COSTOS DE EQUIPOS
DIESEL (RD$)
174.00
PRECIO HORARIO COMBUSTIBLE LUBRICANTES COSTO TOTAL RD$/HORA
Tractor Cat D8l/K-155 Motoniveladora Cat-12G Estabilizadora Cat RM-350B Vibrocompactador Ingersoll Rand SD100 Vibrocompactador Dynapac CC122 Compactador manual Cargardor Cat 950 Camion de agua Ford 450 2500 gls Excavadora Doosan 300 Excavadora Cat-320 C Retroexcavadora Cat 416 Camion Daihatsu 2 m3 Camioneta Toyota 1 cabina Generador torre de luz
2,900.00 1,500.00 10,000.00 1,400.00 700.00 190.00 1,400.00 500.00 2,100.00 1,700.00 1,200.00 350.00 190.00 200.00 CANTIDAD
Acarreo en volteo de 0-5kms Acarreo en volteo km sub-secuente relleno Traslado de equipo en la ciudad
1.00 1.00 1.00
Página 1 de 414200015.xls
RD$/HORA
RD$/HORA
2,262.00 870.00 2,436.00 609.00 348.00 43.50 870.00 435.00 1,392.00 1,044.00 435.00 348.00 174.00 174.00 UNIDAD M3E M3E-KM UND
452.40 174.00 487.20 121.80 69.60 8.70 174.00 87.00 278.40 208.80 87.00 69.60 34.80 34.80
RD$/HORA
5,614.40 2,544.00 12,923.20 2,130.80 1,117.60 242.20 2,444.00 1,022.00 3,770.40 2,952.80 1,722.00 767.60 398.80 408.80 COSTO TOTAL
70.00 14.00 12,000.00
COSTOS DE MATERIALES
DESCRIPCION Diesel Gasolina Base triturada Grava y gravilla triturada Material de relleno (prestamo local) Derecho de Mina Equipos menores gastables Cambio Prima Dólar
CANTIDAD 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
UNID GL. GL. M3E M3E M3S M3S DIA US$
PRECIO BASICO 170.00 185.00 600.00 510.00 125.00 55.00 500.00
IMPUESTO 18.00% 91.80 90.00
FLETE A OBRA 4.00 4.00 375.00 375.00 200.00
PRECIO TOTAL RD$ 174.00 189.00 975.00 976.80 325.00 55.00 590.00 44.75
COSTOS DE MANO DE OBRA US$ 44.75 FACTOR DE AJUSTE = 1.350 CATEGORIA
SALARIO TOTAL
SALARIO BASICO
EQUIV.
Ing. Residente Ing. Control de Obra Topografo Nivelador Porta prisma Capataz Chequeador Op Tractor Op Cargador Op Motoniveladora Ayutande Equipos Op Excavadora Op Compactador (5-12 ton) Peon Supervisor Seguridad Parqueador Mecanico Campo Sereno
RD$/HR $472.50 $371.25 $283.50 $202.50 $101.25 $202.50 $81.00 $175.50 $162.00 $175.50 $81.00 $175.50 $162.00 $67.50 $135.00 $81.00 $135.00 $67.50
RD$/HR RD$/MES RD$/HR $ 350.00 $ 66,733.33 $ 350.00 $ 275.00 $ 52,433.33 $ 275.00 $ 210.00 $ 40,040.00 $ 210.00 $ 150.00 $ 28,600.00 $ 150.00 $ 75.00 $ 14,300.00 $ 75.00 $ 150.00 $ 28,600.00 $ 150.00 $ 60.00 $ 11,440.00 $ 60.00 $ 120.00 $ 22,880.00 $ 130.00 $ 120.00 $ 22,880.00 $ 120.00 $ 140.00 $ 26,693.33 $ 130.00 $ 60.00 $ 11,440.00 $ 60.00 $ 120.00 $ 22,880.00 $ 130.00 $ 100.00 $ 19,066.67 $ 120.00 $ 50.00 $ 9,533.33 $ 50.00 $ 100.00 $ 19,066.67 $ 100.00 $ 60.00 $ 11,440.00 $ 60.00 $ 100.00 $ 19,066.67 $ 100.00 $ 50.00 $ 9,533.33 $ 50.00
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Ingenieria
3.92
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
Transito, Mira, Nivel, Estacion Total, Prisma, cinta, etc
UNIT UNIDAD
mes
QUANTITY CANTIDAD
4.00
UNIT COST COSTO
$20,000.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
AMOUNT IMPORTE $0.00 $0.00 $80,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
$80,000.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Camion Daihatsu 2 m3 Camioneta Toyota 1 cabina
UNIT UNIDAD horas horas
QUANTITY CANTIDAD 4.00 4.00
UNIT COST COSTO 767.60 398.80
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
AMOUNT IMPORTE 3,070.40 1,595.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$4,665.60
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Ing. Residente Ing. Control de Obra Topografo Nivelador Porta prisma Peon
UNIT UNIDAD mes mes mes mes mes mes
QUANTITY CANTIDAD 4.00 8.00 4.00 4.00 4.00 4.00
UNIT COST COSTO $66,733.33 $52,433.33 $40,040.00 $28,600.00 $14,300.00 $9,533.33
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA
AMOUNT IMPORTE $266,933.33 $419,466.67 $160,160.00 $114,400.00 $57,200.00 $38,133.33 $0.00
$1,056,293.33
TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$1,140,958.93 5%
$57,047.95 $1,198,006.88 $305,458.15
s)
Km
AMOUNT IMPORTE $0.00 $0.00 $80,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
$80,000.00
AMOUNT IMPORTE 3,070.40 1,595.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$4,665.60
AMOUNT IMPORTE $266,933.33 $419,466.67 $160,160.00 $114,400.00 $57,200.00 $38,133.33 $0.00
$1,056,293.33
$1,140,958.93 $57,047.95 $1,198,006.88 $305,458.15
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
PA
UNIDAD
Mantenimiento de tránsito
1.00
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Motoniveladora Cat-12G Vibrocompactador Ingersoll Rand SD100 Camion de agua Ford 450 2500 gls
UNIT UNIDAD horas horas horas
QUANTITY CANTIDAD 40.00 40.00 40.00
UNIT COST COSTO
AMOUNT IMPORTE
2,544.00 2,130.80 1,022.00
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
101,760.00 85,232.00 40,880.00 0.00 0.00 0.00 0.00 0.00 0.00
$227,872.00
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Op Motoniveladora Op Compactador (5-12 ton) Chequeador
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD 40.000000 40.000000 40.000000
UNIT COST COSTO
AMOUNT IMPORTE
$175.50 $162.00 $81.00
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%)
$7,020.00 $6,480.00 $3,240.00 $0.00 $0.00 $0.00 $0.00
$16,740.00 $244,612.00
5%
$12,230.60 $256,842.60
TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$256,842.60
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Campamento, oficina de campo
1.00
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Acondicionamiento terreno para campamento Instalaciones Electricas, Sanitarias, Etc. Sereno, vigilancia nocturna Oficina furgón 20' Sanitario Oficina y Obreros Limpieza y Mantenimiento Generador torre de luz Mobiliario
UNIT UNIDAD pa pa mes mes mes mes mes pa
QUANTITY CANTIDAD 1.00 1.00 4.00 4.00 4.00 4.00 4.00 1.00
UNIT COST COSTO 5,000.00 5,000.00 9,533.33 21,240.00 10,620.00 3,000.00 42,515.20 15,000.00
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
AMOUNT IMPORTE 5,000.00 5,000.00 38,133.33 84,960.00 42,480.00 12,000.00 170,060.80 15,000.00 0.00
$372,634.13
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA
$0.00
TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$372,634.13 5%
$18,631.71 $391,265.84 $391,265.84
s)
PA
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
AMOUNT IMPORTE 5,000.00 5,000.00 38,133.33 84,960.00 42,480.00 12,000.00 170,060.80 15,000.00 0.00
$372,634.13
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
$372,634.13 $18,631.71 $391,265.84 $391,265.84
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Laboratorio de campo para densidad de materiales
28,630.60
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
Mecanica de Suelos, ensayos
UNIT UNIDAD
und
QUANTITY CANTIDAD
10.00
UNIT COST COSTO
$5,000.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
AMOUNT IMPORTE $0.00 $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00
$50,000.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Equipo Ganmadensímetro Camioneta Toyota 1 cabina
UNIT UNIDAD
mes mes
QUANTITY CANTIDAD
3.00 3.00
UNIT COST COSTO
30,000.00 35,094.40
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
AMOUNT IMPORTE 0.00 90,000.00 105,283.20 0.00 0.00 0.00 0.00 0.00 0.00
$195,283.20
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Operador Ayudante
UNIT UNIDAD
mes mes
QUANTITY CANTIDAD
3.000000 3.000000
UNIT COST COSTO
$25,000.00 $15,000.00
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA
AMOUNT IMPORTE $0.00 $75,000.00 $45,000.00 $0.00 $0.00 $0.00 $0.00
$120,000.00
TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$365,283.20 5%
$18,264.16 $383,547.36 $13.40
s)
m2
AMOUNT IMPORTE $0.00 $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00
$50,000.00
AMOUNT IMPORTE 0.00 90,000.00 105,283.20 0.00 0.00 0.00 0.00 0.00 0.00
$195,283.20
AMOUNT IMPORTE $0.00 $75,000.00 $45,000.00 $0.00 $0.00 $0.00 $0.00
$120,000.00
$365,283.20 $18,264.16 $383,547.36 $13.40
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Laboratorio de campo para pruebas de hormigón
6,563.49
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
Pileta para curado
UNIT UNIDAD
pa
QUANTITY CANTIDAD
1.00
UNIT COST COSTO
$10,000.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
AMOUNT IMPORTE $0.00 $0.00 $0.00 $10,000.00 $0.00 $0.00 $0.00 $0.00
$10,000.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Rotura de probetas Camioneta Toyota 1 cabina
UNIT UNIDAD
und mes
QUANTITY CANTIDAD
937.64 2.00
UNIT COST COSTO
250.00 35,094.40
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
AMOUNT IMPORTE 0.00 234,410.36 70,188.80 0.00 0.00 0.00 0.00 0.00 0.00
$304,599.16
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Encargado Ayudante
UNIT UNIDAD
mes mes
QUANTITY CANTIDAD
3.000000 3.000000
UNIT COST COSTO
$25,000.00 $15,000.00
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA
AMOUNT IMPORTE $0.00 $75,000.00 $45,000.00 $0.00 $0.00 $0.00 $0.00
$120,000.00
TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$434,599.16 $0.00 $434,599.16 $66.21
s)
m3
AMOUNT IMPORTE $0.00 $0.00 $0.00 $10,000.00 $0.00 $0.00 $0.00 $0.00
$10,000.00
AMOUNT IMPORTE 0.00 234,410.36 70,188.80 0.00 0.00 0.00 0.00 0.00 0.00
$304,599.16
AMOUNT IMPORTE $0.00 $75,000.00 $45,000.00 $0.00 $0.00 $0.00 $0.00
$120,000.00
$434,599.16 $0.00 $434,599.16 $66.21
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Nivelacion final hasta subrasante de calles, y areas a desarrollar (Incluye Corte y Relleno, Compactación, Carguio, Acarreo y Bote)
28,630.60
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Motoniveladora Cat-12G Vibrocompactador Ingersoll Rand SD100 Camion de agua Ford 450 2500 gls
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD 286.31 286.31 286.31
UNIT COST COSTO 2,544.00 2,130.80 1,022.00
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
AMOUNT IMPORTE 728,362.46 610,060.82 292,604.73 0.00 0.00 0.00 0.00 0.00 0.00
$1,631,028.02
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Capataz Chequeador Peon
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD 286.31 286.31 1,145.22
UNIT COST COSTO $202.50 $81.00 $67.50
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA
AMOUNT IMPORTE $57,976.97 $23,190.79 $77,302.62 $0.00 $0.00 $0.00 $0.00
$158,470.37
TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$1,789,498.39 5%
$89,474.92 $1,878,973.31 $65.63
s)
m2
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
AMOUNT IMPORTE 728,362.46 610,060.82 292,604.73 0.00 0.00 0.00 0.00 0.00 0.00
$1,631,028.02
AMOUNT IMPORTE $57,976.97 $23,190.79 $77,302.62 $0.00 $0.00 $0.00 $0.00
$158,470.37
$1,789,498.39 $89,474.92 $1,878,973.31 $65.63
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
m2
UNIDAD
Escarificación
28,630.60
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE
Motoniveladora Cat-12G
hora
95.44
2,544.00
Camion de agua Ford 450 2500 gls
hora
95.44
1,022.00
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
242,787.49 0.00 97,534.91 0.00 0.00 0.00 0.00 0.00 0.00
$340,322.40
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Capataz
UNIT UNIDAD hora
QUANTITY CANTIDAD 95.44
UNIT COST COSTO
AMOUNT IMPORTE
$202.50
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%)
$19,325.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$19,325.66 $359,648.05
5%
$17,982.40 $377,630.46
TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$13.19
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
UNIDAD
Description / Descripcion: Base Granular de pavimento de Calles y Avenidas (0.15m) al 95% de compactación del proctor modificado
m3
4,294.59
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
Base triturada
UNIT UNIDAD
m3
QUANTITY CANTIDAD
5,368.24
UNIT COST COSTO
AMOUNT IMPORTE
$975.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00 $0.00 $5,234,031.56 $0.00 $0.00 $0.00 $0.00 $0.00
$5,234,031.56
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Motoniveladora Cat-12G Vibrocompactador Ingersoll Rand SD100 Camion de agua Ford 450 2500 gls
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD 89.47 89.47 89.47
UNIT COST COSTO
AMOUNT IMPORTE
2,544.00 2,130.80 1,022.00
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
227,613.27 190,644.01 91,438.98 0.00 0.00 0.00 0.00 0.00 0.00
$509,696.26
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Capataz Chequeador Peon
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD 89.47 89.47 357.88
UNIT COST COSTO
AMOUNT IMPORTE
$202.50 $81.00 $67.50
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$18,117.80 $7,247.12 $24,157.07 $0.00 $0.00 $0.00 $0.00
$49,521.99 $5,793,249.81
5%
$289,662.49 $6,082,912.30 $1,416.41
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
m3
UNIDAD
Excavaciones generales menores de 1 mt
1.00
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION Retroexcavadora Cat 416
UNIT UNIDAD hora
QUANTITY CANTIDAD 0.04
UNIT COST COSTO
AMOUNT IMPORTE
2,952.80
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
118.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$118.11
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Op Excavadora Chequeador
UNIT UNIDAD hora hora
QUANTITY CANTIDAD 0.040000 0.040000
UNIT COST COSTO
AMOUNT IMPORTE
$175.50 $81.00
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%)
$7.02 $3.24 $0.00 $0.00 $0.00 $0.00 $0.00
$10.26 $128.37
5%
$6.42 $134.79
TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$134.79
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Relleno de Reposición
1.00
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Compactador manual
UNIT UNIDAD hora
QUANTITY CANTIDAD 0.50
UNIT COST COSTO
AMOUNT IMPORTE
242.20
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
0.00 121.10 0.00 0.00 0.00 0.00 0.00 0.00
$121.10
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Capataz Peon Ayutande Equipos
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD 0.125000 0.250000 0.125000
UNIT COST COSTO
AMOUNT IMPORTE
$202.50 $67.50 $81.00
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%)
$25.31 $16.88 $10.13 $0.00 $0.00 $0.00 $0.00
$52.31 $173.41
5%
$8.67 $182.08
TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$182.08
s)
m3
AMOUNT IMPORTE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
AMOUNT IMPORTE 0.00 121.10 0.00 0.00 0.00 0.00 0.00 0.00
$121.10
AMOUNT IMPORTE $25.31 $16.88 $10.13 $0.00 $0.00 $0.00 $0.00
$52.31 $173.41 $8.67 $182.08
$182.08
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
USOH DR HOUSING Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Relleno compactado
#REF!
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
Relleno
UNIT UNIDAD
m3
QUANTITY CANTIDAD
#REF!
UNIT COST COSTO
AMOUNT IMPORTE
$325.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00 $0.00 #REF! $0.00 $0.00 $0.00 $0.00
#REF!
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Motoniveladora Cat-12G Vibrocompactador Ingersoll Rand SD100
UNIT UNIDAD hora hora
QUANTITY CANTIDAD #REF! #REF!
UNIT COST COSTO
AMOUNT IMPORTE
2,544.00 2,130.80
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
0.00 #REF! #REF! 0.00 0.00 0.00 0.00 0.00
#REF!
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Capataz Peon
UNIT UNIDAD hora hora
QUANTITY CANTIDAD #REF! #REF!
UNIT COST COSTO
AMOUNT IMPORTE
$202.50 $67.50
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%)
#REF! #REF! $0.00 $0.00 $0.00 $0.00 $0.00
#REF! #REF!
5%
#REF! #REF!
TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
#REF!
s)
m3
AMOUNT IMPORTE $0.00 $0.00 #REF! $0.00 $0.00 $0.00 $0.00
#REF!
AMOUNT IMPORTE 0.00 #REF! #REF! 0.00 0.00 0.00 0.00 0.00
#REF!
AMOUNT IMPORTE #REF! #REF! $0.00 $0.00 $0.00 $0.00 $0.00
#REF! #REF! #REF! #REF!
#REF!
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Nivelacion final hasta subrasante de aceras y areas a desarrollar (Incluye Corte y Relleno, Compactación, Carguio, Acarreo y Bote)
28,630.60
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
Material de relleno
UNIT UNIDAD
m3e
QUANTITY CANTIDAD
1,860.99
UNIT COST COSTO
$300.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
AMOUNT IMPORTE $0.00 $0.00 $558,296.70 $0.00 $0.00 $0.00 $0.00 $0.00
$558,296.70
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Retroexcavadora Cat 416 Vibrocompactador Dynapac CC122 Camion de agua Ford 450 2500 gls
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD 372.20 372.20 372.20
UNIT COST COSTO 1,722.00 1,117.60 1,022.00
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
AMOUNT IMPORTE 640,924.61 415,968.26 380,386.15 0.00 0.00 0.00 0.00 0.00 0.00
$1,437,279.02
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Capataz Chequeador Peon
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD 93.05 372.20 372.20
UNIT COST COSTO $202.50 $81.00 $67.50
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA
AMOUNT IMPORTE $18,842.51 $30,148.02 $25,123.35 $0.00 $0.00 $0.00 $0.00
$74,113.89
TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$2,069,689.61 5%
$103,484.48 $2,173,174.09 $75.90
s)
m2
AMOUNT IMPORTE $0.00 $0.00 $558,296.70 $0.00 $0.00 $0.00 $0.00 $0.00
$558,296.70
AMOUNT IMPORTE 640,924.61 415,968.26 380,386.15 0.00 0.00 0.00 0.00 0.00 0.00
$1,437,279.02
AMOUNT IMPORTE $18,842.51 $30,148.02 $25,123.35 $0.00 $0.00 $0.00 $0.00
$74,113.89
$2,069,689.61 $103,484.48 $2,173,174.09 $75.90
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
USOH DR HOUSING Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Arcilla compactada al 90%
#REF!
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
Arcilla
UNIT UNIDAD
m3
QUANTITY CANTIDAD
#REF!
UNIT COST COSTO
AMOUNT IMPORTE
$300.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$0.00 $0.00 #REF! $0.00 $0.00 $0.00 $0.00
#REF!
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Retroexcavadora Cat 416 Vibrocompactador Dynapac CC122
UNIT UNIDAD hora hora
QUANTITY CANTIDAD #REF! #REF!
UNIT COST COSTO
AMOUNT IMPORTE
1,722.00 1,117.60
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
0.00 #REF! #REF! 0.00 0.00 0.00 0.00 0.00
#REF!
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Capataz Peon
UNIT UNIDAD hora hora
QUANTITY CANTIDAD #REF! #REF!
UNIT COST COSTO
AMOUNT IMPORTE
$202.50 $67.50
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%)
#REF! #REF! $0.00 $0.00 $0.00 $0.00 $0.00
#REF! #REF!
5%
#REF! #REF!
TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
#REF!
s)
m2
AMOUNT IMPORTE $0.00 $0.00 #REF! $0.00 $0.00 $0.00 $0.00
#REF!
AMOUNT IMPORTE 0.00 #REF! #REF! 0.00 0.00 0.00 0.00 0.00
#REF!
AMOUNT IMPORTE #REF! #REF! $0.00 $0.00 $0.00 $0.00 $0.00
#REF! #REF! #REF! #REF!
#REF!
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
#REF! Number / Numero:
-
UNIT
Description / Descripcion:
UNIDAD
Nivelacion final hasta subrasante de aceras y areas a desarrollar (Incluye Corte y #REF! Relleno, Compactación, Carguio, Acarreo y Bote)
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
Material de relleno
UNIT UNIDAD
m3e
QUANTITY CANTIDAD
#REF!
UNIT COST COSTO
$300.00
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
AMOUNT IMPORTE $0.00 $0.00 #REF! $0.00 $0.00 $0.00 $0.00 $0.00
#REF!
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Retroexcavadora Cat 416 Vibrocompactador Dynapac CC122 Camion de agua Ford 450 2500 gls
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD #REF! #REF! #REF!
UNIT COST COSTO 1,722.00 1,117.60 1,022.00
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
AMOUNT IMPORTE #REF! #REF! #REF! 0.00 0.00 0.00 0.00 0.00 0.00
#REF!
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Capataz Chequeador Peon
UNIT UNIDAD hora hora hora
QUANTITY CANTIDAD #REF! #REF! #REF!
UNIT COST COSTO $202.50 $81.00 $67.50
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA
AMOUNT IMPORTE #REF! #REF! #REF! $0.00 $0.00 $0.00 $0.00
#REF!
TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
#REF! 5%
#REF! #REF! #REF!
s)
m2
AMOUNT IMPORTE $0.00 $0.00 #REF! $0.00 $0.00 $0.00 $0.00 $0.00
#REF!
AMOUNT IMPORTE #REF! #REF! #REF! 0.00 0.00 0.00 0.00 0.00 0.00
#REF!
AMOUNT IMPORTE #REF! #REF! #REF! $0.00 $0.00 $0.00 $0.00
#REF!
#REF! #REF! #REF! #REF!
SCHEDULE 13 - Schedule of Remuneration Attachment A - Commercial Schedules and Forms Commercial Schedule B - Unit Prices & Methods of Measurement (Unit Price Analysis) [ANALISIS DE PRECIO UNITARIO]
USOH DR HOUSING Number / Numero:
-
UNIT
UNIDAD
Description / Descripcion: Arcilla compactada al 90%
und
1.00
MATERIAL / MATERIALES CODE CODIGO
DESCRIPTION / DESCRIPCION
UNIT UNIDAD
QUANTITY CANTIDAD
UNIT COST COSTO
AMOUNT IMPORTE
Poste H.A. 300-9M
und
1.00
$12,500.00
$12,500.00
Lampara tipo led solid state de 50 watts-220-277 V Brazo de 6' galv. Bombillo 150 watts Fotocelda 120' alambre vinil 10/2 A RD$24.85/pie Peron de 2'x1" Plancha de metal 2"x2"x3/4" Hormigon 210 kg/cm2
und und und und rollo und und m3
1.00 1.00 1.00 1.00 1.00 4.00 1.00 0.50
$18,500.00 $1,350.00 $450.00 $250.00 $2,982.09 $450.00 $850.00 $4,310.54
$18,500.00 $1,350.00 $450.00 $250.00 $2,982.09 $1,800.00 $850.00 $2,155.27
SUBTOTAL MATERIALS / SUBTOTAL MATERIALES
$40,837.36
EQUIPMENT / EQUIPO CODE CODIGO
DESCRIPTION / DESCRIPCION
Izado de poste Transporte de poste
UNIT UNIDAD und und
QUANTITY CANTIDAD 1.00 1.00
UNIT COST COSTO 250.00 750.00
SUBTOTAL EQUIPMENT / SUBTOTAL EQUIPO
AMOUNT IMPORTE 250.00 750.00 0.00 0.00 0.00 0.00 0.00
$1,000.00
LABOR / MANO DE OBRA CODE CODIGO
DESCRIPTION / DESCRIPCION
Mano de obra total
UNIT UNIDAD und
QUANTITY CANTIDAD 1.000000
UNIT COST COSTO $4,286.40
AMOUNT IMPORTE $4,286.40 $0.00 $0.00 $0.00 $0.00 $0.00
SUBTOTAL LABOR / SUBTOTAL MANO DE OBRA TOTAL DIRECT COST (US$) / TOTAL COSTO DIRECTO (US$) PROFIT / UTILIDAD TOTAL PRICE (RD$) / TOTAL PRECIO ( RD%) TOTAL UNIT PRICE (US$) / TOTAL PRECIO UNITARIO ( RD$)
$4,286.40 $46,123.76
22%
$10,147.23 $56,270.99 $56,270.99
Clave
R
Descripción
PRESUPUESTO BASE CanPres
1.00
Und
PrePres
TRABAJOS GENERALES
ImpPres 2,664,261.84
1.01
0
Ingeniería
3.92
Km
305,458.15
1,198,006.88
1.02
0
Mantenimiento de Transito
1.00
PA
256,842.60
256,842.60
1.03
0
Campamento: Oficina de Campo
1.00
PA
1.04
0
Laboratorio de Campo para Densidad de materiales
1.05
0
Laboratorio de Campo para Pruebas de Hormigon
2.00
28,630.60
m
2
6,563.49
m
3
391,265.84
391,265.84
13.40
383,547.36
66.21
TRABAJOS GENERALES
434,599.16 42,409,916.82
MOVIMIENTO DE TIERRA: 2.01
0
Nivelacion final hasta subrasante de calles, y areas a desarrollar (Incluye Corte y Relleno, Compactación, Carguio, Acarreo y Bote)
28,630.60
m2
65.63
1,878,973.31
2.02
0
Escarificación de Superficie
28,630.60
m2
13.19
377,630.46
2.03
0
Base Granular de pavimento de Calles y Avenidas (0.15m) al 95% de compactación del proctor modificado
4,294.59
m3
1,416.41
6,082,912.30
9,198.00
m2
1,225.36
11,270,867.08
19,432.60
m2
1,173.26
22,799,533.68
22,689.00
m2
75.90
1,722,183.50
22,689.00
m2
732.91
16,628,934.49
7,844.00
m
940.43
7,376,716.45
72.00
Uds
1,099.36
79,153.99
3,170.00
m2
732.91
2,323,316.25
4,180.00
300,960.00
55.00
39,894.80
CAPA DE RODADURA:
2.04
0
Avenida Principal: Hormigon Industrial f'c=240 kg/cm2 con malla electrosoldada 2.3 x 2.3 x 100 x 100 (e=0.15m) terminacion rayada con peine metalico 3/4" corte y sellado de juntas ,sellado y curado en base acuosa. Calles Secundarias:
2.05
0
3.00
Hormigon Industrial f'c=240 kg/cm2 con malla electrosoldada 2.3 x 2.3 x 100 x 100 (e=0.15m) terminacion rayada con peine metalico 3/4" corte y sellado de juntas ,sellado y curado en base acuosa. OBRAS COMPLEMENTARIAS: MOVIMIENTO DE TIERRA:
3.01
0
Nivelacion final hasta subrasante de aceras y areas a desarrollar (Incluye Corte y Relleno, Compactación, Carguio, Acarreo y Bote) ACERAS Y CONTENES:
3.02
0
3.03
0
3.04
0
3.05
Hormigon Industrial f'c=210 Kg/cm2 e=0.10 m terminacion rayada con peine metalico 3/4" corte y sellado de juntas ,sellado y curado en base acuosa. Conten (telford) de hormigon pulido fc=180kg/cm2 Rampas Discapacitados Hormigon Industrial f'c=210 Kg/cm2 e=0.10 m terminacion rayada con peine metalico 3/4" corte y sellado de juntas ,sellado y curado en base acuosa. Borde acera de Delimitacion perimetro de Hormigon F´C=210 Kg/cm2 e=0.10 m terminacion rayada con peine metalico 3/4" corte y sellado de juntas ,sellado y curado en base acuosa. SENALIZACION:
3.06
0
Señalizacion Vertical para Estacionamiento de Discapacitados 24''x24'', fijo, en tola galvanizada, tubo 2 x 2 (material grado diamante)
72.00
Uds
3.07
0
Señalizacion Lineas de Estacionamiento en Pintura de Trafico con Microesferas de vidrio
725.36
m
3.08
0
Señalizacion Lineas de Calles en Pintura de Trafico con Microesferas de vidrio
3,477.58
m
55.00
191,266.90
3.09
0
Señalizacion Cruces Peatonales en Pintura de Trafico con Microesferas de vidrio
505.00
m2
55.00
27,775.00
3.10
0
Señalizacion Pintura en Pavimento para Estacionamiento de Discapacitados
900.00
m2
440.00
396,000.00
3.11
0
Bolardos
125.00
Uds
3,000.00
SUB-TOTAL: RD$
375,000.00 74,535,380.03
GASTOS GENERALES: DIRECCION TECN. Y RESP. ADM.
10.00%
7,453,538.00
GASTOS ADMINISTRATIVOS
2.00%
1,490,707.60
TRANSPORTE SEGUROS Y FIANZAS
2.00% 3.00%
1,490,707.60 2,236,061.40
SUPERVISION IMPREVISTO
5.00% 5.00%
3,726,769.00 3,726,769.00
Ley 6-86
1.00%
745,353.80
CODIA ITBIS DEL 10%
0.10% 1.80%
74,535.38 1,341,636.84
Sub-Total Gastos: RD$
22,286,078.63
TOTAL GENERAL: RD$
96,821,458.66