Volumen del concreto PLANTILLA DE CIMENTACION
longitud total de la plantilla V=0.80*0.05*52.87=2.1148 M3
CIMENTACIรN (zapata corrida)
V=O.80*0.15*52.87=6.344 m3
CADENA DE CIMENTACION
V=0.25*0.20*52.87=2.64 m3
CADENA DE DESPLANTE (que va al nivel del piso terminado)
V=0.15*0.10*52.87=0.7930 m3
Volumen total de concreto =11.99 m3
CANTIDAD DE DE TABIQUE QUE SE UTILIZA EN EL MURETE DE ENRACE
รrea del tabique A=0.20*0.40=0.08 M2
รrea del murete A=0.35*52.87=18.5045 M2 Cantidad de tabique:
๐๐.๐๐๐๐ ๐ถ.๐๐
= ๐๐๐. ๐๐ ๐ป๐จ๐ฉ๐ฐ๐ธ๐ผ๐ฌ๐บ
Excavaciรณn EJE Y EJE A B B' B' C D
EJE 1 1' 2 3 3' 4 4' 5
TRAMO 1-4' 2-3' 1'-2 3'-4 1-1 1-5
ANCHO 0.9 0.9 0.9 0.9 0.9 0.9
ALTURA 0.8 0.8 0.8 0.8 0.8 0.8
LARGO 9.47 2.25 1.64 3.11 2.4 9.14 28.01
VOLUMEN(M3) 6.8114 1.62 1.1808 2.2592 1.728 6.5808 20.1802
TRAMO A-C C-D A-D A-B A-B' A'-B' A'-A' B-D
EJE X ANCHO 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
ALTURA 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
LARGO 4.18 2.68 7 2.4 1 2.15 1.19 3.46 24.06
VOLUMEN(M3) 3 1.996 5.04 1.728 0.72 1.548 0.846 2.4913 17.3693
Volumen total de la excavaciรณn = 33.473 m3 volteos =
37.473 7
= 6 vlt
Longitud total: 28.01+ 24.06= 52.87 mts