SCHEDULE
ESTIMATION EQUIPMENT PRODUCTION CAPACITY REFF: PERMEN PUPR NO 28/PRT/M/2016
WBS DESCRIPTION 1 BULLDOZER 1.1 Machine Specification Engine Power Blade/ Bucket Width Blade/ Bucket Hight Blade/ Bucket Capacity Machine Working Efficiency Machine Blade Factor Blade Inclination Factor 1.2 Machine Time Cycle Striping Speed Reverse Speed Planned Stripng Distance/ Tack Overlaping Width Number of Machine Track Delay Time/ Other Cycle Time
CODE
UNIT
Pw L H q Fa Fb Fm
75.00 3.18 1.30 5.37 0.75 1.00 0.70
Vf Vr l Lo n T3 Ts
3.00 Km/Hr ** Based on product C 4.20 Km/Hr ** Based on product C 1 30.00 M 0.30 M1 3.00ποΏ½= β24_(πβ1)^πβππ ** With Asupmtion 15 m 0.10 Mnt ** User Asuption 1.13 Mnt ** Striping Speed + Re
1.3 οΏ½=(οΏ½.πΉ_π.πΉ_π.πΉ_π.60)/π_οΏ½ Machine Production Capacity Production Capacity for Soil Striping οΏ½=(οΏ½Γ{π(πΏβπΏ_0 )+πΏ_0 }.οΏ½_οΏ½.οΏ½_οΏ½.οΏ½_οΏ½.60)/(π.π.π_οΏ½ ) Production Capacity for Flattening
EXCAVATOR BACKHOE Machine Specification Excavator Bucket Cavacity Bucket Fill Factor Excavator Efficiency Factor Excavation Conversion Factor 2.2 Machine Time Cycle Time for Digging and Loading, etc Delay Time, etc Cycle Time οΏ½=(οΏ½.πΉ_π.πΉ_π.60)/(π_οΏ½.πΉ_π£ ).
COEFF
HP M1 M1 M3
149.77
M2/Hr
2,491.09
M2/Hr
Bucket Capacity = L x Good = 0.83; Fair = 0. By Default (1) Standar Flat = 1; Sloping -15%
2 2.1
2.3
Machine Production Capacity Production Capacity for Soil Excavation
M3
V Fb Fa Fv
0.80 1.00 0.75 1.00
T1 T2 Ts
0.32 Mnt 0.10 Mnt 0.42 Mnt
PC 200 (Komatsu) or S ** See Table 9, Perm ** See Table 11, Perme ** See Table 10, Perm
ποΏ½= β24_(πβ1)^πβππ
85.71
M2/Hr
Max Duration 0.32 Min Max Duration 0.10 Min
3 3.1
3.2
DUMP TRUCK DT 3.5 T Machine Specification Dump truck Bucket Capacity Truck Efficiency Truck Speed full Loaded Truck Speed No Loaded Material Desnity Machine Cycle Time Loading Time
Temp Stockpile Distance Delivery Time (Loaded) οΏ½=(οΏ½.πΉ_π.60)/(π·.π_οΏ½ ). loaded) Return Time (Un Delay Time Cycle Time 3.3 Machine Production Capacity Production Capacity for Dump Truck DT 3.5 Ton
4 4.1
4.2
DUMP TRUCK DT 10 T Machine Specification Dump truck Bucket Capacity Truck Efficiency Truck Speed full Loaded Truck Speed No Loaded Material Desnity Machine Cycle Time Loading Time
Temp Stockpile οΏ½=(οΏ½.πΉ_π.60)/(π·.π_οΏ½ ). Distance Delivery Time (Loaded) Return Time (Un loaded) Delay Time Cycle Time 4.3 Machine Production Capacity Production Capacity for Dump Truck DT 10 Ton
5 5.1
MOTOR GRADER Machine Specification Operatinal Wight Capacity Engine Power Blade Length Effective Blade Length
V Fa V1 V2 D
3.50 Ton 0.80 Good = 0.83; Fair = 0. π_1=(οΏ½.60)/(π·.οΏ½_πΈπ₯π 20.00 Km/hr ** )See Table 8, Perm 35.00 Km/hr ** See Table 8, Perm 3 1.60 Ton/M Common Soil
T1
1.53 Minute
** Assume Loading us
L T2 T3 T4 Ts
1.50 4.50 2.57 1.00 9.60
** Assume The Distanc
ποΏ½= β24_(πβ1)^πβππ
10.93
V Fa V1 V2 D T1
M3/Hr
10.00 Ton π_1=(οΏ½.60)/(π·.οΏ½_πΈπ₯π ) 0.80 Good = 0.83; Fair = 0. 20.00 Km/hr ** See Table 8, Perm 35.00 Km/hr ** See Table 8, Perm 3 1.60 Ton/M Common Soil ποΏ½= β24_(πβ1)^πβππ
4.38 Minute
L T2 T3 T4 Ts
1.50 4.50 2.57 1.00 12.45
Q
24.10
Pw L b
Km Mnt Mnt Mnt Mnt
Km Mnt Mnt Mnt Mnt
** Assume Loading us
** Assume The Distanc
M3/Hr
10,800.00 Kgs 135.00 HP 3.71 (πΏ_(β,).60)/ Mtr (οΏ½.1000). 2.60 ποΏ½= β_(πβ1)^πβππ ποΏ½= Mtr β24_(πβ1)^πβππ
Overlap Width Average Operational Speed Working)+π_0 Effeciency οΏ½=(πΏ_β.{π.(πβπ_οΏ½ }.πΉ_πFactor 60)/(π.π.π_οΏ½ ). 5,2 Machine Cycle Time Flattening/Spreading Length Track)+π_0 Numer}.πΉ_π 60.π‘)/(π.π.π_οΏ½.πΉ_π ) οΏ½=(πΏ_β.{π.(πβπ_οΏ½ Estimate Time for one Track Delay Time, etc οΏ½=(πΏ_β.{π.(πβπ_οΏ½ )+π_0 }.πΉ_π 60)/(π.π.π_οΏ½ ). Cycle Time 5.3 Machine Production Capacity Production Capacity Motor Grader for Overlay Spread a Effeciency Fact Production Capacity Motor Grader for Spreading Materials with Thickness
b
Production Capacity Motor Grader for Grading/ Stiping Effeciency Fact
c
6 οΏ½=((π_οΏ½.οΏ½.1000).π‘.πΉ_π)/(π.). Vibrator Roller 6.1 Machine Specification Weight Roller Width Machine Efficiency Factor Average Operational Speed Compaction Layer Thickness Number of Passing Track Overlap Width 6.2 Machine Production Capacity Production Capacity Vibro Roller for Compaction
bo Vt Fa
0.30 5.00 0.60
Mtr Km/hr
Lh n T1 T2 Ts
100.00 2.00 1.20 0.25 1.45
Mtr Trx Minute Minute Minute
** Construction Pannin ** Estimate 6 m Road Formula
M2/Hr
Flattening/ Leveling of
Fa
6,082.76 0.60 608.28 0.10 1.00 6,082.76 0.60
M2/Hr Mtr
Speading Solid Materi
M2/Hr
Flattening / Striping
t Fk Q Fa
b Fa V t n bo
7.05 1.68 0.80 4.00 0.25 8.00 0.20 148.00
Ton Mtr
** See the Product Spe ** See Table 12, Perm
Formula
ποΏ½=πβποΏ½ ** Good Conditions
Km/hr Mtr Mtr M3/Hr
Flattening/ Leveling of
οΏ½=(οΏ½. γπΉ _π.πΉ γ _π.60)/π_οΏ½ .
7 7.1
Wheall Loader Machine Specification Bucket Capacity Engine Power Machine Efficiency Factor Bucket Efficiency Factor 7.2 Machine Cycle Time Wheal Loader Cycle Time Standards 7.3 Machine Production Capacity Production Capacity Vibro Roller for Compaction οΏ½=(π_π.πΉ_π 60)/(π_π.1000).
V Pw Fa Fb
1.50 96.00 0.75 1.00
M3 HP
Ts
0.45
Mnt
150.00
** See Table 04, Permen ** See Table 10, Permen
M3/Hr
** Standard as / Permen
Flattening/ Leveling of
8 8.1
8.2
9 9.1
9.2
Water Tank Truck Machine Specification Water Tank Capacity Max Pumping Capacity Efficiency Factor Production Requirement Water Required Machine Production Capacity Production Capacity Water Truck
Water Pump Machine Specification Machine Capacity Diameter Pipe Max Production Capacity Machine Production Capacity Production Capacity Water Pump Efficiency Factor
V Pa Fa
4,000.00 100.00 0.80
Wc
1.00
,---/M3
4.80
M3/Hr
6.00 3.00 4.50
Hp Inc M3/Hr
4.05 0.90
M3/Hr
Pw D Q
Ltr Ltr/Mnt
Flattening/ Leveling of
Based on Data Sheet
REMARK
Bucket Capacity = L x H2 (M3) Good = 0.83; Fair = 0.75; Bad = 0,67; Worse = 0.58) By Default (1) Standard for good condition of Blade Flat = 1; Sloping -15% = 1.2; Sloping +15% = 1 ** Based on product Catalogue ** Based on product Catalogue
** With Asupmtion 15 m wide striping corriodor ** User Asuption ** Striping Speed + Reverse Speed + Delay Time
PC 200 (Komatsu) or Simmilar ** See Table 9, Permen PUPR No.28/PRT/M/2016 ** See Table 11, Permen PUPR No.28/PRT/M/2016 ** See Table 10, Permen PUPR No.28/PRT/M/2016 Max Duration 0.32 Minuts Max Duration 0.10 Minuts
0)/
Good = 0.83; Fair = 0.80; Bad = 0,75; Worse = 0.7) ** See Table 8, Permen PUPR No.28/PRT/M/2016 ** See Table 8, Permen PUPR No.28/PRT/M/2017 Common Soil ** Assume Loading using Excavator PC 200 ** Assume The Distance of Stockpile "x" Km
Good = 0.83; Fair = 0.80; Bad = 0,75; Worse = 0.7) ** See Table 8, Permen PUPR No.28/PRT/M/2016 ** See Table 8, Permen PUPR No.28/PRT/M/2017 Common Soil ** Assume Loading using Excavator PC 200 ** Assume The Distance of Stockpile "x" Km
60
** See the Product Specification Data Sheet ** See Table 12, Permen PUPR No.28/PRT/M/2016 ** Construction Panning ** Estimate 6 m Road width
Flattening/ Leveling of Overlayed Material
Speading Solid Material
Flattening / Striping
ποΏ½=πβποΏ½ ** Good Conditions
Flattening/ Leveling of Overlayed Material
** See Table 04, Permen PUPR No.28/PRT/M/2016 ** See Table 10, Permen PUPR No.28/PRT/M/2016 ** Standard as / Permen PUPR No.28/PRT/M/2016 Flattening/ Leveling of Overlayed Material
Flattening/ Leveling of Overlayed Material
Based on Data Sheet Product
NO
A
U R A I A N
KODE
KOEF.
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
6
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*) Kapastas tangki aspal
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
ASPHALT MIXING PLANT Pw 294.00 Cp 60.00 A 10.00 W 1,500.00 B 3,135,000,000.00 A' W' B' Ca
10.00 1,500.00 3,135,000,000.00 30,000.00
C
313,500,000.00
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
(B' - C) x D W'
E
374,793.13
b. Asuransi Dll =
0,002 x B' W'
F
4,180.00
Biaya Pasti Per Jam =
(E + F)
G
378,973.13
H1 H2 H3
357,518.70 4,085,928.00 243,210.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms Bahan Bakar Pemanasan Material = 12 x 0,7Cp x Ms Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms
2
Pelumas
3
4
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W' Operator = ( 1 Orang / Jam) x U1
5
Pembantu Operator
0.19925
I
147,735.00
K
313,500.00
L
14,285.71
= ( 3 Orang / Jam) x U2
M
29,142.86
Biaya Operasi per Jam = ( H + I + K + L + M )
P
5,191,320.27
T
5,570,293.40 5,570,200.00
E
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN LAIN-LAIN
1
Tingkat Suku Bunga
is
D
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
( E 01 )
15.00
9 dari 92
2 3 4 5 6 7
Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
U1 U2 Mb Ms Mp
14,285.71 9,714.29 5,650.00 8,107.00 33,500.00
KODE
KOEF.
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
A' W' B'
6.00 2,000.00 1,150,000,000.00
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
C
115,000,000.00
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
ASPHALT FINISHER ( E 02 ) 47.00 6.00 6.00 2,000.00 1,150,000,000.00
0.26424
(B' - C) x D W'
E
136,742.60
b. Asuransi Dll =
0,002 x B' W'
F
1,150.00
Biaya Pasti Per Jam =
(E + F)
G
137,892.60
H1
39,832.50
I
23,617.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
86,250.00
4
Operator
= ( 1 Orang / Jam) x U1
L
14,285.71
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,714.29
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
10 dari 92
D
Biaya Operasi per Jam = ( H + I + K + L + M )
P
173,700.00
TOTAL BIAYA SEWA ALAT / JAM = ( G+P )
T
311,592.60
DIBULATKAN E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
311,500.00
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
KODE
KOEF.
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
ASPHALT SPRAYER ( E 03 ) 15.00 800.00 5.00 2,000.00 116,160,000.00
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
A' W' B'
5.00 2,000.00 116,160,000.00
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
C
11,616,000.00
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
Analisa Alat 2016
i x (1 + i) ^ A' (1 + i) ^ A' - 1
(B' - C) x D
D
0.29832
E
15,593.55
11 dari 92
W' b. Asuransi Dll =
0,002 x B' W'
F
116.16
Biaya Pasti Per Jam =
(E + F)
G
15,709.71
H1
12,712.50
I
7,537.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
8,712.00
4
Operator
= ( 1 Orang / Jam) x U1
L
14,285.71
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
52,962.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
68,671.71 68,600.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
NO
A
U R A I A N
KODE
KOEF.
URAIAN PERALATAN
Analisa Alat 2016
12 dari 92
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
i x (1 + i) ^ A' (1 + i) ^ A' - 1
BULLDOZER 100-150 HP ( E 04 ) Pw 140.00 Cp A 5.00 W 2,000.00 B 880,000,000.00 A' W' B'
5.00 2,000.00 880,000,000.00
C
88,000,000.00
D
0.29832
(B' - C) x D W'
E
118,132.96
b. Asuransi Dll =
0,002 x B' W'
F
880.00
Biaya Pasti Per Jam =
(E + F)
G
119,012.96
H1
118,650.00
I
70,350.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
66,000.00
4
Operator
= ( 1 Orang / Jam) x U1
L
14,285.71
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
279,000.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
398,012.96 398,000.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
13 dari 92
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
i x (1 + i) ^ A' (1 + i) ^ A' - 1
KODE
KOEF.
COMPRESSOR 4000-6500 L\M ( E 05 ) Pw 80.00 Cp A 5.00 W 2,000.00 B 275,000,000.00 A' W' B'
5.00 2,000.00 275,000,000.00
C
27,500,000.00
D
0.29832
(B' - C) x D W'
E
36,916.55
b. Asuransi Dll =
0,002 x B' W'
F
275.00
Biaya Pasti Per Jam =
(E + F)
G
37,191.55
H1
67,800.00
I
40,200.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
20,625.00
Operator
L
14,285.71
4
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
= ( 1 Orang / Jam) x U1
14 dari 92
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
152,625.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
189,816.55 189,800.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
Analisa Alat 2016
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
i x (1 + i) ^ A' (1 + i) ^ A' - 1
KODE
KOEF.
CONCRETE MIXER 0,3 - 0,6 M3 ( E 06 ) Pw 15.00 Cp 500.00 A 4.00 W 2,000.00 B 13,000,000.00 A' W' B'
4.00 2,000.00 13,000,000.00
C
1,300,000.00
D
0.35027
15 dari 92
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
(B' - C) x D W'
E
2,049.05
b. Asuransi Dll =
0,002 x B' W'
F
13.00
Biaya Pasti Per Jam =
(E + F)
G
2,062.05
H1
12,712.50
I
7,537.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
975.00
4
Operator
= ( 1 Orang / Jam) x U1
L
14,285.71
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
45,225.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
47,287.05 47,200.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
NO
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
U R A I A N
KODE
KOEF.
16 dari 92
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
CRANE 10 - 15 TON ( E 07 ) 150.00 15.00 5.00 2,000.00 151,250,000.00
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
A' W' B'
5.00 2,000.00 151,250,000.00
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
C
15,125,000.00
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
0.29832
(B' - C) x D W'
E
20,304.10
b. Asuransi Dll =
0,002 x B' W'
F
151.25
Biaya Pasti Per Jam =
(E + F)
G
20,455.35
H1
127,125.00
I
75,375.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
11,343.75
4
Operator
= ( 1 Orang / Jam) x U1
L
14,285.71
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
237,843.75
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
258,299.10 258,200.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
17 dari 92
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
i x (1 + i) ^ A' (1 + i) ^ A' - 1
KODE
KOEF.
DUMP TRUCK 3 - 4 M3 ( E 08 ) Pw 100.00 Cp 6.00 A 5.00 W 2,000.00 B 186,000,000.00 A' W' B'
5.00 2,000.00 186,000,000.00
C
18,600,000.00
D
0.29832
(B' - C) x D W'
E
24,969.01
b. Asuransi Dll =
0,002 x B' W'
F
186.00
Biaya Pasti Per Jam =
(E + F)
G
25,155.01
H1
84,750.00
I
50,250.00
K
13,950.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
18 dari 92
4
Operator
= ( 1 Orang / Jam) x U1
L
9,714.29
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,285.71
Biaya Operasi per Jam = ( H + I + K + L + M )
P
167,950.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
193,105.01 193,100.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 9,714.29 9,285.71 5,650.00 5,650.00 33,500.00
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
KODE
KOEF.
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
DUMP TRUCK ( E 09 ) 125.00 8.00 5.00 2,000.00 232,500,000.00
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
A' W' B'
5.00 2,000.00 232,500,000.00
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
C
23,250,000.00
2
Faktor Angsuran Modal =
Analisa Alat 2016
i x (1 + i) ^ A'
D
0.29832
19 dari 92
(1 + i) ^ A' - 1 3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
(B' - C) x D W'
E
31,211.26
b. Asuransi Dll =
0,002 x B' W'
F
232.50
Biaya Pasti Per Jam =
(E + F)
G
31,443.76
H1
105,937.50
I
62,812.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
17,437.50
4
Operator
= ( 1 Orang / Jam) x U1
L
9,714.29
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,285.71
Biaya Operasi per Jam = ( H + I + K + L + M )
P
205,187.50
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
236,631.26 236,600.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 9,714.29 9,285.71 5,650.00 5,650.00 33,500.00
NO
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
U R A I A N
KODE
KOEF.
20 dari 92
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
i x (1 + i) ^ A' (1 + i) ^ A' - 1
EXCAVATOR 80 - 140 HP Pw 80.00 Cp 0.50 A 5.00 W 2,000.00 B 961,950,000.00 A' W' B'
5.00 2,000.00 961,950,000.00
C
96,195,000.00
D
0.29832
(B' - C) x D W'
E
129,134.09
b. Asuransi Dll =
0,002 x B' W'
F
961.95
Biaya Pasti Per Jam =
(E + F)
G
130,096.04
H1
67,800.00
I
40,200.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
72,146.25
4
Operator
= ( 1 Orang / Jam) x U1
L
14,285.71
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
204,146.25
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
334,242.29 334,200.00
E
LAIN-LAIN
1 2 3 4 5 6
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
( E 10 )
21 dari 92
7
PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
i x (1 + i) ^ A' (1 + i) ^ A' - 1
KODE
KOEF.
FLAT BED TRUCK 3 - 4 M3 Pw 100.00 Cp 4.00 A 5.00 W 2,000.00 B 190,235,000.00 A' W' B'
5.00 2,000.00 190,235,000.00
C
19,023,500.00
D
0.29832
(B' - C) x D W'
E
25,537.53
b. Asuransi Dll =
0,002 x B' W'
F
190.24
Biaya Pasti Per Jam =
(E + F)
G
25,727.76
H1
84,750.00
I
50,250.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
( E 11 )
22 dari 92
= ( 12,5 % - 17,5 % ) x B' W'
K
14,267.63
4
Operator
= ( 1 Orang / Jam) x U1
L
9,714.29
5
Pembantu Operator
= ( 1 Orang / Jam) x U2
M
9,285.71
Biaya Operasi per Jam = ( H + I + K + L + M )
P
168,267.63
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
193,995.39 193,900.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 9,714.29 9,285.71 5,650.00 5,650.00 33,500.00
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
Analisa Alat 2016
KODE
KOEF.
GENERATOR SET ( E 12 ) Pw 175.00 Cp 125.00 A 5.00 W 2,000.00 B 217,800,000.00 A' 5.00 W' 2,000.00 B' 217,800,000.00
C
21,780,000.00
23 dari 92
2
Faktor Angsuran Modal =
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
0.29832
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
(B' - C) x D W'
E
29,237.91
b. Asuransi Dll =
0,002 x B' W'
F
217.80
Biaya Pasti Per Jam =
(E + F)
G
29,455.71
H1
148,312.50
I
87,937.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
16,335.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
10,714.29 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
273,013.57
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
302,469.28 302,400.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Mekanik Upah Pembantu Mekanik Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 10,714.29 9,714.29 5,650.00 5,650.00 33,500.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
24 dari 92
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
KODE
MOTOR GRADER >100 HP ( E 13 ) Pw 125.00 Cp A 5.00 W 2,000.00 B 1,501,500,000.00 A' 5.00 W' 2,000.00 B' 1,501,500,000.00
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
KOEF.
D
150,150,000.00 0.29832
(B' - C) x D W'
E
201,564.36
b. Asuransi Dll =
0,002 x B' W'
F
1,501.50
Biaya Pasti Per Jam =
(E + F)
G
203,065.86
H1
105,937.50
I
62,812.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
112,612.50
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
305,362.50
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
508,428.36 508,400.00
E
LAIN-LAIN
1 2 3 4 5 6
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
25 dari 92
7
PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
KODE
TRACK LOADER 75 - 100 HP ( E 14 ) Pw 90.00 Cp 1.60 A 5.00 W 2,000.00 B 698,500,000.00 A' 5.00 W' 2,000.00 B' 698,500,000.00
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
KOEF.
69,850,000.00
D
0.29832
(B' - C) x D W'
E
93,768.04
b. Asuransi Dll =
0,002 x B' W'
F
698.50
Biaya Pasti Per Jam =
(E + F)
G
94,466.54
H1
76,275.00
I
45,225.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
26 dari 92
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
52,387.50
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
197,887.50
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
292,354.04 292,300.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
B
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
KODE
KOEF.
WHEEL LOADER 1,0 - 1,6 M3 ( E 15 ) Pw 105.00 Cp 1.50 A 5.00 W 2,000.00 B 825,000,000.00 A' 5.00 W' 2,000.00 B' 825,000,000.00
BIAYA PASTI PER JAM KERJA
Analisa Alat 2016
27 dari 92
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
C
82,500,000.00
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
0.29832
(B' - C) x D W'
E
110,749.65
b. Asuransi Dll =
0,002 x B' W'
F
825.00
Biaya Pasti Per Jam =
(E + F)
G
111,574.65
H1
88,987.50
I
52,762.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
61,875.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
227,625.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
339,199.65 339,100.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
28 dari 92
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
KODE
THREE WHEEL ROLLER 6 - 8 T ( E 16 ) Pw 55.00 Cp 8.00 A 5.00 W 2,000.00 B 412,500,000.00 A' 5.00 W' 2,000.00 B' 412,500,000.00
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
KOEF.
41,250,000.00
D
0.29832
(B' - C) x D W'
E
55,374.82
b. Asuransi Dll =
0,002 x B' W'
F
412.50
Biaya Pasti Per Jam =
(E + F)
G
55,787.32
H1
46,612.50
I
27,637.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
30,937.50
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
129,187.50
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
184,974.82 184,900.00
E
LAIN-LAIN
1 2 3 4
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin
is U1 U2 Mb
15.00 14,285.71 9,714.29 5,650.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
29 dari 92
5 6 7
Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
Ms Mp
KODE
KOEF.
TANDEM ROLLER 6 - 8 T ( E 17 ) Pw 50.00 Cp 8.00 A 5.00 W 2,000.00 B 473,000,000.00 A' 5.00 W' 2,000.00 B' 473,000,000.00
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
5,650.00 33,500.00
47,300,000.00
D
0.29832
(B' - C) x D W'
E
63,496.47
b. Asuransi Dll =
0,002 x B' W'
F
473.00
Biaya Pasti Per Jam =
(E + F)
G
63,969.47
H1
42,375.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
Analisa Alat 2016
30 dari 92
2
Pelumas
3
I
25,125.00
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
35,475.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
126,975.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
190,944.47 190,900.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
Analisa Alat 2016
KODE
Pw Cp A W B A' W' B'
KOEF.
TYRE ROLLER ( E 18 ) 60.00 10.00 5.00 1,800.00 652,204,000.00 5.00 1,800.00 652,204,000.00
31 dari 92
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
65,220,400.00
D
0.29832
(B' - C) x D W'
E
97,281.30
b. Asuransi Dll =
0,002 x B' W'
F
724.67
Biaya Pasti Per Jam =
(E + F)
G
98,005.97
H1
50,850.00
I
30,150.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
54,350.33
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
159,350.33
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
257,356.30 257,300.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
32 dari 92
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
KODE
VIBRATORY ROLLER 5 - 8 T ( E 19 ) Pw 75.00 Cp 7.00 A 5.00 W 2,000.00 B 385,000,000.00 A' 5.00 W' 2,000.00 B' 385,000,000.00
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
KOEF.
38,500,000.00
D
0.29832
(B' - C) x D W'
E
51,683.17
b. Asuransi Dll =
0,002 x B' W'
F
385.00
Biaya Pasti Per Jam =
(E + F)
G
52,068.17
H1
63,562.50
I
37,687.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
28,875.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
154,125.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
206,193.17 206,100.00
E
LAIN-LAIN
1 2
Tingkat Suku Bunga Upah Operator / Sopir
is U1
15.00 14,285.71
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
33 dari 92
3 4 5 6 7
Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
C.
U2 Mb Ms Mp
KODE
KOEF.
CONCRETE VIBRATOR ( E 20 ) Pw 10.00 Cp 0.00 A 4.00 W 1,000.00 B 13,750,000.00 A' 4.00 W' 1,000.00 B' 13,750,000.00
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
9,714.29 5,650.00 5,650.00 33,500.00
1,375,000.00
D
0.35027
(B' - C) x D W'
E
4,334.53
b. Asuransi Dll =
0,002 x B' W'
F
27.50
Biaya Pasti Per Jam =
(E + F)
G
4,362.03
BIAYA OPERASI PER JAM KERJA
Analisa Alat 2016
34 dari 92
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
H1
8,475.00
2
Pelumas
I
5,025.00
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
2,062.50
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
39,562.50
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
43,924.53 43,900.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun
Analisa Alat 2016
KODE
Pw Cp A W B A' W'
KOEF.
STONE CRUSHER ( E 21 ) 220.00 50.00 5.00 2,000.00 1,980,000,000.00 5.00 2,000.00
35 dari 92
c. Harga Alat (*) B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
i x (1 + i) ^ A' (1 + i) ^ A' - 1
B'
1,980,000,000.00
C
198,000,000.00
D
0.29832
(B' - C) x D W'
E
265,799.16
b. Asuransi Dll =
0,002 x B' W'
F
1,980.00
Biaya Pasti Per Jam =
(E + F)
G
267,779.16
H1
186,450.00
I
110,550.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
148,500.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
469,500.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
737,279.16 737,200.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
36 dari 92
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
KODE
KOEF.
Water Pump 70 - 100 mm Pw 6.00 Cp 0.00 A 2.00 W 2,000.00 B 16,500,000.00 A' 2.00 W' 2,000.00 B' 16,500,000.00
C
1,650,000.00
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
0.61512
(B' - C) x D W'
E
4,567.24
b. Asuransi Dll =
0,002 x B' W'
F
16.50
Biaya Pasti Per Jam =
(E + F)
G
4,583.74
H1
5,085.00
I
3,015.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
1,237.50
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
33,337.50
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
37,921.24 37,900.00
E
LAIN-LAIN
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
( E 22 )
37 dari 92
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
is U1 U2 Mb Ms Mp
KODE
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
KOEF.
Water Tanker 3000 - 4500 L ( E 23 ) Pw 100.00 Cp 4,000.00 A 5.00 W 2,000.00 B 158,000,000.00 A' 5.00 W' 2,000.00 B' 158,000,000.00
C
15,800,000.00
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
0.29832
(B' - C) x D W'
E
21,210.24
b. Asuransi Dll =
0,002 x B' W'
F
158.00
Biaya Pasti Per Jam =
(E + F)
G
21,368.24
Analisa Alat 2016
38 dari 92
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
H1
84,750.00
I
50,250.00
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
11,850.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
170,850.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
192,218.24 192,200.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
Analisa Alat 2016
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
KODE
Pw Cp A W B
KOEF.
PEDESTRIAN ROLLER ( E 24 ) 11.00 0.980 4.00 2,000.00 66,000,000.00
39 dari 92
5
Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
i x (1 + i) ^ A' (1 + i) ^ A' - 1
A' W' B'
4.00 2,000.00 66,000,000.00
C
6,600,000.00
D
0.35027
(B' - C) x D W'
E
10,402.88
b. Asuransi Dll =
0,002 x B' W'
F
66.00
Biaya Pasti Per Jam =
(E + F)
G
10,468.88
H1
9,322.50
I
5,527.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
4,950.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
43,800.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
54,268.88 54,200.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
40 dari 92
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
KODE
KOEF.
STAMPER
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
i x (1 + i) ^ A' (1 + i) ^ A' - 1
Pw Cp A W B A' W' B'
( E 25 ) 5.00 0.170 4.00 1,000.00 16,300,000.00 4.00 1,000.00 16,300,000.00
C
1,630,000.00
D
0.35027
(B' - C) x D W'
E
5,138.39
b. Asuransi Dll =
0,002 x B' W'
F
32.60
Biaya Pasti Per Jam =
(E + F)
G
5,170.99
H1
4,237.50
I
2,512.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
2,445.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
33,195.00
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
38,365.99 38,300.00
4 5
D
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
41 dari 92
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
b. Asuransi Dll =
Analisa Alat 2016
KODE
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
KOEF.
JACK HAMMER
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
is U1 U2 Mb Ms Mp
Pw Cp A W B A' W' B'
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
( E 26 ) 3.00 0.00 4.00 1,000.00 11,500,000.00 4.00 1,000.00 11,500,000.00
1,150,000.00
D
0.35027
(B' - C) x D W'
E
3,625.25
0,002 x B' W'
F
23.00
42 dari 92
Biaya Pasti Per Jam =
(E + F)
G
3,648.25
H1
2,542.50
I
1,507.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
1,725.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
29,775.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
33,423.25 33,400.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
Analisa Alat 2016
: a. Umur Ekonomis
KODE
Pw Cp A
KOEF.
FULVI MIXER ( E 27 ) 75.00 0.00 5.00
43 dari 92
5
b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
W B A' W' B'
2,000.00 900,000,000.00 5.00 2,000.00 900,000,000.00
C
90,000,000.00
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
0.29832
(B' - C) x D W'
E
120,817.80
b. Asuransi Dll =
0,002 x B' W'
F
900.00
Biaya Pasti Per Jam =
(E + F)
G
121,717.80
H1
63,562.50
I
37,687.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
67,500.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
192,750.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
314,467.80 314,400.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
44 dari 92
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
KODE
Pw Cp A W B A' W' B'
C i x (1 + i) ^ A' (1 + i) ^ A' - 1
KOEF.
BLENDING EQUIPMENT ( E 52 ) 50.00 30.00 10.00 1,500.00 500,000,000.00 10.00 1,500.00 500,000,000.00
50,000,000.00
D
0.19925
(B' - C) x D W'
E
59,775.62
b. Asuransi Dll =
0,002 x B' W'
F
666.67
Biaya Pasti Per Jam =
(E + F)
G
60,442.29
H1
42,375.00
I
25,125.00
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
50,000.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
141,500.00
TOTAL BIAYA SEWA ALAT / JAM = ( G+P )
T
201,942.29
4 5
D
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
45 dari 92
DIBULATKAN E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
NO
U R A I A N
A
URAIAN PERALATAN
1 2 3 4
Jenis Peralatan Tenaga Kapasitas Alat Baru
5
: a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat Alat Yang Dipakai : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat (*)
B
BIAYA PASTI PER JAM KERJA
1
Nilai Sisa Alat = 10% x B
2
Faktor Angsuran Modal =
3
Biaya Pasti Per Jam a. Biaya Pengembalian Modal =
b. Asuransi Dll =
Analisa Alat 2016
201,900.00
is U1 U2 Mb Ms Mp
KODE
Pw Cp A W B A' W' B'
C
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
KOEF.
ASPALT DITRIBUTOR ( E 41 ) 115.00 4,000.00 5.00 2,000.00 395,000,000.00 5.00 2,000.00 395,000,000.00
39,500,000.00
i x (1 + i) ^ A' (1 + i) ^ A' - 1
D
0.29832
(B' - C) x D W'
E
53,025.59
0,002 x B'
F
395.00
46 dari 92
W' Biaya Pasti Per Jam =
(E + F)
G
53,420.59
H1
97,462.50
I
57,787.50
C.
BIAYA OPERASI PER JAM KERJA
1
Bahan Bakar = ( 0,125-0,175 Ltr/HP/Jam ) x Pw x Ms
2
Pelumas
3
Perawatan Dan Perbaikan = ( 12,5 % - 17,5 % ) x B' W'
K
29,625.00
Operator Pembantu Operator
= ( 1 Orang / Jam) x U1 = ( 1 Orang / Jam) x U2
L M
14,285.71 9,714.29
Biaya Operasi per Jam = ( H + I + K + L + M )
P
208,875.00
D
TOTAL BIAYA SEWA ALAT / JAM = ( G+P ) DIBULATKAN
T
262,295.59 262,200.00
E
LAIN-LAIN
1 2 3 4 5 6 7
Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pembantu Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
is U1 U2 Mb Ms Mp
15.00 14,285.71 9,714.29 5,650.00 5,650.00 33,500.00
4 5
Analisa Alat 2016
= ( 0,01-0,02 Ltr/HP/Jam ) x Pw x Mp
47 dari 92
MIXING PLANT
SATUAN
KET.
( E 01 ) HP Ton/Jam Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Tahun Jam Rupiah liter
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah Rupiah
Khusus AMP
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun
Analisa Alat 2016
48 dari 92
LT FINISHER
Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
( E 02 ) HP Ton Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah
Analisa Alat 2016
49 dari 92
LT SPRAYER
Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
( E 03 ) HP LITER Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Analisa Alat 2016
50 dari 92
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
Analisa Alat 2016
KET.
51 dari 92
ER 100-150 HP
( E 04 ) HP Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
52 dari 92
SATUAN
KET.
OR 4000-6500 L\M ( E 05 ) HP Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah
Analisa Alat 2016
53 dari 92
Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
MIXER 0,3 - 0,6 M3 ( E 06 ) HP LITER Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Analisa Alat 2016
54 dari 92
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
Analisa Alat 2016
KET.
55 dari 92
10 - 15 TON ( E 07 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
56 dari 92
SATUAN
KET.
RUCK 3 - 4 M3 ( E 08 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Analisa Alat 2016
57 dari 92
MP TRUCK
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
( E 09 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Analisa Alat 2016
58 dari 92
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
Analisa Alat 2016
KET.
59 dari 92
OR 80 - 140 HP
( E 10 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
60 dari 92
SATUAN
TRUCK 3 - 4 M3
KET.
( E 11 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Analisa Alat 2016
61 dari 92
RATOR SET
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
( E 12 ) HP Kva Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah
Analisa Alat 2016
62 dari 92
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
63 dari 92
SATUAN
GRADER >100 HP ( E 13 ) HP Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
64 dari 92
SATUAN
ADER 75 - 100 HP ( E 14 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Analisa Alat 2016
65 dari 92
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
ADER 1,0 - 1,6 M3 ( E 15 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah
Analisa Alat 2016
KET.
Alat Baru Alat Baru Alat Baru
66 dari 92
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
67 dari 92
SATUAN
EEL ROLLER 6 - 8 T ( E 16 ) HP M3 Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter
Analisa Alat 2016
68 dari 92
Liter Liter
SATUAN
ROLLER 6 - 8 T ( E 17 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Analisa Alat 2016
69 dari 92
Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
E ROLLER ( E 18 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
Analisa Alat 2016
Alat Baru Alat Baru Alat Baru
70 dari 92
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
71 dari 92
SATUAN
Y ROLLER 5 - 8 T ( E 19 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam
Analisa Alat 2016
72 dari 92
Rp./Jam Liter Liter Liter
SATUAN
ETE VIBRATOR ( E 20 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Analisa Alat 2016
73 dari 92
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
E CRUSHER ( E 21 ) HP TON/jam Tahun Jam Rupiah Tahun Jam
Analisa Alat 2016
Alat Baru Alat Baru
74 dari 92
Rupiah
Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
75 dari 92
mp 70 - 100 mm
SATUAN
KET.
( E 22 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
Analisa Alat 2016
76 dari 92
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
ker 3000 - 4500 L ( E 23 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Analisa Alat 2016
77 dari 92
RIAN ROLLER
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
( E 24 ) HP TON Tahun Jam Rupiah
Analisa Alat 2016
78 dari 92
Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
79 dari 92
TAMPER
SATUAN
KET.
HP TON Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
( E 25 )
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
Analisa Alat 2016
80 dari 92
K HAMMER
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
( E 26 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Analisa Alat 2016
81 dari 92
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
KET.
LVI MIXER ( E 27 ) HP TON Tahun
Analisa Alat 2016
82 dari 92
Jam Rupiah Tahun Jam Rupiah
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
83 dari 92
SATUAN
NG EQUIPMENT ( E 52 ) HP TON Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah
Analisa Alat 2016
84 dari 92
Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
SATUAN
T DITRIBUTOR ( E 41 ) HP Liter Tahun Jam Rupiah Tahun Jam Rupiah
KET.
Alat Baru Alat Baru Alat Baru
Rupiah Rupiah
Rupiah
Rupiah
Analisa Alat 2016
85 dari 92
Rupiah
Rupiah Rupiah
Rupiah
Rupiah Rupiah Rupiah Rupiah Rupiah
%/Tahun Rp./Jam Rp./Jam Liter Liter Liter
Analisa Alat 2016
86 dari 92
1. Wind Farm Civil Works No. I
II
DESCRIPTION EQUIPMENT RENTAL COST Asphalt Mixing Plant Asphalt Finisher Asphalt Sprayer Bulldozer 1000-1500 HP Compressor 4000-6500 L\M Concrete Mixer 0,3 - 0,6 m3 Crane 10 - 15 ton Dump Truck 3 - 4 m3 Dump Truck Excavator 80 - 140 m3 Flat Bed Truck 3 - 4 m3 Generator Set Motor Grader >100 HP Track Loader 75-100 HP Wheel Loader 1,0 - 1,6 m3 Three Wheel Roller 6-8 Ton Tandem Roller 6-9 ton Tyre Roller 8 - 10 T Vibratory Roller 5 - 8 T Concrete Vibrator Stone Crusher Water Pump 70 - 100 mm Water Tanker 3000 - 4500 L Pedestrian Roller Stamper Jack Hammer Fulvi Mixer Aspalt Distributor Concrete Paver Concrete Trowel Concrete Cutter Welding Las Batching Plant Blending Equipment Supporting Tools Supporting Tools (Hose + Tas Lab) EQUIPMENT COMPONENT COST Interest Rate ( %/Tahun ) Operator / Driver
CODE
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 41 28 29 30 31 32 52
UNIT
/ Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour
/ Year / Hour
Operator / Driver Helper Fuel Gasoline Fuel Diesel Solar Fuel Diesel Solar Industrial Oil Machine III
IV
MAN POWER COST Pekerja Tukang Mandor Operator terlatih Pembantu Operator Sopir matrial Pembantu Sopir Mekanik terlatih Pembantu Mekanik Kepala Tukang Tukang Las Konstruksi
/ Hour / Liter / Liter / Liter / Liter
L L L L L L L L L
01 02 03 04 05 06 07 08 09
/ Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour / Hour
COMMON CIVIL WORK MATERIAL Pasir Batu Kali Sirtu
MR. 01 MR. 02 MR. 16
Cubic m Cubic m Cubic m
Pasir Agregat Batu Agregat Agregat Kasar Agregat Halus Semen/Filler Material Tanah Timbunan Material Tanah Pilihan Aspal Curah Kerosene / Minyak Aspal Semen (50 kg) Besi Beton Kawat Beton Sirtu Paku Kayu Perancah Solar Solar industri Minyak Pelumas Agregat A Agregat B Aspal Drum Baja IWF Pasir Urug Besi Beton Dolken Γ 8 - 10 cm
M 01 M 02 M 03 M 04 M 05 M 08 M 09 M 10 M 11 M 12 M 13 M 14 M 16 M 18 M 19 M 21 M 21 A M 22 M 26 M 27 M 31 M 39 M 44 M 20 M 45
Cubic m Cubic m Cubic m Cubic m Kgs Cubic m Cubic m Kgs Ltr Zak Kgs Kgs Cubic m Kgs Cubic m Ltr Ltr Ltr Cubic m Cubic m Kgs Kgs Cubic m Kgs m'
Plastik Agregat Pecah Mesin 0-5 mm Agregat Pecah Mesin 5-10 & 10-20 mm Agregat Pecah Mesin 20-30 mm Pasir pasang / beton Batu Blonos Batu Belah 10 - 15 cm Batu pecah tangan 5 - 7 cm Koral (Batu Pecah mesin 5 - 40 mm ) Koral (Batu Pecah tangan 5 - 40 mm ) Kawat Bronjong 4 mm (Galvanis) Kantung Plastik 60x40x20 Minyak Bekisting Air Kayu Bakar Ready Mix K.125 Ready Mix K.175 Ready Mix K.225 Ready Mix K.250 Ready Mix K.275 Ready Mix K.300 Ready Mix K.350 Meni Besi Plamir tembok Cat Dasar Cat Tembok Kuas 3" Kuas 4" Ampelas Kapek Keramik polos 30x30 cm Batu bata Semen warna Elastomir Shear Conector IV
SPECIAL CIVIL WORK MATERIAL
M 51 M91 M92 M93
M 06
Sq m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Kgs Pcs Ltr Ltr Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Cubic m Kgs Kgs Kgs Kgs Pcs Pcs Ltr Pcs Sq m Pcs Kgs Pcs ls
COEF
UNIT PRICE
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5,570,200.00 311,500.00 68,600.00 398,000.00 189,800.00 47,200.00 258,200.00 193,100.00 236,600.00 334,200.00 193,900.00 302,400.00 508,400.00 292,300.00 339,100.00 184,900.00 190,900.00 257,300.00 206,100.00 43,900.00 737,200.00 37,900.00 192,200.00 54,200.00 38,300.00 33,400.00 314,400.00 262,200.00 72,100.00 12,100.00 30,250.00 5,720.00 193,100.00 201,900.00 2,000.00 56,870.00
1.00 1.00
15.00 14,285.71
TOTAL PRICE
REMARK
5,570,200.00 Coefficient Need to 311,500.00 adjusted due to: 68,600.00 398,000.00 189,800.00 47,200.00 258,200.00 193,100.00 236,600.00 334,200.00 193,900.00 302,400.00 508,400.00 292,300.00 339,100.00 184,900.00 190,900.00 257,300.00 206,100.00 43,900.00 737,200.00 37,900.00 192,200.00 54,200.00 38,300.00 33,400.00 314,400.00 262,200.00 72,100.00 12,100.00 30,250.00 5,720.00 193,100.00 201,900.00 2,000.00 56,870.00
15.00 14,285.71
1.00 1.00 1.00 1.00 1.00
9,714.29 7,800.00 5,650.00 8,107.00 33,500.00
9,714.29 7,800.00 5,650.00 8,107.00 33,500.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
7,857.14 9,714.29 11,428.57 14,285.71 9,714.29 9,714.29 9,285.71 10,714.29 9,714.29 10,714.29 10,714.29
7,857.14 9,714.29 11,428.57 14,285.71 9,714.29 9,714.29 9,285.71 10,714.29 9,714.29 10,714.29 10,714.29
1.00 1.00 1.00
48,300.00 48,300.00 48,300.00
48,300.00 48,300.00 48,300.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
89,658.00 100,290.00 162,757.59 166,637.93 1,340.00 88,900.00 115,100.00 7,387.00 8,824.00 67,000.00 9,800.00 17,200.00 130,800.00 13,600.00 1,936,900.00 5,650.00 8,107.00 33,500.00 206,096.51 200,250.91 9,463.00 12,500.00 88,900.00 9,800.00 5,800.00
89,658.00 100,290.00 162,757.59 166,637.93 1,340.00 88,900.00 115,100.00 7,387.00 8,824.00 67,000.00 9,800.00 17,200.00 130,800.00 13,600.00 1,936,900.00 5,650.00 8,107.00 33,500.00 206,096.51 200,250.91 9,463.00 12,500.00 88,900.00 9,800.00 5,800.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
8,300.00 166,637.93 162,757.59 162,757.59 174,100.00 172,000.00 196,700.00 225,100.00 367,300.00 367,300.00 11,500.00 1,200.00 3,100.00 50.00 347,300.00 967,300.00 997,200.00 1,023,400.00 1,044,300.00 1,075,000.00 1,085,000.00 1,123,600.00 23,000.00 11,500.00 26,100.00 26,100.00 9,400.00 15,700.00 3,100.00 5,200.00 53,600.00 900.00 13,600.00 581,000.00 15,700.00
8,300.00 166,637.93 162,757.59 162,757.59 174,100.00 172,000.00 196,700.00 225,100.00 367,300.00 367,300.00 11,500.00 1,200.00 3,100.00 50.00 347,300.00 967,300.00 997,200.00 1,023,400.00 1,044,300.00 1,075,000.00 1,085,000.00 1,123,600.00 23,000.00 11,500.00 26,100.00 26,100.00 9,400.00 15,700.00 3,100.00 5,200.00 53,600.00 900.00 13,600.00 581,000.00 15,700.00