ACCEPTANCE TEST PROCEDURE FOR FIRE DETECTION AND ALARM SYSTEM
Doc No. Rev. No. Date Page No.
WALK THROUGH TEST CHECKLIST PROJECT:
Upgrade of FDAS System at Petron Polypropylene Plant
LOCATION:
PNOC, Batangas II, Mariveles, Bataan
SN
DEVICE DETAILS
PANEL Result Pass
Fail
_______________ REMARKS
Witnessed and Accepted Chittick Fire and Security Corp Date:
Date : Print Name and Signature
Print Name and Signature
GCGI-TGPP Date :
Date : Print Name and Signature
Print Name and Signature
Protecting Life and Property Since 1948
ACCEPTANCE TEST PROCEDURE FOR FIRE DETECTION AND ALARM SYSTEM
Doc No. Rev. No. Date Page No.
INITIATING DEVICE ALARM TEST (FDAS) CHECKLIST PROJECT:
Upgrade of FDAS System at Petron Polypropylene Plant
LOCATION:
PNOC, Batangas II, Mariveles, Bataan
PANEL
_______________
INSTRUCTIONS: 1. Simulate an Alarm Condition by performing the following: A. Activate the smoke detector with the use of smoke aerosol. B. Activate the Manual Pull Station by pulling the lever and resetting with the key. C. Short the wires terminated to the Pressure Switch from the interface module. 2. Check if Alarm indicator comes out on the Fire Alarm Panel. 3. Read on the LCD Display if the correct device/module address was displayed. 4. Check if the correct custom message is displayed. SN
RESULT
DEVICE DETAILS
PASS
FAIL
REMARKS
Witnessed and Accepted Chittick Fire and Security Corp Date:
Date : Print Name and Signature
Print Name and Signature
TGPP-GCGI Date :
Date : Print Name and Signature
Print Name and Signature
Protecting Life and Property Since 1948