Week Commencing 1-May 8-May 15-May 22-May 29-May 5-Jun 12-Jun 19-Jun 26-Jun 3-Jul 10-Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep
Audit Result
5S Audit - Weekly Confirmation Audit Zone Audited by Date
5S PRODUCTION ZONES CHECKLIST
5S
No
Separate.
1
0
Can the description criteria be met - Yes? Record 1 Can the description criteria be met - No? Record 0
CHECK ITEM All equipment and tooling in regular use.
Criteria
There are no unnecessary stock items at Is there no more than 1 shift of any part number next to the build process work areas. Is scrap, special material etc. clearly marked and segregated.
4
No cables, wiring, airlines lying or hanging loose.
5
Parts separation.
No
Yes
1/ There are no additional tools/hogring guns. 2/ All tools re on counterbalance/chained to location
2 3
Specific area and all parts clearly marked & within reject & scrap area? All should be secured in place. Is there only 1 part number type in a box, check there are no mixed condition boxes.
6
Are all areas clearly identified.
Are all stations and parts above line clearly identified with a standard label?
7
Supplier parts.
Are all parts stored in packaging specification and removed only before use? Special attention to light coloured parts & airb ags.
8
Storage areas and work stations are designed for ease of use.
9
All stock is stored in a fixed place.
0
10 Aisles and display areas are clear and free from obstruction.
Scrub.
Straighten.
If 5S score for Separate is less than 5 then Red Tag should take place in that zone
12 Is the equipment clean.
0
15 Cleaning equipment.
11 The audit area is always clean and free from dirt & debris.
13 The audit area is always clean and free small parts. 14 Personal belongings.
BT-LOS-CL-17-01-06-E
Rev 04 (20-02-06).
1/ Are boxes under the stacking height limits? 2/ Are boxes lineside only 1 high (tri-wall size) Is there a place marked out for everything Is everything within the marked out place/no overlapping? Is the floor clean from the build up of dirt or debris. Is the equipment clean and free from dust, dirt & oil. Are small parts in supplier labelled containers & the floor free from all small parts? Is the area clear of personal belongings? Is the cube board/locker stocked with the correct level of brushes, clothes & cleaning equipment?
Comments
Owner
Photos
Week Commencing Audit Result
18-Jul
25-Jul
1-Aug
8-Aug
15-Aug
22-Aug
29-Aug
5-Sep
12-Sep
19-Sep
26-Sep
3-Oct
10-Oct
17-Oct
24-Oct
31-Oct
7-Nov
14-Nov
21-Nov
28-Nov
5-Dec
12-Dec
19-Dec
26-Dec
2-Jan
9-Jan
16-Jan
23-Jan
30-Jan
6-Feb
Check 4S Instruction, is it displayed?
1) Ensure all signs are BOS ODS/Containments or manufactured signs? 2) Doesthere everyismachine/area haveequipment, a standardtaped sign?cardboard etc Ensure no poor standard
18 Signage or ODS standard 19 Is all equipment standard
Is all racking tube & bracket, is it in a good state of repair
20 Is the racking standard
Are training matrices upto date, check 2 operators to matrix. Have all team members for the zone 21 compeleted JCMS 5S training in the last 12 months Is the 5S audit result displayed on a standard presentation?
22 Display of 5S Standards.
Has 5S audit stayed the same or improved since last audit Is there root cause or 5 why analysis for at least 3 of the repeat failures? Is there a on time timing plan for at least 3 of the root cause failures
Rev 04 (20-02-06).
4S p e
Row 40
1 S 8p e
Row 39
100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2 Ju 4l
Row 41 0
2 A 1g u
Row 38
BT-LOS-CL-17-01-06-E
5S Trend.
20
1 Ju 0l
Audit Actions Row 37
7A g u
0%
0 Separate 0 Straighten 0 Scrub 0 Standardise 0 Systemise
26 Ju n
25 Are countermeasures on a timing plan
% Score
0
TOTAL AUDIT SCORE
1 Ju 2n
24 Are repeat 5S problems solved using JCMS tools
2 M 9y a
23 Improvement in 5S
1 M y a
Systemise.
Check 4S Instruction, is it displayed?
17 Monthly 4S Work Instruction
1 M 5y a
Standardise.
16 Daily 4S Work Instruction
0