Pengolahan DataTM #3 Anggoro Adi Negoro

113160097

OUTLINE

2

Data Datayang Dibutuhkan Well Testing Data, Squence Operation, Fluid Analysis

3

Well Testing Data Time, Pressure, Temperature

4

Squence Operation

5

Fluid Analysis

6

Tahap Pengerjaan Elapsed Time, Squence Operation, Fluid Analysis

7

Elapsed Time Elapsed Time, Squence Operation, Fluid Analysis Elapsed Time (Saat belum terjadi pergantian waktu) •

Contoh



Diketahui Data Uji Sumur sebagai berikut:



1

Date

30/11/2008



Time

6:15:47



P

14.46



T

82.65

Date

30/11/2008



Time

6:16:47



P

14.49



T

82.69



Penyelesaian



Mencari Elapsed Time : [(t2-t1)*24+Elapsed Time Initial]



: [(6:16:47 - 6:15:47)*24+0]



: 0.0166667



Sehingga data (dt) yang diperoleh pada data no 2 adalah 0.0166667



2

8

Elapsed Time Elapsed Time, Squence Operation, Fluid Analysis •

Elapsed Time (Saat terjadi pergantian waktu)



Diketahui Data Uji Sumur sebagai berikut:



15389

Date

30/11/2008



Time

23:59:03



P

1533.23



T

264.64

Date

1/11/2008



Time

0:00.03



P

1533.58



T

254.64



15390



Elapsed Time pada data no 15389 adalah 17.21083 (Caa mencari hasilsama dengan cara yang sebelumnya)



Penyelesaian



Mencari Elapsed Time : [(t15390-t15389)*24], kemudian di general



: 0.016666667



: 0.016666667 + 17.21083



: 17.73775



Sehingga data (dt) yang diperoleh pada data no 15389 adalah 17.73775

9

10

R/Up Lubricator. R.I.H Sinker to 537 m Mku Sinker reached TD # 537 m Mku - P.O.O.H First data / PressureGauge Connected to tool string. Open well to lubricator. R.I.H Stop@ 100 m Mku R.I.H Stop @ 200 m Mku. R.I.H Stop @ 300 m Mku R.I.H Stop @ 400 m Mku R.I.H Tool on depth @ 537 m Mku.

Put the well on production. Shut in well at Wing valve for PBU.

P.O.O.H for Static Gradients Stop@ 400 m Mku P.O.O.H Stop @ 300 m Mku P.O.O.H Stop @ 200 m Mku. P.O.O.H Stop @ 100 m Mku. P.O.O.H Stop @ 0 m Mku. Re run in the sensing point. @ 537 m Mku.

Tool on depth @ 537 m Mku. Open well on 13 mm Choke Shut in well for 4 hours Open well on 16 mm Choke Shut in well for 4 hours Open well on 19mm Choke Shut in well for 4 hours. Open well on 21mm choke. Switched choke to 19 mm for extended flow test, 8 Hours..

P.O.O.H, Bhp survey completed. Rig Down SRO.

Jepitan 13mm ,Sep.P/T = 425 /90, GAS ; 3791.22 Mscf/d Jepitan 16mm ,Sep.P/T = 431 /86, GAS ; 5033.80 Mscf/d Jepitan 19mm,Sep P/T = 431/99,GAS =5999.82 Mscf/d Jepitan 21mm,Sep P/T=424/90, Gas = 6616.68 Mscf/d Jepitan 19mm,Sep P/T = 424/90,GAS =6181.97 Mscf/d Jepitan 19mm,Sep P/T=430/88, Gas =6168.32 Mscf/d

18

Fluid Analysis

19

Fluid Analysis

20

ThankYou Anggoro Adi Negoro +62 823 9929 3912 [email protected] www.anggoroadinegoro.blogspot.com

Related Documents

Anggoro Adi 113160097.pptx
December 2019 2
Anggoro
June 2020 2
Adi
May 2020 34
Adi
December 2019 35
Adi Sembunyiip
October 2019 16
_flash Adi
June 2020 10

More Documents from ""

Anggoro Adi 113160097.pptx
December 2019 2
Masalah Cchitnt.docx
December 2019 11
Surat Izin Anggoro.docx
April 2020 11
Cdt.docx
December 2019 3
Poa Ukm.docx
April 2020 23