PROJECT : AMYTHYST HOTEL Location : Subject : Structural Ratio (As of October 29, 2018)
A. BUILDING AREA STRUCTURE
AREA's
1.0 GROUND FLOOR
925.00 m²
3.0 2ND FLOOR
1,098.44 m²
5.0 3RD FLOOR
1,098.44 m²
4.0 4TH FLOOR
1,098.44 m²
5.0 5TH FLOOR
1120.24 m²
6.0 ROOFDECK
250.12 m²
TOTAL
5,590.68 m²
ITEMS B. CONCRETE & STEEL DATA :
CONCRETE VOLUME ( m3 )
STEEL BARS ( kgs )
kgs / m3
1.0 FOUNDATION
454.36
39,005.52
85.85
2.0 SLAB ON GRADE
115.63
4,205.69
36.37
94.40
41,405.98
438.62
4.1 2ND FLOOR
99.97
26,795.36
268.03
4.2 3RD FLOOR
99.19
26,556.72
267.74
4.3 4TH FLOOR
98.28
26,508.65
269.73
4.4 5TH FLOOR
102.07
28,314.88
277.41
3.0 COLUMNS 4.0 BEAMS
56.86
13,551.95
238.34
5.0 SUSPENDED SLABS
4.5 ROOF DECK
466.57
46,307.99
99.25
6.0 SHEAR WALLS
297.54
55,744.46
187.35
1,884.87
308,397.18
163.62
7.0 MISCELLANEOUS STRUCTURES TOTAL
CONCRETE RATIO (m3/m2)
0.34