Week50 08 December 12 December

  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Week50 08 December 12 December as PDF for free.

More details

  • Words: 1,737
  • Pages: 8
Summary: High Lights

1. 2. 3.

4. 5.

Cisco Firewall resolver is tested and the discovery logic able to identify it as Cisco Firewall. Logical design of the current production DB is On-Going (Incident related tables are completed, change and problem work in progress). Requirement Phase is in Progress. i. ESB Framework requirements are started. ii. Configuration, Release, SLA requirements are started. iii. Oracle Top 15 Scenarios identification is in completed review in progress. Implementation of EMAIL Gateway is on-going. Host and Service Discovery using NMAP testing is in progress.

Low Lights

1. 2. 3.

Service Catalogues specific to 7STRATA services needs to be defined and agreed upon to progress further on the requirements. XML-RPC Latency implementation needs modification as GSMC team needs cyclic/re-arm of latency also to be considered while identifying the node breach for the given value. Top 10/5 Scenarios identification requirements for Network/Switch/OS is not yet started.

Action Items on Open Issues Action No 1

Description

Owner

Start Date

Citrix Session Handling

Shreyas/Bharat

22nd August 2008

2

Using generic HQ agent how to monitor the several instances of the same application/executable.

Shreyas/Bharat

3

SMS Queuing enabling in Kannel Configuration.

Preethi/Surenda r

28th November 2008

Karthi

06th November 2008 04th November 2008

4 5

6

7

Delivery report setup in Fedora core 8 is not working however the same works in Ubuntu. Need to investigate on this. Service Catalogues needs to be defined for 7STRATA services Check with OpenNMS support for adding the assets into OpenNMS using XML file. Need some JSP hands to support report formatting/prompting (not full time, may be 20%) Pentaho report formatting in Design Studio needs tomcat integration. Currently version of the Pentaho has issue; raised a ticket with Pentaho on this.

Weekly Status Report 1

Pramod

Sriram/Karthi

12th December 2008

Aashirwat / Sriram

12th December 2008

7STRATA

End Date

Status Open. [Not getting hold on accessing the Citrix session. Citrix is not providing that option this is concluded based on our initial analysis.] Open. Karthik will be trying to get some support from Hyperic in this perspective. Open.

Current week tasks: December 2008

Start Date: 8thDecember 2008

End Date: 12th

ESB Team Task Description

Resource

Requirement Collection on following items

Surendar

i) ESB Driven Rapid Business Flow Framework a) Business Flow Framework Logging Mechanism Message flow into ESB Response flow from ESB b) Business Flow Framework Audit Trial Message flow into ESB Response flow from ESB ii) Analyze of ODE in Service mix 4.0 iii) Migrating and Testing the Application from Service mix 3.0 to Service mix 4.0 1)Knowledge transfer on Camel (Message Endpoints Pattern) 2) Analyze and bundling the OSGI component in Service mix 4.0 3) Study on JAAS 1) Requirement Collection Activities. 2) CVs short listing for open Jobs. 3) Interviews.

Kiran Balaji

Dependenci es/Remarks Done.

Done. On-Going. On-Going On-Going. Done. Done.

ESB Remediation Team Task Description

Resource

1) Hyperic KT to Srinivas P and J P Datta 2) KT on Remediation Framework 3) OpenNMS Latency Violation Application Deployment 4) Production Issues Hyperic Event Missing issue (08/12/08) 5) Requirement Collection on Remediation Framework Component identification for Remote Access in Remediation Framework People Involved in following task (Bharath, Balakrishna, Kiran, Surendar) DB Schema Design For Knowledge Base. 6) DB Schema Design For Password Vault

Bharat

1) Got KT On Remediation Framework 2) Working on Telnet Component

Shreyas

1) Got KT On Remediation Framework. 2) Worked on RDP Component for Windows.

BalaKrish na

Weekly Status Report 2

7STRATA

Dependenci es/Remarks Done.

Done. On-Going. Leave For Three Days. Done. Identified RDP is not possible to fit

in Remediation Framework

NMS Team Task Description

Resource

1) Review E-Mail Gateway. 2) Review Junit correlation test scenarios. 3) CA-Unicenter DB analysis. 4) Update Rapid requirement doc. 5) Understanding Level platform & its DB schema. 6) Status update. 1) Setup done for correlating of OpenNMS events like Node UP/Down with Cold Start.2) Gone through some of the functionalities corresponding to mibble parser.3) Fixed code to handle Fluctuation Alarm generation.

Shrikant

1) 2) 3) 4)

Sathya Pratha

Deriving relationship from Mac forwarding info (In progress). NMAP Host Discovery Integration (In Progress). Firewall resolver tested. Interviews.

1) Prepared, executed and run Correlation test scenarios using JUnit. 2) Generated JUnit Test report and analyzed the report. 3) Studied and Understood how Host and Services Discovery Module works. 4) Installed Host and Services Discovery Module on my PC. 5) Prepared and Executed some test cases of HSDM.

Dependencies/Re marks

Rajesh

Mac FDB Table in progress. NMAP Host Discovery Integration in Progress.

Rishikeshwa r

Production Team Task Description

Resource

Correlation Support for OpenNMS Events (Code Changes) Enabled Log for Hyperic Events in Production Setup for Hyperic Performance Data on staging server (cron Enabled & Stress testing) Redeployment of Hyperic Events in production to fix the lag in event population in rapid Deployment of Application for fetching all interfaces for given node Studying How to do scheduling in spring (On-going) 1) Interviews.

Preethi

Weekly Status Report 3

7STRATA

Dependenci es/Remarks Done.

Pramod

On-Leave from 10th December till 17th December

2008 1) Implementation of RRD (Latency related report). 2) User Documentation of production applications. 1) Implement JMX Client to get the Data sources used by applications deployed in application server. 1) Implemented Message Actions over the Email Gateway. 2) Tested Message Actions. 3) Constructed and configured Incident Id Pattern matching logic. 4) Completed message fetching based on Message UIDs stored on the file. 5) Tested message fetching for the mail client.

Lakshmi Priya Jayapraka sh Srinivas

Done. Done. On-Going.

Data warehouse Team Task Description

Resource

OLTP Production Database Understanding Workshop o Fault - with Kondappa, Balaji o ITIL Incident – with Kondappa, Balaji o ITIL Problem – with Anish, Balaji o ITIL Change – with Alladeen, Balaji Data Modeling of Fault & Incident in OLTP Data Modeling of Problem - will be done EOD today Data Modeling of Change - will be done EOD today Induction to Aasheerwadh on Reporting Started POC to do sample reporting using Pentaho Report Designer

SriRam

Dependenci es/Remarks Done.

Induction on 7Strata environment and applications from SriRam. Implemented POC using Pentaho Reporting. Having issues in rendering it in JSP.

Aasheerwadh

Done. Raised a bug in Pentaho on formatting the report using report studio deployed in Tomcat.

Weekly Status Report 4

7STRATA

Next week Plan [Start Date: 15thDecember 2008 December 2008]

End Date: 20th

ESB Team Task Description

Resource

1) Requirement collection for ESB Framework Message/Event Tracking i. Analyze handling errors in message flow ii. Securing the ESB Environment [Authentication and Authorization] iii. Analyze whether transactional message flow is needed iv. Common Event Messaging Format v. Message/Event Correlation ID generation for Tracking

Surendar

Dependenci es/Remarks This task is also shared with Kiran.

2)

ODE  Process Definition Management understanding and sample implementation. i. List process definition search (name, namespace, status, deployed/or not) ii. List all active process instances. 1) Proof of Concept on OSGi(JAAS implementation)

1) Requirement Collection Activities. 2) CVs short listing for open Jobs. 3) Interviews.

Kiran

Will be Leave from 19/12/08 20/12/08 On-Going. Done. Done.

Balaji

ESB Remediation Team Task Description

Resource

1) Requirement Collection on Remediation Framework Freezing DB Schema Design For Knowledge Base Freezing DB Schema Design For Password Vault DB Scheme design for Workflow Persistence Discussion On Framework Management(Preformance,Scalability,Integrity,Reliability,Maintainence) 2) Hyperic HQ KT to JP Dutta, Srinivas Poldas

Bharat

1) Working on Telnet Component 2) Routing slip pattern implementation in ESB

Shreyas

1) Need to implement proof of concept on Axis (Complete web service stuff and Soap concept) and update ESB team and does knowledge share. 2) Camel Pattern implementation work to be done and update ESB team on this and do knowledge share.

BalaKrish na

Dependenci es/Remarks This task is also shared with Shreyas and Balakrishna.

NMS Team Task Description

Resource

1) Rapid server requirement gathering tasks. Discussion and update document. a) Generic RRD Interface b) Transition GUIs c) Manage/Unmanaged resources programmatically in Hyperic. d) Manage/Unmanaged resources in OpenNMS.

Shrikant

Weekly Status Report 5

7STRATA

Dependencies/Re marks

2) CA-Unicenter DB analysis. 3) Understanding Level platform & its DB schema. 4) Review e-mail gateway implementation. 5) Status report. 1) Setup correlation server to receive OpenNMS events and test correlation scenario for Node UP/Down with Cold Start and integration testing. 2) Understanding mibble for MIB parsing. 1) Discovery pending items. 2) Understanding Level Platform. 3) Host & service discovery integration testing. 4) Understanding Host & service discovery code. 1) Testing Host & service discovery. 2) Understanding Host & service discovery code for owning the code.

Rajesh

Sathya Pratha Rishikeshwa r

Production Team Task Description

Resource

1) CA Service Desk integration(Java related Implementation) 2) Production Issues if any Changes to Build : 3) JBoss-spring scheduler implementation. 4) Splitting of jboss-spring.xml into three files for Dao, factory etc. 5) Implement Hibernate Template to all other applications in production. 1) Understand the Module-Import.XML file and play with it in terms of populating the assets using it. [High Priority]. 2) Understanding Level Platform with respect to integration with Rapid. [High Priority] 3) Come up with the document which covers up what we want and what are the options we have from the architecture perspective etc based on the discussion held on 24th October meeting. 4) Interviews 5) JMeter Understanding and testing Hyperic performance web page using JMeter. 1) Implement new RRD logic (Cyclic /Re-arm Based breaching latency for the node) 1) Hyperic Custom Plug-in KT 2) Implement JMX Client to get the Data sources used by applications deployed in application server. 1) EMAIL Gateway integration testing: i) Build & start script. (1 day) ii) Prepare list of test scenarios in excel sheet and execute them. (1 days) iii) Testing. 2) Hyperic custom plug-in KT.

Preethi

Pramod

Dependenci es/Remarks

Will be on Leave till coming Wednesday.

Lakshmi Priya Jayapraka sh Srinivas

Data warehouse Team Task Description

Resource

1) RRD Understanding Workshop for collecting Performance & Availability Samples 2) Verification of OLTP Data models with Sravan 3) Complete Requirements Specification docs for current reports with required enhancements 4) DW Infrastructure requirements Specification(will span for two weeks) o Servers o Disk space o Assign DBA ownership 5) Start DW Design to accommodate current reporting requirements. 6) Explore Problem & Change for additional reporting requirements.

SriRam

Weekly Status Report

6

7STRATA

Dependenci es/Remarks Done.

1) Complete POC using Pentaho to publish the Sample reports in Pentaho Server (using OLTP data)

Aasheerwadh

Done. Raised a bug in Pentaho on formatting the report.

Weekly Status Report 7

7STRATA

Weekly Status Report 8

7STRATA

Related Documents

12 December
July 2020 5
12 December
July 2020 7
December'08
April 2020 17
December 08
December 2019 45
December 08
December 2019 23