7 Annex 2

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 7 Annex 2 as PDF for free.

More details

  • Words: 18,089
  • Pages: 26
Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

AN N EX 2 .1 N ETWOR K TE CHN IC AL SPE CIFI CATION An nex 2 .1 . 1

Ge ne r al

2.1.1.1

Mi ni stry of E duc ati o n (MO E) re q ui re s the C ontr ac tor to sup pl y, del i ve r, i nst al l, te st, c ommi ssi o n and mai nt ai n Sc ho ol s Ne tw ork I nfrastr uc ture Syste m and othe r Pe ri phe ral s (Hardw are s and e qui pme nts) For Gove rn me nt Pri mary, Se c on dary a nd Re li gi o us Sc h ool s.

2. 1. 1 .2

The c ontrac t or shal l provi de ad vi ce on m atte rs rel ati n g to the de si gn, de ve l opme nt, i nst al l ati on, ope rati on and mai nte n anc e of Sc ho ol s Ne tw ork I nfrastr uc ture . The c ontrac tor shal l al so advi c e on mat te rs rel ati n g to si te pre para ti on an d al l othe r re l ate d ma tte rs.

An nex 2 .1 . 2 Scop e o f Te nd e r fo r Scho o l Ne t wo rk Inf ras t ruct u re Sys t e m and Its Pe rip he r als .

2.1.2.1

Sc hool N e tw ork I nfras truc t ure S yste m an d I ts Pe ri p he ral s shal l c onsi st of AL L TH E PA CK AGES sta te d i n the fol l ow i n g;

2 .1 . 2. 1 .1 A PPEN DI X 2 .1 . 2. 1 .2 A PPEN DI X 2.1.2.1.3 A PPEN DI X SC HO O L S 2 .1 . 2. 1 .4 A PPEN DI X 2 .1 . 2. 1 .5 A PPEN DI X

1 - N ETW O RK TEC HNI C AL SP ECI FI C ATI O N 2 - TRAIN I N G 3 L I ST OF GOVE RN MEN T SEC O N DA RY 4 - L I ST OF GOVE RN MEN T P RI MARY SC HO O L S 5 - L I ST OF GOVE RN MEN T REL I GI O US SC HO O L S

2.1.2.1.6

The c ontr ac tor i s to su bmi t a fi xe d pri c e sum mary sc he d ule i n B rune i C urre nc y for all the abo ve me nti one d p ac kage s.

2.1.2.1.7

The c ontr ac tor i s to su bmi t a de tai l fi xe d pri c e sc he d ul e i n Bru nei C urre nc y for e ac h s cho o l base d on al l the a bove me nti o ne d p ac kage s and the propose d n umbe r of ne tw ork de vi c e s b ase d on the i ndi vi dual b ui l di ng di agra m / fl oor pl an a nd p hysi c al ne tw ork di agr am.

An nex 2 .1 . 3

2.1.3.1.1 An nex 2 .1 . 4

Ove rv ie w o f Bui ld ing & N e t wo rk Archit e ct u re The propose d l oc ati on are; ( re fe r t o Anne x 1 – M and at o ry Re q uire me nt ) Co nt r act o r ’ s Req uire me nt s

Annex 2.1 – Network Technical Specification

Page 1 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2. 1. 4 .1

The c ontrac t or shal l furni sh expl a nator y bri e fs on the de ri vati on of t he prop ose d sys te m, an d hi ghl i gh t a ny ac c e ssorie s, i nte rfac e s and / or at tac h me nts ne ce ssary to sup port and o pe rate t he pro pose syste m.

2. 1. 4 .2

The c ontrac t or shal l provi de te sti ng proc e ss, i nc l udi n g the te sti ng proc e dure s, te sti n g e qui pme nts use d, te sti n g sc o pe and c ove rage that i s to c onfi rm or exce e d TI S/ EI A – 56 8 A l ate st sta nd ards.

2.1.4.3

The c ontr ac tor shal l provi de al l de tai l produc ts spe c i fi c ati on for al l i te ms propose d for the syste m. Al l i te ms shal l be mar ke d c le arl y for fu ture re fe re nc e .

2.1.4.4

The c ontrac t or shal l provi de at l e ast one (1 ) c abl i n g i mpl an tati on expe rt (ce rti fi e d S truc t ure d C abl i ng i nstal l e r) i n c ha rge of the proj e c t w ho has at le ast 5 ye ars expe ri e nc e i n t he str uc ture d c abl i ng sys te m de si gn an d i mpl e me nta ti on. He / she shal l al so have parti c i p ate d i n al l of the re fe re nce si te s quote s by the c ontrac tor. The c on trac tor shal l provi de te c hni c al expe rti se an d mai n te nanc e su ppor t for the w hole struc ture d c a bl i ng syste m.

2.1.4.5

Pre fe re nc e w il l be gi ve n to the C ontr ac tor / subc ontrac tor wi th I SO 9 00 0 Q ual i ty Ma nage me n t ac c re di te d c omp any i n B rune i Darussal a m, wi t h sc ope c ove ri n g struc ture d c a bl i ng syste m i nstal l ati on.

Annex 2.1 – Network Technical Specification

Page 2 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

An nex 2 .1 . 5

St ruct u re d C ab ling and L o cal Wi re le ss N et wo rk

2 .1 . 5 . 1 Ge ne r al Re q uire me nt s 2 .1 . 5. 1 .1 The c abl e pl ant and l oc al w i re le ss ne tw ork shal l su ppo rt the org ani sati o nal lon g te rm g oal of i mpl e me nti n g a si ngl e struc ture d i nfras truc t ure to su ppo rt a c om ple te i nte gr ate d data c om muni c a ti on ne tw ork i n g syste m.

2.1.5.1.2

The c abl i n g an d l oc al wi re l e ss ne tw ork sc he me s to use d at all l eve l s of the ne tw ork sh al l be stri c tl y sta nda rd b ase d, flexi bl e , e asi l y man age d an d mai ntai ne d. Ease of exp ansi on and grow th i s extre me l y i mpor tan t. The c a bl i ng and l oc al w i re le ss ne tw ork m ust sup port mul ti ve nd or ne tw ork arc hi te c ture and must provi de flexi bi l i ty for use rs to easi l y swi tc h ap pl i c ati on w he n nee de d.

2 .1 . 5. 1 .3 The c abl i ng an d l oc al wi re l e ss ne tw ork a nd c omp one nts sh al l pre fe rabl y fro m the same man ufac t ure r.

2.1.5.1.4

Si n gl e- G an g 1 3 Am p 3 PI N UK ty pe dual pow e r poi nt to be provi de d for a ny ne tw ork hardw are ’ s, w he re ne c e ssary.

2 .1 . 5 . 2 Sco p e o f Wo rk 2 .1 . 5. 2 .1 To su ppl y a nd i nst al l ho ri zon tal C ate gory 6 Unshi e l de d Tw i ste d Pai r (UTP) c o ppe r c abl e or l oc al w i re le ss ne tw ork w he re re q ui re d and ne ce ssary for data se rvi ce s.

2.1.5.2.2

To su ppl y a nd i nst al le d e qui pme nt rac k s, pa tc h p ane l s, UTP c ate gory 6 patc h c ords, c ate g ory 6 RJ 4 5 i np ut a nd ou tp ut soc ke ts, C ate gory 6 UTP c abl e s an d fac e pl ate s an d C ate gory 6 RJ 45 c ord s. Al l e qui p me nts exc e pt l oc al w i re le ss ac c e ss poi n t m ust be fi xe d i nsi de the rac k . Loc al wi rel e ss ac c e ss p oi nt must be i nst al le d outsi de the rac k , w he re i t maxi mi ze d c onne c ti on spe e d.

2 .1 . 5. 2 .3 To te st al l c abl e s a nd doc ume nte d te st re sul t.

Annex 2.1 – Network Technical Specification

l oc al

w ire le ss

ne tw ork

an d

Page 3 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2.1.5.2.4

To l abe l al l c a ble s, dat a outl e ts, patc h pa nel s an d l oc al w i re le ss ac c e ss poi n ts ac c ordi ng to AN SI / EI A/ TI A sta nd ard c onsi ste nt w i th i nd ustry prac ti c e .

2.1.5.2.5

I n t he c ase of w al l mo unte d pa tc h pa nel s c abi ne ts or rac k s, the c ontr ac tor shal l m ake provi si o ns to su ppl y an d i nstal l rei nf orc e me n t str uc ture s to su ppo rt the c a bi ne t / rac k s ag ai nst t he w al l . Al l c onne c ti ons tr unk i n g must be u phe l d by me ans of su ppor ti ng br ac ke ts.

2 .1 . 5. 2 .6 The c ontrac t or i s to de si gn avai l a ble sp ac e pro vi de d.

an d

w ork

wi thi n

t he

2.1.5.2.7

To provi de c ompl e te doc u me nta ti on i nc l udi n g di a gra ms an d bui l t draw i ngs show i n g c abl e runs, l oc ati on of d ata ou tle ts, i nte n de d ran ge of l oc al w ire le ss ne tw ork an d p atc h p ane l s toge the r w i th ful l sup porti ng doc ume nt ati on. Dupl i c ate softc opy of the di agr ams an d dr aw i ngs are to be provi de d i n A utoC AD c ompa ti bl e format an d text doc ume nt ati on are to be i n Mi c rosoft Word c om pati bl e format, store d i n C D RO M me di a.

2.1.5.2.8

A ny re moval of exi sti ng fi xt ure m ust be re pl ace d i n ac c e pt abl e format. The c ont rac tor shal l make go od any d ama ge s i n c o nne c ti on to t he ne tw ork i nstal l ati o n w ork s. In ad di ti on, the c on trac tor shal l mee k goo d to fi nal de c orati on s for any da mage s c ause d to t he b ui l di ng and fi xt ure s. Hac k i n g of w all s an d any str uc ture c h an ge s shal l be ke p t to a mi ni mu m. If hac k i ng an d str uc tur al c han ge s are absol ute l y ne c e ssary, pri or ap proval mus t be soug ht from the rel e van t aut hori ti e s.

2 .1 . 5. 2 .9 The fac e pl ate provi de d shal l be RJ 4 5 j ac k w i th shu tte r, w i th e mbe d de d c omp artme n t for l abe l .

2.1.5.2.10 The c ontrac t or sh al l de si gn an d i m ple me nt c abl i n g work w i thi n sc ope of the tr unk i n g a nd othe r pro vi de d i n the exi sti ng b ui l di ng. The pro vi de extr a c abl e sup port as pe r AN SI/ EI A/ TI A sta nda rd, for t he prope r c a ble pl an t.

Annex 2.1 – Network Technical Specification

su pp ort syste ms c ontr ac tor sh al l re qui re me nt of sup port to the

Page 4 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2 .1 . 5 . 3 St and a rd 2 .1 . 5. 3 .1

Ne tw ork c abl i ng syste m shal l be de si g ne d a nd c onstr uc te d i n ac c orda nc e wi th the l ate st re vi si on of the fol l owi n g stan da rd: IE EE 8 02 . 3 ( Et he rne t 1 0b as e T) IE EE 8 02 . 3 . ab (Gig ab it Et he rne t 1 00 0 B as e TX) AN SI X3 T9 .5 AN SI/ EIA/ TI A TSB 3 6 AN SI/ EIA/ TI A TSB 4 0 AN SI/ EIA/ TI A 56 8 B- 1 ; B- 2 ; B- 3; Cat e g o ry 6 Dr aft 9a AN SI/ EIA/ TI A 6 06 AN SI/ EIA/ TI A 6 07 ISO/ IEC DIC 1 18 01

2 .1 . 5. 3 .2 S truc t ure d C abl i n g Syste m i s to be use d at al l l e ve l s of the ne tw ork . It shal l be stri c tl y stan da rd base d, fl exi bl e, e asil y m ana ge d an d mai nt ai ne d. Ease of expa nsi on an d grow th i s extre me l y i m porta nt. The c a bl i ng syste m sh al l sup port m ul ti ve ndor ne tw ork arc hi te c t ure an d shal l provi de fl exi bi l i ty for use rs to e asi l y sw i tc h appl i c ati o n w he n nee de d. 2 .1 . 5 . 4 St at io n Co rd s 2 .1 . 5. 4 .1

The c ontr ac tor sh al l su ppl y the stati on c ords (dro p c abl e ) tha t c onne c t te rmi n al de vi ce s to the i nfo rma ti on outl e ts / fac e pl ate s.

2 .1 . 5. 4 .2 The stati o n c ord s shal l be UTP c abl e that me e t C ate gory 6 pe rform anc e spe c i fi c ati o ns for d ata an d shal l be from the same ma nuf ac ture r and type as the hori zo ntal c abl e i nst al le d i n the c abl e pl an t. 2 .1 . 5. 4 .3 The stati on c ord s sh al l be te rmi na te d w i th shi el d RJ 45 pl u gs at both e nds. B oth RJ4 5 pl ugs m ust be form the sa me man ufac t ure r as the RJ 45 mod ul ar j ac k s i nstal le d i n the c abl e pl an t. 2 .1 . 5. 4 .4 The stati on c ord s sh al l be i ndi vi d ual l y te ste d to spe c i fi c ati on and re qui re me nt of AN SI/ EI A/ TI A stan dard. The c ontr ac tor m ust pro vi de te c h ni c al spe c i fi c ati o n an d pe rfo rma nc e re ports for the stati on c ords.

Annex 2.1 – Network Technical Specification

Page 5 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2.1.5.4.5

The c ontr ac tor sh al l i nst al l a to tal nu mbe r of stati o n c ords base d on the nu mbe r of Data poi nt o utl e ts i nst al le d i n e ac h room of the bui l di n g for thi s proj e c t.

2.1.5.4.6

The le ngt h of sta ti on c ord wi l l be de te rmi ne d by i ndi vi dual di st anc e of te rmi nal de vi c e to the i nform ati on ou tle t w i thi n a n offi c e roo m.

2.1.5.4.7

The di stri b uti on and i nstal l ati on of the st ati on c ords sh al l be ma de b y the c ontrac tor.

2 .1 . 5 . 5 Inf o rmat io n out le t s 2 .1 . 5. 5 .1 The i nform ati on outl e ts shal l mee t or exc e e d C ate gor y 6 UTP spe c i fi c ati on for d ata. 2 .1 . 5. 5 .2 Al l i nfo rma ti on outl e ts su ppl i e d by the c ontr ac tor shal l be a uni ve rsal ap pl i c ati on RJ4 5 ty pe .

2.1.5.5.3

Al l i nformati o n outl e ts shal l be man dato ry an gle d and sh utte re d RJ4 5 Mod ul ar J ac k s, Si n gl e soc ke ts.

2 .1 . 5. 5 .4 The i nform ati on outl e ts shal l be 1 0B ase Tx ETHE RN ET, 1 00 B ase Tx, 1 00 0B ase TX GI GAB I T ETHE RN ET a ppl i c ati ons.

2.1.5.5.4

a ble FAST and

to su ppor t ETHERN E T, AT M 1 55

The i nformati o n outl e t shal l be made from hi gh- i mpac t, l ow smoke PVC ma te ri al s.

2 .1 . 5. 5 .5 The i nformati o n outl e t shal l be I nsul ate d Di spl ac e me nt C on ne c tor (I DC ) wi ri n g te rmi na ti on.

2.1.5.5.6

The Modul ar RJ 45 Jac k shal l c onfo rm to AN SI / EI A/ TI A -T56 8 B w i ri ng sc he me s.

2.1.5.5.7

A ny bl ank and un use d Modul a r J ac k posi ti o n shal l be fi l le d w i th bl a nk mo dul e o n the fac e pl ate .

Annex 2.1 – Network Technical Specification

Page 6 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2 .1 . 5 . 6 H o rizo nt al Sub s yst e m 2 .1 . 5. 6 .1

Hori zo ntal subsys te m de sc ri be d he re i ncl u de s the UTP c abl e i nst al le d be twe e n the fac e pl ate a nd the p atc h p ane l s.

2.1.5.6.2

The UTP c a ble shal l be ru n usi ng a st ar to pol og y format from the patc h p ane l at the ad mi ni stra ti on subsy ste m to e ac h i ndi vi dual i nfo rmati o n outl e ts.

2.1.5.6.3

Eac h ru n of c abl e be tw ee n pa tc h pane l a nd the i nfo rma ti on outl e t shal l be c onti n uou s w i tho ut any j oi nt s or spl i c e s.

2 .1 . 5. 6 .4 UTP C ate g ory 6 c a ble s are use d for hori zont al c abl e a nd te rmi n ati on i n t he p atc h pane l . 2 .1 . 5. 6 .5 Al l UT P c a ble s must be te rmi n ate d at b oth e nds, and w i th pro pe r shie l di n g re qui re d for UTP c a ble s. The te rmi n ati on shal l be c onsi s te nt wi t h AN SI / EI A/ TI A TSB 4 0.

2.1.5.6.6

Duri n g the i nstal l ati o n of c abl e s arou nd be n ds an d j unc ti ons, the C ontrac tor shal l e nsure mi ni mum be n d ra di us for c ate go ry 6 UTP is no t vi ol ate d, i n addi ti o n the c on trac tor shal l e nsure that the mi ni mu m p ul l i ng te nsi on force for the UTP c abl e i s not vi ol ate d.

2 .1 . 5. 6 .7 The type of hori zon tal C ate gory 6 c abl e use d shal l be Uns hi el de d Tw i ste d Pai r (UTP) non- pl e num, l ow smoke w i th sol i d w i re c ond uc tor c ore . The c abl e shal l mee t or exc ee d the pe rform anc e re qui re me nts of C ate gory 6 as spe c i fi e d i n I SO / I EC DI S 1 18 01 an d AN SI / EI A/ TI A 56 8 TSB - 36 .

2.1.5.6.8

The le ngt h of e ac h i ndi vi du al ru n of C ate gory 6 UTP hori zon tal c a ble from t he ad mi ni strati o n su bsys te m to the i nfo rmati o n outl e ts shal l no t exce e d 9 0 me te rs.

2. 1. 5 .6 . 9 The same c ate gory spee d data. Annex 2.1 – Network Technical Specification

6

UTP c a ble

shal l

su ppor t hi gh

Page 7 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2.1.5.6.10 Eve ry l oose end of hori zo ntal c a ble mus t be l abel e d c orre spo ndi ng to i nfo rma ti on ou tle ts i de nti fi c a ti on.

2.1.5.6.11 The UTP C ate gor y 6 c abl e mus t mee t i nte rn ati on al sta nd ards on e le c troma gne ti c e mi ssi on an d i mmu ni ty EN 50 0 81 -1 , EN5 0 08 2 -1, EN 6 60 22 , EN 5 50 24 and I SO/ I EC 1 18 01 .

2.1.5.6.12 The UTP c a bl i ng i nfra struc ture shal l be a ble to su ppo rt hi g h bi t rate an d broa dc as t ap pl i c ati on suc h as 1 55 mb ps ATM an d broa dc ast si g nal from TV stati on.

a

2.1.5.6.13 The foll ow i ng re qui re me nts shal l be me t for al l C ate go ry 6 UTP c abl e li mi ts: C harac te ri sti c s Ge ne ral Ce rti fi c ati on

Le n gth Max. Pul li n g Te nsi o n N omi nal we i ght/ 1 00 0 ft. I nsul ati on Mate ri al Te m pe rature Ran ge DC Re si stanc e C apac i ta nc e Str uc tur al Re turn Loss I nput I mpe nde nc e N VP Die le c tri c Bre ak dow n Prop aga ti on De l ay Prop aga ti on De l ay Ske w

Annex 2.1 – Network Technical Specification

Para me te rs C MR rate d c abl e 23 AW G C AT 6 Uns hie l de d Tw i ste d Pai r AN SI/ EI A/ TI A 5 68 B, 2 -1 C at 6 C abl e spe c i fi c ati on AN SI/ EI A/ TI A 5 68 B, 2 -1 C at 6 C ha nne l Spe c i fi c ati ons UL ve ri fi e d an d l i ste d 1 00 me te rs 4 0 l b.

Draft

9a

Draft

9a

2 4 l b. F EB -2 0 °C ~ 60 °C More t han 9. 38 Ω pe r 10 0 me te r / 5% ma x. 1 30 pF pe r 10 0 me te r 1 -20 MHz: 3 3 dB 2 0 -10 0 MHz: 2 3 -10 l og (f/2 0 ) 1 00 Ω ± 1 5 % 1 00 MH z 1 00 Ω ± 2 2 Ω 10 0 MHz – 20 0 MHz 1 00 Ω ± 3 2 Ω 20 0 MHz – 30 0 MHz 7 1% 2 50 0 Vol ts DC 5 .5 ŋse c / m max @ 1 0 MHz 2 5 ŋse c / 10 0 m max.

Page 8 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

C harac te ri sti c s Re tu rn l oss

Para me te rs 1 7. 32 dB @ 25 0 MHz

Fre que nc y (MHz)

N EXT (mi n dB )

PSN E XT (mi n dB )

ELF E XT (mi n dB )

1. 00 0 4. 0 00 8. 00 0 10 .0 00 16 .0 00 20 .0 00 25 .0 00 31 .2 50 62 .5 00 10 0. 00 0 20 0. 00 0 25 0. 00 0

74 .3 0 65 .3 0 60 .8 0 59 .3 0 56 .2 0 54 .8 0 53 .3 0 51 .9 0 47 .4 0 44 .3 0 39 .8 0 38 .3 0

72 .3 0 63 .3 0 58 .8 0 57 .3 0 54 .2 0 52 .8 0 51 .3 0 49 .9 0 45 .4 0 42 .3 0 37 .8 0 36 .3 0

67 .8 0 55 .8 0 49 .7 0 47 .8 0 43 .7 0 41 .8 0 39 .8 0 37 .9 0 31 .9 0 27 .8 0 21 .8 0 19 .8 0

Atte n uati o n (max dB ) 2. 0 3. 8 5. 4 6. 0 7. 7 8. 6 9. 6 1. 8 15 .7 20 .2 29 .8 --

2 .1 . 5 . 7 Pat ch Pane l 2 .1 . 5. 7 .1

Al l patc h pane l s m ust be ac c om pa nie d by a c a ble ma na ge me nt bar / ma nage me nt pane l . Wi th c abl e re te n ti on tray at the re ar te rmi nati on are a to m ai ntai n an d su ppor t the te rmi na te d c abl e s.

2 .1 . 5. 7 .2 W he ne ve r possi bl e all UTP h ori zon tal c abl e shal l be te rmi n ate d i n one p atc h pa ne l provi de a ful l y i nte g rate d d ata c om mu ni c ati on sys te m 2 .1 . 5. 7 .3 Hori z ont al w i ri n g wi l l be te rmi na te d at a patc h p ane l i n a c onve ni e nt, se c ure d loc ati o n. It wi l l be ha rd- wi re d i nto the re ar of the patc h pa ne l by I nsul ati on Di spl ac e me nt C on ne c ti on. The re ar patc h pa nel m ust no t be ac ce ssi bl e to the use r. 2 .1 . 5. 7 .4 Patc h pane l wi l l be rac k m oun te d i n wi the r w al l mo unte d 1 9” e qui pme nts rac k s or free st andi ng 19 ” e qui p me nt rac k . 2 .1 . 5. 7 .5 Al l 4 p ai rs of wi re s w il l be pre se nte d to the hori z ont al p atc h p ane l . Eac h patc h pa nel shal l have 1 6 or 2 4 po rts.

Annex 2.1 – Network Technical Specification

Page 9 of 26

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2.1.5.7.6

Pe rmane n t l abe l i ng mus t be pre se nte d to that e ac h soc ke t c a n be re adi l y i de nti fi e d.

2.1.5.7.7

The re mus t be e noug h p atc h pa nel s i nstal le d to provi de c on ne c ti vi ty for e ve ry soc ke t i nst al le d i n the w ork are as.

2 .1 . 5. 7 .8 The C ontrac to r sh al l i nstal l the patc h p ane l s i n suc h as w ay as to mi ni mi ze the effe c t of un ti dy p atc h c ords. 2 .1 . 5. 7 .9 The c ontrac t or sh al l be re sponsi ble for c a bl i ng up to an d i nc l u di ng t he w i ri ng ri se r.

2 .1 . 5 . 8 C ab le M anag e me nt Sys t e m 2 .1 . 5. 8 .1

The c abl e ma na ge me nt syste m use d sh al l be use r fri e ndl y.

2 .1 . 5. 8 .2

The c ontrac t or c an pro pose , as an op ti on, the a ppro pri ate c abl e te sti n g e qui p me nt for the use rs i n orde r for the m to pe rfo rm ba si c troubl e -shoo ti ng duti e s.

2 .1 . 5 . 9 Te st ing 2 .1 . 5. 9 .1 Te st shal l be pe rforme d to the w hole Str uc ture d C abl i ng Sy ste m an d Loc al Wi rel e ss i nc l udi n g bac k bone an d c ross- c onne c ts. 2 .1 . 5. 9 .2 The c ontrac t or sh al l pe rform al l c a ble te sti n g usi ng onl y Le ve l I II C abl e Te ste r by ap prove d man ufac t ure rs for c e rti fie d by AN SI / EI A/ TI A or I SO /I EC DI S 11 80 1 stan da rd bo dy 2 .1 . 5. 9 .3 Al l c a ble s shal l be te ste d by the c on trac tor an d c onfi rm to t he re qui re me nts spe c i fi e d i n thi s spe c i fi c ati on. 2 .1 . 5. 9 .4 The c ontr ac tor m ust te st e ac h e nd- to -e nd c on ne c ti on for i ts l i nk at te nuati o n and N ext (ne ar-e nd c rosstal k ) i n the fre q ue nc y spe c trum from 0 MHz to 25 0 MHz wi th the Annex 2.1 – Network Technical Specification 26

Page 10 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

n um be r of di sc re te poi nts as spe c i fi e d i n the ta ble i n c l ause E. 6 xi i i.

2 .1 . 5. 9 .5 Al l c a ble s shal l be te ste d by the c on trac tor an d c onfi rm to t he re qui re me nts spe c i fi e d i n thi s spe c i fi c ati on. 2 .1 . 5. 9 .6 The c ontr ac tor m ust te st e ac h e nd- to -e nd c on ne c ti on for i ts l i nk at te nuati o n and N ext (ne ar-e nd c rosstal k ) i n the fre q ue nc y spe c trum from 0 MHz to 25 0 MHz wi th the n um be r of di sc re te poi nts as spe c i fi e d i n the ta ble i n c l ause E. 6 xi i i. 2 .1 . 5. 9 .7 The c ontrac t or m ust pe rform the fol l ow i n g te sts for e ve ry l i nk an d provi de te st re sul t: i. ii.

iii. i v. v. vi . vi i . vii i . i x. x. xi . xi i . xii i . xi v. xv.

O pe n ci rc ui ts Shor t c i rc ui ts (be twe e n c on duc to rs, be twe e n c on duc tor s and eart h) Wi re Ma p C abl e l e ngt h Atte n uati o n Re tu rn Loss Ne ar En d C ross-tal k For End Cross- tal k Equ al Le ve l C ross-tal k Pow e rSu m N EXT Pow e rSu m F EXT De l ay S kew Prop aga ti on De l ay DC Re si stanc e C AT 6 Dra ft 9 a. Pe rform anc e He adroom

and

2 .1 . 5. 9 .8 Thoroug h ope rati o nal te sts shal l be c arri e d out on all d ata an d voi c e ci rc ui ts 2 .1 . 5. 9 .9 Al l m ate ri al s, de vi ce s and e qui p me nt su ppl i e d or e re c te d un de r thi s C ontrac t, w hi c h fai l the te st, or d uri ng the c ommi ssi oni ng an d ac c e pta nc e of the syste m sh al l be pl ac e d or re c ti fie d by the C ontr ac tor to the MO E an d the te st shal l be re pe ate d.

2 .1 . 5 . 10

Cus t o me r Acce p t an ce

Annex 2.1 – Network Technical Specification 26

Page 11 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

5 .9 . 1. 1

At the c onc l usi o n of the i nstal l ati on a prel i mi nar y w al k thro ug h wi th the i nstal l ati on c o ntrac t or wi l l be pe rfo rme d to c he c k for i nstal l ati o n q ual i ty, ac c urate pe rfo rma nc e of t he w ork , and to ve ri fy e ngi nee ri n g di a gra ms . A ny mo di fi c ati on to the doc u me ntati o n or the i nstal l ati o n tha t may be re qui re d shal l be ac c o mpl i she d w i thi n 1 mon th pe ri od.

5.9.1.2

“C us tome r Ac c e pta nc e” must be o btai ne d at the e nd of e ac h sta ge of the Syste m Ac c e p tanc e te sts be fore proc e e di n g to the next sta ge . The 2 sta ge s of the Sy ste m Ac c e pt anc e te st are : t he S yste m I nstal l ati on Te sts an d the Syste m Inte gr ati on Te sts. Eac h “C us tome r Ac c e pta nc e” shal l c onsi st of a w al k thro ug h wi th the i nstal l ati on c o ntrac t or. The w al k thro ug h shal l be sc he dul e d wi t hi n 1 mo nt h of the c om pl e ti on of e ac h te st.

5 .9 . 1. 3

The c ontr ac tor sh al l pre p are the ac c e pta nc e te st spe c i fi c ati on doc u me nt an d sub mi t the m i n a dvanc e to t he MO E for a pprov al pri or to the ac c e pta nc e te st.

5.9.1.4

The c ontrac t or sh al l pre pare al l ac c e pt anc e te st re port an d su bmi t the m to the MO E as par t of the doc ume nt ati on re qui re me nts.

5.9.1.5

I n the e ve nt of the c o mpo ne nt uni ts and / or c abl e fai l ure i n suc h te st an d / or syste m prop ose d c ann ot me e t the re qui re me nts spe c i fi c ati on due to the usage of t he i nc o nsi ste nt c om pone nt uni ts; or c abl e s, the c on trac tor shal l re de si gn the syste m or re pl ac e wi t h pro pe r c om pone n t u ni ts or c abl e s an d re su bmi t to the MO E for fi nal a pprov al be fore the i nstal l ati on i s c om me nc e d.

1 .5 . 1 0 .1 1 Dra wing App ro v al 1 .5 . 10 .1 The draw i ng i ssue d by the MO E sh ow s the de si g n i nte n t, w ork i ng pri nc i pl e s and vi sual ap pe aranc e of the w ork. Al l de tai l s c ontai ne d w i thi n the dr aw i ngs a re to show the vi sual a ppe ara nc e onl y. 1 .5 . 10 .2 The draw i ng i ssue d by the MO E sh ow s the de si g n i nte n t, w ork i ng pri nc i pl e s and vi sual ap pe aranc e of the w ork. Al l de tai l s c ontai ne d w i thi n the dr aw i ngs a re to show the vi sual a ppe ara nc e onl y.

1.5.10.3

The c ontrac t or sh al l sub mi t tw o (2 ) se ts of C AD draw i n g to the MO E for a pprov al . The C AD draw i n g w i ll be re vie we d by the MO E. The C ontr ac tor sh al l no t c om me nc e any w ork , fabri c a ti on, proc ure me nt ma nuf ac ture r, e tc u nti l the MO E has ap prove d suc h

Annex 2.1 – Network Technical Specification 26

Page 12 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

dr aw i ngs b y stam pi ng the m AP PROVED or AP PROV ED W I TH CO MMEN T S. The c on trac to r i s to note that the C AD dr aw i ng i s to be sub mi tte d p unc t ual l y an d al l ow i n g suf fi c ie nt ti me for re vie w.

1.5.10.4

The appro val of C AD dr aw i ng by the MO E shal l not rel i e ve the c ontr ac tor of thi s re sponsi bi li ty for the w ork i ngs, pe rformanc e , an d func ti o n of the work s as spe c i fi e d i n the Te n de r d oc ume n ts.

1.5.10.5

The progra mmi n g of the prod uc ti on of the C AD draw i ng i s to be sub mi tte d to t he MO E.

Annex 2.1 – Network Technical Specification 26

Page 13 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

1.5.12.12 M aint e n ance / ap p lic at io n As s urance and Wa rr ant y 1 .5 . 12 .1 The C ontrac to r sh al l provi de a tw e nty (2 0 ) ye ars p assi ve pro duc t w arran ty on al l c om pone nts of the S truc t ure d C abl i n g Syste m i n the te n de r, bac ke d by the ma nuf ac ture r an d a tw e nty (20 ) ye ar ap pl i c ati on ass uranc e on t he ap pl i c ati on, fo rm the da te of suc c e ssf ul c ommi ssi oni n g. The c ontrac tor shal l spe c i fy i n de tai l the c ove rage of the i r w arrant y prog ram i n t hi s Te nde r. 1 .5 . 12 .2 The C ontr ac tor sh al l al so pro vi de a one (1 ) ye ar o n si te w arra nty w i th e ffe c t from the syste m Ac c e ptanc e Date afte r the S yste m I nte grati o n Te st. 1 .5 . 12 .3 The C ontrac to r sh al l provi de de tai l s of t he c osts and se rvi ce l e ve l avai l abl e w i thi n the w arr anty. 1 .5 . 12 .4 Up on c om pl e ti on of the C ontrac t w ork s, t he C on trac tor sh al l su bmi t al l suc h w arranti e s i n re spe c t of the c on trac t Work su ppl i e d or i nstal l e d on si te , ag ai nst de fe c ti ve m ate ri al s.

1.5.12.5

The w arranti e s sh al l be su bmi tte d w i thi n thi rty (3 0 d ays from the issue of the Ce rti fi c ate of C ompl e ti on, to be i ssue d b y the MO E on the syste m c om mi ssi oni n g Date an d the Sys te m Ac c e pta nc e Date.

1.5.12.6

The c ontr ac tor’ s l oc al sup port te a m mus t re spo nd to w arra nt/ mai nte nanc e c all s wi thi n tw o (2 ) hours du ri ng w ork i ng ho urs c ove re d by t he w arran ty/ mai n te nanc e c on trac t. T he re mu st al so be a si ngl e poi nt- of-c o ntac t for al l c al l s to c han nel to.

1 .5 . 12 .7 The c ontrac t or i s re qui re d to su bmi t a sc he dul e for pre ve nti ve / routi ne mai nte nanc e to be pe rforme d at ti me s ap prove d by the MO E. 1 .5 . 12 .8 The C ontrac to r sh al l provi de i n the i r pro posal the mai nte nanc e organi zati on al struc t ure c l e arl y i de n ti fyi n g the rol e s a nd re sponsi bi li ti e s of vari ous parti e s i nvol ve d. 2 .1 . 5 . 13

1.5.13.1

Do cume nt at io n

The C ontr ac tor sh al l pro pose a se t of c ommo n l abe li n g c on ve nti ons.

1 .5 . 13 .2 Al l i nfo rma ti on outl e ts m ust be l abe le d w i th a uni que i de nti fi e r Annex 2.1 – Network Technical Specification 26

Page 14 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

1. 5. 1 3. 3 I nform ati on ou tle t i de nti fi c a ti on mu st be show n on the c orre spon di n g patc h pa nel soc ke ts.

1.5.13.4

The l abe l s an d thei r mark i n gs m ust be d urabl e a nd le gi bl e and must not de gr ade wi thi n the li fe ti me of the c abl i ng syste m. The l abe l mark i n g must be i n del i bl e and w ate r proof.

1. 5. 1 3. 5 The C ontrac to r must sup pl y, i n 2 bou nd se ts, asi nstal l e d draw i n gs spe c i fyi ng l oc ati on of i nfo rma ti on outl e ts, pa tc h pa nel c onfi gu rati on an d de tai l s of t he c abl e runs . C ontrac tor shal l al so provi de A utoC AD c omp ati bl e di a grams an d draw i ngs an d text fi le s i n Mi c rosoft Word c om pati ble format. 1. 5. 1 3. 6 O pe rati ng ma nual s for any hardw are c omp one nts re l ati n g to the c abl e must be pro vi de d to the MO E. 1. 5. 1 3. 7 The doc u me ntati o n must be re ce i ve d from t he su ppl i e r wi thi n one (1 ) mo nth of i nstal l ati on.

2 .1 . 5 . 14

Sit e Pre p ar at io n Inf o rmat io n.

1.5.15.1

The C ontr ac tor sh al l vi si t e ach s it e / lo cat io n on t hei r ow n pre fe re nc e be fore submi t ti ng propos al to advi c e on ma tte rs re l ati n g the de si gn, de ve l opme nt, i nst al l ati on, ope ra ti on an d mai n te nanc e of the syste m.

1.5.15.2

The C ontr ac tor sh al l pro pose the c abl i ng ne tw ork pl an w hi c h show s the l ayou t / c abl i n g di agra m of al l ne tw ork de vi c e s and n um be r of Data poi n t outl e ts an d de vi ce s i n e ac h of the i mp orta nt l oc ati ons. Impo rt ant lo cat io ns are cl assro oms, l i brary, Admi ni s trati on bl oc k / offi c e , sta ff roo m, spe c i al rooms, sc hool hal l an d othe r l oc ati o ns prop ose d by t he sc ho ol .

1 .5 . 15 .3 Exi sti n g c abl e trays, trunk i n gs, c ond ui ts, un de rgro un d pi pe s c an be use d. The c ontr ac tor shal l provi de pri c e s pe r uni t me asure me nt of c abl e trays, tr unk i n g, c ond ui ts, i n c ase suc h fac i l i ti e s are not provi de d for i n l oc ati o ns w he re the y are re qui re d. 1. 5. 1 5. 4 As trunk i n g for the c abl e s i nc l udi n g pu nc turi n g of hol e s throu gh w al l may be re qui re d, the c ontrac tor shal l i nc l ude suc h c ost i n the c abl i n g uni t c ost a nd the w ork shal l be unde rta ke n.

1.5.15.5

If duri n g the pro gre ss of fabri c ati o n, i nstal l ati o n of the w ork, the c ont rac tor nee d s to pu t c om pl e te i te ms i nto

Annex 2.1 – Network Technical Specification 26

Page 15 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

stora ge the n the c ont rac tor shal l noti fy MO E to i nspe c t al l i te ms.

1.5.15.6

The c ontrac t or shal l un de rtake to re move any te sti ng e qui pme n ts an d de bri s le ft at or i n the vi ci ni ty of the vari ous e qui p me nts si te s u pon suc c e ssful c om ple ti on of the syste m i nstal l ati o n.

1.5.15.7

The c ontrac t or mus t kee p t he si te cl e an a nd ti dy to the sati sfac ti o n of MO E.

1. 5. 1 5. 8 The c ontr ac tor shal l ta ke ful l re spon si bi l i ty for the c are of t he w ork from the d ate of c omme nc e me nt unti l the proj e c t is ha nde d ove r to MO E.

1.5.15.9

Al l mate ri al s use d on the i nstal l ati on shal l be of fi rst gra de qu al i ty i n eve ry re spe c t. Al l m ate ri al s su ppl i e d shal l be sui tabl e for the i r pur pose , a nd sh al l c om pl y stri c tl y w i th the rel e vant B rune i St an dards. I n t he abse nc e of suc h loc al sta nda rds, t he spe c i fi e d stan dard shal l be use d or ap propri ate i nd ustry spe ci fi c ati o n.

1. 5. 1 5. 1 0 Al l m ate ri al s, c om pone n ts, e qui pme nt s shal l be tropi c al i se d a nd shal l be sui tabl e for the l oc al si te c ondi ti o n.

1.5.15.11 The c ontrac t or’ s atte nti o n i s i n p arti c ul ar, i s draw n to the fol l ow i n g;

i. I ndo or part s w hi c h may be susc e p ti bl e to ru st

ii.

sh al l be c oate d w i th a n ap prove d anti - rust i nhi bi tor pai nt, to pre ve nt rusti n g of the ste el me m be r. Unl e ss tw o me tal s w hi c h may othe rw i se be i n c on tac t are i nsul ate d, di ssi mi l ar me tal s i n c on tac t shal l be se le c te d suc h th at the po te nti al di ffe re nc e be tw ee n the m in e le c troc he mi c al se ri e s i s no gre ate r th an 0. 5 vol ts.

1. 5. 1 5. 1 2 The c ontr ac tor shal l l i ai se wi th the De par tme nt of Pl anni ng an d Est ate Man age me nt, MO E for al l el e c tri c al c onsu me d for the w ork . Annex 2.1 – Network Technical Specification 26

Page 16 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2 .1 . 5 . 15

Pro je ct M anag e me nt and Sit e Qu alit y As s uran ce

2. 1. 5 .1 5 .1

As MO E pl ac e s gre at i mpor tanc e on t he qual i ty an d mai nt ai na bi li ty of all prod uc ts del i ve re d, i nstal le d and i mpl e me nte d by the C ont rac tor, the C ontr ac tor must pre pare an ove ral l Q ual i ty As sura nc e (Q A) pl a n for a pprov al by the MO E. The de tai l e d Q A pl an mus t be submi t te d to the MO E wi t hi n one (1 ) mo nth afte r the le tte r of ac c e pta nc e i s i ssue d.

1. 5. 1 6. 2 The C ontrac to r shal l provi de a Proj e c t Man age me nt st aff / si te Q A pe rson nel to exe c ute the Q A pl an to the sati sfac ti o n of the MO E an d e nsure t hat the de l i ve ry, i nstal l ati on an d i mple me n tati on of the pro pose d syste m are exe c ute d ac c ordi ng to the pl an. 1. 5. 1 6. 3 Any c ost spe c i fie d assoc i ate d wi t h pro vi di ng Q A shal l be spe c i fie d i n the C ontr ac tor’ s su bmi ssi on.

1.5.16.4

The C ontr ac tor shal l u nde rta ke al l w ork wi t h sk i l l an d c are i n orde r to prod uc e w ork fi t for i ts i nte n de d pur pose and of the hi ghe st q ual i ty.

1.5.16.5

The C ontr ac tor must su ppl y a si te ma na ge r w ho w i ll take day to day re spon si bi l i ty for the prod uc ti on and i nstal l ati on pro gram. The si te ma na ge r, duri n g hi s ti me i n si te mus t c onti n ue to li ai se fai th al l statu tory b odi e s and ot he r parti e s re le va nt to the prod uc ti on an d i nstal l ati on.

2 .1 . 5 . 16 2. 1. 5 .1 6 .1

Te chni cal Supp o rt St aff and Exp e rie n ce The C ontr ac tor shal l pro vi de a li st of the i r te c h ni c al sup port staff, toge t he r wi t h the i r work i n g expe ri e nc e i n the re le va nt fi el d.

1. 5. 1 7. 2 The C ontrac to r shal l stati on at le ast one (1 ) ce rti fi e d struc t ure d c a ble i nstal le r i n B rune i Daru ssal am for sup port c ove r d uri ng the man ufac t ure r w arr anty.

Annex 2.1 – Network Technical Specification 26

Page 17 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

1. 5. 1 7. 3 The C ontrac to r shal l state i f thei r sta ff are trai ne d by the man ufac t ure r, on- si te trai ni ng or ot he r me ans.

1.5.17.4

The C ontrac to r shal l state the ne are st l oc ati o n of the i r pri nc i p al ’ s su pp ort C e ntre. Thi s Ce ntre shal l have pe rma ne ntl y stati o ne d sup port staffs w ho are c apa bl e of provi di ng te c hni c al su pp ort e ffi ci e ntl y.

1.5.17.5

The c ontr ac tor shal l provi de a li st of al l exi sti n g struc t ure s c abl i ng sys te ms re fe re nc e use rs wi t h the Te n de r su bmi ssi on. The pro pose d struc t ure d c abl i ng man ufac t ure r shal l have at le ast fi ve (5 ) re fe re nc e si te s i n Bru nei Daru ssal am.

Annex 2.1 – Network Technical Specification 26

Page 18 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

An nex 2 .1 . 6 H ard w are s , Sof t w are s , Ot he r re lat e d Eq uip me nt s and s it e p re p ar at io ns de s crib ed in t he p ack ag es 1 .5 . 1

Ge ne r al

1.5.1.1 The

C ontrac to r sho ul d vis it AN N EX 1 – MAN DATORY su bmi tti ng pro posal s.

AL L t he s it e s REQUIREM EN T

und e r be fore

1 .5 . 1. 2

The ha rdw are and softw are re q ui re me nts are use d p urel y for e duc ati onal p urp ose s. The C ontr ac tors sh al l ta ke i nto c onsi de rati o n the se re qui re me nts i n the i r pro posal .

1 .5 . 1. 3

The C ontrac to rs are i nvi te d to submi t i ts propos al to su ppl y Hardw are suc h as Mul ti me di a De sk to p PC , Mul ti me di a N ote book , Ne tw ork C ol our L ase r Pri nte r, N e tw ork L ase r Pri n te r, Sc a nne r for Wi ndow s e nvi ron me nt an d a nu mbe r of softw are pac kage s.

1 .5 . 1. 4

The C ontr ac tors sh al l c on fi gure al l ne w Mul ti me di a De sk top PC , Mul ti me di a N ote b ook hardw are to the MoE’ s ne tw ork i nc l udi n g t he vi rus prote c ti on syste m to ful fi l l the re qui re me nts of Mi ni stry of Educ ati on (Mo E).

1 .5 . 1. 5

The C ontr ac tors sh al l c om pl e te the i mpl e me nta ti on of the w hol e proje c t i .e Del i ve ry, te sti n g an d c om mi ssi oni n g of Goo ds an d Se rvi c e s w i thi n three (3 ) mo nth s c omme nc i n g one (1 ) w ee k afte r si gni n g the c on trac t a gree me nt.

1 .5 . 2

Sco p e o f Wo rks The Co nt r act o r s hall :

1.5.2.1 su ppl y a nd de l i ve r i n re spe c t of the Goo ds at the Si te i n ac c o rda nc e wi t h t he pha se s state d i n App e nd ix 1 to Ap p e nd ix 5 . 1 .5 . 2. 2

su ppl y an d de l i ve r i n re spe c t of the go ods at the si te for P hase I wi l l be i mme di a tel y a fte r the si g ni ng of the c on trac t a gree me nt;

1 .5 . 2. 3

su ppl y an d de l i ve r i n re spe c t of the go ods at the si te for P hase I I w i ll be i mme di ate l y a fte r the provi si onal ac c e pt anc e te st has c om ple te d for Phase I;

1 .5 . 2. 4

su ppl y an d de l i ve r i n re spe c t of the go ods at the si te for P hase II I wi l l be i mme di a tel y a fte r the provi si onal ac c e pt anc e te st has c om ple te d for Phase II ;

1 .5 . 2. 5

pro vi de Se rvi ce i n re spe c t of the Go ods at the Si te;

1 .5 . 2. 6

ke e p stoc k of spare par ts for the c onti nue d use an d ope ra ti on of the Goo ds;

Annex 2.1 – Network Technical Specification 26

Page 19 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

1 .5 . 2. 7

pro vi de Addi ti o nal Se rvi c e s i n re spe c t of the Hardw are i n the Go ve rnme nt’ s p osse ssi on (“ Exi sti ng Hardw are ” );

1 .5 . 2. 8

u pon del i ve ry, i nst al l ati on an d c om mi ssi oni n g (i nc l udi n g a ppl i c ati on and data mi grati o n) of the Hardw are, the C ont rac tor shal l trans port t he exi sti ng Hardw are i n the Go ve rnme nt ‘ s po sse ssi on to a loc ati o n to be s pe ci fi e d b y the Go ve rnme nt, i n go od c on di ti on / un dam age d;

1 .5 . 2. 9

e nsure tha t al l the Hardw are are w ork i ng pro pe rl y afte r i nst al l ati on i nc l udi ng Ha rdw are that i s p art of a ne tw ork syste m;

1 .5 . 2. 10 fu rni sh de tai le d o pe rati on an d mai n te nanc e ma nual s for the Go ods or a ny par t(s) the re of; 1 .5 . 2. 11 su pe rvi se the pe rformanc e and ope rati o n of the G oods an d provi si on of t he Se rvi ce s, i nc l u di ng the provi si on of an y e nhanc e me nt s or fi xe s th at may be ne c e ssary or de si rabl e to e nsure that the Goods are ful l y fu nc ti onal an d c onf orm in all re spe c t wi th t he C on trac t S pe c i fi c ati o ns; 1 .5 . 2. 12 pro vi de the G ove rnme n t wi t h al l ne c e ssary ad vi ce , su pe rvi si on an d te c hni c al assi sta nc e t hat ma y be re qui re d by t he G ove rnme n t duri n g the pre par ati on, i nst al l ati on, c om mi ssi oni n g, ac c e pt anc e te sti ng or post i mpl e me nt ati on of t he G oods; an d 1 .5 . 2. 13 pro mp tl y i nfo rm, u pd ate an d/ or provi de the Gove rn me nt w i th an y expansi o ns, ad di ti ons, e nha nc e me n ts or Ne w Re le ase (s) to or of the Softw are a nd Ha rdw are . The pri c e (s) of any suc h expa nsi ons, a ddi ti on s, e nha nc e me nts or N ew Re le ase (s), i f no t al re ady agre e d to u nde r thi s C on trac t, shal l be ne goti ate d and agree d to be tw ee n t he p arti e s. 1 .6 . 7

Tr ain ing Pro g ramme

1.6.1

The prospe c ti ve c ont rac tor shal l be re spo nsi bl e for b ui l di ng the c apa bi li ti e s of thee n d-use rs as w el l as the su ppo rt te am an d bri ng the i r sk i l l s to appro pri ate and a de quate l e ve l .

1.6.2

The prospe c ti ve c ont rac tor shal l c ond uc t a sui ta bl e pro gra m re qui re d for the suc c e ssful i m ple me nt ati on, ope ra ti ons an d ma nage me n t of al l t he c om pone n ts i nst al le d. The prospe c ti ve c on trac to r sh al l al so pro pose the n umbe r pe rso nne l a nd d urati o n re q ui re d for e ac h trai ni ng. The trai ni n g re qui pme nt shal l i ncl u de b ut not l i mi te d to the fol l ow i ng:

1 .6 . 2. 1 .1 usi n g Mi c rosoft outl ook (e -mai l ) for e nd- use rs 1 .6 . 2. 1 .2 Usi n g I nte rne t Expl ore r (we d brow se r) for e nd- use rs 1 .6 . 2. 1 .3 O ve ral l PC ho use kee pi n g Annex 2.1 – Network Technical Specification 26

Page 20 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2 .1 . 8

2 .1 . 9

1 .6 . 3

The pros pe c ti ve C ontr ac tor sh al l be re sponsi ble for the arr an ge me nt a nd provi si on of sui tabl e trai ne rs an d rel e van t c ourse mate ri al s.

1 .6 . 4

Al l expe nse s for t he e ngage me n t of trai ne r(s) shal l be bo rne by t he C ont rac tor.

Pro je ct M anag e me nt 1 .8 . 1. 1

The C ontr ac tor sh al l de si g nate a Proj e c t Mana ge r for ma na gi ng the proje c t. The Proj e c t Mana ge r shal l be pri mari l y re sponsi ble for, b ut not li mi te d to, the fol l ow i ng ta sk s and ac ti vi tie s :

1 .8 . 1. 1

The C ontr ac tor sh al l de si g nate a Proj e c t Mana ge r for ma na gi ng the proje c t. The Proj e c t Mana ge r shal l be pri mari l y re sponsi ble for, b ut not li mi te d to, the fol l ow i ng ta sk s and ac ti vi tie s :

1 .8 . 1. 2

Di re c ti n g an d c oordi nati ng the w ork s an d se rvi c e s w hi c h are to be exe c u te d or provi de d by the C on trac tor u nde r the c on trac t;

1 .8 . 1. 3

Admi ni ste ri n g the c ontr ac t an d mo ni tori n g the progre ss, i nst al l ati on and te sti ng of e qui pme nt, te c hni c al pe rso nne l tr ai ni ng, l ogi sti c su pp ort, doc u me nta ti on pre pa rati on and ope rati on sta rt-u p;

1 .8 . 1. 4

B ei n g the age nt of t he C on trac tor i n all de al i ngs wi th the Go ve rnme nt.

1 .8 . 1. 5

Al l ac ti ons of the Proj e c t Mana ge r shal l be bi n di n g on the Pros pe c ti ve C on trac tor.

1 .8 . 1. 6

The Gove rnme nt sh al l h ave di re c t ac c e ss to the C ont rac tor an d/ or Proje c t Mana ge r at al l ti me s. I f the Proj e c t Ma nage r i s abse nt for any d urati o n, the Pro spe c ti ve C on trac tor shal l de si gnate an othe r e mpl oye e to pe rform hi s duti e s an d func ti ons

St at us Re p o rt ing

1.9.1.1

The C ontrac to r sh al l de li ve r to the G ove rnme n t w ri tte n pro gre ss and status re por ts e ve ry tw o (2 ) w ork i ng we ek s i n a format of the Pros pe c ti ve C ontrac t or's c hoi c e . The su bmi ssi on and ac ce p tanc e of the se re por ts shal l not i n an y w ay prej u di c e t he ri g hts of the Gove rnme nt to make an y c l ai ms agai nst the Pros pe c ti ve C ontr ac tor.

1 .9 . 1. 2

The C ontrac to r sh al l noti fy the Gove rn me nt of any expe c te d de l ay i n the de li ve ry of an y part of the i te ms an d Se rvi ce s to be pe rfo rme d. The Pros pe c ti ve C ont rac tor shal l re fe r i m me di ate l y to the Gove rn me nt an y mat te r l i kel y to i mpe de t he pro gre ss of the de li ve ry of t he I te ms and Se rvi ce s.

Annex 2.1 – Network Technical Specification 26

Page 21 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

1 .9 . 1. 3

The Gove rnme nt m ay c al l progre ss mee ti n gs e ve ry one (1 ) mo nth i nte rval s duri n g w hi c h the Proje c t Man age r sh al l at te nd an d re port to t he G ove rnme n t on the pro gre ss of the del i ve ry of the I te ms a nd Se rvi c e s. The pro gre ss me e ti ngs shal l be hel d at ve n ue s c hose n by the Go ve rnme nt.

1 .8 . 1 0 Imp le me nt at io n Pl an

2.1.10.1The C ontr ac tor sh al l, w i thi n te n (10 ) w ork i ng d ays from the da te of issu anc e of Aw ard of C ontrac t prod uc e and mai ntai n an up- to -d ate Impl e me nt ati on Pl a n show i ng ti me sc he d ule and se que nc e of e ve nts for the i nst al l ati on of the Syste m i nc l udi n g del i ve ry, i nstal l ati o n, c om mi ssi oni n g an d ac ce p tanc e of the Syste m. It shal l al so i ncl u de ac ti vi ti e s to be c arri e d out b y the Gove rn me nt. 2 .1 . 10 .2 The Impl e me nt ati on Pl an shal l be up date d at i nte rval s of tw o (2 ) c ale nd ar we ek s to show the expe c te d and ac t ual e ve n ts an d c ompl e ti on date s. The I mpl e me nta ti on Pl an sh al l be ma de av ai l abl e to the G ove rnme n t for re vi ew. 2 .1 . 10 .3 The C ontrac to r sh al l de li ve r to the Em pl oye r w ri tte n pro gre ss an d status re ports e ve ry tw o (2 ) c al e ndar w ee k s i n a format appro ve d by the Em pl oye r. The sub mi ssi on an d ac c e pta nc e of the se re ports sh al l n ot i n any w ay pre j udi c e the ri ghts of the Empl oye r to ma ke any c l ai ms a gai nst the C on trac tor. 2 .1 . 10 .4 The C ontrac to r sh al l noti fy the Empl oye r of an y expe c te d de l ay i n the de l i ve ry of an y part of the Syste m a nd/ or the se rvi ce s to be pe rforme d. The C ontr ac tor shal l re fe r i mme di a tel y to t he Empl o ye r any mat te r li ke l y to i mpe de the pro gre ss of the sup pl y and i nstal l ati on of the Syste m.

2.1.11

H e lp De sk Se rvice s 2 .1 . 11 .1 The C ontr ac tor sh al l re c omme n d an d provi de the pol i c y an d proc e d ure s for a hel p de sk envi ron me nt at t he se rvi ce c e nte r w hi c h han dl e i ssue i nc l udi ng, bu t not li mi te d to the fol l ow i ng: 2 .1 . 11 .1 . 1 The he l pde sk i s to provi de sup port to se rvi c e re que st or he l p from all re gi ste re d use rs. The use rs sh al l be gi ve n a se t of pho ne nu mbe r, ge ne ral fax n o, e mai l s, an d ot he r forms to ac c e ss to the he l p de sk to ask for he l p. 2 .1 . 11 .1 . 2 The re que sts c oul d be c omm uni c ate d thro ug h di ffe re nt mo de suc h as te le p hone c al l s, e mai l or othe r mo de of c omm uni c ati o ns. 2 .1 . 11 .1 . 3 The he l p de sk h as to have the fac i l i ty to i de nti fy the c al l e r, au the nti c ate the c al le r an d doc ume nt t he re que sts

Annex 2.1 – Network Technical Specification 26

Page 22 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2. 1. 1 1. 2 He l p de sk pe rforms as c al le rs w ho see k hel p

a

si n gl e

poi nt

of

c ontac t

for

2. 1. 1 1. 3 He l p de sk w i ll provi de t he fi rst l i ne of sup port, w hi c h w i ll provi de the basi c te c hni c al or re l e vant k now le d ge to hel p and assi st the c al le r. W he n i t i s an i ssue i de nti fie d to re q ui re more i n de pth k now le d ge for issue re sol uti on, the hel p de sk wi l l e sc al ate to the next l e ve l of sup port.

2.1.11.4 He l p de sk w i ll ha ve a se t of pre -sc he dul e d or a gree d u pon se rvi c e l e ve l of the se rvi ce s a nd wi l l re -di re c t the c al le r to t he re l e vant part y assi gne d to re sol ve the pro ble m. Thi s re sourc e i s us ual l y u nde r a bac k - to -bac k agre e me nt wi th a pre -assi gne d c ompa ny or pa rty. He l p de sk sh al l i ssue a re que st l og or I D to trac k the se re que sts. 2. 1. 1 1. 5 He l p de sk up on cl osi n g the c al le r re que st w il l c l ose the l og I D an d i nform the c all e r or re que ste r that the i ssue is c l ose d. A w ee k l y or mon thl y- c onsol i da te d re port shal l be ge ne rate d from t he he l p de sk syste ms.

2.1.11.6 The sta nda rd c ove rage pe ri od shal l be from Mon days to Thurs days and Satu rd ays, from 7 .4 5 a m to 5 .0 0 p m. 2. 1. 1 1. 7 If the Em pl oye r re qui re s the C ontrac tor to pro vi de any Mai nte na nc e Se rvi ce s outsi de the sta nda rd c ove ra ge pe ri od, the C ontrac t or sh al l be obl i ge d to provi de suc h se rvi c e s to the Empl oye r at no ad di ti onal c ost. 2. 1. 1 1. 8 The C ontr ac tor ’ s Re sp onse Ti me ou tsi de the stan dard c ove rage pe ri od shal l be wi thi n three (3 ) h ours fro m the ti me of re ce i pt by the C ontrac to r of a re que st from the Empl oye r to re c ti fy a fa ul t. 2. 1 . 12 Do cu me nt at io n 2. 1. 1 2. 1 The C ontr ac tor shal l pro vi de al l doc ume nts w ri tte n i n Engl i sh an d expre sse d i n c le ar, c onsi ste nt, re adi l y un de rstan dabl e an d de fi ne d te rms. Al l d oc ume n ts shal l have c ompre he nsi ve i ndi c e s to fac i l i tate qui c k re fe re nc e . 2 .1 . 12 .2 The C ontr ac tor sh al l doc ume nt ati on se t an d i nc l u de t he fol l ow i ng:

su ppl y o ne c op y of the doc ume nta ti on se ts

2 .1 . 12 .2 . 1 Te c h ni c al spe c i fi c ati on i n ac c o rda nc e C ont rac tor’ s offi c i al p ubl i she d g ui de .

w i th

e ac h shal l the

2 .1 . 12 .2 . 2 Syste m a nd O pe rati n g ma nual s

2.1.12.2.3B roc hure s. 2 .1 . 12 .3 Al l d oc ume n ts produc e d by the C ontrac to r i n ful fi ll i n g thi s Re que st For Propos al shal l be c ome t he pro pe rty of the Gove rn me nt of B rune i Daru ssal am. The Gove rnme nt re se rve s the ri ght to re pro duc e , at no c ost w ha tsoe ve r, an y d oc ume n tati on su ppl i e d for i ts ow n use . Pri or a pprov al must be ob tai ne d from the Gove rn me nt for an y Annex 2.1 – Network Technical Specification 26

Page 23 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

re prod uc ti on an d/ or di st ri buti o n of any suc h d oc ume n ts pro duc e d by the C ontrac tor. 2 .1 . 1 3 Pe rs o nne l 2 .1 . 13 .1 Al l pe rson nel mo bi li se d or assi g ne d by the C on trac tor sh al l ha ve exc e l le nt i nte rpe rso nal an d c omm uni c ati o n sk i l l s. 2 .1 . 13 .2 The Prospe c ti ve C ontr ac tor shal l provi de ne c e ssary pe rson ne l w i th ade q uate sk i ll s.

2.1.14

al l

the

Te chni cal Sp e cif ic at io n

2.1.14.1 The C ontrac to r sh al l prop ose a sui t abl e an d c ost-e ffe c ti ve ha rdw are sol u ti on. ( Ref e r to A PPEN DIX 1 – N ETWOR K TE CH N ICAL SPE CIFI CATION )

2.1.15

WARRAN T Y AN D M AIN TEN AN CE

2.1.15.1 The C ontrac to r sh al l have t he te c hni c al a nd l ogi sti c c a pabi l i ty to m ai ntai n al l the e qui p me nt and i nte gral softw are c on fi gur ati on su ppl i e d.

2.1.15.2 The C ontr ac tor sh al l de mo nstra te i ts a bi li ty to mai ntai n an ac ce p tabl e le ve l of b ac kup e qui pme nt and spare parts w i thi n B rune i to sup port al l the e qui pme nt an d i nte gral softw are c on fi gur ati on su ppl i e d.

2.1.15.3 A m ai nte na nc e c on trac t wi l l be si gne d wi th t he C on trac tor th at w il l c ove r the sup port of al l the e qui pme nt and i nte gr al softw are c onfi g urati on sup pl ie d. 2 .1 . 15 .4 The C ontrac to r sh al l have trai ne d pe rso nne l to c ove r al l the ab ove are as w i thi n t he pe ri od of the mai nte na nc e c on trac t.

2.1.15.5 The Re spo nse Ti me shal l be tw o (2 ) hou rs fro m the no ti fi c ati on of a faul t an d m ac hi ne Dow n Ti me shal l be si x (6 ) ho urs, as shal l be de te rmi ne d wi thi n the mai nte na nc e c on trac t. A te mpo rary re pl ac e me nt mac hi ne of the same or si mi l ar c onfi gura ti on has to be made avai l abl e on- si te i f t he probl e m c ann ot be re c ti fi e d or re sol ve d wi thi n t he sa me d ay.

2.1.15.6 A q uarte rl y pre ve nti ve mai nte na nc e shal l be pe rfo rme d at the c ust ome r’ s si te w i thi n the pe ri od of t he mai nte nanc e c on trac t. Thi s se rvi ce shal l c ove r the c he c ki n g an d te sti ng of al l the e qui p me nt and i nte gral softw are c o nfi gur ati on c ove re d by the mai n te nanc e c ontr ac t. 2 .1 . 15 .7 The C ontrac to r sh al l de mons trate t he abi l i ty to su ppl y a b ac kup syste m i n the eve nt of a maj or syste m fai l ure to e nabl e the c usto me r to c onti n ue w ork i ng.

Annex 2.1 – Network Technical Specification 26

Page 24 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2.1.15.8 The warranties by the Tenderer shall remain in force and applicable for one (1) year commencing from the date of issuance of the Provisional Acceptance Certificate by the Ministry of Education. Warranty inclusive parts and services covers all the proposed equipment and integral software configuration. After expiry of the warranty period, the Tenderer shall provide the maintenance services chargeable in respect of the equipment for a period of four (4) years.

2.1.15.9 A quarterly preventive maintenance shall be performed at the customer’s site within the period of the maintenance contract. This service shall cover the checking and testing of all the equipment and integral software configuration covered by the maintenance contract. 2.1.15.10The Tenderer shall have the technical and logistic capability to maintain all the equipment and integral software configuration supplied. 2.1.15.11The Tenderer shall have trained personnel to cover all sites within the period of the maintenance contract.

2.1.16

Ge ne r al Guid e line s fo r Pro s pe ct ive Co nt ract o r' s Prop o s al 2 .1 . 17

Thi s se c ti on of the Re que st For Pro posal provi de s t he g ui de li ne for the Prospe c ti ve C on trac tors i n pre se nti n g the i r pro posal s.

2 .1 . 18 The Pros pe c ti ve C ontr ac tors shal l be pre pare d to i nc or porate any or al l spe c i fi c ati ons an d de sc ri pti on of pro duc ts a nd se rvi c e s su bmi tte d i n c onne c ti on wi t h thi s Re que st For Pro posal i nto any fut ure c ontrac tual a gre e me nt. 2 .1 . 19 The Pros pe c ti ve C ontr ac tor sh al l exa mi ne c are ful l y the Re que st For Pro posal doc u me nts an d sh al l at hi s ow n expe nse a nd on hi s ow n re spo nsi bi l i ty obtai n al l ne c e ssary i nformati o n on al l matte rs, w hi c h ma y i nfl ue nc e or affe c t i ts pro posal . 2 .1 . 20 Al l pro posal s su bmi tte d shal l be de e me d to re mai n val i d for si x (6 ) mont hs afte r the de adl i ne for su bmi ssi on of Pro posal pre sc ri be d by the Gove rn me nt. An y Prop osal expre sse s to be val i d for a shorte r pe ri od m ay, i n the a bsol ute di sc re ti on of the Gove rnme nt, be re j e c te d. N o pro posal s m ay w i thdr aw i ts pro posal w i thi n that pe ri od. 2 .1 . 21 I n exc e pti o nal c i rc um stanc e , t he Gove rn me nt may re q ue st the Pros pe c ti ve C on trac tor’ s c o nse nt to an exte nsi o n of the pe ri od of val i di ty. The re que st an d t he re sp onse s the re to shal l be ma de i n wri ti n g or by c abl e or te l ex. N o c ha nge s to t he prop osal sh al l be al l owe d w i thou t the pe rmi ssi on of the Gove rnme nt.

Annex 2.1 – Network Technical Specification 26

Page 25 of

Department of Schools, Ministry of Education Project Title : The Supply, Delivery, Installation, Testing, Commissioning and Maintenance of Schools Network Infrastructure for Government Primary, Secondary and Religious Schools Ministry of Education, Brunei Darussalam (Phase I, II & III) Project Ref : MOE/EGOV/DS/001-9/2004

2 .1 . 22 The Pros pe c ti ve C ontr ac tor i s re que ste d to kee p i ts pro posal as stri c tl y c onfi de nti al an d not to re ve al an ythi n g ab out i ts pro posal to the publ i c or the pre ss. 2 .1 . 23 The Prospe c ti ve i nc u rre d i n the pro posal .

C ontr ac tor shal l pre parati o n an d

be ar al l expe nse s sub mi ssi on of t hi s

2 .1 . 24 The Gove rnme nt i s not bou nd to ac ce p t the l ow e st bi d of the pro posal . 2 .1 . 25 A ny offe r or bri be or ot he r i nd uc e me nt to an y pe rso n w i th the vie w to i nfl ue nc e the pl ac i ng of t he C ontrac t w i ll re sul t i n the i nst ant re j e c ti on of the propos al . The c onc e rn pe rson or p arty sh al l be l i abl e to be prose c u te d for offe nc e un de r the Pre ve n ti on of C orr upti o n Ac t (C a p 1 31 ) or any offe nc e un de r Se c ti on 1 61 to 16 5 or 2 13 to 2 15 of the Pe nal C ode (C ap 2 2). 2 .1 . 26 The Prospe c ti ve C ontr ac tor 's propos al shal l c onform to the fol l ow i ng l ayo ut: Se c ti on 1:

Ma nage me nt Sum mary

Se c ti on 2:

Pro pose d Go ods a nd Se rvi c e s

Se c ti on 3:

Pri c e s of Goo ds an d Se rvi c e s

Se c ti on 4:

St ate me nt of C om pl i anc e

Se c ti on 5:

C om pany Profi le

Se c ti on 6:

Pe rso nne l

Se c ti on 7:

C re de n ti al s and Re fe re nc e s

Se c ti on 8:

Doc u me ntati o n

Se c ti on 9:

O the r I nform ati on

Annex 2.1 – Network Technical Specification 26

Page 26 of

Related Documents

7 Annex 2
November 2019 0
Annex 7
November 2019 2
Annex 2
October 2019 8
Annex 2
October 2019 9
Annex 2
November 2019 7
Annex
November 2019 22