28-11 (version 1).xlsx

  • Uploaded by: Ivan Valdebenito Sanchez
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View 28-11 (version 1).xlsx as PDF for free.

More details

  • Words: 9,104
  • Pages: 63
Nº partida 1.2 CIERRE PERIMETRAL ITEM DESCRIPCION 1 MATERIALES 1.1 Malla Raschel 2,1MT 1.2 Polin impregnado 4"x2,4MT 1.3 Grapa Galvanizada 1" 1kg inchalam Alambre puas#14 7kg100MT 1.4 EXCAVACION EN TERRENO A 2 MANO DE OBRA 2.1 JORNAL EXCAVADOR 2.2 MAESTRO CARPINTERO + AYUDANTE 2.3 LEYES SOCIALES B C

UNIDAD

(ml) CANTIDAD

UNIDAD UNIDAD UNIDAD UNIDAD UNIDAD

1.24 0.50 0.28 0.05 0.50 SUB TOTAL

HD HD %

SUB TOTAL TOTAL

Nº partida 1.3 ESCARPE CON MAQUINARIA (m³) ITEM DESCRIPCION UNIDAD 1 MANO DE OBRA 1.1 OPERADOR MAQUINA PESADA dia 1.2 LEYES SOCIALES % A 2 MAQUINARIA Y EQUIPO 2.1 MOTONIVELADORA 160HP hr 2.2 DIESEL LT B C

Nº partida ITEM 1 1.1 1.2 1.3 1.4 A 2 2.1

0.05 0.025 48.25

TRAZADO, NIVELES (2usos) (ml) DESCRIPCION UNIDAD MATERIALES Pino cepillado seco 1x5"x3,2m UNIDAD Pino dimencionado verde 2x2"x3,2m UNIDAD Clavo corriente 3" bolsa 1kg inchalam UNIDAD Alambre Negro #14 recocido inchalam KG

CANTIDAD 0.006 48.25 SUB TOTAL 0.035 0.45 SUB TOTAL TOTAL

1.4

CANTIDAD 0.32 0.17 0.08 0.11 SUB TOTAL

MANO DE OBRA MAESTRO 1°

HD

0.12

2.2 2.3 B C

Nº partida 2.1 ITEM 1 1.1 1.2 1.3 A 2 2.1 2.2 B C

Nº partida 2.2 ITEM 1

JORNAL LEYES SOCIALES

HD %

0.025 48.25 SUB TOTAL TOTAL

EXCAVACION DESCRIPCION MAQUINARIA Y EQUIPO RETROEXCAVADORA CAMION TOLVA DE 7m³ DIESEL

(m³) UNIDAD

CANTIDAD

HOR HOR LT

0.03 0.02 0.45 SUB TOTAL

MANO DE OBRA operador LEYES SOCIALES

HD %

0.03 48.25 SUB TOTAL TOTAL

EMPLANTILLADO 100k DESCRIPCION MATERIALES

1.1

GRAVA (flete)

1.2 1.3 A 2 2.1 2.2 2.3 B 3 3.1 B C

ARENA (flete) Cemento BIO-BIO 25kg

m³ UNIDAD

m³ m³ SAC

CANTIDAD 0.735 0.546 4.2 SUB TOTAL

MANO DE OBRA concretero confeccion hormigon concretero colocacion hormigon LEYES SOCIALES

HD HD %

0.9 0.42 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO BETONERA 11p 7,5hp mes0208hr

DIA

0.2777 SUB TOTAL TOTAL

CIMIENTO Nº partida 2.3.1 ITEM

MOLDAJE CIMIENTO (3USOS) (m³) DESCRIPCION UNIDAD

CANTIDAD

1 1.1 1.2 1.3 1.4 1.5 1.6 A 2 2.1 2.2 B C

MATERIALES Desmoldante madera Topex Bidon4,5l. Pino cepillado seco 1x5"x3,2m Pino dimencionado seco 2x2"x3,2m Alambre Negro #14 recocido inchalam clavos corrientes 2 1/2" bolsa 2,5 kg clavos corrientes 4" bolsa 1 kg

Nº partida 2.3.2 ITEM 1 1.1 A 2 2.2 2.4 2.5 B 3 3.1 C D

KG UNIDAD UNIDAD KG KG KG

0.02 2.5 1.28 0.03 0.022 0.1 SUB TOTAL

MANO DE OBRA CARPINTERO + AYUDANTE LEYES SOCIALES

HD %

0.125 48.25 SUB TOTAL TOTAL

HORMIGON CIMIENTO (m³) DESCRIPCION UNIDAD MATERIALES HORMIGON G-25 m³

CANTIDAD 1.05 SUB TOTAL

MANO DE OBRA CONCRETERO JORNAL LEYES SOCIALES

HD m³ %

0.49 0.025 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO VIBRADOR DE INMERCION

DIA

0.05 SUB TOTAL TOTAL

SOBRECIMIENTO

Nº partida 2.4.1 MOLDAJE SOBRECIMIENTO (3USOS) (m²) ITEMDESCRIPCION UNIDAD CANTIDAD 1 MATERIALES 1.1 Desmoldante madera Topex KG 0.02 1.2 Pino cepillado seco 1x5"x3,2m UNIDAD 2.5 1.3 Pino dimencionado seco 2x2"x3,2m UNIDAD 0.5 1.4 Alambre Negro #14 recocido inchalam KG 0.003 1.5 clavos corrientes 2 1/2" bolsa 2,5 kg KG 0.1 1.6 clavos corrientes 4" bolsa 1 kg KG 0.018

A 2 2.1 2.2 B C Nº partida 2.4.2 ITEM 1 1.1 A 2 2.1 2.3 2.4 B 3 3.1 C D

SUB TOTAL MANO DE OBRA CARPINTERO + AYUDANTE LEYES SOCIALES

HD %

0.1 48.25 SUB TOTAL TOTAL

Hormigon SOBRE CIMIENTO(m³) DESCRIPCION UNIDAD MATERIALES HORMIGON H-25 m³

CANTIDAD 1.05 SUB TOTAL

MANO DE OBRA CONCRETERO JORNALES LEYES SOCIALES

m³ m³ %

0.49 0.025 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO VIBRADOR DE INMERCION

DIA

Nº partida 2.5.1 ENFIERRADURA diametro 12mm (KG) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 BARRA PARA HORMIGON 12 MM 6 MT A44-28H 0 kg 1.2 Alambre Negro #18 recocido inchalam KG A 2 MANO DE OBRA 2.1 ENFIERRADOR + AYUD HD 2.2 LEYES SOCIALES % B C

Nº partida 2.5.2 ENFIERRADURA diametro 8mm A44-28 (KG) ITEM DESCRIPCION UNIDAD 1 materiales 1.1 BARRA PARA HORMIGON 8 MM 6 MT A44-28H kg

0.05 SUB TOTAL TOTAL

CANTIDAD 1.05 0.02 SUB TOTAL 0.006 48.25 SUB TOTAL TOTAL

CANTIDAD 1.05

1.2 A 2 2.1 2.2 B C

Alambre Negro #18 recocido inchalam

KG

SUB TOTAL MANO DE OBRA ENFIERRADOR + AYUD LEYES SOCIALES

HD %

0.006 48.25 SUB TOTAL TOTAL

Nº partida 2.6.1 MOLDAJE PILARES (m²) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 Desmoldante madera Topex KG 1.2 Pino cepillado seco 1x5"x3,2m UNIDAD 1.3 Pino dimencionado seco 2x2"x3,2m UNIDAD 1.4 Alambre Negro #14 recocido inchalam KG 1.5 clavos corrientes 2 1/2" bolsa 2,5 kg KG 1.6 clavos corrientes 4" bolsa 1 kg KG A 2 MANO DE OBRA 2.1 CARPINTERO + 1/2 AYUDANTE DIA 2.2 LEYES SOCIALES % B C

Nº partida 2.6.2 ITEM 1 1.1 A 2 2.1 2.2 B 3 3.1 C D

0.02

HORMIGON PILARES(m³) DESCRIPCION UNIDAD MATERIALES HORMIGON H-25 m³

CANTIDAD 0.02 2.5 0.5 0.15 0.1 0.1 SUB TOTAL 0.12 48.25 SUB TOTAL TOTAL

CANTIDAD 1.05 SUB TOTAL

MANO DE OBRA CONCRETERO + JORNALES LEYES SOCIALES

m³ %

0.06 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO VIBRADOR DE INMERCION

c/u

0.05 SUB TOTAL TOTAL

Nº partida 2.6.3 ENFIERRADURA diametro 12mm (KG) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 BARRA PARA HORMIGON 8 MM 6 MT A44-28H 0 kg 1.2 Alambre Negro #18 recocido inchalam KG A 2 MANO DE OBRA 2.1 ENFIERRADOR + AYUD HD 2.2 LEYES SOCIALES % B C

CANTIDAD 1.05 0.02 SUB TOTAL 0.006 48.25 SUB TOTAL TOTAL

Nº partida 2.6.4 ENFIERRADURA diametro 8mm A44-28(KG) ITEM DESCRIPCION UNIDAD CANTIDAD 1 materiales 1.1 BARRA PARA HORMIGON 8 MM 6 MT A44-28H kg 1.05 1.2 Alambre Negro #18 recocido inchalam KG 0.02 A SUB TOTAL 2 MANO DE OBRA 2.1 ENFIERRADOR + AYUD HD 0.006 2.2 LEYES SOCIALES % 48.25 B SUB TOTAL C TOTAL

Nº partida 2.7.3 MOLDAJE VIGAS Y CADENAS ITEM DESCRIPCION 1 MATERIALES 1.1 Pino dimencionado seco 2x2"x3,2m 1.2 Terciado Estructural 18mm 1,2mx2.4m 1.3 Alambre Negro #14 recocido inchalam 1.5 clavos corrientes 2 1/2" bolsa 2,5 kg A 2 MANO DE OBRA 2.1 CARPINTERO + 1/2 ayudante 2.2 LEYES SOCIALES B C

Nº partida 2.7.4 HORMIGON DE VIGAS Y CADENAS (m³) ITEM DESCRIPCION 1 MATERIALES 1.1 HORMIGON H-25

(m²) UNIDAD

CANTIDAD

UNIDAD m² UNIDAD kg

0.17 0.11 0.11 0.13 SUB TOTAL

HD %

0.12 48.25 SUB TOTAL TOTAL

UNIDAD m³

CANTIDAD 1.05

A 2 2.1 2.2 B 3 3.1 C D

SUB TOTAL MANO DE OBRA CONCRETERO + JORNALES LEYES SOCIALES

m³ %

0.06 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO VIBRADOR DE INMERCION

DIA

0.05 SUB TOTAL TOTAL

Nº partida 2.8 radier ITEM DESCRIPCION 1 MATERIALES 1.1 HORMIGON G-20 1.2 Aditivo endurecedor superficial A 2 MANO DE OBRA 2.1 maestro 1ª 2.2 ayudande 2.3 leyes sociales B C

(m³) UNIDAD

CANTIDAD

m³ saco

1.05 0.1

Nº partida 2.9 ALABÑILERIA ITEM DESCRIPCION 1 MATERIALES 1.1 Ladrillo Titan Reforzado Hueco 29x14x7,1cm 1.2 Cemento BIO-BIO 25kg 1.3 ARENA A 2 MANO DE OBRA 2.1 ALBAÑIL + AYUDANTE 2.2 LEYES SOCIALES B C

(m²) UNIDAD

CANTIDAD

m² SAC m³

39.29 0.125 0.033

Nº partida 2.9.1 ITEM 1

SUB TOTAL HD HD %

0.05 0.05 48.25 SUB TOTAL TOTAL

SUB TOTAL HD %

ENFIERRADURA diametro 8mm A44-28 (KG) descripcion UNIDAD materiales

0.156 48.25 SUB TOTAL TOTAL

CANTIDAD

1.1 1.2 A 2 2.1 2.2 B C

BARRA PARA HORMIGON 8 MM 6 MT A44-28H Alambre Negro #18 recocido inchalam

kg KG

1.05 0.02 SUB TOTAL

MANO DE OBRA ENFIERRADOR + AYUD LEYES SOCIALES

Nº partida 2.10.1 MOLDAJE ESCALERA ITEM DESCRIPCION 1 MATERIALES 1.1 Pino dimencionado seco 2x2"x3,2m 1.2 Pino dimencionado seco 3x3x3,2m 1.3 Terciado moldaje 18mm 1.4 Alambre Negro #14 recocido inchalam 1.5 Clavo corriente 3" bolsa 1kg inchalam A 2 MANO DE OBRA 2.1 CARPINTERO + AYUDANTE 2.2 LEYES SOCIALES B C

HD %

0.006 48.25 SUB TOTAL TOTAL

(m²) UNIDAD

CANTIDAD

UNIDAD UNIDAD UNIDAD KG kg

0.17 0.46 0.55 0.11 0.03 SUB TOTAL

HD %

Nº partida 2.10.2 ENFIERRADURA diametro 12mm (KG) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 BARRA PARA HORMIGON 8 MM 6 MT A44-28H 0 kg 1.2 Alambre Negro #18 recocido inchalam KG A 2 MANO DE OBRA 2.1 ENFIERRADOR + AYUD HD 2.2 LEYES SOCIALES % B C

Nº partida 2.10.3 ENFIERRADURA diametro 8mm A44-28 (KG) ITEM descripcion UNIDAD 1 materiales 1.1 BARRA PARA HORMIGON 8 MM 6 MT A44-28H kg

0.05 48.25 SUB TOTAL TOTAL

CANTIDAD 1.05 0.02 SUB TOTAL 0.006 48.25 SUB TOTAL TOTAL

CANTIDAD 1.05

1.2 A 2 2.1 2.2 B C

Alambre Negro #18 recocido inchalam

0.02 SUB TOTAL

MANO DE OBRA ENFIERRADOR + AYUD LEYES SOCIALES

HD %

0.01 48.25 SUB TOTAL TOTAL

Nº partida 2.10.4 ITEM 1 1.1 A 2 2.2 2.3 B 3 3.1 C D

HORMIGON ESCALERA (m³) DESCRIPCION UNIDAD MATERIALES HORMIGON G-25 m³

CANTIDAD 1.05 SUB TOTAL

MANO DE OBRA CONCRETERO + JORNALES LEYES SOCIALES

HD %

0.05 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO VIBRADOR DE INMERCION

Nº partida 2.11.1 MOLDAJE LOSA ITEM DESCRIPCION 1 MATERIALES 1.1 Desmoldante madera Topex 16lt 1.2 Pino cepillado seco 1x5"x3,2m 1.3 Pino dimencionado seco 2x2"x3,2m 1.4 terciado estructural 1,2mx2,4mx12 mm 1.5 clavos corrientes 2 1/2" bolsa 2,5 kg 1.6 clavos corrientes 4" bolsa 1 kg 1.7 alzaprima A 2MANO DE OBRA Carpintero 2.1 + ayudante 2.2LEYES SOCIALES B C

ITEM

KG

Nº partida 2.11.4 HORMIGON LOSA DESCRIPCION

DIA

0.05 SUB TOTAL TOTAL

(m²) UNIDAD

CANTIDAD

lt UNIDAD UNIDAD pla KG KG UNIDAD

0.2 2.5 0.5 0.37 0.1 0.1 2.5 SUB TOTAL

HD %

(m³) UNIDAD

0.2 48.25 SUB TOTAL TOTAL

CANTIDAD

1 1.1 A 2 2.2 2.3 B 3 3.1 C D

MATERIALES HORMIGON G-25



1.05 SUB TOTAL

MANO DE OBRA CONCRETERO + JORNALES LEYES SOCIALES

HD %

0.05 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO VIBRADOR DE INMERCION

DIA

Nº partida 2.11.2 ENFIERRADURA diametro 10mm A44-28 (KG) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 BARRA PARA HORMIGON 8 MM 6 MT A44-28H 0 kg 1.2 Alambre Negro #18 recocido inchalam KG A 2 MANO DE OBRA 2.1 ENFIERRADOR + AYUD HD 2.2 LEYES SOCIALES % B C

Nº partida 2.11.3 ENFIERRADURA diametro 8mm A44-28(KG) ITEM DESCRIPCION UNIDAD 1 materiales 1.1 BARRA PARA HORMIGON 8 MM 6 MT A44-28H kg 1.2 Alambre Negro #18 recocido inchalam KG A 2 MANO DE OBRA 2.1 ENFIERRADOR + AYUD HD 2.2 LEYES SOCIALES % B C

Nº partida 2.12.1 TABIQUERIA METALCON (m²) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 Tornillo autoperforante 8x1/2 caja 100unid. UNIDAD 1.2 Tabigal montante38x38x0,5mm ML

0.05 SUB TOTAL TOTAL

CANTIDAD 1.05 0.02 SUB TOTAL 0.01 48.25 SUB TOTAL TOTAL

CANTIDAD 1.05 0.02 SUB TOTAL 0.01 48.25 SUB TOTAL TOTAL

CANTIDAD 12 0.85

1.3 1.4 A 2 2.1 2.2 B C

Clavo Hilte SDM 3,7x25mm bolsa 10 unid FULMINANTE VERDE CALIBRE 22

UNIDAD UNIDAD

1.5 1.5 SUB TOTAL

MANO DE OBRA CARPINTERO + AYUDANTE LEYES SOCIALES

Nº partida 2.13.2 TECHUMBRE ITEM DESCRIPCION 1 MATERIALES 1.2 Tabigal montante38x38x0,5mm 1.3 Tabigal montante60x38x0,5mm 1.4 Tornillo autoperforante 8x1/2 caja 100unid. A 2 MANO DE OBRA 2.1 CARPINTERO + AYUDANTE 2.2 LEYES SOCIALES B C

DIA %

0.05 48.25 SUB TOTAL TOTAL

(m²) UNIDAD

CANTIDAD

ML ML UNIDAD

1.98 1.78 15 SUB TOTAL

DIA %

Nº partida 2.13.1 ENVIGADO DE METALCOM (m²) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 Tornillo autoperforante 8x1/2 caja 100unid. UNIDAD 1.2 Tabigal montante38x38x0,5mm ML 1.3 Clavo Hilte SDM 3,7x25mm bolsa 10 unid UNIDAD 1.4 FULMINANTE VERDE CALIBRE 22 UNIDAD A 2 MANO DE OBRA 2.1 CARPINTERO + AYUDANTE DIA 2.2 LEYES SOCIALES % B C

Nº partida 2.13.3 COSTANERA METALCOM (m²) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.2 Estructura Omega 0,85mm de espesor UNIDAD

0.05 48.25 SUB TOTAL TOTAL

CANTIDAD 12 1.98 1.5 1.5 SUB TOTAL 0.05 48.25 SUB TOTAL TOTAL

CANTIDAD 0.33

1.3 A 2 2.1 2.2 B C

Tornillo autoperforante 8x1/2 caja 100unid.

UNIDAD

12 SUB TOTAL

MANO DE OBRA CARPINTERO + AYUDANTE LEYES SOCIALES

DIA %

0.05 48.25 SUB TOTAL TOTAL

(ml) P.U $ 22 $ 17,908 $ 4,496 $ 11,924 $ 3,689

PT

SUB TOTAL

$ $ $ $ $ $

27 8,954 1,259 596 1,845 12,681

SUB TOTAL TOTAL

$ 14,500 $ $ 48,000 $ $ 1,925 $ $ $

725 1,200 929 2,854 15,534

P.U

PT

$ 15,000 $ 90

$ 90 $ 43 $ 133

$ 25,000 $ 392

$ 875 $ 176 $ 1,051 $ 1,185

SUB TOTAL

SUB TOTAL TOTAL

P.U $ 1,782 $ 2,807 $ 18,059 $ 1,193 SUB TOTAL $ 29,000 $

PT $ 570 $ 477 $ 1,445 $ 131 $ 2,623 3,480

0.075

SUB TOTAL TOTAL

$ 14,500 $ $ 3,843 $ $

P.U

363 1,854 5,697 $ 8,320

PT

SUB TOTAL

$ 14,000 $ $ 9,200 $ $ 392 $ $

420 184 176 780

SUB TOTAL TOTAL

$ 15,000 $ $ 450 $ $ $

450 217 667 1,448

P.U

PT

$ 15,000

$ 11,025

$ 15,000 $ 2,050

$ 8,190 $ 8,612 $ 27,827

$ 14,500 $ 14,500 $ 19,140

$ 13,050 $ 6,090 $ 9,235 $ 28,375

$ 6,590

$ 1,830 $ 1,830 $ 58,032

SUB TOTAL

SUB TOTAL

SUB TOTAL TOTAL

P.U

PT

$ 210 $ 1,193 $ 1,000 $ 2,050 $ 1,202 $ 1,672 SUB TOTAL

$ $ $ $ $ $ $

4 2,983 1,280 62 26 167 4,329

SUB TOTAL TOTAL

$ 48,000 $ $ 6,000 $ $ $

6,000 2,895 8,895 13,224

P.U

PT

SUB TOTAL

$ 51,748 $ $

54,335 54,335

SUB TOTAL

$ 26,000 $ $ 14,500 $ $ 13,103 $ $

12,740 363 6,322 19,424

SUB TOTAL TOTAL

$ 119,990 $ $ $

6,000 6,000 79,759

P.U $ 1,000 $ 2,067 $ 1,202 $ 14,277 $ 1,672 $ 916

PT $ $ $ $ $ $

20 5,168 601 43 167 16

SUB TOTAL

$

6,015

SUB TOTAL TOTAL

$ 49,000 $ $ 4,900 $ $ $

4,900 2,364 7,264 13,280

P.U

PT

SUB TOTAL

$ 57,437 $ $

60,309 60,309

SUB TOTAL

$ 26,000 $ $ 14,500 $ $ 13,103 $ $

12,740 363 6,322 19,424

SUB TOTAL TOTAL

$ 119,990 $ $ $

6,000 6,000 85,733

P.U

PT

SUB TOTAL

$ 5,118 $ $ 4,361 $ $

5,374 87 5,461

SUB TOTAL TOTAL

$ 51,000 $ $ 306 $ $ $

306 148 454 5,915

P.U

PT $ 2,261 $

2,374

7247.1

SUB TOTAL

$ 4,361 $ $

87 2,461

SUB TOTAL TOTAL

$ 51,000 $ $ 306 $ $ $

306 148 454 2,915

P.U

PT

$ 1,000 $ 2,067 $ 1,202 $ 14,277 $ 1,672 $ 916 SUB TOTAL

$ $ $ $ $ $ $

20 5,168 601 2,142 167 92 7,931

SUB TOTAL TOTAL

$ 38,500 $ $ 4,620 $ $ $

4,620 2,229 6,849 14,780

P.U

PT

$ 57,437

$ 60,309 $ 60,309

$ 1,600 $ 96

$ 96 $ 46 $ 142

$ 119,990

$ 6,000 $ 6,000 $ 66,451

SUB TOTAL

SUB TOTAL

SUB TOTAL TOTAL

P.U

PT

SUB TOTAL

$ 5,118 $ $ 4,361 $ $

5,374 87 5,461

SUB TOTAL TOTAL

$ 51,000 $ $ 306 $ $ $

306 148 454 5,915

) P.U

PT

SUB TOTAL

$ 2,261 $ $ 4,361 $ $

2,374 87 2,461

SUB TOTAL TOTAL

$ 51,000 $ $ 306 $ $ $

306 148 454 2,915

P.U

PT

$ 1,193 $ 14,277 $ 1,782 $ 2,067 SUB TOTAL

$ $ $ $ $

203 1,570 196 269 2,238

SUB TOTAL TOTAL

$ 38,500 $ $ 4,620 $ $ $

4,620 2,229 6,849 9,087

P.U $

PT 57,437 $

60,309

SUB TOTAL

$

60,309

SUB TOTAL

$ 1,600 $ $ 96 $ $

96 46 142

SUB TOTAL TOTAL

$ 119,990 $ $ $

6,000 6,000 66,451

P.U

PT

SUB TOTAL

$ 46,058 $ $ 7,591 $ $

48,361 759 49,120

SUB TOTAL TOTAL

$ 29,000 $ $ 19,000 $ $ 2,400 $ $ $

1,450 950 1,158 3,558 52,678

P.U

PT

SUB TOTAL

$ 204 $ $ 1,966 $ $ 748 $ $

8,015 246 25 8,286

SUB TOTAL TOTAL

$ 49,000 $ $ 7,644 $ $ $

7,644 3,688 11,332 19,618

P.U

PT

$ 2,261 $ 4,361

$ 2,374 $ 87 $ 2,461

$ 4,620 $ 28

$ 28 $ 13 $ 41 $ 2,502

SUB TOTAL

SUB TOTAL TOTAL

P.U

PT

$ 1,782 $ 1,412 $ 11,756 $ 1,966 $ 1,672 SUB TOTAL

$ $ $ $ $ $

303 649 6,466 216 50 7,685

SUB TOTAL TOTAL

$ 48,000 $ $ 2,400 $ $ $

2,400 1,158 3,558 11,243

P.U

PT

SUB TOTAL

$ 5,118 $ $ 4,361 $ $

5,374 87 5,461

SUB TOTAL TOTAL

$ 52,000 $ $ 312 $ $ $

312 151 463 5,924

P.U

PT $ 2,261

$ 2,374

$ 4,361

$ 87 $ 2,461

$ 52,000 $ 520

$ 520 $ 251 $ 771 $ 3,232

SUB TOTAL

SUB TOTAL TOTAL

P.U

PT

SUB TOTAL

$ 57,437 $ $

60,309 60,309

SUB TOTAL

$ 29,000 $ $ 1,450 $ $

1,450 700 2,150

SUB TOTAL TOTAL

$ 119,990 $ $ $

6,000 6,000 68,458

P.U $ 706 $ 17,908 $ 1,782 $ 12,345 $ 2,807 $ 18,059 2626

PT $ $ $ $ $ $ $ $

141 44,769 891 4,568 281 1,806 6,565 59,020

$ 38,500 $ $ 7,700 $ $ $

7,700 3,715 11,415 70,435

SUB TOTAL

P.U

PT

$ 57,437

$ 60,309 $ 60,309

$ 29,000 $ 1,450

$ 1,450 $ 700 $ 2,150

$ 119,990

$ 6,000 $ 6,000 $ 68,458

SUB TOTAL

SUB TOTAL

SUB TOTAL TOTAL

P.U

PT

SUB TOTAL

$ 3,361 $ $ 4,361 $ $

3,529 87 3,616

SUB TOTAL TOTAL

$ 52,000 $ $ 520 $ $ $

520 251 771 4,387

P.U

PT

SUB TOTAL

$ 2,261 $ $ 4,361 $ $

2,374 87 2,461

SUB TOTAL TOTAL

$ 52,000 $ $ 520 $ $ $

520 251 771 3,232

P.U

PT $ 1,000 $ $ 1,202 $

12,000 1,022

SUB TOTAL

$ 1,672 $ $ 150 $ $

2,508 225 15,755

SUB TOTAL TOTAL

$ 48,000 $ $ 2,400 $ $ $

2,400 1,158 3,558 19,313

P.U

PT

SUB TOTAL

$ 1,202 $ $ 1,000 $ $ 1,000 $ $

2,380 1,780 15,000 19,160

SUB TOTAL TOTAL

$ 48,000 $ $ 2,400 $ $ $

2,400 1,158 3,558 22,718

P.U

PT $ 1,000 $ 1,202 $ 1,672 $ 150

SUB TOTAL

$ $ $ $ $

12,000 2,380 2,508 225 17,113

SUB TOTAL TOTAL

$ 48,000 $ $ 2,400 $ $ $

2,400 1,158 3,558 20,671

P.U

PT $ 1,202 $

397

SUB TOTAL

$ 1,000 $ $

12,000 12,397

SUB TOTAL TOTAL

$ 48,000 $ $ 2,400 $ $ $

2,400 1,158 3,558 15,955

1 1.1 1.2 1.3 1.4 2 2.1 2.2 2.3 2.3.1 2.3.2 2.4 2.4.1 2.4.2 2.5 2.5.1 2.5.2 2.6 2.6.1 2.6.2 2.6.3 2.6.4 2.5 2.5.1 2.5.2 2.5.3 2.5.4 2.6 2.7 2.8 2.8.1 2.8.2 2.8.3 2.8.4 2.9 2.9.1 2.9.2 2.9.3 2.9.4 2.10

descripción obras preliminares instalaion de faenas cierre perimetral escarpe trazado y niveles obra gruesa excavacion emplantillado cimiento moldaje cimiento hormigon cimiento sobrecimiento moldaje sobrecimeinto hormigon sobreciemiento viga fundacion enfierradura dm 12 enfierradura dm 8 pilares moldaje pilares hormigon pilares enfierradura dm 12 enfierradura dm 8 cadenas enfierradura dm 12 enfierradura dm 8 moldaje cadena hormigon cadena radier albañileria escalera moldaje escalera enfierradura dm 12 enfierradura dm 8 hormigon escalera losa cielo moldaje losa enfierradura dm 10 enfierradura dm 8 hormigon losa tabiqueria interior

Uni

Cant

PRESUPUESTO DETALLAD M. Obra

P. Unit

GL ML M3 ML

1 80 20 57.77

$ 202,395 $ 15,534 $ $ 1,185 $ $ 8,320 $

M3 M3

47.46 $ 1.445 $

1,448 $ 58,032 $

31,656 41,002

M2 M3

77.0 $ 17.11 $

13,224 $ 79,759 $

684,915 332,352

M2 M3

57.9 $ 3.57 $

13,280 $ 85,733 $

420,600 69,345

KG KG

305.32 $ 120.13 $

5,915 $ 2,915 $

138,507 54,496

M2 M3 KG KG

167.52 5.01 516.18 414.88

$ $ $ $

14,780 66,451 5,915 2,915

$ $ $ $

1,147,370 713 234,162 188,208

KG KG M2 M3 M3 M2

326.6 151.19 60.08 3.84 5.93 60.85

$ $ $ $ $ $

1,310 1,290 9,087 66,451 52,678 19,618

$ $ $ $ $ $

246,934 114,311 411,497 547 21,099 689,566

M2 KG KG M3

8.7 18.73 34.23 0.67

$ $ $ $

11,243 5,924 3,232 68,458

$ $ $ $

30,955 8,663 26,388 1,440

M2 KG KG M3

8.97 82.06 374.83 4.19

$ $ $ $

70,435 4,387 3,232 68,458

$ $ $ $

102,395 63,260 288,956 9,007

228,305 2,669 329,087

2.10.1 2.10.2 2.11 2.11.1 2.11.2 2.11.3 3 3.1 3.2 3.3 3.4 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 4.31 4.32 4.33

tabiqueria metalcom tabiqueria aislam glass techumbre metalcom techumbe cerchas metalcom envigado metalcom costanera metalcom instalaciones inodoros wc Luminaria, cajas y enchufes tuberia agua potable distrib. alcantarillado y camaras terminaciones ceramica muro relleno compactado afinado de piso piso flotante cama de ripio alfombra revestimiento fibrocemento plancha osb techo filtro cubierta ceramico piso empastado cielo aislamglass cielo revestimiento cielo desmoldante para madera empastado de muro cubre juntas pvc reestimeinto piedra polietileno papel mural carpenter latex oleo moldura ventanas guarda polvos pintura muro exterior pintura muro interio tapacanes pintura fibrocmento exterior estuco muros exteriores puerta pino oregon puerta principal + qincalleria ventanas caballete tejas asfaltica

M2 M2

35.8 $ 35.69 $

19,313 $ 2,376 $

127,376 23,187

M2 M2 M2

95.06 $ 37.59 $ 88.67 $

22,718 $ 20,671 $ 15,955 $

338,223 133,745 315,488

uni uni ml ml

2 8 38 38

63,590 37,500 8,763 11,447

$ $ $ $

7,180 120,000 142,994 54,986

M2 M3 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 ML M2 M2 M2 M2 M2 M2 ML M2 M2 ML M2 M2 UNI UNI UNI ML M2

86.75 4.65 38.71 20.04 38.71 56.52 23.33 88.17 88.17 24.12 34.95 41.38 41.38 315.6 158.28 5.28 19.4 42.98 172.29 54.27 33.11 20.37 83.71 137.01 16.95 38.4 23.33 65.03 9 2 10 14.32 91.93

$ 13,980 $ $ 3,399 $ $ 7,857 $ $ 23,746 $ $ 1,727 $ $ 15,934 $ $ 25,596 $ $ 14,262 $ $ 4,931 $ $ 7,299 $ $ 3,484 $ $ 2,371 $ $ 12,968 $ $ 210 $ $ 7,163 $ $ 15,140 $ $ 19,422 $ $ 5,107 $ $ 2,193 $ $ 1,605 $ $ 2,500 $ $ 13,866 $ $ 2,776 $ $ 277,012 $ $ 31,612 $ $ 2,314 $ $ 2,022 $ $ 9,422 $ $ 89,839 $ $ 98,248 $ $ 135,287 $ $ 33,170 $ $ 9,249 $

257,214 7,570 176,754 71,302 51,057 58,410 111,995 654,214 62,088 71,516 92,098 26,685 307,036 37,556 1,049,555 11,350 57,521 30,266 153,252 72,410 44,177 21,894 89,973 182,806 22,616 74,291 31,128 555,304 64,044 13,252 106,740 53,074 234,054

$ $ $ $

TOTAL COSTO DIRECTO GASTOS GENERALES 79.00% UTILIDADES 18.00% NETO IVA 19.00% TOTAL

GASTOS GENERALES descripcion Bodeguero Jefe de obra Prevencioncita de riesgo nochero Capataz

unidad mes mes mes mes mes

cantidad

Consumos descripcion Baños químicos Standard Instalación de electricidad instalaciones sanitarias Consumo de agua consumo de electricidad

unidad unidad gl gl mes mes

cantidad

P.Unitario M.Obra 2 $ 100,000 1 $ 90,000 1 $ 90,000 3 $ 55,000 3 $ 65,000

Varios descripcion Elementos de seguridad gastos oficina

unidad c/u gl

cantidad

P.Unitario M.Obra 3 25,000 3 600,000

3 3 3 3 3

P.Unitario $ 350,000 $ 600,000 $ 400,000 $ 350,000 $ 550,000

M.Obra $ 1,050,000 $ 1,800,000 $ 1,200,000 $ 1,050,000 $ 1,650,000

PRESUPUESTO DETALLADO Materiales Eq y Maq.

$1,014,450

esfuerzo

$

21,028

6 0.12 8.38

$ 40,210 $

37,019 2,644

1.42 1.91

$ 333,326 $ 929,679 $ 102,651

9.63 8.81

$ 348,295 $ 215,303 $

5.79 1.84

$ 151,542

$

21,418

$1,667,391 $ 295,673 $1,328,518 $ 302,147 $ $2,818,924 $1,021,135 $ $ $ $ $ $

180,752 80,697 134,460 231,586 $ 291,281 504,181

$ 66,857 $ 102,287 $ 84,249 $ 40,407 $ $ $ $ $

529,410 296,751 922,558 252,694 $

1.83 0.72

30,057

23,038

20.10 0.30 3.10 2.49 1.96 0.91 7.2096 0.2304 0.6 9.4926

4,020

0.435 0.11 0.21 0.03

25,138

1.8 0.82 2.25 0.21

Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

202,395 1,242,755 23,697 480,629 68,675 83,856 1,018,241 1,364,683 768,895 306,066 1,805,898 350,170 2,475,888 332,918 3,053,087 1,209,343 427,686 195,008 545,957 255,171 312,380 1,193,747 97,812 110,950 110,637 45,867 631,805 360,011 1,211,514 286,839 -

M. Obra $ $ $ $

210,041 2,455 302,760

PROYECCIONES Materiales Eq y Maq. $ - $ $ 943,438 $ $ - $ $ 140,934 $

19,977 -

$ 29,123 $ - $ $ 37,722 $ 37,395 $ $ - $ - $ $ 630,122 $ 309,993 $ $ 305,764 $ 864,601 $ $ - $ - $ $ 386,952 $ 323,914 $ $ 63,798 $ 200,231 $ $ - $ - $ $ 127,426 $1,550,674 $ $ 50,137 $ 274,976 $ $ - $ - $ $ 1,055,580 $1,235,522 $ $ 656 $ 280,997 $ $ 215,429 $2,621,600 $ $ 173,152 $ 949,655 $ $ - $ - $ $ 227,179 $ 168,099 $ $ 105,166 $ 75,049 $ $ 378,577 $ 125,047 $ $ 503 $ 215,375 $ $ 19,411 $ 270,892 $ $ 634,401 $ 468,888 $ $ - $ - $ $ 28,478 $ 62,177 $ $ 7,970 $ 95,127 $ $ 24,277 $ 78,352 $ $ 1,325 $ 37,578 $ $ - $ - $ $ 94,203 $ 492,351 $ $ 58,199 $ 275,979 $ $ 265,840 $ 857,979 $ $ 8,286 $ 235,005 $

35,168 2,512 97,519 20,347 28,555 21,886 3,819 23,881

$ 564,018 $ 61,607 $1,821,346 $ 643,276 $1,099,202 $ $ $ $

120,000 180,000 190,000 380,000

$ 955,532 $ 1,141 $ $ 109,208 $ $ 404,563 $ 5,047 $ $ 842,190 $ 485,164 $ 603,305 $ 372,648 $ 104,548 $ 29,663 $ 71,429 $ 229,562 $ 28,404 $ 84,205 $ 68,591 $ 319,257 $ 189,238 $ 224,560 $ 14,704 $ 38,612 $ 260,549 $ 142,434 $ 94,206 $ 11,655 $ 14,576 $ 16,041 $ 57,428 $ 744,504 $ 183,244 $1,246,134 $ 421,915 $ 616,207

7,094 18,170 10,735

1.79 $ 1.07 $ $ 4.753 $ 1.8795 $ 4.4335 $ $ $ $ $ $ $ 13.0125 $ 0.20925 $ 4.65 $ 2.004 $ 2.7 $ 1.413 $ 2.333 $ 11.4621 $ 2.20425 $ 3.618 $ 1.6 $ 1.2414 $ 5.4 $ $ 37.987 $ 0.264 $ 1 $ 1.0745 $ 1 $ 1.6281 $ 0.9933 $ 0.50925 $ 2.09275 $ 4.11 $ 0.51 $ 2.304 $ 0.6999 $ 15.6072 $ 1.8 $ 0.4 $ 3 $ 1.432 $ $

691,395 84,794 2,159,569 777,021 1,414,690 127,180 300,000 332,994 434,986 1,212,745 15,805 304,132 475,866 66,838 900,600 597,159 1,257,519 434,736 176,063 121,762 98,115 536,598 65,960 1,133,760 79,941 376,778 219,504 377,812 87,114 82,789 282,443 232,406 277,012 34,270 88,867 47,169 612,732 808,548 196,496 1,352,874 474,989 850,261

$ $

117,186 $ 524,537 $ 21,332 $ 57,295 $

-

$ $ $

311,166 $1,693,852 $ 123,046 $ 598,247 $ 290,249 $1,022,258 $

-

$ $ $ $

6,606 110,400 131,554 50,587

$ $ $ $

111,600 167,400 176,700 353,400

$ $ $ $

-

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

236,637 6,964 162,613 65,598 46,972 53,737 103,036 601,877 57,121 65,795 84,730 24,551 282,473 34,552 965,590 10,442 52,919 27,845 140,992 66,617 40,643 20,142 82,775 168,181 20,806 68,348 28,638 510,880 58,920 12,192 98,201 48,828 215,329

$ 888,644 $ 1,061 $ 101,563 $ 376,244 $ 4,694 $ 783,237 $ 451,203 $ 561,074 $ 346,563 $ 97,229 $ 27,587 $ 66,429 $ 213,492 $ 26,416 $ 78,311 $ 63,790 $ 296,909 $ 175,992 $ 208,841 $ 13,675 $ 35,909 $ 242,310 $ 132,463 $ 87,612 $ 10,839 $ 13,556 $ 14,919 $ 53,408 $ 692,389 $ 170,417 $1,158,905 $ 392,381 $ 573,072

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

6,739 17,262 10,198 -

$ $ $ $ $ $

Materiales

Equi. Maq

subcontatos TOTAL $ $ $ $ $ $

Materiales Equi. Maq $ 200,000 $ 90,000 $ 90,000 $ 165,000 $ 195,000

subcontatos TOTAL $ $ $ $ $ $

Materiales Equi. Maq 75000 1800000

subcontratosTOTAL

40,774,869 32,212,147 13,137,663 86,124,679 16,363,689 102,488,368

1,050,000 1,800,000 1,200,000 1,050,000 1,650,000 6,750,000

M.Obra Materiales $ 945,000 $ 1,656,000 $ 1,104,000 $ 966,000 $ 1,518,000

M.Obra

Materiales Equi. Maq $ 186,000 $ 83,700 $ 83,700 $ 153,450 $ 181,350

M.Obra

Materiales

200,000 90,000 90,000 165,000 195,000 740,000

75000 1800000 1875000 9365000

Equi. Maq

Equi. Maq 71250 1710000

OYECCIONES Subcontratos $ $ $ $

5 0 7

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

1 2 8 8 5 2 2 1 18 0 3 2 2 1 6 0 1 8 0 0 0 0 2 1 2 0

Total

Saldo

$ - $ 202,395 $ 1,153,484 $ 89,271 $ 22,432 $ 1,265 $ 443,702 $ 36,928 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

64,292 77,631 940,123 1,267,892 710,871 284,378 1,678,102 325,113 2,291,120 310,208 2,837,032 1,122,809 395,280 180,215 503,631 237,764 290,303 1,103,298 90,656 103,097 102,629 42,722 586,556 334,179 1,123,821 267,173

$ 4,382 $ 6,225 $ $ 78,118 $ 96,791 $ $ 58,024 $ 21,688 $ $ 127,796 $ 25,056 $ $ 184,768 $ 22,710 $ 216,055 $ 86,534 $ $ 32,406 $ 14,793 $ 42,326 $ 17,406 $ 22,077 $ 90,450 $ $ 7,156 $ 7,853 $ 8,008 $ 3,145 $ $ 45,249 $ 25,833 $ 87,694 $ 19,666

$ $

2 $ 1 $

641,725 $ 78,628 $

49,670 6,167

$ $ $

4 $ 2,005,021 $ 154,548 2 $ 721,294 $ 55,727 4 $ 1,312,511 $ 102,179

$ $ $ $

-

$ $ $ $

118,206 277,800 308,254 403,987

$ $ $ $

8,974 22,200 24,740 30,999

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

11 0 4 2 2 1 2 10 2 3 1 1 5 33 0 1 1 1 1 1 0 2 4 0 2 1 14 2 0 3 1 -

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

1,125,292 14,765 281,442 441,844 61,866 836,975 554,240 1,162,960 403,686 163,027 112,319 90,981 495,970 60,968 1,043,934 74,232 349,829 203,837 349,833 80,294 76,552 262,453 215,240 255,797 31,646 81,905 43,557 564,301 751,311 182,609 1,257,108 441,210 788,402

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

87,453 1,040 22,689 34,022 4,972 63,625 42,919 94,558 31,050 13,036 9,443 7,134 40,627 4,993 89,825 5,709 26,949 15,667 27,978 6,821 6,236 19,989 17,166 21,215 2,625 6,962 3,613 48,431 57,237 13,887 95,766 33,779 61,859

$37,618,326 $3,156,544 $27,380,325 $4,831,822 ###

subcontatos TOTAL $ 945,000 $ 1,656,000 $ 1,104,000 $ 966,000 $ 1,518,000 $ 6,189,000

SALDO $ 105,000 $ 144,000 $ 96,000 $ 84,000 $ 132,000 $ 561,000

subcontatos TOTAL $ 186,000 $ 83,700 $ 83,700 $ 153,450 $ 181,350 $ 688,200

SALDO $ 14,000 $ 6,300 $ 6,300 $ 11,550 $ 13,650 $ 51,800

subcontatos TOTAL

SALDO

71250 1710000 1781250

3750 90000 93750

Nº partida 4.1 CERAMICA MURO (m²) ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 Porcelanato 30x30cm gris m² 1.2 Adhesivo en polvo 25kg Topex saco 1.3 Frague impermeable 1 kilo Topex saco 1.4 set de espaciadores 3cm 200uni UNIDAD A 2 MANO DE OBRA 2.1 Maestro ceramista HD 2.2 LEYES SOCIALES % B C

Nº partida 4.2 ITEM 1 1.2 A 2 2.1 2.2 B 3 3.1 3.2 3.3 C D

Nº partida 4.3 ITEM 1 1.1 1.2 A 2

RELLENO COMPACTADO (m³) DESCRIPCION UNIDAD MATERIALES bensina 93 oct lt

CANTIDAD 1.05 0.18 0.4 0.01 SUB TOTAL 0.15 48.25 SUB TOTAL TOTAL

CANTIDAD 0.5 SUB TOTAL

MANO DE OBRA JORNAL 1 Cuadrilla LEYES SOCIALES

HD HD %

0.02 0.025 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO placa compactada carretilla pala punta huevo

hr m³ UNIDAD

0.042 0.04 0.015 SUB TOTAL TOTAL

AFINADO DE PISO e = 2 cm. ( m²) DESCRIPCION UNIDAD MATERIALES Cemento BIO-BIO 25kg saco Arena fina m³ MANO DE OBRA

CANTIDAD 1 0.02 SUB TOTAL

2.1 2.2 2.3 B 3 3.1 C D

maestro 1ª ayudante LEYES SOCIALES

HD HD %

0.08 0.04 48.25 SUB TOTAL

MAQUINARIA Y EQUIPO pulidora de piso

hr

0.171 SUB TOTAL TOTAL

Nº partida 4.4 PISO FLOTANTE (m²) ITEM DESCRIPCION UNIDAD CANTIDAD 1 MATERIALES 1.1 Piso laminado 8mm New Ardennes m² 1.08 1.2 Espuma niveladora 10m² rollo m² 1.08 1.3 Guaradpolvo MDF ml 0.68 1.4 Cubrejuntas ml 0.68 A SUB TOTAL 2 MANO DE OBRA 2.1 carpintero HD 0.05 2.2 ayudante HD 0.05 2.3 LEYES SOCIALES % 48.25 B SUB TOTAL C TOTAL

Nº partida 4.5 CAMA DE RIPIO COMPACTADA e = 8 cm. m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.2 Grava m³ 1.3 Bencina 93 oct lt A 2 MANO DE OBRA 2.1 jornal HD 2.2 ayudante HD 2.3 leyes sociales HD B 3 MAQUINARIA Y EQUIPO 3.1 placa compactada hr 3.1 Placa compactadora hr C D

CANTIDAD 0.11 0.05 SUB TOTAL 0.02 0.05 48.25 SUB TOTAL 0.042 0.01 SUB TOTAL TOTAL

Nº partida 4.6 ALFOMBRA CUBRE PISO ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 alfombra Shaggy mix Home collection m² 1.2 adhesivo de contacto lt A 2 MANO DE OBRA 2.1 MAESTRO 1ª HD 2.2 LEYES SOCIALES % B C

Nº partida 4.7 ITEM 1 1.1 1.2 1.3 1.4 1.5 1.6 A 2 2.1 2.2 2.3 B C

REVESTIMIENTO FIBROCEMENTO DESCRIPCION MATERIALES Siding fibrocemento madera perfil j pvc Perfil comienzo PVC Perfil Término PVC Silicona neutra Tornillo soberbio 3/16X2 MANO DE OBRA carpintero ayudante LEYES SOCIALES

FILTRO CUBIERTA DESCRIPCION

1.05 0.286 SUB TOTAL 0.025 48.25 SUB TOTAL TOTAL

m2 UNIDAD CANTIDAD UNIDAD ml ml ml UNIDAD UNIDAD

2.3 0.6 0.45 0.45 0.06 14 SUB TOTAL

HD HD %

0.05 0.05 48.25 SUB TOTAL TOTAL

Nº partida 4.8 PLANCHA OSB TE m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 OSB estructural de pino m² 1.2 Tornillo soberbio 3/16X 1 1/2" UNIDAD A 2 MANO DE OBRA 2.1 carpintero + 1/2 ayudante HD 2.2 LEYES SOCIALES % B C

Nº partida 4.9 ITEM

CANTIDAD

m² UNIDAD

CANTIDAD 0.34 8 SUB TOTAL 0.13 48.25 SUB TOTAL TOTAL

CANTIDAD

1 1.1 A 2 2.1 2.2 B C

MATERIALES fieltro 15lb



1.05 SUB TOTAL

MANO DE OBRA ayudante LEYES SOCIALES

HD %

0.025 48.25 SUB TOTAL TOTAL

Nº partida 4.10 CERAMICA PISO m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 porcelanato 30x30 m² 1.2 Adhesivo en polvo 25kg Topex saco 1.3 Frague impermeable 1 kilo Topex kg 1.4 set de espaciadores 3cm 200uni c/u A 2 MANO DE OBRA 2.1 Maestro ceramista UNIDAD 2.2 LEYES SOCIALES % B C

Nº partida 2.12.2 TABIQUERIA AISLAMGLASS m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 lana de vidrio 40mm Aislanglass m² A 2 MANO DE OBRA 2.1 jornal HD 2.2 LEYES SOCIALES % C

Nº partida 4.11 ITEM 1 1.1 A 2 2.1

EMPASTADO DE CIELO DESCRIPCION MATERIALES Pasta muro exterior 1kg

m² UNIDAD kg

CANTIDAD 1.05 0.18 0.4 0.01 SUB TOTAL 0.15 48.25 SUB TOTAL TOTAL

CANTIDAD 0.035 SUB TOTAL 0.03 48.25 SUB TOTAL TOTAL

CANTIDAD 1 SUB TOTAL

MANO DE OBRA pintor + 1/2 ayudante

HD

0.045

2.2

LEYES SOCIALES

%

B C Nº partida 4.12 AISLAMGLASS cielo ITEM DESCRIPCION 1 MATERIALES 1.1 lana de vidrio 40mm Aislanglass A 2 MANO DE OBRA 2.1 jornal 2.2 leyes sociales B C

m² UNIDAD

0.035 SUB TOTAL

HD %

0.03 48.25 SUB TOTAL TOTAL

Nº partida 4.16 CUBRE JUNTAS ML ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 cubrejunta plana 1mt Beige Generico c/u 1.2 tarugo fisher c/u 1.3 tornillo punta fina negro c/u A 2 MANO DE OBRA 2.1 carpintero HD 2.2 LEYES SOCIALES % B C

REVESTIMIENTO PIEDRA m²

CANTIDAD

rollo

Nº partida 4.13 REVESTIMIENTO EN CIELO m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 volcanita yeso carton 10mm m² 1.2 Tornillo soberbio 3/16X 1 1/2" UNIDAD A 2 MANO DE OBRA 2.1 carpintero + 1/2 ayudante HD 2.2 LEYES SOCIALES % B C

Nº partida 4.17

48.25 SUB TOTAL TOTAL

CANTIDAD 0.33 8 SUB TOTAL 0.13 48.25 SUB TOTAL TOTAL

CANTIDAD 1.1 3 3 SUB TOTAL 0.05 48.25 SUB TOTAL TOTAL

ITEM 1 1.1 1.2 1.3 A 2 2.1 2.2 B C

DESCRIPCION MATERIALES Piedra pizarra 20x10cm Holztek adhesivo beckron 25 kg separadores MANO DE OBRA maestro ceramista LEYES SOCIALES

UNIDAD m² kg c/u

1.1 0.25 0.01 SUB TOTAL

HD %

1 48.25 SUB TOTAL TOTAL

Nº partida 4.18 POLIETILEN m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 1 x 10 m Polietileno 0,1 mm m² A 2 MANO DE OBRA 2.1 ayudante HD 2.2 leyes sociales % C

Nº partida 4.19 ITEM 1 1.1 1.2 A 2 2.1 2.2 B C

PAPEL MURAL DESCRIPCION MATERIALES papel mural tocoao crudo Cola Fría Normal MANO DE OBRA instalador LEYES SOCIALES

Nº partida 4.20 L ITEM DESCRIPCION 1 MATERIALES 1.1 latex experto 1 galon blanco 1.2 Brocha 5 x 5/8" 1.3 lija A 2 MANO DE OBRA

CANTIDAD

m² UNIDAD

CANTIDAD 1.05 SUB TOTAL 0.025 48.25 SUB TOTAL TOTAL

CANTIDAD

m² gr

1.05 0.05 SUB TOTAL

m² %

1 48.25 SUB TOTAL TOTAL

m² UNIDAD galon c/u pliego

CANTIDAD 0.067 0.01 0.15 SUB TOTAL

2.1 2.2 B C

pintor LEYES SOCIALES

HD %

Nº partida 4.21 OLEO( 2 man m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 oleo profesional brillante 1 galon tricolor galon 1.2 Brocha 5 x 5/8" c/u 1.3 lija pliego 2 2.1 2.2 B C

MANO DE OBRA pintor LEYES SOCIALES

HD %

Nº partida 4.22 MOLDURAS VENTANAS ML ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 Moldura Exterior FC12R 1.22 mt ml 1.2 clavo corriente 2 1/2" kg A 2 MANO DE OBRA 2.1 carpintero HD 2.2 leyes sociales % B C

Nº partida 4.23 ITEM 1 1.1 1.2 A 2 2.1 2.2 B C

GUARDAP DESCRIPCION MATERIALES guarda polvos MDF cedro clavo tarugo MANO DE OBRA carpintero leyes sociales

ML UNIDAD

0.03 48.25 SUB TOTAL TOTAL

CANTIDAD 0.067 0.01 0.15 SUB TOTAL 0.03 48.25 SUB TOTAL TOTAL

CANTIDAD 0.82 0.1 SUB TOTAL 0.025 48.25 SUB TOTAL TOTAL

CANTIDAD

UNIDAD UNIDAD

0.33 2 SUB TOTAL

HD %

0.025 48.25 SUB TOTAL TOTAL

Nº partida 4.24 pintura muros exteri m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 pintura barnis marino nogal galon 1.2 Brocha 5 x 5/8" c/u lija pliego A 2 MANO DE OBRA 2.1 pintor HD 2.2 LEYES SOCIALES % B C Nº partida 4.25 pintura interiores m2 ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 pintura barnis marino nogal galon 1.2 Brocha 5 x 5/8" c/u lija pliego A 2 MANO DE OBRA 2.1 pintor HD 2.2 LEYES SOCIALES % B C

Nº partida 4.26 ITEM 1 1.1 1.2 A 2 2.1 2.2 2.3 B C

TAPACANES ML DESCRIPCION UNIDAD MATERIALES pino cepillado 1x4" unidad clavo corriente 2 1/2" kg

Nº partida 4.14 ITEM 1 1.1

ESTUCO MUROS INTERIORES 1:3m² DESCRIPCION UNIDAD MATERIALES cemento especial saco

MANO DE OBRA carpintero jornal leyes sociales

HD HD %

CANTIDAD 0.067 0.01 0.15 SUB TOTAL 0.03 48.25 SUB TOTAL TOTAL

CANTIDAD 0.067 0.01 0.15 SUB TOTAL 0.03 48.25 SUB TOTAL TOTAL

CANTIDAD 0.34 0.03 SUB TOTAL 0.03 0.03 48.25 SUB TOTAL TOTAL

CANTIDAD 0.125

1.2 A 2 2.1 2.2 2.3 B C

arena fina



0.028 SUB TOTAL

MANO DE OBRA maestro 1ª ayudante leyes sociales

HD HD %

0.12 0.12 48.25 SUB TOTAL TOTAL

Nº partida 4.27 pintura fibrocemento exterior m² ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 pintura barnis marino nogal galon 1.2 Brocha 5 x 5/8" c/u 1.3 lija pliego 2 2.1 2.2 B C

MANO DE OBRA pintor LEYES SOCIALES

HD %

Nº partida 4.15 ESTUCO EXTERIOR 1:3 e=3cm ITEM DESCRIPCION 1 MATERIALES 1.1 Cemento especial 1.2 Arena fina 1.3 Aditivo impermeabilizante A 2 MANO DE OBRA 2.1 Maestro 1ra 2.2 ayudante 2.3 LEYES SOCIALES B C

m² UNIDAD

Nº partida 4.28 ITEM 1 1.1 1.2 1.3 A

UNIDAD UNIDAD

PUERTA PINO OREGÓN DESCRIPCION MATERIALES puerta pino Oregon BISAGRA MANILLAS

CANTIDAD 0.067 0.01 0.15 SUB TOTAL 0.03 48.25 SUB TOTAL TOTAL

CANTIDAD

saco m³ lt

0.2 0.028 0.12 SUB TOTAL

HD HD %

0.12 0.12 48.25 SUB TOTAL TOTAL

UNIDAD UNIDAD UNIDAD

CANTIDAD 1 3 2 SUB TOTAL

2 2.1 2.2 2.3 B C

MANO DE OBRA carpintero ayudante LEYES SOCIALES

HD HD %

Nº partida 4.29 PUERTA Principal + quincallerUNIDAD ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 puerta pino Oregon UNIDAD 1.2 BISAGRA UNIDAD 1.3 cerradura antipalanca negra poli UNIDAD 1.4 tarugo clavo con tornillo UNIDAD A 2 MANO DE OBRA 2.1 carpintero HD 2.2 ayudante HD 2.3 LEYES SOCIALES % B C

Nº partida 4.30 VENTANAS ITEM DESCRIPCION 1 MATERIALES 1.1 VENTANA ALUMINIO 1,40x1,20 A 2 MANO DE OBRA 2.1 Carpintero 2.2 Ayudnate 2.3 LEYES SOCIALES B C

UNIDAD UNIDAD UNIDAD

0.1 0.1 48.25 SUB TOTAL TOTAL

CANTIDAD 1 3 1 12 SUB TOTAL 0.1 0.1 48.25 SUB TOTAL TOTAL

CANTIDAD 1 SUB TOTAL

HD HD %

Nº partida 4.31 caballete ML ITEM DESCRIPCION UNIDAD 1 MATERIALES 1.1 Caballete fibrocemento hembra teja ml 1.2 tornillo techo con golilla 2 1/2" x 12 UNIDAD

0.15 0.15 48.25 SUB TOTAL TOTAL

CANTIDAD 1.1 4 SUB TOTAL

2 2.1

MAO DE OBRA hojalatero

HD

0.05

2.2 2.3 B C Nº partida ITEM 1 1.1 A 2 2.1 2.2 B C

ayudande leyes sociales

HD %

VENTANAS 60x60 cm baños UNIDAD DESCRIPCION UNIDAD MATERIALES VENTANA ALUMINIO 60x60 cm UNIDAD

0.05 48.25 SUB TOTAL TOTAL

CANTIDAD 1 SUB TOTAL

MANO DE OBRA Carpintero Ayudnate LEYES SOCIALES

HD HD %

0.15 0.15 48.25 SUB TOTAL TOTAL

P.U

PT

$ 9,824 $ $ 2,253 $ $ 696 $ $ 1,622 $ SUB TOTAL $

10,315 406 278 16 11,015

$ 33,000 $ 2,000 SUB TOTAL TOTAL

2,000 965 2,965 13,980

$ $ $ $

P.U $ SUB TOTAL

PT 491 $ $

245 245

$ 14,500 $ 32,000 $ 1,090 SUB TOTAL

$ $ $ $

290 800 526 1,628

$ 5,202 $ 30,160 $ 6,714 SUB TOTAL TOTAL

$ $ $ $ $

218 1,206 101 1,526 3,399

P.U $ 2,807 $ $ 723 $ SUB TOTAL $

PT 2,807 14 2,821

$ 29,000 $ 19,000 $ 3,080 SUB TOTAL

$ $ $ $

2,320 760 1,486 4,566

$ 2,745 $ SUB TOTAL $ TOTAL $

469 469 7,857

P.U $ $ $ $ SUB TOTAL

PT 8,219 6,849 2,151 3,605

$ $ $ $ $

8,877 7,397 1,463 2,451 20,188

$ 29,000 $ 19,000 $ 2,400 SUB TOTAL TOTAL

$ $ $ $ $

1,450 950 1,158 3,558 23,746

P.U $ $ SUB TOTAL

PT 962 $ 491 $ $

$ 14,500 $ 19,000 $ 1,240 SUB TOTAL

106 25 130

$ $ $ $

290 950 598 1,319

$ 5,202 $ $ 5,882 $ SUB TOTAL $ TOTAL $

218 59 277 1,727

P.U

PT

$ 12,597 $ $ 5,854 $ SUB TOTAL $

13,226 1,674 14,901

$ 29,000 $ 725 SUB TOTAL TOTAL

725 725 1,033 15,934

P.U $ $ $ $ $ $ SUB TOTAL

$ $ $ $

PT 5,118 3,571 4,622 3,689 3,353 210

$ $ $ $ $ $ $

11,771 2,143 2,080 1,660 201 2,941 20,796

$ 29,000 $ 19,000 $ 2,400 SUB TOTAL TOTAL

$ $ $ $ $

1,450 950 2,400 4,800 25,596

P.U

PT

$ 7,471 $ $ 538 $ SUB TOTAL $ $ 38,500 $ 5,005 SUB TOTAL TOTAL

P.U

$ $ $ $

PT

2,540 4,303 6,843 5,005 2,415 7,420 14,262

$ 4,025 $ SUB TOTAL $

4,226 4,226

$ 19,000 $ 475 SUB TOTAL TOTAL

475 229 704 4,931

P.U

$ $ $ $

PT

$ 3,461 $ $ 2,253 $ $ 696 $ $ 1,622 $ SUB TOTAL $

3,634 406 278 16 4,334

$ 33,000 $ 2,000 SUB TOTAL TOTAL

2,000 965 2,965 7,299

P.U

$ $ $ $

PT

$ 49,319 $ SUB TOTAL $

1,726 1,726

$ 14,500 $ 435 SUB TOTAL TOTAL

435 215 650 2,376

P.U $ SUB TOTAL $

$ $ $ $

PT 849 $ $

849 849

39,500 $

1,778

$ 1,778 $ SUB TOTAL $ TOTAL $

P.U

858 2,635 3,484

PT

$ 49,319 $ SUB TOTAL $

1,726 1,726

$ 14,500 $ 435 SUB TOTAL TOTAL

435 210 645 2,371

P.U

$ $ $ $

PT

$ 3,773 $ $ 538 $ SUB TOTAL $ $ 38,500 $ 5,005 SUB TOTAL TOTAL

P.U

$ $ $ $

1,245 4,303 5,548 5,005 2,415 7,420 12,968

PT

$ 3,605 $ $ 496 $ $ 2,513 $ SUB TOTAL $

3,966 1,487 7,538 12,991

$ 29,000 $ 1,450 SUB TOTAL TOTAL

1,450 700 2,150 15,140

$ $ $ $

P.U

PT

$ 14,277 $ 2,941 $ 1,622 SUB TOTAL

$ $ $ $

15,705 735 16 16,457

$ 2,000 $ $ 2,000 $ SUB TOTAL $ TOTAL $

2,000 965 2,965 19,422

P.U

PT

$ 4,193 $ SUB TOTAL $

4,403 4,403

$ 19,000 $ 475 SUB TOTAL TOTAL

475 229 704 5,107

P.U

$ $ $ $

PT

$ 1,087 $ $ 3,250 $ SUB TOTAL $

1,141 163 1,303

$ $ SUB TOTAL TOTAL

600 290 890 2,193

P.U

600 $ 600 $ $ $

PT

$ 3,017 $ $ 3,353 $ $ 235 $ SUB TOTAL $

202 34 35 271

$ 30,000 $ 900 SUB TOTAL TOTAL

P.U

$ $ $ $

900 434 1,334 1,605

PT

$ 16,378 $ 3,353 $ 235 SUB TOTAL

$ $ $ $

1,097 34 35 1,166

TOTAL

30,000 $ 900 $ $ $

900 434 1,334 2,500

P.U

PT

$ $

$ 15,490 $ $ 890 $ SUB TOTAL $

12,702 89 12,791

$ 29,000 $ 725 SUB TOTAL TOTAL

725 350 1,075 13,866

P.U

$ $ $ $

PT

$ 2,151 $ $ 496 $ SUB TOTAL $

710 992 1,702

$ 29,000 $ 725 SUB TOTAL TOTAL

725 350 1,075 2,776

$ $ $ $

P.U

PT

$ 9,235 $ $ 3,353 $ $ 235 $ SUB TOTAL $ $ 30,000 $ 900 SUB TOTAL TOTAL

P.U

$ $ $ $

$ 30,000 $ 900 SUB TOTAL TOTAL

P.U

$ $ $ $

619 34 35 688 900 434 1,334 2,022

PT

$ 1,050 $ $ 748 $ SUB TOTAL $ $ 29,000 $ 14,500 $ 1,305 SUB TOTAL TOTAL

$

900 434 1,334 2,022

PT

$ 9,235 $ $ 3,353 $ $ 235 $ SUB TOTAL $

P.U

619 34 35 688

$ $ $ $ $

357 22 380 870 435 630 1,935 2,314

PT 2,807 $

351

$ SUB TOTAL

723 $ $

$ 29,000 $ 19,000 $ 5,760 SUB TOTAL TOTAL

P.U

$ $ $ $ $

P.U

$ $ $ $

P.U $ 52,933 $ 2,092 $ 11,756 SUB TOTAL

619 34 35 688 900 434 1,334 2,022

PT

$ 2,807 $ $ 723 $ $ 2,513 $ SUB TOTAL $ $ 29,000 $ 19,000 $ 5,760 SUB TOTAL TOTAL

3,480 2,280 2,779 8,539 8,910

PT

$ 9,235 $ $ 3,353 $ $ 235 $ SUB TOTAL $ $ 30,000 $ 900 SUB TOTAL TOTAL

20 371

$ $ $ $ $

561 20 302 883 3,480 2,280 2,779 8,539 9,422

PT $ $ $ $

52,933 6,277 23,513 82,723

$ 29,000 $ 19,000 $ 4,800 SUB TOTAL TOTAL

P.U

$ $ $ $ $

2,900 1,900 2,316 7,116 89,839

PT

$ 52,933 $ 2,092 $ 26,462 $ 496 SUB TOTAL

$ $ $ $ $

52,933 6,277 26,462 5,950 91,622

$ 29,000 $ 19,000 $ 4,800 SUB TOTAL TOTAL

$ $ $ $ $

2,900 1,900 2,316 6,626 98,248

P.U

PT

$ 124,613 $ SUB TOTAL $

124,613 124,613

$ 29,000 $ 19,000 $ 7,200 SUB TOTAL TOTAL

4,350 2,850 3,474 10,674 135,287

P.U

$ $ $ $ $

PT

$ 3,592 $ $ 6,378 $ SUB TOTAL $ $

31,000 $

3,951 25,513 29,463 1,550

$ 19,000 $ 2,500 SUB TOTAL TOTAL

P.U

$ $ $ $

950 1,206 3,706 33,170

PT

$ 19,235 $ SUB TOTAL $

19,235 19,235

$ 29,000 $ 19,000 $ 7,200 SUB TOTAL TOTAL

4,350 2,850 3,474 10,674 29,909

$ $ $ $ $

Nº partida 1.1 Instalacion de faenas ITEM DESCRIPCION 1 Consumo 1.1 container con baño A B

GL UNIDAD CANTIDAD mes

3

P.U

$ 67,465 SUB TOTAL TOTAL

Nº partida 3.1 instalacion agua potable ITEM DESCRIPCION UNIDAD CANTIDAD P.U 1 materiales 1.1 tuberia pvc 20 mm ml 1.03 $ 175 1.2 adhesivo pvc 187ml uni 0.03 $ 1,840 1.3 fittings % 0.6 $ 235 A SUB TOTAL 2 mano de obra 2.1 gasfiter HD 0.4 $ 32,000 2.2 ayudante HD 0.4 19000 2.3 leyes sociales % 48.25 20400 B SUB TOTAL C TOTAL

Nº partida ITEM 1 1.1 1.2 2 A 2.1 2.2

cañeria sanitaria 110 mm DESCRIPCION UNIDAD materiales tuberia pvc 110 mm 6m uni Lija al agua 9" x 11" nº 80 uni cemento pvc 250 cc vinilit uni mano de obra alcantarillero + ayudenate leyes sociales

HD %

B

C

Nº partida ITEM 1

cañeria sanitaria 75 mm DESCRIPCION UNIDAD materiales

CANTIDAD

P.U

0.175 $ 6,042 0.21 $ 294 0.025 $ 2,024 SUB TOTAL 0.02 $ 53,000 48.25 1060 SUB TOTAL TOTAL

CANTIDAD

P.U

1.1 1.2 1.3 A 2 2.1 2.2

tuberia pvc 75 mm 6m Lija al agua 9" x 11" nº 80 cemento pvc 250 cc vinilit

uni uni uni

0.175 $ 6,378 0.19 $ 294 0.0155 $ 2,024 SUB TOTAL

mano de obra alcantarillero + ayudenate leyes sociales

HD %

0.02 $ 53,000 48.25 $ 1,060 SUB TOTAL TOTAL

B

C

Nº partida ITEM 1 1.1 1.2 1.3 A 2 2.1 2.2

cañeria sanitaria 50 mm DESCRIPCION UNIDAD materiales tuberia pvc 50 mm 6m uni Lija al agua 9" x 11" nº 80 uni cemento pvc 250 cc vinilit uni mano de obra alcantarillero + ayudenate leyes sociales

HD %

B

C

Nº partida ITEM 1 1.1 1.2 1.3 A 2 2.1 2.2 B

C

instalaciones electricas DESCRIPCION UNIDAD materiales tuberia pvc 50 mm 6m uni Lija al agua 9" x 11" nº 80 uni cemento pvc 250 cc vinilit uni mano de obra alcantarillero + ayudenate leyes sociales

HD %

CANTIDAD

P.U

0.175 $ 5,067 0.17 $ 294 0.01 $ 2,024 SUB TOTAL 0.02 $ 53,000 48.25 $ 1,060 SUB TOTAL TOTAL

CANTIDAD

P.U

0.175 $ 5,067 0.17 $ 294 0.01 $ 2,024 SUB TOTAL 0.02 $ 53,000 48.25 $ 1,060 SUB TOTAL TOTAL

PT $ 202,395 $ 202,395 $ 202,395

PT $ 180 $ 55 $ 141 $ 376 $ 12,800 $ 7,600 9843 $ 30,243 $ 30,619

precio precio

1250 2190

precio precio precio

7190 350 2408.56

PT $ 1,057 $ 62 $ 51 $ 1,170 $ 1,060 $ 51,145 $ 52,205 $ 53,375

PT

$ 1,116 $ 56 $ 31 $ 1,203 $ 1,060 $ 511 $ 1,571 $ 2,775

precio precio precio

7590 350 2408.56

precio precio precio

6030 350 2408.56

PT $ 887 $ 49 $ 20 $ 956 $ 1,060 $ 511 $ 1,571 $ 2,527

PT $ 887 $ 49 $ 20 $ 956 $ 1,060 $ 511 $ 1,571 $ 2,527

Tabla de rendimiento de mano de obra N°Partida

Especificacion

unidad

cierre perimetral

ml

Escarpe con maquinaria Trazado y nivel Excavacion

m³ ml m³

Emplantillado



Moldaje Cimiento



Hormigon cimiento



Moldaje Sobrecimiento



Hormigon Sobrecimiento



Enfierradura diametro 12 Enfierradura diametro 8 Moldaje Pilares Hormigon Pilares Enfierradura diametro 12 Enfierradura diametro 8 moldaje vigas y cadenas Hormigon vigas y cadenas Albañileria moldaje escalera hormigon escalera moldaje losa Hormigon losa Enfierradura diametro 10 tabiqueria metalcom techumbre envigado de metalcom costanera metalcom CERAMICA MURO m²

kg kg m² kg kg kg m² m³ m² m² m³ m² m² kg m² m² m² m² m²

RELLENO COMPACTADO m3

m3

AFINADO DE PISO e = 2 cm. m²



PISO FLOTANTE m²



CAMA DE RIPIO COMPACTADA e = 8 cm



CAMA DE RIPIO COMPACTADA e = 8 cm



ALFOMBRA CUBRE PISO



REVESTIMIENTO FIBROCEMENTO



PLANCHA OSB TECHO FILTRO CUBIERTA CERAMICA PISO TABIQUERIA AISLAMGLASS EMPASTADO DE CIELO AISLAMGLASS cielo REVESTIMIENTO EN CIELO CUBRE JUNTAS PVC REVESTIMIENTO PIEDRA POLIETILENO PAPEL MURAL pintura LATEX 2 manos pintura OLEO( 2 manos) MOLDURAS VENTANAS GUARDAPOLVO pintura muros exterior pintura interiores

m² m² m² m² m² m² m² ml m² m² m² m² m² ml ml m² m²

TAPACANES

ml

ESTUCO MUROS INTERIORES 1:3 e= 2,5



pintura fibrocemento exterior



ESTUCO EXTERIOR 1:3 e=3cm



PUERTA PINO OREGÓN

unidad

PUERTA Principal + quincalleria

unidad

radier

m3

VENTANAS

unidad

caballete

ml

VENTANAS 60x60 cm baños

unidad

miento de mano de obra obreros Maestro carpintero y ayudante jornal excavador Operador maquina pesada Maestro y Jornal operador de maquina concretero confeccion hormigon concretero colocacion hormigon Carpintero + Ayudante concretero jormal Carpintero + Ayudante concretero jornal Enfierrador + Ayudante Enfierrador + Ayudante Carpintero + 1/2 Ayudante concretero + jornal Enfierrador + Ayudante Enfierrador + Ayudante Carpintero+ 1/2 ayudante concretero + jornal albañil + ayudante Carpintero + Ayudante concretero + jornal Carpintero + 1/2 Ayudante concretero + jornal Enfierrador + Ayudante Enfierrador + Ayudante Carpintero + Ayudante Carpintero + Ayudante Carpintero + Ayudante Maestro ceramista JORNAL 1 Cuadrilla maestro 1ª ayudante carpintero ayudante jornal

Rend.diario 25.00 20.00 166.60 33.33 33.33 1.11 2.38 20.00 1.00 1.00 20.00 1.00 1.00 100.00 100.00 9.00 16.66 100.00 100.00 8.33 16.66 7.69 20.00 16.66 5.00 16.66 100.00 20.00 20.00 20.00 20.00 1.00 50.00 40.00 12.50 25.00 20.00 20.00 50.00

ayudante MAESTRO 1ª carpintero ayudante carpintero + 1/2 ayudante ayudante Maestro ceramista jornal pintor + 1/2 ayudante jornal carpintero + 1/2 ayudante carpintero maestro ceramista ayudante instalador pintor pintor carpintero carpintero pintor pintor carpintero jornal maestro 1ª ayudante pintor Maestro 1ra ayudante carpintero ayudante carpintero ayudante maestro 1ª ayudande Carpintero Ayudnate hojalatero ayudande Carpintero Ayudnate

20.00 40.00 20.00 20.00 7.69 40.00 1.00 33.33 22.22 33.33 7.69 20.00 1.00 40.00 1.00 33.33 33.33 40.00 40.00 33.33 33.33 33.33 33.33 8.33 8.33 33.33 8.33 8.33 10.00 10.00 10.00 10.00 20.00 20.00 6.67 6.67 20.00 20.00 6.67 6.67

Related Documents

Thu 7(2811)
June 2020 1
2811 Jan 04qp
October 2019 9
2811 Jan 04ms
October 2019 8
2811 Jan 05ms
October 2019 5
2811 Jun 04ms
October 2019 3
Version
November 2019 36

More Documents from ""

Evaluacionh
October 2019 10
Mi Historia De Vida
May 2020 14
Automovilismo
May 2020 5