DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATE
Project Client Location
Item Code
WBS / BoQ Code
Definition
10
DEMOLITIONS Demolish existing slabs or concrete pavings,buildings,foundations,structures Demolition of asphaltic paving road, up to 15 cm thick, by mechanical means. Demolition of underground piping and/or channels by mechanical means. Demolition of manholes and/or pits (any type) by mechanical means. SITE PREPARATION Clearing, stripping and grading of of natural land for specified average thickness General excavation by mechanical means (Cut) General filling with select fill material from excavation (Fill / Embankment) PILING WORKS Supply and installation of sheet piling system with plate thickness as per project standards,specifications or approved drawings. Supply and execution in situ concrete ø30 cm diameter bored piles Supply and execution in situ concrete ø60 cm diameter bored piles Supply and execution in situ concrete ø90 cm diameter bored piles Supply and execution in situ concrete ø120 cm diameter bored piles
DEMOLISH0001
1010
DEMOLISH0002
1020
DEMOLISH0003
1030
DEMOLISH0004
1040 20
SITECLEAR0001
2010
EXCV0001
2020
FILL0001
2010 30
SHEETPILE0001
3010
PILE0001
3020
PILE0002
3030
PILE0003
3040
PILE0004
3050
PILE0005
3060
Cut-off concrete piles head
PILETEST0001
3070
PILETEST0002
3080
Execution of integrity test for piles. Execution of load compression test on working piles (1,5 working load)
PILETEST0003
3090 40
EXCV0002
4010
Execution of Preliminary compression test (2,5 working load) EARTHWORKS Structural deep excavation of soil for the depth 0.00-2.00 m
EXCV0003
4020
Structural deep excavation of soil for the depth 2.00-4.00 m
EXCV0004 EXCV0005 EXCV0006
4030 4040 4050
Hand excavation of soil Pipe/Trench excavation of soil for the depth 0.00-2.00 m Pipe/Trench excavation of soil for the depth 2.00-4.00 m
FILL0002
4060
Structural filling with back fill material from excavation.
FILL0003
4070
General filling with borrowed granular material. (Imported Fill)
FILL0004
4080
Structural filling with borrowed granular material. (Imported Fill)
FILL0005
4090
Trench filling with back fill material from excavation.
FILL0006
4100
FILL0007 FILL0008 FILL0009 CONCRETE0001 CONCRETE0002
4110 4120 4130 50 5010 5020
CONCRETE0003
5030
CONCRETE0004
5040
CONCRETE0005
5050
CONCRETE0006
5060 60
FORMWORK0001
6010
FORMWORK0002
6020
FORMWORK0003
6030
FORMWORK0004
6040
FORMWORK0005
6050 70
REBAR0001
7010
REBAR0002
7020
REBAR0003
7030
REBAR0004
7040
REBAR0005
7050 80
Pipe/Trench bedding/padding with borrowed granular fill material (Imported Fill) Pipe/Trench bedding/padding with clean sand Filling inside of tank foundations with clean sand. Tank foundations filling with oil sand mixture. CONCRETE WORKS Supply and pouring of lean concrete Supply and pouring of mass concrete Supply and pouring of concrete for various and slab foundations (sleepers, stairs, thickened slab foundation,tank foundations) Supply and pouring of concrete for footing type foundations (columns,equipment and valve foundations, pipe supports,lighting post,single footing) Supply and pouring of conrete for slabs,beams,walls and columns. Supply and pouring of conrete for manholes and trenches. FORMWORKS Supply and erection of straight formwork for various and slab foundations (sleepers, stairs, thickened slab foundation,tank foundations) Supply and erection of straight formwork for footing type foundations (columns,equipment and valve foundations, pipe supports,lighting post,single footing) Supply and erection of straight formwork for slab and beams and column Supply and erection of straight formwork for walls Supply and erection of straight formwork for manholes and trenches REBAR WORKS Supply and installation of steel reinforcement for various and slab foundations (sleepers, stairs, thickened slab foundation,tank foundations) Supply and installation of steel reinforcement for footing type foundations (columns,equipment and valve foundations, pipe supports,lighting post,single footing) Supply and installation of steel reinforcement for slabs,beams and walls and column Supply and installation of steel reinforcement for manholes and trenches Supply and installation of steel fabric mesh reinforcement for pavements and slabs. STRUCTURAL STEEL WORKS
STEEL0001
8010
STEEL0002
8020
STEEL0003
8030
STEEL0004
8040
GRAT0001 GRAT0002 GRAT0003
8050 8060 8070
Supply steel Supply steel Supply steel Supply steel Supply Supply Supply
ANCHOR0001
8080
Supply and installation of fabricated,galvanized anchor bolts
EMBEDDED0001
8090
FIREPROOFING0001
8100
PRECAST0001 GROUT0001 GROUT0002 GROUT0003 JOINT0001 JOINT0002
90 9010 100 10010 10020 10030 110 11010 11020 120
FENCE0001
12010
FENCE0002
12020 130
GEOTEXT0001
13010
HDPE0001
13020
POLYETH0001
13030
COATING0001
13040
COATING0002
13050
PVCWATERSTOP0001
13060 140
and erection of fabricated,painted heavy structural and erection of fabricated,painted medium structural and erection of fabricated and painted light structural and erection of fabricated,painted piperack structural and erection of fabricated,galvanized steel gratings and erection of fabricated,galvanized steel gratings and erection of galvanized chequered plate
Supply and installation of fabricated,galvanized embedded plates Supply and installation of steel intumescent fireproofing and proper primer. PRECAST WORKS Supply and installation of precast concrete manholes GROUTS Supply and application of cementious non-shrink mortar. Supply and application of cement base grouting mortar. Supply and application of epoxy grouting mortar. JOINTS Supply and application of expansion joint sealing. Supply and application of construction/cutting joint sealing. FENCES & GATES Supply and installation of fence SSD-1,barbered wire chainlink fence Supply and installation of fenceTYPE-IV,barbered wire chainlink fence WATERPROOFING & COATING Supply and erection of geotextile membrane under buried elements Supply and erection of HDPE membrane liner under tank foundations Supply and erection of polyethylene sheet membrane under concrete pavements. Supply and application of bituminous waterproofing emulsion for concrete surfaces Supply and application of bituminous waterproofing emulsion for concrete surfaces Supply and application of pvc waterstop. PAVINGS & ROADS Supply and execution of concrete in paving,reinforced with single/double mesh.(Light Duty) Supply and execution of concrete in paving,reinforced with single/double mesh.(Heavy Duty) Supply and execution of asphalt wearing course. Supply and execution of asphalt binder course.
PAVING0001
14010
PAVING0002
14020
ROAD0001 ROAD0002
14030 14040
ROAD0003
14050
Supply and execution of subbase material for roads with material according with project standards and specifications.
ROAD0004
14060
Supply and execution of base material for roads with material according with project standards and specifications.
ROAD0005 ROAD0006
14070 14080
ROAD0007
14090
ROAD0008
14100
ROAD0009 KERB0001
14110 14120 150 15010 15020 15030 15040 15050 15060 15070 15080 15090 15100 15110 15120 15130 15140 15150 15160 15170 15180 15190 15200 15210 15220 15230 15240 15250 15260 15270 15280 15290 15300 15310 15320 15330 15340 15350 15360 15370 15380 15390 15400 15410 15420 15430 15440 15450 15460 15470 15480
PVCPIPE0001 PVCPIPE0002 PVCPIPE0003 PVCPIPE0004 PVCPIPE0005 PVCPIPE0006 PVCPIPE0007 PVCPIPE0008 PVCPIPE0009 PVCPIPE0010 PVCPIPE0011 PVCPIPE0012 PVCPIPE0013 PVCPIPE0014 PVCPIPE0015 PVCPIPE0016 PVCPIPE0017 PVCPIPE0018 PVCPIPE0019 PVCPIPE0020 PVCPIPE0021 PVCPIPE0022 PVCPIPE0023 PVCPIPE0024 HDPEPIPE0001 HDPEPIPE0002 HDPEPIPE0003 HDPEPIPE0004 HDPEPIPE0005 HDPEPIPE0006 HDPEPIPE0007 HDPEPIPE0008 HDPEPIPE0009 HDPEPIPE0010 HDPEPIPE0011 HDPEPIPE0012 HDPEPIPE0013 HDPEPIPE0014 HDPEPIPE0015 HDPEPIPE0016 HDPEPIPE0017 HDPEPIPE0018 HDPEPIPE0019 HDPEPIPE0020 HDPEPIPE0021 HDPEPIPE0022 HDPEPIPE0023 HDPEPIPE0024
Supply and application of tack coat in asphalt roads. Supply and application of prime coat in asphalt roads. Supply and complete installation of metallic safety guardrail in sides of roads. Supply and complete installation of concrete barrier type "New Jersey" or similar in sides of roads. Supply and erection of signposting in ways. Supply and erection of signposting in ways. U/G WORKS Supply and installation uPVC pipe Ø50 mm Supply and installation uPVC pipe Ø75 mm Supply and installation uPVC pipe Ø90 mm Supply and installation uPVC pipe Ø110 mm Supply and installation uPVC pipe Ø125 mm Supply and installation uPVC pipe Ø140 mm Supply and installation uPVC pipe Ø160 mm Supply and installation uPVC pipe Ø180 mm Supply and installation uPVC pipe Ø200 mm Supply and installation uPVC pipe Ø250 mm Supply and installation uPVC pipe Ø300 mm Supply and installation uPVC pipe Ø350 mm Supply and installation uPVC pipe Ø400 mm Supply and installation uPVC pipe Ø450 mm Supply and installation uPVC pipe Ø500 mm Supply and installation uPVC pipe Ø550 mm Supply and installation uPVC pipe Ø600 mm Supply and installation uPVC pipe Ø650 mm Supply and installation uPVC pipe Ø700 mm Supply and installation uPVC pipe Ø750 mm Supply and installation uPVC pipe Ø800 mm Supply and installation uPVC pipe Ø850 mm Supply and installation uPVC pipe Ø900 mm Supply and installation uPVC pipe Ø950 mm Supply and installation HDPE pipe Ø75 mm Supply and installation HDPE pipe Ø90 mm Supply and installation HDPE pipe Ø100 mm Supply and installation HDPE pipe Ø110 mm Supply and installation HDPE pipe Ø125 mm Supply and installation HDPE pipe Ø140 mm Supply and installation HDPE pipe Ø160 mm Supply and installation HDPE pipe Ø180 mm Supply and installation HDPE pipe Ø200 mm Supply and installation HDPE pipe Ø250 mm Supply and installation HDPE pipe Ø300 mm Supply and installation HDPE pipe Ø350 mm Supply and installation HDPE pipe Ø400 mm Supply and installation HDPE pipe Ø450 mm Supply and installation HDPE pipe Ø500 mm Supply and installation HDPE pipe Ø600 mm Supply and installation HDPE pipe Ø700 mm Supply and installation HDPE pipe Ø800 mm Supply and installation HDPE pipe Ø900 mm Supply and installation HDPE pipe Ø1000 mm Supply and installation HDPE pipe Ø1100 mm Supply and installation HDPE pipe Ø1200 mm Supply and installation HDPE pipe Ø1300 mm Supply and installation HDPE pipe Ø1400 mm
HDPEPIPE0025 HDPEPIPE0026 GRPPIPE0001 GRPPIPE0002 GRPPIPE0003 GRPPIPE0004 GRPPIPE0005 GRPPIPE0006 GRPPIPE0007 GRPPIPE0008 GRPPIPE0009 GRPPIPE0010 GRPPIPE0011 GRPPIPE0012 GRPPIPE0013 GRPPIPE0014 GRPPIPE0015 GRPPIPE0016 GRPPIPE0017 GRPPIPE0018 GRPPIPE0019
15490 15500 15510 15520 15530 15540 15550 15560 15570 15580 15590 15600 15610 15620 15630 15640 15650 15660 15670 15680 15690
WARNINGTAPE0001
15700 160
MASONARY0001
16010
MASONARY0002
16020
MASONARY0003
16030
MASONARY0004
16040 170
PLASTER0001
17010
PLASTER0002
17020
PLASTER0003
17040 180
PAINTING0001
18010
PAINTING0002
18020
Supply and installation HDPE pipe Ø1500 mm Supply and installation HDPE pipe Ø1600 mm Supply and installation GRP pipe Ø50 mm Supply and installation GRP pipe Ø75 mm Supply and installation GRP pipe Ø100 mm Supply and installation GRP pipe Ø150 mm Supply and installation GRP pipe Ø200 mm Supply and installation GRP pipe Ø250 mm Supply and installation GRP pipe Ø300 mm Supply and installation GRP pipe Ø350 mm Supply and installation GRP pipe Ø400 mm Supply and installation GRP pipe Ø450 mm Supply and installation GRP pipe Ø500 mm Supply and installation GRP pipe Ø550 mm Supply and installation GRP pipe Ø600 mm Supply and installation GRP pipe Ø650 mm Supply and installation GRP pipe Ø700 mm Supply and installation GRP pipe Ø750 mm Supply and installation GRP pipe Ø800 mm Supply and installation GRP pipe Ø850 mm Supply and installation GRP pipe Ø900 mm Supply and installation of warning tape for underground systems. MASONARY WORKS Supply and installation of hollow concrete block including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of lightweight concrete block including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of solid block brick including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of pre-cast concrete lintels including all associated work, as specified under the Technical Specification and applicable standards. PLASTERING WORKS Supply and application of cement plaster for external and internal surfaces including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of gypsum plaster for wall and ceiling including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of arcylic based ready mixed plaster including all associated work, as specified under the Technical Specification and applicable standards. PAINTING & ACID RESISTANT COATING Supply and application of painting for external surfaces including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of painting for internal surfaces walls and ceilings including all associated work, as specified under the Technical Specification and applicable standards.
PAINTING0003
18030
PAINTING0004
18040 190
FLOORTILE0001
19010
FLOORTILE0002
19020
FLOORTILE0003
19030
FLOORTILE0004
19050 200
ROOF0001
20010
ROOF0002
20020
ROOF0003
20030
ROOF0004
20040
ROOF0005
20050 210
DOOR0001
21010
DOOR0002
21020
DOOR0003
21030
DOOR0004
21040
Supply and application of dust proof painting for cement floors including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of acid resistant coating/epoxy screed 5mm minimum for floors including all associated work, as specified under the Technical Specification and applicable standards. FLOORING & TILING Supply and application of rigid finished floors(ceramic) including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of rigid finished floors(terazzo/marble) including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of flexible finished floors(uPVC/Vinyl/Carpet/Heavy Duty Vinyl) including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of rigid finished walls(ceramic/terazzo/marble) including all associated work, as specified under the Technical Specification and applicable standards. ROOFING & INSULATION Supply and application of water-proof membrane for roofs bituminous multi coats including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of rigid thermal insulation for roofs including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of light weight concrete screed average th. 70mm for roofs including all associated work, as specified under the Technical Specification and applicable standards. Supply and application of roof insulation with Thermal insulation rockwool 40 mm + finish coatincluding all associated work, as specified under the Technical Specification and applicable standards. Supply and application of roof insulation with ytong multipor including all associated work, as specified under the Technical Specification and applicable standards. WINDOWS & DOORS & PARTITION WALLS Supply and installation of timber door hollow core including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of timber door solid including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of internal hollow metal door single leaf including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of internal hollow metal door double leaf including all associated work, as specified under the Technical Specification and applicable standards.
DOOR0005
21050
DOOR0006
21060
DOOR0007
21070
DOOR0008
21080
DOOR0009
21090
DOOR0010
21100
PARTITIONWALL0001
21110
WINDOW0001
21120 220
Supply and installation of roll-up shutter motorised door including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of fire resistant 30 minutes including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of fire resistant 60 minutes including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of aluminium doors with panel including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of External Hollow metal door double leaf (Insulated) (Gas-Tight)including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Internal Hollow metal door double leaf (Insulated) (Gas-Tight)including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of gypsum board partition wall with panel including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of steel frame gas tight window including all associated work, as specified under the Technical Specification and applicable standards. CLADDING
22010
Supply and installation of panel aluminium pre-finished (wall single skin panel) including all associated work, as specified under the Technical Specification and applicable standards.
CLAD0002
22020
Supply and installation of pre-formed panel aluminium prefinished (wall sandwich panel)including all associated work, as specified under the Technical Specification and applicable standards.
CLAD0003
22030
Supply and installation of Panel aluminium pre-finished (roof single skin panel) including all associated work, as specified under the Technical Specification and applicable standards.
CLAD0001
CLAD0004
22040
CLAD0005
22050
CLAD0006
22060
CLAD0007
22070
Supply and installation of Pre-formed panel aluminium prefinished (roof sandwich panel) including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Pre-formed panel galvanized steel sheet prefinished ( wall sandwich panel ) including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Panel galvanized steel sheet prefinished ( roof single skin panel ) including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Pre-formed panel galvanized steel sheet prefinished ( roof sandwich panel ) including all associated work, as specified under the Technical Specification and applicable standards.
CLAD0008
22080
CLAD0009
22090
CLAD0010
22100
CLAD0011
22110
Supply and installation of Suspended ceiling mineral fiber Armstrong or similar including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of raised modular floor fire resistant including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Thermally Insulated Cladding panel with Polyester powder coated finish including all associated work, as specified under the Technical Specification and applicable standards. Supply and installation of Thermally Insulated Roof panel with Polyester powder coated finish including all associated work, as specified under the Technical Specification and applicable standards.
) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Drawings ID : WBS, Section, Area, etc. :
Unit
001-GA-001
m² m ea
m² m³ Select Fill or Backfill please specify.
m² m m m m ea
C30/37concrete; Rebar C30/37concrete; Rebar C30/37concrete; Rebar C30/37concrete; Rebar C30/37concrete; Rebar
S420 S420 S420 S420 S420
ea ea ea
m³
001-GA-001
SECTION 1 SECTION 3 Project Specific SUBSTATION TANKER Standard / Class, Specification / 1, SECTION 2 - WEIGHBRIDG Grade, Type, Property Employer's SUBSTATION 2 GATEHOUSE E AND Requirements AND MCC LOGISTIC BUILDINGS BUILDING
m³
m³
001-GA-001
7588.426666667
m³ m³ m³ m³ m³
Select Fill or Backfill please specify.
5295.898666667
m³ m³ m³
Select Fill or Backfill please specify.
m³ m³ m³ m³ m³ m³
C16/20 C30/37
237.498
m³
m³
1672.74
m³
2313.531
m³
m²
m²
1374.16
m²
8672.80
m²
2777.28
m²
ton
S420
ton
S420
167.274
ton
S420
323.20503
ton
S420
ton
S420
ton ton
S275JR
ton
11.025
ton m² m² m²
595.58
ton ton m² m³ m³ m³ m³ m m m m
m² m² m²
5697.52
m²
3435.09
m² m
m²
15 cm THK
m²
20 cm THK
m² m²
5 cm 8 cm
m³
15 cm THK
m³
15 cm THK
m² m² m m m² m² m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m
m m m m m m m m m m m m m m m m m m m m m m
m²
m²
m²
m
m²
m²
m²
m²
Water Based PaintExternal
m²
Water Based PaintInternal
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
(th=7,5 cm : 1 Frame / Double Board )
m²
W=0,9 m H=2,1m (8);W=1m H=2m (4)
m²
38/154;0,5 mm
m²
0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane
m²
0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane
m²
0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane
m²
0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane
m²
0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane
m²
0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane
m²
600 x 600 ; Single Board
m²
600x600x38 mm, PVC Vinyl
m²
0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane
m²
0,4mm base sheet,0,5 mm top sheet,60 mm polyurethane
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
SECTION 9 -INLET SECTION 4 PUMPING SECTION 6 SECTION 7 SECTION 8 TANKER SECTION 5 STATION ADMINISTRATION -LABORATORY - CHEMICAL OFFLOADIN - CAR PARK WET WELL, BUILDING BUILDING BUILDING G BAYS DRYWELL AND COARSE SCREEN
3678.714667 215.2266667
3293.958667 191.8266667
84.468
4.84
248
14
68.8
6
683.56
36.80
344.00
35.00
0.00
0.00
24.8
1.4
10.32
0.9
986.58
14.7
2.863200421 0.249697711 2.1096875
0.183984375
2.752
0.24
844.68
48.4
1429.64
89.8
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
SECTION 10 SECTION 13 SECTION 14 SECTION 11 - FINE -FLASH SECTION 15 SECTION 16 SECTION 12 SCREENS, DISSOLVED MIXER, - SBR FEED -SBR EQUALISATI - API GRIT AIR FLOCCULAT TANK AND SINGLE ON TANK SEPARATOR REMOVAL, FLOATATIO OR AND SBR FEED STAGE AND AND API UNIT GRIT N UNIT PRIMARY PUMP WAS PUMP FEED PUMP CLASSIFIER (DAF) CLARIFIER
001-GA-001
SECTION 17 - SBR EFFLUENT STORAGE TANK AND REACTION TANK FEED PUMP
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
SECTION 19 - REACTION TANK AND NEUTRALISA SECTION 23 SECTION 20 SECTION 22 TION TANK, - CLEAN SECTION 18 - CHLORINE SECTION 21LAMELLA WATER -ADVANCED CONTACT DUAL MEDIA GRANULAR CLARIFIER SUMP, GAC OXIDATION TANK AND FILTER ACTIVATED AND AND DMF PROCESS FILTER (DMF) CARBON LAMELLA BACKWASH FEED PUMP FILTER CLARIFIER PUMPS INERT SLUDGE PUMP
784.7623333
555.5063333
30.1
178.184 25.988
188.64 44.32 213.08
17.8184 3.78012
25.28064
7.6
0.332930281 0.2453125
0.18
568.52 310.96
001-GA-001
001-GA-001
001-GA-001
SECTION 24 SECTION 25 SECTION 26 - BLENDING - PLANT - PLANT TANK AND DRAIN DRAIN DEEP WELL PUMPING PUMPING INJECTION STATION 1 STATION 2 PUMPS
001-GA-001
001-GA-001
001-GA-001
001-GA-001
SECTION 27 EMERGENC SECTION 28 SECTION 29 SECTION 30 Y LAGOON - OIL - INERT - INERT AND FLOW RECOVERY SLUDGE SLUDGE RETURN SYSTEM TREATMENT TREATMENT PUMPING STATION
1122.206
452.282
50.368
590.704 42.62
252.26 152.18 242.48
59.0704 6.12448
51.0741
1.150607053 0.490625
0.49
2663.68 508.9
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
SECTION 33 SECTION 34 SECTION 36 SECTION 31 SECTION 32 - ODOUR - ODOUR SECTION 35 SECTION 37 -ORGANO -BIO -BIO CONTROL CONTROL - FOAM -SODA ASH SULPHIDES SLUDGE SLUDGE UNIT 1 UNIT 2 DOSING DOSING DOSING TREATMENT TREATMENT (LIQUID (SLUDGE SYSTEM SYSTEM SYSTEM STREAM) STREAM)
2511.354
3280.68
1471.766
2083.63
103.402
130.05
880.09
852.60
71.816
275.60
502.38
659.36
168.68
520.00
517.44
1456.00
88.009
85.26
10.43976
40.404
139.86
1638
0.7182
0
1.301890573 5.753035264 0.6378125
2.453125
0.772
5
3494.82
1300.48
1135.2
1990.8
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
SECTION 38 SECTION 39 SECTION 40 SECTION 41 SECTION 42 SECTION 43 SECTION 44 - HCL - LIME - NaOCL -SMBS - Fe2(SO4)3 - POLYMER - UREA DOSING DOSING DOSING DOSING DOSING DOSING DOSING SYSTEM SYSTEM SYSTEM SYSTEM SYSTEM SYSTEM SYSTEM
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
001-GA-001
SECTION 50 SECTION 45 SECTION 48 SECTION 47 SECTION 49 - POWDER SECTION 46 SECTION 51 - CATIONIC - DEACTIVATED PHOSPHORI - GLUCOSE COAGULANT( - CHEMICAL COAGULANT EMULSIFIE CARBON C ACID DOSING FeCl3) DOSING DOSING R DOSING (PAC) DOSING SYSTEM DOSING LINES SYSTEM SYSTEM DOSING SYSTEM SYSTEM SYSTEM
001-GA-001
001-GA-001
001-GA-001
SECTION 54 SECTION 53 SECTION 52 - SCADA - EXTERNAL - PROCESS SYSTEM AND WORKS AND PIPEWORK ASSOCIATED SERVICES WORKS
13212
11123
289
1800 2011.5
5480.00 6480.00 855.00
180.00 263.25
2890.00 7387.50
Page 81
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code 10 DEMOLITIONS DEMOLISH0001 1010 Demolish existing slabs or concrete pavings,buildings,foundations,structures
Item Code
Description / Price Content All work required for the demolition, demolition equipment, auxiliary requirements (scaffolding, etc.), cutting and removal of rebars from reinforced concrete, loading and transporting of debris to an authorized exterior dump site
DEMOLISH0002
1020 Demolition of asphaltic paving road, up to 15 cm thick, by mechanical means.
All work required for the demolition, demolition equipment, auxiliary requirements (scaffolding, etc.), cutting and removal of rebars from reinforced concrete, loading and transporting of debris to an authorized exterior dump site
DEMOLISH0003
1030 Demolition of underground piping and/or channels by mechanical means.
All work required for the demolition, demolition equipment, auxiliary requirements (scaffolding, etc.), cutting and removal of rebars from reinforced concrete, loading and transporting of debris to an authorized exterior dump site
DEMOLISH0004
1040 Demolition of manholes and/or pits (any type) by mechanical means.
All work required for the demolition, demolition equipment, auxiliary requirements (scaffolding, etc.), cutting and removal of rebars from reinforced concrete, loading and transporting of debris to an authorized exterior dump site
SITECLEAR0001
20 SITE PREPARATION 2010 Clearing, stripping and grading of of natural Removal of natural and organic soil, trees, plants, bushes, land for specified average thickness grass, roots. The vegetation, including roots tree stumps, shall be removed completely Includes the transport of machinery to and within the job site, positioning time for machinery, cleaning, ripping, excavation of the surface grade, intermediate storage, removal and transport of all materials from the cleaned area to an authorized external dump area (including trees, stumps, plants,and all types of undesirable material) safety requirements and dumping fees.
Page 82
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code EXCV0001 2020 General excavation by mechanical means. (Cut)
Item Code
FILL0001
SHEETPILE0001
PILE0001
Description / Price Content Excavation required for leaving a working area to a specific level and to flatten, compact and prepare the site on a specific conditions. The excavation is performed in rock and it is required the use of hydraulic hammer. Includes positioning time for machinery, cutting and ripping and excavating.
2010 General filling with select fill material from Backfilling for large open areas to create a work platform in excavation.(Fill/Embankment) required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed on open areas where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary.Transportation of material,stockpiling and spreading is included. The material shall be selected material from excavations complying with specifications.If excaveted material is suitable for backfilling ,no material price is inclueded.If crusher is necessary to grade and screen materials on site in terms of specification compliant, the crusher price shall be included in material price, otherwise it shall not. 30 PILING WORKS 3010 Supply and installation of sheet piling system with plate thickness as per project standards,specifications or approved drawings.
3020 Supply and execution in situ concrete ø30 cm diameter boring piles.
The price includes material supply, layout works and plotting, installation, Removal, truck load and transport out of property limits, tools, auxiliary means, specialized machinery and, in general all required material and labor for the correct completion of all work. Supply, prefabrication, erection and removal of auxiliary steel structure is included. The price includes machinery movement within the work site, fuel, water, maintenance of machinery and cleaning, reexchanges steel casing and/or bentonite sludge or any other thixotropic sludge, piling execution,supply and puring of concrete, supply and installation of rebar.
Page 83
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
Project Client Location
WBS / BoQ Definition Code PILE0002 3030 Supply and execution in situ concrete ø60 cm diameter boring piles.
Item Code
Description / Price Content The price includes machinery movement within the work site, fuel, water, maintenance of machinery and cleaning, reexchanges steel casing and/or bentonite sludge or any other thixotropic sludge, piling execution,supply and puring of concrete, supply and installation of rebar
PILE0003
3040 Supply and execution in situ concrete ø90 cm diameter boring piles.
The price includes machinery movement within the work site, fuel, water, maintenance of machinery and cleaning, reexchanges steel casing and/or bentonite sludge or any other thixotropic sludge, piling execution,supply and puring of concrete, supply and installation of rebar.
PILE0004
3050 Supply and execution in situ concrete ø120 cm diameter boring piles.
The price includes machinery movement within the work site, fuel, water, maintenance of machinery and cleaning, reexchanges steel casing and/or bentonite sludge or any other thixotropic sludge, piling execution,supply and puring of concrete, supply and installation of rebar.
PILE0005
3060 Cut-off concrete piles head
The price includes the cutting off pile heads,load and transport of debris to an authorized exterior dump site, dumping fees, auxiliary means and, in general, all required materials and labor for the correct completion of the required unit.
PILETEST0001
3070 Execution of integrity test for piles.
The price includes supply and installation of test set-up, equipment,manpower and consumable.
PILETEST0002
3080 Execution of load compression test on working piles (1,5 working load)
The price includes supply and installation of test set-up, equipment,manpower and consumable.
PILETEST0003
3090 Execution of Preliminary compression test (2,5 working load)
The price includes supply and installation of test set-up, equipment,manpower and consumable.The material of test specimen piles shall be provided by TEKFEN. Execution in situ concrete test boring piles shall be carried by others.
40 EARTHWORKS
Page 84
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code EXCV0002 4010 Structural deep excavation of soil for the depth 0.00-2.00 m
Item Code
Description / Price Content Structural deep excavations for foundations, catch basins, pits, tie beams, etc., performed below the elevation of the finishing grade with the machine shall be located outside of the area to be excavated.Rock excavation refers to the excavation executed with hydraulic hammer.
EXCV0003
4020 Structural deep excavation of soil for the depth 2.00-4.00 m
Structural deep excavations for foundations, catch basins, pits, tie beams, etc., performed below the elevation of the finishing grade with the machine shall be located outside of the area to be excavated.Rock excavation refers to the excavation executed with hydraulic hammer.
EXCV0004
4030 Hand excavation of soil
Structural deep excavations for foundations, catch basins, pits, tie beams, etc., performed below the elevation of the finishing grade with hand shall be located outside of the area to be excavated.
EXCV0005
4040 Pipe/Trench excavation of soil for the depth Structural deep excavations for trecnhes,cable channels 0.00-2.00 m performed below the elevation of the finishing grade with hand shall be located outside of the area to be excavated.Up to 2.00 m
Page 85 Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code EXCV0006 4050 Pipe/Trench excavation of soil for the depth Structural deep excavations for trecnhes,cable channels 2.00-4.00 m performed below the elevation of the finishing grade with hand shall be located outside of the area to be excavated.Up to 4.00 m
Item Code
FILL0002
4060 Structural filling with select fill material from excavation.
Backfilling for limited areas such as foundations,pits etc to create a work platform in required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed on limited areas where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary.Transportation of material,stockpiling and spreading is included.The material shall be selected material from excavations complying with specifications.If crusher is necessary to grade and screen materials on site in terms of specification compliant, the crusher price shall be included in material price, otherwise it shall not.
FILL0003
4070 General filling with borrowed granular material. (Imported Fill)
Filling for large open areas to create a work platform in required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed on open areas where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary. Supply of material,transportation of material,stockpiling and spreading is included. The material shall be imported from borrowed pits near the site.
Page 86
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code FILL0004 4080 Structural filling with borrowed granular material. (Imported Fill)
Item Code
Description / Price Content Filling for limited areas such as foundations,pits etc to create a work platform in required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed on limited areas where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary. Supply of material,transportation of material,stockpiling and spreading is included. The material shall be imported from borrowed pits close t o the site complying with the specifications.
FILL0005
4090 Trench filling with select fill material from excavation.
Backfilling for trenches to create a work platform in required level, compact and prepare the site on a specific condition. In detail, general backfilling are performed along trenches where backfilling equipment can operate at the same level as the grading with temporary ramps if necessary.Transportation of material,stockpiling and spreading is included.The material shall be selected material from excavations complying with specifications.If crusher is necessary to grade and screen materials on site in terms of specification compliant, the crusher price shall be included in material price, otherwise it shall not.
FILL0006
4100 Pipe/Trench bedding/padding with borrowed granular fill material (Imported Fill)
Filling with borrowed granular fill material for bedding/ padding use around and under buried pipes.Supply of material, transportation of material,stockpiling and spreading is included.The material shall be imported from borrowed pits close to the site complying with the specifications.
FILL0007
4110 Pipe/Trench bedding/padding with clean sand
Filling with clean sand material for bedding/ padding use around and under buried pipes.Supply of material, transportation of material,stockpiling and spreading is included.The material shall be imported from borrowed pits close to the site complying with the specifications.
Page 87
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code FILL0008 4120 Filling inside of tank foundations with clean Filling with inside of tank foundations with clean sand.Supply sand. of material, transportation of material,stockpiling and spreading is included.The material shall be imported from borrowed pits close to the site complying with the specifications.
Item Code
FILL0009
4120 Tank foundations filling with oil sand mixture.
Supply of material, transportation of material,stockpiling and spreading is included.The material shall be imported from borrowed pits close to the site complying with the specifications.
CONCRETE0001
50 CONCRETE WORKS 5010 Supply and pouring of lean concrete
CONCRETE0002
5020 Supply and pouring of mass concrete
CONCRETE0003
5030 Supply and pouring of concrete for various Supply and pouring of concrete for various and slab and slab foundations (sleepers, stairs, foundations foundations. Concrete grade and content shall thickened slab foundation,tank comply with the specifications. foundations)
Supply and pouring of lean concrete 5<=th<= 10cm .Concrete grade and content shall comply with the specifications.
Supply and pouring of mass concrete for the foundation that has volume greater than 500 m3 and poured in a lumped. Concrete grade and content shall comply with the specifications.
Page 88
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code CONCRETE0004 5040 Supply and pouring of concrete for footing Supply and pouring of concrete for any kind foundations. type foundations (columns,equipment and Concrete grade and content shall comply with the valve foundations, pipe supports,lighting specifications. post,single footing)
Item Code
CONCRETE0005
5050 Supply and pouring of conrete for slabs,beams,walls.
Supply and pouring of concrete for elevated slabs,beams,walls. Concrete grade and content shall comply with the specifications.
CONCRETE0006
5060 Supply and pouring of conrete for manholes and trenches.
Supply and pouring of concrete for manholes,trenches,valve pits. Concrete grade and content shall comply with the specifications.
FORMWORK0001
60 FORMWORKS 6010 Supply and erection of straight formwork for various and slab foundations (sleepers, stairs, thickened slab foundation,tank foundations)
Piping and equipment supports, sleepers, paving thickened slab footings, pedestal for stairs and non-elevated pedestal for turbines shall be considered in this class. Including all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, material costs.
Page 89
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code FORMWORK0002 6020 Supply and erection of straight formwork Columns, pedestals less than 1 meter high (measured from for footing type foundations the upper side of the foot) shall be considered in this (columns,equipment and valve foundations, class.Including all aspects of prefabrication of the required pipe supports,lighting post,single footing) material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs. Item Code
FORMWORK0003
6030 Supply and erection of straight formwork for slab and beams.
Elevated slabs and beams for building shall be considered in this class. Including all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs.
FORMWORK0004
6040 Supply and erection of straight formwork for walls
Basement, retaining and shear walls shall be considered in this class. Including all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs.
FORMWORK0005
6050 Supply and erection of straight formwork for manholes and trenches
Basement, retainin and shear walls shall be considered in this class. Including all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs.
REBAR0001
70 REBAR WORKS 7010 Supply and installation of steel Includes material supply, intermediate storage and transport, reinforcement for various and slab labor costs (cutting and bending), installation, manpower, foundations (sleepers, stairs, thickened slab tools, machinery and, in general, all required materials and foundation,tank foundations) labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.
Page 90 Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code REBAR0002 7020 Supply and installation of steel Includes material supply, intermediate storage and transport, reinforcement for footing type foundations labor costs (cutting and bending), installation, manpower, (columns,equipment and valve foundations, tools, machinery and, in general, all required materials and pipe supports,lighting post,single footing) labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.
Item Code
REBAR0003
7030 Supply and installation of steel reinforcement for slabs,beams and walls
Includes material supply, intermediate storage and transport, labor costs (cutting and bending), installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.
REBAR0004
7040 Supply and installation of steel reinforcement for manholes and trenches
Includes material supply, intermediate storage and transport, labor costs (cutting and bending), installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.
REBAR0005
7050 Supply and installation of steel fabric mesh Includes material supply, intermediate storage and transport, reinforcement for pavements and slabs. labor costs (cutting and bending), installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. Steel reinforcement grade and content shall comply with the specifications.
STEEL0001
80 STRUCTURAL STEEL WORKS 8010 Supply and erection of fabricated,painted heavy structural steel
Includes material supply, intermediate storage and transport, labor costs, installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The steel frames,columns,beams,bracings greater than 250 kg shall be considered in this class.(i.e.workshops,steel structure buildings,) Steel grade and content shall comply with the specifications.
Page 91
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code STEEL0002 8020 Supply and erection of fabricated,painted medium structural steel
Item Code
Description / Price Content Includes material supply, intermediate storage and transport, labor costs, installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The steel frames,columns,beams,bracings between 50 kg and 250 kg shall be considered in this class.(i.e. platform ,skids) Steel grade and content shall comply with the specifications.
STEEL0003
8030 Supply and erection of fabricated and painted light structural steel
Includes material supply, intermediate storage and transport, labor costs, installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The steel frames,columns,beams,bracings below 50 kg shall be considered in this class.(i.e.shelters ,stairs) Steel grade and content shall comply with the specifications.
STEEL0004
8040 Supply and erection of fabricated,painted piperack structural steel
Includes material supply, intermediate storage and transport, labor costs, installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The steel frames,columns,beams,bracings used in the piperack construction shall be considered in this class. Steel grade and content shall comply with the specifications.
GRAT0001
8050 Supply and erection of fabricated,galvanized steel gratings
Including material supply, surface treatment (blasting + priming if required / hot dip galvanizing), finishing surface paint, special pieces, accessories, general repair (priming/galvanizing, paint, damages, welding, etc.) and, in general, all required materials and labor for the correct completion of all work. Loads on the platform 250-300 kg/m2, shall be considered in this class. Steel grade and content shall comply with the specifications.
Page 92 Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code GRAT0002 8060 Supply and erection of fabricated,galvanized steel gratings
Item Code
Description / Price Content Including material supply, surface treatment (blasting + priming if required / hot dip galvanizing), finishing surface paint, special pieces, accessories, general repair (priming/galvanizing, paint, damages, welding, etc.) and, in general, all required materials and labor for the correct completion of all work. Loads on the platform 750 kg/m2 shall be considered in this class. Steel grade and content shall comply with the specifications.
GRAT0003
8070 Supply and erection of galvanized chequered plate
Including material supply, surface treatment (blasting + priming if required / hot dip galvanizing), finishing surface paint, special pieces, accessories, general repair (priming/galvanizing, paint, damages, welding, etc.) and, in general, all required materials and labor for the correct completion of all work. Steel grade and content shall comply with the specifications.
ANCHOR0001
8080 Supply and installation of fabricated,galvanized anchor bolts
The unit price includes fabrication, supply, installation, all related accessories (i.e. sleeves, nuts, washers, etc.), accurate surveying, supply and installation of all templates (except for turbines), drillings (screw and machine type included), temporary supports, protections, labeling and any other requirement, regardless of nature, necessary for the correct complete installation of the required unit.Steel grade and content shall comply with the specifications.
EMBEDDED0001
FIREPROOFING0001
8090 Supply and installation of fabricated,galvanized embedded plates
The unit price includes fabrication, supply, installation and any other requirement, regardless of nature, necessary for the correct complete installation of the required unit.Steel grade and content shall comply with the specifications. 8100 Supply and installation of steel intumescent The unit price includes fabrication, supply, installation of 5 cm fireproofing and proper primer. < th <10 cm fire proofing concrete coating, supply and installation of mesh reinforcement and hooks,mastic sealing between the concrete layer edge and the metal structure, according to the specifications. 90 PRECAST WORKS
Page 93 Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code PRECAST0001 9010 Supply and installation of precast concrete Includes material supply in workshop, works layout and manholes plotting, formwork, concrete works, vibrating, curing, removal of formwork, storage, protection, custody and, in general, all required materials and labor for the correct completion of all work. It is also included the load, transport and unload in the final position of the element.Embedded items are excluded. The quantity of rebar shall be included in rebar items.
Item Code
GROUT0001
GROUT0002
GROUT0003
JOINT0001
JOINT0002
100 GROUTS 10010 Supply and application of cementious non- The unit price includes supply, application, preparation, shrink mortar. supports, pouring mediums, and any other requirement, regardless of nature, necessary for the correct installation of the required unit. 10020 Supply and application of cement base The unit price includes supply, application, preparation, grouting mortar. supports, pouring mediums, and any other requirement, regardless of nature, necessary for the correct installation of the required unit. 10030 Supply and application of epoxy grouting The unit price includes supply, application, preparation, mortar. supports, pouring mediums, and any other requirement, regardless of nature, necessary for the correct installation of the required unit. 110 JOINTS 11010 Supply and application of expansion joint The unit price includes layout works and plotting, material sealing. supply, installation of material following manufacturer recommendations, manpower, surface preparation, , tools, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. 11020 Supply and application of construction/cutting joint sealing.
The unit price includes layout works and plotting, material supply, installation of material following manufacturer recommendations, manpower, surface preparation, , tools, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work.
Page 94 Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code 120 FENCES & GATES FENCE0001 12010 Supply and installation of fence SSD1,barbered wire chainlink fence
Item Code
FENCE0002
GEOTEXT0001
HDPE0001
POLYETH0001
12020 Supply and installation of fenceTYPEIV,barbered wire chainlink fence
130 WATERPROOFING & COATING 13010 Supply and erection of geotextile membrane under buried elements
Description / Price Content The price includes material supply, clamps, accessories, earthing, tools, auxiliary means, machinery and, in general, all required material and labor for the correct completion of all work. Excavation, backfilling and filling, concrete pouring shall be excluded. These items shall be considred in relevant line items.SSD-1 is a type of fence used in ARAMCO projects. The price includes material supply, clamps, accessories, earthing, tools, auxiliary means, machinery and, in general, all required material and labor for the correct completion of all work. Excavation, backfilling and filling, concrete pouring shall be excluded. These items shall be considred in relevant line items.TYPE-IV is a type of fence used in ARAMCO projects.
The unit price includes material supply, manpower, grip, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
13020 Supply and erection of HDPE membrane liner under tank foundations
The unit price includes material supply of sitable material according with project standars, specifications and drawings, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
13030 Supply and erection of polyethylene sheet membrane under concrete pavements.
The unit price includes material supply of suitable material according with project standars, specifications and drawings, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
Page 95
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code COATING0001 13040 Supply and application of bituminous waterproofing emulsion for concrete surfaces
Item Code
COATING0002
PVCWATERSTOP0001
Description / Price Content Complete system of concrete surface treatments required for concrete protection, as required by project specifications. For concrete below ground or above ground. The unit price includes material supply of sitable material according with project standars, specifications and drawings, application or installation according with manufacturer recommendations, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
13050 Supply and application of bituminous waterproofing emulsion for concrete surfaces
Complete system of concrete surface treatments required for concrete protection, as required by project specifications. For concrete below ground or above ground. The unit price includes material supply of sitable material according with project standars, specifications and drawings, application or installation according with manufacturer recommendations, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
13060 Supply and application of pvc waterstop.
The unit price includes material supply of suitable material according with project standars, specifications and drawings, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
140 PAVINGS & ROADS
Page 96
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code PAVING0001 14010 Supply and execution of concrete in The unit price includes material supply, mesh supply & paving,reinforced with single/double mesh. installation, concrete pouring by any mean, spreading, (Light Duty) vibrating, leveling, curing, slope forming, floating, troweling according with project standards, specifications or approved drawings, tools, auxiliary means, machinery, and, in general, all required materials and labor for the correct completion of all work. formworks shall be excluded. These items shall be considered in relevant line items.
Item Code
PAVING0002
14020 Supply and execution of concrete in The unit price includes material supply, mesh supply & paving,reinforced with single/double mesh. installation, concrete pouring by any mean, spreading, (Heavy Duty) vibrating, leveling, curing, slope forming, floating, troweling according with project standards, specifications or approved drawings, tools, auxiliary means, machinery, and, in general, all required materials and labor for the correct completion of all work. formworks shall be excluded. These items shall be considered in relevant line items.
ROAD0001
14030 Supply and execution of asphalt wearing course.
The unit price includes the material supply, spreading by any means, compaction, forming and sealing joints, tools, auxiliary means, machinery,according with project standards, specifications or approved drawings and, in general, all required materials and labor for the correct completion of all work. Thickness shall be indicated in BoQ items.
ROAD0002
14040 Supply and execution of asphalt binder course.
The unit price includes the material supply, spreading by any means, compaction, forming and sealing joints, tools, auxiliary means, machinery,according with project standards, specifications or approved drawings and, in general, all required materials and labor for the correct completion of all work. Thickness shall be indicated in BoQ items.
Page 97
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code ROAD0003 14050 Supply and execution of subbase material The unit price includes material supply with characteristics for roads with material according with according project requirements and specifications for each project standards and specifications. kind of material, transportation, intermediate storage, preparation of area to be backfilled (scarifying and recompacting), spreading, irrigation, compaction, grading, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work.
Item Code
ROAD0004
14060 Supply and execution of base material for The unit price includes material supply with characteristics roads with material accoridng with project according project requirements and specifications for each standards and specifications. kind of material, transportation, intermediate storage, preparation of area to be backfilled (scarifying and recompacting), spreading, irrigation, compaction, grading, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work.
ROAD0005
14070 Supply and application of tack coat in asphalt roads.
The unit price includes material supply, installation, surface treatment, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work.
ROAD0006
14080 Supply and application of prime coat in asphalt roads.
The unit price includes material supply, installation, surface treatment, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work.
Page 98
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
Project Client Location
WBS / BoQ Definition Description / Price Content Code ROAD0007 14090 Supply and complete installation of metallic The unit price includes material supply (materials shall be safety guardrail in sides of roads. according with project standards, specifications and drawings and anchoring according with manufacturer recommendations, painting as per specification and installation of any required reflecting fittings. ), Excavation, refining, backfilling, loading and transporting to an authorized dumping area, dumping fees, compaction, complete foundation shall be excluded. These items shall be considered in relevant line items.
Item Code
ROAD0008
14100 Supply and complete installation of concrete barrier type "New Jersey" or similar in sides of roads.
The unit price includes material supply (materials shall be according with project standards, specifications and drawings and anchoring according with manufacturer recommendations, painting as per specification and installation of any required reflecting fittings.)
ROAD0009
14110 Supply and erection of signposting in ways.
The unit price includes material supply (materials shall be according with project standards, specifications and drawings and anchoring according with manufacturer recommendations, painting as per specification and installation of any required reflecting fittings. ), Excavation, refining, backfilling, loading and transporting to an authorized dumping area, dumping fees, compaction, complete foundation shall be excluded. These items shall be considered in relevant line items.
KERB0001
14120 Supply and installation of kerbs
The unit price includes material supply materials and installation in accordance with project standards, specifications and drawings.
150 U/G WORKS
Page 99
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code PVCPIPE0001 15010 Supply and installation uPVC pipe Ø50 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Item Code
PVCPIPE0002
15020 Supply and installation uPVC pipe Ø75 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0003
15030 Supply and installation uPVC pipe Ø90 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0004
15040 Supply and installation uPVC pipe Ø110 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 100
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code PVCPIPE0005 15050 Supply and installation uPVC pipe Ø125 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0006
15060 Supply and installation uPVC pipe Ø140 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0007
15070 Supply and installation uPVC pipe Ø160 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0008
15080 Supply and installation uPVC pipe Ø180 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 101
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code PVCPIPE0009 15090 Supply and installation uPVC pipe Ø200 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0010
15100 Supply and installation uPVC pipe Ø250 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0011
15110 Supply and installation uPVC pipe Ø300 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0012
15120 Supply and installation uPVC pipe Ø350 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 102
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code PVCPIPE0013 15130 Supply and installation uPVC pipe Ø400 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0014
15140 Supply and installation uPVC pipe Ø450 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0015
15150 Supply and installation uPVC pipe Ø500 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0016
15160 Supply and installation uPVC pipe Ø550 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 103
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code PVCPIPE0017 15170 Supply and installation uPVC pipe Ø600 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0018
15180 Supply and installation uPVC pipe Ø650 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0019
15190 Supply and installation uPVC pipe Ø700 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0020
15200 Supply and installation uPVC pipe Ø750 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 104
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code PVCPIPE0021 15210 Supply and installation uPVC pipe Ø800 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0022
15220 Supply and installation uPVC pipe Ø850 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0023
15230 Supply and installation uPVC pipe Ø900 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
PVCPIPE0024
15240 Supply and installation uPVC pipe Ø950 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 105
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code HDPEPIPE0001 15250 Supply and installation HDPE pipe Ø75 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Item Code
HDPEPIPE0002
15260 Supply and installation HDPE pipe Ø90 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0003
15270 Supply and installation HDPE pipe Ø100 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0004
15280 Supply and installation HDPE pipe Ø110 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 106
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code HDPEPIPE0005 15290 Supply and installation HDPE pipe Ø125 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0006
15300 Supply and installation HDPE pipe Ø140 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0007
15310 Supply and installation HDPE pipe Ø160 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0008
15320 Supply and installation HDPE pipe Ø180 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 107
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code HDPEPIPE0009 15330 Supply and installation HDPE pipe Ø200 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0010
15340 Supply and installation HDPE pipe Ø250 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0011
15350 Supply and installation HDPE pipe Ø300 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0012
15360 Supply and installation HDPE pipe Ø350 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 108
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code HDPEPIPE0013 15370 Supply and installation HDPE pipe Ø400 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0014
15380 Supply and installation HDPE pipe Ø450 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0015
15390 Supply and installation HDPE pipe Ø500 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0016
15400 Supply and installation HDPE pipe Ø600 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 109
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code HDPEPIPE0017 15410 Supply and installation HDPE pipe Ø700 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0018
15420 Supply and installation HDPE pipe Ø800 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0019
15430 Supply and installation HDPE pipe Ø900 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0020
15440 Supply and installation HDPE pipe Ø1000 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 110
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code HDPEPIPE0021 15450 Supply and installation HDPE pipe Ø1100 mm
Item Code
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0022
15460 Supply and installation HDPE pipe Ø1200 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0023
15470 Supply and installation HDPE pipe Ø1300 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
HDPEPIPE0024
15480 Supply and installation HDPE pipe Ø1400 mm
This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 111
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code HDPEPIPE0025 15490 Supply and installation HDPE pipe Ø1500 mm
Item Code
HDPEPIPE0026
15500 Supply and installation HDPE pipe Ø1600 mm
Description / Price Content This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items. This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0001
15510 Supply and installation GRP pipe Ø50 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0002
15520 Supply and installation GRP pipe Ø75 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 112
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code GRPPIPE0003 15530 Supply and installation GRP pipe Ø100 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Item Code
GRPPIPE0004
15540 Supply and installation GRP pipe Ø150 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0005
15550 Supply and installation GRP pipe Ø200 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0006
15560 Supply and installation GRP pipe Ø250 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 113
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code GRPPIPE0007 15570 Supply and installation GRP pipe Ø300 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Item Code
GRPPIPE0008
15580 Supply and installation GRP pipe Ø350 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0009
15590 Supply and installation GRP pipe Ø400 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0010
15600 Supply and installation GRP pipe Ø450 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 114
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code GRPPIPE0011 15610 Supply and installation GRP pipe Ø500 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Item Code
GRPPIPE0012
15620 Supply and installation GRP pipe Ø550 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0013
15630 Supply and installation GRP pipe Ø600 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0014
15640 Supply and installation GRP pipe Ø650 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 115
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code GRPPIPE0015 15650 Supply and installation GRP pipe Ø700 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Item Code
GRPPIPE0016
15660 Supply and installation GRP pipe Ø750 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0017
15670 Supply and installation GRP pipe Ø800 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
GRPPIPE0018
15680 Supply and installation GRP pipe Ø850 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Page 116
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code GRPPIPE0019 15690 Supply and installation GRP pipe Ø900 mm This unit price includes the material supply,spacers, special pieces, accessories and piping fittings, joints (elastic joints could be glued or not), supply and installation of cable pulling guides,lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. Excavation,backfilling and filling shall be excluded. These items shall be considered in relevant line items.
Item Code
WARNINGTAPE0001
MASONARY0001
MASONARY0002
MASONARY0003
MASONARY0004
15700 Supply and installation of warning tape for The unit price includes the material supply, installation, underground systems. overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
160 MASONARY WORKS 16010 Supply and installation of hollow concrete The unit price includes the material supply, installation, block including all associated work, as overlaps, tools, auxiliary means, and, in general, all required specified under the Technical Specification materials and labor for the correct completion of all work. and applicable standards. 16020 Supply and installation of lightweight The unit price includes the material supply, installation, concrete block including all associated overlaps, tools, auxiliary means, and, in general, all required work, as specified under the Technical materials and labor for the correct completion of all work. Specification and applicable standards. 16030 Supply and installation of solid block brick The unit price includes the material supply, installation, including all associated work, as specified overlaps, tools, auxiliary means, and, in general, all required under the Technical Specification and materials and labor for the correct completion of all work. applicable standards. 16040 Supply and installation of pre-cast concrete The unit price includes the material supply, installation, lintels including all associated work, as overlaps, tools, auxiliary means, and, in general, all required specified under the Technical Specification materials and labor for the correct completion of all work. and applicable standards. 170 PLASTERING WORKS
Page 117
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code PLASTER0001 17010 Supply and application of cement plaster The unit price includes the material supply, installation, for external and internal surfaces including overlaps, tools, auxiliary means, and, in general, all required all associated work, as specified under the materials and labor for the correct completion of all work. Technical Specification and applicable standards.
Item Code
PLASTER0002
17020 Supply and application of gypsum plaster The unit price includes the material supply, installation, for wall and ceiling including all associated overlaps, tools, auxiliary means, and, in general, all required work, as specified under the Technical materials and labor for the correct completion of all work. Specification and applicable standards.
PLASTER0003
17030 Supply and application of arcylic based The unit price includes the material supply, installation, ready mixed plaster including all associated overlaps, tools, auxiliary means, and, in general, all required work, as specified under the Technical materials and labor for the correct completion of all work. Specification and applicable standards.
PAINTING0001
PAINTING0002
PAINTING0003
180 PAINTING & ACID RESISTANT COATING 18010 Supply and application of painting for external surfaces including all associated work, as specified under the Technical Specification and applicable standards. 18020 Supply and application of painting for internal surfaces walls and ceilings including all associated work, as specified under the Technical Specification and applicable standards. 18030 Supply and application of dust proof painting for cement floors including all associated work, as specified under the Technical Specification and applicable standards.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
Page 118
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code PAINTING0004 18040 Supply and application of acid resistant The unit price includes the material supply, installation, coating/epoxy screed 5mm minimum for overlaps, tools, auxiliary means, and, in general, all required floors including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.
Item Code
FLOORTILE0001
FLOORTILE0002
190 FLOORING & TILING 19010 Supply and application of rigid finished floors(ceramic) including all associated work, as specified under the Technical Specification and applicable standards. 19010 Supply and application of rigid finished floors(terazzo/marble) including all associated work, as specified under the Technical Specification and applicable standards.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
FLOORTILE0003
19020 Supply and application of flexible finished The unit price includes the material supply, installation, floors(uPVC/Vinyl/Carpet/Heavy Duty Vinyl) overlaps, tools, auxiliary means, and, in general, all required including all associated work, as specified materials and labor for the correct completion of all work. under the Technical Specification and applicable standards.
FLOORTILE0004
19040 Supply and application of rigid finished The unit price includes the material supply, installation, walls(ceramic/terazzo/marble) including all overlaps, tools, auxiliary means, and, in general, all required associated work, as specified under the materials and labor for the correct completion of all work. Technical Specification and applicable standards.
ROOF0001
200 ROOFING & INSULATION 20010 Supply and application of water-proof The unit price includes the material supply, installation, membrane for roofs bituminous multi coats overlaps, tools, auxiliary means, and, in general, all required including all associated work, as specified materials and labor for the correct completion of all work. under the Technical Specification and applicable standards.
Page 119
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code ROOF0002 20020 Supply and application of rigid thermal The unit price includes the material supply, installation, insulation for roofs including all associated overlaps, tools, auxiliary means, and, in general, all required work, as specified under the Technical materials and labor for the correct completion of all work. Specification and applicable standards.
Item Code
ROOF0003
20030 Supply and application of light weight The unit price includes the material supply, installation, concrete screed average th. 70mm for overlaps, tools, auxiliary means, and, in general, all required roofs including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.
ROOF0004
20050 Supply and application of roof insulation with bituminous primer including all associated work, as specified under the Technical Specification and applicable standards.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
ROOF0005
20060 Supply and application of roof insulation with ytong multipor mm including all associated work, as specified under the Technical Specification and applicable standards.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
DOOR0001
DOOR0002
210 WINDOWS & DOORS & PARTITION WALLS 21010 Supply and installation of timber door hollow core including all associated work, as specified under the Technical Specification and applicable standards. 21020 Supply and installation of timber door solid including all associated work, as specified under the Technical Specification and applicable standards.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
Page 120
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code DOOR0003 21030 Supply and installation of internal hollow metal door single leaf including all associated work, as specified under the Technical Specification and applicable standards.
Item Code
Description / Price Content The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
DOOR0004
21040 Supply and installation of internal hollow metal door double leaf including all associated work, as specified under the Technical Specification and applicable standards.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
DOOR0005
21050 Supply and installation of roll-up shutter motorised door including all associated work, as specified under the Technical Specification and applicable standards. 21060 Supply and installation of fire resistant 30 minutes including all associated work, as specified under the Technical Specification and applicable standards. 21070 Supply and installation of fire resistant 60 minutes including all associated work, as specified under the Technical Specification and applicable standards. 21080 Supply and installation of aluminium doors with panel including all associated work, as specified under the Technical Specification and applicable standards. 21090 Supply and installation of gypsum board partition wall with panel including all associated work, as specified under the Technical Specification and applicable standards.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
DOOR0006
DOOR0007
DOOR0008
PARTITIONWALL0001
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
Page 121
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Code WINDOW0001 21100 Supply and installation of steel frame gas tight window including all associated work, as specified under the Technical Specification and applicable standards. 220 CLADDING CLAD0001 22010 Supply and installation of panel aluminium pre-finished (wall single skin panel) including all associated work, as specified under the Technical Specification and applicable standards.
Item Code
Description / Price Content The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
CLAD0002
22020 Supply and installation of pre-formed panel The unit price includes the material supply, installation, aluminium pre-finished (wall sandwich overlaps, tools, auxiliary means, and, in general, all required panel)including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.
CLAD0003
22030 Supply and installation of Panel aluminium The unit price includes the material supply, installation, pre-finished (roof single skin panel) overlaps, tools, auxiliary means, and, in general, all required including all associated work, as specified materials and labor for the correct completion of all work. under the Technical Specification and applicable standards.
CLAD0004
22040 Supply and installation of Pre-formed panel The unit price includes the material supply, installation, aluminium pre-finished (roof sandwich overlaps, tools, auxiliary means, and, in general, all required panel) including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.
CLAD0005
22050 Supply and installation of Pre-formed panel The unit price includes the material supply, installation, galvanized steel sheet prefinished ( wall overlaps, tools, auxiliary means, and, in general, all required sandwich panel ) including all associated materials and labor for the correct completion of all work. work, as specified under the Technical Specification and applicable standards.
Page 122
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code CLAD0006 22060 Supply and installation of Panel galvanized The unit price includes the material supply, installation, steel sheet prefinished ( roof single skin overlaps, tools, auxiliary means, and, in general, all required panel ) including all associated work, as materials and labor for the correct completion of all work. specified under the Technical Specification and applicable standards.
Item Code
CLAD0007
22070 Supply and installation of Pre-formed panel The unit price includes the material supply, installation, galvanized steel sheet prefinished ( roof overlaps, tools, auxiliary means, and, in general, all required sandwich panel ) including all associated materials and labor for the correct completion of all work. work, as specified under the Technical Specification and applicable standards.
CLAD0008
22080 Supply and installation of Suspended ceiling The unit price includes the material supply, installation, mineral fiber Armstrong or similar including overlaps, tools, auxiliary means, and, in general, all required all associated work, as specified under the materials and labor for the correct completion of all work. Technical Specification and applicable standards.
CLAD0009
22090 Supply and installation of raised modular The unit price includes the material supply, installation, floor 600x600mm fire resistant including all overlaps, tools, auxiliary means, and, in general, all required associated work, as specified under the materials and labor for the correct completion of all work. Technical Specification and applicable standards.
CLAD0010
22100 Supply and installation of Thermally Insulated Cladding panel with Polyester powder coated finish including all associated work, as specified under the Technical Specification and applicable standards.
The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.
Page 123
Project Client Location
DESIGN, BUILD, OPERATE AND MAINTAIN (DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TR
WBS / BoQ Definition Description / Price Content Code CLAD0011 22110 Supply and installation of Thermally The unit price includes the material supply, installation, Insulated Roof panel with Polyester powder overlaps, tools, auxiliary means, and, in general, all required coated finish including all associated work, materials and labor for the correct completion of all work. as specified under the Technical Specification and applicable standards.
Item Code
Page 124
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure Volume of concrete in each concrete element, as measured on approved drawings.
m³
Surface of asphalt roads , as measured on approved drawings.
m²
Length of pipes/channels, as measured on approved drawings.
m
Number of pits,manholes, as measured on approved drawings.
ea
Surface will be measured as defined on reference drawings.
m²
NOTES
Page 125
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure Volume for excavation shall be measured in its natural state as is stated on approved m³ reference plans and topographic profiles. The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. m³
Surface will be measured as defined on reference drawings. m²
The measurement of “in-situ” piles shall be as specified on approved
m
NOTES
Page 126
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The measurement of “in-situ” piles shall be as specified on approved m
The measurement of “in-situ” piles shall be as specified on approved
m
The measurement of “in-situ” piles shall be as specified on approved
m
The measurement of “in-situ” piles shall be as specified on approved
ea
The measurement of “in-situ” piles shall be as specified on approved The measurement of “in-situ” piles shall be as specified on approved The measurement of “in-situ” piles shall be as specified on approved
ea
ea
ea
NOTES
Page 127
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure Excavated volume will be measured in its natural state considering the elevations as m³ shown on approved reference plans and topographical profiles. Excavated volume will be measured in its natural state considering the elevations as shown on approved reference plans and topographical profiles.
m³
Excavated volume will be measured in its natural state considering the elevations as shown on approved reference plans and topographical profiles.
m³
Excavated volume will be measured in its natural state considering the elevations as shown on approved reference plans and topographical profiles.
m³
NOTES
Up to 150 : s=10 cm >=151 to 300 s=15 cm >=301 to 500 s=20 cm >=501 to 900 s=30 cm >=901 to 1600 s=45 cm >=1601 to 2400 s=60 cm >=2401 s=90 cm s=Additional width allowance for each side of conduit
Page 128
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure Excavated volume will be measured in its natural state considering the elevations as shown on approved reference plans and topographical profiles. m³
The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. m³
The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles.
m³
NOTES Up to 150 : s=10 cm >=151 to 300 s=15 cm >=301 to 500 s=20 cm >=501 to 900 s=30 cm >=901 to 1600 s=45 cm >=1601 to 2400 s=60 cm >=2401 s=90 cm s=Additional width allowance for each side of conduit
Page 129
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. m³
The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. m³
The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles. The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles.
m³
m³
NOTES
Page 130
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The filling volume shall be measured as stated on approved reference drawings m³ and, when required, using topographic profiles. The filling volume shall be measured as stated on approved reference drawings and, when required, using topographic profiles.
m³
The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.
m³
The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.
m³
The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.
m³
NOTES
Page 131
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings and it shall be measured m³ assigning the same surface as the foundation that is supported. The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.
m³
The unit shall be measured as stated on approved drawings and it shall be measured assigning the same surface as the foundation that is supported.
m³
The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete.
m²
NOTES
Page 132
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete. m²
The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete.
The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete.
The unit shall be measured as stated on approved drawings, measuring the formwork in contact with concrete.
The unit shall be measured as stated on approved drawings. Overlaps not indicated on drawings shall not be measured
m²
m²
m²
ton
NOTES
Page 133
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. Overlaps not indicated on ton drawings shall not be measured The unit shall be measured as stated on approved drawings. Overlaps not indicated on drawings shall not be measured The unit shall be measured as stated on approved drawings. Overlaps not indicated on drawings shall not be measured The unit shall be measured as stated on approved drawings. Overlaps not indicated on drawings shall not be measured
ton
ton
ton
The unit shall be measured as stated on approved drawings. ton
NOTES
Page 134
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. ton
The unit shall be measured as stated on approved drawings. ton
The unit shall be measured as stated on approved drawings. ton
The unit shall be measured as stated on approved drawings. m²
NOTES
Page 135
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. ton
The unit shall be measured as stated on approved drawings.
ton
The unit shall be measured as stated on approved drawings. m²
NOTES
Page 136
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings.
m³
The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
m³
m³
m³
The unit shall be measured as stated on approved drawings. m
The unit shall be measured as stated on approved drawings. m
NOTES
Page 137
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m
The unit shall be measured as stated on approved drawings. m
The unit shall be measured as stated on approved drawings.
m²
The unit shall be the area of the surface to be waterproofed as specified on approved drawings.
m²
The unit shall be measured as specified on approved drawings, considering only the concrete surface in horizontal projection to be protected.
m²
NOTES
Page 138
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be the area of the protected concrete as specified on approved drawings. m²
The unit shall be the area of the protected concrete as specified on approved drawings. m²
The unit shall be the area of the protected concrete as specified on approved drawings.
m
NOTES
Page 139
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings.
m²
The unit shall be measured as stated on approved drawings.
m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
NOTES
Page 140
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The filling volume shall be measured as specified on approved drawings. m³
The filling volume shall be measured as specified on approved drawings. m³
The unit shall be measured as specified on approved drawings.
m²
The unit shall be measured as specified on approved drawings.
m²
NOTES
Page 141
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured along the axis as specified on approved drawings. m
The unit shall be measured along the axis as specified on approved drawings.
m
The unit shall be measured along the axis as specified on approved drawings. m
The unit shall be measured along the axis as specified on approved drawings.
m
NOTES
Page 142
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 143
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 144
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 145
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 146
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 147
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 148
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 149
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 150
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 151
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 152
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 153
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 154
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 155
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 156
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 157
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 158
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe.
m
m
m
NOTES
Page 159
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as the length of piping correctly installed, theoretical measurement in approved m drawings considering the axes of the pipe.
The unit shall be measured with the trench length indicated on drawings measured along the trench axis. The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
m
m²
m²
m²
m²
NOTES
Page 160
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings.
m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
NOTES
Page 161
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings.
m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
NOTES
Page 162
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
m²
m²
NOTES
Page 163
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
The unit shall be measured as stated on approved drawings.
m²
m²
m²
m²
The unit shall be measured as stated on approved drawings. m²
NOTES
Page 164
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
NOTES
Page 165
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
The unit shall be measured as stated on approved drawings. m²
NOTES
Page 166
(DBOM) CONTRACT FOR INTEGRATED INDUSTRIAL WASTEWATER TREATMENT WORKS (IIWWTW) PHASE I (CP798) ASHGHAL PWA Doha,Qatar Unit of Measurement Sketch measure The unit shall be measured as stated on approved drawings. m²
NOTES