

DEMOLITIONS Demolish existing slabs or concrete pavings,buildings,foundations,structures Demolition of asphaltic paving road, up to 15 cm thick, by mechanical means. Demolition of underground piping and/or channels by mechanical means. Demolition of manholes and/or pits (any type) by mechanical means. SITE PREPARATION Clearing, stripping and grading of of natural land for specified average thickness General excavation by mechanical means (Cut) General filling with select fill material from excavation (Fill / Embankment) PILING WORKS Supply and installation of sheet piling system with plate thickness as per project standards,specifications or approved drawings. Supply and execution in situ concrete ø30 cm diameter bored piles Supply and execution in situ concrete ø60 cm diameter bored piles Supply and execution in situ concrete ø90 cm diameter bored piles Supply and execution in situ concrete ø120 cm diameter bored piles

DEMOLISH0001

1010

DEMOLISH0002

1020

DEMOLISH0003

1030

DEMOLISH0004

1040 20

SITECLEAR0001

2010

EXCV0001

2020

FILL0001

2010 30

SHEETPILE0001

3010

PILE0001

3020

PILE0002

3030

PILE0003

3040

PILE0004

3050

PILE0005

3060

Cut-off concrete piles head

PILETEST0001

3070

PILETEST0002

3080

Execution of integrity test for piles. Execution of load compression test on working piles (1,5 working load)

PILETEST0003

3090 40

EXCV0002

4010

Execution of Preliminary compression test (2,5 working load) EARTHWORKS Structural deep excavation of soil for the depth 0.00-2.00 m

EXCV0003

4020

Structural deep excavation of soil for the depth 2.00-4.00 m

EXCV0004 EXCV0005 EXCV0006

4030 4040 4050

Hand excavation of soil Pipe/Trench excavation of soil for the depth 0.00-2.00 m Pipe/Trench excavation of soil for the depth 2.00-4.00 m

FILL0002

4060

Structural filling with back fill material from excavation.

FILL0003

4070

General filling with borrowed granular material. (Imported Fill)

FILL0004

4080

Structural filling with borrowed granular material. (Imported Fill)

FILL0005

4090

Trench filling with back fill material from excavation.

FILL0006

4100

FILL0007 FILL0008 FILL0009 CONCRETE0001 CONCRETE0002

4110 4120 4130 50 5010 5020

CONCRETE0003

5030

CONCRETE0004

5040

CONCRETE0005

5050

CONCRETE0006

5060 60

FORMWORK0001

6010

FORMWORK0002

6020

FORMWORK0003

6030

FORMWORK0004

6040

FORMWORK0005

6050 70

REBAR0001

7010

REBAR0002

7020

REBAR0003

7030

REBAR0004

7040

REBAR0005

7050 80

Pipe/Trench bedding/padding with borrowed granular fill material (Imported Fill) Pipe/Trench bedding/padding with clean sand Filling inside of tank foundations with clean sand. Tank foundations filling with oil sand mixture. CONCRETE WORKS Supply and pouring of lean concrete Supply and pouring of mass concrete Supply and pouring of concrete for various and slab foundations (sleepers, stairs, thickened slab foundation,tank foundations) Supply and pouring of concrete for footing type foundations (columns,equipment and valve foundations, pipe supports,lighting post,single footing) Supply and pouring of conrete for slabs,beams,walls and columns. Supply and pouring of conrete for manholes and trenches. FORMWORKS Supply and erection of straight formwork for various and slab foundations (sleepers, stairs, thickened slab foundation,tank foundations) Supply and erection of straight formwork for footing type foundations (columns,equipment and valve foundations, pipe supports,lighting post,single footing) Supply and erection of straight formwork for slab and beams and column Supply and erection of straight formwork for walls Supply and erection of straight formwork for manholes and trenches REBAR WORKS Supply and installation of steel reinforcement for various and slab foundations (sleepers, stairs, thickened slab foundation,tank foundations) Supply and installation of steel reinforcement for footing type foundations (columns,equipment and valve foundations, pipe supports,lighting post,single footing) Supply and installation of steel reinforcement for slabs,beams and walls and column Supply and installation of steel reinforcement for manholes and trenches Supply and installation of steel fabric mesh reinforcement for pavements and slabs. STRUCTURAL STEEL WORKS

STEEL0001

8010

STEEL0002

8020

STEEL0003

8030

STEEL0004

8040

GRAT0001 GRAT0002 GRAT0003

8050 8060 8070

Supply steel Supply steel Supply steel Supply steel Supply Supply Supply

ANCHOR0001

8080

Supply and installation of fabricated,galvanized anchor bolts

EMBEDDED0001

8090

FIREPROOFING0001

8100

PRECAST0001 GROUT0001 GROUT0002 GROUT0003 JOINT0001 JOINT0002

90 9010 100 10010 10020 10030 110 11010 11020 120

FENCE0001

12010

FENCE0002

12020 130

GEOTEXT0001

13010

HDPE0001

13020

POLYETH0001

13030

COATING0001

13040

COATING0002

13050

PVCWATERSTOP0001

13060 140

and erection of fabricated,painted heavy structural and erection of fabricated,painted medium structural and erection of fabricated and painted light structural and erection of fabricated,painted piperack structural and erection of fabricated,galvanized steel gratings and erection of fabricated,galvanized steel gratings and erection of galvanized chequered plate

Supply and installation of fabricated,galvanized embedded plates Supply and installation of steel intumescent fireproofing and proper primer. PRECAST WORKS Supply and installation of precast concrete manholes GROUTS Supply and application of cementious non-shrink mortar. Supply and application of cement base grouting mortar. Supply and application of epoxy grouting mortar. JOINTS Supply and application of expansion joint sealing. Supply and application of construction/cutting joint sealing. FENCES & GATES Supply and installation of fence SSD-1,barbered wire chainlink fence Supply and installation of fenceTYPE-IV,barbered wire chainlink fence WATERPROOFING & COATING Supply and erection of geotextile membrane under buried elements Supply and erection of HDPE membrane liner under tank foundations Supply and erection of polyethylene sheet membrane under concrete pavements. Supply and application of bituminous waterproofing emulsion for concrete surfaces Supply and application of bituminous waterproofing emulsion for concrete surfaces Supply and application of pvc waterstop. PAVINGS & ROADS Supply and execution of concrete in paving,reinforced with single/double mesh.(Light Duty) Supply and execution of concrete in paving,reinforced with single/double mesh.(Heavy Duty) Supply and execution of asphalt wearing course. Supply and execution of asphalt binder course.

PAVING0001

14010

PAVING0002

14020

ROAD0001 ROAD0002

14030 14040

ROAD0003

14050

Supply and execution of subbase material for roads with material according with project standards and specifications.

ROAD0004

14060

Supply and execution of base material for roads with material according with project standards and specifications.

ROAD0005 ROAD0006

14070 14080

ROAD0007

14090

ROAD0008

14100

ROAD0009 KERB0001

14110 14120 150 15010 15020 15030 15040 15050 15060 15070 15080 15090 15100 15110 15120 15130 15140 15150 15160 15170 15180 15190 15200 15210 15220 15230 15240 15250 15260 15270 15280 15290 15300 15310 15320 15330 15340 15350 15360 15370 15380 15390 15400 15410 15420 15430 15440 15450 15460 15470 15480

PVCPIPE0001 PVCPIPE0002 PVCPIPE0003 PVCPIPE0004 PVCPIPE0005 PVCPIPE0006 PVCPIPE0007 PVCPIPE0008 PVCPIPE0009 PVCPIPE0010 PVCPIPE0011 PVCPIPE0012 PVCPIPE0013 PVCPIPE0014 PVCPIPE0015 PVCPIPE0016 PVCPIPE0017 PVCPIPE0018 PVCPIPE0019 PVCPIPE0020 PVCPIPE0021 PVCPIPE0022 PVCPIPE0023 PVCPIPE0024 HDPEPIPE0001 HDPEPIPE0002 HDPEPIPE0003 HDPEPIPE0004 HDPEPIPE0005 HDPEPIPE0006 HDPEPIPE0007 HDPEPIPE0008 HDPEPIPE0009 HDPEPIPE0010 HDPEPIPE0011 HDPEPIPE0012 HDPEPIPE0013 HDPEPIPE0014 HDPEPIPE0015 HDPEPIPE0016 HDPEPIPE0017 HDPEPIPE0018 HDPEPIPE0019 HDPEPIPE0020 HDPEPIPE0021 HDPEPIPE0022 HDPEPIPE0023 HDPEPIPE0024

Supply and application of tack coat in asphalt roads. Supply and application of prime coat in asphalt roads. Supply and complete installation of metallic safety guardrail in sides of roads. Supply and complete installation of concrete barrier type "New Jersey" or similar in sides of roads. Supply and erection of signposting in ways. Supply and erection of signposting in ways. U/G WORKS Supply and installation uPVC pipe Ø50 mm Supply and installation uPVC pipe Ø75 mm Supply and installation uPVC pipe Ø90 mm Supply and installation uPVC pipe Ø110 mm Supply and installation uPVC pipe Ø125 mm Supply and installation uPVC pipe Ø140 mm Supply and installation uPVC pipe Ø160 mm Supply and installation uPVC pipe Ø180 mm Supply and installation uPVC pipe Ø200 mm Supply and installation uPVC pipe Ø250 mm Supply and installation uPVC pipe Ø300 mm Supply and installation uPVC pipe Ø350 mm Supply and installation uPVC pipe Ø400 mm Supply and installation uPVC pipe Ø450 mm Supply and installation uPVC pipe Ø500 mm Supply and installation uPVC pipe Ø550 mm Supply and installation uPVC pipe Ø600 mm Supply and installation uPVC pipe Ø650 mm Supply and installation uPVC pipe Ø700 mm Supply and installation uPVC pipe Ø750 mm Supply and installation uPVC pipe Ø800 mm Supply and installation uPVC pipe Ø850 mm Supply and installation uPVC pipe Ø900 mm Supply and installation uPVC pipe Ø950 mm Supply and installation HDPE pipe Ø75 mm Supply and installation HDPE pipe Ø90 mm Supply and installation HDPE pipe Ø100 mm Supply and installation HDPE pipe Ø110 mm Supply and installation HDPE pipe Ø125 mm Supply and installation HDPE pipe Ø140 mm Supply and installation HDPE pipe Ø160 mm Supply and installation HDPE pipe Ø180 mm Supply and installation HDPE pipe Ø200 mm Supply and installation HDPE pipe Ø250 mm Supply and installation HDPE pipe Ø300 mm Supply and installation HDPE pipe Ø350 mm Supply and installation HDPE pipe Ø400 mm Supply and installation HDPE pipe Ø450 mm Supply and installation HDPE pipe Ø500 mm Supply and installation HDPE pipe Ø600 mm Supply and installation HDPE pipe Ø700 mm Supply and installation HDPE pipe Ø800 mm Supply and installation HDPE pipe Ø900 mm Supply and installation HDPE pipe Ø1000 mm Supply and installation HDPE pipe Ø1100 mm Supply and installation HDPE pipe Ø1200 mm Supply and installation HDPE pipe Ø1300 mm Supply and installation HDPE pipe Ø1400 mm

HDPEPIPE0025 HDPEPIPE0026 GRPPIPE0001 GRPPIPE0002 GRPPIPE0003 GRPPIPE0004 GRPPIPE0005 GRPPIPE0006 GRPPIPE0007 GRPPIPE0008 GRPPIPE0009 GRPPIPE0010 GRPPIPE0011 GRPPIPE0012 GRPPIPE0013 GRPPIPE0014 GRPPIPE0015 GRPPIPE0016 GRPPIPE0017 GRPPIPE0018 GRPPIPE0019

15490 15500 15510 15520 15530 15540 15550 15560 15570 15580 15590 15600 15610 15620 15630 15640 15650 15660 15670 15680 15690

WARNINGTAPE0001

15700 160

MASONARY0001

16010

MASONARY0002

16020

MASONARY0003

16030

MASONARY0004

16040 170

PLASTER0001

17010

PLASTER0002

17020

PLASTER0003

17040 180

PAINTING0001

18010

PAINTING0002

18020

Supply and installation HDPE pipe Ø1500 mm Supply and installation HDPE pipe Ø1600 mm Supply and installation GRP pipe Ø50 mm Supply and installation GRP pipe Ø75 mm Supply and installation GRP pipe Ø100 mm Supply and installation GRP pipe Ø150 mm Supply and installation GRP pipe Ø200 mm Supply and installation GRP pipe Ø250 mm Supply and installation GRP pipe Ø300 mm Supply and installation GRP pipe Ø350 mm Supply and installation GRP pipe Ø400 mm Supply and installation GRP pipe Ø450 mm Supply and installation GRP pipe Ø500 mm Supply and installation GRP pipe Ø550 mm Supply and installation GRP pipe Ø600 mm Supply and installation GRP pipe Ø650 mm Supply and installation GRP pipe Ø700 mm Supply and installation GRP pipe Ø750 mm Supply and installation GRP pipe Ø800 mm Supply and installation GRP pipe Ø850 mm Supply and installation GRP pipe Ø900 mm Supply and installation of warning tape for underground systems. MASONARY WORKS Supply and installation of hollow concrete block including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of lightweight concrete block including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of solid block brick including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of pre-cast concrete lintels including all associated work, as specified under the Technical Specification and applicable standards. PLASTERING WORKS Supply and application of cement plaster for external and internal surfaces including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of gypsum plaster for wall and ceiling including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of arcylic based ready mixed plaster including all associated work, as specified under the Technical Specification and applicable standards. PAINTING & ACID RESISTANT COATING Supply and application of painting for external surfaces including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of painting for internal surfaces walls and ceilings including all associated work, as specified under the Technical Specification and applicable standards.

PAINTING0003

18030

PAINTING0004

18040 190

FLOORTILE0001

19010

FLOORTILE0002

19020

FLOORTILE0003

19030

FLOORTILE0004

19050 200

ROOF0001

20010

ROOF0002

20020

ROOF0003

20030

ROOF0004

20040

ROOF0005

20050 210

DOOR0001

21010

DOOR0002

21020

DOOR0003

21030

DOOR0004

21040

Supply and application of dust proof painting for cement floors including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of acid resistant coating/epoxy screed 5mm minimum for floors including all associated work, as specified under the Technical Specification and applicable standards. FLOORING & TILING Supply and application of rigid finished floors(ceramic) including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of rigid finished floors(terazzo/marble) including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of flexible finished floors(uPVC/Vinyl/Carpet/Heavy Duty Vinyl) including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of rigid finished walls(ceramic/terazzo/marble) including all associated work, as specified under the Technical Specification and applicable standards. ROOFING & INSULATION Supply and application of water-proof membrane for roofs bituminous multi coats including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of rigid thermal insulation for roofs including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of light weight concrete screed average th. 70mm for roofs including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of roof insulation with Thermal insulation rockwool 40 mm + finish coatincluding all associated work, as specified under the Technical Specification and applicable standards. Supply and application of roof insulation with ytong multipor including all associated work, as specified under the Technical Specification and applicable standards. WINDOWS & DOORS & PARTITION WALLS Supply and installation of timber door hollow core including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of timber door solid including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of internal hollow metal door single leaf including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of internal hollow metal door double leaf including all associated work, as specified under the Technical Specification and applicable standards.

DOOR0005

21050

DOOR0006

21060

DOOR0007

21070

DOOR0008

21080

DOOR0009

21090

DOOR0010

21100

PARTITIONWALL0001

21110

WINDOW0001

21120 220

Supply and installation of roll-up shutter motorised door including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of fire resistant 30 minutes including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of fire resistant 60 minutes including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of aluminium doors with panel including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of External Hollow metal door double leaf (Insulated) (Gas-Tight)including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Internal Hollow metal door double leaf (Insulated) (Gas-Tight)including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of gypsum board partition wall with panel including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of steel frame gas tight window including all associated work, as specified under the Technical Specification and applicable standards. CLADDING

22010

Supply and installation of panel aluminium pre-finished (wall single skin panel) including all associated work, as specified under the Technical Specification and applicable standards.

CLAD0002

22020

Supply and installation of pre-formed panel aluminium prefinished (wall sandwich panel)including all associated work, as specified under the Technical Specification and applicable standards.

CLAD0003

22030

Supply and installation of Panel aluminium pre-finished (roof single skin panel) including all associated work, as specified under the Technical Specification and applicable standards.

CLAD0001

CLAD0004

22040

CLAD0005

22050

CLAD0006

22060

CLAD0007

22070

Supply and installation of Pre-formed panel aluminium prefinished (roof sandwich panel) including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Pre-formed panel galvanized steel sheet prefinished ( wall sandwich panel ) including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Panel galvanized steel sheet prefinished ( roof single skin panel ) including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Pre-formed panel galvanized steel sheet prefinished ( roof sandwich panel ) including all associated work, as specified under the Technical Specification and applicable standards.

CLAD0008

22080

CLAD0009

22090

CLAD0010

22100

CLAD0011

22110

Supply and installation of Suspended ceiling mineral fiber Armstrong or similar including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of raised modular floor fire resistant including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Thermally Insulated Cladding panel with Polyester powder coated finish including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Thermally Insulated Roof panel with Polyester powder coated finish including all associated work, as specified under the Technical Specification and applicable standards.

) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Drawings ID : WBS, Section, Area, etc. :

Unit

001-GA-001

m² m ea

m² m³ Select Fill or Backfill please specify.

m² m m m m ea

C30/37concrete; Rebar C30/37concrete; Rebar C30/37concrete; Rebar C30/37concrete; Rebar C30/37concrete; Rebar

S420 S420 S420 S420 S420

ea ea ea



001-GA-001

SECTION 1 SECTION 3 Project Specific SUBSTATION TANKER Standard / Class, Specification / 1, SECTION 2 - WEIGHBRIDG Grade, Type, Property Employer's SUBSTATION 2 GATEHOUSE E AND Requirements AND MCC LOGISTIC BUILDINGS BUILDING





001-GA-001

7588.426666667

m³ m³ m³ m³ m³

Select Fill or Backfill please specify.

5295.898666667

m³ m³ m³

Select Fill or Backfill please specify.

m³ m³ m³ m³ m³ m³

C16/20 C30/37

237.498





1672.74



2313.531







1374.16



8672.80



2777.28



ton

S420

ton

S420

167.274

ton

S420

323.20503

ton

S420

ton

S420

ton ton

S275JR

ton

11.025

ton m² m² m²

595.58

ton ton m² m³ m³ m³ m³ m m m m

m² m² m²

5697.52



3435.09

m² m



15 cm THK



20 cm THK

m² m²

5 cm 8 cm



15 cm THK



15 cm THK

m² m² m m m² m² m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m

m m m m m m m m m m m m m m m m m m m m m m







m









Water Based PaintExternal



Water Based PaintInternal

























W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



W=0,9 m H=2,1m (8);W=1m H=2m (4)



(th=7,5 cm : 1 Frame / Double Board )



W=0,9 m H=2,1m (8);W=1m H=2m (4)



38/154;0,5 mm



0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane



0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane



0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane



0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane



0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane



0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane



600 x 600 ; Single Board



600x600x38 mm, PVC Vinyl



0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane



0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

SECTION 9 -INLET SECTION 4 PUMPING SECTION 6 SECTION 7 SECTION 8 TANKER SECTION 5 STATION ADMINISTRATION -LABORATORY - CHEMICAL OFFLOADIN - CAR PARK WET WELL, BUILDING BUILDING BUILDING G BAYS DRYWELL AND COARSE SCREEN

3678.714667 215.2266667

3293.958667 191.8266667

84.468

4.84

248

14

68.8

6

683.56

36.80

344.00

35.00

0.00

0.00

24.8

1.4

10.32

0.9

986.58

14.7

2.863200421 0.249697711 2.1096875

0.183984375

2.752

0.24

844.68

48.4

1429.64

89.8

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

SECTION 10 SECTION 13 SECTION 14 SECTION 11 - FINE -FLASH SECTION 15 SECTION 16 SECTION 12 SCREENS, DISSOLVED MIXER, - SBR FEED -SBR EQUALISATI - API GRIT AIR FLOCCULAT TANK AND SINGLE ON TANK SEPARATOR REMOVAL, FLOATATIO OR AND SBR FEED STAGE AND AND API UNIT GRIT N UNIT PRIMARY PUMP WAS PUMP FEED PUMP CLASSIFIER (DAF) CLARIFIER

001-GA-001

SECTION 17 - SBR EFFLUENT STORAGE TANK AND REACTION TANK FEED PUMP

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

SECTION 19 - REACTION TANK AND NEUTRALISA SECTION 23 SECTION 20 SECTION 22 TION TANK, - CLEAN SECTION 18 - CHLORINE SECTION 21LAMELLA WATER -ADVANCED CONTACT DUAL MEDIA GRANULAR CLARIFIER SUMP, GAC OXIDATION TANK AND FILTER ACTIVATED AND AND DMF PROCESS FILTER (DMF) CARBON LAMELLA BACKWASH FEED PUMP FILTER CLARIFIER PUMPS INERT SLUDGE PUMP

784.7623333

555.5063333

30.1

178.184 25.988

188.64 44.32 213.08

17.8184 3.78012

25.28064

7.6

0.332930281 0.2453125

0.18

568.52 310.96

001-GA-001

001-GA-001

001-GA-001

SECTION 24 SECTION 25 SECTION 26 - BLENDING - PLANT - PLANT TANK AND DRAIN DRAIN DEEP WELL PUMPING PUMPING INJECTION STATION 1 STATION 2 PUMPS

001-GA-001

001-GA-001

001-GA-001

001-GA-001

SECTION 27 EMERGENC SECTION 28 SECTION 29 SECTION 30 Y LAGOON - OIL - INERT - INERT AND FLOW RECOVERY SLUDGE SLUDGE RETURN SYSTEM TREATMENT TREATMENT PUMPING STATION

1122.206

452.282

50.368

590.704 42.62

252.26 152.18 242.48

59.0704 6.12448

51.0741

1.150607053 0.490625

0.49

2663.68 508.9

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

SECTION 33 SECTION 34 SECTION 36 SECTION 31 SECTION 32 - ODOUR - ODOUR SECTION 35 SECTION 37 -ORGANO -BIO -BIO CONTROL CONTROL - FOAM -SODA ASH SULPHIDES SLUDGE SLUDGE UNIT 1 UNIT 2 DOSING DOSING DOSING TREATMENT TREATMENT (LIQUID (SLUDGE SYSTEM SYSTEM SYSTEM STREAM) STREAM)

2511.354

3280.68

1471.766

2083.63

103.402

130.05

880.09

852.60

71.816

275.60

502.38

659.36

168.68

520.00

517.44

1456.00

88.009

85.26

10.43976

40.404

139.86

1638

0.7182

0

1.301890573 5.753035264 0.6378125

2.453125

0.772

5

3494.82

1300.48

1135.2

1990.8

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

SECTION 38 SECTION 39 SECTION 40 SECTION 41 SECTION 42 SECTION 43 SECTION 44 - HCL - LIME - NaOCL -SMBS - Fe2(SO4)3 - POLYMER - UREA DOSING DOSING DOSING DOSING DOSING DOSING DOSING SYSTEM SYSTEM SYSTEM SYSTEM SYSTEM SYSTEM SYSTEM

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

001-GA-001

SECTION 50 SECTION 45 SECTION 48 SECTION 47 SECTION 49 - POWDER SECTION 46 SECTION 51 - CATIONIC - DEACTIVATED PHOSPHORI - GLUCOSE COAGULANT( - CHEMICAL COAGULANT EMULSIFIE CARBON C ACID DOSING FeCl3) DOSING DOSING R DOSING (PAC) DOSING SYSTEM DOSING LINES SYSTEM SYSTEM DOSING SYSTEM SYSTEM SYSTEM

001-GA-001

001-GA-001

001-GA-001

SECTION 54 SECTION 53 SECTION 52 - SCADA - EXTERNAL - PROCESS SYSTEM AND WORKS AND PIPEWORK ASSOCIATED SERVICES WORKS

13212

11123

289

1800 2011.5

5480.00 6480.00 855.00

180.00 263.25

2890.00 7387.50

Page 81

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code 10 DEMOLITIONS DEMOLISH0001 1010 Demolish existing slabs or concrete pavings,buildings,foundations,structures

Item Code

Description / Price Content All work required for the demolition, demolition equipment, auxiliary requirements (scaffolding, etc.), cutting and removal of rebars from reinforced concrete, loading and transporting of debris to an authorized exterior dump site

DEMOLISH0002

1020 Demolition of asphaltic paving road, up to 15 cm thick, by mechanical means.

All work required for the demolition, demolition equipment, auxiliary requirements (scaffolding, etc.), cutting and removal of rebars from reinforced concrete, loading and transporting of debris to an authorized exterior dump site

DEMOLISH0003

1030 Demolition of underground piping and/or channels by mechanical means.

All work required for the demolition, demolition equipment, auxiliary requirements (scaffolding, etc.), cutting and removal of rebars from reinforced concrete, loading and transporting of debris to an authorized exterior dump site

DEMOLISH0004

1040 Demolition of manholes and/or pits (any type) by mechanical means.

All work required for the demolition, demolition equipment, auxiliary requirements (scaffolding, etc.), cutting and removal of rebars from reinforced concrete, loading and transporting of debris to an authorized exterior dump site

SITECLEAR0001

20 SITE PREPARATION 2010 Clearing, stripping and grading of of natural Removal of natural and organic soil, trees, plants, bushes, land for specified average thickness grass, roots. The vegetation, including roots tree stumps, shall be removed completely Includes the transport of machinery to and within the job site, positioning time for machinery, cleaning, ripping, excavation of the surface grade, intermediate storage, removal and transport of all materials from the cleaned area to an authorized external dump area (including trees, stumps, plants,and all types of undesirable material) safety requirements and dumping fees.

Page 82

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code EXCV0001 2020 General excavation by mechanical means. (Cut)

Item Code

FILL0001

SHEETPILE0001

PILE0001

Description / Price Content Excavation required for leaving a working area to a specific level and to flatten, compact and prepare the site on a specific conditions. The excavation is performed in rock and it is required the use of hydraulic hammer. Includes positioning time for machinery, cutting and ripping and excavating.

2010 General filling with select fill material from Backfilling for large open areas to create a work platform in excavation.(Fill/Embankment) required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed on open areas where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary.Transportation of material,stockpiling and spreading is included. The material shall be selected material from excavations complying with specifications.If excaveted material is suitable for backfilling ,no material price is inclueded.If crusher is necessary to grade and screen materials on site in terms of specification compliant, the crusher price shall be included in material price, otherwise it shall not. 30 PILING WORKS 3010 Supply and installation of sheet piling system with plate thickness as per project standards,specifications or approved drawings.

3020 Supply and execution in situ concrete ø30 cm diameter boring piles.

The price includes material supply, layout works and plotting, installation, Removal, truck load and transport out of property limits, tools, auxiliary means, specialized machinery and, in general all required material and labor for the correct completion of all work. Supply, prefabrication, erection and removal of auxiliary steel structure is included. The price includes machinery movement within the work site, fuel, water, maintenance of machinery and cleaning, reexchanges steel casing and/or bentonite sludge or any other thixotropic sludge, piling execution,supply and puring of concrete, supply and installation of rebar.

Page 83

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

Project Client Location

WBS / BoQ Definition Code PILE0002 3030 Supply and execution in situ concrete ø60 cm diameter boring piles.

Item Code

Description / Price Content The price includes machinery movement within the work site, fuel, water, maintenance of machinery and cleaning, reexchanges steel casing and/or bentonite sludge or any other thixotropic sludge, piling execution,supply and puring of concrete, supply and installation of rebar

PILE0003

3040 Supply and execution in situ concrete ø90 cm diameter boring piles.

The price includes machinery movement within the work site, fuel, water, maintenance of machinery and cleaning, reexchanges steel casing and/or bentonite sludge or any other thixotropic sludge, piling execution,supply and puring of concrete, supply and installation of rebar.

PILE0004

3050 Supply and execution in situ concrete ø120 cm diameter boring piles.

The price includes machinery movement within the work site, fuel, water, maintenance of machinery and cleaning, reexchanges steel casing and/or bentonite sludge or any other thixotropic sludge, piling execution,supply and puring of concrete, supply and installation of rebar.

PILE0005

3060 Cut-off concrete piles head

The price includes the cutting off pile heads,load and transport of debris to an authorized exterior dump site, dumping fees, auxiliary means and, in general, all required materials and labor for the correct completion of the required unit.

PILETEST0001

3070 Execution of integrity test for piles.

The price includes supply and installation of test set-up, equipment,manpower and consumable.

PILETEST0002

3080 Execution of load compression test on working piles (1,5 working load)

The price includes supply and installation of test set-up, equipment,manpower and consumable.

PILETEST0003

3090 Execution of Preliminary compression test (2,5 working load)

The price includes supply and installation of test set-up, equipment,manpower and consumable.The material of test specimen piles shall be provided by TEKFEN. Execution in situ concrete test boring piles shall be carried by others.

40 EARTHWORKS

Page 84

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code EXCV0002 4010 Structural deep excavation of soil for the depth 0.00-2.00 m

Item Code

Description / Price Content Structural deep excavations for foundations, catch basins, pits, tie beams, etc., performed below the elevation of the finishing grade with the machine shall be located outside of the area to be excavated.Rock excavation refers to the excavation executed with hydraulic hammer.

EXCV0003

4020 Structural deep excavation of soil for the depth 2.00-4.00 m

Structural deep excavations for foundations, catch basins, pits, tie beams, etc., performed below the elevation of the finishing grade with the machine shall be located outside of the area to be excavated.Rock excavation refers to the excavation executed with hydraulic hammer.

EXCV0004

4030 Hand excavation of soil

Structural deep excavations for foundations, catch basins, pits, tie beams, etc., performed below the elevation of the finishing grade with hand shall be located outside of the area to be excavated.

EXCV0005

4040 Pipe/Trench excavation of soil for the depth Structural deep excavations for trecnhes,cable channels 0.00-2.00 m performed below the elevation of the finishing grade with hand shall be located outside of the area to be excavated.Up to 2.00 m

Page 85 Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code EXCV0006 4050 Pipe/Trench excavation of soil for the depth Structural deep excavations for trecnhes,cable channels 2.00-4.00 m performed below the elevation of the finishing grade with hand shall be located outside of the area to be excavated.Up to 4.00 m

Item Code

FILL0002

4060 Structural filling with select fill material from excavation.

Backfilling for limited areas such as foundations,pits etc to create a work platform in required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed on limited areas where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary.Transportation of material,stockpiling and spreading is included.The material shall be selected material from excavations complying with specifications.If crusher is necessary to grade and screen materials on site in terms of specification compliant, the crusher price shall be included in material price, otherwise it shall not.

FILL0003

4070 General filling with borrowed granular material. (Imported Fill)

Filling for large open areas to create a work platform in required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed on open areas where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary. Supply of material,transportation of material,stockpiling and spreading is included. The material shall be imported from borrowed pits near the site.

Page 86

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code FILL0004 4080 Structural filling with borrowed granular material. (Imported Fill)

Item Code

Description / Price Content Filling for limited areas such as foundations,pits etc to create a work platform in required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed on limited areas where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary. Supply of material,transportation of material,stockpiling and spreading is included. The material shall be imported from borrowed pits close t o the site complying with the specifications.

FILL0005

4090 Trench filling with select fill material from excavation.

Backfilling for trenches to create a work platform in required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed along trenches where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary.Transportation of material,stockpiling and spreading is included.The material shall be selected material from excavations complying with specifications.If crusher is necessary to grade and screen materials on site in terms of specification compliant, the crusher price shall be included in material price, otherwise it shall not.

FILL0006

4100 Pipe/Trench bedding/padding with borrowed granular fill material (Imported Fill)

Filling with borrowed granular fill material for bedding/ padding use around and under buried pipes.Supply of material, transportation of material,stockpiling and spreading is included.The material shall be imported from borrowed pits close to the site complying with the specifications.

FILL0007

4110 Pipe/Trench bedding/padding with clean sand

Filling with clean sand material for bedding/ padding use around and under buried pipes.Supply of material, transportation of material,stockpiling and spreading is included.The material shall be imported from borrowed pits close to the site complying with the specifications.

Page 87

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code FILL0008 4120 Filling inside of tank foundations with clean Filling with inside of tank foundations with clean sand.Supply sand. of material, transportation of material,stockpiling and spreading is included.The material shall be imported from borrowed pits close to the site complying with the specifications.

Item Code

FILL0009

4120 Tank foundations filling with oil sand mixture.

Supply of material, transportation of material,stockpiling and spreading is included.The material shall be imported from borrowed pits close to the site complying with the specifications.

CONCRETE0001

50 CONCRETE WORKS 5010 Supply and pouring of lean concrete

CONCRETE0002

5020 Supply and pouring of mass concrete

CONCRETE0003

5030 Supply and pouring of concrete for various Supply and pouring of concrete for various and slab and slab foundations (sleepers, stairs, foundations foundations. Concrete grade and content shall thickened slab foundation,tank comply with the specifications. foundations)

Supply and pouring of lean concrete 5<=th<= 10cm .Concrete grade and content shall comply with the specifications.

Supply and pouring of mass concrete for the foundation that has volume greater than 500 m3 and poured in a lumped. Concrete grade and content shall comply with the specifications.

Page 88

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code CONCRETE0004 5040 Supply and pouring of concrete for footing Supply and pouring of concrete for any kind foundations. type foundations (columns,equipment and Concrete grade and content shall comply with the valve foundations, pipe supports,lighting specifications. post,single footing)

Item Code

CONCRETE0005

5050 Supply and pouring of conrete for slabs,beams,walls.

Supply and pouring of concrete for elevated slabs,beams,walls. Concrete grade and content shall comply with the specifications.

CONCRETE0006

5060 Supply and pouring of conrete for manholes and trenches.

Supply and pouring of concrete for manholes,trenches,valve pits. Concrete grade and content shall comply with the specifications.

FORMWORK0001

60 FORMWORKS 6010 Supply and erection of straight formwork for various and slab foundations (sleepers, stairs, thickened slab foundation,tank foundations)

Piping and equipment supports, sleepers, paving thickened slab footings, pedestal for stairs and non-elevated pedestal for turbines shall be considered in this class. Including all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, material costs.

Page 89

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code FORMWORK0002 6020 Supply and erection of straight formwork Columns, pedestals less than 1 meter high (measured from for footing type foundations the upper side of the foot) shall be considered in this (columns,equipment and valve foundations, class.Including all aspects of prefabrication of the required pipe supports,lighting post,single footing) material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs. Item Code

FORMWORK0003

6030 Supply and erection of straight formwork for slab and beams.

Elevated slabs and beams for building shall be considered in this class. Including all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs.

FORMWORK0004

6040 Supply and erection of straight formwork for walls

Basement, retaining and shear walls shall be considered in this class. Including all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs.

FORMWORK0005

6050 Supply and erection of straight formwork for manholes and trenches

Basement, retainin and shear walls shall be considered in this class. Including all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs.

REBAR0001

70 REBAR WORKS 7010 Supply and installation of steel Includes material supply, intermediate storage and transport, reinforcement for various and slab labor costs (cutting and bending), installation, manpower, foundations (sleepers, stairs, thickened slab tools, machinery and, in general, all required materials and foundation,tank foundations) labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.

Page 90 Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code REBAR0002 7020 Supply and installation of steel Includes material supply, intermediate storage and transport, reinforcement for footing type foundations labor costs (cutting and bending), installation, manpower, (columns,equipment and valve foundations, tools, machinery and, in general, all required materials and pipe supports,lighting post,single footing) labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.

Item Code

REBAR0003

7030 Supply and installation of steel reinforcement for slabs,beams and walls

Includes material supply, intermediate storage and transport, labor costs (cutting and bending), installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.

REBAR0004

7040 Supply and installation of steel reinforcement for manholes and trenches

Includes material supply, intermediate storage and transport, labor costs (cutting and bending), installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.

REBAR0005

7050 Supply and installation of steel fabric mesh Includes material supply, intermediate storage and transport, reinforcement for pavements and slabs. labor costs (cutting and bending), installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.

STEEL0001

80 STRUCTURAL STEEL WORKS 8010 Supply and erection of fabricated,painted heavy structural steel

Includes material supply, intermediate storage and transport, labor costs, installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The steel frames,columns,beams,bracings greater than 250 kg shall be considered in this class.(i.e.workshops,steel structure buildings,) Steel grade and content shall comply with the specifications.

Page 91

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code STEEL0002 8020 Supply and erection of fabricated,painted medium structural steel

Item Code

Description / Price Content Includes material supply, intermediate storage and transport, labor costs, installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The steel frames,columns,beams,bracings between 50 kg and 250 kg shall be considered in this class.(i.e. platform ,skids) Steel grade and content shall comply with the specifications.

STEEL0003

8030 Supply and erection of fabricated and painted light structural steel

Includes material supply, intermediate storage and transport, labor costs, installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The steel frames,columns,beams,bracings below 50 kg shall be considered in this class.(i.e.shelters ,stairs) Steel grade and content shall comply with the specifications.

STEEL0004

8040 Supply and erection of fabricated,painted piperack structural steel

Includes material supply, intermediate storage and transport, labor costs, installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The steel frames,columns,beams,bracings used in the piperack construction shall be considered in this class. Steel grade and content shall comply with the specifications.

GRAT0001

8050 Supply and erection of fabricated,galvanized steel gratings

Including material supply, surface treatment (blasting + priming if required / hot dip galvanizing), finishing surface paint, special pieces, accessories, general repair (priming/galvanizing, paint, damages, welding, etc.) and, in general, all required materials and labor for the correct completion of all work. Loads on the platform 250-300 kg/m2, shall be considered in this class. Steel grade and content shall comply with the specifications.

Page 92 Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code GRAT0002 8060 Supply and erection of fabricated,galvanized steel gratings

Item Code

Description / Price Content Including material supply, surface treatment (blasting + priming if required / hot dip galvanizing), finishing surface paint, special pieces, accessories, general repair (priming/galvanizing, paint, damages, welding, etc.) and, in general, all required materials and labor for the correct completion of all work. Loads on the platform 750 kg/m2 shall be considered in this class. Steel grade and content shall comply with the specifications.

GRAT0003

8070 Supply and erection of galvanized chequered plate

Including material supply, surface treatment (blasting + priming if required / hot dip galvanizing), finishing surface paint, special pieces, accessories, general repair (priming/galvanizing, paint, damages, welding, etc.) and, in general, all required materials and labor for the correct completion of all work. Steel grade and content shall comply with the specifications.

ANCHOR0001

8080 Supply and installation of fabricated,galvanized anchor bolts

The unit price includes fabrication, supply, installation, all related accessories (i.e. sleeves, nuts, washers, etc.), accurate surveying, supply and installation of all templates (except for turbines), drillings (screw and machine type included), temporary supports, protections, labeling and any other requirement, regardless of nature, necessary for the correct complete installation of the required unit.Steel grade and content shall comply with the specifications.

EMBEDDED0001

FIREPROOFING0001

8090 Supply and installation of fabricated,galvanized embedded plates

The unit price includes fabrication, supply, installation and any other requirement, regardless of nature, necessary for the correct complete installation of the required unit.Steel grade and content shall comply with the specifications. 8100 Supply and installation of steel intumescent The unit price includes fabrication, supply, installation of 5 cm fireproofing and proper primer. < th <10 cm fire proofing concrete coating, supply and installation of mesh reinforcement and hooks,mastic sealing between the concrete layer edge and the metal structure, according to the specifications. 90 PRECAST WORKS

Page 93 Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code PRECAST0001 9010 Supply and installation of precast concrete Includes material supply in workshop, works layout and manholes plotting, formwork, concrete works, vibrating, curing, removal of formwork, storage, protection, custody and, in general, all required materials and labor for the correct completion of all work. It is also included the load, transport and unload in the final position of the element.Embedded items are excluded. The quantity of rebar shall be included in rebar items.

Item Code

GROUT0001

GROUT0002

GROUT0003

JOINT0001

JOINT0002

100 GROUTS 10010 Supply and application of cementious non- The unit price includes supply, application, preparation, shrink mortar. supports, pouring mediums, and any other requirement, regardless of nature, necessary for the correct installation of the required unit. 10020 Supply and application of cement base The unit price includes supply, application, preparation, grouting mortar. supports, pouring mediums, and any other requirement, regardless of nature, necessary for the correct installation of the required unit. 10030 Supply and application of epoxy grouting The unit price includes supply, application, preparation, mortar. supports, pouring mediums, and any other requirement, regardless of nature, necessary for the correct installation of the required unit. 110 JOINTS 11010 Supply and application of expansion joint The unit price includes layout works and plotting, material sealing. supply, installation of material following manufacturer recommendations, manpower, surface preparation, , tools, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. 11020 Supply and application of construction/cutting joint sealing.

The unit price includes layout works and plotting, material supply, installation of material following manufacturer recommendations, manpower, surface preparation, , tools, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work.

Page 94 Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code 120 FENCES & GATES FENCE0001 12010 Supply and installation of fence SSD1,barbered wire chainlink fence

Item Code

FENCE0002

GEOTEXT0001

HDPE0001

POLYETH0001

12020 Supply and installation of fenceTYPEIV,barbered wire chainlink fence

130 WATERPROOFING & COATING 13010 Supply and erection of geotextile membrane under buried elements

Description / Price Content The price includes material supply, clamps, accessories, earthing, tools, auxiliary means, machinery and, in general, all required material and labor for the correct completion of all work. Excavation, backfilling and filling, concrete pouring shall be excluded. These items shall be considred in relevant line items.SSD-1 is a type of fence used in ARAMCO projects. The price includes material supply, clamps, accessories, earthing, tools, auxiliary means, machinery and, in general, all required material and labor for the correct completion of all work. Excavation, backfilling and filling, concrete pouring shall be excluded. These items shall be considred in relevant line items.TYPE-IV is a type of fence used in ARAMCO projects.

The unit price includes material supply, manpower, grip, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

13020 Supply and erection of HDPE membrane liner under tank foundations

The unit price includes material supply of sitable material according with project standars, specifications and drawings, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

13030 Supply and erection of polyethylene sheet membrane under concrete pavements.

The unit price includes material supply of suitable material according with project standars, specifications and drawings, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

Page 95

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code COATING0001 13040 Supply and application of bituminous waterproofing emulsion for concrete surfaces

Item Code

COATING0002

PVCWATERSTOP0001

Description / Price Content Complete system of concrete surface treatments required for concrete protection, as required by project specifications. For concrete below ground or above ground. The unit price includes material supply of sitable material according with project standars, specifications and drawings, application or installation according with manufacturer recommendations, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

13050 Supply and application of bituminous waterproofing emulsion for concrete surfaces

Complete system of concrete surface treatments required for concrete protection, as required by project specifications. For concrete below ground or above ground. The unit price includes material supply of sitable material according with project standars, specifications and drawings, application or installation according with manufacturer recommendations, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

13060 Supply and application of pvc waterstop.

The unit price includes material supply of suitable material according with project standars, specifications and drawings, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

140 PAVINGS & ROADS

Page 96

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code PAVING0001 14010 Supply and execution of concrete in The unit price includes material supply, mesh supply & paving,reinforced with single/double mesh. installation, concrete pouring by any mean, spreading, (Light Duty) vibrating, leveling, curing, slope forming, floating, troweling according with project standards, specifications or approved drawings, tools, auxiliary means, machinery, and, in general, all required materials and labor for the correct completion of all work. formworks shall be excluded. These items shall be considered in relevant line items.

Item Code

PAVING0002

14020 Supply and execution of concrete in The unit price includes material supply, mesh supply & paving,reinforced with single/double mesh. installation, concrete pouring by any mean, spreading, (Heavy Duty) vibrating, leveling, curing, slope forming, floating, troweling according with project standards, specifications or approved drawings, tools, auxiliary means, machinery, and, in general, all required materials and labor for the correct completion of all work. formworks shall be excluded. These items shall be considered in relevant line items.

ROAD0001

14030 Supply and execution of asphalt wearing course.

The unit price includes the material supply, spreading by any means, compaction, forming and sealing joints, tools, auxiliary means, machinery,according with project standards, specifications or approved drawings and, in general, all required materials and labor for the correct completion of all work. Thickness shall be indicated in BoQ items.

ROAD0002

14040 Supply and execution of asphalt binder course.

The unit price includes the material supply, spreading by any means, compaction, forming and sealing joints, tools, auxiliary means, machinery,according with project standards, specifications or approved drawings and, in general, all required materials and labor for the correct completion of all work. Thickness shall be indicated in BoQ items.

Page 97

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code ROAD0003 14050 Supply and execution of subbase material The unit price includes material supply with characteristics for roads with material according with according project requirements and specifications for each project standards and specifications. kind of material, transportation, intermediate storage, preparation of area to be backfilled (scarifying and recompacting), spreading, irrigation, compaction, grading, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work.

Item Code

ROAD0004

14060 Supply and execution of base material for The unit price includes material supply with characteristics roads with material accoridng with project according project requirements and specifications for each standards and specifications. kind of material, transportation, intermediate storage, preparation of area to be backfilled (scarifying and recompacting), spreading, irrigation, compaction, grading, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work.

ROAD0005

14070 Supply and application of tack coat in asphalt roads.

The unit price includes material supply, installation, surface treatment, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work.

ROAD0006

14080 Supply and application of prime coat in asphalt roads.

The unit price includes material supply, installation, surface treatment, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work.

Page 98

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

Project Client Location

WBS / BoQ Definition Description / Price Content Code ROAD0007 14090 Supply and complete installation of metallic The unit price includes material supply (materials shall be safety guardrail in sides of roads. according with project standards, specifications and drawings and anchoring according with manufacturer recommendations, painting as per specification and installation of any required reflecting fittings. ), Excavation, refining, backfilling, loading and transporting to an authorized dumping area, dumping fees, compaction, complete foundation shall be excluded. These items shall be considered in relevant line items.

Item Code

ROAD0008

14100 Supply and complete installation of concrete barrier type "New Jersey" or similar in sides of roads.

The unit price includes material supply (materials shall be according with project standards, specifications and drawings and anchoring according with manufacturer recommendations, painting as per specification and installation of any required reflecting fittings.)

ROAD0009

14110 Supply and erection of signposting in ways.

The unit price includes material supply (materials shall be according with project standards, specifications and drawings and anchoring according with manufacturer recommendations, painting as per specification and installation of any required reflecting fittings. ), Excavation, refining, backfilling, loading and transporting to an authorized dumping area, dumping fees, compaction, complete foundation shall be excluded. These items shall be considered in relevant line items.

KERB0001

14120 Supply and installation of kerbs

The unit price includes material supply materials and installation in accordance with project standards, specifications and drawings.

150 U/G WORKS

Page 99

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code PVCPIPE0001 15010 Supply and installation uPVC pipe Ø50 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Item Code

PVCPIPE0002

15020 Supply and installation uPVC pipe Ø75 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0003

15030 Supply and installation uPVC pipe Ø90 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0004

15040 Supply and installation uPVC pipe Ø110 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 100

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code PVCPIPE0005 15050 Supply and installation uPVC pipe Ø125 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0006

15060 Supply and installation uPVC pipe Ø140 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0007

15070 Supply and installation uPVC pipe Ø160 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0008

15080 Supply and installation uPVC pipe Ø180 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 101

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code PVCPIPE0009 15090 Supply and installation uPVC pipe Ø200 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0010

15100 Supply and installation uPVC pipe Ø250 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0011

15110 Supply and installation uPVC pipe Ø300 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0012

15120 Supply and installation uPVC pipe Ø350 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 102

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code PVCPIPE0013 15130 Supply and installation uPVC pipe Ø400 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0014

15140 Supply and installation uPVC pipe Ø450 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0015

15150 Supply and installation uPVC pipe Ø500 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0016

15160 Supply and installation uPVC pipe Ø550 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 103

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code PVCPIPE0017 15170 Supply and installation uPVC pipe Ø600 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0018

15180 Supply and installation uPVC pipe Ø650 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0019

15190 Supply and installation uPVC pipe Ø700 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0020

15200 Supply and installation uPVC pipe Ø750 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 104

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code PVCPIPE0021 15210 Supply and installation uPVC pipe Ø800 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0022

15220 Supply and installation uPVC pipe Ø850 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0023

15230 Supply and installation uPVC pipe Ø900 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

PVCPIPE0024

15240 Supply and installation uPVC pipe Ø950 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 105

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code HDPEPIPE0001 15250 Supply and installation HDPE pipe Ø75 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Item Code

HDPEPIPE0002

15260 Supply and installation HDPE pipe Ø90 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0003

15270 Supply and installation HDPE pipe Ø100 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0004

15280 Supply and installation HDPE pipe Ø110 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 106

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code HDPEPIPE0005 15290 Supply and installation HDPE pipe Ø125 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0006

15300 Supply and installation HDPE pipe Ø140 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0007

15310 Supply and installation HDPE pipe Ø160 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0008

15320 Supply and installation HDPE pipe Ø180 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 107

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code HDPEPIPE0009 15330 Supply and installation HDPE pipe Ø200 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0010

15340 Supply and installation HDPE pipe Ø250 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0011

15350 Supply and installation HDPE pipe Ø300 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0012

15360 Supply and installation HDPE pipe Ø350 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 108

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code HDPEPIPE0013 15370 Supply and installation HDPE pipe Ø400 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0014

15380 Supply and installation HDPE pipe Ø450 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0015

15390 Supply and installation HDPE pipe Ø500 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0016

15400 Supply and installation HDPE pipe Ø600 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 109

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code HDPEPIPE0017 15410 Supply and installation HDPE pipe Ø700 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0018

15420 Supply and installation HDPE pipe Ø800 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0019

15430 Supply and installation HDPE pipe Ø900 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0020

15440 Supply and installation HDPE pipe Ø1000 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 110

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code HDPEPIPE0021 15450 Supply and installation HDPE pipe Ø1100 mm

Item Code

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0022

15460 Supply and installation HDPE pipe Ø1200 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0023

15470 Supply and installation HDPE pipe Ø1300 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

HDPEPIPE0024

15480 Supply and installation HDPE pipe Ø1400 mm

This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 111

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code HDPEPIPE0025 15490 Supply and installation HDPE pipe Ø1500 mm

Item Code

HDPEPIPE0026

15500 Supply and installation HDPE pipe Ø1600 mm

Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items. This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0001

15510 Supply and installation GRP pipe Ø50 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0002

15520 Supply and installation GRP pipe Ø75 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 112

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code GRPPIPE0003 15530 Supply and installation GRP pipe Ø100 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Item Code

GRPPIPE0004

15540 Supply and installation GRP pipe Ø150 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0005

15550 Supply and installation GRP pipe Ø200 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0006

15560 Supply and installation GRP pipe Ø250 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 113

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code GRPPIPE0007 15570 Supply and installation GRP pipe Ø300 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Item Code

GRPPIPE0008

15580 Supply and installation GRP pipe Ø350 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0009

15590 Supply and installation GRP pipe Ø400 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0010

15600 Supply and installation GRP pipe Ø450 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 114

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code GRPPIPE0011 15610 Supply and installation GRP pipe Ø500 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Item Code

GRPPIPE0012

15620 Supply and installation GRP pipe Ø550 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0013

15630 Supply and installation GRP pipe Ø600 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0014

15640 Supply and installation GRP pipe Ø650 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 115

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code GRPPIPE0015 15650 Supply and installation GRP pipe Ø700 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Item Code

GRPPIPE0016

15660 Supply and installation GRP pipe Ø750 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0017

15670 Supply and installation GRP pipe Ø800 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

GRPPIPE0018

15680 Supply and installation GRP pipe Ø850 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Page 116

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code GRPPIPE0019 15690 Supply and installation GRP pipe Ø900 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.

Item Code

WARNINGTAPE0001

MASONARY0001

MASONARY0002

MASONARY0003

MASONARY0004

15700 Supply and installation of warning tape for The unit price includes the material supply, installation, underground systems. overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

160 MASONARY WORKS 16010 Supply and installation of hollow concrete The unit price includes the material supply, installation, block including all associated work, as overlaps, tools, auxiliary means, and, in general, all required specified under the Technical Specification materials and labor for the correct completion of all work. and applicable standards. 16020 Supply and installation of lightweight The unit price includes the material supply, installation, concrete block including all associated overlaps, tools, auxiliary means, and, in general, all required work, as specified under the Technical materials and labor for the correct completion of all work. Specification and applicable standards. 16030 Supply and installation of solid block brick The unit price includes the material supply, installation, including all associated work, as specified overlaps, tools, auxiliary means, and, in general, all required under the Technical Specification and materials and labor for the correct completion of all work. applicable standards. 16040 Supply and installation of pre-cast concrete The unit price includes the material supply, installation, lintels including all associated work, as overlaps, tools, auxiliary means, and, in general, all required specified under the Technical Specification materials and labor for the correct completion of all work. and applicable standards. 170 PLASTERING WORKS

Page 117

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code PLASTER0001 17010 Supply and application of cement plaster The unit price includes the material supply, installation, for external and internal surfaces including overlaps, tools, auxiliary means, and, in general, all required all associated work, as specified under the materials and labor for the correct completion of all work. Technical Specification and applicable standards.

Item Code

PLASTER0002

17020 Supply and application of gypsum plaster The unit price includes the material supply, installation, for wall and ceiling including all associated overlaps, tools, auxiliary means, and, in general, all required work, as specified under the Technical materials and labor for the correct completion of all work. Specification and applicable standards.

PLASTER0003

17030 Supply and application of arcylic based The unit price includes the material supply, installation, ready mixed plaster including all associated overlaps, tools, auxiliary means, and, in general, all required work, as specified under the Technical materials and labor for the correct completion of all work. Specification and applicable standards.

PAINTING0001

PAINTING0002

PAINTING0003

180 PAINTING & ACID RESISTANT COATING 18010 Supply and application of painting for external surfaces including all associated work, as specified under the Technical Specification and applicable standards. 18020 Supply and application of painting for internal surfaces walls and ceilings including all associated work, as specified under the Technical Specification and applicable standards. 18030 Supply and application of dust proof painting for cement floors including all associated work, as specified under the Technical Specification and applicable standards.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

Page 118

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code PAINTING0004 18040 Supply and application of acid resistant The unit price includes the material supply, installation, coating/epoxy screed 5mm minimum for overlaps, tools, auxiliary means, and, in general, all required floors including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.

Item Code

FLOORTILE0001

FLOORTILE0002

190 FLOORING & TILING 19010 Supply and application of rigid finished floors(ceramic) including all associated work, as specified under the Technical Specification and applicable standards. 19010 Supply and application of rigid finished floors(terazzo/marble) including all associated work, as specified under the Technical Specification and applicable standards.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

FLOORTILE0003

19020 Supply and application of flexible finished The unit price includes the material supply, installation, floors(uPVC/Vinyl/Carpet/Heavy Duty Vinyl) overlaps, tools, auxiliary means, and, in general, all required including all associated work, as specified materials and labor for the correct completion of all work. under the Technical Specification and applicable standards.

FLOORTILE0004

19040 Supply and application of rigid finished The unit price includes the material supply, installation, walls(ceramic/terazzo/marble) including all overlaps, tools, auxiliary means, and, in general, all required associated work, as specified under the materials and labor for the correct completion of all work. Technical Specification and applicable standards.

ROOF0001

200 ROOFING & INSULATION 20010 Supply and application of water-proof The unit price includes the material supply, installation, membrane for roofs bituminous multi coats overlaps, tools, auxiliary means, and, in general, all required including all associated work, as specified materials and labor for the correct completion of all work. under the Technical Specification and applicable standards.

Page 119

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code ROOF0002 20020 Supply and application of rigid thermal The unit price includes the material supply, installation, insulation for roofs including all associated overlaps, tools, auxiliary means, and, in general, all required work, as specified under the Technical materials and labor for the correct completion of all work. Specification and applicable standards.

Item Code

ROOF0003

20030 Supply and application of light weight The unit price includes the material supply, installation, concrete screed average th. 70mm for overlaps, tools, auxiliary means, and, in general, all required roofs including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.

ROOF0004

20050 Supply and application of roof insulation with bituminous primer including all associated work, as specified under the Technical Specification and applicable standards.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

ROOF0005

20060 Supply and application of roof insulation with ytong multipor mm including all associated work, as specified under the Technical Specification and applicable standards.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

DOOR0001

DOOR0002

210 WINDOWS & DOORS & PARTITION WALLS 21010 Supply and installation of timber door hollow core including all associated work, as specified under the Technical Specification and applicable standards. 21020 Supply and installation of timber door solid including all associated work, as specified under the Technical Specification and applicable standards.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

Page 120

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code DOOR0003 21030 Supply and installation of internal hollow metal door single leaf including all associated work, as specified under the Technical Specification and applicable standards.

Item Code

Description / Price Content The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

DOOR0004

21040 Supply and installation of internal hollow metal door double leaf including all associated work, as specified under the Technical Specification and applicable standards.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

DOOR0005

21050 Supply and installation of roll-up shutter motorised door including all associated work, as specified under the Technical Specification and applicable standards. 21060 Supply and installation of fire resistant 30 minutes including all associated work, as specified under the Technical Specification and applicable standards. 21070 Supply and installation of fire resistant 60 minutes including all associated work, as specified under the Technical Specification and applicable standards. 21080 Supply and installation of aluminium doors with panel including all associated work, as specified under the Technical Specification and applicable standards. 21090 Supply and installation of gypsum board partition wall with panel including all associated work, as specified under the Technical Specification and applicable standards.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

DOOR0006

DOOR0007

DOOR0008

PARTITIONWALL0001

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

Page 121

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Code WINDOW0001 21100 Supply and installation of steel frame gas tight window including all associated work, as specified under the Technical Specification and applicable standards. 220 CLADDING CLAD0001 22010 Supply and installation of panel aluminium pre-finished (wall single skin panel) including all associated work, as specified under the Technical Specification and applicable standards.

Item Code

Description / Price Content The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

CLAD0002

22020 Supply and installation of pre-formed panel The unit price includes the material supply, installation, aluminium pre-finished (wall sandwich overlaps, tools, auxiliary means, and, in general, all required panel)including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.

CLAD0003

22030 Supply and installation of Panel aluminium The unit price includes the material supply, installation, pre-finished (roof single skin panel) overlaps, tools, auxiliary means, and, in general, all required including all associated work, as specified materials and labor for the correct completion of all work. under the Technical Specification and applicable standards.

CLAD0004

22040 Supply and installation of Pre-formed panel The unit price includes the material supply, installation, aluminium pre-finished (roof sandwich overlaps, tools, auxiliary means, and, in general, all required panel) including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.

CLAD0005

22050 Supply and installation of Pre-formed panel The unit price includes the material supply, installation, galvanized steel sheet prefinished ( wall overlaps, tools, auxiliary means, and, in general, all required sandwich panel ) including all associated materials and labor for the correct completion of all work. work, as specified under the Technical Specification and applicable standards.

Page 122

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code CLAD0006 22060 Supply and installation of Panel galvanized The unit price includes the material supply, installation, steel sheet prefinished ( roof single skin overlaps, tools, auxiliary means, and, in general, all required panel ) including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.

Item Code

CLAD0007

22070 Supply and installation of Pre-formed panel The unit price includes the material supply, installation, galvanized steel sheet prefinished ( roof overlaps, tools, auxiliary means, and, in general, all required sandwich panel ) including all associated materials and labor for the correct completion of all work. work, as specified under the Technical Specification and applicable standards.

CLAD0008

22080 Supply and installation of Suspended ceiling The unit price includes the material supply, installation, mineral fiber Armstrong or similar including overlaps, tools, auxiliary means, and, in general, all required all associated work, as specified under the materials and labor for the correct completion of all work. Technical Specification and applicable standards.

CLAD0009

22090 Supply and installation of raised modular The unit price includes the material supply, installation, floor 600x600mm fire resistant including all overlaps, tools, auxiliary means, and, in general, all required associated work, as specified under the materials and labor for the correct completion of all work. Technical Specification and applicable standards.

CLAD0010

22100 Supply and installation of Thermally Insulated Cladding panel with Polyester powder coated finish including all associated work, as specified under the Technical Specification and applicable standards.

The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

Page 123

Project Client Location

DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR

WBS / BoQ Definition Description / Price Content Code CLAD0011 22110 Supply and installation of Thermally The unit price includes the material supply, installation, Insulated Roof panel with Polyester powder overlaps, tools, auxiliary means, and, in general, all required coated finish including all associated work, materials and labor for the correct completion of all work. as specified under the Technical Specification and applicable standards.

Item Code

Page 124

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure Volume of concrete in each concrete element, as measured on approved drawings.



Surface of asphalt roads , as measured on approved drawings.



Length of pipes/channels, as measured on approved drawings.

m

Number of pits,manholes, as measured on approved drawings.

ea

Surface will be measured as defined on reference drawings.



NOTES

Page 125

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure Volume for excavation shall be measured in its natural state as is stated on approved m³ reference plans and topographic profiles. The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. m³

Surface will be measured as defined on reference drawings. m²

The measurement of “in-situ” piles shall be as specified on approved

m

NOTES

Page 126

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The measurement of “in-situ” piles shall be as specified on approved m

The measurement of “in-situ” piles shall be as specified on approved

m

The measurement of “in-situ” piles shall be as specified on approved

m

The measurement of “in-situ” piles shall be as specified on approved

ea

The measurement of “in-situ” piles shall be as specified on approved The measurement of “in-situ” piles shall be as specified on approved The measurement of “in-situ” piles shall be as specified on approved

ea

ea

ea

NOTES

Page 127

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure Excavated volume will be measured in its natural state considering the elevations as m³ shown on approved reference plans and topographical profiles. Excavated volume will be measured in its natural state considering the elevations as shown on approved reference plans and topographical profiles.



Excavated volume will be measured in its natural state considering the elevations as shown on approved reference plans and topographical profiles.



Excavated volume will be measured in its natural state considering the elevations as shown on approved reference plans and topographical profiles.



NOTES

Up to 150 : s=10 cm >=151 to 300 s=15 cm >=301 to 500 s=20 cm >=501 to 900 s=30 cm >=901 to 1600 s=45 cm >=1601 to 2400 s=60 cm >=2401 s=90 cm s=Additional width allowance for each side of conduit

Page 128

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure Excavated volume will be measured in its natural state considering the elevations as shown on approved reference plans and topographical profiles. m³

The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. m³

The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles.



NOTES Up to 150 : s=10 cm >=151 to 300 s=15 cm >=301 to 500 s=20 cm >=501 to 900 s=30 cm >=901 to 1600 s=45 cm >=1601 to 2400 s=60 cm >=2401 s=90 cm s=Additional width allowance for each side of conduit

Page 129

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. m³

The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. m³

The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles.





NOTES

Page 130

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The filling volume shall be measured as stated on approved reference drawings m³ and, when required, using topographic profiles. The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles.



The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.



The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.



The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.



NOTES

Page 131

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings and it shall be measured m³ assigning the same surface as the foundation that is supported. The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.



The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.



The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete.



NOTES

Page 132

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete. m²

The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete.

The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete.

The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete.

The unit shall be measured as stated on approved drawings. Overlaps not indicated on drawings shall not be measured







ton

NOTES

Page 133

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. Overlaps not indicated on ton drawings shall not be measured The unit shall be measured as stated on approved drawings. Overlaps not indicated on drawings shall not be measured The unit shall be measured as stated on approved drawings. Overlaps not indicated on drawings shall not be measured The unit shall be measured as stated on approved drawings. Overlaps not indicated on drawings shall not be measured

ton

ton

ton

The unit shall be measured as stated on approved drawings. ton

NOTES

Page 134

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. ton

The unit shall be measured as stated on approved drawings. ton

The unit shall be measured as stated on approved drawings. ton

The unit shall be measured as stated on approved drawings. m²

NOTES

Page 135

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. ton

The unit shall be measured as stated on approved drawings.

ton

The unit shall be measured as stated on approved drawings. m²

NOTES

Page 136

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings.



The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.







The unit shall be measured as stated on approved drawings. m

The unit shall be measured as stated on approved drawings. m

NOTES

Page 137

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m

The unit shall be measured as stated on approved drawings. m

The unit shall be measured as stated on approved drawings.



The unit shall be the area of the surface to be waterproofed as specified on approved drawings.



The unit shall be measured as specified on approved drawings, considering only the concrete surface in horizontal projection to be protected.



NOTES

Page 138

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be the area of the protected concrete as specified on approved drawings. m²

The unit shall be the area of the protected concrete as specified on approved drawings. m²

The unit shall be the area of the protected concrete as specified on approved drawings.

m

NOTES

Page 139

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings.



The unit shall be measured as stated on approved drawings.



The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

NOTES

Page 140

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The filling volume shall be measured as specified on approved drawings. m³

The filling volume shall be measured as specified on approved drawings. m³

The unit shall be measured as specified on approved drawings.



The unit shall be measured as specified on approved drawings.



NOTES

Page 141

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured along the axis as specified on approved drawings. m

The unit shall be measured along the axis as specified on approved drawings.

m

The unit shall be measured along the axis as specified on approved drawings. m

The unit shall be measured along the axis as specified on approved drawings.

m

NOTES

Page 142

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 143

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 144

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 145

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 146

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 147

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 148

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 149

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 150

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 151

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 152

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 153

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 154

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 155

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 156

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 157

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 158

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.

m

m

m

NOTES

Page 159

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.

The unit shall be measured with the trench length indicated on drawings measured along the trench axis. The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.

m









NOTES

Page 160

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings.



The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

NOTES

Page 161

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings.



The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

NOTES

Page 162

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.





NOTES

Page 163

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.

The unit shall be measured as stated on approved drawings.









The unit shall be measured as stated on approved drawings. m²

NOTES

Page 164

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

NOTES

Page 165

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

The unit shall be measured as stated on approved drawings. m²

NOTES

Page 166

(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²

NOTES

Related Documents

Boq
October 2019 33
Boq
May 2020 18
Boq Sample
June 2020 17
Boq Scribd.xlsx
December 2019 22
Boq Scribd.xlsx
December 2019 16
Boq - Structural.xlsx
April 2020 13

More Documents from "onur uman"

Table 5.docx
April 2020 4
Boq - Structural.xlsx
April 2020 13
Ayazaga_150515.pdf
April 2020 10
Mesleki Hizmetler.pptx
April 2020 8
V Kanal Plan.pdf
April 2020 6