Assignment 4.docx

  • Uploaded by: Shefali Raturi
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Assignment 4.docx as PDF for free.

More details

  • Words: 759
  • Pages: 3
Organization Design & Change Assignment 4: The Paradoxical Twins (A) Why did Omega discover the design problem, but not Acme? After taking up the contract, Omega’s President Jim Rawls discussed the company’s go to strategy by including department heads of each department associated with the project. Instead of telling them what to be done and how, he gave them the power to decide and plan how to do the work. Due to organisation’s flat structure, there was consistent communication between different departments and they also proposed ideas to help each other. Along with this daily meetings between department heads and key personnel ensure that each department was aware of developments in other departments. All these factors, created a healthy and collaborative working environment due to which there was a higher chance of early detection and proper rectification of a problem. On the other hand Acme’s structure was mechanistic in nature, which led to President John Tyler being the sole person planning and taking decisions regarding the strategy to be taken up for completion of contract. Due to this no department knew the importance and criticality of the contract and thus had less motivation or were far behind schedules. Additionally, inter departmental communication was absent due to which the different department’s schedule were not properly aligned and were not aware of the updates in the other departments. Also, as they were already running behind schedule and had had number of re-runs, their only focus was on finishing the task.

(B) Why Acme was offered the final order even though Omega helped to rectify the design? The reasons for Acme being given the final order in spite of the fact that Omega rectified the design are: i.

Acme’s President John Tyler was in constant touch with the clients, updating them regularly about the manufacturing progress. This led to him having good relations with the designer head of the photocopier manufacturer. In contrast, Jim Rawls of Omega hardly stayed in touch with the clients and communicated only when they found an error in the design of the connector cable. Due to good relations build over time by John Tyler, he may be able to exert pressure and influence the company to get the final contract. 1

ii.

One of the directives given by photocopier manufacturer was to reduce final cost. As Acme was able to reduce its unit cost by 20 percent, the profit margin for the company would be more if they choose Acme given that their defect rate were minimized.

(C) How do you compare the organizing logic of Omega and Acme? i.

ii.

iii.

The organizing logic of Acme and Omega were totally different form each other even though they were formed from the same company and were catering to the same industry. Acme chose to retain its original management which was mechanistic in nature. The internal functioning was formal in nature – detailed organization charts and job descriptions. The different departments worked in silos and there was no inter department communication. The structure was seen as efficient for high volume manufacturing. Also, most of the planning and decision was done by the president rather basing than on discussion with department heads. On the other hand, Omega as an organization was informal in nature with lesser number of employees. The employees were not held back by any kind of organization chart or specific job description. The rule of not allowing written memo allowed better inter departmental communication and everyone knew what was happening in the whole organization, irrespective of which department they work in. According to mechanical dept. head much time is sometimes wasted in making everyone understand about their workings and taking suggestions.

(D) What is your key learning from this case? i.

ii.

iii.

Before starting any new project, all the departments (or stakeholders) should be involved in the decision making process. Regular meetings should also be done between these stakeholders to give updates. Error detection and correction should be incorporated from the beginning of the project. As the project progress forward, the cost of error detection and correction increases manifold. Keeping consistent communication with your client (external party) is also as important as communication internally. The point of contact should regularly update them so that they are also a part of the communication loop and know the progress. Good relationship is also an important factor for discovering more business opportunities for your organization. 2

iv.

The ideology and outlook of top leadership firm greatly shapes and influences the organization’s way of working, attitude and culture.

3

Related Documents

Assignment
November 2019 71
Assignment
July 2020 45
Assignment
November 2019 56
Assignment
November 2019 57
Assignment
June 2020 28
Assignment
June 2020 20

More Documents from ""