SCHEDULE

ESTIMATION EQUIPMENT PRODUCTION CAPACITY REFF: PERMEN PUPR NO 28/PRT/M/2016

WBS DESCRIPTION 1 BULLDOZER 1.1 Machine Specification Engine Power Blade/ Bucket Width Blade/ Bucket Hight Blade/ Bucket Capacity Machine Working Efficiency Machine Blade Factor Blade Inclination Factor 1.2 Machine Time Cycle Striping Speed Reverse Speed Planned Stripng Distance/ Tack Overlaping Width Number of Machine Track Delay Time/ Other Cycle Time

CODE

UNIT

Pw L H q Fa Fb Fm

75.00 3.18 1.30 5.37 0.75 1.00 0.70

Vf Vr l Lo n T3 Ts

3.00 Km/Hr ** Based on product C 4.20 Km/Hr ** Based on product C 1 30.00 M 0.30 M1 3.00𝑇�= βˆ‘24_(π‘›βˆ’1)^𝑛▒𝑇𝑛 ** With Asupmtion 15 m 0.10 Mnt ** User Asuption 1.13 Mnt ** Striping Speed + Re

1.3 οΏ½=(οΏ½.𝐹_𝑏.𝐹_π‘š.𝐹_π‘Ž.60)/𝑇_οΏ½ Machine Production Capacity Production Capacity for Soil Striping οΏ½=(οΏ½Γ—{𝑛(πΏβˆ’πΏ_0 )+𝐿_0 }.οΏ½_οΏ½.οΏ½_οΏ½.οΏ½_οΏ½.60)/(𝑁.𝑛.𝑇_οΏ½ ) Production Capacity for Flattening

EXCAVATOR BACKHOE Machine Specification Excavator Bucket Cavacity Bucket Fill Factor Excavator Efficiency Factor Excavation Conversion Factor 2.2 Machine Time Cycle Time for Digging and Loading, etc Delay Time, etc Cycle Time οΏ½=(οΏ½.𝐹_𝑏.𝐹_π‘Ž.60)/(𝑇_οΏ½.𝐹_𝑣 ).

COEFF

HP M1 M1 M3

149.77

M2/Hr

2,491.09

M2/Hr

Bucket Capacity = L x Good = 0.83; Fair = 0. By Default (1) Standar Flat = 1; Sloping -15%

2 2.1

2.3

Machine Production Capacity Production Capacity for Soil Excavation

M3

V Fb Fa Fv

0.80 1.00 0.75 1.00

T1 T2 Ts

0.32 Mnt 0.10 Mnt 0.42 Mnt

PC 200 (Komatsu) or S ** See Table 9, Perm ** See Table 11, Perme ** See Table 10, Perm

𝑇�= βˆ‘24_(π‘›βˆ’1)^𝑛▒𝑇𝑛

85.71

M2/Hr

Max Duration 0.32 Min Max Duration 0.10 Min

3 3.1

3.2

DUMP TRUCK DT 3.5 T Machine Specification Dump truck Bucket Capacity Truck Efficiency Truck Speed full Loaded Truck Speed No Loaded Material Desnity Machine Cycle Time Loading Time

Temp Stockpile Distance Delivery Time (Loaded) οΏ½=(οΏ½.𝐹_π‘Ž.60)/(𝐷.𝑇_οΏ½ ). loaded) Return Time (Un Delay Time Cycle Time 3.3 Machine Production Capacity Production Capacity for Dump Truck DT 3.5 Ton

4 4.1

4.2

DUMP TRUCK DT 10 T Machine Specification Dump truck Bucket Capacity Truck Efficiency Truck Speed full Loaded Truck Speed No Loaded Material Desnity Machine Cycle Time Loading Time

Temp Stockpile οΏ½=(οΏ½.𝐹_π‘Ž.60)/(𝐷.𝑇_οΏ½ ). Distance Delivery Time (Loaded) Return Time (Un loaded) Delay Time Cycle Time 4.3 Machine Production Capacity Production Capacity for Dump Truck DT 10 Ton

5 5.1

MOTOR GRADER Machine Specification Operatinal Wight Capacity Engine Power Blade Length Effective Blade Length

V Fa V1 V2 D

3.50 Ton 0.80 Good = 0.83; Fair = 0. 𝑇_1=(οΏ½.60)/(𝐷.οΏ½_𝐸π‘₯𝑐 20.00 Km/hr ** )See Table 8, Perm 35.00 Km/hr ** See Table 8, Perm 3 1.60 Ton/M Common Soil

T1

1.53 Minute

** Assume Loading us

L T2 T3 T4 Ts

1.50 4.50 2.57 1.00 9.60

** Assume The Distanc

𝑇�= βˆ‘24_(π‘›βˆ’1)^𝑛▒𝑇𝑛

10.93

V Fa V1 V2 D T1

M3/Hr

10.00 Ton 𝑇_1=(οΏ½.60)/(𝐷.οΏ½_𝐸π‘₯𝑐 ) 0.80 Good = 0.83; Fair = 0. 20.00 Km/hr ** See Table 8, Perm 35.00 Km/hr ** See Table 8, Perm 3 1.60 Ton/M Common Soil 𝑇�= βˆ‘24_(π‘›βˆ’1)^𝑛▒𝑇𝑛

4.38 Minute

L T2 T3 T4 Ts

1.50 4.50 2.57 1.00 12.45

Q

24.10

Pw L b

Km Mnt Mnt Mnt Mnt

Km Mnt Mnt Mnt Mnt

** Assume Loading us

** Assume The Distanc

M3/Hr

10,800.00 Kgs 135.00 HP 3.71 (𝐿_(β„Ž,).60)/ Mtr (οΏ½.1000). 2.60 𝑇�= βˆ‘_(π‘›βˆ’1)^𝑛▒𝑇𝑛 𝑇�= Mtr βˆ‘24_(π‘›βˆ’1)^𝑛▒𝑇𝑛

Overlap Width Average Operational Speed Working)+𝑏_0 Effeciency οΏ½=(𝐿_β„Ž.{𝑛.(π‘βˆ’π‘_οΏ½ }.𝐹_π‘ŽFactor 60)/(𝑁.𝑛.𝑇_οΏ½ ). 5,2 Machine Cycle Time Flattening/Spreading Length Track)+𝑏_0 Numer}.𝐹_π‘Ž 60.𝑑)/(𝑁.𝑛.𝑇_οΏ½.𝐹_π‘˜ ) οΏ½=(𝐿_β„Ž.{𝑛.(π‘βˆ’π‘_οΏ½ Estimate Time for one Track Delay Time, etc οΏ½=(𝐿_β„Ž.{𝑛.(π‘βˆ’π‘_οΏ½ )+𝑏_0 }.𝐹_π‘Ž 60)/(𝑁.𝑛.𝑇_οΏ½ ). Cycle Time 5.3 Machine Production Capacity Production Capacity Motor Grader for Overlay Spread a Effeciency Fact Production Capacity Motor Grader for Spreading Materials with Thickness

b

Production Capacity Motor Grader for Grading/ Stiping Effeciency Fact

c

6 οΏ½=((𝑏_οΏ½.οΏ½.1000).𝑑.𝐹_π‘Ž)/(𝑛.). Vibrator Roller 6.1 Machine Specification Weight Roller Width Machine Efficiency Factor Average Operational Speed Compaction Layer Thickness Number of Passing Track Overlap Width 6.2 Machine Production Capacity Production Capacity Vibro Roller for Compaction

bo Vt Fa

0.30 5.00 0.60

Mtr Km/hr

Lh n T1 T2 Ts

100.00 2.00 1.20 0.25 1.45

Mtr Trx Minute Minute Minute

** Construction Pannin ** Estimate 6 m Road Formula

M2/Hr

Flattening/ Leveling of

Fa

6,082.76 0.60 608.28 0.10 1.00 6,082.76 0.60

M2/Hr Mtr

Speading Solid Materi

M2/Hr

Flattening / Striping

t Fk Q Fa

b Fa V t n bo

7.05 1.68 0.80 4.00 0.25 8.00 0.20 148.00

Ton Mtr

** See the Product Spe ** See Table 12, Perm

Formula

𝑏�=π‘βˆ’π‘οΏ½ ** Good Conditions

Km/hr Mtr Mtr M3/Hr

Flattening/ Leveling of

οΏ½=(οΏ½. 〖𝐹 _𝑏.𝐹 γ€— _π‘Ž.60)/𝑇_οΏ½ .

7 7.1

Wheall Loader Machine Specification Bucket Capacity Engine Power Machine Efficiency Factor Bucket Efficiency Factor 7.2 Machine Cycle Time Wheal Loader Cycle Time Standards 7.3 Machine Production Capacity Production Capacity Vibro Roller for Compaction οΏ½=(𝑃_π‘Ž.𝐹_π‘Ž 60)/(π‘Š_𝑐.1000).

V Pw Fa Fb

1.50 96.00 0.75 1.00

M3 HP

Ts

0.45

Mnt

150.00

** See Table 04, Permen ** See Table 10, Permen

M3/Hr

** Standard as / Permen

Flattening/ Leveling of

8 8.1

8.2

9 9.1

9.2

Water Tank Truck Machine Specification Water Tank Capacity Max Pumping Capacity Efficiency Factor Production Requirement Water Required Machine Production Capacity Production Capacity Water Truck

Water Pump Machine Specification Machine Capacity Diameter Pipe Max Production Capacity Machine Production Capacity Production Capacity Water Pump Efficiency Factor

V Pa Fa

4,000.00 100.00 0.80

Wc

1.00

,---/M3

4.80

M3/Hr

6.00 3.00 4.50

Hp Inc M3/Hr

4.05 0.90

M3/Hr

Pw D Q

Ltr Ltr/Mnt

Flattening/ Leveling of

Based on Data Sheet

REMARK

Bucket Capacity = L x H2 (M3) Good = 0.83; Fair = 0.75; Bad = 0,67; Worse = 0.58) By Default (1) Standard for good condition of Blade Flat = 1; Sloping -15% = 1.2; Sloping +15% = 1 ** Based on product Catalogue ** Based on product Catalogue

** With Asupmtion 15 m wide striping corriodor ** User Asuption ** Striping Speed + Reverse Speed + Delay Time

PC 200 (Komatsu) or Simmilar ** See Table 9, Permen PUPR No.28/PRT/M/2016 ** See Table 11, Permen PUPR No.28/PRT/M/2016 ** See Table 10, Permen PUPR No.28/PRT/M/2016 Max Duration 0.32 Minuts Max Duration 0.10 Minuts

0)/

Good = 0.83; Fair = 0.80; Bad = 0,75; Worse = 0.7) ** See Table 8, Permen PUPR No.28/PRT/M/2016 ** See Table 8, Permen PUPR No.28/PRT/M/2017 Common Soil ** Assume Loading using Excavator PC 200 ** Assume The Distance of Stockpile "x" Km

Good = 0.83; Fair = 0.80; Bad = 0,75; Worse = 0.7) ** See Table 8, Permen PUPR No.28/PRT/M/2016 ** See Table 8, Permen PUPR No.28/PRT/M/2017 Common Soil ** Assume Loading using Excavator PC 200 ** Assume The Distance of Stockpile "x" Km

60

** See the Product Specification Data Sheet ** See Table 12, Permen PUPR No.28/PRT/M/2016 ** Construction Panning ** Estimate 6 m Road width

Flattening/ Leveling of Overlayed Material

Speading Solid Material

Flattening / Striping

𝑏�=π‘βˆ’π‘οΏ½ ** Good Conditions

Flattening/ Leveling of Overlayed Material

** See Table 04, Permen PUPR No.28/PRT/M/2016 ** See Table 10, Permen PUPR No.28/PRT/M/2016 ** Standard as / Permen PUPR No.28/PRT/M/2016 Flattening/ Leveling of Overlayed Material

Flattening/ Leveling of Overlayed Material

Based on Data Sheet Product

NO

A

U R A I A N

KODE

KOEF.

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

6

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*) Kapastas tangki aspal

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

ASPHALT MIXING PLANT Pw 294.00 Cp 60.00 A 10.00 W 1,500.00 B 3,135,000,000.00 A' W' B' Ca

10.00 1,500.00 3,135,000,000.00 30,000.00

C

313,500,000.00

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

(B' - C) x D W'

E

374,793.13

b. Asuransi Dll =

0,002 x B' W'

F

4,180.00

Biaya Pasti Per Jam =

(E + F)

G

378,973.13

H1 H2 H3

357,518.70 4,085,928.00 243,210.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms Bahan Bakar Pemanasan Material = 12 x 0,7Cp x Ms Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms

2

Pelumas

3

4

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W' Operator = ( 1 Orang / Jam) x U1

5

Pembantu Operator

0.19925

I

147,735.00

K

313,500.00

L

14,285.71

= ( 3 Orang / Jam) x U2

M

29,142.86

Biaya Operasi per Jam = ( H + I + K + L + M )

P

5,191,320.27

T

5,570,293.40 5,570,200.00

E

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN LAIN-LAIN

1

Tingkat Suku Bunga

is

D

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

( E 01 )

15.00

9 dari 92

2 3 4 5 6 7

Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

U1 U2 Mb Ms Mp

14,285.71 9,714.29 5,650.00 8,107.00 33,500.00

KODE

KOEF.

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

A' W' B'

6.00 2,000.00 1,150,000,000.00

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

C

115,000,000.00

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

ASPHALT FINISHER ( E 02 ) 47.00 6.00 6.00 2,000.00 1,150,000,000.00

0.26424

(B' - C) x D W'

E

136,742.60

b. Asuransi Dll =

0,002 x B' W'

F

1,150.00

Biaya Pasti Per Jam =

(E + F)

G

137,892.60

H1

39,832.50

I

23,617.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

86,250.00

4

Operator

= ( 1 Orang / Jam) x U1

L

14,285.71

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,714.29

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

10 dari 92

D

Biaya Operasi per Jam = ( H + I + K + L + M )

P

173,700.00

TOTAL BIAYA SEWA ALAT / JAM = ( G+P )

T

311,592.60

DIBULATKAN E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

311,500.00

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

KODE

KOEF.

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

ASPHALT SPRAYER ( E 03 ) 15.00 800.00 5.00 2,000.00 116,160,000.00

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

A' W' B'

5.00 2,000.00 116,160,000.00

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

C

11,616,000.00

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

Analisa Alat 2016

i x (1 + i) ^ A' (1 + i) ^ A' - 1

(B' - C) x D

D

0.29832

E

15,593.55

11 dari 92

W' b. Asuransi Dll =

0,002 x B' W'

F

116.16

Biaya Pasti Per Jam =

(E + F)

G

15,709.71

H1

12,712.50

I

7,537.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

8,712.00

4

Operator

= ( 1 Orang / Jam) x U1

L

14,285.71

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

52,962.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

68,671.71 68,600.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

NO

A

U R A I A N

KODE

KOEF.

URAIAN PERALATAN

Analisa Alat 2016

12 dari 92

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

i x (1 + i) ^ A' (1 + i) ^ A' - 1

BULLDOZER 100-150 HP ( E 04 ) Pw 140.00 Cp A 5.00 W 2,000.00 B 880,000,000.00 A' W' B'

5.00 2,000.00 880,000,000.00

C

88,000,000.00

D

0.29832

(B' - C) x D W'

E

118,132.96

b. Asuransi Dll =

0,002 x B' W'

F

880.00

Biaya Pasti Per Jam =

(E + F)

G

119,012.96

H1

118,650.00

I

70,350.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

66,000.00

4

Operator

= ( 1 Orang / Jam) x U1

L

14,285.71

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

279,000.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

398,012.96 398,000.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

13 dari 92

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

i x (1 + i) ^ A' (1 + i) ^ A' - 1

KODE

KOEF.

COMPRESSOR 4000-6500 L\M ( E 05 ) Pw 80.00 Cp A 5.00 W 2,000.00 B 275,000,000.00 A' W' B'

5.00 2,000.00 275,000,000.00

C

27,500,000.00

D

0.29832

(B' - C) x D W'

E

36,916.55

b. Asuransi Dll =

0,002 x B' W'

F

275.00

Biaya Pasti Per Jam =

(E + F)

G

37,191.55

H1

67,800.00

I

40,200.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

20,625.00

Operator

L

14,285.71

4

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

= ( 1 Orang / Jam) x U1

14 dari 92

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

152,625.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

189,816.55 189,800.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

Analisa Alat 2016

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

i x (1 + i) ^ A' (1 + i) ^ A' - 1

KODE

KOEF.

CONCRETE MIXER 0,3 - 0,6 M3 ( E 06 ) Pw 15.00 Cp 500.00 A 4.00 W 2,000.00 B 13,000,000.00 A' W' B'

4.00 2,000.00 13,000,000.00

C

1,300,000.00

D

0.35027

15 dari 92

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

(B' - C) x D W'

E

2,049.05

b. Asuransi Dll =

0,002 x B' W'

F

13.00

Biaya Pasti Per Jam =

(E + F)

G

2,062.05

H1

12,712.50

I

7,537.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

975.00

4

Operator

= ( 1 Orang / Jam) x U1

L

14,285.71

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

45,225.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

47,287.05 47,200.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

NO

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

U R A I A N

KODE

KOEF.

16 dari 92

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

CRANE 10 - 15 TON ( E 07 ) 150.00 15.00 5.00 2,000.00 151,250,000.00

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

A' W' B'

5.00 2,000.00 151,250,000.00

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

C

15,125,000.00

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

0.29832

(B' - C) x D W'

E

20,304.10

b. Asuransi Dll =

0,002 x B' W'

F

151.25

Biaya Pasti Per Jam =

(E + F)

G

20,455.35

H1

127,125.00

I

75,375.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

11,343.75

4

Operator

= ( 1 Orang / Jam) x U1

L

14,285.71

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

237,843.75

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

258,299.10 258,200.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

17 dari 92

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

i x (1 + i) ^ A' (1 + i) ^ A' - 1

KODE

KOEF.

DUMP TRUCK 3 - 4 M3 ( E 08 ) Pw 100.00 Cp 6.00 A 5.00 W 2,000.00 B 186,000,000.00 A' W' B'

5.00 2,000.00 186,000,000.00

C

18,600,000.00

D

0.29832

(B' - C) x D W'

E

24,969.01

b. Asuransi Dll =

0,002 x B' W'

F

186.00

Biaya Pasti Per Jam =

(E + F)

G

25,155.01

H1

84,750.00

I

50,250.00

K

13,950.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

18 dari 92

4

Operator

= ( 1 Orang / Jam) x U1

L

9,714.29

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,285.71

Biaya Operasi per Jam = ( H + I + K + L + M )

P

167,950.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

193,105.01 193,100.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 9,714.29 9,285.71 5,650.00 5,650.00 33,500.00

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

KODE

KOEF.

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

DUMP TRUCK ( E 09 ) 125.00 8.00 5.00 2,000.00 232,500,000.00

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

A' W' B'

5.00 2,000.00 232,500,000.00

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

C

23,250,000.00

2

Faktor Angsuran Modal =

Analisa Alat 2016

i x (1 + i) ^ A'

D

0.29832

19 dari 92

(1 + i) ^ A' - 1 3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

(B' - C) x D W'

E

31,211.26

b. Asuransi Dll =

0,002 x B' W'

F

232.50

Biaya Pasti Per Jam =

(E + F)

G

31,443.76

H1

105,937.50

I

62,812.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

17,437.50

4

Operator

= ( 1 Orang / Jam) x U1

L

9,714.29

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,285.71

Biaya Operasi per Jam = ( H + I + K + L + M )

P

205,187.50

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

236,631.26 236,600.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 9,714.29 9,285.71 5,650.00 5,650.00 33,500.00

NO

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

U R A I A N

KODE

KOEF.

20 dari 92

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

i x (1 + i) ^ A' (1 + i) ^ A' - 1

EXCAVATOR 80 - 140 HP Pw 80.00 Cp 0.50 A 5.00 W 2,000.00 B 961,950,000.00 A' W' B'

5.00 2,000.00 961,950,000.00

C

96,195,000.00

D

0.29832

(B' - C) x D W'

E

129,134.09

b. Asuransi Dll =

0,002 x B' W'

F

961.95

Biaya Pasti Per Jam =

(E + F)

G

130,096.04

H1

67,800.00

I

40,200.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

72,146.25

4

Operator

= ( 1 Orang / Jam) x U1

L

14,285.71

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

204,146.25

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

334,242.29 334,200.00

E

LAIN-LAIN

1 2 3 4 5 6

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

( E 10 )

21 dari 92

7

PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

i x (1 + i) ^ A' (1 + i) ^ A' - 1

KODE

KOEF.

FLAT BED TRUCK 3 - 4 M3 Pw 100.00 Cp 4.00 A 5.00 W 2,000.00 B 190,235,000.00 A' W' B'

5.00 2,000.00 190,235,000.00

C

19,023,500.00

D

0.29832

(B' - C) x D W'

E

25,537.53

b. Asuransi Dll =

0,002 x B' W'

F

190.24

Biaya Pasti Per Jam =

(E + F)

G

25,727.76

H1

84,750.00

I

50,250.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

( E 11 )

22 dari 92

= ( 12,5 % - 17,5 % ) x B' W'

K

14,267.63

4

Operator

= ( 1 Orang / Jam) x U1

L

9,714.29

5

Pembantu Operator

= ( 1 Orang / Jam) x U2

M

9,285.71

Biaya Operasi per Jam = ( H + I + K + L + M )

P

168,267.63

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

193,995.39 193,900.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 9,714.29 9,285.71 5,650.00 5,650.00 33,500.00

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

Analisa Alat 2016

KODE

KOEF.

GENERATOR SET ( E 12 ) Pw 175.00 Cp 125.00 A 5.00 W 2,000.00 B 217,800,000.00 A' 5.00 W' 2,000.00 B' 217,800,000.00

C

21,780,000.00

23 dari 92

2

Faktor Angsuran Modal =

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

0.29832

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

(B' - C) x D W'

E

29,237.91

b. Asuransi Dll =

0,002 x B' W'

F

217.80

Biaya Pasti Per Jam =

(E + F)

G

29,455.71

H1

148,312.50

I

87,937.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

16,335.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

10,714.29 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

273,013.57

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

302,469.28 302,400.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Mekanik Upah Pembantu Mekanik Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 10,714.29 9,714.29 5,650.00 5,650.00 33,500.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

24 dari 92

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

KODE

MOTOR GRADER >100 HP ( E 13 ) Pw 125.00 Cp A 5.00 W 2,000.00 B 1,501,500,000.00 A' 5.00 W' 2,000.00 B' 1,501,500,000.00

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

KOEF.

D

150,150,000.00 0.29832

(B' - C) x D W'

E

201,564.36

b. Asuransi Dll =

0,002 x B' W'

F

1,501.50

Biaya Pasti Per Jam =

(E + F)

G

203,065.86

H1

105,937.50

I

62,812.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

112,612.50

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

305,362.50

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

508,428.36 508,400.00

E

LAIN-LAIN

1 2 3 4 5 6

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

25 dari 92

7

PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

KODE

TRACK LOADER 75 - 100 HP ( E 14 ) Pw 90.00 Cp 1.60 A 5.00 W 2,000.00 B 698,500,000.00 A' 5.00 W' 2,000.00 B' 698,500,000.00

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

KOEF.

69,850,000.00

D

0.29832

(B' - C) x D W'

E

93,768.04

b. Asuransi Dll =

0,002 x B' W'

F

698.50

Biaya Pasti Per Jam =

(E + F)

G

94,466.54

H1

76,275.00

I

45,225.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

26 dari 92

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

52,387.50

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

197,887.50

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

292,354.04 292,300.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

B

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

KODE

KOEF.

WHEEL LOADER 1,0 - 1,6 M3 ( E 15 ) Pw 105.00 Cp 1.50 A 5.00 W 2,000.00 B 825,000,000.00 A' 5.00 W' 2,000.00 B' 825,000,000.00

BIAYA PASTI PER JAM KERJA

Analisa Alat 2016

27 dari 92

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

C

82,500,000.00

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

0.29832

(B' - C) x D W'

E

110,749.65

b. Asuransi Dll =

0,002 x B' W'

F

825.00

Biaya Pasti Per Jam =

(E + F)

G

111,574.65

H1

88,987.50

I

52,762.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

61,875.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

227,625.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

339,199.65 339,100.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

28 dari 92

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

KODE

THREE WHEEL ROLLER 6 - 8 T ( E 16 ) Pw 55.00 Cp 8.00 A 5.00 W 2,000.00 B 412,500,000.00 A' 5.00 W' 2,000.00 B' 412,500,000.00

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

KOEF.

41,250,000.00

D

0.29832

(B' - C) x D W'

E

55,374.82

b. Asuransi Dll =

0,002 x B' W'

F

412.50

Biaya Pasti Per Jam =

(E + F)

G

55,787.32

H1

46,612.50

I

27,637.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

30,937.50

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

129,187.50

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

184,974.82 184,900.00

E

LAIN-LAIN

1 2 3 4

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin

is U1 U2 Mb

15.00 14,285.71 9,714.29 5,650.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

29 dari 92

5 6 7

Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

Ms Mp

KODE

KOEF.

TANDEM ROLLER 6 - 8 T ( E 17 ) Pw 50.00 Cp 8.00 A 5.00 W 2,000.00 B 473,000,000.00 A' 5.00 W' 2,000.00 B' 473,000,000.00

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

5,650.00 33,500.00

47,300,000.00

D

0.29832

(B' - C) x D W'

E

63,496.47

b. Asuransi Dll =

0,002 x B' W'

F

473.00

Biaya Pasti Per Jam =

(E + F)

G

63,969.47

H1

42,375.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

Analisa Alat 2016

30 dari 92

2

Pelumas

3

I

25,125.00

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

35,475.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

126,975.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

190,944.47 190,900.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

Analisa Alat 2016

KODE

Pw Cp A W B A' W' B'

KOEF.

TYRE ROLLER ( E 18 ) 60.00 10.00 5.00 1,800.00 652,204,000.00 5.00 1,800.00 652,204,000.00

31 dari 92

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

65,220,400.00

D

0.29832

(B' - C) x D W'

E

97,281.30

b. Asuransi Dll =

0,002 x B' W'

F

724.67

Biaya Pasti Per Jam =

(E + F)

G

98,005.97

H1

50,850.00

I

30,150.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

54,350.33

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

159,350.33

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

257,356.30 257,300.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

32 dari 92

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

KODE

VIBRATORY ROLLER 5 - 8 T ( E 19 ) Pw 75.00 Cp 7.00 A 5.00 W 2,000.00 B 385,000,000.00 A' 5.00 W' 2,000.00 B' 385,000,000.00

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

KOEF.

38,500,000.00

D

0.29832

(B' - C) x D W'

E

51,683.17

b. Asuransi Dll =

0,002 x B' W'

F

385.00

Biaya Pasti Per Jam =

(E + F)

G

52,068.17

H1

63,562.50

I

37,687.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

28,875.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

154,125.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

206,193.17 206,100.00

E

LAIN-LAIN

1 2

Tingkat Suku Bunga Upah Operator / Sopir

is U1

15.00 14,285.71

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

33 dari 92

3 4 5 6 7

Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

C.

U2 Mb Ms Mp

KODE

KOEF.

CONCRETE VIBRATOR ( E 20 ) Pw 10.00 Cp 0.00 A 4.00 W 1,000.00 B 13,750,000.00 A' 4.00 W' 1,000.00 B' 13,750,000.00

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

9,714.29 5,650.00 5,650.00 33,500.00

1,375,000.00

D

0.35027

(B' - C) x D W'

E

4,334.53

b. Asuransi Dll =

0,002 x B' W'

F

27.50

Biaya Pasti Per Jam =

(E + F)

G

4,362.03

BIAYA OPERASI PER JAM KERJA

Analisa Alat 2016

34 dari 92

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

H1

8,475.00

2

Pelumas

I

5,025.00

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

2,062.50

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

39,562.50

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

43,924.53 43,900.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun

Analisa Alat 2016

KODE

Pw Cp A W B A' W'

KOEF.

STONE CRUSHER ( E 21 ) 220.00 50.00 5.00 2,000.00 1,980,000,000.00 5.00 2,000.00

35 dari 92

c. Harga Alat (*) B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

i x (1 + i) ^ A' (1 + i) ^ A' - 1

B'

1,980,000,000.00

C

198,000,000.00

D

0.29832

(B' - C) x D W'

E

265,799.16

b. Asuransi Dll =

0,002 x B' W'

F

1,980.00

Biaya Pasti Per Jam =

(E + F)

G

267,779.16

H1

186,450.00

I

110,550.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

148,500.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

469,500.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

737,279.16 737,200.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

36 dari 92

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

KODE

KOEF.

Water Pump 70 - 100 mm Pw 6.00 Cp 0.00 A 2.00 W 2,000.00 B 16,500,000.00 A' 2.00 W' 2,000.00 B' 16,500,000.00

C

1,650,000.00

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

0.61512

(B' - C) x D W'

E

4,567.24

b. Asuransi Dll =

0,002 x B' W'

F

16.50

Biaya Pasti Per Jam =

(E + F)

G

4,583.74

H1

5,085.00

I

3,015.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

1,237.50

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

33,337.50

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

37,921.24 37,900.00

E

LAIN-LAIN

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

( E 22 )

37 dari 92

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

is U1 U2 Mb Ms Mp

KODE

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

KOEF.

Water Tanker 3000 - 4500 L ( E 23 ) Pw 100.00 Cp 4,000.00 A 5.00 W 2,000.00 B 158,000,000.00 A' 5.00 W' 2,000.00 B' 158,000,000.00

C

15,800,000.00

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

0.29832

(B' - C) x D W'

E

21,210.24

b. Asuransi Dll =

0,002 x B' W'

F

158.00

Biaya Pasti Per Jam =

(E + F)

G

21,368.24

Analisa Alat 2016

38 dari 92

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

H1

84,750.00

I

50,250.00

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

11,850.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

170,850.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

192,218.24 192,200.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

Analisa Alat 2016

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

KODE

Pw Cp A W B

KOEF.

PEDESTRIAN ROLLER ( E 24 ) 11.00 0.980 4.00 2,000.00 66,000,000.00

39 dari 92

5

Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

i x (1 + i) ^ A' (1 + i) ^ A' - 1

A' W' B'

4.00 2,000.00 66,000,000.00

C

6,600,000.00

D

0.35027

(B' - C) x D W'

E

10,402.88

b. Asuransi Dll =

0,002 x B' W'

F

66.00

Biaya Pasti Per Jam =

(E + F)

G

10,468.88

H1

9,322.50

I

5,527.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

4,950.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

43,800.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

54,268.88 54,200.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

40 dari 92

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

KODE

KOEF.

STAMPER

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

i x (1 + i) ^ A' (1 + i) ^ A' - 1

Pw Cp A W B A' W' B'

( E 25 ) 5.00 0.170 4.00 1,000.00 16,300,000.00 4.00 1,000.00 16,300,000.00

C

1,630,000.00

D

0.35027

(B' - C) x D W'

E

5,138.39

b. Asuransi Dll =

0,002 x B' W'

F

32.60

Biaya Pasti Per Jam =

(E + F)

G

5,170.99

H1

4,237.50

I

2,512.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

2,445.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

33,195.00

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

38,365.99 38,300.00

4 5

D

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

41 dari 92

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

b. Asuransi Dll =

Analisa Alat 2016

KODE

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

KOEF.

JACK HAMMER

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

is U1 U2 Mb Ms Mp

Pw Cp A W B A' W' B'

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

( E 26 ) 3.00 0.00 4.00 1,000.00 11,500,000.00 4.00 1,000.00 11,500,000.00

1,150,000.00

D

0.35027

(B' - C) x D W'

E

3,625.25

0,002 x B' W'

F

23.00

42 dari 92

Biaya Pasti Per Jam =

(E + F)

G

3,648.25

H1

2,542.50

I

1,507.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

1,725.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

29,775.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

33,423.25 33,400.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

Analisa Alat 2016

: a. Umur Ekonomis

KODE

Pw Cp A

KOEF.

FULVI MIXER ( E 27 ) 75.00 0.00 5.00

43 dari 92

5

b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

W B A' W' B'

2,000.00 900,000,000.00 5.00 2,000.00 900,000,000.00

C

90,000,000.00

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

0.29832

(B' - C) x D W'

E

120,817.80

b. Asuransi Dll =

0,002 x B' W'

F

900.00

Biaya Pasti Per Jam =

(E + F)

G

121,717.80

H1

63,562.50

I

37,687.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

67,500.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

192,750.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

314,467.80 314,400.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

44 dari 92

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

KODE

Pw Cp A W B A' W' B'

C i x (1 + i) ^ A' (1 + i) ^ A' - 1

KOEF.

BLENDING EQUIPMENT ( E 52 ) 50.00 30.00 10.00 1,500.00 500,000,000.00 10.00 1,500.00 500,000,000.00

50,000,000.00

D

0.19925

(B' - C) x D W'

E

59,775.62

b. Asuransi Dll =

0,002 x B' W'

F

666.67

Biaya Pasti Per Jam =

(E + F)

G

60,442.29

H1

42,375.00

I

25,125.00

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

50,000.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

141,500.00

TOTAL BIAYA SEWA ALAT / JAM = ( G+P )

T

201,942.29

4 5

D

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

45 dari 92

DIBULATKAN E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

NO

U R A I A N

A

URAIAN PERALATAN

1 2 3 4

Jenis Peralatan Tenaga Kapasitas Alat Baru

5

: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)

B

BIAYA PASTI PER JAM KERJA

1

Nilai Sisa Alat = 10% x B

2

Faktor Angsuran Modal =

3

Biaya Pasti Per Jam a. Biaya Pengembalian Modal =

b. Asuransi Dll =

Analisa Alat 2016

201,900.00

is U1 U2 Mb Ms Mp

KODE

Pw Cp A W B A' W' B'

C

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

KOEF.

ASPALT DITRIBUTOR ( E 41 ) 115.00 4,000.00 5.00 2,000.00 395,000,000.00 5.00 2,000.00 395,000,000.00

39,500,000.00

i x (1 + i) ^ A' (1 + i) ^ A' - 1

D

0.29832

(B' - C) x D W'

E

53,025.59

0,002 x B'

F

395.00

46 dari 92

W' Biaya Pasti Per Jam =

(E + F)

G

53,420.59

H1

97,462.50

I

57,787.50

C.

BIAYA OPERASI PER JAM KERJA

1

Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms

2

Pelumas

3

Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'

K

29,625.00

Operator Pembantu Operator

= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2

L M

14,285.71 9,714.29

Biaya Operasi per Jam = ( H + I + K + L + M )

P

208,875.00

D

TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN

T

262,295.59 262,200.00

E

LAIN-LAIN

1 2 3 4 5 6 7

Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan

is U1 U2 Mb Ms Mp

15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00

4 5

Analisa Alat 2016

= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp

47 dari 92

MIXING PLANT

SATUAN

KET.

( E 01 ) HP Ton/Jam Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Tahun Jam Rupiah liter

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah Rupiah

Khusus AMP

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun

Analisa Alat 2016

48 dari 92

LT FINISHER

Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

( E 02 ) HP Ton Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah

Analisa Alat 2016

49 dari 92

LT SPRAYER

Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

( E 03 ) HP LITER Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Analisa Alat 2016

50 dari 92

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

Analisa Alat 2016

KET.

51 dari 92

ER 100-150 HP

( E 04 ) HP Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

52 dari 92

SATUAN

KET.

OR 4000-6500 L\M ( E 05 ) HP Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah

Analisa Alat 2016

53 dari 92

Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

MIXER 0,3 - 0,6 M3 ( E 06 ) HP LITER Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Analisa Alat 2016

54 dari 92

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

Analisa Alat 2016

KET.

55 dari 92

10 - 15 TON ( E 07 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

56 dari 92

SATUAN

KET.

RUCK 3 - 4 M3 ( E 08 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Analisa Alat 2016

57 dari 92

MP TRUCK

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

( E 09 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Analisa Alat 2016

58 dari 92

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

Analisa Alat 2016

KET.

59 dari 92

OR 80 - 140 HP

( E 10 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

60 dari 92

SATUAN

TRUCK 3 - 4 M3

KET.

( E 11 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Analisa Alat 2016

61 dari 92

RATOR SET

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

( E 12 ) HP Kva Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah

Analisa Alat 2016

62 dari 92

Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

63 dari 92

SATUAN

GRADER >100 HP ( E 13 ) HP Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

64 dari 92

SATUAN

ADER 75 - 100 HP ( E 14 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Analisa Alat 2016

65 dari 92

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

ADER 1,0 - 1,6 M3 ( E 15 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah

Analisa Alat 2016

KET.

Alat Baru Alat Baru Alat Baru

66 dari 92

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

67 dari 92

SATUAN

EEL ROLLER 6 - 8 T ( E 16 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter

Analisa Alat 2016

68 dari 92

Liter Liter

SATUAN

ROLLER 6 - 8 T ( E 17 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016

69 dari 92

Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

E ROLLER ( E 18 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

Analisa Alat 2016

Alat Baru Alat Baru Alat Baru

70 dari 92

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

71 dari 92

SATUAN

Y ROLLER 5 - 8 T ( E 19 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam

Analisa Alat 2016

72 dari 92

Rp./Jam Liter Liter Liter

SATUAN

ETE VIBRATOR ( E 20 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016

73 dari 92

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

E CRUSHER ( E 21 ) HP TON/jam Tahun Jam Rupiah Tahun Jam

Analisa Alat 2016

Alat Baru Alat Baru

74 dari 92

Rupiah

Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

75 dari 92

mp 70 - 100 mm

SATUAN

KET.

( E 22 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

Analisa Alat 2016

76 dari 92

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

ker 3000 - 4500 L ( E 23 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Analisa Alat 2016

77 dari 92

RIAN ROLLER

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

( E 24 ) HP TON Tahun Jam Rupiah

Analisa Alat 2016

78 dari 92

Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

79 dari 92

TAMPER

SATUAN

KET.

HP TON Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

( E 25 )

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

Analisa Alat 2016

80 dari 92

K HAMMER

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

( E 26 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Analisa Alat 2016

81 dari 92

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

KET.

LVI MIXER ( E 27 ) HP TON Tahun

Analisa Alat 2016

82 dari 92

Jam Rupiah Tahun Jam Rupiah

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

83 dari 92

SATUAN

NG EQUIPMENT ( E 52 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah

Analisa Alat 2016

84 dari 92

Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

SATUAN

T DITRIBUTOR ( E 41 ) HP Liter Tahun Jam Rupiah Tahun Jam Rupiah

KET.

Alat Baru Alat Baru Alat Baru

Rupiah Rupiah

Rupiah

Rupiah

Analisa Alat 2016

85 dari 92

Rupiah

Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah Rupiah

%/Tahun Rp./Jam Rp./Jam Liter Liter Liter

Analisa Alat 2016

86 dari 92

1. Wind Farm Civil Works No. I

II

DESCRIPTION EQUIPMENT RENTAL COST Asphalt Mixing Plant Asphalt Finisher Asphalt Sprayer Bulldozer 1000-1500 HP Compressor 4000-6500 L\M Concrete Mixer 0,3 - 0,6 m3 Crane 10 - 15 ton Dump Truck 3 - 4 m3 Dump Truck Excavator 80 - 140 m3 Flat Bed Truck 3 - 4 m3 Generator Set Motor Grader >100 HP Track Loader 75-100 HP Wheel Loader 1,0 - 1,6 m3 Three Wheel Roller 6-8 Ton Tandem Roller 6-9 ton Tyre Roller 8 - 10 T Vibratory Roller 5 - 8 T Concrete Vibrator Stone Crusher Water Pump 70 - 100 mm Water Tanker 3000 - 4500 L Pedestrian Roller Stamper Jack Hammer Fulvi Mixer Aspalt Distributor Concrete Paver Concrete Trowel Concrete Cutter Welding Las Batching Plant Blending Equipment Supporting Tools Supporting Tools (Hose + Tas Lab) EQUIPMENT COMPONENT COST Interest Rate ( %/Tahun ) Operator / Driver

CODE

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 41 28 29 30 31 32 52

UNIT

/ Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour

/ Year / Hour

Operator / Driver Helper Fuel Gasoline Fuel Diesel Solar Fuel Diesel Solar Industrial Oil Machine III

IV

MAN POWER COST Pekerja Tukang Mandor Operator terlatih Pembantu Operator Sopir matrial Pembantu Sopir Mekanik terlatih Pembantu Mekanik Kepala Tukang Tukang Las Konstruksi

/ Hour / Liter / Liter / Liter / Liter

L L L L L L L L L

01 02 03 04 05 06 07 08 09

/ Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour

COMMON CIVIL WORK MATERIAL Pasir Batu Kali Sirtu

MR. 01 MR. 02 MR. 16

Cubic m Cubic m Cubic m

Pasir Agregat Batu Agregat Agregat Kasar Agregat Halus Semen/Filler Material Tanah Timbunan Material Tanah Pilihan Aspal Curah Kerosene / Minyak Aspal Semen (50 kg) Besi Beton Kawat Beton Sirtu Paku Kayu Perancah Solar Solar industri Minyak Pelumas Agregat A Agregat B Aspal Drum Baja IWF Pasir Urug Besi Beton Dolken Ø 8 - 10 cm

M 01 M 02 M 03 M 04 M 05 M 08 M 09 M 10 M 11 M 12 M 13 M 14 M 16 M 18 M 19 M 21 M 21 A M 22 M 26 M 27 M 31 M 39 M 44 M 20 M 45

Cubic m Cubic m Cubic m Cubic m Kgs Cubic m Cubic m Kgs Ltr Zak Kgs Kgs Cubic m Kgs Cubic m Ltr Ltr Ltr Cubic m Cubic m Kgs Kgs Cubic m Kgs m'

Plastik Agregat Pecah Mesin 0-5 mm Agregat Pecah Mesin 5-10 & 10-20 mm Agregat Pecah Mesin 20-30 mm Pasir pasang / beton Batu Blonos Batu Belah 10 - 15 cm Batu pecah tangan 5 - 7 cm Koral (Batu Pecah mesin 5 - 40 mm ) Koral (Batu Pecah tangan 5 - 40 mm ) Kawat Bronjong 4 mm (Galvanis) Kantung Plastik 60x40x20 Minyak Bekisting Air Kayu Bakar Ready Mix K.125 Ready Mix K.175 Ready Mix K.225 Ready Mix K.250 Ready Mix K.275 Ready Mix K.300 Ready Mix K.350 Meni Besi Plamir tembok Cat Dasar Cat Tembok Kuas 3" Kuas 4" Ampelas Kapek Keramik polos 30x30 cm Batu bata Semen warna Elastomir Shear Conector IV

SPECIAL CIVIL WORK MATERIAL

M 51 M91 M92 M93

M 06

Sq m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Kgs Pcs Ltr Ltr Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Kgs Kgs Kgs Kgs Pcs Pcs Ltr Pcs Sq m Pcs Kgs Pcs ls

COEF

UNIT PRICE

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

5,570,200.00 311,500.00 68,600.00 398,000.00 189,800.00 47,200.00 258,200.00 193,100.00 236,600.00 334,200.00 193,900.00 302,400.00 508,400.00 292,300.00 339,100.00 184,900.00 190,900.00 257,300.00 206,100.00 43,900.00 737,200.00 37,900.00 192,200.00 54,200.00 38,300.00 33,400.00 314,400.00 262,200.00 72,100.00 12,100.00 30,250.00 5,720.00 193,100.00 201,900.00 2,000.00 56,870.00

1.00 1.00

15.00 14,285.71

TOTAL PRICE

REMARK

5,570,200.00 Coefficient Need to 311,500.00 adjusted due to: 68,600.00 398,000.00 189,800.00 47,200.00 258,200.00 193,100.00 236,600.00 334,200.00 193,900.00 302,400.00 508,400.00 292,300.00 339,100.00 184,900.00 190,900.00 257,300.00 206,100.00 43,900.00 737,200.00 37,900.00 192,200.00 54,200.00 38,300.00 33,400.00 314,400.00 262,200.00 72,100.00 12,100.00 30,250.00 5,720.00 193,100.00 201,900.00 2,000.00 56,870.00

15.00 14,285.71

1.00 1.00 1.00 1.00 1.00

9,714.29 7,800.00 5,650.00 8,107.00 33,500.00

9,714.29 7,800.00 5,650.00 8,107.00 33,500.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

7,857.14 9,714.29 11,428.57 14,285.71 9,714.29 9,714.29 9,285.71 10,714.29 9,714.29 10,714.29 10,714.29

7,857.14 9,714.29 11,428.57 14,285.71 9,714.29 9,714.29 9,285.71 10,714.29 9,714.29 10,714.29 10,714.29

1.00 1.00 1.00

48,300.00 48,300.00 48,300.00

48,300.00 48,300.00 48,300.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

89,658.00 100,290.00 162,757.59 166,637.93 1,340.00 88,900.00 115,100.00 7,387.00 8,824.00 67,000.00 9,800.00 17,200.00 130,800.00 13,600.00 1,936,900.00 5,650.00 8,107.00 33,500.00 206,096.51 200,250.91 9,463.00 12,500.00 88,900.00 9,800.00 5,800.00

89,658.00 100,290.00 162,757.59 166,637.93 1,340.00 88,900.00 115,100.00 7,387.00 8,824.00 67,000.00 9,800.00 17,200.00 130,800.00 13,600.00 1,936,900.00 5,650.00 8,107.00 33,500.00 206,096.51 200,250.91 9,463.00 12,500.00 88,900.00 9,800.00 5,800.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

8,300.00 166,637.93 162,757.59 162,757.59 174,100.00 172,000.00 196,700.00 225,100.00 367,300.00 367,300.00 11,500.00 1,200.00 3,100.00 50.00 347,300.00 967,300.00 997,200.00 1,023,400.00 1,044,300.00 1,075,000.00 1,085,000.00 1,123,600.00 23,000.00 11,500.00 26,100.00 26,100.00 9,400.00 15,700.00 3,100.00 5,200.00 53,600.00 900.00 13,600.00 581,000.00 15,700.00

8,300.00 166,637.93 162,757.59 162,757.59 174,100.00 172,000.00 196,700.00 225,100.00 367,300.00 367,300.00 11,500.00 1,200.00 3,100.00 50.00 347,300.00 967,300.00 997,200.00 1,023,400.00 1,044,300.00 1,075,000.00 1,085,000.00 1,123,600.00 23,000.00 11,500.00 26,100.00 26,100.00 9,400.00 15,700.00 3,100.00 5,200.00 53,600.00 900.00 13,600.00 581,000.00 15,700.00

Related Documents


More Documents from "Dicky Seprianto"