Pengolahan DataTM #3 Anggoro Adi Negoro
113160097
OUTLINE
2
Data Datayang Dibutuhkan Well Testing Data, Squence Operation, Fluid Analysis
3
Well Testing Data Time, Pressure, Temperature
4
Squence Operation
5
Fluid Analysis
6
Tahap Pengerjaan Elapsed Time, Squence Operation, Fluid Analysis
7
Elapsed Time Elapsed Time, Squence Operation, Fluid Analysis Elapsed Time (Saat belum terjadi pergantian waktu) •
Contoh
•
Diketahui Data Uji Sumur sebagai berikut:
•
1
Date
30/11/2008
•
Time
6:15:47
•
P
14.46
•
T
82.65
Date
30/11/2008
•
Time
6:16:47
•
P
14.49
•
T
82.69
•
Penyelesaian
•
Mencari Elapsed Time : [(t2-t1)*24+Elapsed Time Initial]
•
: [(6:16:47 - 6:15:47)*24+0]
•
: 0.0166667
•
Sehingga data (dt) yang diperoleh pada data no 2 adalah 0.0166667
•
2
8
Elapsed Time Elapsed Time, Squence Operation, Fluid Analysis •
Elapsed Time (Saat terjadi pergantian waktu)
•
Diketahui Data Uji Sumur sebagai berikut:
•
15389
Date
30/11/2008
•
Time
23:59:03
•
P
1533.23
•
T
264.64
Date
1/11/2008
•
Time
0:00.03
•
P
1533.58
•
T
254.64
•
15390
•
Elapsed Time pada data no 15389 adalah 17.21083 (Caa mencari hasilsama dengan cara yang sebelumnya)
•
Penyelesaian
•
Mencari Elapsed Time : [(t15390-t15389)*24], kemudian di general
•
: 0.016666667
•
: 0.016666667 + 17.21083
•
: 17.73775
•
Sehingga data (dt) yang diperoleh pada data no 15389 adalah 17.73775
9
10
R/Up Lubricator. R.I.H Sinker to 537 m Mku Sinker reached TD # 537 m Mku - P.O.O.H First data / PressureGauge Connected to tool string. Open well to lubricator. R.I.H Stop@ 100 m Mku R.I.H Stop @ 200 m Mku. R.I.H Stop @ 300 m Mku R.I.H Stop @ 400 m Mku R.I.H Tool on depth @ 537 m Mku.
Put the well on production. Shut in well at Wing valve for PBU.
P.O.O.H for Static Gradients Stop@ 400 m Mku P.O.O.H Stop @ 300 m Mku P.O.O.H Stop @ 200 m Mku. P.O.O.H Stop @ 100 m Mku. P.O.O.H Stop @ 0 m Mku. Re run in the sensing point. @ 537 m Mku.
Tool on depth @ 537 m Mku. Open well on 13 mm Choke Shut in well for 4 hours Open well on 16 mm Choke Shut in well for 4 hours Open well on 19mm Choke Shut in well for 4 hours. Open well on 21mm choke. Switched choke to 19 mm for extended flow test, 8 Hours..
P.O.O.H, Bhp survey completed. Rig Down SRO.
Jepitan 13mm ,Sep.P/T = 425 /90, GAS ; 3791.22 Mscf/d Jepitan 16mm ,Sep.P/T = 431 /86, GAS ; 5033.80 Mscf/d Jepitan 19mm,Sep P/T = 431/99,GAS =5999.82 Mscf/d Jepitan 21mm,Sep P/T=424/90, Gas = 6616.68 Mscf/d Jepitan 19mm,Sep P/T = 424/90,GAS =6181.97 Mscf/d Jepitan 19mm,Sep P/T=430/88, Gas =6168.32 Mscf/d
18
Fluid Analysis
19
Fluid Analysis
20
ThankYou Anggoro Adi Negoro +62 823 9929 3912
[email protected] www.anggoroadinegoro.blogspot.com