IJM Corporation Bhd Four Laning of Jhansi-Lakhnadon Section Km 132-187.8 (upto start of Sagar Bypass) of NH-26 in the State of Madhya Pradesh: Civil work Contract Package Project: No. ADB-II/C-4 Rate Sno

Description

Unit

BoQ

Adnl. Qty

VO Qty

BoQ

VO

Amnt

Diff

Remarks

1 6.05 a)

Providing and laying in position Reinforced Cement Concrete in open foundations complete as per drawings and Technical Specifications Section 1500, 1700 and 2100. a) Grade M 30 Cum

3611

8566

7663.25

2080.13

4698

2617.87

20,061,377

2 6.06 i)

Providing and laying in position Reinforced Cement Concrete in pier, pier cap, pedestals, cantilever/ counterfort abutment, abutment cap, dirt wall, wing wall, retaining wall, buffer wall etc., complete as per drawings and Technical Specifications Sections 1500, 1700 and 2200 i) Grade M 30 Cum

3104

7762

6986

2594.54

5064

2469.46

17,251,676

670 599

698.33 736.36

530.83 586.61

32578.92 32578.92

61354 61423

28775.08 28844.08

15,274,676 16,920,341

439550.25

96.99

140

43.01

18,904,177

3 6.08 i)

Providing & fixing in position HYSD (TMT) Fe 415 grade reinforcement bars in foundations, substructures, superstructures etc., complete as per drawings and Technical Specifications Section 1600 i) For Foundations MT ii) For Sub Structures MT

4

Construction of embankment with approved materials from borrow areas complete as per Technical 2.02 Specification Clause 305 with all leads and lifts.

Cum

2,241,799

5

As per JMF for DBM %age of Bitumen is 4.68% as against the 4.25% considered in Contract, hence the 4.03 difference in %age of bitumen shall be paid by NHAI

Cum

65,888

1,000,000

21,882,827

110,295,073

IJM Corporation Bhd Project:

Four Laning of Jhansi-Lakhnadon Section Km 132-187.8 (upto start of Sagar Bypass) of NH-26 in the State of Madhya Pradesh: Civil work Contract Package No. ADB-II/C-4 Rate

Sno

Description 1

2

Unit 3

BoQ 4

VO Rate approved by Price Adjust IC/NHAI Ment 9 10

Estimated Adnl. VO Qty applicable Qty to New rate BoQ 6 7=(6-5x 25%) 8

5

Diff 11=(9+10-8)

Amnt 12=11 x 7

Remarks 13

1 6.05 a)

Providing and laying in position Reinforced Cement Concrete in open foundations complete as per drawings and Technical Specifications Section 1500, 1700 and 2100. a) Grade M 30 Cum

3611

8566.92

7664.17

2080.13

3,665.00

614.94

2,199.81

As per clause 52.2 new rate applicable for the qty beyond 16,859,702 25% of BoQ Qty.

2 6.06 i)

Providing and laying in position Reinforced Cement Concrete in pier, pier cap, pedestals, cantilever/ counterfort abutment, abutment cap, dirt wall, wing wall, retaining wall, buffer wall etc., complete as per drawings and Technical Specifications Sections 1500, 1700 and 2200 i) Grade M 30 Cum

3104

7762

6986

2594.54

3943

648.11

1,996.57

13,948,066 25% of BoQ Qty.

670 599

698.33 736.36

530.83 586.61

32578.92 32578.92

48222 48277

3,777.20 3,783.54

19,420.28 19,481.62

589349.25

96.99

168

3 6.08 i) 4 6.08 ii)

Providing & fixing in position HYSD (TMT) Fe 415 grade reinforcement bars in foundations, substructures, superstructures etc., complete as per drawings and Technical Specifications Section 1600 i) For Foundations MT ii) For Sub Structures MT

5

Construction of embankment with approved materials from borrow areas complete as per Technical 2.02 Specification Clause 305 with all leads and lifts.

Cum

2,241,799

6

As per JMF for DBM %age of Bitumen is 4.68% as against the 4.25% considered in Contract, hence the 4.03 difference in %age of bitumen shall be paid by NHAI

Cum

65,888

1,149,799

71.01

332.12

As per clause 52.2 new rate applicable for the qty beyond

As per clause 52.2 new rate

10,308,867 applicable for the qty beyond 11,428,191 25% of BoQ Qty. As per clause 52.2 new rate applicable for the qty beyond

41,848,512 25% of BoQ Qty.

21,882,827 diffrence of Bitumen in JMF

116,276,165

National Highways Authority of India ADBII/ C4 MP Amount of Price Adjustment pursuant to Clause 70 Contract Package: ADB II - C4 Project Commencement Date: 24.10.2005 Base date for initial price indices : Sep' 2005 Consultant : M/s ROUGHTON INTERNATIONAL- CEG JV

Interim Payment Certificate No Month/Year Schedule Period of Completion Scheduled Completion Date Contractor

: 30months :M/s IJM CORPORATION BERHAD

M30 Foundation

Item no

(1) VL Vb Vf Vc Vs Vp Vm

Component

(2)

Value of work done (Rs)

Value of secured advance (Rs)

Value of material incorpotd. in the works (Rs)

Value of 'R' (4+5-6)

(3)

(4)

(5)

(6)

(7)

(8) 10% 0.00% 10%

Feb-09

3,655.00

0.00

3,655.00

32.93% 0.00% 20% 27.07%

Month

Labour - Pl Bitumen - Pb POL - Pf Cement - Pc Steel - Ps Plant and Machinery and Spares - Pp Other materials - Pm

% of component 'P'

Initial indices value as on September, 05

Change in Indicies value index for this month (10-9)/9

(9) 572.00 12944.09 35.45 164.20

(10) 719.67 25924.00 33.94 221.30

264.90 202.80 197.20

284.20 222.10 228.40

3,655.00

-

-

Remarks

(12) 80.21 (13.23)

0.3477 0.0729 0.0952 0.1582

355.77 59.13 133.06

3,655.00

Reference

( 0.85x7x8x11)

(11) 0.2582 1.0028 -0.0426

Escalation for the Month of Feb/09 TOTAL AMOUNT ( Rs )

Price Adjustment

(13)

614.94 614.94

Qty

7,664.17

4,713,004.70

M30 Substructure

Item no

Component

Month

Value of work done (Rs)

Value of secured advance (Rs)

Value of material incorpotd. in the works (Rs)

Value of 'R' (4+5-6)

% of component 'P'

(1) VL

(2)

(3)

(4)

(5)

(6)

(7)

(8)

Labour - Pl

Vb

Bitumen - Pb

Vf

POL - Pf

Vc

Cement - Pc

Vs Vp Vm

Other materials - Pm

Initial indices value as on September, 05

Change in Indicies value index for this month (10-9)/9

Remarks

10%

(10) 719.67

0%

12944.09

25924.00

1.0028

10%

35.45

33.94

-0.0426

(14.28)

31%

164.20

221.30

0.3477

355.77

Steel - Ps

0%

264.90

284.20

0.0729

-

Plant and Machinery and Spares - Pp

20%

202.80

222.10

0.0952

63.79

29.48%

197.20

TOTAL AMOUNT ( Rs )

3,943.00

3,943.00

0.00

-

3,943.00

-

0.2582

228.40 0.1582 Escalation for the Month of Feb/09

3,943.00 Qty

Reference

( 0.85x7x8x11)

(9) 572.00

Feb-09

(11)

Price Adjustment

(12)

(13)

86.53 -

156.30 648.11 648.11 6,986.00

4,527,696.46

TMT Reinforcement - Fdn

Item no

Component

(2)

Month

Value of secured advance (Rs)

Value of material incorpotd. in the works (Rs)

Value of 'R' (4+5-6)

(4)

(5)

(6)

(7)

% of component 'P'

Change in Indicies value index for this month (10-9)/9

Price Adjustment Remarks

(10) 719.67

(12)

10%

(9) 572.00

(11)

Labour - Pl

0.2582

1,058.18

Bitumen - Pb

0%

12944.09

25924.00

1.0028

-

Vf

POL - Pf Cement - Pc

Vp Vm

Other materials - Pm

10%

35.45

33.94

-0.0426

0%

164.20

221.30

0.3477

-

Steel - Ps

51%

264.90

284.20

0.0729

1,517.26

Plant and Machinery and Spares - Pp

20%

202.80

222.10

0.0952

780.16

9.19%

197.20

Feb-09

TOTAL AMOUNT ( Rs )

48,222.00

48,222.00

0.00

-

48,222.00

-

228.40 0.1582 Escalation for the Month of Feb/09

48,222.00 Qty

Reference

( 0.85x7x8x11)

Vb

Vs

(8)

Initial indices value as on September, 05

(1) VL

Vc

(3)

Value of work done (Rs)

(13)

(174.59)

596.19 3,777.20 3,777.20 530.83

2,005,051.08

TMT Reinforcement - Substructure

Item no

Component

Month

Value of work done (Rs)

Value of secured advance (Rs)

Value of material incorpotd. in the works (Rs)

Value of 'R' (4+5-6)

% of component 'P'

(1) VL

(2)

(3)

(4)

(5)

(6)

(7)

(8)

Labour - Pl

Vb

Bitumen - Pb

Vf

POL - Pf

Vc

Cement - Pc

Vs Vp Vm

Other materials - Pm

Initial indices value as on September, 05

Change in Indicies value index for this month (10-9)/9

Price Adjustment

10%

(10) 719.67

0%

12944.09

25924.00

1.0028

10%

35.45

33.94

-0.0426

0%

164.20

221.30

0.3477

-

Steel - Ps

51%

264.90

284.20

0.0729

1,517.26

Plant and Machinery and Spares - Pp

20%

202.80

222.10

0.0952

781.05

9.25%

197.20

Feb-09

TOTAL AMOUNT ( Rs )

48,277.00

48,277.00

0.00

-

48,277.00

-

(11)

(12)

0.2582

1,059.39

228.40 0.1582 Escalation for the Month of Feb/09

48,277.00 Qty

Remarks

( 0.85x7x8x11)

(9) 572.00

(13)

(174.79)

600.63 3,783.54 3,783.54 736.36

2,786,062.65

Reference

IJM Corporation Bhd Four Laning of Jhansi-Lakhnadon Section Km 132-187.8 (upto start of Sagar Bypass) of NH-26 in the State of Madhya Pradesh: Civil work Contract Package Project: No. ADB-II/C-4 Rate Sno

Description

Unit

BoQ

Adnl. Qty

VO Qty

BoQ

VO

Amnt

Diff

Remarks

1 6.05 a)

Providing and laying in position Reinforced Cement Concrete in open foundations complete as per drawings and Technical Specifications Section 1500, 1700 and 2100. a) Grade M 30 Cum

3611

8566

7663.25

2080.13

4698

2617.87

20,061,377 forwarded to NHAI

2 6.06 i)

Providing and laying in position Reinforced Cement Concrete in pier, pier cap, pedestals, cantilever/ counterfort abutment, abutment cap, dirt wall, wing wall, retaining wall, buffer wall etc., complete as per drawings and Technical Specifications Sections 1500, 1700 and 2200 i) Grade M 30 Cum

3104

7762

6986

2594.54

5064

2469.46

17,251,676 forwarded to NHAI

3 6.08 i)

Providing & fixing in position HYSD (TMT) Fe 415 grade reinforcement bars in foundations, substructures, superstructures etc., complete as per drawings and Technical Specifications Section 1600

IC recommended and

IC recommended and

IC recommended and

i) For Foundations

MT

670

698.33

530.83

32578.92

61354

28775.08

15,274,676 forwarded to NHAI

ii) For Sub Structures

MT

599

736.36

586.61

32578.92

61423

28844.08

16,920,341 forwarded to NHAI

640773.25

96.99

156

59.01

IC recommended and

4

Construction of embankment with approved materials from borrow areas complete as per Technical 2.02 Specification Clause 305 with all leads and lifts.

Cum

2,241,799

5

As per JMF Bitumen diffrence as considered in 4.03 Contract, paynebt by NHAI

Cum

65,888

1,201,223

37,810,748 In process

8,016,043 As per contract payable

115,334,860